• About a Finished product - E g : carton boxes ( we pack your end products)• Organization structure • Importance of all modules and their roles ( SD/MM/PP/QM/PM/FICO)• Production planning – SAP • Master Data : Material master :Fg/Sfg/Raw, BOM, Routing , Production version• Planning : Sales order Through Production order• Execution: Confirmation with GI and GR • Cost Analysis • Technically complete• Close the Production order.
Agenda
Organization Structure
CHINA
PLANT HYDUSA
INDIA Japan
Company
Company code
CHENNAI HYDERABAD BANGALORE
PLANTS
Importance of All modules ( SD/MM/PP/QM/PM/FICO)
SD : Sales& Distribution
MM :Material & Management
PP :Production Planning
QM : Quality management
PM : Plant Maintenance
FI CO : Finance and Control
This gets orders from market and see that it is delivered
This looks into procurement of required materials and maintain stocks by GI & GR
This looks into production of the FG for the required order quantity
This looks into Quality of Incoming, In process and before dispatch of the material for order
This looks into maintenance of the machine /equipment to give Maximum efficiency to give good out put
This looks into creation of company/company code /plant and maintain cost
centers/profit center for financial accounting in the organization
PRODUCTION PLANNING - SAP
Master Data Planning Execution
MATERIAL MASTER
BILL OF MATERIALS
WORK CENTER
ROUTINGS
PRODUCTION VERSION
PLANNED INDEPENDENT
REQUIREMENTS(Make to stock)
OR
CUSTOMER SPECIFIC REQUIREMENTS
(Make to Order)
ORDER CREATION
RELEASING OF THE ORDER
CONFIRMATION OF THE ORDER
GOODS ISSUE TO ORDER
GOODS RECEIPT OF THE ORDER
COST ANALYSIS
MASTERDATA
MATERIAL MASTER FINISHED GOODS /SEMI FINISHED GOODS/RAWMATERAIL
BILL OF MATERIALTO MAKE FG
WORK CENTER TO MAKE FG
PAPER - SFG
FINISHED GOOD – (CARTON BOX)
APPLYING GUM - RAW
PULP - RAW
MACHINE REQUIRED TO PRODUCE THE REQUIRED PRODUCT
ROUTINGTO MAKE FG
NUMBER OF OPERATIONS REQUIRED TO PRODUCE THE REQUIRED PRODUCT
NUMBER OF METHODS IN WHICH THE SAME PRODUCT CAN BE PRODUCEDUSING DIFFERENT MATERIALS AND ROUTINGS
PRODUCTIONVERSION
Planning
PLANNED INDEPENDENT REQUIREMENTS THIS ARE THE REQUIREMENTS WHICH ARE ENTERED INTO SYSTEMUSING ; TCODE : MD61
CUSTOMER SPECIFIC – VA01
MATERIAL REQ PLANG – MD02
Stocks Requirements List & Production order creation
PRODUCTION ORDER CREATIONCO01STOCK REQUIREMENTS LIST
MD04
SALES ORDER VISIBLE IF PRODUCTION IS SPECIFICE TO SALES ORDER –CO02 - Assignment
REQUIREMENT TROUGH SALES ORDER
Checking Bom, Routing, Material availability
PRODUCTION ORDER CONFIRMATIONCO11N
BILL OF MATERIAL IN PRODUCTION ORDERCO02
CHECK FOR ALL THE ABOVE MATERIAL AVAILABILITY , BOM, ROUTING AND COSTS IF ANY
Release of Production order and Confirmations and GI /GR
PRODUCTION ORDER CONFIRMATIONCO11N
RELEASE OF PRODUCTION ORDER BY CLICK GREEN FLAGCO02
GOODS RECEIPT -101 MVT TYPE
GOODS MOVMENT -261 MVT TYPE
Confirmation of the Goods receipt to the order
CHECK IN MDO4 FOR THE REQUIRED STOCK UPDATED AS CUSTOMER STOCKMD04
CHECK FOR DELIVER COMPLETE IN ORDER
Technical completion/ Settlement/Closing of Production order
TECHNICALLY COMPLELETION OF ORDERCO02
CLOSING THE PRODUCTION ORDER
SETTLEMENT OF THE PRODUCTION ORDER T.Code KO88 - FI CO Transactions
SAP PP Contents• SAP PP• • · Overview of ERP• · About SAP• · SAP Hierarchy Structure• • 1.0 Organization structure For Production planning Module • 1. Company• 1.1 Company Code• 1.2 Plants • 2.0 Master data in Production planning Module • 2.1 Material Master• 2.1.0 Finished Product• 2.1.1 Semi Finished Product• 2.1.2 Raw Material• 2.2 Bill of Material• 2.3 Work center• 2.4 Routing• 2.5 Production version
• 3.0 Demand Planning • 3.1 Planning strategies 40 • 3.2 Planned independent Requirements• 3.2.1 Production orders Execution Procesess• 3.2.2 Requirements• 3.2.3 MRP• 3.2.4 Planned order conversion to Production order• 3.25 Assignment of Settlement Rule• 3.2.6 Release of Production Order• 3.2.7 Confirmation• 3.2.8 Goods issue• 3.2.9 Goods Receipt• 3.2.10 Delivery Complete• 3.2.11 Technically completion Of Production order• 3.2.12 Variance Calculations By FI CO• 3.2.13 Settlement Of order By FI CO• 3.2.14 Close Of Production Order• 4.0 Forecast based planning• 4.1 Material activation for forecast view• 4.2Maintaining of consumption values• 4.3Execute for planning for future period• 4.4Requirements in Md04• 4.5 MRP run to get Purchase requisitions and planned orders
• 5.0 Factory calendar creation • 5.1 Defining public holiday• 5.2 Defining public holiday Calendar• 5.3 Defining Factory calendar and assigning in plant.• 6.0 Different Production Process widely used in industries• 6.1 Consumption based planning next • 6.2 Customer Specific Requirements STRATEGY • 6.3 Discrete manufacturing• 6.4 Reptative Manufacturing• 6.5 Sales Operational Planning• 6.6 Serial number Profile • 6.7 Variant Configuration• 6.1 Customer Specific Requirements STRATEGY 20 • 6.1.1 Creation of Materail master with sales views• 6.1.2 Creation of sales order• 6.1.3 Run MRP to get sales order number for assembly and raw materials• 6.1.4 Creation of Production order through sales order• 6.1.5 Procurement of BOM components as special stock• 6.1.6 Difference between unrestricted stock and specific stock• 6.1.7 Confirmation and issue of specific stock • 6.2 Consumption based Planning• 6.2 Maintaining safety stock in material master• 6.2.2 Issue or consume stock • 6.2.3 MRP RUN• 6.2.4 Creation of purchase requisitions
• 6.3 Discrete Manufacturing Process• 6.3.1 Master data • 6.3.2 Production order creation5.1.3 Release of Production Order• 6.3.3 Confirmation• 6.3.4 Goods issue• 6.3.5 Goods Receipt• 6.3.6 Delivery Complete• 6.3.7 Technically completion Of Production order• 6.3.8 Variance Calculations By Fico• 6.3.9 Settlement Of order By Fico• 6.3.10 Close Of Production Order• 6.3.11. Goods Movement in PP (Integration with MM)• 6.3.12 Goods Receipt w ref .to Production Order• 6.3.13 Goods Issue w ref to Production Order• 6.3.14 Goods Receipt Reversal w ref to Production Order• 6.3.15 Goods Issue Reversal w ref to Production Order• 7.0 Repetitive Manufacturing Process• 7.1 Master data• 7.2 Production version• 7.3 Cost Estimate• 7.4 Production cost collector• 7.5 Preliminary cost estimate • 7.6 Back Flush• 7.7 GI GR Postings• 7.8 Variances calculations• 7.9 Settlement
• 8.0 Sales and Operational Planning – SOP• 8 .1 Standard Planning (with standard so76 info structure)• 8·2 Planning with the Product Groups• 8.3 Planning with the Materials• 8.4 Product Group Aggregation and Desegregation• 8.5 Creation of Plan and version management• 8·6 Transfer of Plan to Demand Management• 8.7 MRP run to get planned orders• 9.0 Serial number in Production planning• 9.1 Serial number Profile• 9.2 Master data Set up• 9.3 Serial number creation• 9.4 Assignment of serial number• 9.5 Production order confirmation• 9.6 Goods Receipt with respect to Serial number. • 10. Variant Configuration • 10.1 Overview• 10.2creation of characteristics• 10.3 . Maintain BOM• 10.4 Maintain required table data• 10. Setting a variant material
• 11.0 Required Configuration steps in PP• 11.1 Define MRP controllers• 11.2 Define Parameters• 11.3 Define standard value keys• 11.4 Define Control keys• 11.5 Order types and dependant parameters• 12.0 : PROJECT -- ASAP METHODOLOGY• 1. Overview of Various steps involved in SAP IMPLEMENTAION • 2. Sample project work with respect to PP Module.• Integration of PP with other modules• MM• SD• QM• FI
SAP PP TRAINING BY DIRECT TRAINER &REALTIME CONSULTANT
• Name : DINAKAR• Mobile: 91 9885766653 & Whatsup :9885939921• Skype : himbuj• Mail : [email protected]• Duration : Completion of course contents w.r.t. grasping of individual• Word Documents with screen shots will also be provided• After each class and will be evaluated by assignments by making student