safety in construction designficci.in/events/20682/isp/smishra-larsen-toubro.pdf · safety in...

58
Hazard Recognition and Risk Analysis Safety in Construction Design Larsen & Toubro E&C Division Sudhir Mishra Every single worker deserves to go home to his family in the same condition he arrived in!!!!

Upload: nguyenkhuong

Post on 17-Mar-2018

220 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Safety in Construction Design

Larsen & Toubro – E&C Division

Sudhir Mishra

Every single worker deserves to

go home to his family in the same

condition he arrived in!!!!

Page 2: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Safety Credo

ZERO INCIDENT

CREDO

No work related ill-health

No occupational accident & material damage

No harm to the environment

No personal injuries

• Block 5 Development Package 14, MOQ

• 9 Well platform project, ONGC• Songo Songo, Tanzania

ACHIEVEMENTS1 million man-hours without LTA in

All operations OHSAS 18001 and

ISO 14001 certified

2Larsen & Toubro – E&C Division

Page 3: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Construction Accidents

56% falls from height

21% trapped by something collapsing or overturning

10% struck by a moving vehicle

5% contact with electricity or electrical discharge

4% struck by a flying/falling object during machine lifting of materials

3% contact with moving machinery or material being machined

1% exposure to a hot or harmful substance

Co

nstr

ucti

on

Sit

e

Safe

ty

Larsen & Toubro – E&C Division

Page 4: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

4

DANGER! AN

ACCIDENT WAITING

TO OCCUR!

No Fall Protection.

Scaffold missing

planking. Competent

Person?

DON’T GET CAUGHT IN THE DROP ZONE

FALLS KILL

DON’T BECOME A

STATISTIC !!

Larsen & Toubro – E&C Division

Page 5: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

5

Excessive

overhang on

planks

Guardrails

missing on

working levels

No fall

protection

Larsen & Toubro – E&C Division

Page 6: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

?? Reduced Inlet Piping

Anything wrong

here?

Reduced

Inlet Piping

Larsen & Toubro – E&C Division

Page 7: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

?? Plugged Bellows, Failed Inspection, Maintenance

Bellows plugged

in spite of sign

Anything wrong

here?

Failed

Inspection

Program

Signs of

Maintenance

Issues

Larsen & Toubro – E&C Division

Page 8: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

?? Discharges Pointing DownAnything wrong

here?

Anything wrong

here?

Discharges

Pointing Down

Larsen & Toubro – E&C Division

Page 9: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

?? Long Moment Arm

Anything wrong

here?

Long

Moment Arm

Larsen & Toubro – E&C Division

Page 10: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

?? Will these bolts hold in a relief event

Anything wrong

here?

Will these

bolts hold

in a

relief event?

Larsen & Toubro – E&C Division

Page 11: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Flixborough1 June 1974

April 2006 ICAO Seminar Baku

•Modification Control

•Use suitably trained, educated

and responsible people

•Know what you don’t know

Larsen & Toubro – E&C Division

Page 12: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

SevesoJuly 1976

Understanding safe state to leave reactions

Multiple layers of protection

Automated Reaction stop systems for exothermic systems

April 2006 ICAO Seminar Baku

Larsen & Toubro – E&C Division

Page 13: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Longford25 September 1998

Sale

Barry Beach

Marine Terminal

Long Island Point

Fractionation Plant,

Crude Oil Tank Farm

and Liquids Jetty

Longford

Gas & Oil Processing

Port

Phillip

Bay

c

Melbourne

Altona

Monotower

Sub-sea Well Oil Platform

Gas Platform

Concrete Structure

Barracouta Marlin

Snapper

Gooding

Compression (GTC)

c

c

• Training needs to impart and refresh knowledge.

• Must identify other hazards and provide relevant training.

•Corporate knowledge must be captured and kept alive

Larsen & Toubro – E&C Division

Page 14: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Major AccidentsPiper Alpha

• Deadliest Accident so far: 1988 Piper Alpha (167 fatalities)

• Caused by a Simple Mistake

• A Pressure Safety Valve was accidentally left open after Maintenance

• Plant started without knowing this

• Oil Fire ruptured Gas Riser leading to Massive Release of Gas

Larsen & Toubro – E&C Division

Page 15: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Piper Alpha

The Piper Alpha, as seen from a crew change helicopter, before the fire started.

Larsen & Toubro – E&C Division

Page 16: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Piper AlphaAll that remains of the oil platform after the devastating fire burns out.

Larsen & Toubro – E&C Division

Page 17: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Explosion on Transocean Rig

Deepwater Horizon Fire followed by the Rig sinking 24000 Gallons of Oil leaking from BOP Riser Worst Environmental Disaster in USA

Major AccidentsDeepwater Horizon Rig (2010)

17Larsen & Toubro – E&C Division

Page 18: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Deepwater Horizon Rig

The Deepwater Horizon Rig, before the fire Accident (2010).

Larsen & Toubro – E&C Division

Page 19: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Deepwater Horizon Rig

Capsizes (2010)

Larsen & Toubro – E&C Division

Page 20: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Bombay High offshore installation 2005: Risk assessment

identified that the installation was vulnerable to ship

collision because a critical pipe was unprotected. Work was

planned to build a guard around the pipe.

Larsen & Toubro – E&C Division

Page 21: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

On 28 July 2005 the dive support vessel collided with the

installation, the edge of the vessel’s heli-deck cut the pipe.

10 employees (from 220) and 40% of India's crude oil supply

were lost.

The hazards identified in risk assessment are real and require action

Larsen & Toubro – E&C Division

Page 22: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

LOAD OUT

MHN RD N-14 PLATFORM

Larsen & Toubro – E&C Division

Page 23: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

When Finished……Past Glory Restored

MHN RD N-14 PLATFORM

Larsen & Toubro – E&C Division

Page 24: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Common failures can be

avoided by

robust design

Larsen & Toubro – E&C Division

Page 25: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Successful Thought is One Thought Away From Normal Thought….

Larsen & Toubro – E&C Division

Page 26: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Structural/ Environmental

Causes:

Structural failures due to

extreme weather

Corrosion

Inadequate design

Crane boom collision

Consequences:

Asset damage

Multiple fatalities / injuries

Larsen & Toubro – E&C Division

Page 27: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Platform Destroyed by Drifting SEMI

Larsen & Toubro – E&C Division

Page 28: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

When accidents occur, structures withstand till the rescue arrives…..

Subsea intervention is expensive and shall be minimized

Excessive deflections are cause of worry….

Larsen & Toubro – E&C Division

Page 29: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Inadequate Deck Height

due to Subsidence

The seafloor at this

location has subsided 10

feet. The (+)10 is at the

waterline.

Larsen & Toubro – E&C Division

Page 30: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Mitigation

Before

After

After

40’ 54’

Reduce Consequence of Failure

1. Reduce Load on Platform

2. Increase Strength of Platform

Larsen & Toubro – E&C Division

Page 31: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Horizontal Exhaust of WHRE

Before After

Vertical Exhaust (25 m from deck plate)

Helideck

Job: Modification of Exhaust Duct to Prevent Hot Air during Chopper Take-off

Larsen & Toubro – E&C Division

Page 32: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Exposed Hot Oil Line

Crane Pedestal Line Protective Shed Structure

Before After

Job: Protective Shed Installation for Hot Oil Lines (NQO-NQP Bridge)

Larsen & Toubro – E&C Division

Page 33: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Deteriorated Heat Insulation

Replaced with new A-60 Rated Insulation

Before After

Job: Insulation below switch gear, control rooms and transformer rooms

Larsen & Toubro – E&C Division

Page 34: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Before After

New Staircase InstalledNo Secondary Staircase for Emergency

Job: Additional Staircase for Emergency from TG Top to Control Room

Larsen & Toubro – E&C Division

Page 35: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Inherently Safer Design, Green Chemistry

and Green Engineering

Green Chemistry

and Engineering

Inherently

Safer

Design

Larsen & Toubro – E&C Division

Page 36: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Ability to Influence Safety

Conceptual Design

Detailed Engineering

Procurement

Construction

Start-up

High

Low

Ability to

Influence

Safety

Project Schedule

Larsen & Toubro – E&C Division

Page 37: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Design Hazard Management

Inherent Safety

Appraise Select Define Execute Operate

Engineered Safety Procedural

Safety

Larsen & Toubro – E&C Division

Behavioral

Safety

Page 38: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Design Verification Process L&T

Design

KickoffDesign

Internal

Review

Issue for

Construction

External

Review

Trade contractor

involvement

• Establish design for

safety expectations

• Include construction and

operation perspective

• Identify design for safety

process and tools

• QA/QC

• Cross-discipline

review

• Focused safety review

• Owner review

Larsen & Toubro – E&C Division

Page 39: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Designin

Projects

Procurement

Engineering

QC at

Yard

Execution

Client/CA

TPIExternal BodiesInternal Bodies

CA:-Certifying Agency

TPI:-Third Party Inspection Agency

Marketing

Commissioning

L&T Design Interfaces Methodology

Larsen & Toubro – E&C Division

Page 40: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Example of Integral RelationFire Protection

QHSE Engineering

Fireproof Structural Steel Structural

Layout for Escape Routes Facilities

Fire Water Systems Piping / Facilities

Fire-fighting Equipment Facilities

Alarm and Shutdown

Systems

Instruments and Control

Vapour Detection Systems Instruments and Control

Larsen & Toubro – E&C Division

Page 41: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Example of Integral RelationFire Protection (Contd)

QHSE Engineering

Heating / Ventilating

(smoke)

Civil / Structural /

Facilities

Electrical Classification Electrical

Emergency response

plans

Operations / Maintenance

Fire size / duration Process

Fire and blast simulations Structural / Civil

Regulations / standards Contracts

Larsen & Toubro – E&C Division

Page 42: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Example of Integral RelationOther Examples (Contd)

QHSE Projects

Safety of Barges Incorporate Safety

Clauses in Barge Contract

Safety at Site Incorporate Safety

Clauses in Subcontracts

Safety at Site Yard Disciplinary Protocol

Safety of Equipment Safety Specs in

Procurement

Larsen & Toubro – E&C Division

Page 43: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

QHSE Studies

Preliminary Noise Study Preliminary Health Program

Preliminary Fire Study Checklist Studies (say 30)

Preliminary Explosion Study What-If Studies

Preliminary Toxic Gas Third Party Interfaces

Dispersion Study QHSE Audit Plan

Preliminary Smoke Study Project Behavioral Safety Plan

Preliminary Hazardous Area

Classification

Larsen & Toubro – E&C Division

Page 44: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

QHSE Studies

Design HAZOP Hazardous Area

ClassificationGas Dispersion StudyManagement of ChangeFire / Explosion Studyprogram

Noise Study

Smoke / Ventilation Study

Larsen & Toubro – E&C Division

Page 45: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Safety culture improvement

Technical improvement

Safety management

focused on

employees

Time

Inju

ries

Focus on people

Larsen & Toubro – E&C Division

Page 46: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Risk Containment at L&T

Highest priority to people

Behavior based safety management

PTW and JSA in place

Training & Courses for employees

Identify High Risk Activities

Action Plan Development

Governance Structure Facilitation

Safety Field Audit (SFA) – Including training on

the tool and field coaching

Implementation of Action Plan

46Larsen & Toubro – E&C Division

Page 47: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Page 48: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Page 49: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Page 50: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Safety Tool Box Talk

Larsen & Toubro – E&C Division

Page 51: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

CCTV INSTALLED ON TOP OF ELEVATOR

CCTV Monitoring

Larsen & Toubro – E&C Division

Page 52: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Hard Barricading for Ground Movement

Larsen & Toubro – E&C Division

Page 53: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Safety Nets

Larsen & Toubro – E&C Division

Page 54: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Safety Instructions in Cabins

Larsen & Toubro – E&C Division

Page 55: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

We always:• Comply with all applicable safety rules and regulations• Operate within design or environmental limits• Use/Involve right tools, equipment, procedures and people for the

job• Ensure safety devices are in place and functioning• Follow instructions and ask in case of doubt• Correct & report unsafe conditions, near misses and even minor

Injuries• Keep the job site clean and orderly• Follow written procedures for high risk and unusual situations• Use, maintain and repair equipment by authorized personnel only• Meet customers’ requirements and specifications

There is always time to do it right

Tenets of Operational Excellence

Larsen & Toubro – E&C Division

Page 56: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

L&T Policy on Contractor Management

Contractors HSE capability checks at the time of RFQ.

Internal audit and verification of fitness for employment in terms of resources.

Verification of certification and interviewing the employees to assess the competency level.

Assessment of HSE documentation system and HSE statistics

Larsen & Toubro – E&C Division

Page 57: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Structural marvels are created on everyday basis…

Larsen & Toubro – E&C Division

Page 58: Safety in Construction Designficci.in/events/20682/ISP/SMishra-Larsen-Toubro.pdf · Safety in Construction Design ... •9 Well platform project, ONGC •Songo Songo, Tanzania

Hazard Recognition and Risk Analysis

Challenging Journey of Offshore Structures …

Thank you

Larsen & Toubro – E&C Division