Sanitary & Domestic
Wastewater treatment
solutions
Wastewater treatment is simple and easy. .
C.B.F seriesDaily capacity: 5 - 50 m³
Eco-Sys seriesDaily capacity: 0.5 - 5.0 m³
Sanitary & Household wastewater treatment
C.B.F Technology
and its advantages
Small scaleSmall scale wastewater treatmentwastewater treatment unitsunits
Daily capacity: 0.5 – 5.00.5 – 5.0 m³ m³
The best solution for private housesprivate houses, gas stationsgas stations, restaurantsrestaurants, guesthouses guesthouses and more.
Units available: Eco-Sys 1+, 2+ ,4+ & P
esi E co -S y s sy stem s in sta lla tio n la y o u t (sch em a tic )
P la n n in g ,d esig n in g & m a n u fa ctu r in g b y e co lo g ica l sy stem s in tern a tio n a l LTD - a ll r ig h ts re se rv ed -
V ers . 0 6 /0 1
esi E co-S y s sy stem s in sta lla tion lay ou t (sc h e m a tic )
esiE c o -S y s
P r e -se p a r a t io n ta n k(vo lu m e : u p to 5 0 % o f th e d a ily cap ac ity
acco rd in g to th e o rgan ic overload )
4500
1400
esi Eco-Sys 1+ ( 0.5 to 1.5 m³/d)
1540
Planning , designing & manufacturing by ecological systems international LTD - all rights reserved -
V: 06/01
Outlet
Overflow
Inlet
Bedding
CP
Sprinkler Filter
1540
1025
1800
esi Eco-Sys 1+
C
Eco-Sys 01+ unit Small scale wastewater treatment unit (0.5 to 1.5 m³/d) * Energy low! (Small circulation pump) * Pre-separation tank is required (volume: 0.5 m³) * Can be installed in 4 hours (!) * The filter should be replaced every 6-12 months * Service to the unit once a month.
esi Eco-Sys 2+ (2 to 3 m³/d)
1850
18
20
Planning , designing & manufacturing by ecological systems international LTD - all rights reserved -
V: 06/01
Outlet
Overflow
Inlet
Bedding
CP
FP
Sprinkler
Filters
C
C15
50
1850
14
10
C
esi Eco-Sys 2+
Eco-Sys 2 + unit Small scale wastewater treatment unit ( 2 to 3 m³/d)
* Energy low! (2 Small circulation pump)
* Pre-separation tank is required (volume: 1 m³) * Can be installed in 6 hours (!) * The 3 filters should be replaced every 12 months. * Service to the unit once a month.
esi Eco-Sys 4+ ( 4 to 5 m³/d )
2150
18
20
Planning , designing & manufacturing by ecological systems international LTD - all rights reserved -
V: 06/01
Outlet
Overflow
Inlet
Bedding
CP
FP
Sprinkler
Filters
C
C
C
CC
16
40
2150
14
10
esi Eco-Sys 4+
Eco-Sys 4+ unitSmall scale wastewater treatment unit (up to 5 m³/d).
* Energy low! (Small circulation pump). * Pre-separation tank is required (volume: 2 m³). * Can be installed in 6 hours (!). * The 5 filters should be replaced every 6-12 months. * Service to the unit once a month.
Eco-Sys P (pumping well)
The P indicates an integral pumping well (attached to the unit).
* Energy low! (Small pump). * The pumping well volume is 100 liters (or more). * Should be ordered with the unit. * All props for operation are including. * Service with the unit - once a month.
Small scaleSmall scale wastewater treatmentwastewater treatment plantsplants Daily capacity: 55 - - 5050 m³ m³
The best solution for gas stationsgas stations, restaurantsrestaurants, guests housesguests houses, hotelshotels, small farmssmall farms and villagesvillages,
country clubscountry clubs , Army campsArmy camps, Public parksPublic parksand more
Note:the treated water can be reused as irrigation water in public parks or for agriculture needs.
esi C .B .F sy stem s in sta lla tio n la y o u t (sch em a tic )
P la n n in g ,d esig n in g & m a n u fa ctu r in g b y e co lo g ica l sy stem s in tern a tio n a l LTD - a ll r ig h ts re se rv ed -
V ers . 0 6 /0 1
esi C .B .F sy stem s in sta lla tion lay ou t(sc h e m a tic )
esiC B F
P re-sep ara tion tan k(v o lu m e: u p to 5 0 % o f th e d a ily cap ac ity acco rd in g
to th e o rg an ic o v e rlo ad )
esi C.B.F 5+ ( up to 8 m³/d) V: 6/01
Planning , designing & manufacturing by ecological systems international LTD - all rights reserved -
2000
220
0
D = 2000
CPFP
Inlet
Sprinkler
Bedding
Filters
Outlet
Overflow
esiCBF +5
C.B.F 5+ plant Small scale wastewater treatment plant (up to 8 m³/d)
* Energy low! (Only 2 small pumps) * Pre-separation tank is required (Max. volume: 2.5 m³) * Can be installed in 8 hours (!) * The filters should be replaced every 12-18 months. * Service to the plant once a month
esi C.B.F 10+ ( up to 13 m³/d)
Planning , designing & manufacturing by ecological systems international LTD - all rights reserved -
2000
2200
D = 2000
CPFP
Inlet
Sprinkler
Bedding
Filters
Outlet
Overflow
esiCBF 10 +
V: 06/01
C.B.F 10+ plant Small scale wastewater treatment plant (up to 13 m³/d) * Energy low! (Only 2 small pumps) * Pre-separation tank is required (Max. volume: 5 m³) * Can be installed in 8 hours (!) * The filters should be replaced every 12-18 months. * Service to the plant once a month
esi C.B.F 15+ (up to 18 m³/d)
2400
2200
Planning , designing & manufacturing by ecological systems international LTD - all rights reserved -
V: 06/01
Inlet
Bedding
CP FP
Sprinkler
Outlet
Overflow
Filters
2000
esiCBF 15+
C.B.F 15+ plant Small scale wastewater treatment plant (up to 18 m³/d)
* Energy low! (Only 2 small pumps) * Pre-separation tank is required (Max. volume: 7 m³) * Can be installed in 8 hours (!) * The filters should be replaced every 12-18 months. * Service to the plant once a month.
esi C.B.F 20+ ( up to 23 m³/d )
2420
2300
Planning , designing & manufacturing by ecological systems international LTD - all rights reserved -
V: 06/01
Inlet
Bedding
C P F P
Sprinkler
Outlet
Overflow
Filters
D = 2000
esiCBF 20+
C.B.F 20 + plant Small scale wastewater treatment plant (up to 23 m³/d)
* Energy low! (Only 2 small pumps) * Pre-separation tank is required (Max. volume: 12 m³ ) * Can be installed in 8 hours (!) * The filters should be replaced every 12-18 months. * Service to the plant once a month.
esi C.B.F 25+ (up to 28 m³/d )
Planning , designing & manufacturing by ecological systems international LTD - all rights reserved -
V: 06/01
Note : for export transportation reasons we separate the “Filters chamber” from the reactor body. This enable us on one hand to reduce the costs for the customer and provide the same simple , easy &
efficient solution, on the other hand.
Side view
esi CBF 25+for export
Top view
Biological reactor
Filtration chamber
C.B.F 25+ plant Small scale wastewater treatment plant (up to 28 m³/d)
* Energy low! (Only 2 small pumps) * Pre-separation tank is required (Max. volume:14 m³) * Can be installed in 8 hours (!) * The filters should be replaced every 12-18 months. * Service to the plant once a month.
esi C.B.F 30+ (up to 33 m³/d )
Planning , designing & manufacturing by ecological systems international LTD - all rights reserved -
V: 06/01
Note : for export transportation reasons we separate the “Filters chamber” from the reactor body. This enable us on one hand to reduce the costs for the customer and provide the same simple , easy &
efficient solution, on the other hand.
Side viewesi CBF 30+
for export
Top view
Biological reactor
Filtration chamber
C.B.F 30+ plant Small scale wastewater treatment plant (up to 33 m³/d)
* Energy low! (Only 2 small pumps) * Pre-separation tank is required (Max. volume: 16 m³) * Can be installed in 8 hours (!) * The filters should be replaced every 12-18 months. * Service to the plant once a month.
esi C.B.F 35+ (up to 40 m 3/ d )
Planning , designing & manufacturing by ecological systems international LTD - all rights reserved -
V: 06/01
Note : for export transportation reasons we separate the “Filters chamber” from the reactor body. This enable us on one hand to reduce the costs for the customer and provide the same simple , easy &
efficient solution, on the other hand.
Side viewesi CBF 30+
for export
Top view
Biological reactor
Filtration chamber
C.B.F 35+ plant Small scale wastewater treatment plant (up to 40 m³/d)
* Energy low! (Only 2 small pumps) * Pre-separation tank is required (Max. volume: 20 m³) * Can be installed in 2 days (!) * The filters should be replaced every 12-18 months. * Service to the plant once a month.
esi C.B.F 50 (up to 50 m 3/ d )
Planning , designing & manufacturing by ecological systems international LTD - all rights reserved -
V: 06/01
Note : for export transportation reasons we separate the “Filters chamber” from the reactor body. This enable us on one hand to reduce the costs for the customer and provide the same simple , easy &
efficient solution, on the other hand.
Side viewesi CBF 50
for export
Top view
Biological reactor
Filtration chamber
C.B.F 50 plant Small scale wastewater treatment plant (up to 50 m³/d )
* Energy low! (Only 2 small pumps) * Pre-separation tank is required (Max. volume: 25 m³) * Can be installed in 2 days (!) * The filters should be replaced every 12-18 months. * Service to the plant once a month.
Household and small scaleHousehold and small scale wastewater treatmentwastewater treatment units and plants up to 5 m³/d
for domestic & sanitary wastewater treatment solutions.
small scalesmall scale wastewater treatmentwastewater treatment units and plants up to 200 m³/d
for domestic & sanitary wastewater treatment solutions as well as reuse of the influent as irrigation
water in public parks or for agriculture needs.
Note: for increased capacity we install more plants in parallelfor increased capacity we install more plants in parallel
The Minister of housing and the mayor of Jerusalem are launching our C.B.F 50 system for reusing treated water as irrigation water in the “Jerusalem Botanical Gardens” .
As a complimentary equipment and accessories for our units and plants we
supply the following products:
- Control panel for the reactors (GSM guided - by cellular phone)
- Pre-separation tanks (propylene) in different volumes: 0.4 , 1 , 2 , 3.6 , 5.2 , 6.9 m³
- Grease trap tanks (propylene) in different volumes:
from 120 to 6900 liters
- Air pumps for our reactors
- Trickling media bedding any size and volume required
- Starter & acceleration emulsions for a better biological process in our reactors.
Our “C.B.F” technology is based on bio-filter and trickling-filter Our “C.B.F” technology is based on bio-filter and trickling-filter technologies. We manage to minimized the size and volume of the technologies. We manage to minimized the size and volume of the
reactor but to keep its efficiency while treating maximum capacity.reactor but to keep its efficiency while treating maximum capacity.
The main advantages are:
> Minimum reactor volume - Maximum wastewater capacity.
> Energy low- minimum electro mechanical components – strive to O failures.
> Installation , service and maintenance are simple ,easy & Low cost.
> Modular- when capacity increases installing anther module in parallel to the exiting system without any interference.
> Our reactors are designed to operate in hot and cold climate zones all around the globe.