rigid pavement design 58_2015
TRANSCRIPT
-
8/19/2019 Rigid Pavement Design 58_2015
1/16
DATA
1 State
2 Type of Road
3 Carriageway
4 Design period
5 Lane width6 Transverse joint spaing
! "#etive C$R of o%pated s&'(grade
) Design Tra* in C+,D in eah diretion
- A./e distri'&tion
a 0ront sing/e a./e
' Rear Sing/e A./e
Rear tande% a./e
d Rear tride% a./e
1
11 Trave/ing ti%e distri'&tion
6 A to 6,
6, to 6A
12 Average n&%'er of a./es per o%%eria/ vehi/e
13 a.i%&% Day ti%e te%perat&re di#erentia/ in s/a' for 'otto% &p ra
14
Sing/e A./e Tande% A./e
A./e Load C/ass A./e Load C/ass
1)5 1-5 1)715 3) 4
1!5 1)5 1!743 36 3)
165 1!5 1)72! 34 36
155 165 127-) 32 34
145 155 27-) 3 32
135 145 1762 2) 3
125 135 2762 26 2)
115 125 2765 24 26
15 115 2765 22 24
-5 15 3725 2 22
)5 -5 3725 1) 2
8 )5 14715 8 1)
1
CAS"(1 Conrete pave%ent with Tied Conrete Sho&/der with Dowe/ed joints
CAS"(2 Conrete pave%ent witho&t Tied Conrete Sho&/der and witho&t Dowe/
CAS"(3 Conrete pave%ent with widened o&ter /ane
CAS"(4 Conrete poave%ent 'onded to Dry Lean Layer
,erentage of o%%eria/ vehi/es with spaing 'etween the front a./e
9 the :rst rear a./e /ess than 475%
a.i%&% ight ti%e te%perat&re di#erentia/ in s/a' for Top downraing Day ti%e di#;2 of sing/ea./es
-
8/19/2019 Rigid Pavement Design 58_2015
2/16
?nterfae an 'e 'onded or &n'onded ,@C
DLC;Ce%ent treated Aggregate
Drainage Layer as per design
Separation /ayer rade ?;??;+;+?
S&'(grade
CAS"(1
ST",(1 Se/etion of od&/&s of s&'grade reation
i "#etive C$R of o%pated s&'grade
ii od&/&s of s&'(garde reation
iii ,rovide
ran&/ar s&'('ase
DLC S&'('ase
iv
v Provide a debonding layer of polythene sheet of 1
Se/etion of 0/e.&ra/ strength of onrete
i 2) days o%pressive strength of e%ent onrete
ii - days o%pressive strength of e%ent onrete
iii 2) days Be.&ra/ strength of e%ent onrete
iv - days Be.&ra/ strength of e%ent onrete
ST",(2 Concrete properties
i "/asti %od&/&s of onrete
ii ,oissons ratio of onrete
iii 'it weight of onrete
iv Design 0/e.&ra/ strength of onrete
ST",(3 Se/etion of Design Tra* for 0atig&e Ana/ysis
i Design period
ii Ann&a/ rate of growth of o%%eria/ tra*
iii Two way o%%eria/ vo/&%e per day
iv > tra* in predo%inant diretion
v Tota/ two way o%%eria/ vehi/es d&ring design period
vi Average n&%'er of a./es per o%%reia/ vehi/es
vii Tota/ two way o%%eria/ vehi/es d&ring design period
viii &%'er of a./es in predo%inant diretion
i.
. ight ti%e design a./e repetitions 12 ho&r
. Day ti%e design a./e repetitions 12 Eo&r
.i Day ti%e si. ho&r a./e /oad repetitions
"#etive %od&/&s of s&'(grade reation of o%'ined fo&grade< ran&/ar s&'('ase and DLC s&'('ase
Design Tra* after adj&sting for /atera/ p/ae%ent of a./diretion of tra* for %&/ti(/ane highways
-
8/19/2019 Rigid Pavement Design 58_2015
3/16
.ii
.iii ight ti%e Si. ho&r a./e /oad repetions
.iv
.v
.vi A./e /oad ategorywise design a./e /oad repetions for top
0ront Sing/e 45> 6!5)6!
Rear Sing/e 15> 2252)6- Tande% 25> 3!54!)2
Tride% 15> 2252)6-
ST", 4 Pavement Option1 ! Concrete pavement with "ied Concrete #h
i Tria/ Thiness
ii Radi&s of re/ative thiness
iii ' ! (eta )actor in the stress e*$ations will be +,-
ST", 5
C$m$lative )atig$e Damage analysis for (ottom $p Crac.ing
id point of the a./e /oad /ass is adopted for stress a/(ottom $p clac.ing )atig$e analysis for Day time ! -
Rear Sing/e a./es
1- 4))-6 275 755 63336 76!!!251)13
1) 3-26!5 274 74)5 1!32461 722665!33)-
1! 4115-- 273 7465 )3441- 74-563)52!16 2-2422 2726 745! 2--!!3 713-)4-43)
15 6!135 2 744 in:nite
14 364-6 17)5 73!4 in:nite
13 5-25 17!5 7354 in:nite
12 5-!1 17! 7343 in:nite
11 5-!1 176 7323 in:nite
1 !321) 175 733 in:nite
- !321) 174 72)3 in:nite
8- 31)!)1 173 7263 in:nite
2252- 7-6!-31316!
Eene Design n&%'er of a./e /oad repetions for bottom
> of o%%eria/ vehi//es having the spaing 'etween ta./e of the rear a./e &nit /ess than 475%
Si. ho&r night ti%e design a./e repetitions for"op downwhee/ 'ase 8 475%
A./eCategory
,ropotion ofa./eategory
CategorywiseA./e repetions for'otto% &praing ana/ysis
id(pointof A./e/oad in
".petedrepetitions
0/e.&ra/Stress pa
Stress Ratio SR
A//owa'/erepetions ni
0atig&e Da%age ni;i
-
8/19/2019 Rigid Pavement Design 58_2015
4/16
C$m$lative )atig$e Damage analysis for "op down Crac.ing
id point of the a./e /oad /ass is adopted for stress a/
"op Down clac.ing )atig$e analysis for 3ight time ! -
Rear Sing/e a./es
1- 33!33- 274 74)5 1!32461 71-4!1664)!
1) 323-5! 273 7465 )3441- 73-11-45
1! 33-56- 272 7444 in:nite
16 24124) 271 7424 in:nite
15 553)! 2 744 in:nite
14 311 17- 73)4 in:nite
13 4)6-6 17) 7364 in:nite
12 4-253 17! 7343 in:nite
11 4-253 176 7323 in:nite1 645 175 733 in:nite
- 174 72)3 in:nite
8- 173 7263 in:nite
7233!26)432
1- 7!
id(point
of A./e/oad in ".petedrepetitions 0/e.&ra/Stress pa Stress Ratio SR
A//owa'/e
repetions ni 0atig&e Da%age ni;i
-
8/19/2019 Rigid Pavement Design 58_2015
5/16
$ihar
E
0o&r /ane divided
3 years
375 %
475 %
)>
3
45>
15>
25>
15>
55>
4>
6>
2735
ing 167)
1374
Tride% A./e
A./e Load C/ass
1475 53 56 5723
175 5 53 47)5
3763 4! 5 3744
275 44 4! !712
276- 41 44 1711
1726 3) 41 1271
37- 35 3) 1575!
571- 32 35 1372)
673 2- 32 4755
674 26 2- 3716
)7- 23 26 371
34723 8 23 1!75)
1 1
d joints
CC
0re=&eny > of Tande% a./es
0re=&eny >of Tride% a./es
-
8/19/2019 Rigid Pavement Design 58_2015
6/16
s&'('ase
of 417272
F )>
F 573 pa;% fro% Ta'/e 2
F 15 %%
F 15 %% ! days o%pr
F 2)5 ,a;% 0ro% ta'/e 4
5 micron between DLC & PQC
G 4 pa
G 4) ,a
F 475 ,a
F 47-5 ,a
" F 3 pa
H F 715
I F 24
F 47-5 ,a
F 3 years
F 7!5
F 6
F 5>
F 2556446-2 C+
F 2735
F 6!6526
F 33)2513
F !5-562)
F 455!3!!
F 33)251F 151-126
dation of s&'(
;%3
s 25> of predo%onant
-
8/19/2019 Rigid Pavement Design 58_2015
7/16
F 15+1412-
F 2252)6)-
F 55>
F 124+4
down and 'otto% &p
55!5)51
1)5)61!3-!6-5
1)5)61!
$lder with Doweled %oints
h F 72) %
? F 7666213 %
for doweled transverse %oints for carrying o$t "DC analysis
&/ations o$r tra/c and positive "emperat$re Di0erential
Rear Tande% A./es
544443 271 7424 in:nite
3-4252 2 744 in:nite
1362-- 17- 73)4 in:nite -3)! 17) 7364 in:nite
114 17! 7343 in:nite
4!31 176 7323 in:nite
146436 175 733 in:nite
1-4)!3 174 72)3 in:nite
236551 173 7263 in:nite
2436 172 7242 in:nite
3341!6 171 7222 in:nite
12)5262 1 722 in:nite
562
$p crac.ing analysis
e front a./e and the :rst
crac.ing analysis for
CategorywiseA./e repetions for
Top downraing ana/ysis
".petedrepetitions
0/e.&ra/Stress pa
StressRatio SR
A//owa'/erepetions ni
0atig&eDa%age ni;i
-
8/19/2019 Rigid Pavement Design 58_2015
8/16
&/ations
o$r tra/c and negative "emperat$re Di0erential
Rear Tande% A./es
44-166 273 7465 1!32461 725-265 11!)25
32525) 272 7444 )3441- 73-16! 1-264
112446 271 7424 !!4--
!!442 2 744 1644
)332) 17- 73)4 22!!65
3-31 17) 7364 2!5!
12)1 17! 7343 35!!2
16!! 176 7323 2--1)1
1-5155 175 733 12561-)252 174 72)3 !11-1
2!56-5 173 7263 6-)3-
16341 172 7242 3-654
+4-46 72-)432 2252+
".petedrepetitions 0/e.&ra/Stress pa
Stress
Ratio SR
A//owa'/e
repetions ni
0atig&e
Da%age ni;i ".petedrepetitions
-
8/19/2019 Rigid Pavement Design 58_2015
9/16
-
8/19/2019 Rigid Pavement Design 58_2015
10/16
ssive strength of ! pa
-
8/19/2019 Rigid Pavement Design 58_2015
11/16
-
8/19/2019 Rigid Pavement Design 58_2015
12/16
Rear Tride% A./es
2735 74!5 1!32461 76)1
2725 7455 )3441- 71315!
2715 7434
275 7414
17-5 73-4
17)5 73!4
17!5 7354
1765 7333
1755 73131745 72-3
1735 72!3
1725 7253
7)116)
0/e.&ra/
Stresspa
Stress
Ratio SR
A//owa'/e
repetionsni
0at g&eDa%age
ni;i
-
8/19/2019 Rigid Pavement Design 58_2015
13/16
D7#893 O) D:;83;97 L;
) a%'er 275>
- e%'an%ent side s/ope 2J1
1 ,@C 3 %%
11 DLC 15 %%
12 Thiness of drainage /ayer 15 %%
13 Drainage /ayer wi// 'e provided 'e/ow DLC /ayer for f&// width of e%'a
D"S?
1 Co%'ined thiness of DLC
$ D
A$ F
AC F
AD F
Drop of e/evation a/ong AC F
Drop of e/evation a/ong CD F
Drop of e/evation a/ong AD F
radient a/ong AD F
Cra in:/tration rate F
&%'er of /ongit&dina/ joint F
Kidth of pave%ent s&'jeted to in:/tration F
/ength of transverse ras or joints FSpaing of transverse joint F
rate :/tration thro&gh &nraed pave%ent F
Diretion of Bow of water
-
8/19/2019 Rigid Pavement Design 58_2015
14/16
rate of in:/tration of water into pave%ent F
F
@ F
A F
Kith drainage /ayer of 715% A F
Re=&ired oe*ient of per%ea'i/ity F
A%o&nt of in:/trated water per %etre width Bowing a/ong thepath AD of the drainage /ayer
-
8/19/2019 Rigid Pavement Design 58_2015
15/16
n%ent
174%
1274) %
16725 %
73!44%
726%
76344%
73-4
7223
3
-75%
)75%475%
%3;day;%
-
8/19/2019 Rigid Pavement Design 58_2015
16/16
7115
17)6)!5
?A %3;day;%
4!7)! %3;day
715 s=%
31-%;day
%3;day;%
%3;day;%