resume - rick haase

7
CA Office 1145 Apache Ave. South Lake Tahoe, CA 96150 NY Office 70 W. 93rd St., #24E New York, NY 10025 Phone: (646) 666-0194 Mobile: (603) 231-1223 [email protected] www.axispointdesign.com Employment History Owner – Piping / Process Design Specialist, Axis Point Design (2004 - Present) – Responsible for high purity process/mechanical utility piping design, process equipment skid design, facility design/equipment vendor coordination, 3D model coordination and construction support on biotech/pharmaceutical projects throughout the United States and Singapore. Perform piping design activities of field as–builts, P&ID development, equipment layout, 3D facility and piping design, piping plan and detail development, piping material and installation specifications, design checking, vendor submittal review, and construction support. Manage Designers and Drafters. Resume Education A.A. Mechanical Design, Fox Valley Technical College, Appleton, WI Professional Registration & Training ISPE Member Intergraph CADWorx Plant Software Training Intergraph CADWorx P&ID Software Training Uniform Plumbing Code Training Scope of Facility Writing Scope of Services Writing Intergraph Microstation 3D Modeling Rick Haase Piping / Process Design Specialist Mr. Haase has 33 years of process facility, high purity process and utility piping design experience in the biotech/pharmaceutical, chemical, micro-electronics, and food/beverage industries. Biotech/Pharmaceutical experience includes design in the following areas: fermentation/bioreactors, media prep, buffer prep, purification, CIP, clean and plant utilities, process module and skid design, bulk powder handling, packaging. 27 years of CAD experience includes 3D modeling with bill of material database, intelligent P&ID’s, 2D construction drawings and CAD standards development on Autodesk/AutoCAD and Intergraph/Microstation based systems. Design activities on projects included project management, 3D model management, 3D M.E.P. facility space coordination, client liaison for vendor equipment and facility coordination, scope definition, engineering estimate, piping and instrumentation diagram development, facility and equipment layout, high purity process and utility piping design, process module and skid design, plumbing design, piping specification development, vendor submittal review, construction management, construction support, field verification of system as-builts and facility start-up. As a Piping/Process Design Specialist, he has contributed significantly to the success of many projects, including those listed below.

Upload: rhaase

Post on 20-May-2015

424 views

Category:

Career


8 download

TRANSCRIPT

Page 1: Resume - Rick Haase

CA Office 1145 Apache Ave. South Lake Tahoe, CA 96150 NY Office 70 W. 93rd St., #24E New York, NY 10025 Phone: (646) 666-0194 Mobile: (603) 231-1223 [email protected] www.axispointdesign.com

Employment History Owner – Piping / Process Design Specialist, Axis Point Design (2004 - Present) – Responsible for high

purity process/mechanical utility piping design, process equipment skid design, facility design/equipment vendor coordination, 3D model coordination and construction support on biotech/pharmaceutical projects throughout the United States and Singapore. Perform piping design activities of field as–builts, P&ID development, equipment layout, 3D facility and piping design, piping plan and detail development, piping material and installation specifications, design checking, vendor submittal review, and construction support. Manage Designers and Drafters.

Resume Education

• A.A. Mechanical Design,

Fox Valley Technical

College, Appleton, WI

Professional Registration & Training

• ISPE Member

• Intergraph CADWorx Plant

Software Training

• Intergraph CADWorx P&ID

Software Training

• Uniform Plumbing Code

Training

• Scope of Facility Writing

• Scope of Services Writing

• Intergraph Microstation 3D

Modeling

Rick Haase Piping / Process Design Specialist

Mr. Haase has 33 years of process facility, high purity process and

utility piping design experience in the biotech/pharmaceutical,

chemical, micro-electronics, and food/beverage industries.

Biotech/Pharmaceutical experience includes design in the following

areas: fermentation/bioreactors, media prep, buffer prep, purification,

CIP, clean and plant utilities, process module and skid design, bulk

powder handling, packaging.

27 years of CAD experience includes 3D modeling with bill of

material database, intelligent P&ID’s, 2D construction drawings and

CAD standards development on Autodesk/AutoCAD and

Intergraph/Microstation based systems.

Design activities on projects included project management, 3D

model management, 3D M.E.P. facility space coordination, client

liaison for vendor equipment and facility coordination, scope

definition, engineering estimate, piping and instrumentation diagram

development, facility and equipment layout, high purity process and

utility piping design, process module and skid design, plumbing

design, piping specification development, vendor submittal review,

construction management, construction support, field verification of

system as-builts and facility start-up.

As a Piping/Process Design Specialist, he has contributed

significantly to the success of many projects, including those listed

below.

Page 2: Resume - Rick Haase

Resume - Rick Haase

2

Lead Piping Designer, Phoenix Imperative Inc. (2001 - 2004) – Responsible for piping design activities of intelligent P&ID development, 3D equipment and piping model development for process modules, piping plan and detail development, piping fabrication isometrics, process module vendor coordination, facility equipment layout, design checking, vendor submittal review, and construction support. Also managed Piping Designers/Drafters.

Senior Piping Designer, Fluor Daniel (1989 - 2001) – Responsible for piping design activities on biotech/pharmaceutical, food and beverage, chemical facility projects. Performed piping design activities of field as–builts, P&ID development, equipment layout, 3D facility and piping design, piping/plumbing plan and detail development, piping material and installation specifications, design checking, vendor submittal review, and construction support. Also functioned as Discipline CAD Coordinator. Worked in Chicago, San Francisco and field offices.

Machine Designer, Voith Inc. (1979 - 1988) – Responsible for the design and drafting of various paper making machines.

Project Experience

Novartis Singapore Pharmaceuticals Manufacturing Pte Ltd, Singapore – BioPharmOps Project (through Jacobs Engineering)

Large Scale Cell Culture Facility, Grass Roots. - Responsible for 3D process piping design, upstream manufacturing process module design and coordination. Supervised (10) Designers. Design activities on project included: BIM / MEP coordination, 3D process piping model development with material database, piping plan and detail development, piping fabrication isometrics, facility equipment layout, piping material and installation specifications, design checking, vendor submittal review, process equipment / module vendor coordination and construction support.

Roche Singapore Technical Operations Pte Ltd, Singapore – DI/WFI Water Upgrade Project

Deionized Water/Water For Injection Generation and distribution Expansion. - Responsible for new 3D process piping design and existing piping design modifications. Design activities on project included: BIM / MEP coordination, 3D process piping model development with material database, piping plan and detail development, piping fabrication isometrics, piping material and installation specifications, design checking, vendor submittal review, and construction support.

Lonza Biologics Tuas Pte Ltd, Singapore – Media Prep Suite Addition

Media Prep Suite Addition. - Responsible for 3D suite design of equipment, platform, vessels, process and utility piping design. Design activities on project included: BIM / MEP coordination, 3D process equipment and piping model development with material database, piping plan and detail development, piping fabrication isometrics, facility equipment layout, piping material and installation specifications, design checking, vendor submittal review, model design reviews via internet.

Lonza Biologics, Portsmouth, NH – Purification Suite Build-out (through Parsons)

Purification Suite Build-out, 2 story expansion. - Responsible for 3D model management of entire project, which included process skid and equipment vendors. 3D model management activities included: BIM / MEP coordination, development of project modeling guidelines, discipline space coordination and clash resolutions, 3D model reviews via internet. Design activities on project

Page 3: Resume - Rick Haase

Resume - Rick Haase

3

included: 3D process equipment and piping model development with material database, piping plan and detail development, piping fabrication isometrics, process equipment vendor coordination, facility equipment layout, piping material and installation specifications, design checking, vendor submittal review, and construction support.

Baxter Bioscience, Hayward, CA – Lab Relocation Project

Lab Relocation Project. - Responsible for lab demolition drawing package, lab general arrangement plan, lab utility and piping design, and installation drawing package.

Roche Singapore Technical Operations Pte Ltd, Singapore – Clean Steam Distribution Expansion (through Lifetek Solutions)

Clean Steam Distribution Expansion. - Responsible for 3D process piping design modifications. Design activities on project included: BIM / MEP coordination, 3D process piping model development with material database, piping plan and detail development, piping fabrication isometrics, piping material and installation specifications, design checking, vendor submittal review, and construction support.

Lonza Biologics Tuas Pte Ltd, Singapore – Water for Injection Storage and Distribution Expansion

(through Lifetek Solutions)

Water for Injection Storage and Distribution Expansion. - Responsible for 3D skid design of process piping design. Design activities on project included: BIM / MEP coordination, 3D process equipment and piping model development with material database, piping plan and detail development, piping fabrication isometrics, facility equipment layout, piping material and installation specifications, design checking, vendor submittal review, model design reviews via internet.

Lonza Biologics Tuas Pte Ltd, Singapore – Media Prep Tri-Blender Installation and Process Piping Modifications

Media Prep Tri-Blender Installation and Process Piping Modifications. - Responsible for 3D design of process piping modifications. Design activities on project included: 3D process equipment and piping model development with material database, piping plan and detail development, piping fabrication isometrics, facility equipment layout, piping material and installation specifications, design checking, vendor submittal review, model design reviews via internet.

Novartis, Emeryville, CA – Laboratory Renovation (through Ipurity)

Laboratory Renovation Project (Fully 3D modeled) - Responsible for 3D process/mechanical piping design, including existing site utility survey information, BIM / MEP coordination, piping plans and details.

Lonza Biologics Tuas Pte Ltd, Singapore – WFI Storage and Distribution Loop System Addition (through Lifetek Solutions)

WFI storage vessel, heat exchangers, distribution pumps and distribution loop addition for new building addition. - Responsible for 3D design of equipment skids and piping design. Design activities on project included: BIM / MEP coordination, 3D process equipment and piping model development with material database, piping plan and detail development, piping fabrication isometrics, facility equipment layout, piping material and installation specifications, design checking, vendor submittal review, model design reviews via internet.

Page 4: Resume - Rick Haase

Resume - Rick Haase

4

Bayer Healthcare, Berkeley, CA – Portable Vessel Blast Thaw Station (through Ipurity)

Portable Vessel Blast Thaw Station - Responsible for 3D process/mechanical piping design, including existing site survey information, process/utility P&ID development, vessel configuration, space coordination, piping plans and details.

Novartis, Holly Springs, NC – Technology Development Pilot Plant (through Lifetek Solutions)

New Pilot Plant Facility Project (Fully 3D modeled) - Responsible for 3D process/mechanical piping design, including existing site utility survey information, process/utility P&ID development, BIM / MEP coordination, piping plans and details.

Allergan, Waco, TX – Process/Compounding Skid (through DCI/Lifetek Solutions)

Process/Compounding Skid w/ (3) process vessels, frame and supporting process/utility piping and accessories. - Responsible for 3D skid design. Design activities on project included: 3D process equipment, frame and piping model development, skid assembly plan and detail development, piping fabrication isometrics, piping material and installation specifications, design checking, vendor submittal review, and skid fabrication support.

Roche Singapore Technical Operations Pte Ltd, Singapore – WFI Loop & Storage Modifications

Piping and Control Modifications to WFI Return Loop and Storage Systems. - Responsible for 3D process piping design modifications. Design activities on project included: BIM / MEP coordination, 3D process equipment and piping model development with material database, piping plan and detail development, piping fabrication isometrics, facility equipment layout, piping material and installation specifications, design checking, vendor submittal review, and construction support.

Roche Singapore Technical Operations Pte Ltd, Singapore – Waste Water System Upgrade

Waste Water System Modifications. - Responsible for 3D model management, equipment arrangements and piping design. 3D model management activities included: discipline space coordination and clash resolutions, 3D model reviews via Webex. Design activities on project included: 3D equipment and piping model development with material database, piping plan and detail development, equipment vendor coordination, facility equipment layout, piping material and installation specifications, design checking, vendor submittal review, and construction support.

Lonza BioSciences Singapore Pte Ltd, Singapore – Water Pre-Treatment Upgrade

Piping modifications required for addition of (2) UV Sterilization Units. - Responsible for 3D piping design modifications. Design activities on project included: 3D process equipment and piping model development with material database, piping plan and detail development, piping fabrication isometrics, facility equipment layout, piping material and installation specifications, design checking, vendor submittal review, and construction support.

Lonza BioSciences Singapore Pte Ltd, Singapore – Multiple Customer Filtration Modifications

Piping modifications required for additional product filtration installations. - Responsible for 3D process piping design modifications. Design activities on project included: 3D process equipment and piping model development with material database, piping plan and detail development, piping fabrication isometrics, facility equipment layout, piping material and installation specifications, design checking, vendor submittal review, and construction support.

Page 5: Resume - Rick Haase

Resume - Rick Haase

5

Lonza BioSciences Singapore Pte Ltd, Singapore – (2) 200L Bioreactor Installation

Piping modifications required for installation of (2) 200L Bioreactors. - Responsible for 3D process and utility piping design modifications. Design activities on project included: 3D process equipment and piping model development with material database, piping plan and detail development, piping fabrication isometrics, facility equipment layout, piping material and installation specifications, design checking, vendor submittal review, and construction support.

Roche Singapore Technical Operations Pte Ltd, Singapore – Purified Water System

Design and Installation of new Purified Water System including generation, storage and distribution. - Responsible for 3D model management, process equipment design and process piping. 3D model management activities included: BIM / MEP coordination, development of project modeling guidelines, discipline space coordination and clash resolutions, 3D model reviews via Webex. Design activities on project included: 3D process equipment and piping model development with material database, piping plan and detail development, piping fabrication isometrics, process module vendor coordination, facility equipment layout, piping material and installation specifications, design checking, vendor submittal review, and construction support.

Baxter Bioscience, Hayward, CA – Plant Steam Boiler Replacement

Plant Steam Boiler Replacement along with Steam Distribution and Condensate Return Piping. - Responsible for demolition drawing package, boiler room general arrangement plan, 3D steam and condensate piping design, and installation drawing package. Also assisted with vendor submittal reviews and field construction support.

Dendreon, Seal Beach, CA – Immunotherapy Manufacturing Facility (through Lifetek Solutions)

Immunotherapy Manufacturing Facility Project (Fully 3D modeled) - Responsible for BIM / MEP coordination, 3D process/mechanical piping design, including piping plans and details. Assisted with field construction support.

Dendreon, Union City, GA – Immunotherapy Manufacturing Facility (through Lifetek Solutions)

Immunotherapy Manufacturing Facility Project (Fully 3D modeled) - Responsible for BIM / MEP coordination, 3D process/mechanical piping design, including piping plans and details.

Lonza Biologics Tuas Pte Ltd, Singapore – Large Scale Cell Culture Facility (through Parsons)

Large Scale Cell Culture Project LBXS-2, 280,000 Sq. Ft. Grass Roots Facility (Fully 3D modeled). - Responsible for 3D model management of entire project, which included 2 major Engineering Firms and 5 major Process Module/Super Skid vendors located in various global locations. 3D model management activities included: BIM / MEP coordination, development of project modeling guidelines, discipline space coordination and clash resolutions, 3D model reviews via Webex. Design activities on project included: 3D process equipment and piping model development with material database, piping plan and detail development, piping fabrication isometrics (1200+ isos created), process module vendor coordination, facility equipment layout, piping material and installation specifications, design checking, vendor submittal review, and construction support.

BioMarin Pharmaceutical Inc., Novato, CA – Heat Treatment Skid (through Lifetek Solutions/DCI)

Heat Treatment Skid - 650L process vessel, heat exchanger, pump w/process and utility piping. Used for heating/cooling a process intermediate stream to remove background impurities. - Responsible for 3D skid design, including client model reviews via Webex, assembly drawing, frame details, and

Page 6: Resume - Rick Haase

Resume - Rick Haase

6

piping fabrication isometric drawings. Assisted with vendor submittal reviews, and shop fabrication support.

Roche (Lonza Biologics Singapore Pte Ltd), Singapore – Large Scale Cell Culture Facility (through Parsons)

Large Scale Cell Culture Project LBXS-1, 280,000 Sq. Ft. Grass Roots Facility (Fully 3D modeled). - Responsible for 3D model management of entire project, which included 2 major Engineering Firms and 5 major Process Module/Super Skid vendors located in various global locations. 3D model management activities included: BIM / MEP coordination, development of project modeling guidelines, discipline space coordination and clash resolutions, 3D model reviews via Webex. Design activities on project included: 3D process equipment and piping model development with material database, piping plan and detail development, piping fabrication isometrics (1100+ isos created), process module vendor coordination, facility equipment layout, piping material and installation specifications, design checking, vendor submittal review, and construction support. Less than 2% high purity piping re-work for piping designed by Axis Point Design.

Baxter Bioscience, Hayward, CA – 1600L & 400L Bioreactor Installation

Modified existing Cell Culture Suite to install new 1600L & 400L Bioreactors. - Responsible for process/utility piping distribution modifications and design. Also responsible for contractor coordination, on behalf of Baxter, as well as updating utility system P&ID and piping drawings, HVAC air flow diagrams, HVAC pressurization and classification drawings maintained as Baxter Master Files.

Baxter Bioscience, Hayward, CA – CoSeal/FloSeal Relocation

Relocated existing CoSeal/FloSeal manufacturing from Fremont, CA facility to Hayward, CA facility. - Responsible for process/utility system as-builts and HVAC system as-builts, updating process/utility system P&ID and piping drawings, HVAC air flow diagrams, HVAC pressurization and classification drawings.

Baxter Bioscience, Hayward, CA – Purification Suite Modifications

Expanded existing Purification Suite into existing Cell Inoculum & Gowning Rooms. - Responsible for utility system modifications and HVAC modifications, updating utility system P&ID and piping drawings, HVAC air flow diagrams, HVAC pressurization and classification drawings.

Dey L.P., Napa, CA – Clinical Pilot Plant, Detailed Design (through IPS)

Detailed design for 4,000 sq. ft. pilot plant for clinical and product launch quantities of products using Form/Fill Seal technology. - Responsible for equipment layouts, plant and process utility distribution p&ids, plant and process utility distribution piping, process waste and plumbing systems, piping system specifications.

Amgen, Bothell, WA – Wastewater Treatment System Replacement (through IPS)

Replacement of 8,500 gallon neutralization tank, bulk acid and caustic storage tanks, metering pumps, and associated piping. - Responsible for project management, equipment specification, equipment arrangements, piping design and specification, vendor submittal review, construction management and commissioning.

Orthovita, Malvern, PA – Costasis/Vitagel Relocation (through IPS)

Page 7: Resume - Rick Haase

Resume - Rick Haase

7

Relocation of purchased product process from Palo Alto, CA to Malvern, PA. - Responsible for site utility survey, P&ID development, equipment specification, fixture detail design, facility layout, process and utility piping design, vendor submittal review, construction support.

Baxter Bioscience, Fremont, CA – Purified Water System As-Builts

Required as-builts of Purified Water System P&ID and piping drawings. - Responsible for system walk down verification, updating system P&ID and piping drawings.

Baxter Bioscience, Hayward, CA – Process and Utility System As-Builts

Required as-builts of Process and Utility System P&IDs, facility and piping drawings. - Responsible for system walk down verification, updating system P&IDs, updating facility drawings, updating piping drawings, CAD standard development, document control protocol.

Amgen, Bothell, WA – HVAC System As-Builts (through IPS)

Required as-builts of cell culture facility HVAC system. - Responsible for system walk down verification, updating system P&IDs, updating facility HVAC drawings.

Lonza Biologics, Portsmouth, NH – Large Scale Build-Out Project (through Parsons)

Large Scale Build-Out Project 280,000 Sq. Ft. Cell Culture Facility Expansion. - Responsible for piping design activities of intelligent P&ID development, 3D equipment and piping model development with material database for process modules, piping plan and detail development, piping fabrication isometrics, process module vendor coordination, facility equipment layout, plumbing plan development, piping material and installation specifications, design checking, vendor submittal review, and construction support.

ITT PureFlo, Danvers, MA – Bioreactor Skid Piping Design (through SiberCAD)

Design of 300L bioreactor skid. - Responsible for 3D model of bioreactor skid, piping design, piping fabrication isometrics, bill of material extraction.

Nabisco, Various Locations – Bakery Modifications and Upgrades

Served as Lead Mechanical Designer on several projects. Performed piping design activities of P&ID development, equipment layout, piping and plumbing plan and detail development, construction support, and field as-builts. Also functioned as Discipline CAD Coordinator.

Pillsbury, Various Locations – Food Plants

Served as Lead Mechanical Designer on several projects throughout the Pillsbury and Green Giant Companies. Responsible for process equipment layout and piping design. Also assisted in equipment installations.