Page 1 of 6 Khalid Hanif QC Supervisor / Manager SAP No. 70008400 Contact Nos.: +966 55 889 6930 (KSA), +92 333 776 7103 (PAK) Emails: [email protected], [email protected] Objective: To realize true potential by working in an environment that is conducive to hard work and creative thinking. To seek a responsible and rewarding position with a leading organization, that ensures long-term carrier and growth opportunity. Educational & Technical Qualification: Technical Qualification: Diploma/Certification in the field of Electrical Technology from International Islamic University (Iqra Center for Technical Education)-Islamabad (Pakistan). Diploma/Certification in the field of Electronics Technology from International Islamic University (Iqra Center for Technical Education)-Islamabad (Pakistan). Awareness & Internal Audit Training (ISO 9001:2015, OHSAS 18001:2007 & ISO 14001:2015) from QCCS Quality Services Co. W. L. L, Al Khobar – Saudi Arabia. Secondary School Certificate (SSC): Board of Intermediate & Secondary Education Sargodha (Pakistan). Government High School Mankera, District Bhakkar “1st Div/B Grade” Computer Proficiency: Microsoft office-Word, Excel, PowerPoint, Outlook & Internet applications 22-YEARS PROFESSIONAL EXPERIENCE IN THE FOLLOWING COMPANIES IMAD COMPANY FOR TRADING & CONTRACTING, AL-KHOBER 31952 (SAUDI ARABIA) Position: QC Manager Duration: From April 07, 2014 to May 30, 2018 (4.2-Years) Client: Saudi Arabian Oil Company “SAUDI ARAMCO” Project: BI-10-01252 / Contact No. 6600030489 Co-Generation Interconnection Facilities at Abqaiq Plants (ABQ)-Saudi Arabia Scope of Work: Installation of interconnecting piping including valves, electrical, instrumentation, civil & steel structural works for the following utilities from the existing network to the 3 rd Party Cogeneration Facility: Boiler Feed Water System. (Carbon Steel, Pipe dia 14’’, 03-Kilometers long) High Pressure Steam System. (Low Alloy Steel, Pipe dia 30’’, 03-Kilometers long) Fuel Gas System. (Carbon Steel, Pipe dia 12’’, 500-Meters long) and Metering Skid Utility Water System. (Carbon Steel “FBE internal coated”, Pipe dia 6’’, 300-Meters long) Drinking Water System. (RTR/Carbon Steel, FBE internal coated, Pipe dia 3’’, 02-Kilometers long) Fire Water System. (Carbon Steel, FBE internal coated, Pipe dia 30’’, 200-Meters long) Oily / Storm Water System. (RTR/Carbon Steel, Pipe dia 4’’, 02-Kilometers long) Resume

Upload: others

Post on 22-May-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1 of 6

Khalid Hanif QC Supervisor / Manager

SAP No. 70008400 Contact Nos.: +966 55 889 6930 (KSA), +92 333 776 7103 (PAK)

Emails: [email protected], [email protected]

Objective: To realize true potential by working in an environment that is conducive to hard work and creative thinking. To seek a responsible and rewarding position with a leading organization, that ensures long-term carrier and growth opportunity.

Educational & Technical Qualification:

Technical Qualification:

Diploma/Certification in the field of Electrical Technology from International Islamic University (Iqra Center for Technical Education)-Islamabad (Pakistan).

Diploma/Certification in the field of Electronics Technology from International Islamic University (Iqra Center for Technical Education)-Islamabad (Pakistan).

Awareness & Internal Audit Training (ISO 9001:2015, OHSAS 18001:2007 & ISO 14001:2015) from QCCS Quality Services Co. W. L. L, Al Khobar – Saudi Arabia.

Secondary School Certificate (SSC):

Board of Intermediate & Secondary Education Sargodha (Pakistan). Government High School Mankera, District Bhakkar “1st Div/B Grade”

Computer Proficiency:

Microsoft office-Word, Excel, PowerPoint, Outlook & Internet applications

22-YEARS PROFESSIONAL EXPERIENCE IN THE FOLLOWING COMPANIES

IMAD COMPANY FOR TRADING & CONTRACTING, AL-KHOBER 31952 (SAUDI ARABIA)

Position: QC Manager

Duration: From April 07, 2014 to May 30, 2018 (4.2-Years)

Client: Saudi Arabian Oil Company “SAUDI ARAMCO”

Project: BI-10-01252 / Contact No. 6600030489

Co-Generation Interconnection Facilities at Abqaiq Plants (ABQ)-Saudi Arabia

Scope of Work:

Installation of interconnecting piping including valves, electrical, instrumentation, civil & steel structural works for the following utilities from the existing network to the 3rd Party Cogeneration Facility:

Boiler Feed Water System. (Carbon Steel, Pipe dia 14’’, 03-Kilometers long)

High Pressure Steam System. (Low Alloy Steel, Pipe dia 30’’, 03-Kilometers long)

Fuel Gas System. (Carbon Steel, Pipe dia 12’’, 500-Meters long) and Metering Skid

Utility Water System. (Carbon Steel “FBE internal coated”, Pipe dia 6’’, 300-Meters long)

Drinking Water System. (RTR/Carbon Steel, FBE internal coated, Pipe dia 3’’, 02-Kilometers long)

Fire Water System. (Carbon Steel, FBE internal coated, Pipe dia 30’’, 200-Meters long)

Oily / Storm Water System. (RTR/Carbon Steel, Pipe dia 4’’, 02-Kilometers long)

Resume

Page 2 of 6

Sewer Water System. (Carbon Steel, Pipe dia 14’’, 100-Meters long)

Complete Fabrication work of Steel Structural Supports & Pipe Spools (applied Pre-Heating & PWHT)

Non-Destructive Testing “NDT” (RT, PT, UT, PMI, Hardness Test, PAUT)

Civil & Structural works (Concrete foundations & pedestals, Galvanized Structural Pipe supports, structural bridges for piping, Platforms & Ladders, asphalting works.

Electrical & Instrumentation works (DCS, Loose Instruments, Lighting Poles, Control, Power & Fiber Optic Cables, Structural Grounding)

Painting / Coating works, Fire proofing works on steel structure, Hot Insulation & Cladding on Pipes.

Position: QC Supervisor / Projects Coordinator Duration: From April 23, 2013 to April 06, 2014 (1-Year)

Projects: 1) SAUDI ARAMCO (BI-10-01252 / Contact No. 6600030489) (Design Phase) Co-Generation Interconnection Facilities Abqaiq Plants (ABQ)-Saudi Arabia

2) SAUDI ARAMCO (BI-10-01256 / Contact No. 6600030489) (Design Phase) Co-Generation Interconnection Facilities Hawiyah Gas Plant (HGP)-Saudi Arabia

3) IMAD Real Estate (34-Residential Villas & Multistory Commercial Plaza), Al-Khober-KSA

4) New Construction of IMAD Petrol Station, Abu Hyderya. Dammam-Saudi Arabia

Duration: From March 21, 2012 to April 22, 2013 (1.1-Years)

Client: Saudi Arabian Oil Company “SAUDI ARAMCO”

Project: BI-10- 00059 / Contract No. 6600017880

Sulfur Recovery Plant Upgrade Phase-II @ Uthmaniyah Gas Plant (UGP)-Saudi Arabia

Duration: From May 16, 2011 to March 20, 2012 (10-Months)

Client: Saudi Arabian Oil Company “SAUDI ARAMCO”

Project: BI-10- 00057 / Contract No. 6600017880

Sulfur Recovery Plant Upgrade Phase-II @ Shedgum Gas Plant (SGP)-Saudi Arabia

Position: QC Electrical Inspector

Duration: From April 8, 2007 to May 15, 2011 (4.1-Years)

Client: Saudi Arabian Oil Company “SAUDI ARAMCO”

Project: BI-10- 03082 / Contract No. 6600016578

Replace Obsolete Electrical Distribution Equipment @ Abqaiq Plants – Saudi Arabia

(Low, Medium and High Voltage (69KV / 115KV)

Scope of Work:

Construction of New Substation Service Buildings including battery rooms, Switch Yards and Transformer Yards & modification work in the existing substations:

Installation, testing & commissioning of LV / MV Switchgears, Motor Control Centers (MCC), enclosed combination motor controllers, Fire Water Pump Controllers (FWPC), Manual Transfer Switch (MTS), Power & Lighting Distribution Panels, Lighting Contactor Panels, Dry Type Transformers, High Resistance Grounding System (HRGS), Non-Fused Discussed switches, Battery Chargers, Station Batteries, 125V-DC Distribution Panels, Uninterruptible Power Supply System (UPS), Cable Trays & Grounding system, Laying & Termination of Control & Power cables and Building wires.

Page 3 of 6

Remote Control Panels for 69KV SF6 Hybrid Type Circuit Breakers, 115KV SF6 Conventional type Circuit Breakers, 69KV Breaker Fail Protection Panels, 69KV Bus Bar Protection Panels, 69KV Cable Protection Panels, 69KV/115KV Line Protection Panels and Revenue Metering Panels etc.

69KV SF6 Hybrid Type Circuit Breakers, 69KV Motor operated disconnect switches, 69KV Surge Arresters, Voltage Transformers, Post Insulators, Aluminum Tubular Bus (complete structure), 115KV SF6 Conventional Type Circuit Breakers, Lighting Mast/Lighting pole with High Pressure Sodium Lighting Fixtures, 2.5MVA (13.8KV-2.4KV) Oil Filled Power Distribution Transformers, 150KVA (2.4KV-0.48KV) Oil Filled Power Distribution Transformers, Neutral Grounding Resisters (NGR).

Duties and Responsibilities are the followings but not limited to:

Review the quality related elements during design, procurement & construction to ensure it remains relevant, effective, and achieves mandated quality objectives and targets.

Responsible for the implementation and management of the Project Quality Plan including the coordination, performance and execution of construction inspection and testing services for the project.

Managing and performing the daily QC responsibilities of specific projects to ensure the project is constructed in accordance with the established minimum standards.

Direct oversight and review of the entire documentation and physical inspection phase of the work flow process and working with other in-house personnel (e.g.: Project Manager, Construction Manager, QA Manager, Site Superintendents, Discipline engineers etc.) and external personnel to produce and document a quality product.

Perform all of the major QC activities required to construct the project at hand and to provide in a timely manner the written documentation described in each project's specific contract documents.

Preparation and Implementation of Quality Control Inspection and Procedures as per project Specifications

and ensure all necessary documentation is available at point-of-use.

Create, update and maintain the project submittal log and all other project specific quality control reports.

Manage and oversee project quality to ensure compliance to codes, standards, regulations, equipment specific specifications, and QMS requirements.

Providing leadership, mentorship, technical and statistical expertise and direction of all QC personnel.

Verify and document that all materials received for the project are in conformance with the approved submittal, are handled and stored appropriately and are acceptable for use in the project.

Tool box meeting with crew involved in the construction work to insure the understanding and compliance of the requirements of the project (applicable standards, sharing experienced knowledge, lesson learned and best practices) before the work start.

Elaborating inspection and test programs and assuring that the quality of the work meets or exceeds the project’s contractual requirements, and maintain the standard of excellence.

Oversee supervision of all visual inspections, documentation and Non-destructive Testing (NDT), including 3rd Party subcontractors.

Supervise Inspectors engaged in inspection and testing activities to ensure high productivity and high technical integrity.

Conduct preparatory, initial and follow-up meetings to establish an understanding of the standards of care desired for each definable feature of work. Verify that checklists are being used and signed off for each and every construction activities and other similar items of work.

Formulate, document and maintain quality control standards and on-going quality control objectives.

Create, document and implement inspection criteria and procedures.

Page 4 of 6

Review and approval of reports of inspection and tests results prepared by QC Inspectors.

Maintain active role on internal Continuous Improvement teams.

Coordinate with the client representative on all quality related matters.

Coordinate all receipt inspections.

Participate in the site internal and external audits.

Coordinate all the quality site inspections through the site QC inspectors.

Control all nonconformance reports and undertake remedial action.

Review the client specification and undertake relevant training to the site QC inspector.

Monitor the implementation of the approved site Project Quality Plan.

Complete and coordinate the approval of the sites QC technical submittals to the client.

Coordinate with the site construction manager on all quality issues.

Ensure the safety is adhered at site.

Hold regular scheduled meetings with construction to review outstanding items and upcoming activities.

Assure all technical documents relative to site quality control are current status.

Chair and document weekly QC meetings with the client and provide written minutes as described in project specific contract documents.

SIEMENS (PAKISTAN) ENGINEERING COMPANY LIMITED (ISLAMABAD-PAKISTAN)

Internship:

02-Months internship (July & August 2001) in Siemens Pakistan Engineering Company Ltd. (Islamabad)

Afterward joined Siemens Pakistan and performed services on the following positions:

1. Position: Assistant Service Engineer (ASE)

Duration: September 1, 2004 to March 9, 2007 (2.6-Years)

2. Position: Quality Control Officer Duration: September 3, 2001 to August 31, 2004 (3-Years)

Location: Islamabad (Pakistan)

Project: Various Projects in all over the Pakistan

Department: Automation & Drives Division (A&D) Sales & Services

During this period, major responsibilities were in the SIEMENS Pakistan:

As an Assistant Service Engineer:

Supervision of the Installation, Testing, Commissioning, Troubleshooting & Maintenance of the electrical equipment’s. (Diesel Generators, Automatic Mains Failure Panels (AMF), Auto Synchronizing Panels (ASP), Auto Transfer Switches (ATS), Auto Generator Sets Panels (AGS), Manual Override Panels (MOR), Manual Change over Panels (MCO), Power Distribution Panels (PDP), Switchgears, Control gears, and UPS).

Execution of preventive maintenance program as per maintenance schedule suggested by the maintenance planning department, to ensure trouble free operation of all electrical equipment’s.

Management of warranty and after-sale services to customer.

Supervision and training of the junior staff members.

To ensure all the official records are fully up-to date.

Page 5 of 6

Power & Control Cables: Laying & Termination of power cables (Via Direct Buried, PVC Conduits, RGS Conduits, PVC Duct & Cable Trays), Megger insulation resistance test and continuity of Power/Control cables (On real, after laying prior to backfill and prior to termination with equipment/panel boards.

As a Quality Control Officer:

Performed receiving inspection according to applicable required standards of electrical equipment’s, Power and control cables, parts and materials, which were using on the projects/work areas.

Perform pre-inspection to ensure that all installed materials are in conformance with the applicable standards, drawings and specifications.

Conduct interim and final inspections with owner’s representative per inspection and testing procedures.

Inspection of the installation of Diesel Generating Sets, Power Distribution Panels, UPS, Motors, Relay Panels, Change-over Panels, Switchgear and Controlgears.

Inspection of the laying, splicing and termination of Power and control cables.

Insulation resistance/continuity test of all wiring systems prior to termination with the equipment, Switchgears, Controlgears, panel boards etc.

Prepare non-conformance reports (NCR) to the concerns and assist in developing corrective actions according to the approved quality plans, inspection test plans & relevant to client.

Take immediate remedial to clear inspection logbook comments/pro-actives & close out the NCR’s and relevant logbook entries after the implementation of the recommended corrective actions.

Review work procedures and method statements for compliance with good work practices.

Co-ordinate for all activities in material handling, storage, preservation etc. as to ensure adequate protection & proper storage, handling, & preservation of the materials at store also at site as per the recommendation and standard requirements.

Witness for insulation resistance test & continuity of the cables.

Witness for the testing & commissioning of electrical equipment, power distribution panels.

To co-ordinate with the client in all quality & technical related matters and resolve the issues by coordinating with the concerned discipline engineers.

To ensure all the quality records are fully up-to date.

Prepare required documentation and maintain files for final turnover to the client.

Major Clients were the followings:

Oil & Gas Development Company Ltd. Pakistan (OGDCL), Pakistan State Oil (PSO) & Shell Petroleum, Schlumberger, BGP Pakistan, Zever Petroleum (ZP) Corporation, Pakistan Telecommunication Company Ltd. (PTCL), Telenor, Mobilink & U-fone network, Pakistan Atomic Energy Commission (PAEC), National Database & Registration Authority (NADRA), Pakistan Army, Pakistan Air Force (PAF), Survey of Pakistan & other Government departments, Bestway Cement, Pakistan Cement & Standard Charted Bank, European Union Commission (EU), Philippines Embassy, Denmark Embassy, Finland Embassy & Thai Embassy, Hospitals (Fauji Foundation (FFH), Family Health, DG Health Azad Kashmir, KDA Hospital Kohat, Rawalpindi Medical Complex (RMC).

__________________________________________________________________________________________

MALIK ENGINEERS (PVT.) LTD. BHAKKAR-PAKISTAN

Position: Foreman (Electrical)

Duration: April 1995 to August 2000 (5.4-Years)

Location: Mankera-Bhakkar (Pakistan)

During this period, the following tasks were achieved:

Page 6 of 6

Responsible for the Installation of Lighting Poles (Street & Road lights).

Laying & Termination of the Power Cables for the street & road lights up-to 120mm².

Complete wiring work for the houses, offices & commercial buildings via concealed & open conduits wiring, PVC Duct, & beaten wiring.

Installation of Power Distribution Panel boards.

Installation & maintenance of the lighting fixtures, fans, receptacles and all kind of home appliance etc. __________________________________________________________________________________________

Supplementary Information:

I have a strong drive to succeed and achieve results with cooperation of the team. I am a firm believer in teamwork, as individualistic tendencies tend to hamper the business these days. I place special emphasize on clear & free flow of communication between colleagues and my teammate. I integrate well into a team structure with everyone assisting to achieve results according to their field of experience.

With SIEMENS Pakistan & IMAD Co., I have had very good exposure at top levels of organization; main tasks were to coordinate and manage to execute the projects. __________________________________________________________________________________________

Personal Information:

Father Name : Muhammad Hanif

Nationality : Pakistani

Passport # : AH6787493

Religion : Islam

Domicile : Punjab (Pakistan)

Marital Status : Married

Driving License : Pakistan + Saudi Arabia

Language Known : Urdu, English, Basic Arabic

Permanent Address : House No. 480, Near Hashmi Clinic, Housing Colony Mandi Town

Bhakkar. (Punjab-Pakistan)

Temporary / Mailing Address: IMAD Company for Trading & Contracting

P. O. Box- 677, Al-Khober 31952-Saudi Arabia

Declaration:

I HEREBY CERTIFY THAT THE FOREGOING INFORMATION ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF.

KHALID HANIF

**********