roof drainage questionnaire - buildingdrainage.aco · the more details you provide, the better...

1
Roof drainage questionnaire 1 2 3 Project identification Roof description Drainage selection Construction / project name: Technical specification contact person (e-mail, phone): Street, Town, Country: Design rainfall intensity (300l/s.ha if N/A): Peak rainfall intensity (600l/s.ha if N/A): Project type: Preferred drainage type: Roof type (inclination angle): Roof construction material: Roof surface material: Waterproof layer type / manufacturer: Roof insulated: Is the building intended to be used as a school, hospital or prison? Is emergency drainage required by the architect/designer? Project phase: new building siphonic flat (0-15deg.) concrete membrane only (e.g. Asphalt, TPO, m-PVC) Bitumen (e.g. Asphalt) below construction Yes Yes blueprint planning refurbishment gravity sloped (15-45 deg.) light metal (trapezoidal) pebble / gravel m-PVC / TPO above construction not insulated No No approval planning extension undecided sharp (+45deg.) wood/other green roof Sheet metal actual construction Please answer all the questions below to enable us to complete your designs and related calculations, and to avoid us having to ask for additional clarification on key points or to make unnecessary recalculations. Completed questionnaires should be emailed to: [email protected] | +420 734 797 373 A: m approach section min. 40 cm B: m height from roof to ground level C: m from roof to backflow level D: m distance from roof outlet to collector pipe line Documentation provided: Please provide us a roof drawing or hand made sketch. Must contain essential measures includig lengths, widths, different roof levels required for elevator installations, etc. CAD layouts Inclination plans Roof construction Cross sections Downpipe positions Sketches Comments: Completed questionnaires should be emailed to: [email protected] | +420 734 797 373 The more details you provide, the better first shot proposal will be. D A B C downpipe roof outlet collector pipeline

Upload: lamdung

Post on 13-Jul-2019

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Roof drainage questionnaire - buildingdrainage.aco · The more details you provide, the better first shot proposal will be. D A B C downpipe roof outlet collector pipeline. Created

Roof drainage questionnaire

1

2

3

Project identification

Roof description

Drainage selection

Construction / project name:

Technical specification contact person (e-mail, phone):

Street, Town, Country:

Design rainfall intensity (300l/s.ha if N/A):

Peak rainfall intensity (600l/s.ha if N/A):

Project type:

Preferred drainage type:

Roof type (inclination angle):

Roof construction material:

Roof surface material:

Waterproof layer type / manufacturer:

Roof insulated:

Is the building intended to be used as a school, hospital or prison?

Is emergency drainage required by the architect/designer?

Project phase:

new building

siphonic

flat (0-15deg.)

concrete

membrane only (e.g. Asphalt, TPO, m-PVC)

Bitumen (e.g. Asphalt)

below construction

Yes

Yes

blueprint planning

refurbishment

gravity

sloped (15-45 deg.)

light metal (trapezoidal)

pebble / gravel

m-PVC / TPO

above construction not insulated

No

No

approval planning

extension

undecided

sharp (+45deg.)

wood/other

green roof

Sheet metal

actual construction

Please answer all the questions below to enable us to complete your designs and related calculations, and to avoid us having to ask for additional clarification on key points or to make unnecessary recalculations. Completed questionnaires should be emailed to: [email protected] | +420 734 797 373

A: m approach section min. 40 cm

B: m height from roof to ground level

C: m from roof to backflow level

D: m distance from roof outlet to collector pipe line

Documentation provided:

Please provide us a roof drawing or hand made sketch. Must contain essential measures includig lengths,widths, different roof levels required for elevator installations, etc.

CAD layouts

Inclination plans

Roof construction

Cross sections

Downpipe positions

Sketches

Comments:

Completed questionnaires should be emailed to: [email protected] | +420 734 797 373

The more details you provide, the better first shot proposal will be.

D

A

B

C

downpipe

roof outlet

collector pipeline