1 http://www.ursjv.gov.si/ REPUBLIC OF SLOVENIA MINISTRY OF ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management 500 km Republic of Slovenia Republic of Slovenia 3 rd Review Meeting Vienna, May 2009

Upload: zoe

Post on 05-Jan-2016

40 views

Category:

Documents


4 download

DESCRIPTION

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management. Republic of Slovenia. 3 r d Review Meeting Vienna, May 200 9. PRESENTATION OVERVIEW. Introduction – Basic information on the Slovenian Nuclear Programme - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Republic of Slovenia

1

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

500 km

Republic of SloveniaRepublic of Slovenia3rd Review MeetingVienna, May 2009

Page 2: Republic of Slovenia

2

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

PRESENTATION OVERVIEW

• Introduction – Basic information on the Slovenian Nuclear Programme

• Brief presentation of the National Report

• Conclusions

• General response to questions

Page 3: Republic of Slovenia

3

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

• Introduction – Slovenian Nuclear Programme

• Brief presentation of the National Report• Conclusions• General response to questions

Page 4: Republic of Slovenia

4

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Disused Sealed Sources

Decommiss-ioning

Liabilities

Central Interim Storage for Radioactive Waste

Central Interim Storage for Radioactive waste

Users and state

Users and stateApplication Wastes

LILW repository - operational in 2013 or with high level waste

Central Interim Storage for Radioactive Waste then transfer to LILW repository

LILW repository - operational in 2013

LILW repository - operational in 2013

Central Interim Storage for Radioactive Waste, then transfer to LILW repository

LILW repository - operational in 2013

Nuclear Fuel Cycle

Waste

Decommissioning Fund(Levy from kWh)

Decommissioning Fund (Levy from kWh)

Decommissioning Fund(Levy from kWh)

Spent Fuel

Planned Facilities

Current Practice / Facilities

FundingLong Term Management

Policy

Type

Summary of basic information

LILW repository - operational in 2013

On site storage

Dry storage, then disposal or export

On site wet storage at NPP

On site storage and ultimate geological disposal – 50 years

Page 5: Republic of Slovenia

5

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Waste generators

Austria

Ital

y

Croatia

Hungary

Krško nuclear

power-plant

Žirovski vrhuranium mine

Researchreactor

Central interim storage for

radioactive wasteLJUBLJANA

Hot cell

AdriaticSea

Page 6: Republic of Slovenia

6

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

The Krško NPP

• Major producer of radioactive waste in Slovenia– PWR two loops Westinghouse design

– 700 MWe

– 24th fuel cycle– Joint project of Slovenia and Croatia– Start of the construction: 1974– First criticality and connection to the grid: 1981– Commercial operation: 1983– Design life time 40 years,

probably extended

Page 7: Republic of Slovenia

7

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

The Krško NPP

• All LILW radioactive waste and spent fuel stored within the plant area, capacities nearly exhausted

• Spent nuclear fuel stored in the spent fuel pool, re-racked in 2003, sufficient until end of design life time and beyond

Page 8: Republic of Slovenia

8

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

TRIGA Mark II Research Reactor

• Part of Jožef Stefan Institute Reactor Centre– 250 kWt General Atomic open pool type, – Start in 1966, – In 1991 re-licensed for pulse mode operation– Shall terminate the operation in 2016

• No spent fuel on site (return of spent fuel to U.S. in 1999)

• Minor amount of LILW• Hot laboratory as an integral part since

early 2008 (licensed for treatment of RW from small producers)

Page 9: Republic of Slovenia

9

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

The Central Interim Storage for Radioactive Waste in Brinje

• Storage of low and intermediate level radioactive waste from medical, industrial and research applications

• Constructed in 1984, • Operational since 1986• Refurbished in 2004• Two and a half years of trial operation• Operating license in early 2008

Page 10: Republic of Slovenia

10

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Žirovski Vrh Uranium Mine

• Operation from 1984 to 1990,

• Lifetime production 610,000 tons,

• 452.5 tons U3O8 equivalent of yellow cake

• In 1990 the decision to close

• Mine and Mill decommissioned

• Mine waste pile remediation completed

• Mill tailings remediated

Page 11: Republic of Slovenia

11

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Governmental Organizations

• Slovenian Nuclear Safety Administration (1987)

• Slovenian Radiation Protection Administration (2003)

• Agency for Radwaste Management (1991)

• Public Enterprise Žirovski vrh Mine (1992)

• Fund for the decommissioning of the Krško NPP (1995)

Page 12: Republic of Slovenia

12

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Governmental Policy

• Resolution on the National Energy Programme

• Resolution on the National Programme for Radioactive Waste and Spent Fuel Management (2006-2015)

• Agreement between Slovenia and Croatia on Krško NPP

• Decommissioning Plan for the Krško NPP

Page 13: Republic of Slovenia

13

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

• Introduction – Slovenian Nuclear Programme

• Brief presentation of the National Report• Conclusions• General response to questions

Page 14: Republic of Slovenia

15

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Issues raised at the 2nd Review Meeting

• Implementation of Agreement with Croatia – Proceeding

• Siting, design and licensing of the LILW repository– Public acceptance pending

• Continue to seek solution to geological disposal– Continuing

• Characterisation of waste in Central Interim Storage Facility– Completed

• Hot cell refurbishment– Completed and licensed

• Uranium Mine – waste pile final remediation– Completed

Page 15: Republic of Slovenia

16

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Main Novelties since the 2st Report

• Characterisation of historical waste stored in CISF completed

• Central Interim Storage for Radioactive Waste licensed

• Hot Cell Laboratory licensed• Licence for remediation work at Boršt waste pile

(upgrading mill and mine tailings safety)• Progress in siting of LILW repository • The Decommissioning Plan is under revision• 10 fresh fuel elements and 500kg of yellow cake sold

to AREVA

Page 16: Republic of Slovenia

17

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Spent Fuel Management Policy

NPP Krško• Dry storage for SF:

– construction 2024 - 2037 – operation 2037 – 2070

• Looking for regional or global solutions• Disposal of SF in Slovenia

– beginning of site characterization 2035– beginning of construction 2055

• After storage period disposal in Slovenia or export

Page 17: Republic of Slovenia

18

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Spent Fuel Management Policy

Research Reactor• Stop operating in 2016, • Return SF to U.S. by 2019

Page 18: Republic of Slovenia

19

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Spent Fuel Management Practices - Krško NPP

• Spent fuel pool for 1694 fuel assemblies, made of reinforced concrete, covered with SS liner, leak detection system

• Water purification system, < 18.4 x104 Bq/cm3

• Criticality analysis design basis criterion, keff+3< 0.95

• Average burn-up 45.9 GWd/MTU

• Re-racked in 2003

Page 19: Republic of Slovenia

20

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Spent Fuel Management Practices – Research Reactor

• Two spent fuel pools, both empty

• Newer spent fuel pool is operational with capacity of 195 spent fuel elements

• Made of reinforced concrete, covered with SS liner, on-line water radioactivity monitoring

Page 20: Republic of Slovenia

21

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Radioactive Waste Management Policy

• Responsibility for LILW management:– Producers,– State-owned public service (ARAO)

• According to 2002 Act – Site for LILW repository - approved by 2008

– Repository - operational 2013

Page 21: Republic of Slovenia

22

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

RAW Management Practices – The Central Interim Storage for Radwaste

• Operational since 1986, first operator Institute J. Stefan

• Transferred to Agency for Radwaste Management in 1999

• “Polluter pays” principle since 2000• Refurbishment finished in 2004• Beginning of trial operation in 2005• Operating license in early 2008

Page 22: Republic of Slovenia

23

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

RAW Management Practices – Žirovski Vrh Uranium Mine

• Two permanent waste disposal sites:– Jazbec mine waste pile (SAR approved,

remediation completed)– Boršt mill tailings site (SAR approved)

• Underground mine closed

• Ore processing plant decommissioned

• Contaminated waste materials from decommissioning disposed on Jazbec mine waste pile

• Geomechanical stability problem of Boršt mill tailings addressed in SAR

Page 23: Republic of Slovenia

24

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

RAW Management Practices – Krško NPP

• Radioactive Waste Management Programme • Radioactive Waste Committee at Krško NPP• Radioactive waste treatment and conditioning:

gaseous, liquid and solid radioactive waste processing systems

• Radioactive waste volume reduction programme: – Two super compaction campaigns,– Four incineration and melting campaigns– In-Drum Drying System– Installation of supercompactor on site– 18-month fuel cycle

• PSR accomplished in 2004 => waste storage operation is appropriately addressed

Page 24: Republic of Slovenia

25

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

RAW Management Practices – Small Producers

• Jožef Stefan Institute: – Solid radwaste transferred to

Central Interim Storage for Radwaste • Industry and Research:

– ~90 different organisations, – 800 sealed radioactive sources, – Spent and disused sources shipped to Central Interim Storage

for Radwaste• Medicine:

– 7 hospitals, – Decay storage tanks at Institute of Oncology, – Short lived radioactive waste stored at users’ locations,– After decay transferred to the municipal disposal site

Page 25: Republic of Slovenia

26

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Inventories and Lists

Krško NPP• Spent fuel

– 872 assemblies – 18-months fuel cycle (since 2004)

• LILW– 3,685 drums, 2,174 m3, 1.93x10+13 Bq

• Other– 2 steam generators and other bulky items

Page 26: Republic of Slovenia

27

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Inventories and Lists

Page 27: Republic of Slovenia

28

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Inventories and Lists

Page 28: Republic of Slovenia

29

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Inventories and Lists

Research Reactor TRIGA Mark II• Spent fuel

– All returned to U.S. in 1999, with option to return the rest by 2019

• Other waste– Various items, mainly contaminated

laboratory equipment and tools (annual discharge rate ~1 m3 ) are transferred to Central interim storage facility

Page 29: Republic of Slovenia

30

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Inventories and Lists

Žirovski Vrh Uranium Mine • Jazbec Mine Waste Pile

– Total 1,198,800 m3 (mine waste, red mud, filter cake from mine water treatment station, soil and ruins from uranium ore processing plant)

– Total activity of disposed material 21.7 TBq

• Boršt Mill Tailings– Total 409,000 m3 (mine waste, mill tailings)– Total activity of storage material 48.8 TBq

Page 30: Republic of Slovenia

31

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Inventories and Lists

Central Interim Storage for Radioactive Waste• Status at the end of 2007:

– 305 drums– 210 special bulky items– 333 spent sealed sources (60Co, 137Cs, 85Kr, 90Sr) – Total activity app. 3,600 GBq

• Status at the end of 2008 (after characterisation)– 345 drums– 31 special bulky items– 82 spent sealed sources (60Co, 137Cs, 85Kr, 90Sr) – Total activity app. 3,650 GBq

Page 31: Republic of Slovenia

32

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Inventories and Lists

Isotopic Laboratory of the Institute of Oncology• LLW is packed in 60 l barrels - decay storage• Sealed sources (Co, Ir, Ra) - Central Interim Storage• Liquid radioactive waste (faecal sludge) is collected in

decay storage tanks and released into the hospital sewage system after about half a year

Page 32: Republic of Slovenia

33

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Legislative and Regulatory Framework

Safety of spent fuel and radioactive waste management:– Act on Ionising Radiation Protection and Nuclear Safety - “2002

Act” - basic requirements– Detailed safety requirements in regulation ’’On management of

radioactive waste and spent fuel’’ (JV7), adopted in May 2006

Page 33: Republic of Slovenia

34

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Regulatory Body

Slovenian Nuclear Safety Administration (SNSA)• Established in 1987• Director of the SNSA

– appointed and released by the Government – responsible to the Minister– SNSA is represented on the Governmental and

Parliamentary level by the Minister

• Staff– interdisciplinary– 46 employees (including director)

• In 2007 acquired the ISO 9001:2000 certificate for the management system

Page 34: Republic of Slovenia

35

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Regulatory Body

Structure in thousands EUR

Salaries 1,301

Targeted Research Programmes 104

Material expenses 355

Investments 38

Membership fees (IAEA, OECD/NEA, USNRC)

289

Outsourcing Nuclear Safety 225

Radiation Safety 203

EURANOS Project 8

Total 2,523

Page 35: Republic of Slovenia

36

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Human and Financial Resources

NPP Krško• Responsibilities:

– Radioactive waste => Chemistry Department, – Spent fuel => Nuclear Fuel Department, – Radiological control => Radiation Protection Department

• 573 employees (at the end of 2007), 8 directly involved in RAW management

• Expenses for radioactive waste and spent fuel are part of production costs

• Development of a Site Specific Decommissioning Plan for NPP Krško to assess financial resources

• Fund for decommissioning and final disposal of radioactive waste and spent fuel is independent from the NPP

Page 36: Republic of Slovenia

37

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Human and Financial Resources

JSI Reactor Infrastructure Centre• Reactor operational staff responsible for spent

fuel and radioactive waste handling and managing. Budget 200,000 EUR per year. Financial provisions for decommissioning are not assured yet.

• Staff of 11Agency for Radwaste Management• Staff of 24• State budget, Decommissioning Fund for the

Krško NPP, fees for storage and future disposal of radioactive waste

Page 37: Republic of Slovenia

38

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Operational Radiation Protection

Annual collective dose for 2007

(man mSv)

Krško NPP 36.2

TRIGA RR 0.9*

Žirovski vrh Uranium Mine

20

CISF 1* due to radiation practices and RWM

Occupational Exposure due to RW Management

Page 38: Republic of Slovenia

39

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Operational Radiation Protection

Annual dose (Sv) for 2008

Žirovski vrh Uranium Mine

110

Global contamination 9.8

Krško NPP 1

TRIGA RR 0.5

CISF 0.2

Estimated effective dose for population

Page 39: Republic of Slovenia

40

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Decommissioning

No nuclear facility under decommissioning (excluding the remediation of the Žirovski vrh Uranium Mine)

• Site Specific Decommissioning Plan for Krško NPP, levy per produced kWhe paid to the Fund is 0.3 Eurocents

• Research project to estimate quantity and composition of LILW resulting of dismantling of TRIGA Mark II

• Decommissioning of Žirovski vrh is assured by Slovenian Government

Page 40: Republic of Slovenia

41

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Siting of Proposed Facilities

• LILW repository should become operational by the year 2013, site known by 2008.

• Two main criteria:– Safe disposal solution, supported by the safety

assessment– Site selection performed in agreement with local

community

• Licensing process: – Environmental Impact Assessment is mandatory for

spent fuel management facilities and radioactive waste management facilities

– Safety Analysis Report is the key document

Page 41: Republic of Slovenia

42

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Siting of Proposed Facilities

• Public Involvement: – invitation to local communities, 8 responded, 3

withdrawn, – 12 potentially suitable sites in 5 local communities, – 3 locations in 3 communities were approved for further

field investigation, 1 withdrawn– 2 local partnerships were established– The spatial planning procedure for the potential location

Vrbina in Krško started in 2006, waiting for consent of the local council

– The spatial planning procedure for the potential location Brežice started in 2007, in process

Page 42: Republic of Slovenia

43

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Siting of Proposed Facilities (cntd’)

NPP Krško

Vrbina-Krško municipality

Vrbina- Brežice municipality

Sava River

Page 43: Republic of Slovenia

44

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Siting of Proposed Facilities (cntd’)

Design basis for the LILW repository• Three variants considered on the potential

location Vrbina in Krško municipality– Surface type – Tunnel type – Near Surface silos

• Proposal: Silo type of LILW repository – Structures used for operating stage placed on

embankment, later removed– Structure placed 15 to 50 m beneath the

surface– Lays in saturated soil, separated from fresh

water, covered by 5 m thick clay layer– Silos structure: 33 m high and 26 m in

diameter– Capacity: 700 concrete containers in 10 levels

Silos structure in operating time: vertical and horizontal cross section.

Page 44: Republic of Slovenia

45

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Disposal of Spent Fuel

Krško NPP:• Plans for repository

– beginning of site characterisation 2035 (identify sites)– beginning of construction 2055 (propose the site)– beginning of disposal 2065

• Export option also considered

Page 45: Republic of Slovenia

46

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Disposal of Spent Fuel

Research Reactor:• Decision on termination of operation in

2016– Shipment and permanent disposal of spent fuel

within the framework of the U.S. government programme

Page 46: Republic of Slovenia

47

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Transboundary Movement

• Council Directive 2006/117/EURATOM of November 2006 has been adopted

• In 2005 transit of irradiated nuclear fuel from Austria via Slovenia to Port of Koper

• In October 2005 shipment from the Krško NPP for incineration and melting, returned in December 2006

• In December 2008 shipment from the Krško NPP sent for incineration and melting

• In 2008 three transits of nuclear fuel from Italy, Romania and Hungary via Slovenia to Port of Koper

Page 47: Republic of Slovenia

48

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Disused Sealed Sources

• Storage:– Central Interim Storage– “Polluter pays’’ principle

• Re-manufacturing and re-entry – No manufacturing of sealed sources in Slovenia

• Successful campaign in the faculties and state institutions

• HASS Directive has been adopted• Effective System for Prevention of Illicit

Trafficking of Radioactive Materials in Shipments of Metal Scrap – In force since January 1, 2008

Page 48: Republic of Slovenia

51

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

• Introduction – Slovenian Nuclear Programme• The Republic of Slovenia - a party to the Joint

Convention• Brief presentation of the National Report• Conclusions• General response to questions

Page 49: Republic of Slovenia

52

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

CONCLUSIONS

• Amount of radwaste in Slovenia is relatively small, but magnitude of problems is similar as in countries with big nuclear programmes

• Current situation is well under control

• Slovenia respects provisions of Joint Convention

Page 50: Republic of Slovenia

53

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Challenges

• LILW repository siting, construction and operation

• Agreement with Croatia about common solution for Krško NPP waste disposal

• Updated Krško NPP Decommissioning plan

Page 51: Republic of Slovenia

54

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

• Introduction – Slovenian Nuclear Programme• The Republic of Slovenia - a party to the Joint

Convention• Brief presentation of the National Report• Conclusions• General response to questions

Page 52: Republic of Slovenia

55

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

General response to questions

• 57 questions from 11 countries addressed– Regulatory authority– Decommissioning of the Krško NPP– Strategy for spent fuel disposal– Central interim storage – Planned repository for LILW – Žirovski vrh Uranium Mine– Spent fuel in Krško NPP– Discharges to the environment– Clearance levels– Disused sealed sources– Treatment and storage of RAW in Krško NPP

Page 53: Republic of Slovenia

56

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Regulatory Authority

• Two competent authorities (SNSA and SRPA) reporting to different ministries, independent in administrative decisions– medical institutions, using radioactive sources are legal

persons, financed through the Health Insurance of Slovenia (The Ministry of Health is not a user of radioactive sources)

• Cooperation between SNSA and SRPA• No problem!

• Authorisation of authorised experts (TSOs for nuclear safety are authorised by SNSA; TSOs for radiation protection are authorised by SRPA)

Page 54: Republic of Slovenia

57

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Regulatory Authority

• SNSA management system– Documented in five levels

of management documentation

– Seven core processes and two supporting processes

– Regular communication with stakeholders/clients

– The SNSA clients: licensees, authorised organizations, ministries, public and other organizations, non governmental organizations

– Surveys on customer’ and employee’s satisfaction

MANAGEMENT MANUAL

OrganisationalprocedureOrganisational

procedureOrganisationalprocedureOrganisational

procedure

Organisationalinstruction

Organisationalinstruction

Organisationalinstruction

Mission Vision Values Policy statement

Q

OP

ON

records

Strategic plan Annual plan

Organisationalinstruction

Organisationalinstruction

Organisationalinstruction

Page 55: Republic of Slovenia

58

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Decommissioning of the Krško NPP

• Decommissioning of NPP Krško, disposal of RW and SF is joint responsibility of contracting parties (SLO-CRO Agreement)

• Decommissioning Plan, approved in March 2005, is being revised

• Parties shall assure financial resources for decommissioning and for disposal of RW and SF

• One year after entry into force each party should establish its own decommissioning fund (both Funds established)

• If agreed on joint solution parties shall finance it in equal shares or they shall finance their share of activities by themselves

• In Slovenia the levy per kWh is 0.3 Euro cents (higher in Croatia)

• The levy shall be re-assessed on the basis of revised Decommissioning Plan (2009)

Page 56: Republic of Slovenia

59

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Decommissioning of the Krško NPP

• So far no agreement on joint solution, Slovenia is developing RW management plan only for its share of waste.

• Volume of decommissioning waste assessed, conditional clearance => effective dose 10 Sv and collective dose 1 man Sv must be justified for each individual case

• Strategy: immediate dismantling (2023 to 2037) - 7 scenario options analyzed

• Next update of The National Programme for Managing RW and SF in 2015, meanwhile the global development is monitored

Page 57: Republic of Slovenia

60

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Strategy for spent fuel disposal

• Decommissioning programme: – NPP shut down in 2024, however extension probable– Transfer of spent fuel to dry storage 2024-2030 (storage period

35 years)– No detailed plans for dry storage facility at the moment

• Strategy for Long-Term Spent Fuel Management:– Repository in deep geological formation assured in 2065,

closed in 2075 (waiting for establishment of optimal disposal technology, multinational solutions also considered)

– Export (no bilateral agreement or negotiations yet)– For cost assessment Swedish concept was taken as a reference

model

• Eventual other HLW (Am, Ra, highly active sources not met the WAC for LILW Repository) shall be disposed off in geological repository

Page 58: Republic of Slovenia

61

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Central Interim Storage

• Refurbishment:– Transfer of responsibility for operation from JSI to ARAO in 1999– Main safety problems: obsolete installations, poor data on

inventory, lack of procedures, no safety analysis report– Refurbishment prepared (ventilation system, floor drain system, physical and fire protection, air drying system, minor other remediation and maintenance works)– Waste packages approved by regulator (limitation: 2 mSv/h on contact)

• Licensing: – Trial operation in 2005, – After trial period, safety analysis report was updated– Operational license issued in 2008, max. 10 years

• Projected service life:– In case of LILW repository => decontaminated or decommissioned – In case of no new solution => continue to operate

Page 59: Republic of Slovenia

62

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Central Interim Storage

• Inventory characterisation of RAW– All historical waste categorized and repacked – Liquid waste exceeding WAC identified and prepared for treatment (must be treated by the end of 2009)– Radioactive waste inventory database updated– No other safety measures needed

Page 60: Republic of Slovenia

63

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Planned repository for LILW

• Time frame:

– Site approval envisaged for 2008 is delayed into 2009

– Operation from 2013 till 2037

– 5-year closure period until 2042

• The site has not been approved yet, hopefully this month

• Decision to abandon the second suitable location is pending

Page 61: Republic of Slovenia

64

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Planned repository for LILW

• Financial compensation to municipalities:– 2.3 mio EUR/year (10 % during field investigations)

• Public involvement: – Two public hearings (2004 and 2008)– Establishment of local partnership (Brežice and Krško)– Activities: visits to CISF, public discussions, independent

expert studies– Municipality has to confirm the proposal of the National

Spatial Plan for LILW repository– Proposed site selection can’t be vetoed, once confirmed by

municipal council

Page 62: Republic of Slovenia

65

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Planned repository for LILW

• Proposal: silo type repository

• Draft WAC for disposal prepared for a silo type repository (anticipated)

• Dose constraint 300 Sv per year (individual from a critical group) in compliance with ICRP recommendations (normal evolution scenario, normal degradation of the repository)

• 12 scenarios for abnormal events treated in SSAR

Page 63: Republic of Slovenia

66

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Planned repository for LILW

• Consultations with neighbouring countries (trans-boundary impacts)– The process of Strategic Environmental Assessment (SEA)

according to SEA Directive started for potential locations (Vrbina in the Krško municipality and Vrbina in the Brežice municipality)

• If the SEA Report will show trans-boundary impacts , Slovenia will involve neighbouring countries in the process of trans-boundary consultations

– The process of the Environmental Impact Assessment according to the EIA Directive has not been started yet

Page 64: Republic of Slovenia

67

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Žirovski vrh uranium mine

• Underground mine permanently closed, outflow of the mine waters is under control

• Processing plant decommissioned; land is given to local municipality for unlimited use

• Jazbec mining waste disposal site, remediation completed– Covered with 2.2 m thick soil layers,– Background and seepage waters drained– Site re-cultivated with grass and fenced

• Boršt mill taillings disposal site – Remediation work to be completed by 2010

Page 65: Republic of Slovenia

68

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Žirovski vrh uranium mine

• Closing requirements – Safety cases approved through the licensing process– Limits for liquid effluents and seepage water are set– Limits for radon exhalation rate are set for both disposal

sites, 0.7 Bq/m2/s and 0.1 Bq/m2/s respectively– External radiation limit set to 0.2 Gy/h– Total effective dose limit 0.3 mSv/year

• Measurement of discharges– Operational period: TSOs and analytical laboratory of the

Žirovski vrh Uranium Mine– Decommissioning: TSOs – Annual reporting to the SNSA– Programme on environmental radioactivity (off-site)

measurements by SNSA

Page 66: Republic of Slovenia

69

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Treatment and storage of RAW in the NPP Krško

• Storage safety requirements – No release of radioactive substances, – Package integrity assured, – Corrosion resistant, – Installation of new air condition system planned– Administrative restrictions: external exposure 0.2 mSv/year at

the fence of the plant

• Storage capacity– 1470 m2, capacity 2000 m3, 5000 drums– Storage space still sufficient due to waste treatments

(incineration, melting, supercompaction), Installation of steel construction (two levels of storage), bridge crane => 11200 drums

– 95% filled in 2010, – Increase of storage capacity not planned

Page 67: Republic of Slovenia

70

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Treatment and storage of RAW in the NPP Krško

• Conditioning of evaporator concentrate and spent resins– Original method: solidification with vermiculite– To minimize the quantity of solid waste => In-Drum-

Drying System– Acceptance criteria for the final product: solid block

with no free liquid, less than 30 wt. % of moisture content

– Additional studies performed by operator, License for processing issued by SNSA

– No swelling of waste form expected, type of packages (SS drums) corrosion resistant at least 40 years

– Prevention against the self ignition: in the phase of development of the process, sorting of the waste to be treated, Room with IDDS equipped with fire protection sensors

Page 68: Republic of Slovenia

71

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Treatment and storage of RAW in the NPP Krško

• Solid RAW: – Not conditioned or ready for disposal– The integrity of packages regularly checked

• Spent ion exchange resins from the secondary circuit – treated as Non-Nuclear Waste

• Spent ion exchange resins from the primary circuit:– Solidification by vermiculate-cement and since 1998 in-

drum drying system

• Quantification of radionuclide content of the treated solid waste – with drum scanner (for 208 l drums); scaling factors for minor radionuclide assessment are used

Page 69: Republic of Slovenia

72

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Spent Fuel in the NPP Krško

• Burn-up of spent fuel– No plan to introduce nuclear fuel with the

enrichment of 235U higher than 5 wt% (handling not possible in the current storage facility)

Page 70: Republic of Slovenia

73

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Discharges to the environment

Krško NPP• Limits for radioactive effluents for the NPP set

during the licensing process (Technical Specification)

• Limits for liquid discharges to Sava River set in Operational license and TS

• Two operational limits for liquid discharges are changed– Total activity of fission and activation radionuclides,

including noble gases, excluding H-3 =>100 GBq/y– Total activity of H-3 => 45 TBq/y

Planned LILW• Limits not established yet

Page 71: Republic of Slovenia

74

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Discharges of 131I from Department for Nuclear Medicine

• Estimated from the administered activities to patients

• Releases limited by – Activity allowed in individual patients (1100 MBq) and – Number of patients (max. 6 per week hospitalized)

• In average patients excrete app. 50% of 131I => the activity concentration of discharged water does not exceed prescribed limits

Discharges to the environment

Page 72: Republic of Slovenia

75

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Clearance levels

• Specific activity bellow clearance levels => release without approval (just notification to regulatory body), upon the decision of regulatory body additional measurements may be carried out before release

• Surface contamination (limits defined in Bq per 100 cm2) for:– Surface in controlled area– Unrestricted area– Surface of soil– Equipment and tool contamination– Surface of protective clothing and skin contamination

Page 73: Republic of Slovenia

76

http://www.ursjv.gov.si/

REPUBLIC OF SLOVENIAMINISTRY OF ENVIRONMENT AND SPATIAL PLANNINGSLOVENIAN NUCLEAR SAFETY ADMINISTRATION

Disused sealed sources

• Transport of radioactive sources inside Slovenia– Licensing for transport under special arrangements and

packages for which multilateral approval is mandatory

• The scrap dealers recognized the benefit of orphan sources detection (detection capabilities improved, better commercial contracts with suppliers) and do not comply about costs