sara portfolio april 2011 cput 2nd yr

35
Portfolio april 2011 sara savahl _209004606_2nd year cput 2011

Upload: sara-savahl

Post on 07-May-2015

243 views

Category:

Business


3 download

TRANSCRIPT

  • 1.Portfolioapril2011
    sara savahl _209004606_2nd year cput 2011

2. Contents
House Meyer
HouseBrowne
House Wooley
House Lancaster
House Loch

  • Under each of the different projects there are descriptions of the work, drawings done by me and drawings with a substantial amount of revisions but not all done by me. At the end of the list of drawings/information the four questionsto be answered for each drawing will be in table format.

sara savahl_209004606_2nd year cput 2011
3. 1.1 House Meyer
This project started in 2010 and has gone onto site February2011. The main plans of this house will have featured in one of last years 2nd year portfolios.
Description of work : alterations and additions were made to this house. Faade modernised to fit in with the rest of the recently renovated homes in the area. The first floor of this house was almost completely flattened and redone. Once we started on site we realized that much more walls had to come down to make the alterations.
The following drawings fall in the 80%+ category
- Electrical layout- spigot position drawing
- Lighting layout- stairs detail
-Bathroom layouts- manifold detail
-Shutter-wall detail- sanitary ware schedule
-External balustrade detail
sara savahl _209004606_2nd year cput 2011
4. 1.1 House Meyer
sara savahl 209004606 2nd year cput 2011
5. sara savahl 209004606 2nd year cput 2011
1.1 House Meyer- Electrical Layout
6. 1.1 House Meyer- Lighting Layout
sara savahl _209004606_2nd year cput 2011
7. 1.1 House Meyer-Bathroom Layouts
sara savahl _209004606_2nd year cput 2011
8. 1.1 House Meyer - Bathroom layouts
sara savahl _209004606_2nd year cput 2011
9. 1.1 House Meyer - Bathroom Layouts
sara savahl _209004606_2nd year cput 2011
10. sara savahl 209004606 2nd year cput 2011
1.1 House Meyer - Shutter Detail
11. 1.1 House Meyer - Manifold Detail And Sanitary Ware Schedule
sara savahl 209004606 2nd year cput 2011
12. 1.1 House Meyer- Spigot Position
sara savahl _209004606_2nd year cput 2011
13. 1.1 House Meyer - External Balustrade
sara savahl _209004606_2nd year cput 2011
14. 1.2 House Meyer
Drawings with revisionsand less than 80% of work done by me.
A brickwork layout was requested by the contractor to make it easier for the foreman on site to determine which walls were to be demolished and where new walls were mean to be built. Info simply had to be removed from this layout and walls(new/demolished/existing) to be made more clear.
sara savahl _209004606_2nd year cput 2011
15. 1.2 House Meyer - Manifold Detail
Drawings with revisionsand less than 80% of work done by me.
Stairs section/details
Most of this drawing had been done by the architect, it was asked of me to finish the balustrade detail and make some additionsand changes to the sections as the balustrade had changed.
sara savahl _209004606_2nd year cput 2011
16. 1.2 House Meyer MainPlan
Drawings with revisionsand less than 80% of work done by me.
When window positions and other small changes had been made on bathroom layouts and other drawings. they also had to be changed on the main plans an elevations layouts, which would intern be reissued on site. so that the contractors were aware of the changes.
sara savahl _209004606_2nd year cput 2011
17. 1.2 House Meyer Elevation and Sections
Drawings with revisionsand less than 80% of work done by me.
sara savahl _209004606_2nd year cput 2011
18. 1.2House Meyer Window Schedule
Drawings with revisionsand less than 80% of work done by me.
When changes were made to suite spaces better. It meant window schedules had to be changed and reissued on site (to the contractor). The contractormakes the necessary orders when it comes to building materials , finishes and so on.
sara savahl _209004606_2nd year cput 2011
19. sara savahl 209004606 2nd year cput 2011
1.3 House Meyer Site Photos
Above: half the roof had been removed to accommodate for new walls to be built.
Below: some plants had been cleared and these trees were kept. The brickwork on the right on this picture is the new laundry room and kitchen.
20. sara savahl 209004606 2nd year cput 2011
1.3 House Meyer Site Photos
Above: the previous picture had shown the back yard and view of the roof. This is the front view from the street. Where new brickwork has started and other walls have been demolished.
Below: the new laundry and kitchen had not yet been built at this point.
21. sara savahl 209004606 2nd year cput 2011
2.1 House Browne
This project startedearly this year. Measuring up of the site had already taken place before Istarted work.
I got there in time to finish off the council submissiondrawingsand take them to council. Going through heritage with this house was not the easiest . As it was older than 60 years and officials wanted to go on site visits. This was all happening whenHWC decided to changed the over-the-counter help as they did before to handing over your plans and them contacting you. Which takes much longer.
description of work: alterations and additions -playroom incorporated into the space as the clients were expecting their first child. Faade modernised slightly to make space for an open pergola/patio area. This house has a beautiful garden and we left as much of it intact as possible.
the following drawings fall in the 80%+ category
-plans- tiling layout
-elevations- kitchen window detail
- door schedules- lighting/electrical layout
- window schedules
22. 2.1 House Browne
sara savahl 209004606 2nd year cput 2011
23. sara savahl 209004606 2nd year cput 2011
2.1 House Browne - Plans for council
24. sara savahl 209004606 2nd year cput 2011
2. House Browne - Elevations for council
25. sara savahl 209004606 2nd year cput 2011
2.1 HouseBrowne Door schedules
Door schedules are issued on A4, with each door on a separate page, with specifications.
26. sara savahl 209004606 2nd year cput 2011
2.1 HouseBrowne Window schedules
Window schedules are issued on a sheet in table format for ease of reading.
27. sara savahl 209004606 2nd year cput 2011
2.1 HouseBrowne Tiling Layout
28. sara savahl 209004606 2nd year cput 2011
2.1 HouseBrowne Kitchen window detail
And Elec/lighting layout
29. sara savahl 209004606 2nd year cput 2011
3. House Wooley
This project is still in its early stages. We arefinalising the design with the client, as it changed because the client required anotherroom. As this project is in its early stages I have only just started the council submission drawings.
Description of work : Add on two extra rooms to house with kitchenette and bathroom.
Changed windows and add bay window to faade.
The following drawings fall in the 80%+ category
- start of council submission drawings
30. sara savahl 209004606 2nd year cput 2011
3.1 House Wooley Start Of Council Sub.
31. sara savahl 209004606 2nd year cput 2011
3.1 House Wooley SG Diagram
I work atsmall firm so I do research on products, find SG diagrams on the internet and also attend meeting at council and the HWC (Heritage) on behalf of the architect.
32. sara savahl 209004606 2nd year cput 2011
4. House Lancaster
This is a new project in sketch design phase. Measuring up of the site will take place soon as the sketch design was to show the client what it could look like in future with a few alterations.
Description of work : move existing garages to end of site and slightly modernise the rear end of the house.
The following drawings fall in the 80%+ category
No drawings have been done by me yet. We have however gathered information on the site and have taken an engineer to the site to inspect the house. The client bought the property and made these inquiries before buying.
33. sara savahl 209004606 2nd year cput 2011
4.1 House Lancaster
This house went to the HWC for enquiries about the site because it was older than 60 years old. We needed to know if we were able to move the existing garages and modernise the back while keeping the faade as natural as possible. In this specific part of Rondebosch the houses come straight up to the street. There are no pavements/sidewalks.
34. sara savahl 209004606 2nd year cput 2011
5. House Loch
This project started last year and I got the opportunity to do my first set of council submission drawings.
Description of work : the work space had to be maximised to its fullest, because I was on a small plot and they needed a conference room that could later be split up.
The following drawings fall in the 80%+ category
- Council submission drawings
Left: SG diagram
Right: locality plan
35. sara savahl 209004606 2nd year cput 2011
5.1 House Loch Council Submission Drawing
The end.