report series d- groundwater hydrology...

47
Pre-Permitting Environmental / Socio-Economic Data Report Series Report Series D- Groundwater Hydrology Figures Preliminary data. Do not cite or quote. The Pebble Partnership is providing environmental and socio-economic baseline data collected to inform the development of the Pebble Project to state and federal agencies, project stakeholders and the general public prior to project permitting as part of its commitment to full and open disclosure. A comprehensive Environmental Baseline Document (EBD) will subsequently be prepared and appended to future project permit applications. The EBD will also be made publicly available when complete. Prepared for the Pebble Limited Partnership by Water Management Consultants 130-10691 Shellbridge Way Richmond BC V6X 2W8 CANADA 604 273 6299 Report D-5 (Figures) Pumping Test Figures PW1, PW3, PW4, PW5, PW6, PW7, PW8 September 20, 2004 - September 22, 2005 Submitted to the Pebble Limited Partnership June 2008

Upload: vuxuyen

Post on 05-Apr-2018

225 views

Category:

Documents


1 download

TRANSCRIPT

  • Pre-Permitting Environmental / Socio-Economic Data Report Series

    Report Series D-Groundwater Hydrology Figures

    Preliminary data. Do not cite or quote.

    The Pebble Partnership is providing environmental and socio-economic baseline data collected to inform the development of the Pebble Project to state and federal agencies, project stakeholders and the general public prior to project permitting as part of its commitment to full and open disclosure.

    A comprehensive Environmental Baseline Document (EBD) will subsequently be prepared and appended to future project permit applications. The EBD will also be made publicly available when complete.

    Prepared for the Pebble Limited Partnership byWater Management Consultants130-10691 Shellbridge WayRichmond BC V6X 2W8CANADA

    604 273 6299

    Report D-5 (Figures)Pumping Test FiguresPW1, PW3, PW4, PW5, PW6, PW7, PW8

    September 20, 2004 - September 22, 2005Submitted to the Pebble Limited Partnership June 2008

  • PRE-PERMITTING ENVIRONMENTAL SOCIOECONOMIC DATA

    REPORT SERIES

    REPORT SERIES D: GROUNDWATER HYDROLOGY

    SECTION 5 PUMPING TEST FIGURES

  • Section 5 Pumping Test Figures

    Table of Contents

    PW1:

    P-4AS ................................................................................................1 P-4AD ................................................................................................2 P-6S...................................................................................................3 P-6M ..................................................................................................4 P-6D...................................................................................................5 Barologger .........................................................................................6

    PW3: MW-11S.............................................................................................7 MW-11M ............................................................................................8 MW-11D.............................................................................................9 Barologger .........................................................................................10

    PW4:

    MW-1S...............................................................................................11 MW-1M ..............................................................................................12 MW-1D...............................................................................................13 Barologger .........................................................................................14

    PW5:

    MW-11D.............................................................................................15 MW-14S.............................................................................................16 MW-14D.............................................................................................17 P-05-24 ..............................................................................................18 P-05-25 ..............................................................................................19

    PW6:

    MW-14S.............................................................................................20 MW-14D.............................................................................................21 P-05-25 ..............................................................................................22 PW5...................................................................................................23 PW6...................................................................................................24 Barologger .........................................................................................25

  • Section 5 Pumping Test Figures

    Table of Contents contd

    PW7:

    MW-3 .................................................................................................26 P-05-26S............................................................................................27 P-05-26D ...........................................................................................28 PW7...................................................................................................29 Barologger .........................................................................................30

    PW8:

    P-05-29S............................................................................................31 P-05-29M...........................................................................................32 P-05-29D ...........................................................................................33 P-05-29D2 .........................................................................................34 P-2D...................................................................................................35 Barologger .........................................................................................36

  • SECTION 5 PUMPING TEST FIGURES

    PUMPING TEST PW1

  • Pumping Test PW1 - Piezometer P-4AS

    30.32

    30.34

    30.36

    30.38

    30.40

    30.42

    30.44

    30.46

    30.48

    30.50

    20/Sep/046:00

    20/Sep/0412:00

    20/Sep/0418:00

    21/Sep/040:00

    21/Sep/046:00

    21/Sep/0412:00

    21/Sep/0418:00

    22/Sep/040:00

    22/Sep/046:00

    22/Sep/0412:00

    Pres

    sure

    (ft H

    2O)

    P-4AS (3323 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 1.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW1Piezometer P-4AS

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 1 of 36 The Pebble Partnership

  • Pumping Test PW1 - Piezometer P-4AD

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    20/Sep/046:00

    20/Sep/0412:00

    20/Sep/0418:00

    21/Sep/040:00

    21/Sep/046:00

    21/Sep/0412:00

    21/Sep/0418:00

    22/Sep/040:00

    22/Sep/046:00

    22/Sep/0412:00

    22/Sep/0418:00

    Pres

    sure

    (ft H

    2O)

    P-4AD (12091 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 1.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW1Piezometer P-4AD

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 2 of 36 The Pebble Partnership

  • Pumping Test PW1 - Piezometer P-6S

    19.58

    19.59

    19.60

    19.61

    19.62

    19.63

    19.64

    19.65

    19.66

    19.67

    19.68

    19.69

    20/Sep/046:00

    20/Sep/0412:00

    20/Sep/0418:00

    21/Sep/040:00

    21/Sep/046:00

    21/Sep/0412:00

    21/Sep/0418:00

    22/Sep/040:00

    22/Sep/046:00

    22/Sep/0412:00

    Pres

    sure

    (ft H

    2O)

    P-6S (2891 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 1.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW1Piezometer P-6S

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 3 of 36 The Pebble Partnership

  • Pumping Test PW1 - Piezometer P-6M

    26.00

    26.50

    27.00

    27.50

    28.00

    28.50

    29.00

    29.50

    20/Sep/046:00

    20/Sep/0412:00

    20/Sep/0418:00

    21/Sep/040:00

    21/Sep/046:00

    21/Sep/0412:00

    21/Sep/0418:00

    22/Sep/040:00

    22/Sep/046:00

    22/Sep/0412:00

    Pres

    sure

    (ft H

    2O)

    P-6M (7731 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 1.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW1Piezometer P-6M

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 4 of 36 The Pebble Partnership

  • Pumping Test PW1 - Piezometer P-6D

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    20/Sep/046:00

    20/Sep/0412:00

    20/Sep/0418:00

    21/Sep/040:00

    21/Sep/046:00

    21/Sep/0412:00

    21/Sep/0418:00

    22/Sep/040:00

    22/Sep/046:00

    22/Sep/0412:00

    22/Sep/0418:00

    Pres

    sure

    (ft H

    2O)

    P-6D (22854 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 1.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW1Piezometer P-6D

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 5 of 36 The Pebble Partnership

  • Pumping Test PW1 - Barometric Pressure

    31.80

    32.00

    32.20

    32.40

    32.60

    32.80

    33.00

    33.20

    20/Sep/046:00

    20/Sep/0412:00

    20/Sep/0418:00

    21/Sep/040:00

    21/Sep/046:00

    21/Sep/0412:00

    21/Sep/0418:00

    22/Sep/040:00

    22/Sep/046:00

    22/Sep/0412:00

    22/Sep/0418:00

    Pres

    sure

    (ft H

    2O)

    Barologger (2312 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 1.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW1

    Barologger

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 6 of 36 The Pebble Partnership

  • SECTION 5 PUMPING TEST FIGURES

    PUMPING TEST PW3

  • Pumping Test PW3 - Monitoring Well MW-11S

    18.30

    18.40

    18.50

    18.60

    18.70

    18.80

    18.90

    19.00

    19.10

    07/Oct/040:00

    07/Oct/0412:00

    08/Oct/040:00

    08/Oct/0412:00

    09/Oct/040:00

    09/Oct/0412:00

    10/Oct/040:00

    10/Oct/0412:00

    11/Oct/040:00

    11/Oct/0412:00

    12/Oct/040:00

    12/Oct/0412:00

    Pres

    sure

    (ft H

    2O)

    MW-11S (6317 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 3.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW3

    Monitoring Well MW-11S

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 7 of 36 The Pebble Partnership

  • Pumping Test PW3 - Monitoring Well MW-11M

    27.00

    28.00

    29.00

    30.00

    31.00

    32.00

    33.00

    34.00

    07/Oct/040:00

    07/Oct/0412:00

    08/Oct/040:00

    08/Oct/0412:00

    09/Oct/040:00

    09/Oct/0412:00

    10/Oct/040:00

    10/Oct/0412:00

    11/Oct/040:00

    Pres

    sure

    (ft H

    2O)

    MW-11M (14974 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 3.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW3

    Monitoring Well MW-11M

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 8 of 36 The Pebble Partnership

  • Pumping Test PW3 - Monitoring Well MW-11D

    29.60

    29.80

    30.00

    30.20

    30.40

    30.60

    30.80

    07/Oct/040:00

    07/Oct/0412:00

    08/Oct/040:00

    08/Oct/0412:00

    09/Oct/040:00

    09/Oct/0412:00

    10/Oct/040:00

    10/Oct/0412:00

    11/Oct/040:00

    11/Oct/0412:00

    12/Oct/040:00

    12/Oct/0412:00

    Pres

    sure

    (ft H

    2O)

    MW-11D (15072 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 3.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW3

    Monitoring Well MW-11D

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 9 of 36 The Pebble Partnership

  • Pumping Test PW3 - Barometric Pressure

    31.80

    32.00

    32.20

    32.40

    32.60

    32.80

    33.00

    33.20

    07/Oct/040:00

    07/Oct/0412:00

    08/Oct/040:00

    08/Oct/0412:00

    09/Oct/040:00

    09/Oct/0412:00

    10/Oct/040:00

    10/Oct/0412:00

    11/Oct/040:00

    11/Oct/0412:00

    12/Oct/040:00

    12/Oct/0412:00

    Pres

    sure

    (ft H

    2O)

    Barologger (2312 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 3.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW3

    Barologger

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 10 of 36 The Pebble Partnership

  • SECTION 5 PUMPING TEST FIGURES

    PUMPING TEST PW4

  • Pumping Test PW4 - Monitoring Well MW-1S

    6.00

    6.50

    7.00

    7.50

    8.00

    8.50

    9.00

    9.50

    20/Sep/040:00

    23/Sep/040:00

    26/Sep/040:00

    29/Sep/040:00

    02/Oct/040:00

    05/Oct/040:00

    08/Oct/040:00

    11/Oct/040:00

    14/Oct/040:00

    17/Oct/040:00

    20/Oct/040:00

    23/Oct/040:00

    Pres

    sure

    (ft H

    2O)

    MW-1S (6890 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 4.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW4

    Monitoring Well MW-1S

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 11 of 36 The Pebble Partnership

  • Pumping Test PW4 - Monitoring Well MW-1M

    0.00

    2.00

    4.00

    6.00

    8.00

    10.00

    12.00

    14.00

    16.00

    18.00

    20/Sep/040:00

    23/Sep/040:00

    26/Sep/040:00

    29/Sep/040:00

    02/Oct/040:00

    05/Oct/040:00

    08/Oct/040:00

    11/Oct/040:00

    14/Oct/040:00

    17/Oct/040:00

    20/Oct/040:00

    23/Oct/040:00

    Pres

    sure

    (ft H

    2O)

    MW-1M (10402 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 4.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW4

    Monitoring Well MW-1M

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 12 of 36 The Pebble Partnership

  • Pumping Test PW4 - Monitoring Well MW-1D

    0.00

    2.00

    4.00

    6.00

    8.00

    10.00

    12.00

    14.00

    16.00

    18.00

    20/Sep/040:00

    23/Sep/040:00

    26/Sep/040:00

    29/Sep/040:00

    02/Oct/040:00

    05/Oct/040:00

    08/Oct/040:00

    11/Oct/040:00

    14/Oct/040:00

    17/Oct/040:00

    20/Oct/040:00

    23/Oct/040:00

    Pres

    sure

    (ft H

    2O)

    MW-1D (11807 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 4.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW4

    Monitoring Well MW-1D

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 13 of 36 The Pebble Partnership

  • Pumping Test PW4 - Barometric Pressure

    31.80

    32.00

    32.20

    32.40

    32.60

    32.80

    33.00

    33.20

    33.40

    20/Sep/040:00

    23/Sep/040:00

    26/Sep/040:00

    29/Sep/040:00

    02/Oct/040:00

    05/Oct/040:00

    08/Oct/040:00

    11/Oct/040:00

    14/Oct/040:00

    17/Oct/040:00

    20/Oct/040:00

    23/Oct/040:00

    Pres

    sure

    (ft H

    2O)

    Barologger (2860 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 4.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW4

    Barologger

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 14 of 36 The Pebble Partnership

  • SECTION 5 PUMPING TEST FIGURES

    PUMPING TEST PW5

  • Pumping Test PW5 - Monitoring Well MW-11D

    19.04

    19.06

    19.08

    19.10

    19.12

    19.14

    19.16

    19.18

    04/Aug/0512:00

    05/Aug/050:00

    05/Aug/0512:00

    06/Aug/050:00

    06/Aug/0512:00

    07/Aug/050:00

    07/Aug/0512:00

    08/Aug/050:00

    08/Aug/0512:00

    Pres

    sure

    (ft H

    2O)

    MW-11D (426 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 5.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW5

    Monitoring Well MW-11D

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 15 of 36 The Pebble Partnership

  • Pumping Test PW5 - Monitoring Well MW-14S

    10.40

    10.50

    10.60

    10.70

    10.80

    10.90

    11.00

    11.10

    11.20

    11.30

    04/Aug/0512:00

    05/Aug/050:00

    05/Aug/0512:00

    06/Aug/050:00

    06/Aug/0512:00

    07/Aug/050:00

    07/Aug/0512:00

    08/Aug/050:00

    08/Aug/0512:00

    Pres

    sure

    (ft H

    2O)

    MW-14S (549 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 5.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW5

    Monitoring Well MW-14S

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 16 of 36 The Pebble Partnership

  • Pumping Test PW5 - Monitoring Well MW-14D

    18.40

    18.60

    18.80

    19.00

    19.20

    19.40

    19.60

    19.80

    20.00

    04/Aug/0512:00

    05/Aug/050:00

    05/Aug/0512:00

    06/Aug/050:00

    06/Aug/0512:00

    07/Aug/050:00

    07/Aug/0512:00

    08/Aug/050:00

    08/Aug/0512:00

    Pres

    sure

    (ft H

    2O)

    MW-14D (1445 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 5.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW5

    Monitoring Well MW-14D

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 17 of 36 The Pebble Partnership

  • Pumping Test PW5 - Piezometer P-05-24

    12.00

    12.20

    12.40

    12.60

    12.80

    13.00

    04/Aug/0512:00

    05/Aug/050:00

    05/Aug/0512:00

    06/Aug/050:00

    06/Aug/0512:00

    07/Aug/050:00

    07/Aug/0512:00

    08/Aug/050:00

    08/Aug/0512:00

    Pres

    sure

    (ft H

    2O)

    P-05-24 (588 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 5.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW5Piezometer P-05-24

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 18 of 36 The Pebble Partnership

  • Pumping Test PW5 - Piezometer P-05-25

    18.80

    19.00

    19.20

    19.40

    19.60

    19.80

    20.00

    20.20

    04/Aug/0512:00

    05/Aug/050:00

    05/Aug/0512:00

    06/Aug/050:00

    06/Aug/0512:00

    07/Aug/050:00

    07/Aug/0512:00

    08/Aug/050:00

    08/Aug/0512:00

    Pres

    sure

    (ft H

    2O)

    P-05-25 (16753 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 5.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW5Piezometer P-05-25

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 19 of 36 The Pebble Partnership

  • SECTION 5 PUMPING TEST FIGURES

    PUMPING TEST PW6

  • Pumping Test PW6 - Monitoring Well MW-14S

    19.50

    20.00

    20.50

    21.00

    21.50

    22.00

    22.50

    23.00

    24/Sep/050:00

    27/Sep/050:00

    30/Sep/050:00

    03/Oct/050:00

    06/Oct/050:00

    09/Oct/050:00

    12/Oct/050:00

    15/Oct/050:00

    18/Oct/050:00

    Pres

    sure

    (ft H

    2O)

    MW-14S (8376 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 6.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW6

    MW-14S

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 20 of 36 The Pebble Partnership

  • Pumping Test PW6 - Monitoring Well MW-14D

    21.00

    21.50

    22.00

    22.50

    23.00

    23.50

    24.00

    24.50

    25.00

    25.50

    24/Sep/050:00

    27/Sep/050:00

    30/Sep/050:00

    03/Oct/050:00

    06/Oct/050:00

    09/Oct/050:00

    12/Oct/050:00

    15/Oct/050:00

    18/Oct/050:00

    Pres

    sure

    (ft H

    2O)

    MW-14D (8626 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    Pre-permitting Environmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW6

    Monitoring Well MW-14D

  • Pumping Test PW6 - Piezometer P-05-25

    19.40

    19.50

    19.60

    19.70

    19.80

    19.90

    20.00

    20.10

    20.20

    20.30

    20.40

    13/Oct/0512:00

    14/Oct/050:00

    14/Oct/0512:00

    15/Oct/050:00

    15/Oct/0512:00

    16/Oct/050:00

    16/Oct/0512:00

    17/Oct/050:00

    Pres

    sure

    (ft H

    2O)

    P-05-25 (2098 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 6.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW6Piezometer P-05-25

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 22 of 36 The Pebble Partnership

  • Pumping Test PW6 - Monitoring Well PW-5

    18.60

    18.70

    18.80

    18.90

    19.00

    19.10

    19.20

    19.30

    19.40

    13/Oct/0512:00

    14/Oct/050:00

    14/Oct/0512:00

    15/Oct/050:00

    15/Oct/0512:00

    16/Oct/050:00

    16/Oct/0512:00

    17/Oct/050:00

    Pres

    sure

    (ft H

    2O)

    PW-5 (2086 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 6.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW6

    Monitoring Well PW5

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 23 of 36 The Pebble Partnership

  • Pumping Test PW6 - Pumping Well PW6

    0.00

    2.00

    4.00

    6.00

    8.00

    10.00

    12.00

    13/Oct/0512:00

    14/Oct/050:00

    14/Oct/0512:00

    15/Oct/050:00

    15/Oct/0512:00

    16/Oct/050:00

    16/Oct/0512:00

    17/Oct/050:00

    Pres

    sure

    (ft H

    2O)

    PW-6 (2940 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 6.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW6Pumping Well PW6

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 24 of 36 The Pebble Partnership

  • Pumping Test PW6 - Barometric Pressure

    25.00

    26.00

    27.00

    28.00

    29.00

    30.00

    24/Sep/050:00

    27/Sep/050:00

    30/Sep/050:00

    03/Oct/050:00

    06/Oct/050:00

    09/Oct/050:00

    12/Oct/050:00

    15/Oct/050:00

    Pres

    sure

    (inc

    hes

    Hg)

    Barologger (1475 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 6.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW6

    Barologger

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 25 of 36 The Pebble Partnership

  • SECTION 5 PUMPING TEST FIGURES

    PUMPING TEST PW7

  • Pumping Test PW7 - Monitoring Well MW-3D

    20.00

    21.00

    22.00

    23.00

    24.00

    25.00

    26.00

    27.00

    21/Sep/050:00

    24/Sep/050:00

    27/Sep/050:00

    30/Sep/050:00

    03/Oct/050:00

    06/Oct/050:00

    09/Oct/050:00

    12/Oct/050:00

    15/Oct/050:00

    Pres

    sure

    (ft H

    2O)

    MW-3D (14905 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 7.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW7

    Monitoring Well MW-13D

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 26 of 36 The Pebble Partnership

  • Pumping Test PW7 - Piezometer P-05-26S

    11.80

    12.00

    12.20

    12.40

    12.60

    12.80

    13.00

    13.20

    13.40

    13.60

    13.80

    21/Sep/050:00

    24/Sep/050:00

    27/Sep/050:00

    30/Sep/050:00

    03/Oct/050:00

    06/Oct/050:00

    09/Oct/050:00

    12/Oct/050:00

    15/Oct/050:00

    Pres

    sure

    (ft H

    2O)

    P-05-26S (15217 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 7.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW7

    Piezometer P-05-26S

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 27 of 36 The Pebble Partnership

  • Pumping Test PW7 - Piezometer P-05-26D

    29.00

    30.00

    31.00

    32.00

    33.00

    34.00

    35.00

    21/Sep/050:00

    24/Sep/050:00

    27/Sep/050:00

    30/Sep/050:00

    03/Oct/050:00

    06/Oct/050:00

    09/Oct/050:00

    12/Oct/050:00

    15/Oct/050:00

    Pres

    sure

    (ft H

    2O)

    P-05-26D (11184 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 7.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW7

    Piezometer P-05-26D

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 28 of 36 The Pebble Partnership

  • Pumping Test PW7 - Pumping Well PW7

    15.00

    17.00

    19.00

    21.00

    23.00

    25.00

    27.00

    29.00

    24/Sep/050:00

    26/Sep/050:00

    28/Sep/050:00

    30/Sep/050:00

    02/Oct/050:00

    04/Oct/050:00

    06/Oct/050:00

    08/Oct/050:00

    10/Oct/050:00

    12/Oct/050:00

    14/Oct/050:00

    16/Oct/050:00

    Pres

    sure

    (ft H

    2O)

    PW-7 (7913 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 7.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW7Pumping Well PW7

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 29 of 36 The Pebble Partnership

  • Pumping Test PW7 - Barometric Pressure

    27.50

    27.70

    27.90

    28.10

    28.30

    28.50

    28.70

    28.90

    29.10

    29.30

    29.50

    13/Sep/050:00

    15/Sep/050:00

    17/Sep/050:00

    19/Sep/050:00

    21/Sep/050:00

    23/Sep/050:00

    25/Sep/050:00

    27/Sep/050:00

    29/Sep/050:00

    01/Oct/050:00

    Pres

    sure

    (ft H

    2O)

    Barologger (711 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 7.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW7

    Barologger

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 30 of 36 The Pebble Partnership

  • SECTION 5 PUMPING TEST FIGURES

    PUMPING TEST PW8

  • Pumping Test PW8 - Piezometer P-05-29S

    1.20

    1.25

    1.30

    1.35

    1.40

    1.45

    1.50

    1.55

    1.60

    14/Sep/050:00

    14/Sep/0512:00

    15/Sep/050:00

    15/Sep/0512:00

    16/Sep/050:00

    16/Sep/0512:00

    17/Sep/050:00

    17/Sep/0512:00

    18/Sep/050:00

    18/Sep/0512:00

    19/Sep/050:00

    19/Sep/0512:00

    20/Sep/050:00

    Pres

    sure

    (ft H

    2O)

    P-05-29S (2809 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 8.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW8

    Piezometer P-05-29S

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 31 of 36 The Pebble Partnership

  • Pumping Test PW8 - Piezometer P-05-29M

    27.20

    27.25

    27.30

    27.35

    27.40

    27.45

    27.50

    27.55

    27.60

    15/Sep/050:00

    15/Sep/0512:00

    16/Sep/050:00

    16/Sep/0512:00

    17/Sep/050:00

    17/Sep/0512:00

    18/Sep/050:00

    18/Sep/0512:00

    19/Sep/050:00

    19/Sep/0512:00

    20/Sep/050:00

    Pres

    sure

    (ft H

    2O)

    P-05-29M (2397 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 8.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW8

    Piezometer P-05-29M

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 32 of 36 The Pebble Partnership

  • Pumping Test PW8 - Piezometer P-05-29D

    15.00

    17.00

    19.00

    21.00

    23.00

    25.00

    27.00

    29.00

    31.00

    33.00

    35.00

    15/Sep/050:00

    15/Sep/0512:00

    16/Sep/050:00

    16/Sep/0512:00

    17/Sep/050:00

    17/Sep/0512:00

    18/Sep/050:00

    18/Sep/0512:00

    19/Sep/050:00

    19/Sep/0512:00

    20/Sep/050:00

    Pres

    sure

    (ft H

    2O)

    P-05-29D (11344 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 8.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW8

    Piezometer P-05-29D

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 33 of 36 The Pebble Partnership

  • Pumping Test PW8 - Piezometer P-05-29D2

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    14/Sep/050:00

    14/Sep/0512:00

    15/Sep/050:00

    15/Sep/0512:00

    16/Sep/050:00

    16/Sep/0512:00

    17/Sep/050:00

    17/Sep/0512:00

    18/Sep/050:00

    18/Sep/0512:00

    19/Sep/050:00

    19/Sep/0512:00

    20/Sep/050:00

    Pres

    sure

    (ft H

    2O)

    P-05-29D2 (15701 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 8.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW8

    Piezometer P-05-29D2

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 34 of 36 The Pebble Partnership

  • Pumping Test PW8 - Piezometer P-2D

    22.30

    22.40

    22.50

    22.60

    22.70

    22.80

    22.90

    23.00

    14/Sep/050:00

    14/Sep/0512:00

    15/Sep/050:00

    15/Sep/0512:00

    16/Sep/050:00

    16/Sep/0512:00

    17/Sep/050:00

    17/Sep/0512:00

    18/Sep/050:00

    18/Sep/0512:00

    19/Sep/050:00

    19/Sep/0512:00

    20/Sep/050:00

    Pres

    sure

    (ft H

    2O)

    P-2D (1023 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 8.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW8Piezometer P-2D

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 35 of 36 The Pebble Partnership

  • Pumping Test PW8 - Barometric Pressure

    28.10

    28.20

    28.30

    28.40

    28.50

    28.60

    28.70

    28.80

    28.90

    29.00

    29.10

    14/09/050:00

    15/09/050:00

    16/09/050:00

    17/09/050:00

    18/09/050:00

    19/09/050:00

    20/09/050:00

    21/09/050:00

    22/09/050:00

    23/09/050:00

    Pres

    sure

    (ft H

    2O)

    Barologger (361 Data Points)

    Project: 7126

    Version: 1 Author: WMC-LC

    Date: June 16, 2008

    Legend

    \\Manu\projects\Pebble\reporting\2008 Pebble Data Report\Pumping Tests\Pump Test 8.xls

    Pre-permittingEnvironmental/Socioeconomic

    Data Report Series

    Report Series D: Groundwater Hydrology

    Section 5 - Pumping Tests:Pumping Well PW8

    Barologger

    Section 5: Pumping Tests - Pumping Test Figures Water Management Consultants June 16, 2008

    7126 Page 36 of 36 The Pebble Partnership

    PEB-0102_data_report_titles_series_DSection 5 - Pumping Test Figures.pdf