resume oct 2016
TRANSCRIPT
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
New No. 19 Old No.17 Natarajan street, Sekar Nagar , Jaffar Khan pet , Chennai -600 083.
Email: [email protected] , Res: 044-24742839
Mobile: 9444826597
CAREER SUMMARY
Thirty Nine ( 39 ) years in India, Enriched Environmental Engineering experience in Water and Sewerage infrastructure at Chennai Metropolitan City and had vital Civil Engineering practice on Construction of Under Ground / Over Head Reservoirs , Water Distribution Stations, Water Head Works, Water Treatment Plants , Sewage Treatment Plant, Sewage Pumping Stations allied O&M and Commissioning works Etc.,
DATE OF BIRTH 10 Th Dec 1955 NATIONALITY: Indian
EDUCATION
Bachelors Degree in Civil with Environmental Engineering Diversification , College of Engineering , Guindy , Anna University, Chennai , Tamil Nadu , Second Class, 2009 .
Diploma in Civil Engineering, Alagappa Government Polytechnic, Karaikudi , State Board of Technical Education, Tamil Nadu, Second Class, 1975.
Presently Completed PG Diploma Env.Law - Post Graduate Diploma in Environmental Law - @ National Law School of University India (NLSUI), Bangalore.
COMPUTER PROFICIENCY
MS Office, MS- DOS Windows 98/2000/XP/Windows 8
LINGUISTIC ABILITY
READ WRITE SPEAK
Page | 1
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
ENGLISH Yes Yes Yes
Tamil Yes Yes Yes
Kannadam - - Yes
Page 2 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
KEY SKILLS
Enriched Environmental Engineering experience in Water and Sewerage infrastructures at Chennai Metropolitan City and had vital Civil Engineering practice on Construction of Under Ground / Over Head Reservoirs , Water Distribution Stations, Water Head Works, Water Treatment Plants , Sewage Treatment Plant, Sewage Pumping Stations other viaduct structures and High rise buildings, Buildings, Machineries Installations Etc.,
Extensive expertise of Project Management Consultancy works of site supervision, construction and commissioning, O&M works accountancy, tendering and evaluation.
Experience in detailed drawings and specifications according to Tamil Nadu Building Practice, CPWD norms and specifications and CPHEEO (Central Publich Health and Environmental Engineering ) manuals on Water Supply and Sewage and its Treatment, CRZ regulations and chiefly Environmental Protection Act rules and regulations etc.,.
Enriched practice of construction methods as per Indian Standards/ BIS, NBC Codes, World Bank/ JBIC, National / International, FIDIC conditions of Contract and execution methods
Proficiency in Measurement, verification and certification of contractors bills etc., Assist contract management, Resolution of Disputes & Arbitration and its Negotiation of Contract Law conciliations, and extension of time.
Assist in testing, trial run & commissioning. Assist in preparation of 'as built' drawing, taking over and closeout report. Post construction services during defect liability period.
Experience in Project Management Consultancy Services for Building Projects, Roads & Bridges, Urban Transport , Water Supply, Sewerage, Waste Water, Solid Waste Experience in Project
Page 3 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
Pre and Post review and Quality / Quantity Auditing , besides had experience in Arbitration and Conciliations.
Had expertise in geotechnical profile analysis. Knowledge of construction methods and construction sequences in civil structural constructions above or below the ground. Besides Knowledge with IRC, Indian Standards, British Codes and Euro Codes, Occupational Safety Health Act, HSE regulations with related labour laws on contract.
EXPERIENCE RECORD:
Organization E S I C - Employees State Insurance Corporation- Hospital, and Occupational Diseases Centre .Ministry of Labour &Employment , Government of India K .K. Nagar, Chennai - 600078, Tamil Nadu ,India
Duration July 2015 - September 2016 – One Year 3 Months Positions Held Assistant Engineer - Civil , Construction and Maintenance Wing, ESIC Hospital, KK Nagar , Chennai- 78
Job Description
Operation & Maintenance of Civil Engineering and Environmental works of 24 x 7 functioning of ESIC Hospital and Occupational Diseases Centre and Bio- Medical Waste Disposal and House Keeping strategy and allied policies.
Responsibilities
In coordination with the Medical Superintendant plan, coordinate and implement, the technical studies for O&M of Hospital.
Page 4 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
Oversee site reconnaissance/technical surveys/assessments and prepare projects or other reports and preliminary cost estimates.
Preparation and maintenance of a detailed implementation plan and in the development of the program work plan, ensuring accurate input into specific plans.
Periodical preparation and review of programs/projects status reports for management, budget review, annual reports, etc.; ensuring that recommendations of technical nature are made to program design and implementation strategies to improve efficiency and effectiveness of service delivery.
Conduct / review technical assessments including O&M practices and governance framework for 24 x 7 ESIC Hospital and Occupational Diseases Centre.
Liaise and closely coordinate with relevant officials from the PCB, municipal water authority and other key Service providers .
Organization LEAF SOCIETY ( Leadership through Education and Action Foundation Society )10/134. Trichy Main Road, Periyaveppanattham village post, Namakkal - 637001 , Tamilnadu ,India
Duration February 2015 - June 2015 – 5Months Positions Held Consultant- Sanitation - Fecal Sludge Management - "Tyumai" Study by Arghyam , Banagalore, Karnataka Open Defecation Elimination program Consultant
State Planning Commission, Tamil Nadu Consultant for School Toilet Program, BASF,
Mangalore, Karnataka.
Page 5 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
Job Description
Study for Data collection and Dissemination of Open Defecation Elimination program/State Planning Commission, Tamil Nadu / Consultant- Sanitation - Fecal Sludge Management - "Tyumai" Study by Arghyam at Namakkal District , and Consultant for CSR -School Toilet Program , BASF, Mangalore, Karnataka Operation and Maintenance strategy and allied policies.
Responsibilities
Study for field Data collections of Sanitation at Namakkal Municipality and Erumapatti Town Panchayat
Conduct / review technical assessments including O&M practices and governance framework for urban decentralized sanitation infrastructure in Town Panchayat and Municipalities.
Liaise and closely coordinate with relevant officials from the municipal water authority and other key actors.
Coordination with State Revenue Authorities / Tamil Nadu Municipal and Directorate of Town Panchayat authorities.
Oversee development of capacity building program. Mentor and supervise technical teams to ensure quality of projects implemented
Organization Institute of Sustainable Development - Non Profit Organisation, Avadi , Chennai , Tamilnadu ,India
Duration November 2014 to January 2015 – 3 Months Positions Held Consultant- Rural water Supply - Community Water PLUS Job Description
Page 6 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
Study for Data collection at Erode District Rural Water Supply at Kathiram patty village and Vannankattu valasu village Panchayat for IRC Study workon Community Water Plus - Operation and Maintenance strategy and allied policies.
Responsibilities
Study for field Data collection at Erode District Rural Water Supply at Kathiram patty village and Vannankattu valasu village Panchayat.
Coordination with State Revenue Authorities / Tamilnadu Water and Drainage Board authorities.
Organization Tamilnadu Water Investment Company Ltd (TWIC) , Chennai -32 , Tamil nadu. India
Duration June 2014 – Sep 2014 – 4 Months Positions Held Consultant- water Supply & Waste Water Project Job Description
Pre feasibility study for Data collection, DPR Preparation, Bid Documents for EPC Project works.
Responsibilities
Prefeasibility study for Data collection to the Sea Water Desalination Plants at Thoothukudi and Ramanathapuram Districts, Tamilnadu, including review and preparation of DPR works.
Coordination with State Revenue Authorities / Tamilnadu Water and Drainage Board authorites.
Evaluation of bid document and selection of contractors , Supervision of construction works as per drawings, specifications and contract documents ,Preparation of implementation schedule using CPM / PERT tools, Verification of layout of all structures with equipment , Preparation of additional drawings and sketches required for execution ,Quality
Page 7 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
assurance & quality control services on materials and workmanship and Progress Report in MS Projects format for EPC Project GMR SEZ Ltd.,.
Detailed Project Report Proof checking for Sewerage Projects funded Kfw Funds for Kanyakumari Municipality and Vallam Municipality (Tanjore)
Organization Chennai Metropolitan Water Supply & Sewerage Board (CMWSSB), Tamil nadu. India
Duration Dec 2013 – Aug 1978 – 35 Years Positions Held Junior Engineer and Assistant Executive Engineer
ASSISTANT EXECUTIVE ENGIEER / Internal Audit Wing - Jan 2013 – Dec 2013
Job Description
Pre Audit and Post Audit of Project Works Govt of Tamil Nadu & JnNURM and various O& M Locations of Chennai Metro Water Board.
Arbitration and Reconciliation of Contract Law cases of Chennai Metro Water project works
Responsibilities
Quality Assurance Services (QAS) including review and monitoring for various types of Infrastructure Developmental works in Chennai Metropolitan City and its adjacent Urban Local Bodies and O&M works.
Project Pre and Post review and Quality / Quantity auditing, besides had experience in Arbitration and Conciliations.
Evaluation of bid document and selection of contractors , Supervision of construction works as per drawings, specifications and contract documents ,Preparation of implementation schedule using CPM / PERT tools, Verification of layout of all structures with equipment , Preparation of additional drawings and sketches required for execution ,Quality
Page 8 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
assurance & quality control services on materials and workmanship and Progress Report in MS Projects format.
Measurement, verification and certification of contractors’/Clents’ bills etc., Assist contract management, resolution of disputes, and extension of time. Assist in testing, trial run & commissioning. Assist in preparation of 'as built' drawing, taking over and closeout report.Post construction services during defect liability period.
Deputy Area Engineer / O&M / SAIDAPET, VALASARAWAKKAM - July 2011 – Dec 2012
Job Description O & M of Water Distribution and sewerage system disposals at Chennai
Municipal locations at Saidapet, Nandanam , Kotturpuram, C.I.T.Nagar, T.Nagar (Part) ,Valasarawakkam , Alwar Thiru Nagar , Nerkundram, and Mettu kuppam.
Responsibilities
O & M of regular daily Water supply Distribution and Sewage Disposal, Quality assurance of water distribution from Water Head works/ Sewage Pumping Stations for Consumers to meet the Environmental standards.
Water sampling and testing, locating the prevention of water pollution/ leaks /water losses and monitoring sewerage system and sewage generation and effective disposal from Sewage Pumping Stations to Sewage Treatment Plants.
Rehabilitation and Repair works on water trunk / feeder/ Distribution / House Service Connection and sewage gravity mains/ pumping mains etc.,
Providing new / rehabilitation of water / sewer house service connections to consumers.
Tax and Consumer charges collection , budgetary provisions, co- ordinate with local body Public Representatives and liaison with other service departments of Municipal Corporation / TNEB/ Revenue Authorities
Page 9 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
ASSISTANT EXECUTIVE ENGIEER / Infrmn. Tech. Corridor - June 2009 – Dec 2011
Projects Handled Est Cost: Rs. 47.77 Crores
Clear Water Transmission main from Kelambakkam Water Head Works along I T Corridor to Pallipattu Head Works – 22 Km
Water Distribution Station of 10 L capacity at Kelambakkam , I T Corridor
Water Distribution main on both sides of I T Corridor to Pallipattu Head Works – 45 Km
Sewer Pumping Main and Sewer Gravity system on both sides of I T Corridor to enable the adjacent Local Bodies – 64 Km
Sewage Treatment Plant at Navalur (ASP)and Sholinga Nallur (SBR)/ Sewage Pumping Stations at various locations along I T Corridor local bodies
Job Description The project is implemented under JnNURM Works includes Major I T Expressway, 4 Town
Panchayats and 10 Panchayat Unions.
The project envisages providing sustainable and protected drinking water supply and effective
Sewage Disposal to meet the demands of Information Technology Express way Corridor and
its adjacent Urban Local Bodies of Perngudi, Okkium Thoraipakkam,
SholingaNallur ,Kottivakkam , Karambakkam , Navalur, Siruseri , Semmanchery, Egattur,
Thaiyur, Kelam bakkam, and Padur.
Responsibilities
Detailed Project Report Preparations, Project implementation for the Water Distribution Station, Sewage Treatment Plant and Sewage Pumping Stations for the Information Technology Corridor – Rajiv Gandhi Salai (OMR) and its adjacent Local Bodies, Chennai Water supply and Sewerage Projects of JnNURM Works.
Project Construction and Commissioning of Water Distribution Station, Sewage Treatment Plant and Sewage Pumping Stations for the Information Technology Corridor – Rajiv Gandhi Salai (OMR) and its
Page 10 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
adjacent Local Bodies , Chennai Water supply and Sewerage Projects of JnNURM Works.
Land Alienation for Water Head Works / Sewage Treatment Plants / Sewage Pumping Stations with T N State Government Revenue Authorities
Environmental Clearances from TNPCB / CRZ Authority / State Environment Authority/ Ministry of Environment and Forest / GOI.
Study of survey maps and Geo-technical data’s, Supervision Head of Topographical Survey.
Co-ordination with the client in the technical evaluation of the DPR. Tender evaluation
O&M of regular daily Water supply Distribution and Sewage Disposal, Quality assurance of water distribution from Water Head works/ Sewage Pumping Stations for Consumers to meet the Environmental standards.
Page 11 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
ASSISTANT EXECUTIVE ENGIEER / Kattupalli Desalination - July 2007 –May 2009
Projects Handled
Clear Product Water/ Raw Water Transmission main from Kattupalli , Minjur 100 MLD De- Salination Plant along Minjur Panjety and Ponneri road to Manali Booster – 39 Km
Product Water Head Works, Under Ground Tank with Pumping Station (HT) to handle 100 MLD at Kattupalli , Minjur De- Salination Plant .
Intermediate Water Distribution Storage and Pumping Station with Under Ground Tank at Manali Booster for North Chennai water supply
Job Description
The project is implemented under JnNURM Works to meet demand of Chennai water supply
utilizing the Reverse Osmosis method Sea Water De-Salination source generation as first in
eternal unique way.
Responsibilities
Detailed Project Report Preparations, Project implementation for the Water Distribution Station, for the Chennai City Augmentation of Water Resource of JnNURM Works.
Project Construction and Commissioning of Water Distribution Station, Raw water / Product Water mains, billing, quantity and quality monitoring.
Land Alienation for Water Head Works / pipe laying with T N State Government Revenue Authorities and NHAI / Major Road Development departments of Highways, Railways.
Study of survey maps and Geo-technical datas. Supervision Head of Topographical Survey.
Co-ordination with the client in the technical evaluation of the DPR. Tender evaluation
O&M of regular daily Water supply Distribution , Quality assurance of water distribution from Water Head works for Consumers to meet the Environmental standards .
Page 12 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
ASSISTANT EXECUTIVE ENGINEER / Projects - Jan 2004 – May 2009
Ambattur sewerage scheme,Valasarawakkam wsy and building construction Mugapper
Projects Handled
Providing Sewerage Collection System – Gravity / Pumping mains/ Sewage Pumping Stations for the Ambattur Municipality – 63 Km
Water Head Works, Under Ground Tank with Pumping Station (LT) to handle 10 MLD at Korattur . Water distribution / feeder /trunk mains laying and commissioning at Korattur - 27 Km
Water Head Works, Under Ground Tank with Pumping Station (LT) to handle 10 MLD at Valasarawakkam . Water distribution / feeder /trunk mains laying and commissioning at Valasarawakkam. 58 KM
Building Construction for the O&M office at Mugappair
Job Description
The project is implemented under JnNURM Works to meet demand of Chennai water supply
and Sewerage system capacity enhancement
Responsibilities
Detailed Project Report Preparations, Project implementation for the Water Distribution Station, for the Chennai City Augmentation of Water Resource of JnNURM Works.
Project Construction and Commissioning of Water Distribution Station, Water mains for distribution, feeder mains, billing and quality and quantity monitoring.
Project Construction and Commissioning of Sewerage system of gravity collection system , pumping mains and sewage pumping stations .
Land Alienation for Water Head Works / pipe laying with T N State Government Revenue Authorities and NHAI / Major Road Development departments of Highways, Railways.
Page 13 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
Study of survey maps and Geo-technical datas. Supervision Head of Topographical Survey.
Co-ordination with the client in the technical evaluation of the DPR. Tender evaluation
O&M of regular daily Water supply Distribution, Quality assurance of water distribution from Water Head works for Consumers to meet the Environmental standards.
Junior Engineeer / Spl Grade - O&M - Sep 2003 – Dec 2004
Mobile Water Supply Distribution and Monitoring Job Description
Operation and maintenance of Mobile Water Supply for the Chennai City South Zone at K.K Nagar Choolaimedu and Valluvar Kottam Lorry filling stations for supply to consumers as drought mitigating measure for Saidapet, Nandanam , Kotturpuram, C.I.T.Nagar, T.Nagar (Part) Choolai medu , KK Nagar, vadapalani ,Valasarawakkam , Alwar Thiru Nagar , Nerkundram, and Mettu kuppam.
Responsibilities
O&M of regular uninterrupted mobile Water supply Distribution monitoring, Quality assurance of water distribution from Water Head works for Consumers to meet the Environmental standards.
Water sampling and testing, locating the prevention of water pollution/ leaks /water losses, Consumers complaint redress.
Junior Engineeer / Spl Grade - Projects - Mar 1993 – Aug 2004
Madras Transmission and Distribution Project, Second Chennai Project and Lands& Buildings KPS WTP
Projects Handled Est. Cost : 85 Crores
1500 mm / 1200 mm dia. PSC/ MS Clear Water/ Raw Water Transmission main – Reach I, II and III from Redhills 300 MLD Water Treatment plant along NH-5 and IRR to Chennai City and Madavaram under Madras Transmission and Distribution Scheme – 59 Km .
Drought Mitigation work – Reverse Pumping of Raw Water arrangements from Porur Lake to Redhills Water Treatment plant
Page 14 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
Product Water Head Works, Under Ground Tank with Pumping Station (HT) to handle 15 MLD at Korattur.
Providing Integrated Water Distribution System with various mains from 1000mm dia. To 100 mm dia DI pipes for Pallipattu and Nandanam Zone under Second Chennai Water Project – 175 Km
Providing surplus water arrangements from Second Conduit and Disposal arrangements to overcome the inundation of KPS WTP.
Job Description The project is implemented under World Bank aided First Chennai (Madras Transmission and
Distribution System) and Second Chennai Project Works to meet demand of Chennai water
supply capacity enhancement and Strengthening of City Water Mains.
Responsibilities
Detailed Project Report Preparations, Project implementation for the Water Distribution Station for the Chennai City Augmentation of Water Resource of World Bank aided Works.
Project Construction and Commissioning of Water Distribution Station, Raw water / Product Water mains, billing, quantity and quality monitoring.
Land Alienation for Water Head Works / pipe laying with T N State Government Revenue Authorities and NHAI / Major Road Development departments of Highways, Railways. Eviction of Unauthorized occupants by Court proceedings to Resettlement and Rehabilitations.
Study of survey maps and Geo-technical datas. Supervision Head of Topographical Survey.
Co-ordination with the client in the technical evaluation of the DPR. Tender evaluation
O&M of regular daily Water supply Distribution, Quality assurance of water distribution from Water Head works for Consumers to meet the Environmental standards.
Junior Engineer/ Spl Grade / Projects - Jan 1990 – Feb 1993
Vysarpadi sewerage scheme , Diversion of zone 6 trunk main at Egmore
Projects Handled Est . Cost 29.80 Crores
Page 15 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
Providing Sewerage Collection System – Gravity / Pumping mains/ Sewage Pumping Stations for the Vysarpadi Sewerage Scheme – 49 Km
Diversion and Shifting of Zone – 6 Water Trunk main laying and Commissioning at Egmore - 7 Km
Job Description
The project is implemented under World Bank fund Works to meet demand of Chennai water
supply and Sewerage system capacity enhancement
Page 16 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
Responsibilities
Project Construction and Commissioning of Sewer gravity system, Sewer Pumping mains and Sewage Pumping Stations, feeder mains, billing and quality and quantity monitoring.
Land Alienation for Water Head Works / pipe laying with T N State Government Revenue Authorities and NHAI / Major Road Development departments of Highways , Railways.
Study of survey maps and Geo-technical datas. Supervision Head of Topographical Survey.
Co-ordination with the client in the technical evaluation of the DPR. Tender evaluation
Junior Engineer / O&M / Kodambakkam and Choolaimedu - Jun 1987
– Dec – 1990
Job Description
Operation and maintenance of sewerage system at Kodambakkam , Vadapalani, Choolai Medu, Gill Nagar, Zakkariah colony and Arumbakkam (Part).
Responsibilities
O&M of regular daily Water supply Distribution and Sewage Disposal, Quality assurance of water distribution from Water Head works/ Sewage Pumping Stations for Consumers to meet the Environmental standards.
Water sampling and testing, locating the prevention of water pollution/ leaks /water losses and monitoring sewerage system and sewage generation and effective disposal from Sewage Pumping Stations to Sewage Treatment Plants.
Rehabilitation and Repair works on water trunk / feeder/ Distribution / House Service Connection and sewage gravity mains/ pumping mains etc.,
Providing new / rehabilitation of water / sewer house service connections to consumers.
Page 17 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
Tax and Consumer charges collection , budgetary provisions, co- ordinate with local body Public Representatives and liaison with other service departments of Municipal Corporation / TNEB/ Revenue Authorities
Page 18 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
Junior Engineer / Planning and Designs, Resource planning - Jun 1986 – May 1987
Project Handled
Preparation of DPR & bid documents for various Govt grants Funded water scheme strengthening and rehabilitation of water mains - Est. Rs. 7.00 crores.
Description
The scope of Govt grants Funded water scheme strengthening and rehabilitation of water mains is to rehabilitate, refurbish and strengthening of water distribution system to achieve equitable distribution.
Responsibility
Involved in the co-ordination with the Board and Anna University in the Technical evaluation of the DPR.
Junior Engineer / O&M / Saidapet, Kottur puram Little mount - Aug 1983 – May 1986
Job Description
Operation and maintenance of sewerage system at Saidapet, Kotturpuram, Little Mount, Nandanam.
Responsibilities
O&M of regular daily Water supply Distribution and Sewage Disposal, Quality assurance of water distribution from Water Head works/ Sewage Pumping Stations for Consumers to meet the Environmental standards.
Water sampling and testing, locating the prevention of water pollution/ leaks /water losses and monitoring sewerage system and sewage generation and effective disposal from Sewage Pumping Stations to Sewage Treatment Plants.
Rehabilitation and Repair works on water trunk / feeder/ Distribution / House Service Connection and sewage gravity mains/ pumping mains etc.,
Page 19 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
Providing new / rehabilitation of water / sewer house service connections to consumers.
Tax and Consumer charges collection , budgetary provisions, co- ordinate with local body Public Representatives and liaison with other service departments of Municipal Corporation / TNEB/ Revenue Authorities
Junior Engineer /Projects - Jan 1980 to Sep 1993
Projects Handled
Thiruvanmiyur water supply scheme Southern Coastal Aquifer water extraction, Velachery water supply scheme, MGR Nagar water supply scheme
Providing Water Distribution system at Thiruvanmiyur and Source augmentation of Coastal Aquifer well extraction and Construction of 7 Lakh Litre OHT – 1No and allied Pumping station works. – Various dia PVC/CI Water mains from 110mm to 750 mm dia. - 81 Km – Est Cost Rs. 9.75 Crores.
Providing 750 mm Dia C.I. Water Supply Trunk main from Southern Coastal Aqufier wells at Akkarai, Neelankarai and Palavakkam along East Coast Road to Thiruvanmiyur Water Head Works and Indra Nagar OHT , Bore- Well construction and pumping station works. – 750 mm dia. C.I Main- 21 Km – Est Cost Rs. 5.30 Crores.
Providing Water Distribution system at Velacheri and Source augmentation of water supply Construction of 3.5 Lakh Litre OHT – 1No, UGT of 7 Lakh Litre capacity and allied Pumping station works. – Various dia PVC/CI Water mains from 110mm to 750 mm dia. - 63 Km – Est Cost Rs. 8.75 Crores.
Providing Water Distribution system at MGR Nagar and Source augmentation of water supply rehabilitating AC Mains in to C.I Water mains – Various dia CI Water mains from 110mm to 450 mm dia. - 32 Km – Est Cost Rs. 4.75 Crores.
Job Description
Page 20 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
The project is implemented under World Bank fund Works to meet demand of Chennai water
supply and Sewerage system capacity enhancement
Responsibilities
Project Construction and Commissioning of Water Distribution system, water head works and Pumping stations, Bore Well construction, feeder mains, billing and quality and quantity monitoring.
Land Alienation for Water Head Works / pipe laying with T N State Government Revenue Authorities and NHAI / Major Road Development departments of Highways , Railways.
Study of survey maps and Geo-technical datas. Supervision Head of Topographical Survey.
Co-ordination with the client in the technical evaluation of the DPR. Tender evaluation
Overseer / Planning and Designs and Resource Wing - Aug 1978 to Dec 1980
Project Handled
Preparation of DPR & bid documents for various Govt grants Funded and TNUDP water scheme strengthening and rehabilitation of water mains for Economically Weaker Section and Middle Income Groups - Est. Rs. 4.00 crores.
Description
The scope of Govt grants Funded water scheme strengthening and rehabilitation of water mains is to rehabilitate, refurbish and strengthening of water distribution system to achieve equitable distribution.
Responsibility
Involved in the co-ordination with the Board and Anna University in the Technical evaluation of the DPR.
Organization : Madras Municipal Corporation , Tamil nadu. India
Duration : July 1977 – Aug 1978 – 1 Year , 1 Month
Page 21 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
Positions Held : Overseer - Water Works
Overseer /Water Works Execution - July 1977 to July 1978
Project Handled
Preparation of DPR & bid documents and supervision for various Govt grants Funded and TNUDP water scheme strengthening and rehabilitation of water mains for Economically Weaker Section and middle Income Groups - Est. Rs. 3.00 crores.
Description
The scope of Govt grants funded water scheme strengthening and rehabilitation of water mains is to rehabilitate, refurbish and strengthening of water distribution system to achieve equitable distribution.
Responsibility
Supervision of Water Supply pipe laying works, Inter connection works and Rehabilitations of Water mains, Billing, Quantity and Quality assurance.
Pioneer Engineering Corporation, Chennai 600028 - Jul 1975 to June 1977
Supervisor / Technical
Project Handled
Construction of Layola Textile Mill factory Building , Uthiramerur, Coal Handling Plant , Ennore Thermal Power Plant Est. Rs. 4.5 crores.
Description
The scopes of works were Textile Mill Construction and Thermal Power Plant construction civil works supervision.
Responsibility
Page 22 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
Supervision of Construction of Buildings for Layola Textile Mill factory Building , Uthiramerur, Coal Handling Plant , Ennore Thermal Power Plant.
Preparation of plans and estimates, Construction management, Financial Accounts including
Involved in the co-ordination with the Board and Anna University in the Technical evaluation of the DPR.
TRAINING PROGRAMS ATTENDED:
Attended Chennai Metro Water Boards’ Training Programs of Planning, Organization Control Work Activities, Principles of Supervision, Operation & Maintenance System, Pre/ Post Commission methods, Water and Sewerage Pipe Laying, Quality Analysis of Water and Waste Water.
Attended Central Public Health and Environmental Engineering Organizations (CPHEEO) Water Distribution system, Sewerage System, Sewage/Water Treatment Plants training at Kreala Water Authority and Birihan Mumbai Corporation.
Page 23 of 24
CURRICULUM VITAE N.MEENAKSHISUNDARAM B.E.,
AREAS OF INTREST:
Project Management Consultancy of Water and Waste Water system schemes
Environmental History of Chennai Water Supply and Sewerage system
PAPERS PUBLISHED:
Article in
www.sewerhistory.org
http://www.sewerhistory.org/grfx/wh_region/India/index.html
Article in
www.indiawaterportal.org
http://www.indiawaterportal.org/articles/manual-scavenging-act-and-municipal-wastewater-workers-india-policy-and-practice
Hobbies:
Interested in Tamil Literature, Classical Music, Classical Films, Translation in Tamil
DECLARATION
I hereby acknowledge that all the information given above is true to the best of my knowledge.
Date N.MEENAKSHISUNADARM
Chennai 83.
Page 24 of 24