Top results
project #: 306520.1 rev1 model: hsc-6x5x12mf-115 hp series: hsc, diesel engine project number: name: reference: location: engineer: contractor: 306520.1.1 fire pump hotel…
submittal number: 221116-01.00 ocps clay springs es submittal transmittal submittal details: reviewers: subject: domestic water piping date recieved: oct 21, 2014 discipline:…
submittal process submittals submittals are required by the contract in order to regulate the timely flow of materials to be incorporated in the work. submittals submittals…
samcrete co. torma silo engineering ministry of trade and industry egyptian holding company for silos and storage grain silo complexes tender no. 6/2013 technical documentation…
building management system ts no: iitc/e/glf/15/4985 dated: 03rd jan, 2016 t e c h n ic a l s u b m it t a l supplier integra international trading & contracting w.l.l…
a. masonry guide fixing a b b. steelwork guide fixing 157 95 3030 vertical slot plan clear opening width of shutter soffit angle direct drive motor clearance galvanised steel…
7/30/2019 submittal review 1/22revision date: 07-01-20121electrical plan reviewsubmittal guide7/30/2019 submittal review 2/22revision date: 07-01-20122table of contentspage…
7/27/2019 submittal log 1/22status as of: 17-apr-11sl. no.datesubmittedtransmittal/letter no. amem doc no. rev.descriptionstatus approval date ref. doc#1 12-jul-10 amem-dc-001…
7/30/2019 submittal 6 1/28apple campus 2project descriptionapril 20137/30/2019 submittal 6 2/28apple campus 2 | project description | april 2013page02030609111213141517192324252627table…
8202019 submittal chillers 116 detailed performance summary for efr-1 project: hotel dann bucaramanga 01072016 prepared by: 04:21pm packagedchillerreport:donotedit unit information…
untitledcustomer: nardone electric 160 olympia ave woburn, ma 01801 usa phone: 781-935-2727 fax: 781-391-3100 _____________________________________ nardone electric fmc fac.
to: project: date: customer: from: location: contact: engineer: unit tag# indoor air handler model: c a w c 1 8 * * type: [ca=cassette air handler] control revison: [c=wall
1. parker hannifin corporation new sampling/sensor system initiative request for proposal submittal© submitted by parker hannifin corporation prepared by steve doe, analytical…
henry® cm100 cold fluid applied high building roofing and waterproofing building confidence™ ™ submittal packet sealant options heath and product declaration
submittal transmittal john moriarty and associates, inc. | 3 church street winchester, ma 01890 page 1 of 2 return by: 10/14/2021 submittal id: 084400-086 r2 purpose: for
lsu120hsv5 submittalmultisite™ crc1 - premtbvc0 multisite crc1+ - premtbvc1 multisite comm. mgr. - pbacnbtr0a pi-485 - pmnfp14a1 dry contact - pdrycb300 lonworks®
caps submittal: design conditions elevation (ft) summer winter (°f) supply (cfm) outdoor air (cfm)db (°f) wb (°f) 965 93.4 78.4 -6.9 9,376 9,376 unit specifications
asug15lzassubmitted to construction submitted by unit no reference drawing no cooling heating rated 14,500 min.—max. 3,100-18,400 rated 18,000 min.—max. 3,100-23,900
contractor’s review stamp a/e review stamp submittal data project dallas park & rec dept admin offices location 10031 e. northwest highway dallas, tx 75238 general
gpi documentrepresentative: engineer: contractor: unit tag: type of service: submitted by: approved by: order no.: quantity: magna1 65-150 f conditions of service flow: head: