Top results
parkes atuc report nov 2007 stats scheduled observing time (2007) 85% downtime (last 12 months): 1% system faults 3.1% high wind observer feedback 25 reports last 12 months…
parkes atuc report may 2008 stats scheduled observing time , oct07-sep08 83% downtime (last 12 months): 1.1% system faults 2.8% high wind observer feedback 25 reports last…
slide 1 status of parkes infrastructure atuc extraordinary meeting 13 february 2012 erik lensson, head, atnf engineering operations contact: erik lensson phone: (02) 6861…
parkes atuc report nov 2007 stats scheduled observing time (2007) –85% downtime (last 12 months): –1% system faults –3.1% high wind observer feedback 25 reports last…
atuc-ir/atuc-50 user manualatuc-m43h/58h/m32l atuc-m43h/58h/m32l about the information in this manual ..................................... 4 about the configuration of this
slide 1 spectrum management: parkes & atca briefing for atuc members csiro astronomy and space science erik lensson | head, atnf engineering operations 30 october 2012…
atuc-50 Цифровая проводная конференц-система atuc-ir Гибридная инфракрасная конференц-система Руководство…
atuc-50 Цифровая проводная конференц-система atuc-ir Гибридная инфракрасная конференц-система Руководство…
atuc-50/atuc-ir user manual50 atuc-ir atuc-ir“atuc-ir ” atuc-m32l • irdu “ir ”atuc-irdu • ira “ir ”atuc-ira • ird “ir
global ccs institute jack parkes – global ccs institute meeting overview regional meeting – austin, texas november 8, 2011 www.globalccsinstitute.com 0 global ccs institute…
atuc atnf opera-ons csiro astronomy and space science douglas bock, assistant director -‐ opera-ons 5 december 2013 current issues…
slide 1astronomy & space science lewis ball cass director director’s report atuc nov 2014 csiro astronomy and space science slide 2 atuc members virginia kilborn, swinburne…
atuc meeting director’s report lewis ball may 2009 gass image mcclure-griffiths & the gass team welcome sarah maddison (chair) andrew walsh george hobbs stuart ryder…
atuc meeting directorâs report brian boyle november 2007 insert presentation title, do not remove csiro from start of footer csiro strategic plan 07-11 the strategic elements…
atuc meeting director’s report lewis ball october 2008 gomez et al p616 h2o maser agb star welcome elaine sadler (chair) sarah maddison (chair elect) andrew walsh george…
astro report to atuc â october 2011 simon johnston head astrophysics, cass atuc, october 2011 csiro. simon johnston - science leaders 2010 astrophysics team (30 ftes) head…
1 © man diesel a/s 32006.02.01 (4140 / pwn) © man diesel a/s 42006.02.01 (4140 / pwn) © man diesel a/s 222006.02.01 (4140 / pwn) 2 © man diesel a/s 23 actuator…
51 octubre 2009 asociaciÓn de empresas gestoras del transporte urbano colectivo cita en tarragona la voz de josep félix ballesteros, alcalde de tarragona entrevista la…
74 eentrevista ignacio gonzález consejero delegado metro de madrid entrevista gerardo lertxundi una nueva etapa profesional entrevista angel f aghili presidente de avele…
atuc-50 full-featured digital conference system max system size 300 users atuc-50 key benefits • feedback suppression and individual dsp for enhanced audio quality •…