Can you compete with this operator?
Roads andTransportTec hnology
CSIR
Overloading profits (per year)
OVERLOAD 5 tons 10 tons 20 tons
1 interlink truck R 54 000 R 108 000 R 216 000
10 interlink trucks R 540 000 R 1 080 000 R 2 160 000
100 interlink trucks R 5 400 000 R 10 800 000 R 21 600 000
Roads andTransportTec hnology
CSIR
80 - 85 % are legally loaded
15 - 20 % are overloaded
Heavy Vehicles
Heavy Vehicles
Cars
%DamageResult
EFFECT OF OVERLOADED VEHICLES
60 %
40 %
Road Roughness in QI units
0 20 40 60 80 100 120 140 1600.6
0.8
1
1.2
1.4
1.6
1.8
HDM Model CB-Roads DBSA Guide
VOCs of heavy trucks as affected byRoad Roughness
Roads andTransportTec hnology
CSIR
Roads andTransportTec hnology
CSIR
Overload Control Strategy
Holistic approach
ALTERNATI
VE RO
UTES
LEG
ISLA
TIO
NCO
URT SYSTE
M
MANPO
WER
MO
NITO
RING
INFR
ASTRUCTU
RE
FUNDIN
G
Roads andTransportTec hnology
CSIR
Gauteng Overload Control Strategy
Key Performance Areas Identification of corridors/areas
for control Monitoring (Weigh-in-Motion) New/existing infrastructure Manpower Strategy for roving teams
Roads andTransportTec hnology
CSIR
Gauteng Overload Control Strategy
Key Performance Areas Information management Inter-provincial co-operation Public awareness Consultation with stakeholders Sustainable funding Legislation
Roads andTransportTec hnology
CSIR
Roads andTransportTec hnology
CSIR
Roads andTransportTec hnology
CSIR
New England Southbound weigh-in-motion October 1999 to May 2001
02468
101214161820
Perc
enta
ge O
verlo
ads
Roads andTransportTec hnology
CSIR
Overload Control Programme
• Heidelberg Traffic Control Centre• One shift from 10 Dec; two shifts from 1
Jan; three shifts from 1 Feb.• Technical committee addressing all issues
pertaining to Heidelberg TCC• Official opening is planned for end Feb
2002
Roads andTransportTec hnology
CSIR
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Months
No
. of
Ve
hic
les
Vehicles Weighed Vehicles Overloaded Vehicles Charged
All Weighbridges : Jan 1999 to Sept 2001
Operation Boima 1
Operation Boima 2
Roads andTransportTec hnology
CSIR
Roads andTransportTec hnology
CSIR
Roads andTransportTec hnology
CSIR
Roads andTransportTec hnology
CSIR
Overload Control Statistics
1999/2000 2000/20012001/2002 (Apr-Sept)
Vehicles Weighed 14 802 18 274 27 837
Vehicles Overloaded8 617 (58%)
9 751 (53%)
10 152 (36%)
Vehicles Charged7 914 (53%)
8 568 (47%)
8 796 (32%)
Roads andTransportTec hnology
CSIR
ALL WEIGHBRIDGES : 1995 to Sept 2001
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
1995 1996 1997 1998 1999 2000 2001
Years
No
. o
f V
eh
icle
s
No of vehicles weighed No of vehicles overloaded No of vehicles charged
Roads andTransportTec hnology
CSIR
0
5
10
15
20
25
30
Years
Av
era
ge
Ov
erl
oa
ds
(%
)
Single axle Tandem axle unit Tridem axle unit
Annual Average Percentage Overloads: 1996 to 2001
Roads andTransportTec hnology
CSIR
Average Percentage Axle Group Overloads: 1988 to 2001 for KwaZulu-Natal
0
5
10
15
20
25
Single axle Tandem axle unit Tridem axle unit
Roads andTransportTec hnology
CSIR
Top Offenders in Gauteng - 2000
CompanyAverage Overload
(kg)
Vehicles Weighed
Vehicles Overloaded
Percentage Overloaded
Vehicles Charged
Percentage Charged
Coaltrans 7 385 109 96 88 89 82
L. Potgieter 6 877 29 25 86 24 83
Cargo Carriers 6 876 27 21 78 16 59
KGB Hauliers 6 502 47 44 94 41 87
BVB Transport 6 150 58 56 97 56 97
Parsons Transport 5 441 17 16 94 12 71
Zero Unlimited 5 008 18 18 100 18 100
Tornado Transport 4 949 20 16 80 15 75
Interbulk 4 653 32 31 97 29 91
Smalberger 4 378 25 24 96 22 88
Roads andTransportTec hnology
CSIR
Overload Control Strategy
• Information management• Identification of and meetings with
frequent offenders• Monitoring changes in heavy vehicle
volumes• Upgrading weighbridge computer
facilities
Roads andTransportTec hnology
CSIR
Roads andTransportTec hnology
CSIR
Roads andTransportTec hnology
CSIR
Overload Control in Gauteng
• Legislation
•Co-operation with Director of Public Prosecutions and Magistrates Commission re: overload seminars
•Database of outcome of charges of frequent offenders
•Responsibility of consignor/consignee
Roads andTransportTec hnology
CSIR
Overload Control Strategy
• Other issues• 5 % tolerance• Overload control meetings with Gautrans
Regional Controllers and Metro co-ordinators: technical and enforcement issues