World Bank Group ICT-enabled Investment Climate Reform: Leveraging Technology to Improve Regulatory Governance in the ECA region A Peer-to-Peer Workshop for Reform Practitioners Tbilisi Tbilisi , , Georgia Georgia – June 4, 20 – June 4, 2013 Sustainable development of the registration system - important factor for improving the investment climate Case study from Serbia Branislav Dobrosavljevic, Data Services Manager, Serbian Business Registers Agency (SBRA)

Upload: branislav-dobrosavljevic

Post on 14-Jun-2015

112 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SBRA for IFC Georgia 04june2013

World Bank Group

ICT-enabled Investment Climate Reform:Leveraging Technology to Improve Regulatory Governance in the ECA region

A Peer-to-Peer Workshop for Reform Practitioners

TbilisiTbilisi, , GeorgiaGeorgia – June 4, 20– June 4, 201133

Sustainable development of the registration system - important factor for improving the investment climate

Case study from Serbia

Branislav Dobrosavljevic, Data Services Manager,

Serbian Business Registers Agency (SBRA)

Page 2: SBRA for IFC Georgia 04june2013

CONTENT:CONTENT:

1. About SBRARegistration reform in Serbia, SBRA Registers, SBRA services

2. „Business of registration“ and SBRA information system - Initial design, implementation, stabilization

3. Enhancing institutional capacity of SBRA - Continual, sequential, sustainable development of the system

4. Challenges and solutions- Lessons learned and advices

Page 3: SBRA for IFC Georgia 04june2013

3

1. About SBRA

www.investmentclimate.org 3

• Ininitial goals of the registration system reform in Serbia: To simplify and accelerate the business registration procedure in Serbia To create a more favorable business environment for foreign investments To create conditions for easier business start ups in Serbia To upgrade state administration through a greater reliance on IT To establish the conditions for creating new jobs and reducing the informal economy

and corruption.

• SBRA (Serbian Business Registers Agency) or Agencija za privredne registre – APR (Serbian) , established mid-2004,

as a crucial part of the registration reform in Serbia, started its operation 3.1.2005.

• - SBRA Information system was completed until 31.3.2006. as a result of the project funded by Swedish government and administered by the World Bank (ICB procurement method);

• - Next crucial step was KOICA project (2008-2010), from the donation of R.Korea;

• - Sequential development of the system is assured by our own ICT development budgets, with strong legal background for any step.

Detailed information about SBRA you may find on our web site: http://www.apr.gov.rs/eng/Home.aspx

Page 4: SBRA for IFC Georgia 04june2013

SBRA – present and future

APR manages many national registers, including registers of companies, entrepreneurs, associations (NGOs), financial statemets and solvency, financial leasing, pledges, bankruptcy estates, etc. as a single, centralized, highly available electronic databases;

Priorities of the SBRA in the early years were:• Simplifying and speeding up the registration process;• Full availability of the data from registries on the Internet, and so on.

• At the present stage, development priorities of the SBRA are:• Interoperability - improving the "one stop shop for registration“, established 2009;• Efficient implementation of widely-used electronic services;• Better data quality and security; • Wider choice and higher quality of data processing and data delivery services, etc.

Page 5: SBRA for IFC Georgia 04june2013

SBRA achievements and recognitions

Creative use of international experience in business registration reform• Collection of information - study tours (Ireland, Sweden, Norway);• Effective use of ICT as a basis for high productivity from the start;• Knowledge transfer to others (Bulgaria, Uganda, Republic of Srpska, ..);

SBRA results • Dynamic development, with rapidly increasing number of registers, development of

eServices G2G/G2B/G2C;• Positive impact on the use of the Internet in Serbia (www.apr.gov.rs),

on other institutions ("one-window system of registration“, from 2009), and on the development of e-Government (directly and via national eGovernment portal);

• Presentations by invitation, regional and international (ECRF, World Bank/IFC, ...);• Acknowledged results in the reports of the World Bank ("Doing Business"),

EU / OECD, NALED / FIC (“Grey Book", “White Book”, “Reformer of the Year"), etc;• Proven very high “user satisfaction”:

Latest quarterly survey by NALED /IPSOS (69%+, 8%-), average rating about 4 of 5.

Page 6: SBRA for IFC Georgia 04june2013

POSITIVE NEGATIVE

CUSTOMERS’ (251 companies) RATINGS OF STATE INSTITUTIONS RELEVANT FOR THE BUSINESS ENTERPRISES SECTOR

Source: NATIONAL ALLIANCE FOR LOCAL ECONOMIC DEVELOPMENT - NALEDPrepared by: IPSOS STRATEGIC MARKETING

Page 7: SBRA for IFC Georgia 04june2013

SBRA RegistersSBRA Registers

www.apr.gov.rs

Page 8: SBRA for IFC Georgia 04june2013
Page 9: SBRA for IFC Georgia 04june2013

NEW SBRA REGISTERS,EXPECTED TO COMMENCE OPERATIONS IN 2013/2014

• REGISTER OF BIDDERS (from September, 2013)

• REGISTER OF FACTORING

• PRE-HARVESTING REGISTER (AGREEMENTS ON AGRICULTURAL FINANCING)

• REGISTER OF DISQUALIFIED ENTITIES (BANNING THE RIGHT TO RUN A BUSINESS)

• REGISTER OF PUBLIC INSTITUTIONS

• REGISTER OF STATE AUTHORITIES

• REGISTER OF DEBENTURES

•REGISTER OF OLD CRAFTS, ...

Page 10: SBRA for IFC Georgia 04june2013

Before and after the Establishment of the SBRA

BEFORE

DIVIDED RESPONSIBILITIES FOR REGISTRATION OF BUSINESS ENTITIES

Lack of the unique and updated records.

Non-transparent registration procedureCorrupted Commercial Courts in Serbia(Source: Feasibility Study for EU accession)

On the business management of various records that are currently within the SBRA’s competence, more than 1,500 employees were engaged (17 commercial courts, 165 municipal offices, Billing and Payment Office Statistical Office of Serbia, Ministry of Internal Affairs, Ministry of Public Administration and Local Government, Ministry of Foreign Affairs, ministries and / or sectors in charge of tourism, National Bank of Serbia ...)

Average registration time: • 71 days (2002)• 54 days (2003)

SBRA TODAY

JURISDICTION FOR THE CONDUCT OF THE PUBLIC ELECTRONIC REGISTERS

Irmplementation of registration procedures is in accordance with the principles of efficiency and transparency .The five-day “silence is consent” principle is applied.

SBRA is from the day one fully self-financed institution (sustainable development) based on the registration fees and fees for other services that SBRA provides (since its establishment in 2005, SBRA has slightly changed its fees only in early April 2010)

350 persons employed or engaged in the Belgrade office and its 13 remote offices throughout Serbia - activities on integrated reception of applications, mail expedition, scanning, archiving, administration

Over EUR 2 Million- Value of existing software , hardware and equipment

Average registration time: 3 days, max 5 days Note: As of May 6, 2009 - One-stop shop system for business registration was introduced: Along with SBRA’s registration decree, an applicant gets a tax ID number, Health and Pension Funds and Employment Organization records.

Page 11: SBRA for IFC Georgia 04june2013

SBRA IN FIGURES (May 23, 2013)

• 107,834 COMPANIES • 218,285 ENTREPRENEURS

• 20,352 ASSOCIATIONS • 47 FOREIGN ASSOCIATIONS

• 822 TOURISM AGENCIES

• 151,205 FINANCIAL STATEMENTS for 2011 (87% submitted in electronic form)

• 1,253 PUBLIC MEDIA

• 41,123 FINANCIAL LEASING CONTRACTS

• 113,453 PLEDGE CONTRACTS(securing claims that worth more than EUR 30 Billion)

...

• OVER 50,000 DAYLY HITS AT THE SBRA WEB PAGE, WHICH MAKES IT ONE OF THE MOST VIDITED/SEARCHED WEB PAGES IN SERBIA

• OVER 400,000 USERS OF SBRA INFO CENTER

• OVER 11,000,000 SCANNED AND ARCHIVED PAGES

• OVER 8 MILLION ARCHIVED FILES

• OVER 3,000,000 RECORDS TAKEN OVER FROM THE COMMERCIAL COURTS AND LOCAL AUTHORITIES ARE FILED IN THE SBRA ARCHIVES

• OVER 14,000 METERS OF PAPER DOCUMENTS ARCHIVED ON SEVERAL LOCATIONS IN BELGRADE AND NOVI SAD

Page 12: SBRA for IFC Georgia 04june2013

Status of e-Government in Serbia – Status of e-Government in Serbia – Strategy, Laws and ImplementationStrategy, Laws and Implementation

• “e-Government Development Strategy” and “Action Plan” from 2010 – modern, based on EU and regional SEE documents and initiatives;

• “Law on electronic signature” (December, 2004), bylaws completed mid-2008;

• “Law on electronic document” (2009); Law on electronic archive still missing!;

• Certificate Authorities: 1 (2008), 2 (2009), 3 (2010); 4 (2011), but:

• Qualified electronic certificates: Expected growth in 2011/2012 not happened, penetration still low; However, likely to be significantly improved in 2013/2014;

• Electronic payments: Limited possibility to pay in local currency (Dinars/RSD), although electronic banking and credit cards are widely adopted;

• Electronic services in public sector: Fully functional „e-Government portal“ exists from 2010, not enough services; Significant improvement, based on law enforcement, expected in 2013/2014.

Page 13: SBRA for IFC Georgia 04june2013

““Data delivery” Services of SBRA – Data delivery” Services of SBRA – new focus new focus

• G2G services - Data delivery to other governmental institutions (more than 30 regular partners in public sector, including key ministries and agencies):• Standard data delivery:

Broad range of pre-defined data categories, delivered by Web Service, FTP, E-mail or CD/DVD;

• Special requests: Customised sets of data and/or statistical analysis (free of charge).

• G2B/G2C services - Data delivery to businesses and citizens:• Standard data delivery: Range of pre-defined data categories, delivered by

Web Service, FTP, E-mail or CD/DVD; Minimal fee (0.1-0.3 USD) per record;

• Special requests: Customised sets of data, on request; Data analysis (limited complexity);

• Free initial analysis service (selection of records, E-mail proforma invoice);Low price, Quick delivery, Online support, Contact center support;

• Important source of SBRA revenue (5%-6%), fast annual growth expected.

Page 14: SBRA for IFC Georgia 04june2013

G2B, G2C Services of SBRA: G2B, G2C Services of SBRA: SBRA Portal - towards full electronic registrationSBRA Portal - towards full electronic registration

• SBRA Information system is “e-Services ready” almost from the beginning;• Unfortunately, due to improper legislation (mandatory paper with signature and stamp), and lack of

electronic certificates and payments, implementation of e-Services in Serbia was long postponed.

• Existing electronic services for businesses and citizens are available on the current SBRA web site: www.apr.gov.rs

• Internet Search on entity status, widely used, with complete data for one entity, available for free; • Complete information services, including highly usable models for all important documents;• All Forms available online (PDF format : fillable, printable, downloadable, some could be submitted;• Current status of the submisson (case), issuance of “extract from the Register” (“semi-electronic”),

etc.

• SBRA “Services portal”, to be available in stages 2013/2014:• Electronic issuance of the “extract from the register”, for companies and entrepreneurs, and others;• Registration of entrepreneurs - complete proces, including issuance of digitally signed Resolution; • Ordering and sending Financial reports and other “value-added data delivery services”;(all services are planned to be available on SBRA services portal and on national e-Government portal) • As electronic payment services in local currency (Dinars/RSD) are in final testing phase, all other

SBRA services non-dependable on external partners could be published in 2013/2014; • Full electronic registration of new companies (one of 20 EU benchmark service) is ready in SBRA,

but depends on extrernal partners (use of electronic signatures in Courts for Articles of Association).

Page 15: SBRA for IFC Georgia 04june2013

LESSON 1: SBRA business strategy -LESSON 1: SBRA business strategy -Principles of sustainabilityPrinciples of sustainability

At the very beginning, self-financing of SBRA was assured by: 3-month financing of all operational costs from the Swedish donation; Sufficient fees for the SBRA services, set by law; Advance payments for all services; Low costs: Simplified registration process; Skillful and trained SBRA staff.

Until now, self-financing of SBRA kept by: Continually improved business processes, increasing productivity of people and

cost savings based on carefull planning and monitoring; Inclusion of new registers (especially Register of financial statements from 2010); Improved services witha a fee, in particular “Data delivery services”.

In the future, self-financing of SBRA will be based on: Further improvement of business processes, standardization (ISO 9001, ISO 27001); Improvement of Information system, based on virtualization, SOA, as well as

improved capacity for sofware development, internal and with outsourcing partners; Improvement of services, based on the combined data from SBRA registers:

It is expected that over the next years revenue from “value added services” wil grow rapidly.

Page 16: SBRA for IFC Georgia 04june2013

2. 2. „Business of registration“„Business of registration“ and SBRA i and SBRA information system nformation system

– Initial design, implementation, stabilization (2004 – 2009/2010) – Initial design, implementation, stabilization (2004 – 2009/2010)

PHASE 1a (2004-2005) Elementary hardware (few multiple-purpose Dell servers – USAID donation); Temporary software solutions for 3 initial registers, basic services.

PHASE 1b (2006-2007) SBRR - Fully implemented World bank administered project (Oct.,2004 – March,2006);

Swedish donation cca 1.4M EUR, including ICT and 3 months SBRA operational costs; Sufficient hardware (Fujitsu-Siemens servers, EMC storage, Cisco communications);

Stable software solutions for registers; Improved services (G2B/G2C).

PHASE 2 (2008-2009/2010) Extended hardware and communications; Completed software solutions for registers; High-quality services (G2G, G2B/G2C): “One Stop Shop project”, phase 1 (2009/V); First steps of SOA-based integration: IRIS module (integrated receiving operation); Microsoft-based platform: Windows Server 2008, MS SQL Server 2008;

Development platform Microsoft .Net framework, C#.

Page 17: SBRA for IFC Georgia 04june2013

SBRA initial system architecture (2004 – 2009/2010): SBRA initial system architecture (2004 – 2009/2010): Simple and efficientSimple and efficient

L3 – Cisco 3750G-24T 10/100/1000 SMIL3 – Cisco 3750G-24T 10/100/1000 SMI

(Server VLAN)

Internal Web Server NLB

hp StorageWorks

!

Ultra 3

SC

SI

Ultra 3

SC

SI

Ultra 3

SC

SI

Ultra 3

SC

SI

Ultra 3

SC

SI

Ultra 3

SC

SI

Ultra 3

SC

SI

Ultra 3

SC

SI

Ultra 3

SC

SI

Ultra 3

SC

SI

Ultra 3

SC

SI

Ultra 3

SC

SI

Ultra 3

SC

SI

Ultra 3

SC

SI

Remote Offices - Cisco 805

Remote VLAN

Cisco 2950-24T Access Switches

DMZ

Firewall/Proxy (ISA Server 2004)

Cisco 2611XM Database Cluster

Cisco 2611XM

Page 18: SBRA for IFC Georgia 04june2013

LESSON 2: ISSUES RESOLVED DURING THE SBRR PROJECT

Project: Serbia Business Registration Reform (SBRR), 2004 - 2006• Grant No.: TF052718• IFB Title: Supply and Installation of the new Serbian Business Registration System software and hardware • IFB Number: SAM-SBRR-ICB-001-SSB-05-TF052718• Date of issue: May 18th, 2005. • Date of completion: March 31th, 2006.

Selection of the experienced international consultant, able to adapt to the local circumstances is crucial (technical skills are not the key point);

World Bank project should be managed carefully from the very beginning:

– Wrong selection of “ICB procurement method for goods” almost killed the project!

Consider realistically the timeframe for each phase of the project;

Close and proactive cooperation with the World Bank staff; Local World Bank Office in Belgrade helped a lot, especially at critical ponts.

Page 19: SBRA for IFC Georgia 04june2013

3. Enhancing institutional capacity of SBRA (1)3. Enhancing institutional capacity of SBRA (1)– Continual, sequential, sustainable development of the system

SBRA registration and information system development:

PHASE 3 (2009/2010-2011)

KOICA project (2008 - 2010/VI), donation 3.2 M$ from R.Korea; 5 generic software modules, developed by the local sodftware company, implemented and further developed;

New, powerful hardware platform (10 IBM „P“ series and „X“ series servers); Software platform (IBM WebSphere, FileNet, COGNOS, OmniFind, etc) and development tools (Java);

Initial SOA architecture using ESB – Integration of internal and external business processes based on extensive use of secure Web services;

Developed set of ready-to-use electronic services (G2G, G2B, G2C), using qualified electronic signatures and electronic payments.

Page 20: SBRA for IFC Georgia 04june2013

KOICA project componentsKOICA project components

o “SBRA Business process improvement project”, including new harware and software; implemented 2008-2010, donation 3.2 M$ from R.Korea;

o All components developed and installed until 2009/VI, full implementation 2009/XII.

ONE STOP SHOP for registration (OSS), Phase 2 Full automation of processes between SBRA and partner agencies, standardised WS;

INTEGRATED REGISTERS (IR) Improved IRIS module (integrated receiving process for all registers, old and new) – very

important part of the system; Integrated archive operation and Integrated expedition activities to follow.

ELECTRONIC ARCHIVE (EA) DMS (IBM FileNet) for unified storage and maintenance of electronic documents, both scanned

images and documents produced by SBRA registers; Strong search engine. FDI PORTAL (future FDI Register)

Collects and publishes relevant Foreign Direct Investment data from multiple sources; INFORMATION HUB PORTAL (IHP)

SBRA Portal for G2B/G2C electronic services, using qualified electronic signatures; Includes authentification, submission, payments, delivery, notification, etc.

Page 21: SBRA for IFC Georgia 04june2013

Pension Fund

Health.Insur.

Register of LeasingRegister of Leasing

Register of PledgesRegister of Pledges

Register of Business Subjects

Register of Business Subjects

DMS

Temporary ElectronicArchive

Permanent Electronic Archive

Portal 1Portal 1

WAN

Regional Offices

Operators

LANOperators

Internet

G2C

G2B G2G

Employ.office

Tax Office

Statistic.Office

Enterprises

Banks

SMES

National Bank

Municipalities

Register 4

Register 5

Register N

Communications

SBRA Software ArchitectureBefore KOICA project

Registration Form

Part1 - SBRA

G2B

G2G

Page 22: SBRA for IFC Georgia 04june2013

Pension Fund

Health.Insur.

Register of LeasingRegister of Leasing

Register of PledgesRegister of Pledges

Register of Business Subjects

Register of Business Subjects

DMS

Temporary ElectronicArchive

Permanent Electronic Archive

Portal 1Portal 1

WAN

Regional Offices

Operators

LANOperators

Internet

G2C

G2B G2G

Employ.office

Tax Office

Statistic.Office

SMES

Banks

Enterprises

National Bank

Municipalities

Register 4

Register 5

Register N

Communications

Figure1 – Current state

Registration Form

Part1 - SBRA

G2G

G2B

Pension Fund

Health.Insur.

Integrated Registers

Register of Leasing

Register of Pledges

Register of Business Subjects

Portal 1

Messages

Part1 - Tax Office

Part2 -Pension Fund

Part3 –HealthInsurance

Part4

….

Part N

WAN

Regional Offices

Operators

LANOperators

DFINew DMSe-Archive

One StopShop

Portal 2

Internet

G2C

G2BG2G

Information Hub / Additional security

G2C

G2B

G2G

Employ.office

Tax Office

Statistic.Office

Enterprises

Banks

SMES

National Bank

Municipalities

Register 4

Register 5

Register N

All New Modules

Registration Form

Part1 - SBRA

Figure2 – After KOICA project

Temporary ElectronicArchive

Permanent Electronic Archive

DMS

Page 23: SBRA for IFC Georgia 04june2013

Business process of registration after implementation of eArchive

Scanning processKofax

FileNet

Document Management Service

IrisService

Petition

SBRA

Saves petition

Upon receive documents are sent to scan

Que

ry fo

r bar

code

met

aD

ocum

ent m

etad

ata

Create / update

folder

Store document and it’s metadata to appropriate folder

2

4

1

5 6

7

8

9

10

11

Party

3Receipt

Page 24: SBRA for IFC Georgia 04june2013

““One Stop Shop for registration”One Stop Shop for registration”(OSS-SBRA)(OSS-SBRA)

Successful Multi-agency project, supported by Serbian Government;Example of coordinated legal, organisational and technological efforts.

Preparation: 2006-2008 (complete study 2006/XII)

Phase 1: From May, 2009 (Government decision 2009/XI) Partner agencies: Tax Authority (TA), Pension fund (PF), Health Fund (HF); Processes partly automated (Web services, FTP data exchange).

Phase 2: From June/December, 2010 (Part of KOICA project) Additional partners: National Bank of Serbia (NBS), Employment Office (EO),

Statistical Office (SO), Ministry of Interior (MUP). Processes fully automated (coordinated Web services on IBM ESB).

Page 25: SBRA for IFC Georgia 04june2013

Introduce a single business registration form;

Introduce a system whereby public authorities can recognise enterprises by a single identification number;

Set up single contact points where a single registration form can be deposited;

Ensure that government departments avoid introducing duplicated or superfluous forms and/or contact points;

Use IT and databases as much as possible for the transmission and authentication of information submitted and/or the exchange of information between public authorities.

OSS PRINCIPLES – DESIRED MODEL OF BUSINESS REGISTRATION

Page 26: SBRA for IFC Georgia 04june2013

SBRA - SINGLE ACCESS POINT ONE STOP SHOP (as of May 6, 2009)

Page 27: SBRA for IFC Georgia 04june2013

LESSON 3: ISSUES RESOLVED DURING THE OSS PROJECT

Technical solutions specified in detail after resolution of the related interoperability issues, including harmonization of the database format and content, as well as business processes.

Initial Risk Analysis has shown that the main OSS challenge will be the relationship with the Tax Authority Directorate, especially regarding issuing of the Tax Identification Number (PIB), so special attention was given to it.

It was clear that strong political support from all involved parties is required for the success of the project, so it was assured (not easy!).

• Conclusion: For e-Government projects like OSS, technical solutions are not an issue ! “The Devil” is somewhere else: in the data, in the processes and in the political support!

Page 28: SBRA for IFC Georgia 04june2013

Register of Regional Development Measurements and IncentivesRegister of Regional Development Measurements and Incentives - result of our own software development: - result of our own software development: http://stat.apr.gov.rs/rrmapeng/

MEASURES AND INCENTIVES:– МЕASURES are established by the Government– INCENTIVES concern:

• regional development projects• improving sectors of the economy• increasing competitiveness• developing cities and municipalities• improving environmental protection• development of insufficiently developed regions• SME and entrepreneurship development• increasing employment• improving infrastructure

the intended use of the incentives is defined in the Classification of the purposes of the incentivesthe intended use of the incentives is defined in the Classification of the purposes of the incentives

RECIPIENTS OF INCENTIVES:– businesses, – local government, regional agencies, regional

associations– institutions– associations– clusters and business incubators– the types of recipients are defined in the Classification

of the types of recipients of incentives

REGIONAL DEVELOPMENT FUNDING SOURCES:– Republic of Serbia Budget– Autonomous Province of Vojvodina Budget– Development Fund of the Republic of Serbia– City of Belgrade Budget– Local Government Budget– EU Instruments of Pre-Accession Assistance (IPA)– International grants, development support– IFI development loans– Donations, contributions and gifts– Other sources

Page 29: SBRA for IFC Georgia 04june2013

3. Enhancing institutional capacity of SBRA (2)3. Enhancing institutional capacity of SBRA (2)– Continual, sequential, sustainable development of the system

SBRA registration and information system development: PHASE 4 (2012-2013/2014)

SBRA medium-term strategy, approved by the Government: „Legal background“ for providing stable source for annual ICT development budget;

New „Law on registration in SBRA“ (implemented in 2012/2013 for all SBRA registers), as a basis for: Business process allignment; Standardization (ISO 9001, ISO 27001), etc.

Hardware and system software integration (IBM, Microsoft) – H/W, communications, security, administration; Operating systems and platform software;

Software integration towards SOA architecture completion, S/W standardization and consolidation (long-term target: Generic register rules, processes and software);

Extended set of electronic services, evolving value-added services (DW/BI/KM based);Homogeneous, flexible system of Web services (G2G, G2B), consistent

interfaces; Tight integration with partners in public sector, as well as with commercial customers;

„Services portal“ development“ - customer-oriented, interactive SBRA Web portal; Publishing number of electronic on this portal and on national „e-Government portal“.

Everything is based on constant capacity building of human resources, internal (strong internal IT Department) and external (managing close relations with several IT partners).

Page 30: SBRA for IFC Georgia 04june2013

SBRA’s DEVELOPMENT CONCEPT

INTEGRATION OF THE PROCEDURES

е-BUSINESS

CENTRAL ARCHIVES

CURRENT BUSINESS REGISTRATION SYSTEM

OF THESBRA

CUSTOMER-ORIENTED SYSTEM

COMPLIANCE WITH EU ADMINISTRATION

STANDARDS

DEVELOPMENT FOCUSOPERATION GOAL

THE LAW ON THE PROCEDURE OF REGISTRATION WITH THE SBRA

SERVICE-ORIENTED ARCHITECTURE(SOA)

ARCHIVE AND DOCUMENT MANAGEMENT SYSTEMS

Page 31: SBRA for IFC Georgia 04june2013

4. Challenges and solutions – 4. Challenges and solutions – Lessons learned, reviewLessons learned, review

GENERAL Technology is just a tool to achieve strategic and tactical business goals;• But all business goals should be set considering the opportunities given by the latest

ICT technologies and (agile) development methodologies.

SECTOR SPECIFIC Public sector is somethig really special!

TECHNOLOGY SPECIFIC Technology is now not a major issue, especially in Public sector projects;

Main issues are in other areas: Business-ICT allignment, organisation, people, budgets, ...

INTEROPERABILITY Again, technology is not the key – XML-based Web Services are wide-spread standard,

universal solution; Semantic, operational and legal IOP are critical in the Public sector.

Project/Program/Portfolio Management (PM) (PM) Methodology implemented - key to success! And not only for ICT projects!• But how to ensure sufficient and stable PM and technology skills in the Public sector?!

Page 32: SBRA for IFC Georgia 04june2013

Lessons learned: SelectedSelected (1)External factors - “Minimal legal background”

Importance of the „minimal legal background“ for the success of interoperability projects – case of national registers

• Development of national registers and its interoperability – basic approach;• Lack or incompleteness of the basic national registers in Serbia:

o Non existing Register of citizens, Register of addresses (streets), etc;o Land register still incomplete and non-consistent, etc.

PM capacity and coordination of the projects in government/public sector

• Critical “success factor”, especially for “One-stop shop” projects;

Aspects of interoperability• Include and properly combine all interoperability levels:

Technical, Semantic, Organizational and Legal;• Case Studies:

o SBRA “One-stop shop for registration” project (2006-2009);o Central Registry of Compulsory Social Insurance – CROSO (current).

Page 33: SBRA for IFC Georgia 04june2013

Lessons learned: SelectedSelected (2) Internal factors – Optimization of outsourcing services

Developing internal IT department

• Strategy and Planning: Positioning ICT function properly, including new role of CIO;

• Staffing: How to attract and retain skilled IT staff in public sector?

Using outsourcing services

• How to assure long-term cooperation with IT partners?

• Public procurement issues: Software development as a specific subject of the service procurement;

• Keeping the balance between the capacity of the internal IT department and outsourcing partners.

Page 34: SBRA for IFC Georgia 04june2013

Lessons learned: SelectedSelected (3) PM is a Key to success

SBRA/Public sector Project constraints

Time: Least flexible

Scope: Most flexible

Resources: Flexible

Sufficient institutional capacity for PM is important at all levels:

Agency / Ministry level Sectorial level National (Government) level – very hard to achive in developing countries!

Page 35: SBRA for IFC Georgia 04june2013

GENERAL ADVICES FOR PRACTITIONERS IN REFORMING REGISTRATION SYSTEM

www.investmentclimate.org 3504/13/23

Prior to starting a radical reform such as reform of the business registration system, and as early as possible, it is necessary TO ENSURE as wide as possible CONSENSUS ON THE BASIC PRINCIPLES OF THE REFORM within the Government and interested institutions.

Since reform involves competencies of several ministries, it is necessary for the Government to establish an INTER-MINISTERIAL BODY to follow up and coordinate the overall reform, and to ensure consistency in the regulations and in the implementation of the Action plan (for the particular reform and for the broader programs).

All agencies involved in the reforms should provide sufficient institutional capacity not only for their internal changes, but also for interoperability (“shared services”) projects.

Do not expect from the technology to resolve key issues in the public sector projects!It will just help you to achieve the best possible results, if the approach was right.

The same rules apply not only in the initial stage of the reform, but also in all the following major stages of reform (as it was presented in all SBRA developmental stages).

.

Page 36: SBRA for IFC Georgia 04june2013

THANK YOU FOR YOUR ATTENTION!