report nbr-hdcs0002 alabama department … · 01-014 5.990 mi concrete pavement rehabilitation on...

161
REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 1 FIRST DIVISION CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 01-001 0.800 MI PATCHING, LEVELING, RESURF & TRAF STRIPE ON CR-1669 FROM THE FAIRVIEW CITY LIMITS TO THE A1RDY-100059363 INTERSECTION OF SR-69; WIREGRASS CONSTRUCTION COMPANY, INC. ACNU59363-ATRP(001) CULLMAN CR-1669 01-002 3.520 MI WIDENING, PLANING, RESURFACING & TRAFFIC STRIPE ON SR-3 (US-31) FROM 0.3 MILES S OF SR-91 STAAM-100053283 (MP 317.210) TO 0.8 MILES N OF JOHNSON'S CROSSING (MP 320.730); GOOD HOPE CONTRACTING CO. INC. HSIPM-100053283 STPAA-HSIP-000(572) CULLMAN SR-3 01-003 BRIDGE REPLACEMENTS (BRIDGE CULVERTS) & APPROACHES AT VARIOUS SITES (4) AS INDICATED ON THE PLANS GRBN1-100042573 ( HASTINGS GENERAL CONTRACTING, INC. ) ACGBBR-2200(205) CULLMAN VARIOUS 01-004 BRIDGE REPAIR CLARKSON COVERED BRIDGE ON CR-1043 IN CLARKSON; BOB SMITH CONSTRUCTION, INC. HCBPP-100043508 STTEL-100043508 HCBPP-STPTE-2200(211) CULLMAN 01-005 3.364 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-74 (US-278) FROM MP 85.510 IN THE CURB & GUTTER NH01M-100058845 SECTION TO THE JUNCTION OF CR-1647 (MP 88.874); GOOD HOPE CONTRACTING COMPANY, INC. NH-0074(533) CULLMAN SR-74 01-006 LITTER COLLECTION AND MAINTENANCE ROADSIDE MOWING ON I-65 FROM THE BLOUNT CO LINE TO THE MORGAN CO 99054-100061668 LINE; ORR CONTRACTING, INC. 99-401-224-I65-401 CULLMAN I-65 01-007 4.882 MI RESURFACING AND TRAFFIC STRIPE ON CR-8 FROM THE JUNCTION OF CR-35 TO THE JUNCTION OF SR- AC232-100061744 69 SW OF DODGE CITY; GOOD HOPE CONTRACTING COMPANYINC. STNUM-100061744 STPNU-2214(250) CULLMAN CR-8 01-008 0.713 MI BRIDGE REPLACEMENT & APPROACHES ON SR-157AT LAKE CATOMA (EIGHT MILE CREEK)(MP 2.268) AND AT NH04E-100038841 THE CSX RAILROAD (MP 4.541) IN CULLMAN; (HRI BRIDGE CORP.) NHF-0157(511) CULLMAN 01-009 & MARSHALL; LITTER COLLECTION AND MAINTENANCE ROADSIDE MOWING ON VARIOUS ROUTES IN CULLMAN AND 99054-100061767 MARSHALL COUNTIES; LOVIN CONTRACTING COMPANY, INC. 99-401-690-000-401 CULLMAN 01-010 1.448 MI RELOCATION (GRADE, DRAINAGE, PAVEMENT & BRIDGE) ON SR-74 (US-278) IN VICINITY OF VEST EBEXL-100046482 CREEK WEST OF CULLMAN; (THE MORRIS GROUP, INC.) EBSPL-100046482 EBF-0074(509) CULLMAN

Upload: lyquynh

Post on 06-Sep-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 1 FIRST DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 01-001 0.800 MI PATCHING, LEVELING, RESURF & TRAF STRIPE ON CR-1669 FROM THE FAIRVIEW CITY LIMITS TO THE A1RDY-100059363 INTERSECTION OF SR-69; WIREGRASS CONSTRUCTION COMPANY, INC. ACNU59363-ATRP(001) CULLMAN CR-1669

01-002 3.520 MI WIDENING, PLANING, RESURFACING & TRAFFIC STRIPE ON SR-3 (US-31) FROM 0.3 MILES S OF SR-91 STAAM-100053283 (MP 317.210) TO 0.8 MILES N OF JOHNSON'S CROSSING (MP 320.730); GOOD HOPE CONTRACTING CO. INC. HSIPM-100053283 STPAA-HSIP-000(572) CULLMAN SR-3

01-003 BRIDGE REPLACEMENTS (BRIDGE CULVERTS) & APPROACHES AT VARIOUS SITES (4) AS INDICATED ON THE PLANS GRBN1-100042573 ( HASTINGS GENERAL CONTRACTING, INC. ) ACGBBR-2200(205) CULLMAN VARIOUS

01-004 BRIDGE REPAIR CLARKSON COVERED BRIDGE ON CR-1043 IN CLARKSON; BOB SMITH CONSTRUCTION, INC. HCBPP-100043508 STTEL-100043508 HCBPP-STPTE-2200(211) CULLMAN

01-005 3.364 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-74 (US-278) FROM MP 85.510 IN THE CURB & GUTTER NH01M-100058845 SECTION TO THE JUNCTION OF CR-1647 (MP 88.874); GOOD HOPE CONTRACTING COMPANY, INC. NH-0074(533) CULLMAN SR-74

01-006 LITTER COLLECTION AND MAINTENANCE ROADSIDE MOWING ON I-65 FROM THE BLOUNT CO LINE TO THE MORGAN CO 99054-100061668 LINE; ORR CONTRACTING, INC. 99-401-224-I65-401 CULLMAN I-65

01-007 4.882 MI RESURFACING AND TRAFFIC STRIPE ON CR-8 FROM THE JUNCTION OF CR-35 TO THE JUNCTION OF SR- AC232-100061744 69 SW OF DODGE CITY; GOOD HOPE CONTRACTING COMPANYINC. STNUM-100061744 STPNU-2214(250) CULLMAN CR-8

01-008 0.713 MI BRIDGE REPLACEMENT & APPROACHES ON SR-157AT LAKE CATOMA (EIGHT MILE CREEK)(MP 2.268) AND AT NH04E-100038841 THE CSX RAILROAD (MP 4.541) IN CULLMAN; (HRI BRIDGE CORP.) NHF-0157(511) CULLMAN

01-009 & MARSHALL; LITTER COLLECTION AND MAINTENANCE ROADSIDE MOWING ON VARIOUS ROUTES IN CULLMAN AND 99054-100061767 MARSHALL COUNTIES; LOVIN CONTRACTING COMPANY, INC. 99-401-690-000-401 CULLMAN

01-010 1.448 MI RELOCATION (GRADE, DRAINAGE, PAVEMENT & BRIDGE) ON SR-74 (US-278) IN VICINITY OF VEST EBEXL-100046482 CREEK WEST OF CULLMAN; (THE MORRIS GROUP, INC.) EBSPL-100046482 EBF-0074(509) CULLMAN

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 2 FIRST DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 01-011 2.126 MI;RESURFACING AND TRAFFIC STRIPE ON CR-698/CR-55 FROM THE JUNCTION OF CR-691 TO THE JUNCTION A1RDY-100059362 OF SR-91 IN HOLLY POND; WHITAKER CONTRACTING CORP. ACNU59362-ATRP(002) CULLMAN CR-698

01-012 1.307 MI INTERCHANGE (GRADE, DRAIN, BASE, PAVE, CULVERT EXT AND SIGNS)ON I-65 AT CR-222 BETWEEN A1RDY-100059761 SR-69 AND SR-74(US-278) IN CULLMAN; CARCEL & G. CONSTRUCTION, LLC ACIM59761-ATRP(001) CULLMAN I-65

01-013 MORGAN & LIMESTONE; MEDIAN CROSSOVER PROTECTION ONI-65 FROM THE UNDERPASS AT CR-1223(MP 313.10) TO HS31M-100058224 THE NORFOLK-SOUTHERN RAILROAD OVERPASS(MP 341.50) IN DECATUR; RMD HOLDINGS, INC. IM01M-100058224 IM-HSIPF-I065(439) CULLMAN I-65

01-014 5.990 MI CONCRETE PAVEMENT REHABILITATION ON SR-3 (US-31)FROM THE N CITY LIMITS OF CULLMAN TO THE STAAM-100052260 MORGAN CO LINE; WIREGRASS CONSTRUCTION CO., INC. STPAA-0003(581) CULLMAN SR-3

01-019 4.161 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-157 FROM SR-69 (MP 0.633) IN EAST POINT TO S NH01M-100057499 OF SR-3 (US-31) (MP 4.794); GOOD HOPE CONTRACTING COMPANY, INC. NH-0157(518) CULLMAN SR-157

01-025 19.163 MI CONCRETE PAVEMENT REHABILITATION ON I-59FROM ETOWAH CO LINE (MP 198.686) TO S OF SR-35 IM04E-100040294 (MP 217.850) IN FORT PAYNE; (GOOD HOPE CONTNRACTING CO., INC.) IM-I059(323) DEKALB

01-026 23.319 MI CONCRETE PAVEMENT REHABILITATION ON I59 FROM S OF SR 35 IN FORT PAYNE (MP 217.850) TO THE IM04E-100048519 GA STATE LINE (MP 241.170); JACKSON PAVING & CONSTRUCTION, INC. IM-I059(336) DEKALB I 59

01-030 & ACNU59772-ATRP(004;8.356 MI RESURF & TRAFF STRIPON CR-44 FROM THE X-SEC OF CR-50 TO THE JCT OF CR- A1RDY-100059770 835;CR-50 FROM THE X-SEC OF SR-75 TO THE X-SEC OF CR-44; JACKSON PAVING & CONSTRUCTION, INC. A1RDY-100059772 ACNU59770-ATRP(004) DEKALB CR-44

01-031 & ACNU59766-ATRP(002);7.584 MI RESURF & TRAFF STRION CR-85(SMITH GAP RD NW)FROM THE JCT OF SR-7 TO A1RDY-100059765 X-SECTION OF CR-121;ON CR-85 FROM THE X-SECTION OFCR-121 TO THE JCT OF SR-40;JACKSON PAVING & CONSTR A1RDY-100059766 ACOA59765-ATRP(002) DEKALB CR-85

01-032 RESURFACING IN DESOTO STATE PARK; JACKSON PAVING & CONSTRUCTION, INC. 99008-100059918

99-801-253-190-301 DEKALB

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 3 FIRST DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 01-033 10.860 MI RESURFACING AND TRAFFIC STRIPE ON SR-75 FROM THE INTERSECTION OF SR-117 TO THE GEORGIA STAAM-100060899 STATE LINE; JACKSON PAVING & CONSTRUCTION, INC. STPAA-0075(530) DEKALB SR-75

01-034 1.840 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-75 FROM 0.3 MI S OF CR-326 AND CR-41 (MP STAAM-100058842 77.860) TO 0.05 MI N OF CR-76 (BARRON RD) S OF FYFFE; JACKSON PAVING & CONSTRUCTION, INC. STPAA-0075(527) DEKALB SR-75

01-035 2.380 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-35 FROM THE JUNCTION OF CR-89 TO THE JUNCTION 99103-100060479 OF SR-7 (US-11) IN FORT PAYNE; JACKSON PAVING & CONSTRUCTION, INC. 99-301-253-035-301 DEKALB SR-35

01-036 7.070 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-75 FROM S OF SR-40 IN HENAGAR TO JUST N OF STAAM-100057488 SR-117 IN IDER; JACKSON PAVING & CONSTRUCTION, INC STPAA-0075(528) DEKALB SR-75

01-037 1.665 MI RESURFACING AND TRAFFIC STRIPE ON CR-50 (TRAYLOR ST) FROM THE JUNCTION OF CR-56 TO THE A1RDY-100059771 JUNCTION OF SR-75 IN FYFFE; JACKSON PAVING & CONSTRUCTION, INC. ACNU59771-ATRP(001) DEKALB CR-50

01-038 LITTER COLLECTION AND MAINTENANCE ROADSIDE MOWING ON I-59 FROM THE ETOWAH CO LINE TO THE GEORGIA 99054-100061669 STATE LINE; ORR CONTRACTING, INC. 99-401-253-I59-401 DEKALB I-59

01-041 1.399 MI PARTIAL BRIDGE REPLACEMENT & APPROACHES ON SR 35 (SBR) OVER THE TENNESSEE RIVER; BROPL-100045263 HRI BRIDGE CORP BROPP-100045263 BRF-0035(504) JACKSON SR 35

01-042 & JACKSON COUNTY; LITTER COLLECTION & MAINTENANCE ROADSIDE MOWING AT VARIOUS SITES IN DEKALB & 99054-100061768 JACKSON COUNTIES; ORR CONTRACTING, INC. 99-401-690-000-403 DEKALB

01-043 ACNU59763-ATRP(001) & ACNU59764-ATRP(001);12.987MIRESURFACING & TRAFF STRIPE ON CR-27 FROM AIRPORT A1RDY-100059762 RD TO CR-121;ON CR-27 FROM CR-121 TO SR-75;& ON CR-27 FROM SR-75 TO THE JACKSON CO LINE; JACKSON P A1RDY-100059763 ACOA59762-ATRP(001) DEKALB CR-27 A1RDY-100059764

01-044 0.184 MI BRIDGE REPLACEMENT (PARTIAL) ON SR-35 AT THE TENNESSEE RIVER; BROPL-100045262 (SCOTT BRIDGE COMPANY, INC.) BRF-0035(503) JACKSON

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 4 FIRST DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 01-045 3.048 MI WIDENING, RESURFACING AND TRAFFIC STRIPE ON CR-479 FROM THE INTERSECTION OF CR-26 TO THE A1RDY-100059769 JUNCTION OF SR-168 W OF CROSSVILLE; JACKSON PAVING & CONSTRUCTION, INC. ACNU59769-ATRP(004) DEKALB CR-479

01-046 1.581 MI WIDENING, RESURFACING AND TRAFFIC STRIPE ON CR-479 FROM THE ETOWAH COUNTY LINE TO THE A1RDY-100059768 INTERSECTION OF CR-26; JACKSON PAVING & CONSTRUCTION, INC. ACNU59768-ATRP(004) DEKALB CR-479

01-047 BRIDGE COATING ON VARIOUS ROUTES AT VARIOUS BRIDGES AS INDICATED BY THE PLANS IN JACKSON, 99005-100055295 MADISON & CHEROKEE COUNTIES; P & H STUCCO & CONSTRUCTION, INC 99-501-690-000-001 JACKSON VARIOUS

01-048 2.300 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-68 FROM JUST W OF CR-24(MP 9.000) TO JUST E OF 99103-100061709 TIDMORE RD (MP 11.300) IN CROSSVILLE; JACKSON PAVING & CONSTRUCTION, INC. 99-301-253-068-401 DEKALB SR-68

01-049 8.610 MI SAFETY WIDENING, RESURFACING AND TRAFFIC STRIPE ON SR-7(US-11)FROM THE N CITY LIMITS OF HS31M-100058849 COLLINSVILLE TO N OF CR-51 IN FT. PAYNE; JACKSON PAVING & CONSTRUCTION, INC. STNUM-100058849 STPNU-HSIP-0007(538) DEKALB SR-7

01-051 2.569 MI OUTSIDE SLOPE SAFETY IMPROVEMENTS ALONG I-20 FROM E OF SR-25 (MP 145.230) IN LEEDS TO W IM04E-100042143 OF KELLY CREEK (MP 147.800); E.O. BYARS CONSTRUCTION, INC. DE-I020(331) ST. CLAIR I 20

01-052 & STPAA-HSIP-0146(500);13.467 MI PLANING, WIDENINGRESURFACING & TRAFFIC STRIPE ON SR-65 FROM SR-146 STAAM-100053276 AT MP 17.543 TO THE TENNESSEE STATE LINE & ON SR- 146 FROM SR-65 AT MP 0.00 TO JUST W OF CR-138 STAAM-100058847 STPAA-0065(500) JACKSON SR-65 HSIP1-00058847

01-053 1.663 MI RESURFACING, SHOULDERS AND TRAFFIC STRIPEON CR-470 FROM CR-21 TO CR-33 NORTHWEST OF A1RDY-100058643 HOLLYWOOD; JACKSON PAVING & CONSTRUCTION, INC. ACNU58643-ATRP(001) JACKSON CR-470

01-054 9.560 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-25 (US-411) FROM N OF CR-10 (MP 174.330) STAAE-100056428 THROUGH BRANCHVILLE TO CR-272 (MADDOX FARM RD); GOOD HOPE CONTRACTING COMPANY, INC. HSIPE-100056428 STPAA-HSIP-0025(533) ST. CLAIR SR 25

01-055 1.979 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-35 FROM 0.10 MI N OF COURTLAND ST(MP 47.470) 01AC1-00058850 TO 0.10 MI S OF SR-2(US-72) (MP 49.450); JACKSON PAVING & CONSTRUCTION, INC. NH01M-100058850 NH-0035(528) JACKSON SR-35

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 5 FIRST DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 01-056 0.241 MI BRIDGE REPLACEMENT & APPROACHES ON CR-151OVER BRYANT CREEK EAST OF PISGAH; A1BRZ-100058646 MILLER & MILLER, INC. ACBRZ58646-ATRP(001) JACKSON CR-151

01-057 9.771 MI RESURF & TRAFFIC STRIPE ON CR-8 FROM APPROX 1.75 MI NE OF CR-521 TO THE INTERSECTION OF A1RDY-100061275 CR-17 IN PLEASANT GROVES; JACKSON PAVING & CONSTRUCTION, INC. ACNU61275-ATRP(003) JACKSON CR-8

01-058 3.875 MI RESURF & TRAFFIC STRIPE ON CR-95 FROM THEJUNCTION OF CR-324 TO THE JUNCTION OF SR-71; STNUM-100062234 JACKSON PAVING & CONSTRUCTION, INC. STPNU-3613(250) JACKSON CR-95

01-059 0.087 MI BRIDGE REPLACEMENT (BRIDGE CULVERT) AND APPROACHES ON SR-4 (US-78) AT CANE CREEK SOUTHEAST BROPE-100042655 OF COOKS SPRINGS; TRI-COUNTY CONSTRUCTION, INC. BR-0004(505) ST. CLAIR SR-4

01-060 0.774 MI INTERSECTION IMPROVEMENTS (GRADE, DRAINAG& PAVEMENT) ON SR-1 (US-431) AT CR-321 (DUG HILL STAAE-100048727 RD) IN HUNTSVILLE; (ANGELO IAFRATE CONSTRUCTION COMPANY) STHVE-100048727 STPAA-STPHV-0001(531) MADISON

01-061 0.576 MI RELOCATION (GRADE, DRAINAGE AND PAVEMENT)OF CHURCH ST FROM N OF PRATT AVE TO OAKWOOD AVE IN STHVE-100040798 HUNTSVILLE; APAC MID-SOUTH, INC. STPHV-8540(600) MADISON

01-063 4.602 MI ADDITIONAL LANES (GRADE, DRAINAGE, PAVE- MENT & SIGNALIZATION) ON SR-53 FROM N OF NICK EBSPE-100037279 FITCHEARD RD NEAR HUNTSVILLE TO S OF CR-19 (JEFF RD); REED CONTRACTING SERVICES, INC.) EB-0053(509) MADISON

01-064 MAINTENANCE ROADSIDE MOWING AND LITTER COLLECTION ALONG I-565 FROM THE LIMESTONE CO LINE TO NEAR 99054-100058073 SR-255; LOVIN CONTRACTING COMPANY, INC. 99-401-452-000-201 (RENEWAL) MADISON I-565

01-066 3.569 MI WIDENING (CLEARING, GRUBBING, UTILITIES, AND SECURITY FENCE) ON CR-7 (ZIERDT RD) FROM S OF STHVE-100056242 CR-11 (MARTIN RD) TO N OF MADISON BLVD IN HUNTSVILLE; REED CONTRACTING SERVICES, INC. STPHV-8507(600) MADISON CR-7

01-067 2.169 MI RESURFACING AND TRAFFIC STRIPE ON CR-152 (ONEONTA CUT-OFF RD) FROM CR-166 (SECTION LINE RD) STNUM-100060161 TO SR-205 W OF ALBERTVILLE; WHITAKER CONTRACTING CORPORATION STPNU-CN13(207) MARSHALL CR-152

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 6 FIRST DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 01-068 0.615 MI BRIDGE & CULVERT REPLACEMENT, RESURFACING& TRAFFIC STRIPE ON OLD MADISON PIKE FROM STAAM-100040317 SLAUGHTER RD TO THORNTON RESEARCH PARK IN HUNTSVILLE; REED CONTRACTING SERVICES, INC. STHVE-100040317 STPAA-STPHV-8525(600) MADISON STHVR-100040317

01-069 4.217 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-53 (US-231) FROM THE TENNESSEE RIVER BRIDGE NH01M-100057497 N OF MEADOWBROOK RD; REED CONTRACTING SERVICES, INC NH-0053(568) MADISON SR-53

01-070 & LIMESTONE; 1.344 MI NEW INTERCHANGE, RAMP ADDITIONS (GRADE, DRAIN, BASE & PAVE) ON I-565 AT IM01M-100050874 CR-3 (CO LINE RD) IN MADISON; REED CONTRACTING SERVICES, INC. IM-I565(307) MADISON I-565

01-071 & NH-HSIP-0255(501); 2.696 MI SAFETY WIDENING, RESURFACING AND TRAFFIC STRIPE ON SR-2(US-72) FROM NH01M-100057502 ENTERPRISE WAY TO SOUTHBOUND ON-RAMP OF SR-255 & ON SR-255 FROM REDSTONE ARESENAL GATE 9 TO SR-2 HSIPM-100057501 NH-0002(560) MADISON SR-2 NH01M-100057501

01-072 0.706 MI INTERSECTION IMPROVEMENTS ON SR-1(US-431)AT SUTTON RD, CALDWELL LANE, PLAINVIEW DR AND OLD STAAM-100056632 BIG COVE RD IN HUNTSVILLE; WIREGRASS CONSTRUCTION COMPANY, INC. STHVM-100056632 STPHV-STPAA-0001(577) MADISON SR-1

01-073 0.081 MI BRIDGE REPLACEMENT ON CR-77 (HOLMES AVE) OVER PINHOOK CREEK IN THE CITY OF HUNTSVILLE; A1RDY-100058618 MILLER & MILLER, INC. STP09-100058618 ACAA58618-DE-A195(935) MADISON CR-77 STP10-100058618

01-074 2.076 MI. ADDITIONAL LANES ON TAYLOR ROAD FROM TERRY DRAKE ROAD TO SUTTON ROAD IN HNTOA-100008378 HUNTSVILLE (REED CONTRACTING SERVICES, INC.) STPAA-4500(210) MADISON ROAD

01-075 & JACKSON COUNTY; LITTER COLLECTION & MAINTENANCE ROADSIDE MOWING AT VARIOUS SITES ON I-565 & SR-2; 99054-100061785 ORR CONTRACTING, INC. 99-401-690-000-405 MADISON

01-076 0.113 MI. GRADE, DRAIN, PAVE & TRAFFIC STRIPE ON RELOCATED HOLMES AVE AT SPARKMAN DR. IN HUNTSVILLE HSST -100032154 ( SHELBY CONTRACTING CO., INC. ) STPHS-000S(108) MADISON AVENUE

01-077 0.143 MI BRIDGE REPLACEMENT ON CR-16 (WALL TRIANA HIGHWAY) OVER MILL CREEK IN MADISON; A1BR1-00058649 CARCEL & G. CONSTRUCTION, LLC ACBR58649-ATRP(001) MADISON CR-16

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 7 FIRST DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 01-078 5.511 MI PLANING, SAFETY WIDENING, RESURFACING, CONCRETE ISLAND AND TRAFFIC STRIPE ON SR-1(US-431) HS31M-100058854 JUST S OF VICTORIAN LANE IN OWENS CROSS RD TO JUSTS OF THE INTERSECTION AT OLD BIG COVE RD;WHITAKER NH01M-100058854 NH-HSIP-0001(580) MADISON SR-1

01-079 5.901 MI PLANING, SAFETY WIDENING, RESURF & TRAFF STRIPE ON THE EASTBOUND LANE OF SR-2 (US-72) FROM HS31M-100060607 E OF SHIELDS RD TO W OF BROCK RD IN HUNTSVILLE; JACKSON PAVING & CONSTRUCTION, INC. NH01M-100060607 NH-HSIP-0002(562) MADISON

01-080 3.199 MI PATCHING, LEVELING, RESURFACING, GUARDRAIL & TRAFFIC STRIPE ON CR-14 (WARRENTON RD) A1RDY-100058657 FROM THE BLOUNT CO LINE TO JUST S OF THE JUNCTION OF CR-44 (FRY GAP RD); WHITAKER CONTRACTING CORP ACNU58657-ATRP(001) MARSHALL CR-14

01-081 & ACOA58653-ATRP(001); 4.783 MI RESURFACING AND TRAF. STRIPE ON CR-10 FROM SR-53 TO CR-2;ON CR-44 A1RDY-100058652 FROM CR-64 TO THE ARAB CL;& ON 10TH ST NW FROM SR -69 TO CR-18 IN ARAB;REED CONTRACTING SERVICES, IN A1RDY-100058653 ACOA58652-ATRP(001) MARSHALL CR-10

01-082 12.0302 MI RESURFACING AND TRAFFIC STRIPE ON UNION GROVE RD FROM SR-69 THROUGH UNION GROVE TO A1RDY-100058628 SR-53 (US-231); REED CONTRACTING SERVICES, INC. ACNU58628-ATRP(001) MARSHALL

01-083 0.378 MI TURN LANE INSTALLATION & INTERSECTION IMPROVEMENTS ON SR-79 FROM S OF WILLOW BEACH RD TO A1RDY-100059483 SR-1(US-431); WHITAKER CONTRACTING CORP ACOA59483-ATRP(001) MARSHALL SR-79

01-084 0.042 MI BRIDGE REPLACEMENT & APPROACHES ON CR-3 (DOUGLAS-HYATT RD) OVER BIG BRANCH IN HORTON; BROFM-100060558 MILLER & MILLER, INC. BRZ-4800(211) MARSHALL CR-3

01-085 0.034 MI BRIDGE REPLACEMENT ON CR-63 (WELCOME HOMECHURCH RD) OVER SLAB CREEK NEAR NIXON CHAPEL; A1BRZ-100058656 MILLER & MILLER, INC. ACBRZ58656-ATRP(001) MARSHALL CR-63

01-086 4.320 MI RESURFACING AND TRAFFIC STRIPE ON SR-1 (US-431)FROM S OF BRASHERS CHAPEL RD(MP 290.520)TO NH981-00058851 JUST N OF SR-79(MP 294.840)IN GUNTERSVILLE; WHITAKER CONTRACTING CORP. NH-0001(581) MARSHALL SR-1

01-087 4.109 MI RESURF & TRAF STRIPE ON CR-414(HUSTLEVILLRD)FROM THE JUNCTION OF SR-227 TO SHORT CREEK; A1RDY-100061320 WHITAKER CONTRACTING CORP. ACOA61320-ATRP(007) MARSHALL CR-414

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 8 FIRST DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 01-092 0.707 MI BRIDGE REPLACEMENT AND APPROACHES ON SR-91 AT THE BROGLEN RIVER NE OF HANCEVILLE; BROPE-100003576 DEMENT CONSTRUCTION COMPANY, LLC BR-0091(501) CULLMAN SR-91

01-093 ST. CLAIR COUNTY; LITTER COLLECTION AND ROADSIDE MOWING ALONG VARIOUS ROUTES IN BLOUNT AND 99054-100059798 ST. CLAIR COUNTIES; SALAZAR CONTRACTING, LLC 99-401-690-000-302 BLOUNT

01-096 1.200 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON CR-64 (N MAIN ST.) FROM SR-69 TO SR-53 (US-231) A1RDY-100058621 IN ARAB; REED CONTRACTING SERVICES, INC. ACOA58621-ATRP(001) MARSHALL CR-64

01-097 0.804 MI RESURFACING, GUARDRAIL AND TRAFFIC STRIPEON EGYPT MOUNTAIN RD (CR-120) FROM LITTLETON RD TO HSIRE-100059843 THE INTERSECTION OF WILLIAMSBURG RD NW OF ATTALLA;MCCARTNEY CONSTRUCTION COMPANY, INC. HRRR-2800(213) ETOWAH CR-120

01-098 2.326 MI RESURFACING IMPROVEMENTS AT VARIOUS LOCATIONS (ROSE RD, GEORGE WALLACE DR & RAILROAD A1RDY-100058620 AVE) IN ALBERTVILLE INDUSTRIAL PARK; WHITAKER CONTRACTING CORPORATION ACOA58620-ATRP(001) MARSHALL

01-101 7.020 MI WIDENING, RESURFACING & TRAFFIC STRIPE ONSR-68 FROM THE DEKALB CO LINE TO THE INTERSECTION HSIPM-100057508 OF SR-25 (US-411) IN LEESBURG; MCCARTNEY CONSTRUCTION COMPANY, INC. STAAM-100057508 STPAA-HSIP-0068(507) CHEROKEE SR-68

01-102 0.493 MI; BRIDGE PAINTING ON VARIOUS ROUTES IN MADISON CO AS INDICATED BY THE PLANS; 99005-100058086 K.V.K. CONTRACTING, INC. 99-501-690-000-201 MADISON

01-103 0.167 MI BRIDGE REPLACEMENT (PRECAST) & APPROACHESON BLAKE BOTTOM RD OVER INDIAN CREEK NEAR BRNM1-00053339 HUNTSVILLE; RILEY BRIDGE COMPANY, INC. BR-8604(600) MADISON

01-104 3.969 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-25 (US-411) FROM THE JEFFERSON CO LINE (MP STAAM-100058716 170.360) IN LEEDS TO CHURCH ST (MP 174.330) IN MOODY; GOOD HOPE CONTRACTING COMPANY, INC. STPAA-0025(537) ST. CLAIR SR-25

01-105 ACNU58636-ATRP(001) & ACNU58634-ATRP(001);13.398MIRESURF., TRAFFIC STRIPE & GUARDRAIL IMPROVEMENTS A1RDY-100058635 ON CR-15 FROM CR-259 TO THE GA STATE LINE;CR-147 FROM CR-44 TO SR-273; & CR-29 FROM CR-12 TO SR-25 A1RDY-100058636 ACNU58635-ATRP(001) CHEROKEE CR-15 A1RDY-100058634

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 9 FIRST DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 01-106 & STPNU-1022(201); 3.750 MI RESURFACING & TRAFFIC STRIPE ON CR-31 FROM THE JCT OF SR-25(US-411)TO STNUM-100061601 THE JCT OF CR-16 & ON CR-69 FROM THE JCT OF CR-118TO THE JCT OF CR-487;MCCARTNEY CONSTRUCTION CO. IN STNUM-100061616 STPNU-1009(203) CHEROKEE CR-31

01-107 0.274 MI BRIDGE REPLACEMENT ON SR-4 (US-78) OVER WOLF CREEK NW OF PELL CITY; BRSM1-00042653 MCINNIS CONSTRUCTION, LLC BR-0004(506) ST. CLAIR SR-4

01-108 2.950 MI RESURFACING AND TRAFFIC STRIPE ON SR-283 FROM SR-25 TO SR-68;ON SR-68 FROM SR-283 TO SR-9; STAAM-100060608 ON SR-9 FROM SR-68 TO THE END OF THE 5-LANE SECTIOOF SR-9; MCCARTNEY CONSTRUCTION CO., INC. STPAA-MR13(902) CHEROKEE SR-283

01-109 CULLMAN & MARSHALL; BRIDGE PAINTING ALONG VARIOUS ROUTES WITHIN THE 1ST DIVISION; 99005-100059991 P & H STUCCO & CONSTRUCTION, INC. 99-501-690-000-301 CHEROKEE

01-110 & 99-501-105-025-401; 8.350 MI CULVERT EXTENSIONS,RESURFACING & TRAFFIC STRIPE ON SR-25(US-411)FROM STAAM-100058853 CR-161 TO THE GEORGIA STATE LINE; GOOD HOPE CONTRACTING COMPANY, INC. 99075-100062164 STPAA-0025(538) CHEROKEE SR-25

01-126 3.589 MI RESURFACING AND TRAFFIC STRIPE ON CR-32 (TUMLIN GAP RD) FROM THE INTERSECTION OF GALLANT STNUM-100060140 RD TO THE INTERSECTION OF SR-132 NEAR GALLANT; GOOD HOPE CONTRACTING COMPANY, INC. STPNU-2800(214) ETOWAH CR-32

01-127 4.799 MI RESURFACING AND TRAFFIC STRIPE ON CR22 FROM CR45 TO NEAR DAVENPORT CEMETERY AND ON CR15 STOAE-100058229 FROM CR60 TO CR259 AT BURGESS; MCCARTNEY CONSTRUCTION CO. INC. STOAE-100058230 STPOA-1009(202)&STPOA-1012(202CHEROKEE

01-128 0.011 MI BRIDGE REPLACEMENT ON STEELE STATION RD OVER ROOK CREEK WEST OF RAINBOW CITY; STOA1-00050700 CARCEL & G. CONSTRUCTION, LLC STPOA-2816(201) ETOWAH

01-129 0.142 MI BRIDGE REPLACEMENT & APPROACHES ON CR-87 (MAYO RD) OVER BRISTOW CREEK W OF THE JUNCTION OF A1BRZ-100058640 SR-179 SW OF BOAZ; CARCEL & G. CONSTRUCTION, LLC ACBRZ58640-ATRP(001) ETOWAH CR-87

01-130 5.550 MI RESURFACING AND TRAFFIC STRIPE ON CR-19 FROM CR-39 TO CR-71 SOUTHWEST OF CENTRE; A1RDY-100058623 MCCARTNEY CONSTRUCTION COMPANY, INC. ACNU58623-ATRP(001) CHEROKEE CR-19

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 10 FIRST DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 01-131 1.390 MI CONCRETE PAVEMENT REHABILITATION ON I-59 N OF US-431 AT VARIOUS SITES AS INDICATED IN THE IM01M-100059861 PLANS; MCCARTNEY CONSTRUCTION COMPANY, INC. IM-I059(371) ETOWAH I-59

01-132 2.411 MI RESURFACING AND TRAFFIC STRIPE ON CR-419 (COLVIN GAP RD) FROM THE CALHOUN CO LINE TO THE GDSTM-100050716 INTERSECTION OF CR-420 (SIBERT ST SOUTH); MCCARTNEY CONSTRUCTION COMPANY, INC. STPOA-8157(600) ETOWAH CR-419

01-133 1.789 MI RESURFACING AND TRAFFIC STRIPE ON CR-276 (STEPHENS GAP RD) FROM THE INTERSECTION OF CR-15 STNUM-100060112 (DUCK SPRINGS RD) TO THE INTERSECTION OF SR-7 (US-11); MCCARTNEY CONSTRUCTION COMPANY, INC. STPNU-2800(215) ETOWAH CR-276

01-134 0.316 MI BRIDGE REPLACEMENT & APPROACHES ON CR-83 (BUD UMPHREY RD) OVER BRISTOW CREEK NE OF WALNUT A1BRZ-100058626 GROVE; WRIGHT BROTHERS CONSTRUCTION COMPANY, INC. ACBRZ58626-ATRP(001) ETOWAH CR-83

01-135 INSTALL SIDEWALKS, SIGNAGE AND TRAFFIC CALMING DEVICES AT EURA BROWN ELEMENTARY SCHOOL IN SRIR1-00055994 GADSDEN; TRI-COUNTY CONSTRUCTION, INC. SRTS-SR11(912) ETOWAH

01-136 7.699 MI PLANING, SAFETY WIDENING, RESURFACING ANDTRAFFIC STRIPE ON SR-132 FROM THE BLOUNT CO LINE HSIPM-100058848 IN ALTOONA TO THE INTERSECTION OF SR-74; WHITAKER CONTRACTING CORPORATION STPAA-HSIP-0132(502) ETOWAH SR-132

01-137 15.830 MI SAFETY WIDENING, RESURFACING & TRAFFIC STRIPE ON SR-7(US-11)FROM THE INTERSECTION OF SR-1 HS31M-100057496 (US-431/5TH AVE)IN ATTALLA TO THE DEKALB CO LINE; MCCARTNEY CONSTRUCTION COMPANY, INC. STOAM-100057496 STPOA-HSIP-0007(537) ETOWAH SR-7

01-138 4.180 MI RESURF & TRAF STRIPE ON CR-162(STEEL STATION RD)FROM THE INTERSECTION OF CR-56(PLEASANT GDSTM-100056670 VALLEY RD)TO THE INTERSECTION OF SR-77; GOOD HOPE CONTRACTING COMPANY, INC. STPOA-2813(250) ETOWAH CR-162

01-139 0.137 MI INTERSECTION IMPROVEMENTS ON CR-125 (MOUNTAINBORO RD) AT SR-1 (US-431); A1RDY-100058622 E. O. BYARS CONSTRUCTION, INC. ACOA58622-ATRP(001) ETOWAH CR-125

01-141 0.832 MI BRIDGE REPLACEMENT (BRIDGE CULVERT) AND APPROACHES ON SR-179 AT WADE CREEK SOUTH OF AURORA BROPE-100050009 AND AT LITTLE COVE CREEK NORTH OF AURORA; WHITAKER CONTRACTING CORPORATION BROPE-100050063 BR-0179(500) & BR-0179(501) ETOWAH SR-179

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 11 FIRST DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 01-142 0.892 MI GRADE, DRAINAGE, PAVEMENT, BRIDGE AND SIGNALS ON THE BLACK CREEK PARKWAY EXTENSION IN GDSTC-100008476 RAINBOW CITY; (WRIGHT BROTHERS CONSTRUCTION CO.) STMOA-STPOA-8104(600) ETOWAH

01-143 9.222 MI RESURFACING, TRAFFIC STRIPE, GUARDRAIL & DRAINAGE ON CR-27 FROM THE ST. CLAIR CO LINE TO A1RDY-100058686 THE JUNCTION OF CR-29 N OF HIGHLAND LAKE; WHITAKER CONTRACTING CORP ACNU58686-ATRP(001) BLOUNT CR-27

01-144 SAFETY IMPROVEMENTS AT W.E. STRIPLIN AND C.A. DONEHOO ELEMENTARY SCHOOLS IN THE CITY OF GADSDEN SRIL1-00057448 AS INDICATED IN THE PLANS; BURNETT CIVIL CONTRACTING, LLC SRTS-SR12(912) ETOWAH

01-145 14.471 MI BASE, PAVE, PARTIAL GRADE & DRAIN & RESURFACING ON THE NEW LOCATION OF SR25 (US411) STOAE-100008733 FROM THE EXISTING 4 LANES IN GADSDEN TO TURKEYTOWN& ON THE EXISTING SR25; GOOD HOPE CONTRACTING CO STAAE-100055654 STPOA-0025(518)&STPAA-0025(526ETOWAH SR 25

01-146 & ST. CLAIR; LITTER COLLECTION & MAINTENANCE ROADSIDE MOWING AT VARIOUS SITES BLOUNT & ST. 99054-100061766 CLAIR COUNTIES; BENTLEY TURF AND LANDSCAPE, INC. 99-401-690-000-402 BLOUNT

01-147 2.963 MI SHOULDER WIDENING ON CR-290 (LAY SPRINGS RD) FROM DELMONT RD TO OLD CAMP RD NE OF GADSDEN HSIPE-100053863 CITY LIMIT; (RICHARDS & SONS CONSTRUCTION CO.) HSIPR-100053863 HRRR-HSIP-CN10(210) ETOWAH

01-148 & ST. CLAIR; LITTER COLLECTION AND MAINTENANCE ROADSIDE MOWING AT VARIOUS SITES ON I-20, I-59 AND 99054-100061781 I-65; LOVIN CONTRACTING COMPANY, INC. 99-401-690-000-404 BLOUNT

01-149 2.452 MI ADDITIONAL LANES (GRADE, DRAIN, PAVEMENT,SIGNALS & BRIDGE) ON SR-77 FROM STEELE STATION RD BROPE-100004851 TO I-59 RAMPS (E SIDE) IN RAINBOW CITY; (MCCARTNEY CONSTRUCTION CO., INC.) NH04E-100004851 NHF-BRF-8106(600) ETOWAH

01-150 3.740 MI RESURFACING AND TRAFFIC STRIPE ON SR-74 (US-278) FROM JUST E OF CR-36 TO THE ETOWAH CO NH01M-100058852 LINE; WHITAKER CONTRACTING CORP. NH-0074(534) BLOUNT SR-74

01-153 0.070 MI PERMANENT RESTORATION FOR DRAINAGE AREA, FENCING & CLEARING ON I-65 FROM N OF THE CR-5 ERLF1-00057240 UNDERPASS (MP 289.800) TO S OF MULBERRY FORK BLACKWARRIOR RIVER (MP 290.500); FORESTRY ENVIRONMENTAL ER-8940(952) BLOUNT I-65

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 12 FIRST DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 01-160 4.980 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON CR-26 FROM W OF DAYS DR TO SR-144 IN RAGLAND; A1RDY-100058629 MCCARTNEY CONSTRUCTION COMPANY, INC. ACNU58629-ATRP(001) ST. CLAIR CR-26

01-161 & ACNU59780-ATRP(001); 17.732 MI RESURFACING AND TRAFFIC STRIPE ON CR-33 FROM SR-53 (US-231) TO CR- A1RDY-100058659 24 & ON CR-36 FROM SR-7 (US-11) TO SR-23; MCCARTNEY CONSTRUCTION COMPANY, INC. A1RDY-100059780 ACNU58659-ATRP(001) ST. CLAIR CR-33

01-162 & ACNU59779-ATRP(001);9.880 MI RESURF & TRAF STRIPON CR-27 FROM THE SHELBY CO LINE TO THE JUNCTION A1RDY-100059778 OF CR-375 & ON CR-54 FROM THE LOGAN MARTIN DAM TO SR-53; MCCARTNEY CONSTRUCTION COMPANY, INC. A1RDY-100059779 ACNU59778-ATRP(004) ST. CLAIR CR-27

01-163 0.214 MI INTERSECTION IMPROVEMENTS (RESURFACING & TRAFFIC SIGNALS) ON WALL-TRIANA HIGHWAY AT HARVEST EBSPE-100056445 RD IN HARVEST; S.J. & L. GENERAL CONTRACTOR, LLC STP08-100056445 EB-DE-A182(900) MADISON

01-164 2.009 MI ADAPTIVE TRAFFIC SIGNAL CONTROL AT SIXTEEN INTERSECTIONS ALONG SR 53 / SR1 NH04E-100057897 (GOVERNORS DR) FROM 14TH ST TO CALIFORNIA ST IN HUNTSVILLE; SHOALS ELECTRIC CO. INC. NHF-0001(573) MADISON SR53

01-171 0.765 MI, BLOUNT & CULLMAN COUNTIES, BRIDGE REPLACEMENT AND APPROACHES ON SR-67 AT THE BROPE-100038032 MULBERRY FORK OF THE BLACK WARRIOR RIVER NORTH OF ROSWELL; MCINNIS CONSTRUCTION, LLC BR-0067(503) BLOUNT SR-67

01-172 0.500 MI RESURFACING AND TRAFFIC STRIPE ON CR-18 (COMMERCIAL ST) FROM SR-91 TO CR-565 IN HANCEVILLE A1RDY-100058615 ; WIREGRASS CONSTRUCTION COMPANY, INC. ACNU58615-ATRP(001) CULLMAN CR-18

01-173 0.255 MI. BRIDGE REHABILITATION ON THE BROAD ST. BRIDGE IN GADSDEN. OAST -100008496 ( PNEUMATIC CONCRETE CO., INC. ) STPOA-8116(600) ETOWAH STREET

01-176 5.256 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-53 (US-231) AND SR-1 (US-431) AT VARIOUS NH01M-100057507 SITES IN HUNTSVILLE AS INDICATED IN THE PLANS; APAC MID-SOUTH, INC. NH01M-100057506 NH-0001(575) & NH-0053(567) MADISON SR-53

01-177 1.952 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON CR-17 (OLD MADISON PIKE) FROM CR-14 (HUGHES RD) A1RDY-100058619 TO CR-19 (SLAUGHTER RD) IN MADISON; APAC MID-SOUTH, INC. ACAA58619-ATRP(001) MADISON CR-17

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 13 FIRST DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 01-180 4.689 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-7 (US-11) FROM S OF STEELE AT (MP 181.320)TO STAAM-100058803 THE ETOWAH CO LINE (MP 186.010); GOOD HOPE CONTRACTING COMPANY, INC. STPAA-0007(536) ST. CLAIR SR-7

01-223 5.016 MI GRADE, DRIAN, PAVE, RETAIN,WALLS, LIGHTIN& BRIDGES ON MEMORIAL PKWY (SR-1/US-431) FROM N STAAC-100004925 SIDE OF OAKWOOD AVE TO N SIDE OF SPARKMAN DR IN HUNTSVILLE; (REED CONT SVC. & MILLER & MILLER INC) STMAAF-0001(537) MADISON

01-226 1.259 MILES WIDENING (GRADE, DRAINAGE, PAVEMENT & SIGNAL ON WINCHESTER ROAD FROM THE HUNTSVILLE STHVL-100008553 CITY LIMIT TO DOMINION CIRCLE APAC-SOUTHEAST, INC., PO BOX 385025, B'HAM 35238 STPHV-8556(600) MADISON HUNTSVI

01-236 MAINTENANCE ROADSIDE MOWING AT VARIOUS LOCATIONS ALONG I-20, I-59 & I-65 AS INDICATED BY PLANS; 99054-100057828 (BENTLEY TURF & LANDSCAPE, INC.) 99-403-692-000-201 ST. CLAIR

01-243 0.477 MI BRIDGE REPLACEMENT & APPROACHES ON SR-75 AT THE CALBERT PRONG OF THE LITTLE WARRIOR RIVER BROPE-100003013 NORTH OF ONEONTA; (RACON, INC.) BR-0075(510) BLOUNT

01-244 0.150 MI BRIDGE REPLACEMENT & APPROACHES ON BALCH ROAD AT KNOX CREEK WEST OF HUNTSVILLE; BROPE-100056326 (MILLER & MILLER, INC.) BR-8525(602) MADISON

01-247 NH-0002(541); 15.918 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON I-565 FROM LIMESTONE CO LINE TO IM04E-100055269 SR-2 (US-72) & ON SR-2 FROM I-565 TO WEST OF CR- 393 IN HUNTSVILLE; (WIREGRASS CONST. CO.) NH04E-100055270 IM-I565(309) MADISON

01-249 0.596 MI STREET IMPROVEMENTS (GRADE, DRAINAGE, PAVEMENT & BRIDGE) ON MERIDIAN STREET FROM PRATT STHVH-100008534 AVENUE TO OAKWOOD AVENUE IN HUNTSVILLE; (REED CONTRACTING SERVICES, INC.) STPHV-8539(600) MADISON

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACNU59363-ATRP(001) CULLMAN CR-1669 0.08 % 01-001 WIREGRASS CON 285,315 30 W 000 000 00-00-00 0 273.63 321,235 0 0 0

STPAA-HSIP-000(572) CULLMAN SR-3 7.17 % 01-002 GOOD HOPE CON 2,837,978 75 W 035 041 05-30-14 1,209,976 251,681.72 3,506,837 0 0 0

ACGBBR-2200(205) CULLMAN VARIOUS 0.69 % 01-003 HASTINGS GEN 975,616 120 W 099 100 08-15-04 983,087 8,499.29 1,231,237 29,800 7,471 37,271

HCBPP-STPTE-2200(211) CULLMAN 1.75 % 01-004 BOB SMITH CON 478,998 100 W 000 000 00-00-00 0 9,662.25 550,848 0 0 0

NH-0074(533) CULLMAN SR-74 9.03 % 01-005 GOOD HOPE CON 1,317,546 30 W 027 031 05-31-14 401,530 136,211.27 1,507,305 0 0 0

99-401-224-I65-401 CULLMAN I-65 7.45 % 01-006 ORR CONTRACTI 98,269 24 W 000 000 00-00-00 0 8,059.60 108,096 0 0 0

STPNU-2214(250) CULLMAN CR-8 0.11 % 01-007 GOOD HOPE 777,655 30 W 000 000 00-00-00 0 1,128.82 945,441 0 0 0

NHF-0157(511) CULLMAN 10.57 % 01-008 HRI BRIDGE CO 6,494,778 225 W 100 099 07-31-13 6,677,362 933,778.53 8,831,920 -7,557 182,584 175,027

99-401-690-000-401 CULLMAN 2.48 % 01-009 LOVIN CONTRAC 290,240 60 W 000 000 00-00-00 0 7,931.15 319,264 0 0 0

EBF-0074(509) CULLMAN 11.14 % 01-010 THE MORRIS GR 11,873,127 300 W 099 100 03-15-12 13,512,170 1,830,158.48 16,424,130 95,108 1,639,043 1,734,151

ACNU59362-ATRP(002) CULLMAN CR-698 0.51 % 01-011 WHITAKER CONT 194,943 30 W 000 000 00-00-00 0 930.75 179,553 0 0 0

ACIM59761-ATRP(001) CULLMAN I-65 0.15 % 01-012 CARCEL & G. 5,794,643 250 W 000 000 00-00-00 0 13,043.92 8,300,248 0 0 0

IM-HSIPF-I065(439) CULLMAN I-65 0.06 % 01-013 RMD HOLDINGS 1,259,195 120 W 000 000 00-00-00 0 1,486.33 2,370,070 0 0 0

STPAA-0003(581) CULLMAN SR-3 0.22 % 01-014 WIREGRASS CON 2,547,012 75 W 000 000 00-00-00 0 6,053.38 2,723,842 0 0 0

NH-0157(518) CULLMAN SR-157 11.43 % 01-019 GOOD HOPE 1,389,847 45 W 097 099 01-31-14 1,393,991 198,729.70 1,737,211 0 4,144 4,144

IM-I059(323) DEKALB 9.61 % 01-025 GOOD HOPE CON 12,846,863 113 D 116 086 08-31-14 15,787,753 1,614,772.86 16,787,574 1,973,200 0 1,973,200

IM-I059(336) DEKALB I 59 5.27 % 01-026 JACKSON PAVIN 24,999,333 1513 D 129 097 05-31-14 26,688,255 1,712,588.43 32,460,199 -13,630 1,688,922 1,675,292

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACNU59770-ATRP(004) DEKALB CR-44 0.00 % 01-030 JACKSON PAVIN 1,378,753 60 W 000 000 00-00-00 0 .00 0 0 0 0

ACOA59765-ATRP(002) DEKALB CR-85 0.00 % 01-031 JACKSON PAVIN 1,379,415 60 W 000 000 00-00-00 0 .00 0 0 0 0

99-801-253-190-301 DEKALB 2.89 % 01-032 JACKSON PAVIN 166,101 30 C 057 100 02-24-14 165,027 5,295.50 182,711 0 3,289 3,289

STPAA-0075(530) DEKALB SR-75 0.00 % 01-033 JACKSON PAVIN 3,151,179 45 W 000 000 00-00-00 0 .00 0 0 0 0

STPAA-0075(527) DEKALB SR-75 2.74 % 01-034 JACKSON PAVIN 1,286,970 30 W 097 100 03-07-14 1,217,363 44,091.92 1,608,623 0 -78,055 -78,055

99-301-253-035-301 DEKALB SR-35 5.61 % 01-035 JACKSON PAVIN 1,049,537 45 W 076 100 04-16-14 1,053,208 64,772.76 1,154,490 3,706 0 3,706

STPAA-0075(528) DEKALB SR-75 4.65 % 01-036 JACKSON PAVIN 2,095,165 50 W 076 100 06-11-14 1,635,589 119,391.61 2,563,117 4,800 0 4,800

ACNU59771-ATRP(001) DEKALB CR-50 2.52 % 01-037 JACKSON PAVIN 258,709 35 W 000 000 00-00-00 0 6,860.83 271,645 0 0 0

99-401-253-I59-401 DEKALB I-59 0.00 % 01-038 ORR CONTRACTI 138,681 42 W 000 000 00-00-00 0 .00 152,549 0 0 0

BRF-0035(504) JACKSON SR 35 4.36 % 01-041 HRI BRIDGE CO 19,999,777 350 W 067 025 10-01-14 6,743,285 911,227.82 20,879,131 0 0 0

99-401-690-000-403 DEKALB 0.00 % 01-042 ORR CONTRACTI 178,281 60 W 000 000 00-00-00 0 .00 196,109 0 0 0

ACOA59762-ATRP(001) DEKALB CR-27 1.22 % 01-043 JACKSON PAVIN 1,895,610 90 W 000 000 00-00-00 0 25,541.45 2,078,674 0 0 0

BRF-0035(503) JACKSON 8.86 % 01-044 SCOTT BRIDGE 14,331,999 280 W 204 100 08-01-12 23,112,087 1,623,031.05 18,306,334 10,588 8,780,088 8,790,676

ACNU59769-ATRP(004) DEKALB CR-479 0.07 % 01-045 JACKSON PAVIN 677,120 35 W 000 000 00-00-00 0 658.86 868,640 0 0 0

ACNU59768-ATRP(004) DEKALB CR-479 0.15 % 01-046 JACKSON PAVIN 322,200 35 W 000 000 00-00-00 0 685.46 435,751 0 0 0

99-501-690-000-001 JACKSON VARIOUS 4.31 % 01-047 P & H STUCCO 988,183 100 W 065 100 02-19-13 991,179 45,709.16 1,058,934 0 2,996 2,996

99-301-253-068-401 DEKALB SR-68 3.98 % 01-048 JACKSON PAVIN 758,682 30 W 000 000 00-00-00 0 33,243.24 834,550 16,870 0 16,870

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPNU-HSIP-0007(538) DEKALB SR-7 0.19 % 01-049 JACKSON PAVIN 1,590,744 30 W 000 000 00-00-00 0 4,317.79 2,219,993 0 0 0

DE-I020(331) ST. CLAIR I 20 12.58 % 01-051 E.O. BYARS CO 939,711 1913 D 105 100 08-15-13 1,145,277 148,807.82 1,182,616 25,871 205,566 231,437

STPAA-0065(500) JACKSON SR-65 2.22 % 01-052 JACKSON PAVIN 1,793,134 55 W 003 001 05-30-14 8,648 65,447.75 2,946,200 0 0 0

ACNU58643-ATRP(001) JACKSON CR-470 4.36 % 01-053 JACKSON PAVIN 212,569 30 W 000 000 00-00-00 0 9,748.97 223,198 0 0 0

STPAA-HSIP-0025(533) ST. CLAIR SR 25 5.17 % 01-054 GOOD HOPE 2,796,949 75 W 099 099 10-31-13 3,041,300 180,771.19 3,495,991 0 244,351 244,351

NH-0035(528) JACKSON SR-35 3.73 % 01-055 JACKSON PAVIN 882,706 30 W 000 000 00-00-00 0 45,410.08 1,217,325 0 0 0

ACBRZ58646-ATRP(001) JACKSON CR-151 2.25 % 01-056 MILLER & MILL 964,889 120 W 000 000 00-00-00 0 21,455.14 953,091 2,550 0 2,550

ACNU61275-ATRP(003) JACKSON CR-8 0.00 % 01-057 JACKSON PAVIN 1,499,241 45 W 000 000 00-00-00 0 .00 0 0 0 0

STPNU-3613(250) JACKSON CR-95 0.00 % 01-058 JACKSON PAVIN 961,962 30 W 000 000 00-00-00 0 .00 0 0 0 0

BR-0004(505) ST. CLAIR SR-4 15.21 % 01-059 TRI-COUNTY 973,851 140 W 085 055 05-31-14 567,595 193,602.99 1,272,575 -6,292 0 -6,292

STPAA-STPHV-0001(531) MADISON 18.69 % 01-060 ANGELO IAFRAT 5,445,590 200 W 099 099 12-01-13 7,135,310 1,170,677.69 6,262,429 84,456 1,689,720 1,774,176

STPHV-8540(600) MADISON 9.72 % 01-061 APAC MID-SOUT 3,174,706 195 W 050 061 05-31-14 1,986,952 355,001.24 3,650,912 167,475 0 167,475

EB-0053(509) MADISON 9.21 % 01-063 REED CONTRACT 13,883,824 330 W 098 099 12-15-13 15,228,042 1,671,209.57 18,142,618 750,485 1,344,218 2,094,703

99-401-452-000-201 (RENEWAL) MADISON I-565 4.97 % 01-064 LOVIN CONTRAC 54,150 12 W 075 100 10-18-13 54,145 4,804.53 96,620 0 -5 -5

STPHV-8507(600) MADISON CR-7 17.54 % 01-066 REED CONTRACT 1,089,578 120 W 077 065 04-30-14 754,595 219,874.75 1,253,015 12,783 0 12,783

STPNU-CN13(207) MARSHALL CR-152 2.57 % 01-067 WHITAKER CONT 420,926 30 W 030 100 03-31-14 385,124 12,924.19 502,213 0 0 0

STPAA-STPHV-8525(600) MADISON 4.96 % 01-068 REED CONTRACT 5,157,394 315 W 011 008 11-01-15 905,898 294,542.11 5,931,004 -516 0 -516

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

NH-0053(568) MADISON SR-53 24.79 % 01-069 REED CONTRACT 1,737,671 75 W 098 099 12-15-13 1,801,396 582,676.93 2,349,704 5,434 63,725 69,159

IM-I565(307) MADISON I-565 5.02 % 01-070 REED CONTRACT 9,407,647 115 D 018 010 05-01-15 1,294,171 588,381.65 11,719,231 221,650 0 221,650

NH-0002(560) MADISON SR-2 12.65 % 01-071 REED CONTRACT 1,151,380 45 W 000 000 00-00-00 0 229,928.19 1,817,377 11,568 0 11,568

STPHV-STPAA-0001(577) MADISON SR-1 1.77 % 01-072 WIREGRASS 1,847,632 180 W 003 001 12-31-14 49,637 51,362.74 2,891,344 0 0 0

ACAA58618-DE-A195(935) MADISON CR-77 1.58 % 01-073 MILLER & MILL 1,688,088 160 W 007 003 10-31-14 314,845 36,826.24 2,317,499 0 0 0

STPAA-4500(210) MADISON ROAD 12.17 % 01-074 REED CONTRACT 8,107,491 300 W 087 100 04-30-08 1,520,823 1,135,369.39 9,323,615 332,530 0 332,530

99-401-690-000-405 MADISON 5.68 % 01-075 ORR CONTRACTI 124,532 24 W 000 000 00-00-00 0 7,789.84 136,985 0 0 0

STPHS-000S(108) MADISON AVENUE 2.05 % 01-076 SHELBY CONTRA 174,787 75 W 095 100 04-29-05 81,000 3,179.88 154,689 0 0 0

ACBR58649-ATRP(001) MADISON CR-16 0.00 % 01-077 CARCEL & G. C 729,306 65 W 000 000 00-00-00 0 .00 0 18,580 0 18,580

NH-HSIP-0001(580) MADISON SR-1 0.20 % 01-078 WHITAKER CONT 3,069,264 70 W 000 000 00-00-00 0 8,766.63 4,362,100 0 0 0

NH-HSIP-0002(562) MADISON 0.09 % 01-079 JACKSON PAVIN 1,671,424 35 W 000 000 00-00-00 0 2,363.75 2,435,806 0 0 0

ACNU58657-ATRP(001) MARSHALL CR-14 1.65 % 01-080 WHITAKER CONT 954,892 45 W 047 100 03-17-14 955,752 18,124.03 1,095,071 700 642 1,342

ACOA58652-ATRP(001) MARSHALL CR-10 0.98 % 01-081 REED CONTRACT 817,910 75 W 000 000 00-00-00 0 11,541.75 1,169,730 0 0 0

ACNU58628-ATRP(001) MARSHALL 2.06 % 01-082 REED CONTRACT 1,613,102 45 W 096 099 10-31-13 1,510,635 34,970.54 1,693,758 0 -102,467 -102,467

ACOA59483-ATRP(001) MARSHALL SR-79 0.09 % 01-083 WHITAKER CONT 1,215,572 1414 D 000 000 00-00-00 0 1,225.65 1,328,640 0 0 0

BRZ-4800(211) MARSHALL CR-3 9.34 % 01-084 MILLER & MILL 375,789 75 W 067 074 06-30-14 289,617 35,800.80 383,292 0 0 0

ACBRZ58656-ATRP(001) MARSHALL CR-63 3.56 % 01-085 MILLER & MILL 652,468 180 W 031 045 06-30-14 310,014 24,438.41 685,092 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

NH-0001(581) MARSHALL SR-1 0.00 % 01-086 WHITAKER CONT 2,849,543 75 W 000 000 00-00-00 0 .00 0 0 0 0

ACOA61320-ATRP(007) MARSHALL CR-414 0.00 % 01-087 WHITAKER CONT 708,913 45 W 000 000 00-00-00 0 .00 0 0 0 0

BR-0091(501) CULLMAN SR-91 14.65 % 01-092 DEMENT CONSTR 4,160,279 200 W 061 068 05-01-14 2,923,654 796,936.35 5,436,424 0 0 0

99-401-690-000-302 BLOUNT 0.03 % 01-093 SALAZAR CONTR 128,055 90 W 021 067 11-01-13 85,476 53.31 140,861 0 0 0

ACOA58621-ATRP(001) MARSHALL CR-64 11.07 % 01-096 REED CONTRACT 303,828 30 W 093 100 11-19-13 302,048 38,712.21 349,402 0 -5,887 -5,887

HRRR-2800(213) ETOWAH CR-120 6.48 % 01-097 MCCARTNEY 294,799 30 W 100 099 10-31-13 220,817 22,794.05 351,729 0 -73,982 -73,982

ACOA58620-ATRP(001) MARSHALL 10.09 % 01-098 WHITAKER 780,050 45 W 082 100 12-31-13 722,158 90,542.44 897,058 0 -59,627 -59,627

STPAA-HSIP-0068(507) CHEROKEE SR-68 4.63 % 01-101 MCCARTNEY 1,802,537 60 W 000 000 00-00-00 0 107,467.71 2,318,861 11,418 0 11,418

99-501-690-000-201 MADISON 2.31 % 01-102 K.V.K. CONTRA 783,458 120 W 031 099 10-31-13 778,224 18,529.62 799,945 0 -5,234 -5,234

BR-8604(600) MADISON 0.00 % 01-103 RILEY BRIDGE 1,318,758 75 W 100 099 03-31-14 1,333,292 .00 0 19,982 14,534 34,516

STPAA-0025(537) ST. CLAIR SR-25 6.62 % 01-104 GOOD HOPE 1,454,578 65 W 094 093 04-30-14 1,359,623 114,913.31 1,735,478 0 -94,955 -94,955

ACNU58635-ATRP(001) CHEROKEE CR-15 2.63 % 01-105 GOOD HOPE CON 1,732,796 60 W 000 000 00-00-00 0 52,501.36 1,992,715 0 0 0

STPNU-1009(203) CHEROKEE CR-31 1.90 % 01-106 MCCARTNEY CON 459,934 45 W 000 000 00-00-00 0 11,358.52 597,600 0 0 0

BR-0004(506) ST. CLAIR SR-4 0.00 % 01-107 MCINNIS 1,513,487 225 W 043 064 08-31-14 997,258 .00 0 0 0 0

STPAA-MR13(902) CHEROKEE SR-283 2.82 % 01-108 MCCARTNEY CON 1,867,154 40 W 000 000 00-00-00 0 63,896.89 2,264,625 0 0 0

99-501-690-000-301 CHEROKEE 0.56 % 01-109 P & H STUCCO 787,000 150 W 000 000 00-00-00 0 4,910.07 865,700 0 0 0

STPAA-0025(538) CHEROKEE SR-25 0.00 % 01-110 GOOD HOPE CON 3,089,576 115 W 000 000 00-00-00 0 200.49 3,685,675 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPNU-2800(214) ETOWAH CR-32 5.56 % 01-126 GOOD HOPE CON 1,139,758 30 W 000 000 00-00-00 0 75,644.95 1,359,862 0 0 0

STPOA-1009(202)&STPOA-1012(202 CHEROKEE 3.76 % 01-127 MCCARTNEY 600,564 40 W 072 099 09-30-13 580,478 26,991.30 716,542 0 -20,086 -20,086

STPOA-2816(201) ETOWAH 0.00 % 01-128 CARCEL & G. C 332,057 45 W 000 000 00-00-00 0 .00 0 0 0 0

ACBRZ58640-ATRP(001) ETOWAH CR-87 2.40 % 01-129 CARCEL & G. C 416,810 60 W 047 044 01-31-14 175,242 11,040.61 458,491 0 0 0

ACNU58623-ATRP(001) CHEROKEE CR-19 2.40 % 01-130 MCCARTNEY 1,511,058 45 W 087 097 09-15-13 1,489,297 39,894.81 1,662,164 0 0 0

IM-I059(371) ETOWAH I-59 9.31 % 01-131 MCCARTNEY 755,776 114 D 124 084 03-31-14 650,807 108,589.22 1,165,997 0 0 0

STPOA-8157(600) ETOWAH CR-419 1.16 % 01-132 MCCARTNEY 503,876 30 W 037 086 04-30-14 422,808 8,588.40 736,513 0 0 0

STPNU-2800(215) ETOWAH CR-276 1.62 % 01-133 MCCARTNEY 400,722 30 W 023 085 04-15-14 291,605 10,351.71 637,487 0 0 0

ACBRZ58626-ATRP(001) ETOWAH CR-83 0.51 % 01-134 WRIGHT BROTHE 1,993,862 225 W 000 000 00-00-00 0 12,477.77 2,404,434 0 0 0

SRTS-SR11(912) ETOWAH 0.00 % 01-135 TRI-COUNTY CO 62,902 40 W 000 000 00-00-00 0 .00 0 0 0 0

STPAA-HSIP-0132(502) ETOWAH SR-132 1.36 % 01-136 WHITAKER CONT 2,225,076 60 W 000 000 00-00-00 0 7,487.11 549,482 0 0 0

STPOA-HSIP-0007(537) ETOWAH SR-7 0.09 % 01-137 MCCARTNEY 3,037,158 65 W 000 000 00-00-00 0 3,537.25 3,667,439 0 0 0

STPOA-2813(250) ETOWAH CR-162 0.10 % 01-138 GOOD HOPE 1,278,958 40 W 000 000 00-00-00 0 1,779.92 1,684,699 0 0 0

ACOA58622-ATRP(001) ETOWAH CR-125 0.10 % 01-139 E. O. BYARS 944,325 150 W 000 000 00-00-00 0 1,093.69 1,058,231 0 0 0

BR-0179(500) & BR-0179(501) ETOWAH SR-179 10.59 % 01-141 WHITAKER CONT 2,398,391 205 W 038 045 05-31-14 1,136,762 332,032.93 3,134,086 0 0 0

STMOA-STPOA-8104(600) ETOWAH 2.31 % 01-142 WRIGHT BROTHE 7,443,256 250 W 100 100 12-31-11 6,982,304 49,425.71 2,138,433 18,463 -460,952 -442,489

ACNU58686-ATRP(001) BLOUNT CR-27 1.90 % 01-143 WHITAKER CONT 1,890,596 90 W 041 028 04-30-14 521,786 41,495.45 2,174,186 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

SRTS-SR12(912) ETOWAH 0.00 % 01-144 BURNETT CIVIL 81,351 40 W 050 094 04-15-14 85,234 .00 0 15,444 0 15,444

STPOA-0025(518)&STPAA-0025(526 ETOWAH SR 25 4.82 % 01-145 GOOD HOPE 18,463,000 375 W 081 056 05-31-14 10,843,384 1,160,906.74 24,066,472 0 0 0

99-401-690-000-402 BLOUNT 0.84 % 01-146 BENTLEY TURF 161,561 60 W 000 000 00-00-00 0 1,493.40 177,717 0 0 0

HRRR-HSIP-CN10(210) ETOWAH 9.31 % 01-147 RICHARDS & SO 196,595 45 W 098 100 06-30-10 194,920 22,033.25 236,425 0 -1,675 -1,675

99-401-690-000-404 BLOUNT 0.31 % 01-148 LOVIN CONTRAC 244,640 60 W 000 000 00-00-00 0 838.51 269,104 0 0 0

NHF-BRF-8106(600) ETOWAH 8.72 % 01-149 MCCARTNEY CON 9,992,544 320 W 076 070 02-15-14 7,098,442 1,139,812.51 13,057,706 33,631 0 33,631

NH-0074(534) BLOUNT SR-74 2.22 % 01-150 WHITAKER CONT 1,035,657 30 W 000 000 00-00-00 0 29,875.58 1,341,905 0 0 0

ER-8940(952) BLOUNT I-65 0.00 % 01-153 FORESTRY 130,627 30 W 083 082 01-31-14 117,174 .00 0 0 0 0

ACNU58629-ATRP(001) ST. CLAIR CR-26 2.58 % 01-160 MCCARTNEY CON 1,179,914 45 W 070 080 10-31-13 878,835 31,988.37 1,238,910 0 0 0

ACNU58659-ATRP(001) ST. CLAIR CR-33 0.67 % 01-161 MCCARTNEY CON 3,463,473 60 W 000 000 00-00-00 0 31,812.04 4,735,023 0 0 0

ACNU59778-ATRP(004) ST. CLAIR CR-27 0.02 % 01-162 MCCARTNEY CON 2,196,292 60 W 000 000 00-00-00 0 465.89 2,326,646 0 0 0

EB-DE-A182(900) MADISON 20.56 % 01-163 S.J. & L. 585,114 100 W 093 100 04-14-14 562,652 143,475.83 697,808 0 0 0

NHF-0001(573) MADISON SR53 14.69 % 01-164 SHOALS ELECTR 960,020 1612 D 099 099 08-01-13 356,354 184,349.55 1,254,499 45,852 -603,666 -557,814

BR-0067(503) BLOUNT SR-67 10.81 % 01-171 MCINNIS CONST 4,130,061 190 W 072 086 05-31-14 3,594,991 583,849.28 5,396,936 -176,698 0 -176,698

ACNU58615-ATRP(001) CULLMAN CR-18 10.07 % 01-172 WIREGRASS CON 159,722 30 W 000 000 00-00-00 0 18,514.41 183,680 0 0 0

STPOA-8116(600) ETOWAH STREET 5.25 % 01-173 PNEUMATIC CON 585,834 120 W 072 100 07-29-05 681,318 38,876.40 739,508 0 0 0

NH-0001(575) & NH-0053(567) MADISON SR-53 6.72 % 01-176 APAC MID-SOUT 3,708,677 120 W 090 098 12-01-13 3,637,985 311,632.23 4,635,586 0 -70,692 -70,692

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACAA58619-ATRP(001) MADISON CR-17 2.10 % 01-177 APAC MID-SOUT 807,502 95 W 087 092 03-31-14 704,459 19,533.47 928,628 2,004 0 2,004

STPAA-0007(536) ST. CLAIR SR-7 6.92 % 01-180 GOOD HOPE CON 769,986 30 W 090 089 04-15-14 661,815 66,633.11 962,428 0 0 0

STMAAF-0001(537) MADISON 10.04 % 01-223 REED CONTRACT 17,271,708 550 W 097 099 11-30-13 18,042,131 2,105,294.37 20,966,586 411,591 770,423 1,182,014

STPHV-8556(600) MADISON HUNTSVI 43.03 % 01-226 APAC-SOUTHEAS 3,597,618 300 W 093 100 12-01-11 3,543,377 1,780,366.81 4,137,261 50,537 -54,241 -3,704

99-403-692-000-201 ST. CLAIR 0.43 % 01-236 BENTLEY TURN 163,681 90 W 023 100 12-03-12 106,305 778.73 180,049 0 0 0

BR-0075(510) BLOUNT 11.89 % 01-243 RACON, INC. 4,416,361 310 W 100 099 07-31-13 4,376,990 686,546.28 5,771,058 4,293 -39,371 -35,078

BR-8525(602) MADISON 16.85 % 01-244 MILLER & MILL 877,469 120 W 098 095 03-01-13 860,365 197,880.11 1,173,696 14,550 -17,104 -2,554

IM-I565(309) MADISON 6.96 % 01-247 WIREGRASS CON 8,376,557 2111 D 100 100 12-01-11 9,158,459 761,894.87 10,946,024 33,750 781,902 815,652

STPHV-8539(600) MADISON 0.00 % 01-249 REED CONTRACT 3,164,831 200 W 098 099 06-30-13 3,580,015 .00 1,175,000 85,799 415,184 500,983 DIVISION TOTALS: 339,389,284 230,971,482 393,692,775 4,310,775 16,150,803 20,461,578 28,158,940.90

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 14 SECOND DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 02-001 0.994 MI CONCRETE PAVEMENT REHAB, RESURFACING, SIGNALS & STRIPE ON SECOND ST FROM JACKSON HIGHWAY A1RDY-100058389 TO WOODWARD AVENUE IN SHEFFIELD; ROGERS GROUP, INC. ACOA58389-ATRP(001) COLBERT 2ND ST

02-002 0.227 MI TRAFFIC SIGNAL UPGRADE ON SR-2(US-72)AT SR-17(US-43)/11TH AVE/JACKSON HIGHWAY)IN SHEFFIELD HS31M-100051698 SHOALS ELECTRIC COMPANY, INC. HSIP-0002(559) COLBERT SR-2

02-003 2.889 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-2(US-72)FROM 0.26 MI E OF CR-1 TO JUST E OF CR- NH01M-100060893 5(MP 5.300); MIDSOUTH PAVING, INC. NH-0002(565) COLBERT SR-2

02-004 INTERECTION IMPROVEMENTS INCLUDING SIGNALS AT SECOND STREET, COX BOULEVARD & JACKSON HIGHWAY IN HSST -100007076 SHEFFIELD. ( APAC-ALABAMA,INC. ) STPHS-108(26) COLBERT STREET

02-005 3.589 MI RESURFACING AND TRAFFIC STRIPE ON SR-247 FROM THE FRANKLIN CO LINE TO MP 15.000; AAST1-00060892 CHARLES E. WATTS, INC. STPAA-0247(502) COLBERT SR-247

02-006 1.739 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON AVALON AVE FROM US-43 (WOODWARD AVE) TO SR-133 A1RDY-100058387 (WILSOM DAM RD) IN MUSCLE SHOALS; APAC MID-SOUTH, INC. ACOA58387-ATRP(001) COLBERT

02-007 0.344 MI INTERSECTION IMPROVEMENTS (GRADE, DRAIN, PAVEMENT & SIGNALS) ON SECOND STREET FROM SHST -100046998 MONTGOMERY AVE TO DOVER AVE IN SHEFFIELD; (JOE KEENUM EXCAVATION & CONSTRUCTION, INC.) STPOA-8805(600) COLBERT

02-008 0.862 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON CR-24 FROM SR-13 (US-43) TO CR-22 IN MUSCLE SHST1-00058097 SHOALS; APAC MID-SOUTH, INC. STPOA-8816(601) COLBERT CR-24

02-010 0.150 MI. GRADE, DRAIN & PAVEMENT ON B'HAM AVE. FROM ASHE BOULEVARD TO SR#17 & ON THIRD ST. FROM SR# HSST -100007072 17 TO ASHE BOULEVARD IN SHEFFIELD. ( APAC-ALABAMA, INC. ) STPHS-108(27) COLBERT SR#17

02-011 1.903 MI WIDENING (GRADE, DRAINAGE, PAVEMENT, SIGNING AND SIGNALS) ON SR133 FROM N OF THE STOAE-100009338 NORFOLK SOUTHERN RAILWAY BRIDGE TO S OF AVALON AVE IN MUSCLE SHOALS; HIGHWAYS, INC STPOAF-8829(600) COLBERT SR133

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 15 SECOND DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 02-016 STPNU-4703(200); 3.896 MI RESURFACING, TRAFFIC STRIPE, CULVERT EXTENSION & GUARDRAIL ON CR-48 AND STNUE-100053537 CR-28 AT SITES INDICATED BY THE PLANS; (S.T. BUNN CONSTRUCTION CO., INC.) STNUE-100056134 STPNU-4719(200) MARION

02-017 0.056 MI INTERSECTION LIGHTING ON CR-312 (HALEY DRIVE) AT CR-35 (GARNER LANE) IN BARTON AT THE STATO-100055450 RIBERFRONT INDUSTRIAL PARK; (SHOALS ELECTRIC COMPANY, INC.) ST-017-888-020 COLBERT

02-018 1.185 MI RESURFACING, DRAINAGE, SIDEWALK & SIGNAL ON JACKSON HWY. (SR-13 / US-43) FROM 2ND STREET SHST -100047001 IN MUSCLE SHOALS TO SR-2 (US-72); (JOE KEENUM EXCAVATION & CONSTRUCTION, INC.) STPOA-8822(600) COLBERT

02-020 4.832 MI. GRADE,DRAINAGE, PAVEMENT, PARTIAL PLANING & RESURFACING ON SR 24(CORRIDOR V) APD8H-100009848 FROM 3 MILES WEST OF RUSSELLVILLE TO WEST OF SR 13 (US 43) IN RUSSELLVILLE APD-0355(504) FRANKLIN SR 24

02-021 0.500 KILO DUAL BRIDGES ON THE RELOCATED SR-13 AT GAS BRANCH SE OF PHIL CAMPBELL; WRIGHT BROTHERS NH01M-100050489 CONSTRUCTION COMPANY, INC. NHF-0013(545) FRANKLIN

02-022 11.244 MI RESURFACING, TRAFFIC STRIPE & PAVEMENT MARKERS ON CR-23 FROM SR-19 IN VINA TO SR-24 AND STNUL-100051594 ON CR-79 FROM MARION COUNTY LINE TO SR-243; S&M EQUIPMENT CO., INC, 835 SHAW RD, LEIGHTON,AL STPNU-3010(201)-STPOA-3036(200FRANKLIN

02-023 2.147 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-13 (US-43) FROM JUST S OF SR-24 (MP 293.700) TO NH01M-100059179 JUST N OF UNDERWOOD RD (MP 295.839); ROGERS GROUP, INC. NH-0013(587) FRANKLIN SR-13

02-024 STPOA-3026(200); 4.064 MI RESURFACING & TRAFFIC STRIPE ON CR-58 FROM CR-49 IN FRANKFORT TO HOVATER STOAL-100056826 MILL RD & FROM CR-73 TO CR-65 (WATERLOO RD); (ROGERS GROUP, INC.) STOAL-100055249 STPOA-3026(201) FRANKLIN

02-025 MAINTENANCE ROADSIDE MOWING ALONG VARIOUS STATE ROUTES AS INDICATED ON THE PLANS 99054-100050139 (COOK CONTRACTORS, INC.) 99-402-692-000-701 FRANKLIN VARIOUS

02-026 3.200 MI RESURFACING & TRAFFIC STRIPE ON DUNCAN CREEK ROAD (SR-62) FROM RUSSELLVILLE CITY LIMITS NUST -100053847 TO WATERLOO ROAD (CR-65) (S&M EQUIPMENT CO., INC.) STPNU-3039(200) FRANKLIN

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 16 SECOND DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 02-027 0.776 MI DUAL BRIDGES ON RELOCATED SR-13 AT BEAR CREEK NORTHWEST OF DIME; STOAL-100050490 (SCOTT BRIDGE COMPANY, INC.) STPOAF-0013(544) FRANKLIN

02-028 7.859 MI ADDITIONAL LANES (GRADE, DRAINAGE, PARTIAPAVE & BRIDGES) SR-24 (CORRIDOR "V") FROM SR-247 APD54-100038595 EAST OF RED BAY TO CR-21 W.S. NEWELL & SONS, INC. AC8L -100038595 ACAPD-0355(501) FRANKLIN

02-029 & ACNU58685-ATRP(001); 8.518 MI LANE ADDITION, PLANING, RESURFACING & TRAFFIC STRIPE ON SR-19 STAAM-100059171 FROM THE JUNCTION OF SR-172 IN VINA TO THE JUNCTIOOF SR-24 IN RED BAY & THE VINA INDUSTRIAL PARK ENT A1RDY-100058685 STPAA-0019(504) FRANKLIN SR-19

02-030 1.444 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-2 (US-72) FROM CR-30 (INDIAN SPRINGS RD) TO NH01M-100059180 CR-316 (HARRIS DR) IN FLORENCE; MIDSOUTH PAVING INC. NH-0002(558) LAUDERDALESR-2

02-031 0.667 MI BRIDGE REPLACEMENT AND APPROACHES ON THE EASTBOUND LANE OF SR-2 (US-72) OVER BLUEWATER BRNM1-00055422 CREEK EAST OF KILLEN; THE BRIDGE BUILDERS OF ALABAMA LLC BRF-0002(545) LAUDERDALE

02-032 13.500 MI RESURFACING & TRAFFIC STRIPE AT VARIOUS SITES AS INDICATED IN THE PLANS; MIDSOUTH PAVING A1RDY-100059646 INC. ACNU59646-ATRP(001) LAUDERDALE

02-034 4.903 MI RESURFACING AND TRAFFIC STRIPE ON SR-13 (US-43) FROM 0.40 MI N OF SR-64 TO THE TENNESSEE NH01M-100060882 STATE LINE; ROGERS GROUP, INC. NH-0013(591) LAUDERDALESR-13

02-035 0.202 MI GRADE, DRAIN, BASE, PAVE AND BRIDGE REPLACEMENT ON RAILROAD AVE AND ON HERMITAGE DR SHSTM-100047005 OVER THE TENNESSEE SOUTHERN RAILROAD IN FLORENCE; B. H. CRAIG CONSTRUCTION COMPANY, INC. STPOA-8863(600) LAUDERDALE

02-036 5.151 MI RESURFACING AND TRAFFIC STRIPE ON SR-20 FROM NATCHEZ TRACE PARKWAY TO 0.12 MI EAST OF STAAM-100060887 CR-222; ROGERS GROUP, INC. STPAA-0020(518) LAUDERDALESR-20

02-038 0.253 MI. BRIDGE REPLACEMENT (3 BRIDGE CULVERTS) & AAPPROACHES AT VARIOU LOCATIONS AS INDICATED ON GRBN1-100044503 THE PLANS. ( B. H. CRAIG CONSTRUCTION CO., INC. ) ACGBBRZ-CN04(209) LAUDREDALE SITES

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 17 SECOND DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 02-039 6.171 MI RESURFACING & TRAFFIC STRIPE ON CR-2 FROM0.60 MI E OF CR-188 TO CR-15; ON CR-51 FROM CR-76 STNUM-100061835 TO CR-50; & ON CR-89 FROM CR-50 TO CR-505; JOE KEENUM EXCAVATION & CONSTRUCTION, INC. STPNU-3914(250) LAUDERDALECR-2

02-043 0.156 MI BRIDGE REPLACEMENTS (2 BRIDGE CULVERTS) AND APPROACHES ON CR-133 AT BRUSH CREEK NORTH OF BROFE-100058748 WRIGHT AND ON CR-49 AT THE EAST FORK OF ANERSON CREEK IN ANDERSON; GLASGOW CONSTRUCTION CO. INC. BRZ-3900(205) LAUDERDALECR 133

02-044 0.076 MI BRIDGE REHABILITATION (PILE ENCASEMENT) ON CR-70 AT ANDERSON CREEK EAST OF ROGERSVILLE; A1BRZ-100058393 SHOTCRETE OF AMERICA, LLC ACBRZ58393-ATRP(001) LAUDERDALECR-70

02-045 0.218 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-20 (US-72 ALT) FROM (MP 43.000) TO SR-101 STAAM-100059167 (MP 43.219) IN TOWN CREEK; REED CONTRACTING SERVICES, INC. STPAA-0020(515) LAWRENCE SR-20

02-046 3.237 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON CR-460 (COURT ST) FROM THE MOULTON CITY LIMITS A1RDY-100060578 TO JUST EAST OF SR-24; ROGERS GROUP, INC. ACNU60578-ATRP(001) LAWRENCE CR-460

02-047 & ST-040-888-007; 1.514 MI BASE, PAVE, AND TRAFFICSTRIPE & ADDITIONAL LANES ON CR-434 FROM THE N STATE-100052318 RIGHT-OF-WAY OF NORFOLK SOUTHERN RAILROAD TO SR-20(US-72) & ON SR-20 AT CR-434;REED CONTRACTING SERV STATE-100058692 ST-040-888-006 LAWRENCE CR-434

02-048 10.499 MI RESURFACING AND TRAFFIC STRIPE ON CR-460FROM THE INTERSECTION OF SR-24 TO THE MORGAN CO STNUL-100062095 LINE; JOE KEENUM EXCAVATION & CONSTRUCTION, INC. STNUM-100062095 STPNU-4014(250) LAWRENCE CR-460

02-049 3.313 MI ROADWAY LIGHTING ON SR-157 FROM 0.2 MILESSOUTH OF CR-87 TO 0.2 MILES NORTH OF SR-33 IN NH04E-100046060 MOULTON; (STONE & SONS ELECTRICAL CONTRACTORS, INC.) NH-0157(507) LAWRENCE

02-053 5.840 MI. GRADEM DRAIN, PARTIAL BASE, PAVE & BRIDGES ON SR 24 (CORRIDOR V) FROM THE APD8H-100009845 MISSISSIPPI STATE LINE THROUGH RED BAY TO SR 247 (S & M EQUIPMENT CO., INC.) APD-0355(505) FRANKLIN SR 24

02-054 6.270 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR20 (US-72 ALT) FROM W OF SR33 (MP 50.430) TO NH04L-100057585 E OF CR383 (MP 56.700) IN HILLSBORO; WIREGRASS CONSTRUCTION CO. INC. NH-0020(514) LAWRENCE SR 20

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 18 SECOND DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 02-055 1.065 MI BRIDGE REPLACEMENT (DUAL) AND APPROACHES ON SR-20 (ALT US-72) AT FOX CREEK EAST OF BROPE-100049328 HILLSBORO; REED CONTRACTING SERVICES, INC. BRF-0020(509) LAWRENCE SR-20

02-056 & FRANKLIN CO; 5.367 MI FULL DEPTH RECLAMATION, PAVE & TRAFFIC STRIPE ON CR-339(SITE 1)FROM CR-460 STNUM-100058601 N TO FRANKLIN CR-80 & ON CR-400(SITE 2)FROM N OF CR-389 TO NE OF CR-403; THE MILLER PAVING GROUP, STPNU-CN12(219) LAWRENCE CR-339

02-060 0.535 MI BRIDGE REPLACEMENTS AT VARIOUS SITES ON CR-13 (SIPSEY CREEK, BOARDTREE CREEK & BARNESVILLE A1BRZ-100058397 CREEK) AS INDICATED IN THE PLANS; RILEY BRIDGE COMPANY, INC. ACBRZ58397-ATRP(001) MARION

02-061 0.757 MI INTERCHANGE LIGHTING ON SR-4 (CORRIDOR X)AT SR-44 EAST OF TWIN; STONE ELECTRIC COMPANY, INC NHSP1-00057160

NHF-0004(531) MARION SR 4

02-062 SLIDE CORRECTIONS ON SR-4 (CORRIDOR X) FROM WEST OF SR-171 (MP 15.900) TO SR-44 AT VARIOUS SITES NH04E-100052801 INDICATED BY THE PLANS; (JOE KEENUM EXCAVATION & CONST. CO.) NHF-0004(522) MARION

02-063 0.896 MI ROADWAY AND DRAINAGE IMPROVEMENTS ON SR-13 IN BEAR CREEK AT SITES AS INDICATED BY THE STATE-100055952 PLANS; S.T. BUNN CONSTRUCTION COMPANY, INC. ST-047-013-001 MARION SR-13

02-064 1.141 MI ADDITIONAL LANES (GRADE, DRAIN, BASE & PAVE) ON SR-17 (US-43) FROM THE 5-LANE SECTION IN STAAM-100058482 HACKLEBURG TO THE 4-LANE SECTION S OF BEAR CREEK; CARCEL & G. CONSTRUCTION, LLC STPOA-0017(546) MARION SR-17

02-065 & STPNU-4700(211); 9.010 MI RESURFACING & TRAFFIC STRIPE ON CR-20 FROM CR-25 TO CR-29 N OF HAMILTON A1RDY-100060454 & ON CR-46 FROM SR-129 TO SR-233 N OF BRILLIANT; S. T. BUNN CONSTRUCTION COMPANY, INC. STNUM-100060452 ACNU60454-ATRP(001) MARION CR-20 STNUR-100060452 STNU1-00060452

02-066 0.416 MI RESURFACING & TRAFFIC STRIPE ON SR-17 FROM THE JUNCTION OF OLD HACKLEBURG RD TO 70 FT E STAAM-100060891 OF N ST IN HACKLEBURG; S. T. BUNN CONSTRUCTION CO.INC. STPAA-0017(556) MARION SR-17

02-067 3.995 MI REPLACEMENT OF FAILED SAFETY LAYERS ON I-22 FROM SR-233 (MP 34.520) TO THE WALKER CO LINE IM01M-100061127 (MP 38.470) EAST OF EXIT 34; S. T. BUNN CONSTRUCTION COMPANY, INC. IM-I022(300) MARION I-22

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 19 SECOND DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 02-068 SLIDE REPAIR ON I-22 0.6 MILES EAST OF SR-171 (US-43/US-278) AT MP 17.400 NEAR EXIT 16; IM01M-100060867 GEOSTABILIZATION INTERNATIONAL, LLC IM-I022(301) MARION I-22

02-070 4.597 MI RESURFACING AND TRAFFIC STRIPE ON SR-233 2.2 MI S OF CR-92 (MP 10.000) TO THE INTERSECTION STAAM-100060880 OF SR-74 (US-278) (MP 14.561); S. T. BUNN CONSTRUCTION COMPANY, INC. STPAA-0233(502) MARION SR-233

02-071 5.984 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-19 FROM THE JUNCTION OF SR-74 (MP 11.510) TO STAAM-100060885 JUST N OF CR-20 (MP 17.480); S. T. CONSTRUCTION COMPANY, INC. STPAA-0019(505) MARION SR-19

02-075 3.053 MI PAVED SHOULDERS AND TRAFFIC STRIPE ON CR-63 FROM FARLEY RD NEAR ARLEY TO OLD ARLEY RD HSIRE-100059948 NEAR HOUSTON; S & C MATERIALS & PAVING, INC. HSIRR-100059948 HRRR-6705(201) WINSTON CR-63

02-076 0.224 MI GUARDRAIL & GUARDRAIL END ANCHORS ON CR- 41 AT DUNCAN BRIDGE OVER THE SIPSEY CREEK NEAR HSIPE-100057523 ARLEY; (ALABAMA GUARDRAIL, INC.) HSIP-6702(201) WINSTON

02-077 0.276 MI GRADE, DRAINAGE & PAVEMENT ON JOINT ARMEDFORCES ACCESS ROAD IN HALEYVILLE; TCSPL-100048841 (TRI-COUNTY CONSTRUCTION, INC.) TCSP-06AL(002) WINSTON

02-078 2.298 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-74(US-278)FROM THE MARION CO LINE(MP 26.090) NH01M-100059178 TO THE INTERSECTION OF SR-5(MP 28.530)W OF NATURALBRIDGE; S. T. BUNN CONSTRUCTION CO. INC. NH-0074(531) WINSTON SR-74

02-079 3.378 MI RESURFACING AND TRAFFIC STRIPE ON CR-32 FROM THE JUNCTION OF CR-55 TO THE JUNCTION OF A1RDY-100060590 SR-195 NEAR DOUBLE SPRINGS; ROGERS GROUP, INC. ACNU60590-ATRP(001) WINSTON CR-32

02-080 0.320 MI FULL DEPTH RECLAMATION ON CR-9 FROM 0.2 MILES NE OF SR-13 TO 3RD WINSTON CO INDUSTRIAL STNUE-100055930 PARK ACCESS ROAD WEST OF LYNN; (S.T. BUNN CONSTRUCTION CO., INC.) STP09-100055930 DE-STPNU-A197(932) WINSTON

02-081 2.435 MI RESURFACING AND TRAFFIC STRIPE ON CR14 FROM CR39 TO THE CULLMAN CO LINE AND ON CR 39 FROM STOAE-100056304 US 278 TO CR 3733 E OF ADDISON; GOOD HOPE CONTRACTING COMPANY, INC. STNUE-100057530 STPOA-6721(201)&STPNU-6720(201WINSTON CR 14

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 20 SECOND DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 02-082 4.679 MI RESURFACING AND TRAFFIC STRIPE ON CR-19 &CR-32 FROM THE JUNCTION OF SR-195 NEAR HALEYVILLE A1RDY-100060589 TO THE JUNCTION OF CR-15; ROGERS GROUP, INC. ACNU60589-ATRP(001) WINSTON CR-19

02-083 6.201 MI RESURFACING AND TRAFFIC STRIPE ON CR-69 (NEWBERG RD) FROM 11TH AVE TO THE FRANKLIN CO LINE A1RDY-100060582 ROGERS GROUP, INC. ACNU60582-ATRP(002) WINSTON CR-69

02-084 12.500 MI FULL DEPTH RECLAMATION, RESURFACING & TRAFFIC STRIPE ON CR-12 FROM THE JUNCTION OF CR-77 A1RDY-100059685 IN ARLEY CONTINUING APPROX 10 MI AROUND THE SOUTHERN LOOP OF CR-12;BLOUNT CONSTRUCTION CO. INC ACNU59685-ATRP(010) WINSTON CR-12

02-085 4.411 MI RESURFACING AND TRAFFIC STRIPE ON CR-15 FROM CR-23 EAST OF HALEYVILLE TO SR-195; STNUE-100054611 (ROGERS GROUP, INC.) STPNU-6700(213) WINSTON

02-086 4.544 MI. GRADEM DRAINAGE, PAVEMENT & BRIDGE WIDENINGON SR 118 FROM SR 107 (US 43) IN GUIN OAST -100038463 TO LUXAPALLILA CREEK IN WINFIELD (TRI-COUNTY CONCRETE CONSTRUCTION, INC) STPOA-0118(503) MARION SR 118

02-087 3.936 MI FULL DEPTH RECLAMATION, SURFACE TREATMENTAND TRAFFIC STRIPE ON CR-2 FROM E OF SR-74 (US-278 STNUM-100059037 E OF DOUBLE SPRINGS TO CR-18; BLOUNT CONSTRUCTION COMPANY, INC. STPNU-6717(200) WINSTON CR-2

02-089 4.681 MI RESURFACING, GUARDRAIL IMPROVEMENTS AND TRAFFIC STRIPE ON CR-7 FROM 33RD ST IN HALEYVILLE STNUM-100059812 TO THE FRANKLIN CO LINE; GOOD HOPE CONTRACTING COMPANY, INC. STPNU-6712(200) WINSTON CR-7

02-091 5.373 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-195 NEAR ASHRIDGE FROM MP 30.400 S OF CR-2 S30AC-100059174 TO MP 35.720 N OF SR-243 NEAR FORKVILLE; ROGERS GROUP, INC. 24AC1-00059174 STPAA-HSIP-0195(506) WINSTON SR-195

02-092 2.959 MI RESURFACING AND TRAFFIC STRIPE ON CR-71 (MOORESVILLE RD) FROM CR-292 (THACH RD) TO CR-117 STNUM-100060049 (SWEET SPRINGS RD) SOUTHWEST OF ARDMORE; REED CONTRACTING SERVICES, INC. STPNU-4202(200) LIMESTONE CR-71

02-093 2.640 MI PHASE I RESURFACING (PLANING, RESURFACING& PVT MARKERS) ON CR-3 (COUNTRY LINE RD) FROM THE A1RDY-100059030 JUNCTION OF MILL RD TO JUST S OF SR-2 (US-72) W OFMADISON; REED CONTRACTING SERVICES, INC. ACAA59030-ATRP(001) LIMESTONE CR-3

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 21 SECOND DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 02-094 4.589 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-127 FROM THE INTERSECTION OF SR-99 TO CR- STAAM-100059181 273 (MAPLES CIRCLE) (MP 4.590); JOE KEENUM EXCAVATION & CONSTRUCTION, INC. STPAA-0127(500) LIMESTONE SR-127

02-095 2.660 MI RESURFACING & TRAFFIC STRIPE ON SR-2(US- 72) FROM YORK LANE(MP 72.163)TO JUST W OF NH01M-100060884 JEFFERSON ST (MP 74.863) IN ATHENS; REED CONTRACTING SERVICES, INC. NH-0002(561) LIMESTONE SR-2

02-096 3.128 MI WIDENING, RESURFACING & TRAFFIC STRIPE ONCR-83 (LINDAY LANE) FROM CR-24 (HUNTSVILLE-BROWNS A1RDY-100060250 FERRY RD) TO SR-251 IN ATHENS; JOE KEENUM EXCAVATION & CONSTRUCTION, INC. ACOA60250-ATRP(001) LIMESTONE CR-83

02-097 & ACAA59662-ATRP(002);7.972 MI RESURFACING & TRAFFSTRIPE ON ELK RIVER MILLS RD FROM BAKER HILL RD TO A1RDY-100059673 TILLMAN MILL RD & ON NICK DAVIS RD FROM MORRESVILLRD TO SANDERSON RD;JOE KEENUM EXCAVATION & CONSTRU A1RDY-100059662 ACNU59673-ATRP(002) LIMESTONE

02-098 4.626 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-2(US-72)FROM CR-95(MCCULLEY MILL RD) TO NH01M-100060890 COUNTY LINE RD; REED CONTRACTING SERVICES, INC. NH-0002(563) LIMESTONE SR-2

02-101 MAINTENANCE ROADSIDE MOWING AND LITTER COLLECTION ALONG VARIOUS STATE ROUTES AT SITES AS INDICATED 99054-100058106 BY THE PLANS; J. WEST, INC. 99-402-692-000-201 FRANKLIN

02-102 0.395 MI INTERSECTION IMPROVEMENTS ON SR 53 (US 231) AT SR 36 IN LACEYS SPRING; REED STATE-100055833 CONTRACTING SERVICES, INC. ST-052-053-002 MORGAN SR 53

02-103 4.620 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR 157 FROM N OF CRUNK RD (MP 79.587) AT NH04L-100054170 UNDERWOOD TO S OF CR 272 (MP 84.250); ROGERS GROUP, INC. NH-0157(517) LAUDERDALESR 157

02-104 MAINTENANCE ROADSIDE MOWING ALONG VARIOUS STATE ROUTES AS INDICATED ON THE PLANS 99054-100050140 (COOK CONTRACTORS, INC.) 99-402-693-000-702 WINSTON VARIOUS

02-106 MORGAN & LIMESTONE, MAINTENANCE ROADSIDE MOWING & LITTER COLLECTION ALONG I65 FROM THE CULLMAN CO 99054-100058077 LINE TO THE STATE LINE & ALONG I565 FROM I65 TO THE MADISON CO LINE; BENTLEY TURF & LANDSCAPE, INC 99-402-694-000-201 MORGAN I 65

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 22 SECOND DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 02-107 6.826 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-36 FROM SR-67(MP 31.860)TO 0.3 MI S OF TALUCAH STAAL-100060889 RD; REED CONTRACTING SERVICES, INC. STPAA-0036(507) MORGAN SR-36

02-108 17.311 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR53 FROM SR251 (6TH STREET) TO MAINSTREET/ EBSPE-100056029 ARDMORE AVE IN ARDMORE & ON SR251 FROM SR3 IN ATHENS TO SR53; WIREGRASS CONSTRUCTION CO., INC. EBSPE-100056028 EB-0053(558) & EB-0251(500) LIMESTONE SR 53

02-109 7.010 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-67 FROM THE CULLMAN CO LINE (MP 10.271) TO NH01M-100060883 0.12 MI N OF ENTREKIN RD (MP 17.268); WHITAKER CONTRACTING CORPORATION NH-0067(506) MORGAN SR-67

02-110 3.409 MI RESURFACING, TRAFFIC STRIPE & CURB RAMP INSTALLATION ON SR-3(US-31)FROM JUST S OF SR-67 NH01M-100060886 (MP 354.958)TO JUST S OF SR-20(MP 358.394)IN DECATUR; WIREGRASS CONSTRUCTION COMPANY, INC. NH-0003(584) MORGAN SR-3

02-111 2.778 MI ADDITIONAL LANES (GRADE, DRAIN, PAVE, BRIDGES AND SIGNALS) ON SR67 FROM SR3 (US31) TO NH04E-100040953 CR41 (DANVILLE RD) IN DECATUR; WIREGRASS CONSTRUCTION CO. INC. NH04L-100040953 NHF-0067(501) MORGAN SR 67 NH981-00040953

02-112 0.025 MI BRIDGE REPLACEMENT ON CR-426(CAVE SPRINGSRD)OVER GINHOUSE BRANCH IN PRICEVILLE; A1RDY-100059680 MILLER & MILLER, INC. ACOA59680-ATRP(007) MORGAN CR-426

02-113 12.505 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR2 (US 72) FROM THE ELK RIVER BRIDGES NH04E-100057959 (MP 59.657) TO NEAR ATHENS (MP 72.300); REED CONTRACTING SERVICES, INC. HSIPE-100057959 NH-HSIP-0002(554) LIMESTONE SR 2

02-115 5.525 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR24 FROM 0.4 MI E OF SR13 (US43) (MP27.100) IN NH04E-100057582 RUSSELLVILLE TO 0.2 MI E OF CR83 (MP 32.700); ROGERS GROUP, INC. NH981-00057582 NH-0024(506) FRANKLIN SR24

02-117 0.075 MI BRIDGE REPLACEMENT (BRIDGE CULVERT) & APPROACHES ON CR 1047 (WEST LACON RD) AT SALLY BROFE-100058289 MIKE CREEK S OF FALKVILLE; TRI-COUNTY CONSTRUCTIONINC BRZ-5200(223) MORGAN CR1047

02-118 0.021 MI BRIDGE REPLACEMENT ON CR-93 AT BEAR CREEKSOUTH OF OAK GROVE; TRI-COUNTY CONSTRUCTION, INC. STOAC-100054691

STMOA-BRZ-3000(209) FRANKLIN

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 23 SECOND DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 02-119 1.770 MI PLANING, RESURFACING & TRAFFIC STRIPE AT VARIOUS SITES IN SHEFFIELD AS INDICATED BY PLANS; SHSTC-100053622 (S&M EQUIPMENT CO., INC.) STMOA-CN10(900) COLBERT

02-120 3.385 MI PLANING, RESURFACING, TRAFFIC STRIPE & BRIDGE RAIL RETROFIT ON SR 67 FROM N OF CR161 NH04E-100056036 (INDIAN HILLS RD) (MP 35.570) TO SR3 (US31) IN DECATUR; REED CONTRACTING SERVICES, INC. HSIPE-100056036 NH-HSIP-0067(505) MORGAN SR 67

02-121 1.404 MI PLANING, RESURFACING & TRAFFIC STRIPE IN FLORENCE AT VARIOUS SITES INDICATED BY THE PLANS; SHSTC-100053627 (S & M EQUIPMENT CO., INC.) STMOA-CN10(919) LAUDERDALE

02-122 2.700 MI RESURFACING AND TRAFFIC STRIPE ON CR-48 FROM THE RUSSELLVILLE CITY LIMITS TO THE INTERSECT STNUM-100061802 OF CR-77; JOE KEENUM EXCAVATION & CONSTRUCTION, INC. STPNU-3025(203) FRANKLIN CR-48

02-123 8.941 MI ADDITIONAL LANES (GRADE, DRAIN, BASE, PAVE & CULVERT) ON SR-24 (CORRIDOR V) FROM DEMPSEY APD8E-100044743 TO 3 MI W OF THE RUSSELLVILLE CITY LIMITS; APAC MID-SOUTH, INC. APD-0355(507) FRANKLIN SR-24

02-124 1.856 MI RESURFACING AND TRAFFIC STRIPE ON SR-13 FROM 0.08 MI NORTH OF OLD TUSCALOOSA RD IN PHIL NH01M-100060888 CAMPBELL TO 0.12 MI SOUTH OF SAND PIT RD; ROGERS GROUP, INC. NH-0013(592) FRANKLIN SR-13

02-125 0.415 MI ROADWAY IMPROVEMENTS ON SUMMIT ST FROM CLAY AVE TO WATERLOO RD IN RUSSELLVILLE; TCSPL-100055134 JOE KEENUM EXCAVATION & CONSTRUCTION, INC. TCSP-10AL(003) FRANKLIN

02-126 7.425 MI ADDITIONAL LANES (GRADE, DRAIN, PART PASE& PAVE & BRIDGE) ON SR-24 (CORRIDOR V) FROM APD8L-100038596 DEMPSEY TO CR-524); (W.S. NEWELL & SONS, INC.) APD-0355(502) FRANKLIN

02-127 5.629 MI RESURFACING & TRAFFIC STRIPE ON CR-47 (2 SITES) AND ON J.C. MAULDIN HIGHWAY AT SITES SHSTC-100053616 INDICATED BY THE PLANS; (S&M EQUIPMENT CO., INC.) STMOA-CN10(211) LAUDERDALE

02-128 0.238 MI BRIDGE REHABILITATION ON THE CR-24(GORDONDR) OVERPASS IN DECATUR; RILEY BRIDGE COMPANY, INC A1BR1-00058398

ACBR58398-ATRP(001) MORGAN CR-24

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 24 SECOND DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 02-129 5.511 MI ADDITIONAL LANES (BASE, PAVE AND PARTIAL GRADE & DRAIN) ON SR-13 (US-43) FROM THE EXISTING DEM04-100004261 FOUR LANE AT KILLEN TO SR-64; ROGERS GROUP, INC. GSPH5-100004261 NHF-0013(572) LAUDERDALESR-13 NH01M-100004261

02-130 2.553 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-2 (US-72) FROM MEADOW RIDGE LANE TO E OF NH01M-100059165 WHEELER HILLS RD (MP 55.120) W OF ROGERSVILLE; JOE KEENUM EXCAVATION & CONSTRUCTION, INC. NH-0002(556) LAUDERDALESR-2

02-131 5.039 MI RESURFACING AND TRAFFIC STRIPE ON LUCAS FERRY RD FROM SR-99 TO SANDERFER RD AND ON A1RDY-100058684 SANDERFER RD FROM LUCAS FERRY RD TO US-31 IN ATHENS; JOE KEENUM EXCAVATION & CONSTRUCTION, INC ACOA58684-ATRP(001) LIMESTONE

02-132 & MARION CO; 4.249 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-172 FROM NEAR WILSON W RD STAAM-100059162 (MP 5.600) THROUGH HODGES TO S OF THE MARION CO LINE (MP 9.420); APAC MID-SOUTH, INC. STPAA-0172(502) FRANKLIN SR-172

02-133 4.874 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-36 FROM CR-36 (NEW CUT RD) TO SR-3 (US-31) STAAM-100059163 IN HARTSELLE; WIREGRASS CONSTRUCTION COMPANY, INC. STPAA-0036(505) MORGAN SR-36

02-134 CULLMAN CO.; 11.261 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON I-65 FROM HURRICANE CREEK (MP IM01M-100049038 315.665) TO 0.6 MI S OF SR-36 (MP 326.874) IN HARTSELLE; WIREGRASS CONSTRUCTION COMPANY, INC. IM-I065(400) MORGAN I-65

02-135 4.605 MI RESURFACING AND TRAFFIC STRIPE ON SR-3 (US-31) FROM THOMAS HAMMONDS RD (MP 362.387) TO STAAM-100059166 PITTS BLVD (MP 367.000) N OF OAKLAND; REED CONTRACTING SERVICES, INC. STPAA-0003(578) LIMESTONE SR-3

02-136 3.495 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-2 (FLORENCE BLVD) FROM MP 33.940 NEAR TUNE NH01M-100059168 AVE TO MP 37.620 AT CR-30 (INDIAN SPRINGS DR) NEARFLORENCE; APAC MID-SOUTH, INC. NH-0002(555) LAUDERDALESR-2

02-137 3.499 MI TRIPLE SURFACE TREATMENT & TRAFFIC STRIPEON CR-23 FROM THE INTERSECTION OF SR-24 TO THE STNUM-100059908 INTERSECTION OF SR-247; CHARLES E. WATTS, INC. STPNU-3013(252) FRANKLIN CR-23

02-138 0.576 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON JACKSON AVE FROM TUSCALOOSA ST TO COTACO ST IN A1RDY-100058390 RUSSELLVILLE; ROGERS GROUP, INC. ACOA58390-ATRP(001) FRANKLIN

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 25 SECOND DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 02-139 4.786 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-207 FROM N OF CR-55 (MP 1.610) TO (MP 6.900) STAAM-100059172 NEAR ANDERSON; JOE KEENUM EXCAVATION & CONSTRUCTIOINC. STPAA-0207(501) LAUDERDALESR-207

02-140 2.210 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON CHURCH ST, 19TH AVE, AND POINT MALLARD DR SE A1RDY-100058399 FROM 6TH AVE TO 8TH ST SE IN DECATUR; REED CONTRACTING SERVICES, INC. ACOA58399-ATRP(001) MORGAN

02-141 5.840 MI PAVEMENT, PARTIAL GRADE & DRAIN & BRIDGE COATING ON SR-24 (CORRIDOR "V") FROM MISSISSIPPI APD8E-100009853 STATE LINE THROUGH RED BAY TO SR-247; (RACON, INC.) NH04E-100009853 ACAPD-NHF-0355(503) FRANKLINE

02-142 0.473 MI RESURFACING & TRAFFIC STRIPE ON SR-13 FROM SR-237 IN PHIL CAMPBELL TO NORTH OF CR-81 99203-100054167 (KENT STREET) (MP 283.017); (S & M EQUIPMENT CO., INC.) 99-302-302-013-101 FRANKLIN

02-143 1.080 MI FULL DEPTH RECLAMATION, RESURFACING AND TRAFFIC STRIPE ON CR-36 FROM THE INTERSECTION OF STNUM-100059254 CR-8 TO THE JUNCTION OF SR-129 IN BRILLIANT; BLOUNT CONSTRUCTION COMPANY, INC. STPNU-4700(209) MARION CR-36

02-144 1.296 MI RESURFACING AND TRAFFIC STRIPE ON CR-20 FROM CR-22 TO CR-63 NORTH OF PHIL CAMPBELL; STNUR-100055193 (APAC MID-SOUTH, INC.) STPNU-3017(201) FRANKLIN

02-147 15.019 MI LEVELING, RESURFACING AND TRAFFIC STRIPEON CR-16 FROM THE INTERSECTION OF CR-88 TO THE A1RDY-100058391 INTERSECTION OF SR-17 (US-43) W OF PHIL CAMPBELL; ROGERS GROUP, INC. ACNU58391-ATRP(001) FRANKLIN CR-16

02-148 7.266 MI; PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-74 (US-278) FROM MP 11.125 JUST E OF THE NH01M-100059177 HAMILTON CITY LIMITS TO THE JUNCTION OF SR-241 (MP19.560); S.T. BUNN CONSTRUCTION COMPANY, INC. NH-0074(530) MARION SR-74

02-149 4.241 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-3 (US-31) FROM MP 367.000 AT PITTS BLVD TO NH01M-100059173 JUST N OF SR-2 (US-72) (MP 371.32) IN ATHENS; WIREGRASS CONSTRUCTION COMPANY, INC. NH-0003(579) LIMESTONE SR-3

02-150 2.339 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-24 FROM THE MISSISSIPPI STATE LINE TO KENNEDY NH04E-100053155 STREET IN RED BAY; (S&M EQUIPMENT CO., INC.) NH-0024(502) FRANKLIN

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 26 SECOND DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 02-151 0.150 MI BRIDGE REPLACEMENT AND APPROACHES ON CR-1137 (WILHITE RD) OVER FLINT CREEK N OF THE A1BRZ-100058407 CULLMAN CO LINE; MILLER & MILLER, INC. ACBRZ58407-ATRP(001) MORGAN CR-1137

02-152 0.510 MI SAFETY IMPROVEMENTS ON HOLT RD (CR-91) FROM THE JUNCTION OF BAIN RD (CR-90) TO THE HSIRE-100059864 JUNCTION OF WALES ST; WIREGRASS CONSTRUCTION CO. INC. HRRR-4200(218) LIMESTONE HOLT RD

02-153 7.099 MI RESURFACING AND TRAFFIC STRIPE AT VARIOUSSITES AS INDICATED IN THE PLANS ON CR-8 (SITE 1); STNUM-100059877 CR-26 (SITE 2); AND CR-58(SITE 3); ROGERS GROUP, INC. STPNU-CN13(205) LAUDERDALE

02-154 2.230 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-13 FROM SAND PITT RD (MP 285.00) TO THE NH01M-100059175 INTERSECTION OF SR-17 (US-43)(MP 287.08) ANDREW JACKSON HIGHWAY; ROGERS GROUP, INC. NH-0013(586) FRANKLIN SR-13

02-155 2.433 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-2 (US-72) FROM THE MISSISSIPPI STATE LINE TO NH01M-100059176 NEAR CR-1, RIVERTON ROSE TRAIL (MP 2.434); APAC MID-SOUTH, INC. NH-0002(557) COLBERT SR-2

02-156 5.681 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-36 FROM TALUCAH RD (MP 38.710) TO W OF SR-53 STAAM-100059169 (US-231) (MP 44.473) N OF VALHERMOSO SPRINGS; REED CONTRACTING SERVICES, INC. STPAA-0036(506) MORGAN SR-36

02-157 0.501 MI BRIDGE REPLACEMENT AND APPROACHES ON CR-41 (DANVILLE RD) OVER THE W FORK OF FLINT CREEK A1BRZ-100058406 NE OF NEEL; WIREGRASS CONSTRUCTION COMPANY, INC. ACBRZ58406-ATRP(001) MORGAN CR-41

02-158 1.382 MI GRADE, DRAIN, BASE, PAVE, AND BRIDGE REPLACEMENT AND REMOVAL ON SR-74 (US-278) AT THE BRNM1-00037158 BUTTAHATCHEE RIVER IN HAMILTON; WRIGHT BROTHERS CONSTRUCTION COMPANY, INC. NH01M-100037158 NHF-BRF-0074(504) MARION SR-74

02-171 0.666 MI SLIDE REPAIR ON I-65 NORTH OF THE CR-45 (BETHEL RD) UNDERPASS NORTH OF HARTSELLE; L24AC-100057238 (ANGELO IAFRATE CONSTRUCTION CO., INC.) ERF-I065(426) MORGAN

02-173 5.597 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-4 (CORRIDOR X) FROM THE SR-171 (US-43) BRIDGE NH04E-100052947 TO THE CR-45 BRIDGE SE OF HAMILTON; (S.T. BUNN CONST. CO.) NHF-0004(526) MARION

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 27 SECOND DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 02-175 1.438 MI ADDITIONAL LANES (GRADE, DRAIN, PAVEMENT,LIGHTING & BRIDGE) ON SR-67 FROM SR-24 TO SR-20 APD8L-100040957 IN WEST DECATUR; (REED CONTRACTING SERVICES, INC.) APD-0067(500) MORGAN

02-183 STPNU-3025(200) & STPNU-3025(202); 7.095 MI TRAFFISTRIPE AND RESURFACING ON CR-48 AT SITES INDICATED EBSPE-100056441 BY THE PLANS; (ROGERS GROUP, INC.) STNUE-100056440 EB-3025(201) FRANKLIN STNUE-100056442

02-184 7.859 MI PARTIAL GRADE & DRAIN & BASE & PAVEMENT ON SR-24 (CORRIDOR V) FROM SR-247 EAST OF RED BAY APD8E-100044740 TO CR-21; (ROGERS GROUP, INC.) APD-0355(506) FRANKLIN

02-187 0.672 MI PARTIAL INTERCHANGE LIGHTING ON SR-4 (CORRIDOR X - FUTURE I-22) AT US-43 S OF HAMILTON; NH04E-100051886 (STONE & SONS ELECTRICAL CONTRACTORS, INC.) NHF-0004(516) MARION

02-188 0.217 MI PEDESTRIAN IMPROVEMENTS ALONG SCHOOL STREET IN BRILLIANT; SRIL -100052487 (RILEY BRIDGE & ENGINEERING CO., INC.) SRTS-SR09(909) MARION

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACOA58389-ATRP(001) COLBERT 2ND ST 0.50 % 02-001 ROGERS GROUP 1,120,226 75 W 000 000 00-00-00 0 6,255.94 1,232,249 0 0 0

HSIP-0002(559) COLBERT SR-2 0.42 % 02-002 SHOALS ELECTR 225,038 30 W 000 000 00-00-00 0 1,151.83 272,513 0 0 0

NH-0002(565) COLBERT SR-2 0.22 % 02-003 MIDSOUTH PAVI 1,528,929 45 W 000 000 00-00-00 0 4,279.77 1,934,796 0 0 0

STPHS-108(26) COLBERT STREET 5.02 % 02-004 APAC-ALABAMA, 103,262 30 W 100 100 11-09-00 0 5,966.46 118,751 0 0 0

STPAA-0247(502) COLBERT SR-247 0.00 % 02-005 CHARLES E. WA 277,936 30 W 000 000 00-00-00 0 .00 0 0 0 0

ACOA58387-ATRP(001) COLBERT 5.47 % 02-006 APAC MID-SOUT 593,760 45 W 000 000 00-00-00 0 34,146.29 623,448 0 0 0

STPOA-8805(600) COLBERT 13.05 % 02-007 JOE KEENUM EX 607,499 60 W 000 000 00-00-00 0 98,248.08 752,585 0 0 0

STPOA-8816(601) COLBERT CR-24 0.00 % 02-008 APAC MID-SOUT 278,978 30 W 077 099 08-27-13 494,866 .00 0 0 0 0

STPHS-108(27) COLBERT SR#17 4.38 % 02-010 APAC-ALABAMA, 104,148 30 W 130 100 08-01-01 123,467 5,983.30 136,516 0 0 0

STPOAF-8829(600) COLBERT SR133 7.55 % 02-011 HIGHWAYS, INC 11,594,865 320 W 064 041 11-01-14 5,105,783 1,095,778.57 14,497,769 27,702 0 27,702

STPNU-4719(200) MARION 3.63 % 02-016 S.T. BUNN CON 1,051,963 45 W 091 100 10-21-11 1,155,008 45,631.86 1,255,114 1,540 0 1,540

ST-017-888-020 COLBERT 7.17 % 02-017 SHOALS ELECTR 25,727 45 W 116 100 02-10-12 25,450 3,297.40 45,980 0 0 0

STPOA-8822(600) COLBERT 10.22 % 02-018 JOE KEENUM EX 853,701 106 W 096 100 02-08-10 1,592,335 135,364.40 1,323,415 94,242 0 94,242

APD-0355(504) FRANKLIN SR 24 25.70 % 02-020 HASTINGS GENE 9,321,533 844 C 162 100 09-30-08 10,700,136 2,919,001.68 11,354,326 188,068 0 188,068

NHF-0013(545) FRANKLIN 4.82 % 02-021 WRIGHT BROTHE 14,790,417 400 W 051 042 03-31-15 8,033,945 931,722.24 19,327,303 34,526 0 34,526

STPNU-3010(201)-STPOA-3036(200 FRANKLIN 3.10 % 02-022 S&M EQUIPMENT 1,541,649 40 W 100 100 10-22-08 1,710,275 26,953.01 867,594 0 0 0

NH-0013(587) FRANKLIN SR-13 19.84 % 02-023 ROGERS GROUP, 1,511,703 45 W 067 033 01-31-14 1,201,243 376,810.79 1,898,874 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPOA-3026(201) FRANKLIN 0.48 % 02-024 ROGERS GROUP, 345,493 45 W 067 033 01-31-14 630,940 1,986.96 412,213 0 0 0

99-402-692-000-701 FRANKLIN VARIOUS 0.00 % 02-025 COOK CONTRACT 192,446 80 W 085 099 12-10-07 192,446 .00 193,358 0 0 0

STPNU-3039(200) FRANKLIN 5.29 % 02-026 S&M EQUIPMENT 435,119 30 W 073 100 03-31-10 449,445 24,190.12 456,876 0 0 0

STPOAF-0013(544) FRANKLIN 12.23 % 02-027 SCOTT BRIDGE 17,711,338 500 W 103 100 04-15-13 19,043,054 2,735,440.38 22,362,070 90,004 0 90,004

ACAPD-0355(501) FRANKLIN 60.83 % 02-028 W.S. NEWELL & 11,171,159 425 W 093 100 07-01-11 18,154,190 135,056.26 222,000 314,178 0 314,178

STPAA-0019(504) FRANKLIN SR-19 4.97 % 02-029 APAC MID-SOUT 2,057,558 65 W 000 000 00-00-00 0 112,181.37 2,254,298 0 0 0

NH-0002(558) LAUDERDALE SR-2 3.82 % 02-030 MIDSOUTH PAVI 1,083,843 40 W 000 000 00-00-00 0 55,794.45 1,460,220 0 0 0

BRF-0002(545) LAUDERDALE 0.00 % 02-031 THE BRIDGE BU 2,759,379 185 W 000 000 00-00-00 0 .00 0 0 0 0

ACNU59646-ATRP(001) LAUDERDALE 2.44 % 02-032 MIDSOUTH PAVI 1,178,423 30 W 000 000 00-00-00 0 34,400.08 1,408,401 0 0 0

NH-0013(591) LAUDERDALE SR-13 3.49 % 02-034 ROGERS GROUP, 1,275,615 40 W 000 000 00-00-00 0 56,482.90 1,616,821 0 0 0

STPOA-8863(600) LAUDERDALE 12.80 % 02-035 B. H. CRAIG 1,719,511 135 W 000 000 00-00-00 0 287,736.07 2,246,963 17,360 0 17,360

STPAA-0020(518) LAUDERDALE SR-20 4.45 % 02-036 ROGERS GROUP 1,579,192 45 W 000 000 00-00-00 0 86,432.98 1,938,347 0 0 0

ACGBBRZ-CN04(209) LAUDREDALE SITES 5.10 % 02-038 B. H. CRAIG C 699,099 150 C 100 100 09-30-04 704,323 47,772.78 936,694 0 0 0

STPNU-3914(250) LAUDERDALE CR-2 2.17 % 02-039 JOE KEENUM 575,725 30 W 000 000 00-00-00 0 16,120.10 742,365 0 0 0

BRZ-3900(205) LAUDERDALE CR 133 6.67 % 02-043 GLASGOW CONST 483,798 80 W 000 000 00-00-00 0 45,662.67 684,198 0 0 0

ACBRZ58393-ATRP(001) LAUDERDALE CR-70 4.57 % 02-044 SHOTCRETE 395,192 120 W 000 000 00-00-00 0 19,908.03 434,711 0 0 0

STPAA-0020(515) LAWRENCE SR-20 6.26 % 02-045 REED CONTRACT 166,198 30 W 097 100 10-31-13 147,089 13,007.61 207,736 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACNU60578-ATRP(001) LAWRENCE CR-460 0.10 % 02-046 ROGERS GROUP 544,388 40 W 000 000 00-00-00 0 614.79 594,070 0 0 0

ST-040-888-006 LAWRENCE CR-434 4.90 % 02-047 REED CONTRACT 390,133 60 W 000 000 00-00-00 0 25,911.44 528,000 0 0 0

STPNU-4014(250) LAWRENCE CR-460 0.02 % 02-048 JOE KEENUM EX 1,278,295 40 W 000 000 00-00-00 0 427.34 1,749,451 0 0 0

NH-0157(507) LAWRENCE 22.24 % 02-049 STONE & SONS 1,063,398 180 W 095 099 07-01-12 1,056,294 295,680.24 1,329,173 0 0 0

APD-0355(505) FRANKLIN SR 24 18.52 % 02-053 S & M EQUIPME 20,465,149 855 C 193 100 01-15-11 25,889,698 5,596,548.38 30,218,700 697,306 0 697,306

NH-0020(514) LAWRENCE SR 20 9.97 % 02-054 WIREGRASS 2,627,000 45 W 098 100 03-03-13 2,747,222 327,403.25 3,283,567 0 0 0

BRF-0020(509) LAWRENCE SR-20 15.50 % 02-055 REED CONTRACT 5,185,166 285 W 070 055 12-01-14 3,378,401 1,050,889.49 6,775,690 0 0 0

STPNU-CN12(219) LAWRENCE CR-339 6.52 % 02-056 THE MILLER PA 589,253 30 W 000 000 00-00-00 0 53,629.92 822,127 0 0 0

ACBRZ58397-ATRP(001) MARION 10.44 % 02-060 RILEY BRIDGE 1,888,478 225 W 000 000 00-00-00 0 226,772.43 2,171,750 51,906 0 51,906

NHF-0004(531) MARION SR 4 0.00 % 02-061 STONE ELECTRI 239,878 120 W 085 098 04-30-14 215,758 .00 0 0 0 0

NHF-0004(522) MARION 23.85 % 02-062 JOE KEENUM EX 1,156,562 120 W 137 099 09-30-13 2,432,554 865,430.05 3,628,000 55,875 0 55,875

ST-047-013-001 MARION SR-13 27.18 % 02-063 S.T. BUNN 1,091,318 110 W 099 099 01-03-14 1,220,731 298,983.96 1,100,000 4,219 0 4,219

STPOA-0017(546) MARION SR-17 6.38 % 02-064 CARCEL & G. C 4,212,792 150 W 022 010 07-31-14 642,214 351,537.30 5,505,045 4,280 0 4,280

ACNU60454-ATRP(001) MARION CR-20 2.88 % 02-065 S. T. BUNN 2,173,062 45 W 000 000 00-00-00 0 64,597.28 2,238,644 0 0 0

STPAA-0017(556) MARION SR-17 0.47 % 02-066 S. T. BUNN 246,206 30 W 000 000 00-00-00 0 1,286.89 272,243 0 0 0

IM-I022(300) MARION I-22 6.83 % 02-067 S. T. BUNN 1,958,652 413 D 215 100 12-30-13 1,891,584 172,602.43 2,524,430 0 0 0

IM-I022(301) MARION I-22 3.83 % 02-068 GEOSTABILIZAT 4,609,655 1414 D 096 094 02-14-14 4,711,703 230,899.64 6,023,644 84,542 0 84,542

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPAA-0233(502) MARION SR-233 2.84 % 02-070 S. T. BUNN 1,157,133 30 W 000 000 00-00-00 0 37,725.53 1,323,810 0 0 0

STPAA-0019(505) MARION SR-19 0.17 % 02-071 S. T. BUNN 1,786,425 40 W 000 000 00-00-00 0 3,669.39 2,092,999 0 0 0

HRRR-6705(201) WINSTON CR-63 4.24 % 02-075 S & C MATERIA 226,198 30 W 000 000 00-00-00 0 11,452.61 269,880 0 0 0

HSIP-6702(201) WINSTON 0.00 % 02-076 ALABAMA GUARD 25,363 30 W 098 100 00-00-00 0 .00 0 0 0 0

TCSP-06AL(002) WINSTON 9.16 % 02-077 TRI-COUNTY CO 219,966 60 W 088 100 08-30-10 189,403 27,090.86 295,496 43,789 0 43,789

NH-0074(531) WINSTON SR-74 0.23 % 02-078 S. T. BUNN 837,886 30 W 000 000 00-00-00 0 2,529.60 1,095,441 0 0 0

ACNU60590-ATRP(001) WINSTON CR-32 0.11 % 02-079 ROGERS GROUP 434,795 30 W 000 000 00-00-00 0 572.09 496,476 0 0 0

DE-STPNU-A197(932) WINSTON 20.19 % 02-080 S.T. BUNN CON 140,081 30 W 040 099 09-30-11 144,438 33,275.96 164,733 0 0 0

STPOA-6721(201)&STPNU-6720(201 WINSTON CR 14 4.63 % 02-081 GOOD HOPE 330,962 45 W 000 000 00-00-00 0 18,311.35 394,876 0 0 0

ACNU60589-ATRP(001) WINSTON CR-19 0.08 % 02-082 ROGERS GROUP 555,332 30 W 000 000 00-00-00 0 573.05 648,221 0 0 0

ACNU60582-ATRP(002) WINSTON CR-69 0.03 % 02-083 ROGERS GROUP, 1,274,335 30 W 000 000 00-00-00 0 568.25 1,457,374 0 0 0

ACNU59685-ATRP(010) WINSTON CR-12 0.50 % 02-084 BLOUNT CONSTR 1,603,096 30 W 000 000 00-00-00 0 9,313.50 1,843,546 0 0 0

STPNU-6700(213) WINSTON 3.20 % 02-085 ROGERS GROUP, 338,453 30 W 093 100 09-30-10 360,652 12,519.86 390,167 0 0 0

STPOA-0118(503) MARION SR 118 13.58 % 02-086 TRI-COUNTY CO 10,493,771 451 C 118 100 04-20-07 16,135,438 1,832,329.01 13,489,900 128,729 0 128,729

STPNU-6717(200) WINSTON CR-2 5.21 % 02-087 BLOUNT CONSTR 549,365 40 W 000 000 00-00-00 0 34,195.91 655,455 0 0 0

STPNU-6712(200) WINSTON CR-7 2.21 % 02-089 GOOD HOPE CON 639,416 30 W 000 000 00-00-00 0 16,901.36 762,897 0 0 0

STPAA-HSIP-0195(506) WINSTON SR-195 0.41 % 02-091 ROGERS GROUP 1,671,237 45 W 069 084 03-29-14 1,412,369 1,279.79 310,296 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPNU-4202(200) LIMESTONE CR-71 5.13 % 02-092 REED CONTRACT 565,147 30 W 000 000 00-00-00 0 40,675.76 791,586 0 0 0

ACAA59030-ATRP(001) LIMESTONE CR-3 2.40 % 02-093 REED CONTRACT 1,603,695 75 W 000 000 00-00-00 0 54,074.86 2,247,593 0 0 0

STPAA-0127(500) LIMESTONE SR-127 5.54 % 02-094 JOE KEENUM 976,667 30 W 000 000 00-00-00 0 81,712.50 1,472,602 0 0 0

NH-0002(561) LIMESTONE SR-2 1.15 % 02-095 REED CONTRACT 1,087,836 40 W 000 000 00-00-00 0 17,785.11 1,537,153 0 0 0

ACOA60250-ATRP(001) LIMESTONE CR-83 0.03 % 02-096 JOE KEENUM 627,957 60 W 000 000 00-00-00 0 296.12 845,277 0 0 0

ACNU59673-ATRP(002) LIMESTONE 0.04 % 02-097 JOE KEENUM 1,073,555 45 W 000 000 00-00-00 0 687.41 1,385,737 0 0 0

NH-0002(563) LIMESTONE SR-2 0.03 % 02-098 REED CONTRACT 2,080,322 70 W 000 000 00-00-00 0 958.62 2,753,803 0 0 0

99-402-692-000-201 FRANKLIN 0.00 % 02-101 J. WEST INC 436,848 110 W 056 100 11-30-12 439,088 .00 484,618 0 0 0

ST-052-053-002 MORGAN SR 53 24.90 % 02-102 REED CONTRACT 635,552 50 W 092 086 03-31-13 596,554 157,527.18 632,476 2,262 0 2,262

NH-0157(517) LAUDERDALE SR 157 4.98 % 02-103 ROGERS GROUP 1,228,795 40 W 092 099 11-30-12 1,206,020 76,526.94 1,535,908 0 0 0

99-402-693-000-702 WINSTON VARIOUS 0.00 % 02-104 COOK CONTRACT 152,713 80 W 049 050 12-01-07 76,356 .00 77,289 0 0 0

99-402-694-000-201 MORGAN I 65 0.00 % 02-106 BENTLEY TURF 193,636 72 W 054 067 11-30-12 129,592 .00 130,578 0 0 0

STPAA-0036(507) MORGAN SR-36 0.34 % 02-107 REED CONTRACT 1,590,500 40 W 000 000 00-00-00 0 6,632.76 1,928,091 0 0 0

EB-0053(558) & EB-0251(500) LIMESTONE SR 53 13.18 % 02-108 WIREGRASS 3,274,545 90 W 101 100 08-27-13 3,684,436 539,781.64 4,092,951 0 0 0

NH-0067(506) MORGAN SR-67 1.01 % 02-109 WHITAKER CONT 1,459,500 45 W 000 000 00-00-00 0 23,488.24 2,316,956 0 0 0

NH-0003(584) MORGAN SR-3 0.92 % 02-110 WIREGRASS CON 2,077,409 125 W 000 000 00-00-00 0 19,004.43 2,056,717 0 0 0

NHF-0067(501) MORGAN SR 67 8.03 % 02-111 WIREGRASS 12,867,145 195 W 075 057 05-31-14 7,407,141 1,341,772.26 16,697,860 -71,237 0 -71,237

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACOA59680-ATRP(007) MORGAN CR-426 0.23 % 02-112 MILLER & MILL 200,969 60 W 000 000 00-00-00 0 725.38 311,000 0 0 0

NH-HSIP-0002(554) LIMESTONE SR 2 8.12 % 02-113 REED CONTRACT 6,027,327 140 W 106 100 11-05-13 6,474,430 650,264.52 8,005,298 11,784 0 11,784

NH-0024(506) FRANKLIN SR24 16.15 % 02-115 ROGERS GROUP 2,792,250 65 W 100 091 04-30-13 2,482,719 496,270.06 3,071,475 -24,045 0 -24,045

BRZ-5200(223) MORGAN CR1047 3.57 % 02-117 TRI-COUNTY 310,308 55 W 075 082 04-15-13 2,271,112 16,781.55 468,969 0 0 0

STMOA-BRZ-3000(209) FRANKLIN 1.13 % 02-118 TRI-COUNTY CO 345,070 60 W 093 100 08-31-10 1,381,227 3,020.53 265,000 0 0 0

STMOA-CN10(900) COLBERT 0.95 % 02-119 S&M EQUIPMENT 360,010 30 W 100 100 07-31-10 316,153 2,935.29 306,788 8,250 0 8,250

NH-HSIP-0067(505) MORGAN SR 67 10.19 % 02-120 REED CONTRACT 1,604,058 60 W 089 100 03-31-14 1,877,637 204,341.01 2,004,960 0 0 0

STMOA-CN10(919) LAUDERDALE 12.73 % 02-121 S&M EQUIPMENT 335,500 30 W 097 100 06-25-10 358,461 57,053.38 448,064 0 0 0

STPNU-3025(203) FRANKLIN CR-48 0.13 % 02-122 JOE KEENUM 482,245 30 W 000 000 00-00-00 0 842.09 629,787 0 0 0

APD-0355(507) FRANKLIN SR-24 1.18 % 02-123 APAC MID-SOUT 18,547,185 375 W 000 000 00-00-00 0 278,200.46 23,385,404 0 0 0

NH-0013(592) FRANKLIN SR-13 2.13 % 02-124 ROGERS GROUP, 644,931 30 W 000 000 00-00-00 0 16,313.06 765,279 0 0 0

TCSP-10AL(003) FRANKLIN 0.26 % 02-125 JOE KEENUM 381,970 30 W 000 000 00-00-00 0 1,082.03 401,068 0 0 0

APD-0355(502) FRANKLIN 13.28 % 02-126 W.S. NEWELL & 14,065,623 425 W 097 098 08-15-13 18,375,187 2,377,297.84 17,900,466 26,022 0 26,022

STMOA-CN10(211) LAUDERDALE 0.44 % 02-127 S&M EQUIPMENT 494,656 30 W 097 100 07-30-10 454,481 2,725.38 617,690 0 0 0

ACBR58398-ATRP(001) MORGAN CR-24 0.00 % 02-128 RILEY BRIDGE 1,173,772 180 W 000 000 00-00-00 0 .00 0 0 0 0

NHF-0013(572) LAUDERDALE SR-13 5.28 % 02-129 ROGERS GROUP 9,073,126 285 W 056 033 09-30-14 3,134,422 636,828.13 12,054,016 0 0 0

NH-0002(556) LAUDERDALE SR-2 7.90 % 02-130 JOE KEENUM 1,289,825 45 W 080 090 07-30-13 1,141,205 127,446.57 1,612,191 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACOA58684-ATRP(001) LIMESTONE 12.60 % 02-131 JOE KEENUM 886,525 60 W 000 000 00-00-00 0 117,370.55 930,852 13,728 0 13,728

STPAA-0172(502) FRANKLIN SR-172 5.99 % 02-132 APAC MID-SOUT 1,331,625 45 W 084 099 06-30-13 1,339,693 99,761.98 1,664,438 0 0 0

STPAA-0036(505) MORGAN SR-36 7.89 % 02-133 WIREGRASS CON 1,149,701 45 W 100 094 09-17-13 1,245,259 121,205.39 1,536,029 0 0 0

IM-I065(400) MORGAN I-65 3.07 % 02-134 WIREGRASS 5,327,661 114 D 000 000 00-00-00 0 238,946.12 7,776,930 566,047 0 566,047

STPAA-0003(578) LIMESTONE SR-3 8.34 % 02-135 REED CONTRACT 1,506,040 50 W 098 100 10-15-13 1,530,653 189,070.52 2,264,382 0 0 0

NH-0002(555) LAUDERDALE SR-2 8.10 % 02-136 APAC MID-SOUT 2,074,568 70 W 104 100 01-30-14 2,013,747 210,114.15 2,593,065 4,000 0 4,000

STPNU-3013(252) FRANKLIN CR-23 0.02 % 02-137 CHARLES E. WA 137,520 30 W 000 000 00-00-00 0 48.02 165,353 0 0 0

ACOA58390-ATRP(001) FRANKLIN 3.47 % 02-138 ROGERS GROUP, 371,534 45 W 000 000 00-00-00 0 14,842.40 427,264 47,000 0 47,000

STPAA-0207(501) LAUDERDALE SR-207 5.58 % 02-139 JOE KEENUM 1,324,460 45 W 064 100 11-05-13 979,046 92,396.07 1,655,482 0 0 0

ACOA58399-ATRP(001) MORGAN 0.52 % 02-140 REED CONTRACT 716,888 45 W 000 000 00-00-00 0 4,167.27 788,577 0 0 0

ACAPD-NHF-0355(503) FRANKLINE 16.09 % 02-141 RACON, INC. 19,242,660 339 W 014 094 02-28-14 21,690,687 3,946,279.29 24,514,571 131,172 0 131,172

99-302-302-013-101 FRANKLIN 0.60 % 02-142 S & M EQUIPME 243,641 30 W 057 100 03-17-11 214,470 1,642.97 273,375 0 0 0

STPNU-4700(209) MARION CR-36 6.74 % 02-143 BLOUNT CONSTR 422,811 45 W 000 000 00-00-00 0 34,013.45 504,463 0 0 0

STPNU-3017(201) FRANKLIN 3.80 % 02-144 APAC MID-SOUT 246,614 30 W 070 100 12-15-10 245,042 11,800.97 309,988 0 0 0

ACNU58391-ATRP(001) FRANKLIN CR-16 1.09 % 02-147 ROGERS GROUP, 1,267,851 45 W 000 000 00-00-00 0 14,631.88 1,331,243 0 0 0

NH-0074(530) MARION SR-74 4.18 % 02-148 S. T. BUNN 1,828,568 60 W 000 000 00-00-00 0 95,647.04 2,285,582 0 0 0

NH-0003(579) LIMESTONE SR-3 15.35 % 02-149 WIREGRASS 1,417,083 50 W 106 100 04-15-14 1,540,994 324,848.34 2,115,120 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

NH-0024(502) FRANKLIN 14.13 % 02-150 S&M EQUIPMENT 849,053 40 W 100 100 11-10-10 734,174 135,219.54 956,815 0 0 0

ACBRZ58407-ATRP(001) MORGAN CR-1137 3.59 % 02-151 MILLER & MILL 911,689 150 W 000 000 00-00-00 0 37,700.93 1,048,441 0 0 0

HRRR-4200(218) LIMESTONE HOLT RD 7.47 % 02-152 WIREGRASS 194,635 30 W 000 000 00-00-00 0 19,784.51 264,812 0 0 0

STPNU-CN13(205) LAUDERDALE 5.22 % 02-153 ROGERS GROUP 633,015 30 W 000 000 00-00-00 0 43,114.47 825,598 0 0 0

NH-0013(586) FRANKLIN SR-13 7.31 % 02-154 ROGERS GROUP 2,155,394 35 W 106 100 11-13-13 2,331,944 197,050.67 2,694,092 0 0 0

NH-0002(557) COLBERT SR-2 13.36 % 02-155 APAC MID-SOUT 1,982,532 50 W 082 084 03-30-14 1,756,615 331,091.45 2,478,026 0 0 0

STPAA-0036(506) MORGAN SR-36 6.39 % 02-156 REED CONTRACT 1,422,309 45 W 067 094 07-31-13 1,141,207 113,625.75 1,777,787 0 0 0

ACBRZ58406-ATRP(001) MORGAN CR-41 0.98 % 02-157 WIREGRASS CON 2,942,631 225 W 000 000 00-00-00 0 38,378.70 3,909,895 0 0 0

NHF-BRF-0074(504) MARION SR-74 4.68 % 02-158 WRIGHT BROTHE 10,442,889 330 W 006 001 07-01-15 213,919 403,121.42 8,597,102 4,637 0 4,637

ERF-I065(426) MORGAN 0.00 % 02-171 ANGELO IAFRAT 940,824 112 D 000 000 00-00-00 0 58.80 1,238,541 0 0 0

NHF-0004(526) MARION 5.18 % 02-173 S.T. BUNN CON 3,547,355 75 W 031 043 09-30-12 1,562,167 229,781.03 4,433,945 0 0 0

APD-0067(500) MORGAN 16.67 % 02-175 REED CONTRACT 9,369,830 415 W 100 080 07-31-13 10,728,739 2,004,374.47 12,019,387 48,867 0 48,867

EB-3025(201) FRANKLIN 2.76 % 02-183 ROGERS GROUP, 788,957 45 W 000 000 00-00-00 0 26,037.18 941,318 174,080 0 174,080

APD-0355(506) FRANKLIN 12.16 % 02-184 ROGERS GROUP, 13,900,276 340 W 099 099 04-14-14 14,128,962 2,154,033.08 17,708,535 828,997 0 828,997

NHF-0004(516) MARION 49.12 % 02-187 STONE & SON E 256,878 120 W 053 099 08-31-12 238,543 164,906.82 335,674 0 0 0

SRTS-SR09(909) MARION 3.36 % 02-188 RILEY BRIDGE 144,074 60 W 093 099 02-28-12 150,964 5,326.09 158,482 0 0 0 DIVISION TOTALS: 341,402,359 247,485,500 411,434,419 3,609,830 0 3,609,830 39,621,729.76

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 28 THIRD DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 03-001 INSTALLATION OF SIDEWALKS, CROSSWALKS & SIGNS NEARMOUTAIN BROOK & CRESTLINE ELEMENTARY SCHOOLS ON SRIL1-00052482 VARIOUS ROUTES AS INDICATED IN THE PLANS IN MOUNTAIN BROOK; WALKER PATTON COMPANY, INC. SRIL1-00052481 SRTS-SR09(903) & SRTS-SR09(904JEFFERSON

03-002 0.604 MI SIDEWALKS, CROSSWALKS AND SIGNING ALONG 18TH ST, 20TH AVE AND 10TH ST IN CALERA AT SITES SRIE1-00057456 AS INDICATED BY THE PLANS; WALKER PATTON CO. INC. SRTS-SR12(917) SHELBY

03-003 1.799 MI ROADWAY REVITALIZATION (LANDSCAPING AND LIGHTING) ON SR-75 FROM S OF HUFFMAN RD TO 25TH STP09-100054895 COURT NE IN CENTERPOINT; TRIPLE J CONSTRUCTION, LLC DE-A194(934) JEFFERSON SR-75

03-004 0.566 MI SIDEWALK, CROSSWALKS AND SIGNING AT THE SIMMONS MIDDLE SCHOOL IN HOOVER AT SITES AS SRIE1-00057436 INDICATED BY THE PLANS; BURNETT CIVIL CONTRACTING,LLC. SRTS-SR12(902) JEFFERSON

03-005 1.145 MI WIDENING (GRADE, DRAINAGE, PAVEMENT AND SIGNALS) ON JEFFERSON AVE SW FROM NEAR 57TH ST CMAQE-100029490 SW TO 50TH ST SW IN BIRMINGHAM; CARCEL & G. CONSTRUCTION, LLC CMAQ-7045(600) JEFFERSON

03-006 3.522 MI INTERCHANGE LIGHTING ON I-20/59 3700' E OF THE ELTON B. STEPHENS EXPRESSWAY INTERCHANGE TO STBHL-100052500 2000' E OF THE I-20/59 SPLIT IN BIRMINGHAM; STONE & SONS ELECTRICAL CONTRACTORS, INC. STBHR-100052500 STPBHF-I059(355) JEFFERSON I-20/59

03-007 0.659 MI BRIDGE REPLACEMENT AND APPROACHES ON I65 (NBR) AT THE NORFOLK SOUTHERN RAILROAD N OF EXIT IM04E-100005054 228 IN CALERA; ALABAMA BRIDGE BUILDERS, INC. IM-I065(401) SHELBY I 65

03-008 11.170 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-119 FROM N OF SR-25 (MP 0.040) TO SR-3 STAAM-100058695 (US-31) (MP 11.600) S OF ALABASTER; WIREGRASS CONSTRUCTION COMPANY, INC. STPAA-0119(504) SHELBY SR-119

03-009 0.209 MI BRIDGE REPLACEMENT AND APPROACHES ON CR12AT DRY CREEK IN MONTEVALLO; WINSTON CONTRACTING, A1BR1-00058382 LLC ACBR58382-ATRP(001) SHELBY CR 12

03-010 6.243 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON VARIOUS STREETS IN BIRMINGHAM AT SITES AS STBHL-100055922 INDICATED BY THE PLANS; DUNN CONSTRUCTION COMPANY,INC. STPBH-CN12(908) JEFFERSON

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 29 THIRD DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 03-011 WALKING TRAIL IN MIDFIELD AT SITES AS INDICATED BYTHE PLANS; WALKER PATTON COMPANY, INC. DEM04-100050321 GSPHM-100050321 DE-AL97(930) JEFFERSON GSPH5-100050321

03-013 MAINTENANCE ROADSIDE MOWING ALONG I-65 AND SR-38 (US-280) AT VARIOUS LOCATIONS AS INDICATED BY THE 99054-100057942 PLANS; BENTLEY TURF AND LANDSCAPE, INC. 99-403-595-000-202 (RENEWAL) SHELBY I-65

03-014 16.800 MI PLANING, RESURFACING AND TRAFFIC STRIPE AT VARIOUS SITES IN AND AROUND BIRMINGHAM AS STBHL-100055918 INDICATED BY THE PLANS; DUNN CONSTRUCTION COMPANY,INC. STPBH-CN12(907) JEFFERSON

03-015 7.323 MI MICRO-MILLING, RESURFACING AND TRAFFIC STRIPE ON I-459 FROM S OF SR-38 (US-280) TO CR-143 GSPH5-100054990 (GRANTS MILL RD) IN MOUNTAIN BROOK; DUNN CONSTRUCTION COMPANY, INC. STP13-100054990 IM-I459(307) JEFFERSON I-459

03-016 0.067 MI BRIDGE REPLACEMENT ON CR-55 (DICKEY SPRINGS RD) AT SHADES CREEK NEAR GREENWOOD; BROPE-100058783 ALABAMA BRIDGE BUILDERS, INC. BR-7004(601) JEFFERSON CR-55

03-017 6.716 MI SAFETY WIDENING, PLANING, RESURFACING, TRAFFIC STRIPE & BRIDGE RAIL RETROFIT ON SR-4(US- HS31M-100061464 78)FROM 19TH ST IN IRONDALE TO 0.147 MI W OF I-20;MIDSOUTH PAVING, INC. STAAM-100061464 STPAA-HSIP-0004(539) JEFFERSON SR-4

03-018 7.331 MI PLANING, RESURFACING, LOOP DETECTORS AND TRAFFIC STRIPE ON SR-3 FROM THE I-65 BRIDGE AT STAAM-100058697 CALERA TO I-65 IN ALABASTER (MP 245.665 TO MP 252.997); DUNN CONSTRUCTION COMPANY, INC. STPAA-0003(577) SHELBY SR-3

03-019 MAINTENANCE ROADSIDE MOWING ALONG VARIOUS ROUTES AS INDICATED IN THE PLANS; 99054-100059746 SALAZAR CONTRACTING, LLC 99-403-371-000-302 JEFFERSON

03-020 5.404 MI PLANING, RESURFACING, GUARDRAIL, TRAFFIC COUNTING UNITS ON I-459 FROM CR-143 (GRANTS MILL IM04E-100054991 RD) TO SR-7 (US-11) NEAR IRONDALE; APAC MID-SOUTH, INC. IM041-00054991 IM-I459(308) JEFFERSON I-459 IM04L-100054991

03-021 0.485 MI WIDENING, RESURFACING AND TRAFFIC STRIPE ON COTTON AVE FROM 10TH ST TO LOMB AVE; A1RDY-100058363 VETERANS LANDSCAPING COMPANY, INC. ACAA58363-ATRP(001) JEFFERSON

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 30 THIRD DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 03-022 TRAFFIC MANAGEMENT CENTER MODIFICATIONS AT CITY HALL AND FIRE STATION NUMBER SIX IN BIRMINGHAM; STBHC-100052764 (METROPOWER, INC.) STMBH-9802(920) JEFFERSON

03-023 3.389 MI INTERSTATE LIGHTING ON I-59 FROM N OF THECHALKVILLE RD EXIT (EXIT 141) TO N OF THE DEERFOOT A1RDY-100058377 PARKWAY EXIT (EXIT 143) IN TRUSSVILLE; TEMPLE ELECTRIC COMPANY, INC. ACIM58377-ATRP(001) JEFFERSON I-59

03-024 SHELBY; 8.193 MI INTERSECTION IMPROVEMENTS & TURN LANE WIDENING ON SR-38 (US-280)FROM HOLLYWOODBLVD NH04E-100059109 TO CR-1514 (DOUG BAKER BLVD) TO INCLUDE WIDENING FOR TURN LANES, STRIPE & SIGNALS; DUNN / APAC JV ACNH-0038(530) JEFFERSON SR-38

03-025 3.418 MI PLANING, RESURFACING, RAMPS, SIDEWALKS, BRIDGE & STRIPING ON LORNA RD FROM THE CAHABA RIVE A1RDY-100058372 TO SR-3 (US-31) & ON PATTON CHAPEL RD FROM LORNA RD TO SR-3 (US-31) IN HOOVER; GOOD HOPE CONTRACTIN ACAA58372-ATRP(001) JEFFERSON

03-026 1.410 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON MOUNT OLIVE RD FROM CR-118 (FIELDSTOWN RD) TO A1RDY-100058367 CR-112 (MOUNT OLIVE BLVD) IN GARDENDALE; DUNN CONSTRUCTION COMPANY, INC. ACAA58367-ATRP(001) JEFFERSON

03-027 0.136 MI BRIDGE REPLACEMENT CR-61 (ALLIANCE RD) ATTHE LOCUST FORK OF WARRIOR RIVER WEST OF PORT BROPL-100047972 BIRMINGHAM; THE MORRIS GROUP, INC., 3 OFFICE PARK CIRCLE, STE., 302, BIRMINGHAM, AL 35202 GRBN1-100047972 ACGBBRF-BRF-3707(200) JEFFERSON

03-028 0.722 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON CR-1523 (SHADY GROVE RD) FROM CR-118(FIELDSTOWN A1RDY-100058370 RD) TO CARRINGTON DR IN GARDENDALE; DUNN CONSTRUCTION COMPANY, INC. ACAA58370-ATRP(001) JEFFERSON CR-1523

03-029 1.340 MI GRADE, DRAIN, PARTIAL BASE & PAVE AND BRIDGE CULVERT ON SR-959 (BIRMINGHAM NORTHERN APD8E-100048412 BELTLINE)FROM W OF SR-79 TO E OF SR-75 N OF PINSON; WRIGHT BROTHERS CONSTRUCTION COMPANY, INC. APD8H-100048412 APD-1602(551) JEFFERSON SR-959 APD98-100048412

03-030 3.205 MI PAVEMENT REHABILITATION ON I-459 FROM N OF SR-150 TO S OF THE SR-3 (US-31) OVERPASS IN IM01M-100055280 HOOVER; DUNN CONSTRUCTION COMPANY, INC. IM-I459(309) JEFFERSON I-459

03-031 STMBH-CN07(909); SIDEWALK & LANDSCAPING ALONG ROCKVIEW LANE & PARK AVE IN HOOVER AT SITES STBHC-100048387 INDICATED BY THE PLANS; (ANGELO IAFRATE CONSTRUCTION CO.) STBHC-100048388 STMBH-CN07(908) JEFFERSON

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 31 THIRD DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 03-032 2.225 MI PLANING, RESURFACING, LOOP DETECTORS AND TRAFFIC STRIPE ON SR-3 (US-31) FROM SHADES CREST HSIPM-100056439 RD IN VESTAVIA HILLS TO HOLLYWOOD BLVD IN HOMEWOOD; DUNN CONSTRUCTION COMPANY, INC. NH01M-100056439 NH-HSIP-0003(574) JEFFERSON SR-3

03-033 1.494 MI WIDENING, PLANING, RESURFACING, GUARDRAILREPLACEMENT ON SR-3 (US-31) FROM THE SHELBY CO NH01M-100053365 LINE TO I-459 IN HOOVER; MIDSOUTH PAVING INC. STATE-100057478 NH-0003(576) & ST-037-003-009 JEFFERSON SR-3

03-034 4.143 MI CONCRETE SLAB & MEDIAN BARRIER REPLACEMENSTRIPE & SIGN ON I-59 FROM N OF SR-3(US-31/EB IM01M-100055653 STEPHENS EXPRESSWAY) TO N OF THE I-20 INTERCHANGE;DUNN CONSTRUCTION COMPANY, INC. IM-I059(365) JEFFERSON I-59

03-035 0.591 MI GRADE, DRAIN, WIDENING, SIGNING & SIGNALSON SR-150 FROM 0.062 MI W OF GROVE BLVD TO 0.450 STATO-100060661 MI E OF I-459 & ON THE I-459 NORTHBOUND RAMPS IN HOOVER; MIDSOUTH PAVING INC. ST-037-999-011 JEFFERSON SR-150

03-036 TRAFFIC SIGNALIZATION UPGRADE ON 18TH ST N AND ON 19TH ST N IN BESSEMER; STONE & SONS ELECTRICAL A1RDY-100058688 CONTRACTORS, INC. ACAA58688-ATRP(001) JEFFERSON 18TH ST

03-037 NH-0005(536), STPAA-7112(605) & ST-659-15; DEMOLITION & STRUCTURE REMOVAL AT VARIOUS SITES APD8E-100055382 INDICATED ON PLANS; (CARCEL & G CONSTRUCTION, LLC) NH04E-100055397 APD-0471(534) JEFFERSON STATE-100055396 STAAE-100055394

03-038 0.055 MI TRUSSVILLE GREENWAY AND WALKING MULTI-USETRAIL ALONG THE CAHABA RIVER IN CIVITAN PARK; CMAQE-100032370 WALKER PATTON COMPANY, INC. CMAQ-9802(923) JEFFERSON

03-039 0.166 MI INTERSECTION IMPROVEMENTS (GRADE, DRAIN, PAVEMENT & SIGNALS) AT VARIOUS INTERSECTIONS IN STBHC-100007545 HOOVER INDICATED BY THE PLANS; (R.E. GRILLS CONSTRUCTION CO., INC.) STMBH-7005(600) JEFFERSON

03-040 WALKWAY SYSTEM AT VARIOUS LOCATIONS IN MOUNTAIN BROOK VILLAGE AS INDICATED BY THE PLANS; CMAQE-100032375 (WALKER PATTON COMPANY, INC.) CMAQ-9802(921) JEFFERSON

03-041 3.560 MI RESURFACING AND TRAFFIC STRIPE ON CR-14 FROM CR-29(CALDWELL MILL RD)TO SR-119 & ON CR-29 A1RDY-100058383 (CALDWELL MILL RD)FROM SR-119 TO VALLEYDALE RD; DUNN CONSTRUCTION COMPANY, INC. ACAA58383-ATRP(004) SHELBY CR-14

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 32 THIRD DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 03-042 7.765 MI WIDENING, RESURFACING, GUARDRAIL AND TRAFFIC STRIPE ON CR-49 FROM THE JUNCTION OF SR-25 STPCL-100056328 N OF COLUMBIANA TO THE JUNCTION OF CR-47 JUST S OFCHELSEA; WIREGRASS CONSTRUCTION COMPANY, INC. STPBH-CN13(908) SHELBY CR-49

03-043 0.238 MI TURN LANES AND INTERSECTION IMPROVEMENTS ON SR-119 (MONTEVALLO RD) AND ON CR-80 (MISSION STATO-100059859 HILL RD) S OF ALABASTER; CHILTON CONTRACTORS, INC. ST-059-119-009 SHELBY SR-119

03-044 0.698 MI GRADE, DRAINAGE, PAVEMENT & SIGNALS ON PATTON CHAPEL RD FROM SR-3 (US-31) TO CRAYRICH STBHC-100007554 DRIVE IN HOOVER; (CORNERSTONE CIVIL CONTRACTORS, LLC) STMBH-STPBH-7020(600) JEFFERSON

03-045 2.171 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON CR-77/CR-118 (FIELDSTOWN RD) FROM JEW HOLLY RD A1RDY-100058371 (CR-1497) TO THOMPSON ST; DUNN CONSTRUCTION CO.INC ACAA58371-ATRP(001) JEFFERSON

03-046 0.524 MI EXTENSION (GRADE, DRAINAGE, PAVEMENT AND BRIDGE) CHAPEL LANE AT I-459 IN HOOVER; STBHL-100039931 (R.R. DAWSON BRIDGE COMPANY, LLC) STPBH-7321(600) JEFFERSON

03-047 2.008 MI ADDITIONAL LANES (GRADE, DRAIN, BASE & PAVE)ON COALBURG RD FROM CR-107 TO CORRIDOR X; STBHR-100033062 W. S. NEWELL & SONS, INC. STPBH-7201(600) JEFFERSON

03-048 0.207 MI GRADE, DRAIN, BASE AND PAVE OF PARK & RIDE LOT ON SHELBY WEST PARKWAY 0.75 MI N OF CR-87 CMAQE-100052622 NEAR THE SHELBY COUNTY AIRPORT; CHILTON CONTRACTORS, INC. CMAQ-9802(914) SHELBY

03-049 0.956 KILO WIDENING (GRADE, DRAINAGE, PAVEMENT ANDSIGNAL) ON CR-1397 (REX LAKE RD) FROM SOUTH OF STBHH-100042381 BARBER MOTORSPORTS PARKWAY TO SR-4 (US-78 IN LEEDS(REID CONSTRUCTION COMPANY, INC.) STMBH-STPBH-3713(200) JEFFERSON

03-050 0.984 MI INTERSECTION IMPROVEMENTS & ADDITIONAL LANES ON SR-38 (US-280) AT SR-119 & ON SR-110 FROM NH01M-100059863 CORPORATE DR TO BROOK HIGHLAND PARKWAY; RUSSO CORPORATION NH-0038(531) SHELBY SR-38

03-051 6.031 MI RESURFACING AND TRAFFIC STRIPE ON CR-10 FROM THE BIBB COUNTY LINE TO THE JUNCTION OF CR-22 A1RDY-100059507 IN PEA RIDGE; WIREGRASS CONSTRUCTION COMPANY, INC. ACAA59507-ATRP(001) SHELBY CR-10

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 33 THIRD DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 03-052 1.330 MI ADDITIONAL LANES (GRADE, DRAINAGE, SIGNAL& PAVEMENT) ON TARRANT-HUFFMAN RD FROM TREADWELL STBHC-100007610 RD TO E BRIARMONT DR IN BIRMINGHAM; (ANGELO IAFRATE CONSTRUCTION CO.) STMBH-STPBH-7229(601) JEFFERSON

03-053 0.102 MI INTERSECTION IMPROVEMENTS ON SR-261 (HELENA RD) AT CR-17 AND CR-52 IN HELENA; A1RDY-100061021 MIDSOUTH PAVING, INC. ACAA61021-ATRP(001) SHELBY SR-261

03-054 1.128 MI GRADE, DRAINAGE, PAVEMENT AND TRAFFIC STRIPE ON JEFFERSON AVE SW FROM 50TH STREET TO 40 STBHC-100029491 TH STREET SW IN BIRMINGHAM; (ANGELO IAFRATE CONSTRUCTION COMPANY) STMBH-7045(601) JEFFERSON

03-055 MAINTENANCE ROADSIDE MOWING AT VARIOUS SITES ALONG I20, I59, I65, I459 AND SR4 (CORRIDOR X) 99054-100057943 AS INDICATED BY THE PLANS; ORR CONTRACTING, INC 99-403-371-000-203 JEFFERSON

03-056 1.676 MI SIDEWALK, LANDSCAPING, IRRIGATION & LIGHTCONDUIT ALONG 14TH STREET FROM 10TH AVENUE SOUTH STBHH-100007566 TO 8TH AVENUE NORTH IN BIRMINGHAM; (WALKER PATTON COMPANY, INC.) STPBH-7089(600) JEFFERSON

03-057 INTERSECTION IMPROVEMENTS AT FOUR SITES INDICATED BY THE PLANS ON LORNA ROAD IN HOOVER; STBHC-100029509 (R.E. GRILLS CONSTRUCTION CO., INC.) STMBH-CMAQ-9802(918) JEFFERSON

03-058 3.786 MI RESURF AND TRAFFIC STRIPE ON CR-17(VALLEYRD)FROM THE INTERSECTION OF CR-29 TO THE INTERSEC- A1RDY-100059514 TION OF SR-38(US-280); DUNN CONSTRUCTION COMPANY, INC. ACAA59514-ATRP(008) SHELBY CR-17

03-061 2.615 MI ADDITIONAL LANES (GRADE, DRAINAGE, ITS, PAVEMENT & LIGHTING) ON I-65 FROM N OF CR-17 IM04E-100051822 (VALLEY DALE RD) TO S OF I-459 IN HOOVER; (DUNN CONSTRUCTION CO., INC.) IM-I065(390) SHELBY

03-062 0.489 MI SIDEWALKS ALONG COUGAR DRIVE FROM ROE CHANDLER RD TO TRUSSVILLE-CLAY ROAD IN CLAY; SRIL -100054658 (SOUTHEASTERN SEALCOATING, INC.) SRTS-SR10(914) JEFFERSON

03-063 10.869 MI, INTERSTATE MEDIAN CROSSOVER PROTECTION ON I20/I59 FROM I459 TO CR56 (VALLEY RD) SW OF IM04E-100055916 FAIRFIELD; GULF EQUIPMENT CORPORATION IM-I020(342) JEFFERSON I20/I59

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 34 THIRD DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 03-064 APD-ACAPD-0471(501); 4.237 MI ROUTE INTERCHANGE (GRADE, DRAINAGE, PAVEMENT & BRIDGES) ON I-22 APD8E-100039575 (CORRIDOR "X") AT I-65 IN BIRMINGHAM; (ARCHER WESTERN CONTRACTORS, LTD.) APD8L-100039575 APD-0471(500) JEFFERSON

03-067 0.387 MI BRIDGE REPLACEMENT AND APPROACHES ON SR269 AT SHORT CREEK IN BIRMINGPORT; RILEY BROPL-100012440 BRIDGE CO., INC. BRF-0269(503) JEFFERSON SR269

03-069 CONCRETE SIDEWALK AND LANDSCAPING AT VARIOUS SITESIN HOMEWOOD AS INDICATED BY THE PLANS; SRIH -100055092 (BURNETT CIVIL CONTRACTING, LLC) SRIL -100055092 SRTS-SR09(915) JEFFERSON

03-072 2.418 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON INVERNESS PARKWAY FROM VALLEYDALE RD (CR 17) STBHL-100055924 TO SR 38 (US 280) IN HOOVER; DUNN CONSTRUCTION CO. INC. STPBH-CN12(903) SHELBY CR 52

03-074 11.512 MI PAVEMENT REHABILITATION ON I-65 FROM THE CHILTON CO LINE (MP 225.948) TO EXIT 238 IM04E-100047394 (MP 237.438); (WIREGRASS CONSTRUCTION COMPANY, INC.) IM-I065(363) SHELBY

03-077 9.050 MI PLANING, RESURFACING, TRAFFIC STRIPE AND GUARDRAIL ON SR-119 FROM SR-3 (US-31) (MP 18.500) STAAM-100058699 TO SR-38 (US-280) (MP28.000) IN PELHAM; APAC MID-SOUTH, INC. STPAA-0119(506) SHELBY SR-119

03-080 8.061 MI ADDITIONAL LANES (GRADE, DRAINAGE, BRIDGE& PAVEMENT) ON I-20 FROM W OF KELLY CREEK (MP 147. STAAC-100041158 70) IN MOODY TO THE END OF THE MEDIAN BARRIER (MP 155.76); (WRIGHT BROTHERS CONSTRUCTION CO.) STMAAF-I020(324) ST. CLAIR

03-081 0.057 MI PARTIAL BRIDGE REPLACEMENT ON THE OVERTOWN BRIDGE OVER THE NORFOLK SOUTHERN RAILROAD BROFM-100058602 ON CR-179 (PLYWOOD PLANK RD); THE BRIDGE BUILDERS OF ALABAMA LLC BRZ-6400(213) WALKER

03-082 10.191 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-18 FROM THE FAYETTE CO LINE TO SR-69 AND ON HSIPM-100056437 SR-69 FROM SR-18 TO MARKET STREET IN OAKMAN; GOOD HOPE CONTRACTING COMPANY, INC. STAAM-100056437 STPAA-HSIP-FM12(900) WALKER SR-18

03-083 9.404 MI PLANING, RESURFACING, END ANCHORS AND TRAFFIC STRIPE ON SR-269 FROM S OF CR-22 (MP 32. STAAM-100058694 120) TO SR-69 (MP 41.524) S OF JASPER; DUNN CONSTRUCTION COMPANY, INC. STPAA-0269(507) WALKER SR-269

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 35 THIRD DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 03-084 11.105 MI PLANING, RESURFACING, LOOP DETECTORS ANDTRAFFIC STRIPE ON SR-69 FROM CENTER ST IN OAKMAN STAAM-100058700 TO THE INTERSECTION OF ELLIOTT BLVD AND 20TH ST INJASPER; GOOD HOPE CONTRACTING COMPANY, INC. STPAA-0069(543) WALKER SR-69

03-085 1.515 MI INTERCHANGE LIGHTING ON SR-4 (I-22) AT CR-371 (INDUSTRIAL PARKWAY), EXIT 65 IN JASPER; IM01M-100052805 SHOALS ELECTRIC COMPANY, INC. IM-0004(535) WALKER SR-4

03-086 APD-IM-0004(520) & APD-IM-0004(527); 7.875 MI PLANING, ULTIMATE PAVING & TRAFFIC STRIPE ON SR-4 AP100-100052995 (US-78/I-22, CORRIDOR X) AT VARIOUS SITE AS INDICAIN THE PLANS FROM(MP57.524)TO(MP65.410);GOOD HOPE AP100-100052984 APD-IM-0004(521) WALKER SR-4 AP100-100055725

03-087 5.800 MI WIDENING, RESURFACING AND TRAFFIC STRIPE ON SR-195 FROM THE JUNCTION OF SR-5 (US-78) TO STAAM-100058696 1.766 MI N OF CR-27 (FALLS CITY RD); GOOD HOPE CONTRACTING COMPANY, INC. STPAA-0195(503) WALKER SR-195

03-088 5.798 MI RESURFACING AND TRAFFIC STRIPE ON SR-195 FROM 1.766 MI N OF CR-27 (FALLS CITY RD) TO THE STAAM-100058698 WINSTON COUNTY LINE; GOOD HOPE CONTRACTING COMPANYINC. STPAA-0195(504) WALKER SR-195

03-100 3.218 MI RESURFACING, TRAFFIC STRIPE, END ANCHORS & BRIDGE RAIL RETRO ON SR-3(US-31)FROM 0.150 MI N 99303-100060380 OF I-65 TO 0.050 MI N OF CR-99 (SHADES CREST RD); DUNN CONSTRUCTION COMPANY, INC. 99-303-371-003-401 JEFFERSON SR-3

03-101 TRAFFIC SIGNAL INSTALLATION ON CR-118 (FIELDSTOWN RD) FROM I-65 N TO SR-3 (US-31) IN GARDENDALE; A1RDY-100058368 STONE ELECTRIC COMPANY, INC. ACAA58368-ATRP(001) JEFFERSON CR-118

03-102 17.313 MI RESURFACING & TRAFFIC STRIPE ON CR 12, CR52, CR17, CR47, & CR51 AT AT SITES AS INDICATED STBHL-100055920 ON THE PLANS (WIREGRASS CONSTRUCTION COMPANY,INC) STPBH-CN12(902) SHELBY CO RDS

03-103 0.465 MI TRANSPORTATION ENHANCEMENT PROJECT ALONG CAHABA RD BETWEEN THE BOTANICAL GARDENS AND THE HPPL1-100054138 BIRMINGHAM ZOO; VETERANS LANDSCAPING COMPANY, INC. STBHL-100054138 HPP-A188(900) JEFFERSON

03-104 0.365 MI SIDEWALK IMPROVEMENTS ALONG 12TH AVE N AT ABRAMS ELEMENTARY SCHOOL IN BESSEMER; SRIE1-00058965 TRIPLE J CONSTRUCTION, LLC SRIL1-00058965 SRTS-SR13(903) JEFFERSON 12TH AV SRIR1-00058965

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 36 THIRD DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 03-105 0.128 MI SIDEWALK INSTALLATION AT CHALKVILLE SCHOOL; TRIPLE J CONSTRUCTION, LLC SRIE1-00058873

SRTS-SR13(904) JEFFERSON

03-106 ACCESS IMPROVEMENTS, LANDSCAPING AND LIGHTING AT THE AMERICAN VILLAGE IN MONTEVALLO; WALKER PATTON TCSPL-100047117 CO. INC. TCSP-TC05(900) SHELBY

03-107 8.006 MI ADAPTIVE TRAFFIC SIGNAL CONTROL AT TWENTYFIVE INTERSECTIONS ALONG SR38 (US280) FROM BROOK NH04E-100057895 MANOR DR IN MOUNTAIN BROOK TO DOUG BAKER BLVD; AMERICAN LIGHTING AND SIGNALIZATION, INC NHF-0038(529) JEFFERSON

03-112 5.940 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR 261 FROM CR 17 IN HELENA TO SR 3 (US 31) HSIPE-100056420 IN PELHAM; APAC MID-SOUTH, INC. STAAE-100056420 STPAA-HSIP-0261(500) SHELBY SR 261 L24AC-100056420

03-114 IM-I020(329); 9.813 MI PAVEMENT RECONSTRUCTION ANDREHABILITATION ON I20 FROM I59 IN BIRMINGHAM TO SR IM04E-100042659 4 (US78) IN LEEDS; DUNN CONSTRUCTION CO. INC./ APAC MID-SOUTH, INC. IMD11-100042659 IM-IMD-I020(325) JEFFERSON I 20 IM04E-100047412

03-115 3.750 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-119 FROM SR-38 (US-280) TO THE SHELBY/ HSIPE-100058701 JEFFERSON CO LINE (MP 28.000 TO MP 31.750) S OF LEEDS; APAC MID-SOUTH, INC. STAAM-100058701 STPAA-HSIP-0119(505) SHELBY SR-119

03-118 2.724 MI WIDENING, RESURFACING AND TRAFFIC STRIPE ON CR-61 FROM SR-145 TO SR-25 IN WILSONVILLE; STATE-100059112 WIREGRASS CONSTRUCTION COMPANY, INC. ST-059-888-005 SHELBY CR-61

03-119 1.079 MI INTERCHANGE LIGHTING ON I-65 AT WALKER CHAPEL RD (EXIT 267) FROM MP 266.71 TO MP 267.79 BHST1-00056170 IN FULTONDALE; STONE ELECTRIC COMPANY, INC. STPBHF-I065(425) JEFFERSON I-65

03-120 1.574 MI WIDENING (GRADE, DRAIN, BASE, PAVE AND TRAFFIC STRIPE) ON THE I-59 S BOUND LANES FROM IM01M-100060180 EXIT 104 (CR-2240, MCASHAN DR) TO THE I-459 S BOUND LANE; APAC MID-SOUTH, INC. IM-I059(370) JEFFERSON I-59

03-121 0.168 MI SIDEWALK CONSTRUCTION AT GREEN VALLEY ELEMENTARY SCHOOL IN HOOVER; SRIE1-00054648 TRIPLE J CONSTRUCTION, LLC SRTS-SR10(904) JEFFERSON

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 37 THIRD DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 03-122 MAINTENANCE ROADSIDE MOWING AT VARIOUS LOCATIONS ALONG I-20, I-65, I-459 AND SR-4 AS INDICATED IN 99054-100060163 THE PLANS; ORR CONTRACTING, INC. 99-403-371-000-401 JEFFERSON

03-183 7.503 MI. PARTIAL GRADE & DRAIN, PAVEMENT, STRIPING & SIGNING ON CORRIDOR X FROM SR#13 NORTH OF ELDR AP54G-100009924 IDGE TO EAST OF SR#118. ( S & M EQUIPMENT COMPANY, INC. ) CX54H-100009924 APD-471(507) WALKER CORR X

03-237 MAINTENANCE ROADSIDE MOWING AT VARIOUS LOCATIONS ALONG I-65 AND SR-38 (US-280) 99054-100051823 (LOVIN CONTRACTING COMPANY, INC.) 99-403-595-000-820 (3RD RENEW)SHELBY

03-238 0.723 MI CONCRETE SIDEWALK, LANDSCAPING & LIGHTINGON BROADWAY STREET IN HOMEWOOD; STBHE-100048386 (CARCEL & G. CONSTRUCTION, LLC) STPBH-CN07(907) JEFFERSON

03-268 0.289 MI BRIDGE REPLACEMENT AND APPROACHES ON CR-11 AT PEAVINE CREEK IN ALABASTER; BROPE-100056389 (BOB SMITH CONSTRUCTION, INC.) BR-7118(601) SHELBY

03-270 STPBH-CN10(908); 2.712 MI PEDESTRIAN IMPROVEMENTS (SIDEWALKS & CROSS WALKS) ALONG VARIOUS STREETS IN SRIL -100055094 VESTAVIA HILLS AS INDICATED BY THE PLANS; (R.E. GRILLS CONSTRUCTION CO., INC.) STBHL-100048391 SRTS-SR09(914) JEFFERSON

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

SRTS-SR09(903) & SRTS-SR09(904 JEFFERSON 0.00 % 03-001 WALKER PATTON 635,256 130 W 100 100 09-08-14 0 .00 0 0 0 0

SRTS-SR12(917) SHELBY 0.00 % 03-002 WALKER PATTON 141,160 45 W 100 100 01-15-14 0 .00 0 5,340 0 5,340

DE-A194(934) JEFFERSON SR-75 0.73 % 03-003 TRIPLE J CONS 146,502 45 W 000 000 00-00-00 0 1,241.96 168,477 0 0 0

SRTS-SR12(902) JEFFERSON 0.00 % 03-004 BURNETT CIVIL 240,681 45 W 000 000 00-00-00 0 .00 0 4,566 0 4,566

CMAQ-7045(600) JEFFERSON 7.69 % 03-005 CARCEL & G. C 3,060,916 180 W 000 000 00-00-00 0 250,694.28 3,256,244 0 0 0

STPBHF-I059(355) JEFFERSON I-20/59 7.01 % 03-006 STONE & SONS 2,791,197 115 D 060 079 09-01-15 2,401,117 209,544.05 2,987,460 58,247 15,231 73,478

IM-I065(401) SHELBY I 65 20.98 % 03-007 ALABAMA BRIDG 4,189,624 113 D 152 099 07-30-14 4,159,615 1,226,043.92 5,842,501 342,233 -370,077 -27,844

STPAA-0119(504) SHELBY SR-119 7.71 % 03-008 WIREGRASS 3,078,736 60 W 087 100 03-24-14 3,130,014 283,858.73 3,680,353 33,228 18,050 51,278

ACBR58382-ATRP(001) SHELBY CR 12 0.00 % 03-009 WINSTON CONTR 1,931,283 200 W 000 000 00-00-00 0 .00 0 0 0 0

STPBH-CN12(908) JEFFERSON 0.93 % 03-010 DUNN CONSTRUC 2,122,424 65 W 000 000 00-00-00 0 22,916.54 2,440,787 187,159 0 187,159

DE-AL97(930) JEFFERSON 2.43 % 03-011 WALKER PATTON 360,066 90 W 099 100 10-31-13 0 7,898.45 325,000 0 0 0

99-403-595-000-202 (RENEWAL) SHELBY I-65 10.70 % 03-013 BENTLEY TURF 110,072 60 W 065 100 12-05-13 100,046 22,213.57 207,447 0 -26 -26

STPBH-CN12(907) JEFFERSON 1.18 % 03-014 DUNN CONSTRUC 3,640,119 100 W 099 100 08-23-13 0 49,459.06 4,186,137 0 0 0

IM-I459(307) JEFFERSON I-459 7.29 % 03-015 DUNN CONSTRUC 8,635,088 2013 D 116 100 06-16-14 9,221,025 844,638.92 11,578,398 321,059 264,879 585,938

BR-7004(601) JEFFERSON CR-55 1.57 % 03-016 ALABAMA BRIDG 1,585,691 160 W 000 000 00-00-00 0 32,666.60 2,072,093 10,240 0 10,240

STPAA-HSIP-0004(539) JEFFERSON SR-4 0.99 % 03-017 MIDSOUTH PAVI 3,651,196 70 W 046 055 10-31-14 2,034,187 45,686.65 4,612,625 0 42,242 42,242

STPAA-0003(577) SHELBY SR-3 5.02 % 03-018 DUNN CONSTRUC 2,565,604 55 W 115 100 01-24-14 2,376,992 154,218.68 3,068,875 5,889 -194,501 -188,612

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

99-403-371-000-302 JEFFERSON 1.25 % 03-019 SALAZAR CONTR 55,700 120 W 023 100 11-27-13 55,696 717.65 57,243 0 -4 -4

IM-I459(308) JEFFERSON I-459 12.84 % 03-020 APAC MID-SOUT 11,426,383 2914 D 098 097 09-11-14 11,637,355 526,139.22 4,094,562 171,320 195,238 366,558

ACAA58363-ATRP(001) JEFFERSON 3.86 % 03-021 VETERANS LAND 2,521,967 230 W 000 000 00-00-00 0 111,971.33 2,900,262 0 0 0

STMBH-9802(920) JEFFERSON 24.66 % 03-022 METROPOWER, I 687,346 120 W 244 048 09-07-14 222,075 128,343.73 520,388 0 0 0

ACIM58377-ATRP(001) JEFFERSON I-59 0.76 % 03-023 TEMPLE ELECTR 1,477,341 115 D 000 000 00-00-00 0 13,049.53 1,698,942 0 0 0

ACNH-0038(530) JEFFERSON SR-38 9.84 % 03-024 DUNN CONSTRUC 15,594,313 2713 D 100 099 09-30-14 21,786,275 922,499.59 9,374,232 1,450,489 4,755,293 6,205,782

ACAA58372-ATRP(001) JEFFERSON 2.15 % 03-025 GOOD HOPE CON 2,079,975 110 W 000 000 00-00-00 0 51,632.20 2,391,972 -56,379 0 -56,379

ACAA58367-ATRP(001) JEFFERSON 8.95 % 03-026 DUNN CONSTRUC 327,648 30 W 000 000 00-00-00 0 33,739.34 376,797 0 0 0

ACGBBRF-BRF-3707(200) JEFFERSON 12.41 % 03-027 THE MORRIS GR 9,295,339 314 W 261 100 01-24-13 8,929,109 216,430.26 1,743,663 112,840 -248,884 -136,044

ACAA58370-ATRP(001) JEFFERSON CR-1523 4.86 % 03-028 DUNN CONSTRUC 206,983 30 W 000 000 00-00-00 0 11,588.73 238,030 0 0 0

APD-1602(551) JEFFERSON SR-959 1.19 % 03-029 WRIGHT BROTHE 46,000,000 390 W 029 018 09-11-16 8,409,806 709,641.77 59,215,162 0 679,658 679,658

IM-I459(309) JEFFERSON I-459 5.34 % 03-030 DUNN CONSTRUC 4,524,164 1514 D 105 099 09-15-14 4,730,999 354,807.45 6,637,454 0 269,844 269,844

STMBH-CN07(908) JEFFERSON 14.55 % 03-031 ANGELO IAFRAT 371,840 120 W 093 100 01-15-13 399,987 87,813.71 603,519 1,236 8,153 9,389

NH-HSIP-0003(574) JEFFERSON SR-3 6.49 % 03-032 DUNN CONSTRUC 1,295,946 60 W 093 100 11-12-13 1,366,960 108,487.17 1,671,213 0 83,033 83,033

NH-0003(576) & ST-037-003-009 JEFFERSON SR-3 3.85 % 03-033 MIDSOUTH PAVI 2,115,518 110 W 070 058 11-15-14 1,217,163 91,527.08 2,374,906 0 19,979 19,979

IM-I059(365) JEFFERSON I-59 4.69 % 03-034 DUNN CONSTRUC 17,791,857 115 D 029 060 12-31-14 15,072,610 911,775.52 19,407,540 496,444 3,954,101 4,450,545

ST-037-999-011 JEFFERSON SR-150 2.47 % 03-035 MIDSOUTH PAVI 3,065,679 150 W 039 019 03-03-15 581,488 98,727.46 3,993,169 0 31,385 31,385

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACAA58688-ATRP(001) JEFFERSON 18TH ST 0.07 % 03-036 STONE & SONS 1,230,766 130 W 000 000 00-00-00 0 1,488.14 2,025,926 0 0 0

APD-0471(534) JEFFERSON 7.74 % 03-037 CARCEL & G. C 224,209 90 W 072 100 09-21-11 233,767 21,707.23 280,395 7,541 9,558 17,099

CMAQ-9802(923) JEFFERSON 27.07 % 03-038 WALKER PATTON 388,248 60 W 000 000 00-00-00 0 478,938.30 1,768,913 0 0 0

STMBH-7005(600) JEFFERSON 16.77 % 03-039 R.E. GRILLS C 1,633,320 275 W 074 100 01-15-13 1,900,847 315,080.33 1,878,318 14,765 81,426 96,191

CMAQ-9802(921) JEFFERSON 25.90 % 03-040 WALKER PATTON 1,596,774 140 W 100 100 06-17-04 0 540,584.23 2,086,576 5,817 0 5,817

ACAA58383-ATRP(004) SHELBY CR-14 0.87 % 03-041 DUNN CONSTRUC 1,063,386 65 W 000 000 00-00-00 0 12,247.23 1,401,453 0 0 0

STPBH-CN13(908) SHELBY CR-49 0.95 % 03-042 WIREGRASS CON 2,278,669 45 W 100 100 05-28-14 0 22,760.59 2,392,602 700 0 700

ST-059-119-009 SHELBY SR-119 16.34 % 03-043 CHILTON CONTR 651,197 60 W 042 028 09-30-14 173,844 109,978.46 672,727 30,323 -487 29,836

STMBH-STPBH-7020(600) JEFFERSON 2.24 % 03-044 CORNERSTONE C 1,476,755 160 W 101 100 12-04-13 1,255,180 30,884.16 1,375,027 0 1,622 1,622

ACAA58371-ATRP(001) JEFFERSON 7.79 % 03-045 DUNN CONSTRUC 463,436 30 W 099 100 12-16-13 0 41,543.89 532,951 0 0 0

STPBH-7321(600) JEFFERSON 11.50 % 03-046 R.R. DAWSON B 5,771,174 330 W 094 100 04-07-14 6,337,592 763,277.80 6,636,851 280,808 541,749 822,557

STPBH-7201(600) JEFFERSON 1.52 % 03-047 W. S. NEWELL 7,554,713 300 W 070 086 12-01-14 7,118,892 131,963.69 8,674,040 195,475 540,087 735,562

CMAQ-9802(914) SHELBY 1.73 % 03-048 CHILTON CONTR 662,373 120 W 000 000 00-00-00 0 19,857.25 1,141,670 0 0 0

STMBH-STPBH-3713(200) JEFFERSON 13.78 % 03-049 REID CONST. C 4,780,389 299 W 115 099 09-30-14 5,280,855 41,497.85 301,028 11,337 500,312 511,649

NH-0038(531) SHELBY SR-38 0.00 % 03-050 RUSSO CORP 6,154,079 310 W 038 017 09-17-15 1,082,427 .00 300,000 15,872 110,626 126,498

ACAA59507-ATRP(001) SHELBY CR-10 0.14 % 03-051 WIREGRASS CON 1,128,528 45 W 000 000 00-00-00 0 2,013.20 1,377,814 0 0 0

STMBH-STPBH-7229(601) JEFFERSON 17.97 % 03-052 ANGELO IAFRAT 2,522,284 187 W 099 100 11-08-13 2,647,878 521,286.35 2,900,626 49,752 746 50,498

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACAA61021-ATRP(001) SHELBY SR-261 0.00 % 03-053 MIDSOUTH PAVI 133,816 30 W 000 000 00-00-00 0 .00 0 0 0 0

STMBH-7045(601) JEFFERSON 17.48 % 03-054 ANGELO IAFRAT 2,282,362 215 W 099 100 03-26-13 2,768,400 458,944.28 2,624,716 118,489 0 118,489

99-403-371-000-203 JEFFERSON 0.58 % 03-055 ORR CONTRACTI 453,650 125 W 085 100 11-22-12 453,639 2,806.10 476,924 0 -11 -11

STPBH-7089(600) JEFFERSON 0.47 % 03-056 WALKER PATTON 1,373,516 120 W 099 100 05-02-13 1,522,599 6,651.05 1,402,339 75,936 239,510 315,446

STMBH-CMAQ-9802(918) JEFFERSON 13.60 % 03-057 R.E. GRILLS C 1,590,850 153 W 103 100 09-06-13 15,747,295 169,538.31 1,246,205 100,898 0 100,898

ACAA59514-ATRP(008) SHELBY CR-17 0.00 % 03-058 DUNN CONSTRUC 1,325,077 60 W 000 000 00-00-00 0 .00 0 0 0 0

IM-I065(390) SHELBY 24.80 % 03-061 DUNN CONSTRUC 6,992,038 1911 D 124 100 07-27-12 6,729,388 2,189,636.88 8,828,042 266,239 -174,329 91,910

SRTS-SR10(914) JEFFERSON 1.54 % 03-062 S-EASTERN SEA 182,961 60 W 088 100 05-28-14 189,798 2,976.18 192,109 10,658 0 10,658

IM-I020(342) JEFFERSON I20/I59 14.26 % 03-063 GULF EQUIPMEN 1,637,081 112 D 099 100 07-10-13 1,824,024 305,083.78 2,139,248 271,958 -4,872 267,086

APD-0471(500) JEFFERSON 3.23 % 03-064 ARCHER WESTER 168,648,758 1514 D 096 062 10-15-15 121,637,993 1,450,212.60 44,772,969 214,082 3,981,057 4,195,139

BRF-0269(503) JEFFERSON SR269 13.07 % 03-067 RILEY BRIDGE 5,605,468 300 W 088 093 04-05-15 5,724,202 979,606.44 7,491,891 415,613 123,834 539,447

SRTS-SR09(915) JEFFERSON 1.29 % 03-069 BURNETT CIVIL 164,775 75 W 095 100 08-01-13 189,623 2,461.36 189,491 3,025 10,622 13,647

STPBH-CN12(903) SHELBY CR 52 10.13 % 03-072 DUNN CONSTRUC 787,044 30 W 100 100 04-09-13 801,032 85,339.15 842,137 0 0 0

IM-I065(363) SHELBY 9.11 % 03-074 WIREGRASS CON 16,187,393 411 D 112 100 07-21-12 17,486,013 1,980,399.34 21,738,695 0 1,308,620 1,308,620

STPAA-0119(506) SHELBY SR-119 16.06 % 03-077 APAC MID-SOUT 2,451,753 60 W 102 100 01-11-14 2,374,163 469,907.32 2,925,224 12,065 -89,370 -77,305

STMAAF-I020(324) ST. CLAIR 12.58 % 03-080 WRIGHT BROTHE 54,952,856 1512 D 104 099 09-30-14 75,611,312 9,032,138.23 71,776,999 1,287,102 19,986,265 21,273,367

BRZ-6400(213) WALKER 0.20 % 03-081 THE BRIDGE BU 244,318 60 W 000 000 00-00-00 0 828.07 407,374 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPAA-HSIP-FM12(900) WALKER SR-18 18.32 % 03-082 GOOD HOPE CON 2,225,371 70 W 100 100 06-14-14 2,077,037 487,665.73 2,660,805 0 -148,333 -148,333

STPAA-0269(507) WALKER SR-269 15.10 % 03-083 DUNN CONSTRUC 2,124,063 45 W 127 100 05-12-14 2,278,243 384,728.52 2,547,381 2,100 152,080 154,180

STPAA-0069(543) WALKER SR-69 6.07 % 03-084 GOOD HOPE CON 2,437,276 60 W 078 073 10-30-14 1,773,302 189,105.77 3,114,485 0 47,401 47,401

IM-0004(535) WALKER SR-4 1.99 % 03-085 SHOALS ELECTR 1,000,363 215 D 022 007 01-02-15 81,781 30,017.97 1,501,807 0 6,700 6,700

APD-IM-0004(521) WALKER SR-4 2.53 % 03-086 GOOD HOPE CON 19,197,858 714 D 052 059 11-07-14 11,331,429 374,185.78 14,782,074 0 126,598 126,598

STPAA-0195(503) WALKER SR-195 3.25 % 03-087 GOOD HOPE 3,326,756 100 W 060 044 10-31-14 1,552,178 109,562.71 3,369,741 0 63,649 63,649

STPAA-0195(504) WALKER SR-195 0.42 % 03-088 GOOD HOPE CON 2,079,978 60 W 057 017 10-30-14 352,859 9,756.71 2,298,088 0 2,161 2,161

99-303-371-003-401 JEFFERSON SR-3 0.03 % 03-100 DUNN CONSTRUC 2,412,049 130 W 000 000 00-00-00 0 928.23 2,653,254 0 0 0

ACAA58368-ATRP(001) JEFFERSON CR-118 0.14 % 03-101 STONE ELECTRI 470,580 130 W 000 000 00-00-00 0 911.82 636,362 0 0 0

STPBH-CN12(902) SHELBY CO RDS 2.16 % 03-102 WIREGRASS CON 3,277,250 75 W 100 100 05-27-14 0 72,966.93 3,372,137 10,456 0 10,456

HPP-A188(900) JEFFERSON 1.31 % 03-103 VETERANS LAND 1,863,807 130 W 000 000 00-00-00 0 28,242.84 2,143,378 0 0 0

SRTS-SR13(903) JEFFERSON 12TH AV 0.00 % 03-104 TRIPLE J CONS 135,602 45 W 000 000 00-00-00 0 .00 0 0 0 0

SRTS-SR13(904) JEFFERSON 0.00 % 03-105 TRIPLE J CONS 137,164 45 W 000 000 00-00-00 0 .00 0 0 0 0

TCSP-TC05(900) SHELBY 0.97 % 03-106 WALKER PATTON 1,042,492 60 W 099 100 07-02-13 0 10,068.58 1,036,913 0 0 0

NHF-0038(529) JEFFERSON 18.19 % 03-107 AMERICAN 1,453,932 1612 D 089 100 05-22-13 1,651,144 345,668.44 1,899,919 209,965 6,307 216,272

STPAA-HSIP-0261(500) SHELBY SR 261 18.81 % 03-112 APAC MID-SOUT 1,408,148 60 W 095 100 12-01-13 1,254,221 318,209.98 1,691,112 0 -141,408 -141,408

IM-IMD-I020(325) JEFFERSON I 20 8.12 % 03-114 DUNN CONSTRUC 38,557,836 2213 D 103 100 06-16-14 42,165,570 3,330,044.33 40,984,419 551,027 3,057,086 3,608,113

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPAA-HSIP-0119(505) SHELBY SR-119 18.83 % 03-115 APAC MID-SOUT 1,289,711 40 W 105 100 05-06-14 1,210,500 289,892.74 1,538,773 0 -75,300 -75,300

ST-059-888-005 SHELBY CR-61 0.64 % 03-118 WIREGRASS 915,704 30 W 000 000 00-00-00 0 9,719.77 1,500,000 0 0 0

STPBHF-I065(425) JEFFERSON I-65 0.00 % 03-119 STONE ELECTRI 825,116 114 D 094 055 09-12-14 683,881 .00 0 23,203 -37,400 -14,197

IM-I059(370) JEFFERSON I-59 6.70 % 03-120 APAC MID-SOUT 2,109,333 113 D 194 100 05-07-14 2,047,523 184,885.43 2,756,361 3,918 47,563 51,481

SRTS-SR10(904) JEFFERSON 0.00 % 03-121 TRIPLE J 164,482 50 W 100 100 04-09-14 0 .00 0 0 0 0

99-403-371-000-401 JEFFERSON 0.23 % 03-122 ORR CONTRACTI 381,410 125 W 064 100 11-18-13 381,410 911.84 383,161 0 0 0

APD-471(507) WALKER CORR X 7.29 % 03-183 S & M EQUIPME 16,700,324 796 C 100 100 10-31-06 17,269,756 1,486,941.75 20,374,979 97,791 565,632 663,423

99-403-595-000-820 (3RD RENEW) SHELBY 0.91 % 03-237 LOVIN CONTRAC 98,730 60 W 000 000 00-00-00 0 2,275.45 249,695 0 0 0

STPBH-CN07(907) JEFFERSON 12.39 % 03-238 CARCEL & G. C 307,503 90 W 100 100 07-26-13 290,398 43,698.69 352,490 0 0 0

BR-7118(601) SHELBY 2.95 % 03-268 BOB SMITH CON 1,475,284 200 W 099 100 08-01-13 0 54,453.87 1,844,002 0 0 0

SRTS-SR09(914) JEFFERSON 1.29 % 03-270 R.E. GRILLS C 698,228 110 W 097 100 09-20-13 749,375 10,405.19 802,962 5,258 0 5,258 DIVISION TOTALS: 570,433,980 464,073,889 479,021,029 7,436,084 40,363,295 47,799,379 35,496,860.01

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 38 FOURTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 04-001 0.065 MI BRIDGE REPLACEMENT (BRIDGE CULVERT) AND APPROACHES ON POSSUM TROT RD AT AN UNKNOWN BRANCH A1BRZ-100058388 IN ASBERRY; CARCEL & G. CONSTRUCTION, LLC ACBRZ58388-ATRP(001) CALHOUN

04-002 1.814 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SUMMERALL GATE RD & EXCHANGE AVE IN ANNISTON ANSTM-100054930 AS INDICATED IN THE PLANS; APAC MID-SOUTH, INC. STPOA-7449(600) CALHOUN

04-003 3.731 MI GRADE, DRAIN, BASE, PAVE, BRIDGE CULVERTSSIGNING, SIGNALS ON SR-901 (ANNISTON E BYPASS) NH01M-100039151 FROM 1500' S OF LAKE YAHOU TO SR-1 (US-431) IN ANNISTON; MCCARTNEY CONSTRUCTION COMPANY, INC. NHF-0901(500) CALHOUN SR-901

04-004 0.307 MI WIDENING (GRADE, DRAINAGE & PAVEMENT) ON EDITH AVE FROM STA. 50+00.00 NEAR EDITH AVENUE ANST -100054921 CONNECTOR TO CAFFEY DRIVE IN OXFORD; (JERRY DOSS CONSTRUCTION, INC.) STPOA-7406(600) CALHOUN

04-005 0.852 MI INTERCHANGE LIGHTING ON I-20 AT SR-21 (EXIT 185) IN OXFORD; TEMPLE ELECTRIC COMPANY, INC IM01M-100057939

IM-I020(345) CALHOUN I-20

04-006 & STPAA-NR13(932); 5.090 MI PLANING, RESURFACING, STRIPING & CURB RAMP INSTALLATIONS ON SR-1(US-431) NH01M-100055615 FROM 0.32 MI N OF SNOW ST TO 0.13 MI S OF THE JUNCTION OF SR-21 AT EAGLE TRAIL;MIDSOUTH PAVING STAAM-100060849 NH-0001(569) CALHOUN SR-1

04-007 HSIP-CN10(914); 2.402 MI SAFETY IMPROVEMENTS ON SR9 AT MP 238.10 IN PEIDMONT & ON SR-1 (US-431) FROM HSIPE-100052322 CR-109 TO ETOWAH COUNTY LINE; (MCCARTNEY CONSTRUCTION CO., INC.) HSIPE-100051436 HSIP-0009(537) HSIP-CN10(914) CALHOUN

04-008 1.585 MI RESURFACING AND TRAFFIC STRIPE ON CR-494 (WHITE GAP RD SE) FROM CR-262 (WHITES GAP RD)TO ANSTM-100057409 THE JACKSONVILLE CITY LIMITS; MCCARTNEY CONSTRUCTION COMPANY, INC. STPOA-7429(600) CALHOUN CR-494

04-009 7.041 MI SAFETY WIDENING, PLANING, RESURFACING & TRAFFIC STRIPE ON SR-74(US-278)FROM THE ETOWAH CO HS31M-100060728 LINE TO SR-200 (MP 155.576); MCCARTNEY CONSTRUCTION COMPANY, INC. NH01M-100060728 NH-HSIP-0074(535) CALHOUN SR-74

04-011 0.236 MI BRIDGE REPLACEMENT (PRECAST)& APPROACHES ON CR-11 AT SANDY CREEK NORTH OF WAVERLY; A1BRZ-100055194 F & W CONSTRUCTION COMPANY, INC. ACBRZ55194-ATRP(001) CHAMBERS CR-11

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 39 FOURTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 04-012 & ACNU60924-ATRP(007);3.308 MI RESURF & TRAF STRIPON CR-211 FROM THE JUNC OF CR-289 E TO THE JUNC OF A1RDY-100059560 CR-212 & ON CR-177 FROM THE JUNC OF CR-388 TO THE JUNC OF CR-299; EAST ALABAMA PAVING CO., INC. A1RDY-100060924 ACNU59560-ATRP(003) CHAMBERS CR-211

04-013 ACOA59552-ATRP(001) & ACOA59554-ATRP(001);8.388 MIWIDENING, RESURFACING & TRAFFIC STRIPE AT VARIOUS A1RDY-100059551 LOCATIONS AS INDICATED IN THE PLANS; EAST ALABAMA PAVING COMPANY, INC. A1RDY-100059552 ACOA59551-ATRP(001) CHAMBERS A1RDY-100059554

04-014 & ACOA59556-ATRP(001); 7.480 MI WIDENING, RESUR- FACING & TRAFFIC STRIPE ON MAGNOLIA RD FROM 21ST A1RDY-100059555 AVE SW E TO NEAR SR-15(US-29)IN LANETT & ON CR-299FROM CR-83 E TO CR-208;EAST ALABAMA PAVING CO. INC A1RDY-100059556 ACOA59555-ATRP(001) CHAMBERS

04-015 ACOA59561-ATRP(001) & ACNU59562-ATRP(001); 16.295 MI FULL DEPTH RECLAMATION, PAVE & TRAFFIC STRIPE A1RDY-100059557 ON CR-289 & CR-222 FROM CR-216 TO SR-1(US-431);CR-210 FROM CR-84 TO CR-202;& CR-222 FROM CR-289 TO A1RDY-100059561 ACNU59557-ATRP(001) CHAMBERS CR-289 A1RDY-100059562

04-018 & STPNU-0924(200); 6.976 MI FULL DEPTH RECLAMATIONPAVE & TRAFFIC STRIPE CR-258(1258)FROM CR-234(1234 A1RDY-100059563 TO THE RANDOLPH CO LINE & ON CR-53(1053)FROM CR-62(1062) TO CR-114(1114); MILLER PAVING GROUP, INC. STNUM-100060199 ACNU59563-ATRP(001) CHAMBERS CR-258

04-020 7.678 MI RESURFACING AND TRAFFIC STRIPE ON SR-148 FROM CR-7 TO SR-9 W OF MILLERVILLE; STAAM-100052964 CHARLES E. WATTS, INC. STPAA-0148(503) CLAY SR-148

04-021 1.473 MI WIDENING, RESURFACING & TRAFFIC SIGNS ON SR-194 (TAYLOR RD) FROM CR-193 TO SR-9 IN STATO-100055569 LINEVILLE; (MCCARTNEY CONSTRUCTION CO., INC.) ST-014-888-009 CLAY

04-022 7.643 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR 77 FROM W OF CR 130 (MP 43.880) NW OF HSIPE-100053175 ASHLAND TO THE TALLADEGA CO LINE; APAC MID-SOUTH, INC. STAAE-100053175 HSIP-STPAA-0077(517) CLAY SR 77

04-023 ACNU60369-ATRP(002) & ACNU60370-ATRP(002);10.214 MI RESURF & TRAF STRIPE ON CR-5 FROM MT. ZION CHUR A1RDY-100060367 RD TO SR-9;ON CR-511 FROM THE TALLADEGA COLINE TO THE COOSA CO LINE;ON CR-4 FROM THE TALLADEGA CO LI A1RDY-100060369 ACNU60367-ATRP(002) CLAY CR-5 A1RDY-100060370

04-025 7.354 MI RESURFACING, WIDENING AND TRAFFIC STRIPE ON SR-9 FROM THE S CITY LIMITS OF ASHLAND TO THE S HSIPM-100058914 END OF THE RAILROAD BRIDGE(MP 188.260)IN LINEVILLEMCCARTNEY CONSTRUCTION COMPANY, INC. STAAR-100058914 STPAA-HSIP-0009(550) CLAY SR-9 STAAL-100058914

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 40 FOURTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 04-026 8.208 MI PLANING, SAFETY WIDENING, RESURFACING & TRAFFIC STRIPE ON SR-49 FROM SR-77 (MP 60.329) TO ACS30-100053179 SR-9 (MP 68.537)IN LINEVILLE; GARY INGRAM GRADING & PAVING, INC. HSIP1-00053179 HSIP-STPAA-0049(506) CLAY SR-49 L24AC-100053179

04-030 COOSA, RUSSELL & TALLAPOOSA COUNTIES; BRIDGE PAINTING ON VARIOUS ROUTES AS INDICATED IN THE 99005-100057982 PLANS; P & H STUCCO & CONSTRUCTION, INC. 99-504-690-000-201 CLEBURNE

04-031 0.044 MI BRIDGE REPLACEMENT (GRADE, DRAIN, BASE, PAVE & BRIDGE) ON CR-46 (BELLS MILL RD) OVER CANE A1BRZ-100058403 CREEK IN HEFLIN; ALABAMA BRIDGE BUILDERS, INC. ACBRZ58403-ATRP(001) CLEBURNE CR-46

04-032 10.086 MI SAFETY WIDENING, PLANING, RESURFACING & TRAFFIC STRIPE ON SR-46 FROM W OF CR-620(MP10.988) HSPR1-00058929 TO THE GEORGIA STATE LINE(MP 21.074); MIDSOUTH PAVING, INC. RECAE-100058929 RECA-STPOA-HSIP-0046(504) CLEBURNE SR-46 RECAL-100058929

04-033 4.290 MI ADDITIONAL LANES (GRADE, DRAIN, PAVE, LIGHTING AND SIGNING) ON I-20 FROM SR-46 IN HEFLIN IM01M-100056061 TO W OF THE TALLAPOOSA RIVER; C.W. MATTHEWS CONTRACTING COMPANY, INC. NH01M-100056061 IM-NHF-I020(339) CLEBURNE I-20

04-034 10.330 MI RESURFACING, WIDENING AND TRAFFIC STRIPEON SR-9 FROM THE CLAY CO LINE TO I-20; HSIPM-100060707 MCCARTNEY CONSTRUCTION COMPANY, INC. STAAM-100060707 STPAA-HSIP-0009(554) CLEBURNE SR-9

04-035 6.935 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-4 (US-78) FROM SR-46 TO CR-61 IN HEFLIN; HSIPM-100057486 APAC MID-SOUTH, INC. STAAM-100057486 STPAA-HSIP-0004(537) CLEBURNE SR-4

04-036 7.760 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-1 (US-431) FROM SOUTH OF SR-9 TO US-78 EAST OF EBSPE-100053185 ANNISTON; (APAC MID-SOUTH, INC.) HSIPE-100053185 EB-HSIP-0001(566) CLEBURNE

04-037 0.00 MI.STRUCTURE REMOVAL AND UNDERGROUND STORAGE TANK REMOVEL AND SOLID REMEDIATION ON U.S.#29 IN STOA -100008290 (SERCON CORP.) STPOA-338(8) CHAMBERS US 29

04-038 4.755 MI SAFETY WIDENING, RESURFACING AND TRAFFIC STRIPE ON SR-46 FROM WITHIN THE CITY LIMITS OF HS31M-100060724 HEFLIN TO W OF THE OVERPASS BRIDGE AT I-20; MIDSOUTH PAVING INC. STNUM-100060724 STPNU-HSIP-0046(505) CLEBURNE SR-46

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 41 FOURTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 04-039 & 99-404-154-281-402; 20.167 MI RESURF, TRAF STRIP& GUARDRAIL REPLACEMENT ON SR-281 FROM THE CLAY CO STAAM-100060713 LINE TO THE S END OF THE BRIDGE OVERPASS AT CR-24(MP 487.280);MCCARTNEY CONSTRUCTION COMPANY, INC. 99044-100059947 STPAA-0281(501) CLEBURNE SR-281

04-040 4.899 MI RESURFACING AND TRAFFIC STRIPE ON CR-5 FROM THE JUNCTION OF CR-125 TO THE TALLADEGA CO A1RDY-100060416 LINE; DUNN CONSTRUCTION COMPANY, INC. ACNU60416-ATRP(001) COOSA CR-5

04-041 7.300 MI RESURFACING AND TRAFFIC STRIPE ON CR-14 FROM THE INTERSECTION OF SR-21/SR-53(US-231) TO A1RDY-100060415 THE JUNCTION OF SR-9; GARY INGRAM GRADING & PAVINGINC. ACNU60415-ATRP(001) COOSA CR-14

04-050 1.256 MI WIDENING (GRADE, DRAINAGE, PAVEMENT, SIGNALS AND SIGNING) ON GLENN AVE/FREDERICK RD A1RDY-100008564 FROM THE OPELIKA CITY LIMITS TO HAMILTON RD; ROBINSON PAVING COMPANY, INC. EBSPE-100008564 ACOA58682-EB-9025(600) LEE

04-051 3.460 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-38 (US-280) FROM SR-147 TO 0.3 MI W OF NH01M-100058927 VETERANS PARKWAY NW OF OPELIKA; EAST ALABAMA PAVING COMPANY, INC. NH-0038(532) LEE SR-38

04-052 0.639 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON CR-97 (SHELTON MILL RD) FROM SR-147 (N COLLEGE AUSTM-100055865 ST) TO JUST S OF SHELTON LANE IN AUBURN; D & J ENTERPRISES, INC. STPOA-9027(600) LEE CR-97

04-053 2.282 MI WIDENING, PLANING, RESURFACING & TRAFFIC STRIPE ON SR-51 FROM THE OPELIKA CITY LIMITS (MP HSIPM-100058922 111.981) TO THE I-85 OVERPASS (MP 114.263); EAST ALABAMA PAVING COMPANY, INC. STAAM-100058922 STPAA-HSIP-0051(510) LEE SR-51

04-054 8.744 MI WIDENING, RESURFACING AND TRAFFIC STRIPE ON CR-146(MOORE'S MILL RD)FROM THE AUBURN CITY A1RDY-100059568 LIMITS TO THE JUNCTION OF SR-169; EAST ALABAMA PAVING COMPANY, INC. ACOA59568-ATRP(002) LEE CR-146

04-055 5.648 MI PAVEMENT REHAB(PLANING, RESURFACING, G'RAIL TRAFFIC STRIPE) ON I-85 FROM SR-15 (US-29) IM01M-100055985 (EXIT 51, MP 51.072) TO BENT CREEK RD (MP 56.720) IN AUBURN; EAST ALABAMA PAVING COMPANY, INC. IM-I085(340) LEE I-85

04-056 4.127 MI RESURFACING AND TRAFFIC STRIPE ON SR-38 FROM 0.3 MI W OF THE WAVERLY PARKWAY TO THE NH01M-100058935 JUNCTION OF I-85; EAST ALABAMA PAVING COMPANY, INC NH-038(533) LEE SR-38

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 42 FOURTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 04-057 7.244 MI WIDENING, RESURFACING AND TRAFFIC STRIPE ON CR-158 FROM THE JUNCTION OF CR-183 TO THE A1RDY-100059567 JUNCTION OF CR-379; EAST ALABAMA PAVING CO. INC. ACAA59567-ATRP(002) LEE CR-158

04-058 2.734 MI RESURFACING AND TRAFFIC STRIPE ON CR-391 FROM THE OPELIKA CITY LIMITS TO US-280/431; AOST1-00056630 EAST ALABAMA PAVING COMPANY, INC. STPOA-4114(200) LEE CR-391

04-059 2.431 MI WIDENING, RESURFACING & TRAFFIC STRIPE ONCR-208 FROM THE RUSSELL CO LINE TO THE JUCTION OF STPCE-100056627 CR-240; ROBINSON PAVING COMPANY, INC. STPCL-100056627 STPPC-8034(600) LEE CR-208

04-060 3.846 MI RESURFACING AND TRAFFIC STRIPE ON CR-65 FROM CR-61 TO CR-59 SOUTHWEST OF OMAHA; A1RDY-100058435 GARY INGRAM GRADING & PAVING, INC. ACNU58435-ATRP(001) RANDOLPH

04-066 9.374 MI RESURFACING, WIDENING AND TRAFFIC STRIPE ON SR-48 FROM THE CITY OF WOODLAND (MP 24.947) TO HSIPM-100058918 THE ALABAMA/GEORGIA STATE LINE; GARY INGRAM GRADING & PAVING, INC STAAM-100058918 STPAA-HSIP-0048(503) RANDOLPH SR-48 24AC1-00058918

04-070 0.905 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON AIRPORT RD FROM CR-61 (SUMMERVILLE RD) TO A1RDY-100057910 RIVERCHASE DR IN PHENIX CITY; ROBINSON PAVING COMPANY, INC. ACAA57910-ATRP(001) RUSSELL

04-071 4.459 MI WIDENING, LEVELING, RESURFACING & TRAFFICSTRIPE ON CR-41 (BOSWELL RD) FROM CR-28 (SANDFORT STNUM-100061403 RD) TO SR-169 IN CRAWFORD; EAST ALABAMA PAVING COMPANY, INC. STPNU-5723(201) RUSSELL CR-41

04-072 6.655 KM RESURFACING AND TRAFFIC STRIPEON U.S.#431 (SR#1) FROM KM 173.445 TO KM 180.100 IN PHENIX 99403-100034094 CITY ( EAST ALABAMA PAVING CO., INC. ) 99-304-576-001-704 RUSSELL US#431

04-073 & ACNU58437-ATRP(002); 15.035 MI RESURFACING & TRAFFIC STRIPE ON CR-4(COTTONTON RD)FROM THE PITTS A1RDY-100058438 VIEW HGWAY TO SR-165 IN COTTONTON; CR-4 (PRUDENCE RD)FROM CR-49 TO SR-1;EAST ALABAMA PAVING CO. INC A1RDY-100058437 ACNU58438-ATRP(001) RUSSELL CR-4

04-074 6.086 MI RESURFACING & TRAFFIC STRIPE ON SR-51 FROM 0.14 MI S OF CR-164 TO THE LEE CO LINE; STAAM-100060709 EAST ALABAMA PAVING COMPANY, INC. STPAA-0051(511) RUSSELL SR-51

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 43 FOURTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 04-075 & LEE; 5.745 MI PLANING, SAFETY WIDENING, RESURF. & TRAFFIC STRIPE ON SR-169 FROM THE INTERSECTION HS31M-100060711 SR-8(US-80) TO JUST W OF CR-175; EAST ALABAMA PAVING COMPANY, INC. STAAM-100060711 STPAA-HSIP-0169(501) RUSSELL SR-169

04-076 2.409 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-8(US-80)FROM SR-1(US-431)TO THE GEORGIA NH01M-100060726 STATE LINE; EAST ALABAMA PAVING COMPANY, INC. NH-0008(576) RUSSELL SR-8

04-080 0.209 MI SINK HOLE REMEDIATION ON SR-21 AT MP 225.000 AT MARDISVILLE; NEWELL ROADBUILDERS, INC. L24AC-100060014

ERPR-8970(900) TALLADEGA SR-21

04-081 5.047 MI MICRO-MILLING, WIDENING, RESURFACING & TRAFFIC STRIPE ON SR-4 (US-78) FROM SR-77 TO THE HSIP1-00058944 TALLADEGA/CALHOUN CO LINE; MCCARTNEY CONSTRUCTION COMPANY, INC. HSPR1-00058944 EB-HSIP-0004(538) TALLADEGA SR-4 EBSPE-100058944

04-082 3.229 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-21 FROM CR-511 TO COUNTRY CLUB DRIVE IN NH01M-100053207 SYLACAUGA; DUNN CONSTRUCTION COMPANY, INC. NHSP1-00053207 NH-0021(544) TALLADEGA SR-21 NH04R-100053207

04-083 5.861 MI RESURFACING AND TRAFFIC STRIPE ON CR-399 (SPEEDWAY BLVD) FROM SR-77 TO THE RIGHTS OF WAY A1RDY-100058449 (ROW) OF I-20 (EXIT 173 IN TALLADEGA); MCCARTNEY CONSTRUCTION COMPANY, INC. ACNU58449-ATRP(001) TALLADEGA CR-399

04-084 0.246 MI SIDEWALK IMPROVEMENTS, SIGNING & STRIPINGON ASTRID PLACE, JOHNSON ST AND NORMAN C. WOODS ST SRIE1-00058861 FROM SOUTH ST EAST TO COFFEE ST EAST IN TALLADEGA;TRIPLE J CONSTRUCTION, LLC SRTS-SR13(909) TALLADEGA

04-085 3.305 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-4 (US-78) FROM JUST W OF CR-207 TO JUST E OF STAAM-100060708 SR-77 IN LINCOLN; MCCARTNEY CONSTRUCTION COMPANY, INC. STPAA-0004(540) TALLADEGA SR-4

04-086 3.655 MI. ADDITIONAL LANES (GRADE, DRAINAGE, PAVEMENT AND BRIDGES) ON I 20 FROM WEST OF IM04L-100033401 THE COLDWATER INTERCHANGE (MP 128.34) TO MP 182.09 NEAR OXFORD (MCCARTNEY CONST.) NH04L-100033401 IM-ACNHF-I020(332) TALLADEGA I 20

04-087 1.809 MI RESURFACING, TRAFFIC STRIPE & GUARDRAIL INSTALLATION ON CR-511(OLD BIRMINGHMAM HIGHWAY) STNUM-100061863 FROM THE RIGHT-OF-WAY OF SR-38(US-280)TO APPROX 270 FT E OF AL AVE IN SYLACAUGA;GARY INGRAM GRADIN STPNU-6114(250) TALLADEGA CR-511

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 44 FOURTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 04-088 1.919 MI RESURF & TRAFF STRIPE ON CR-002 FROM 0.211 MI SW OF CR-246(HILL RD)TO SR-38(US-280) IN A1RDY-100059430 SYLACAUGA; DUNN CONSTRUCTION COMPANY, INC. ACOA59430-ATRP(001) TALLADEGA CR-002

04-090 6.003 MI RESURFACING AND TRAFFIC STRIPE ON CR-6 (MACEDONIA RD) FROM THE JUNCTION OF SR-14 IN A1RDY-100061061 TALLASSEE TO THE JUNCTION OF SR-49; GARY INGRAM GRADING & PAVING, INC. ACNU61061-ATRP(001) TALLAPOOSACR-6

04-091 3.116 MI PLANING, SAFETY WIDENING, RESURFACING & TRAFFIC STRIPE ON SR-22 FROM THE E END OF THE HSIPM-100058933 BRIDGE OVER ELKAHATCHEE CREEK TO SR-38 (US-280) INALEXANDER CITY; GARY INGRAM GRADING & PAVING, INC. STAAM-100058933 STPAA-HSIP-0022(520) TALLAPOOSASR-22

04-092 4.619 MI RESURFACING AND TRAFFIC STRIPE ON SR-49 FROM THE INTERSECTION OF SR-22 IN NEW SITE TO THE STAAM-100058931 CLAY CO LINE; CHARLES E. WATTS, INC. STPAA-0049(504) TALLAPOOSASR-49

04-093 9.093 MI PLANING, SAFETY WIDENING, RESURFACING & TRAFFIC STRIPE ON SR-49 FROM SR-50 TO THE JUNCTION S30AC-100060718 OF S BROADNAX ST IN DADEVILLE; GARY INGRAM GRADING& PAVING, INC. 24AC1-00060718 STPAA-HSIP-0049(505) TALLAPOOSASR-49 HSIPM-100060718

04-094 4.696 MI FULL DEPTH RECLAMATION, RESURF & TRAFF STRIPE ON CR-10(MARTIN LUTHER KING ST)FROM THE NUST1-00062177 JUCTION OF SR-50 IN CAMP HILL TO THE CHAMBERS CO LINE; CHRIS CLARK GRADING AND PAVING, INC. STNUM-100062177 STPNU-6213(250) TALLAPOOSACR-10

04-097 4.952 MI RESURFACING & TRAFFIC STRIPE ON SR-49 FROM MACON COUNTY LINE TO SR-14 SOUTH OF REELTOWN; 99403-100053196 (CHARLES E. WATTS, INC.) 99-304-621-049-101 TALLAPOOSA

04-100 1.155 MI RELOCATION (GRADE, DRAINAGE, PAVEMENT ANDBRIDGE CULVERT) ON SR-63 FROM ELMORE CO LINE TO STOAL-100050258 SOUTH OF 0.Z. HALL ROAD; (REID CONSTRUCTION COMPANY, INC.) STPOA-0063(500) TALLAPOOSA

04-101 3.809 MI PAVEMENT RUBBLIZATION AND LANE ADDITION ON I-20 FROM E OF CR-49 TO THE GEORGIA STATE LINE; IM01M-100056062 MIDSOUTH PAVING, INC. NH01M-100056062 IM-NHF-I020(341) CLEBURNE I-20

04-102 3.342 MI RESURFACING AND TRAFFIC STRIPE ON CEDAR SPRINGS RD FROM ALEXANDRIA-JACKSONVILLE HIGHWAY TO STNUE-100057410 CEDAR SPRINGS DR; MIDSOUTH PAVING, INC. STPNU-0814(250) CALHOUN

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 45 FOURTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 04-103 3.251 MI FULL DEPTH RECLAMATION, RESURFACING AND TRAFFIC STRIPE ON CR-47 FROM THE JUNCTION OF CR-54 STNU1-00062176 IN AUBURN TO THE INTERSECTION OF SR-51; CHRIS CLARK GRADING AND PAVING, INC. STNUM-100062176 STPNU-4113(250) LEE CR-47

04-104 & STPOA-9032(601);1.337 MI RESURFACING AND TRAFFICSTRIPE ON CHEWACLA DR/S ROSS ST AND ON BENTCREEK AOST1-00059967 RD; D & J ENTERPRISES, INC. AOST1-00059965 STPOA-9023(600) LEE

04-108 0.179 MI STREETSCAPING ON NORTH RAILROAD AVENUE FROM SIXTH STREET TO EIGHTH STREET IN OPELIKA; TCSPL-100057622 WALKER PATTON COMPANY, INC. TCSP-11AL(001) LEE

04-112 7.480 MI. RELOCATION AND ADDITIONAL LANES (BASE AND PAVE) ON SR 1 (US 431) FROM THE EBSPL-100004757 BARBOUR COUNTY LINE TO ONE MILE NORTH OF CR 12 (APAC-SOUTHEAST, INC.) EBF-0001(521) RUSSELL SR 1

04-115 6.290 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR 1 (US 431) FROM SR 4 (US 78) TO SR 21 IN NH04E-100057487 OXFORD; MCCARTNEY CONSTRUCTION COMPANY, INC. NH-0001(574) CALHOUN SR 1

04-118 0.672 MI BRIDGE REPLACEMENT AND APPROACHES ON SR77AT THE NORFOLK-SOUTHERN RAILROAD IN LINCOLN; BROPE-100041408 NEWELL & BUSH, INC. BRF-0077(500) TALLADEGA SR 77

04-121 2.821 MI GRADE, DRAINAGE, BRIDGES & PARTIAL BASE & PAVE ON ANNISTON E BYPASS (SR-192) FROM SOUTH OF STOAC-100039149 LAKE YAHOU TO SR-1 (US-431) AT SAKS; (L&T CONSTRUCTION, INC.) STMOAF-0192(901) CALHOUN

04-123 1.453 MI WIDENING (GRADE, DRAINAGE AND PAVEMENT) ON BYNUM BLVD FROM VICTORY DR IN OXFORD TO TURNER STATO-100058006 RD; MCCARTNEY CONSTRUCTION COMPANY, INC. ST-008-202-005 CALHOUN CR 18

04-124 3.408 MI RESURFACING AND TRAFFIC STRIPE ON CR 5 (OLD PROVIDENCE RD) FROM SR63 IN HACKNEYVILLE TO STOAE-100058607 THE CLAY CO LINE; DUNN CONSTRUCTION CO. INC. STPOA-6226(200) TALLAPOOSACR 5

04-133 0.376 MI SIDEWALK AND PEDESTRIAN BRIDGE ALONG THE OLD PIEDMONT GADSDEN HIGHWAY FROM SR-200 TO FIFTH SRIE1-00055997 AVENUE NORTH IN PIEDMONT; BURNETT CIVIL CONTRACTING, LLC SRTS-SR11(901) CALHOUN

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 46 FOURTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 04-146 0.519 MI BRIDGE REPLACEMENT (BRIDGE CULVERT) AND APPROACHES ON SR-26 AT HATCHECHUBBEE CREEK AND AT BROPE-100003311 HIGH LOG CREEK IN HATCHECHUBBEE; ALEXANDER CONTRACTING COMPANY, INC. BR-0026(501) RUSSELL SR-26

04-149 7.177 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON CR-240 FROM SR-169 TO CR-592 SOUTH OF SMITHS A1RDY-100058416 STATION; EAST ALABAMA PAVING COMPANY, INC. ACNU58416-ATRP(001) LEE CR-240

04-152 3.857 MI WIDENING, RESURFACING AND TRAFFIC STRIPE ON CR-39 (NUCKOLS RD) FROM THE INTERSECTION OF CR- PCST1-00055786 18 (OSWICHEE RD) TO THE INTERSECTION OF CR-24 (BRADLEY RD); EAST ALABAMA PAVING COMPANY, INC. STPCE-100055786 STPPC-5706(202) RUSSELL CR-39 STPCH-100055786

04-153 4.984 MI PLANING, RESURFACING, WIDENING & TRAFFIC STRIPE ON SR-9 FROM MP 238.243 TO THE CHEROKEE CO HSIPM-100058919 LINE IN PIEDMONT; APAC MID-SOUTH, INC. STAAM-100058919 STPAA-HSIP-0009(551) CALHOUN SR-9

04-160 0.927 MI RESURFACING, SIGNALS, WIDENING & CULVERT REPLACEMENT ON MOORES MILL RD FROM SAMFORD AVE TO A1RDY-100058413 761 FEET E OF DEAN RD IN AUBURN; D & J ENTERPRISES, INC. ACOA58413-ATRP(001) LEE

04-162 8.157 MI RESURFACING, SAFETY WIDENING AND TRAFFIC STRIPE ON SR-22 FROM THE COOSA RIVER TO W OF HSIPM-100058915 PROCTOR CREEK THROUGH KELLYS CROSSROADS; GARY INGRAM GRADING & PAVING, INC. STNUM-100058915 STPNU-HSIP-0022(518) COOSA SR-22

04-164 1.622 MI WIDENING, RESURFACING AND TRAFFIC STRIPE ON CR-246 FROM THE INTERSECTION OF CR-295 TO THE STAAM-100059953 INTERSECTION OF CR-298 IN SMITHS STATION; EAST ALABAMA PAVING COMPANY, INC. STPAA-8023(600) LEE CR-246

04-165 & ST-008-021-004; & CALHOUN CO; 4.478 MI ADDITIONALANES (GRADE, DRAIN, PAVEMENT, BRIDGE & SIGNALS) STAAE-100033440 ON I20 FROM W OF THE HJ BENTLEY PKWY BRIDGE TO E OF THE SNOW CREEK BRIDGE IN OXFORD; MCCARTNEY CONS BROPE-100033440 IM-STPAAF-BRF-I020(333) TALLADEGA I 20 STATE-100052635

04-166 1.604 MI INTERCHANGE (GRADE, DRAINAGE, PAVEMENT, SIGNING & BRIDGE) ON I-85 AT CR-10 (BEEHIVE RD) AOST -100041200 AT THE AUBURN TECHNOLOGY PARK; (W.S. NEWELL & SONS, INC.) HPPL1-100041200 HPP-IM-STPOA-I085(311) LEE

04-167 5.939 MI RESURFACING AND TRAFFIC STRIPE ON CHOCCOLOCCO RD (CR-55) FROM SCARBOROUGH LANE TO A1RDY-100058365 THE JUNCTION OF SR-9; MCCARTNEY CONSTRUCTION CO., INC. ACNU58365-ATRP(001) CALHOUN

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 47 FOURTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 04-168 10.360 MI PARTIAL GRADE & DRAIN, PAVEMENT AND LANDFILL REMOVAL ON EXTENSION OF SR-275 FROM SR-77 STOAE-100009127 TO SR-21 IN TALLADEGA; (DUNN CONSTRUCTION CO., INC.) STPOA-0275(502) TALLADEGA

04-169 6.951 MI RESURFACING, GRADE, DRAINAGE IMPROVEMENTS& TRAFFIC STRIPE ON COLEY CREEK RD, SCOTT RD & A1RDY-100058504 SUNNY LEVEL CUTOFF AS INDICATED IN THE PLANS IN ALEXANDER CITY; GARY INGRAM GRADING & PAVING, INC. ACOA58504-ATRP(001) TALLAPOOSA

04-174 1.510 MI BRIDGE REPLACEMENT & APPROACHES ON SR-22 AT HILLABEE CREEK EAST OF ALEXANDER CITY; BROPE-100041383 (RACON, INC.) STOAE-100041383 STPOA-BR-0022(507) TALLAPOOSA

04-181 2.132 MI BRIDGE REPLACEMENTS & APPROACHES ON SR-74(US-278) FROM NANCES CREEK INDUSTRIAL BLVD. IN BROPE-100041384 PIEDMONT TO NEAR THE CHEROKEE COUNTY LINE; (MCINNIS CONSTRUCTION, LLC) BRF-0074(526) CALHOUN

04-190 7.983 MI PAVEMENT REHABILITATION & ADDITIONAL LANEON I-20 FROM SNOW CREEK BRIDGE (MP 185.82) IN ACR05-100045422 OXFORD TO CLEBURNE CO LINE; (APAC MID-SOUTH, INC.) ACR01-100045422 IM-NHF-I020(327) CALHOUN

04-192 0.468 MI ACCESS MANAGEMENT (GRADE, DRAINAGE AND PAVEMENT) ON SR-21 FROM PLAZA LANE TO US-78 IN STATE-10052631 OXFORD; (TAYLOR CORPORATION) ST-008-021-006 CALHOUN

04-193 2.723 MI PLANING, RESURFACING, TRAFFIC STRIPE & DRAINAGE IMPROVEMENTS ON SR-22/SR-63 FROM SR/38/ 99403-100055614 US-280 (MP 114.565) TO MP 31.053 (SR-63) ALEXANDERCITY; (GARY INGRAM GRADING & PAVING, INC.) 99-304-621-063-102 TALLAPOOSA

04-194 1.859 MI ADDITIONAL LANES (GRADE, DRAIN, PAVE AND BRIDGE WIDENING) ON I-20 FROM W OF TALLAPOOSA RIV ACR05-100056060 EAST OF HEFLIN TO EAST OF CR-49); (APAC MID-SOUTH, INC.) IM04E-100056060 IM-NHF-I020(340) CLEBURNE

04-196 3.068 MI ROADWAY LIGHTING ON SR-1 (US-431) FROM N OF SR-8 (US-80) IN PHENIX CITY TO LEE COUNTY LINE; NH04E-100053675 (WEBSTER ELECTRIC CO., INC.) NH-0001(560) RUSSELL

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACBRZ58388-ATRP(001) CALHOUN 11.75 % 04-001 CARCEL & G. 258,939 75 W 067 100 01-21-14 311,967 35,002.86 297,780 0 53,029 53,029

STPOA-7449(600) CALHOUN 7.46 % 04-002 APAC MID-SOUT 571,905 50 W 044 100 07-14-14 501,722 52,438.41 702,108 0 0 0

NHF-0901(500) CALHOUN SR-901 2.21 % 04-003 MCCARTNEY CON 12,216,431 305 W 029 017 07-31-15 2,223,793 400,189.19 18,063,253 0 0 0

STPOA-7406(600) CALHOUN 22.35 % 04-004 JERRY DOSS CO 628,993 90 W 086 100 08-08-13 604,117 183,723.13 821,933 0 0 0

IM-I020(345) CALHOUN I-20 0.78 % 04-005 TEMPLE ELECTR 614,212 1915 D 000 000 00-00-00 0 8,404.29 1,071,437 0 0 0

NH-0001(569) CALHOUN SR-1 0.25 % 04-006 MIDSOUTH PAVI 3,018,821 100 W 009 001 05-29-15 74,681 8,775.27 3,415,642 0 0 0

HSIP-0009(537) HSIP-CN10(914) CALHOUN 9.46 % 04-007 MCCARTNEY CON 1,947,059 70 W 101 100 10-30-13 2,087,477 236,005.18 2,493,687 7,500 140,418 147,918

STPOA-7429(600) CALHOUN CR-494 2.03 % 04-008 MCCARTNEY CON 276,276 30 W 047 100 08-26-14 274,805 7,147.56 350,894 0 0 0

NH-HSIP-0074(535) CALHOUN SR-74 0.35 % 04-009 MCCARTNEY CON 2,767,363 65 W 000 000 00-00-00 0 13,482.30 3,786,139 0 0 0

ACBRZ55194-ATRP(001) CHAMBERS CR-11 10.25 % 04-011 F & W CONSTRU 776,865 90 W 101 100 11-06-13 749,623 87,646.88 854,552 0 -27,242 -27,242

ACNU59560-ATRP(003) CHAMBERS CR-211 0.04 % 04-012 EAST ALABAMA 798,633 45 W 000 000 00-00-00 0 442.26 913,233 0 0 0

ACOA59551-ATRP(001) CHAMBERS 3.27 % 04-013 EAST ALABAMA 1,998,988 60 W 082 098 09-09-14 1,722,603 68,802.77 2,098,939 0 0 0

ACOA59555-ATRP(001) CHAMBERS 3.71 % 04-014 EAST ALABAMA 1,651,400 45 W 098 100 08-27-14 1,556,971 65,502.16 1,761,199 0 0 0

ACNU59557-ATRP(001) CHAMBERS CR-289 0.64 % 04-015 THE MILLER PA 2,934,884 70 W 054 021 10-31-14 609,816 20,927.47 3,248,896 0 0 0

ACNU59563-ATRP(001) CHAMBERS CR-258 3.60 % 04-018 THE MILLER PA 979,912 45 W 053 091 07-31-14 891,398 39,458.31 1,095,128 0 0 0

STPAA-0148(503) CLAY SR-148 3.24 % 04-020 CHARLES E. WA 522,149 30 W 053 100 08-11-14 464,521 24,378.27 752,269 0 0 0

ST-014-888-009 CLAY 25.55 % 04-021 MCCARTNEY CON 1,541,148 150 W 100 100 02-06-14 1,880,437 408,811.04 1,600,000 130,613 208,676 339,289

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

HSIP-STPAA-0077(517) CLAY SR 77 3.53 % 04-022 APAC MID-SOUT 2,565,907 75 W 072 100 01-04-14 2,249,978 113,524.14 3,207,204 4,479 320,408 324,887

ACNU60367-ATRP(002) CLAY CR-5 0.02 % 04-023 GARY INGRAM G 1,404,685 60 W 000 000 00-00-00 0 383.70 1,787,877 0 0 0

STPAA-HSIP-0009(550) CLAY SR-9 11.58 % 04-025 MCCARTNEY 2,239,125 70 W 099 091 08-31-14 2,490,812 264,573.92 2,283,469 0 251,687 251,687

HSIP-STPAA-0049(506) CLAY SR-49 0.00 % 04-026 GARY INGRAM 1,895,690 60 W 055 088 08-30-14 1,746,176 3,729.77 0 0 0 0

99-504-690-000-201 CLEBURNE 8.05 % 04-030 P & H STUCCO 510,182 110 W 055 085 08-31-14 433,093 45,193.18 561,201 0 0 0

ACBRZ58403-ATRP(001) CLEBURNE CR-46 7.03 % 04-031 ALABAMA BRIDG 210,499 45 W 062 100 06-10-14 194,814 17,026.03 242,074 0 0 0

RECA-STPOA-HSIP-0046(504) CLEBURNE SR-46 7.39 % 04-032 MIDSOUTH PAVI 2,528,384 65 W 083 095 08-31-14 2,620,326 47,548.67 643,251 0 0 0

IM-NHF-I020(339) CLEBURNE I-20 4.60 % 04-033 C. W. MATTHEW 29,029,977 115 D 067 075 05-01-15 21,578,434 1,745,450.62 37,934,777 23,101 0 23,101

STPAA-HSIP-0009(554) CLEBURNE SR-9 1.57 % 04-034 MCCARTNEY 3,296,440 80 W 065 064 09-30-14 2,109,453 68,755.85 4,377,051 0 0 0

STPAA-HSIP-0004(537) CLEBURNE SR-4 5.50 % 04-035 APAC MID-SOUT 2,080,665 65 W 097 100 07-17-14 2,337,151 155,947.65 2,831,894 4,356 252,130 256,486

EB-HSIP-0001(566) CLEBURNE 6.38 % 04-036 APAC MID-SOUT 2,787,018 75 W 084 099 06-30-13 2,994,185 222,414.71 3,483,578 3,534 203,632 207,166

STPOA-338(8) CHAMBERS US 29 71.59 % 04-037 SERCON CORP. 87,615 60 W 123 100 06-14-95 100,423 82,331.90 114,990 -37,163 10,971 -26,192

STPNU-HSIP-0046(505) CLEBURNE SR-46 1.79 % 04-038 MIDSOUTH PAVI 1,365,377 50 W 000 000 00-00-00 0 32,357.39 1,804,996 0 0 0

STPAA-0281(501) CLEBURNE SR-281 0.12 % 04-039 MCCARTNEY CON 2,340,745 100 W 000 000 00-00-00 0 3,781.49 3,082,970 0 0 0

ACNU60416-ATRP(001) COOSA CR-5 0.09 % 04-040 DUNN CONSTRUC 672,105 30 W 000 000 00-00-00 0 705.40 728,167 0 0 0

ACNU60415-ATRP(001) COOSA CR-14 0.05 % 04-041 GARY INGRAM 1,069,574 30 W 000 000 00-00-00 0 557.31 1,080,428 0 0 0

ACOA58682-EB-9025(600) LEE 14.19 % 04-050 ROBINSON PAVI 4,331,775 250 W 066 048 03-01-15 2,156,328 748,484.57 5,273,198 58,485 0 58,485

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

NH-0038(532) LEE SR-38 9.66 % 04-051 EAST ALABAMA 2,450,614 70 W 092 100 06-26-14 2,844,629 359,150.50 3,714,105 127,008 267,008 394,016

STPOA-9027(600) LEE CR-97 1.95 % 04-052 D & J ENTERPR 263,035 35 W 097 098 07-01-14 225,260 7,657.37 391,801 2,240 0 2,240

STPAA-HSIP-0051(510) LEE SR-51 19.55 % 04-053 EAST ALABAMA 556,204 35 W 089 100 08-05-14 615,848 181,577.69 928,385 23,674 35,970 59,644

ACOA59568-ATRP(002) LEE CR-146 0.09 % 04-054 EAST ALABAMA 1,271,239 45 W 000 000 00-00-00 0 1,624.84 1,693,003 0 0 0

IM-I085(340) LEE I-85 4.81 % 04-055 EAST ALABAMA 7,528,240 1714 D 070 061 03-17-15 4,885,175 499,955.09 10,373,437 0 0 0

NH-038(533) LEE SR-38 3.28 % 04-056 EAST ALABAMA 2,808,663 85 W 035 074 12-01-14 2,259,954 130,762.70 3,979,606 0 0 0

ACAA59567-ATRP(002) LEE CR-158 0.06 % 04-057 EAST ALABAMA 1,971,412 45 W 000 000 00-00-00 0 1,823.09 2,745,095 0 0 0

STPOA-4114(200) LEE CR-391 0.00 % 04-058 EAST ALABAMA 364,032 45 W 100 100 09-13-13 345,539 .00 0 0 -18,493 -18,493

STPPC-8034(600) LEE CR-208 0.21 % 04-059 ROBINSON PAVI 800,539 45 W 000 000 00-00-00 0 2,267.45 1,036,312 0 0 0

ACNU58435-ATRP(001) RANDOLPH 6.57 % 04-060 GARY INGRAM 551,400 30 W 097 100 11-20-13 584,346 41,665.66 634,110 0 32,946 32,946

STPAA-HSIP-0048(503) RANDOLPH SR-48 8.65 % 04-066 GARY INGRAM 3,588,742 70 W 091 095 08-30-14 3,611,850 305,903.00 3,533,193 0 0 0

ACAA57910-ATRP(001) RUSSELL 16.22 % 04-070 ROBINSON PAVI 183,899 35 W 049 100 07-08-14 166,964 32,817.84 202,289 0 0 0

STPNU-5723(201) RUSSELL CR-41 1.70 % 04-071 EAST ALABAMA 778,590 40 W 063 031 06-30-14 243,745 19,754.11 1,158,046 0 0 0

99-304-576-001-704 RUSSELL US#431 5.61 % 04-072 EAST ALABAMA 999,860 55 W 100 100 06-09-97 951,869 56,608.87 1,008,478 3,375 -47,991 -44,616

ACNU58438-ATRP(001) RUSSELL CR-4 1.60 % 04-073 EAST ALABAMA 1,694,596 45 W 080 093 09-30-14 1,568,779 32,166.48 2,006,583 0 0 0

STPAA-0051(511) RUSSELL SR-51 0.64 % 04-074 EAST ALABAMA 1,420,906 60 W 000 000 00-00-00 0 14,715.59 2,285,878 0 0 0

STPAA-HSIP-0169(501) RUSSELL SR-169 0.63 % 04-075 EAST ALABAMA 1,830,772 60 W 018 001 10-31-14 0 18,675.56 2,933,680 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

NH-0008(576) RUSSELL SR-8 0.12 % 04-076 EAST ALABAMA 1,369,435 45 W 000 000 00-00-00 0 2,674.23 2,151,831 0 0 0

ERPR-8970(900) TALLADEGA SR-21 0.44 % 04-080 NEWELL ROADBU 9,459,831 45 C 100 099 09-01-14 9,776,177 42,865.76 9,624,967 199,023 0 199,023

EB-HSIP-0004(538) TALLADEGA SR-4 2.82 % 04-081 MCCARTNEY CON 1,011,678 40 W 078 100 06-20-14 1,052,035 34,391.73 1,217,145 0 40,356 40,356

NH-0021(544) TALLADEGA SR-21 8.04 % 04-082 DUNN CONSTRUC 1,095,904 50 W 080 100 04-25-14 1,205,643 35,975.61 447,427 3,960 105,779 109,739

ACNU58449-ATRP(001) TALLADEGA CR-399 0.55 % 04-083 MCCARTNEY 2,039,202 60 W 040 025 10-03-14 572,546 14,748.08 2,656,493 0 0 0

SRTS-SR13(909) TALLADEGA 0.00 % 04-084 TRIPLE J CONS 127,235 35 W 089 100 04-25-14 129,395 .00 0 0 2,160 2,160

STPAA-0004(540) TALLADEGA SR-4 10.05 % 04-085 MCCARTNEY 1,885,828 55 W 056 100 08-05-14 1,762,335 255,486.64 2,540,280 0 0 0

IM-ACNHF-I020(332) TALLADEGA I 20 6.08 % 04-086 MCCARTNEY CON 29,157,752 2009 D 100 100 11-10-10 34,115,510 2,225,368.85 36,542,536 225,244 4,765,827 4,991,071

STPNU-6114(250) TALLADEGA CR-511 1.25 % 04-087 GARY INGRAM 448,152 30 W 047 089 09-05-14 365,701 6,452.76 513,443 0 0 0

ACOA59430-ATRP(001) TALLADEGA CR-002 0.16 % 04-088 DUNN CONSTRUC 561,399 30 W 000 000 00-00-00 0 1,064.89 633,630 0 0 0

ACNU61061-ATRP(001) TALLAPOOSA CR-6 0.08 % 04-090 GARY INGRAM 869,662 45 W 000 000 00-00-00 0 753.87 912,779 0 0 0

STPAA-HSIP-0022(520) TALLAPOOSA SR-22 14.19 % 04-091 GARY INGRAM 1,158,756 35 W 089 100 07-31-14 1,196,424 205,636.46 1,448,364 0 37,668 37,668

STPAA-0049(504) TALLAPOOSA SR-49 26.79 % 04-092 CHARLES E. WA 369,742 30 W 060 100 08-04-14 245,990 131,700.09 491,420 0 0 0

STPAA-HSIP-0049(505) TALLAPOOSA SR-49 1.54 % 04-093 GARY INGRAM 2,551,324 70 W 023 001 10-29-14 47,773 9,067.26 586,654 0 0 0

STPNU-6213(250) TALLAPOOSA CR-10 0.00 % 04-094 CHRIS CLARK G 793,922 45 W 000 000 00-00-00 0 .00 969,005 0 0 0

99-304-621-049-101 TALLAPOOSA 4.57 % 04-097 HARLES E. WA 446,907 30 W 043 100 10-31-11 578,861 28,128.69 615,299 0 112,953 112,953

STPOA-0063(500) TALLAPOOSA 14.74 % 04-100 REID CONSTRUC 3,856,802 225 W 175 100 10-23-13 3,852,989 764,677.80 5,185,595 184,506 -188,319 -3,813

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

IM-NHF-I020(341) CLEBURNE I-20 0.04 % 04-101 MIDSOUTH PAVI 25,564,944 420 W 000 000 00-00-00 0 15,994.93 35,520,597 0 0 0

STPNU-0814(250) CALHOUN 0.16 % 04-102 MIDSOUTH PAVI 555,451 30 W 000 000 00-00-00 0 1,208.11 714,506 0 0 0

STPNU-4113(250) LEE CR-47 0.05 % 04-103 CHRIS CLARK G 678,300 40 W 000 000 00-00-00 0 521.06 1,003,534 0 0 0

STPOA-9023(600) LEE 0.00 % 04-104 D & J ENTERPR 415,629 35 W 000 000 00-00-00 0 .00 0 0 0 0

TCSP-11AL(001) LEE 16.27 % 04-108 WALKER PATTON 458,015 75 W 106 100 05-01-14 451,503 85,709.79 526,717 5,276 0 5,276

EBF-0001(521) RUSSELL SR 1 11.68 % 04-112 APAC-SOUTHEAS 17,988,337 450 W 107 100 07-16-13 33,562,014 2,567,850.43 21,973,990 4,498,287 14,782,073 19,280,360

NH-0001(574) CALHOUN SR 1 4.48 % 04-115 MCCARTNEY CON 1,825,827 60 W 100 100 01-22-14 1,804,693 102,418.86 2,282,155 0 -21,133 -21,133

BRF-0077(500) TALLADEGA SR 77 12.59 % 04-118 NEWELL & BUSH 3,156,727 190 W 083 100 07-01-14 3,451,338 562,583.37 4,468,412 102,282 192,329 294,611

STMOAF-0192(901) CALHOUN 6.98 % 04-121 L & T CONSTRU 29,374,688 390 W 165 100 01-07-14 33,724,288 2,520,408.01 36,100,379 387,697 4,274,672 4,662,369

ST-008-202-005 CALHOUN CR 18 6.09 % 04-123 MCCARTNEY 1,686,234 100 W 088 100 01-16-14 1,906,896 365,665.04 6,000,000 -550 221,211 220,661

STPOA-6226(200) TALLAPOOSA CR 5 2.11 % 04-124 DUNN CONSTRUC 577,851 30 W 070 092 10-01-13 532,423 14,549.70 689,443 0 0 0

SRTS-SR11(901) CALHOUN 0.00 % 04-133 BURNETT CIVIL 120,467 60 W 070 100 08-11-14 127,723 .00 0 0 0 0

BR-0026(501) RUSSELL SR-26 18.00 % 04-146 ALEXANDER CON 2,612,622 250 W 052 046 10-31-14 1,458,661 614,575.28 3,414,031 0 0 0

ACNU58416-ATRP(001) LEE CR-240 2.82 % 04-149 EAST ALABAMA 1,694,874 45 W 120 100 10-09-13 1,614,869 55,008.97 1,949,105 0 -80,005 -80,005

STPPC-5706(202) RUSSELL CR-39 5.10 % 04-152 EAST ALABAMA 550,454 30 W 097 100 07-22-14 569,607 21,677.82 424,548 23,750 19,412 43,162

STPAA-HSIP-0009(551) CALHOUN SR-9 7.19 % 04-153 APAC MID-SOUT 1,225,609 40 W 100 100 10-04-13 1,380,972 123,126.92 1,710,531 0 155,363 155,363

ACOA58413-ATRP(001) LEE 5.16 % 04-160 D & J ENTERPR 903,058 120 W 099 100 07-11-14 937,271 50,328.59 974,507 8,148 0 8,148

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPNU-HSIP-0022(518) COOSA SR-22 8.65 % 04-162 GARY INGRAM 1,481,323 45 W 096 100 06-03-14 1,466,205 160,217.29 1,851,550 0 0 0

STPAA-8023(600) LEE CR-246 3.44 % 04-164 EAST ALABAMA 439,899 30 W 090 100 12-18-13 425,177 19,801.53 574,836 0 -14,721 -14,721

IM-STPAAF-BRF-I020(333) TALLADEGA I 20 5.88 % 04-165 MCCARTNEY CON 39,219,883 113 D 100 099 06-01-13 43,812,895 1,776,344.07 30,181,452 493,907 4,366,878 4,860,785

HPP-IM-STPOA-I085(311) LEE 34.25 % 04-166 W.S. NEWELL & 18,255,545 1112 D 100 100 07-22-13 20,453,672 630,209.91 1,840,014 777,951 1,474,059 2,252,010

ACNU58365-ATRP(001) CALHOUN 3.91 % 04-167 MCCARTNEY CON 1,396,780 45 W 084 100 12-09-13 1,386,499 62,956.41 1,606,298 0 -10,281 -10,281

STPOA-0275(502) TALLADEGA 11.80 % 04-168 DUNN CONSTRUC 11,876,709 300 W 095 100 10-23-13 14,217,569 1,832,887.11 15,519,830 283,702 2,172,175 2,455,877

ACOA58504-ATRP(001) TALLAPOOSA 7.64 % 04-169 GARY INGRAM 1,733,375 60 W 097 100 07-25-14 1,648,025 152,305.21 1,993,381 0 0 0

STPOA-BR-0022(507) TALLAPOOSA 22.01 % 04-174 RACON, INC. 6,833,192 270 W 132 100 08-21-13 7,352,720 1,529,413.66 6,947,485 75,992 103,182 179,174

BRF-0074(526) CALHOUN 12.71 % 04-181 MCINNIS CONST 8,392,189 300 W 095 077 11-15-14 6,630,386 1,394,271.53 10,966,451 37,752 0 37,752

IM-NHF-I020(327) CALHOUN 20.33 % 04-190 APAC MID-SOUT 18,913,504 113 D 100 100 07-30-14 25,366,837 1,482,716.56 7,290,962 2,420,139 3,936,044 6,356,183

ST-008-021-006 CALHOUN 0.00 % 04-192 TAYLOR CORPOR 1,531,657 140 W 121 099 11-30-13 1,629,423 .00 0 650 97,116 97,766

99-304-621-063-102 TALLAPOOSA 14.73 % 04-193 GARY INGRAM G 1,530,434 100 W 126 100 10-23-13 1,825,430 304,826.93 2,068,287 47,193 291,977 339,170

IM-NHF-I020(340) CLEBURNE 9.92 % 04-194 APAC MID-SOUT 17,005,411 113 D 098 099 10-31-13 17,960,665 2,206,263.27 22,221,736 0 955,254 955,254

NH-0001(560) RUSSELL 13.20 % 04-196 WESTERN ELECT 1,297,871 180 W 097 100 10-18-13 1,299,039 224,031.94 1,695,987 22,812 -21,644 1,168 DIVISION TOTALS: 397,482,874 355,167,241 440,435,807 10,148,923 39,453,534 49,602,457 29,557,894.51

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 48 FIFTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 05-001 4.214 MI RESURFACING AND TRAFFIC STRIPE ON CR-10 FROM CR-65 THROUGH MARVEL TO SHELBY COUNTY LINE; STOAE-100056260 (WIREGRASS CONSTRUCTIO COMPANY, INC.) STPOA-0417(200) BIBB

05-002 0.214 MI SIDEWALKS AND TRAFFIC CONTROL MARKINGS ALONG FOURTH AVE AND TABERNACLE RD IN BRENT AT SRIL1-00054637 SITES AS INDICATED BY THE PLANS; WALKER PATTON COMPANY, INC. SRTS-SR10(900) BIBB

05-003 6.232 MI RESURFACING AND TRAFFIC STRIPE ON CR-10 (MARVEL RD) FROM THE JUNCTION OF SR-25 TO THE STNUM-100060315 JUNCTION OF CR-65 (BULLDOG BEND RD) N.E. OF PIPER;WIREGRASS CONSTRUCTION COMPANY, INC. STPNU-0417(201) BIBB CR-10

05-004 0.700 MI SAFETY IMPROVEMENTS (PLANING, RESURFACING& TRAFFIC STRIPE) ON SR-5 AT INDUSTRIAL PARK RD IN HPPH1-100053684 WOODSTOCK & AT CR-24 IN WEST BLOCKTON; (APAC MID-SOUTH, INC.) HPPL1-100053684 HPP-A146(901) BIBB

05-005 4.795 MI GRADE, DRAINAGE & BRIDGE CULVERT ON NEW LOCATION OF SR-6 (US-82) FROM EAST OF SR-25 IN NH04E-100004473 CENTREVILLE TO EAST OF CR-20; (RACON, INC.) NHF-0006(530) BIBB

05-006 0.483 MI BRIDGE REPLACEMENT (GRADE, DRAIN, BASE, PAVE & CULVERT) ON SR-6 (US-82) OVER OAKMULGEE BRNM1-00049169 CREEK N OF THE BIBB CO LINE; TOMLIN CONSTRUCTION, LLC BRF-0006(541) BIBB SR-6

05-007 CHILTON, FAYETTE, GREENE, LAMAR, PERRY & PICKENS COUNTIES; BRIDGE PAINTING AT VARIOUS LOCATIONS IN 99005-100057423 THE FIFTH DIVISION AS INDICATED IN THE PLANS; P & H STUCCO & CONSTRUCTION, INC. 99-505-999-950-101 BIBB

05-008 4.796 MI BASE, PAVE & PARTIAL GRADE AND DRAIN ON SR-6 (US-82) FROM E OF SR-25 TO E OF CR-20 IN NH01M-100004472 CENTREVILLE; WIREGRASS CONSTRUCTION COMPANY, INC. NHF-0006(545) BIBB SR-6

05-009 8.111 MI PLANING, SAFETY WIDENING, RESURFACING ANDTRAFFIC STRIPE ON SR-219 FROM THE PERRY CO LINE TO HSIPM-100059139 THE JUNCTION OF SR-6 (US-82) IN CENTREVILLE; WIREGRASS CONSTRUCTION COMPANY, INC. STPAA-HSIP-0219(505) BIBB SR-219

05-010 & IM-HSIPF-I065(431); 27.925 MI GUIDERAIL INSTALL-ATION ON I-65 FROM THE AUTAUGA CO LINE TO THE HSIPM-100057804 SHELBY CO LINE; RMD HOLDINGS, INC. IM01M-100057804 IM-HSIPF-I065(428) CHILTON I-65 HSIPM-100057862 IM01M-100057862

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 49 FIFTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 05-011 0.548 MI BRIDGE REPLACEMENT(GRADE, DRAIN, BASE, PAVE & TRAFFIC STRIPE)ON SR-145 OVER YELLOW LEAF BRSM1-00037654 CREEK; THE BRIDGE BUILDERS OF ALABAMA LLC BR-0145(502) CHILTON SR-145

05-012 6.173 MI RESURFACING, TRAFFIC STRIPE, RUMBLE STRIP& SIGNING ON CR-24 FROM CR-37 TO CR-49 SOUTH OF HSIPR-100052296 CLANTON & ON CR-59 AT CR-24 SW OF CLANTON; (WIREGRASS CONSTRUCTION COMPANY) STOAL-100052296 STPOA-HRRR-1111(201) CHILTON

05-014 4.199 MI RESURFACING AND TRAFFIC STRIPE ON CR-29 FROM SR-3 (US-31) TO CR-48 EAST OF THORSBY; STOAE-100059084 WIREGRASS CONSTRUCTION COMPANY, INC. STPOA-1118(200) CHILTON CR-29

05-015 7.805 MI PLANING, RESURFACING, WIDENING & TRAFFIC STRIPE ON SR-22 FROM THE DALLAS CO LINE TO THE HSIPM-100059131 SR-6(US-82) OVERPASS IN MAPLESVILLE; ASPHALT CONTRACTORS, INC. STNUM-100059131 STPNU-HSIP-0022(517) CHILTON SR-22

05-016 3.616 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-145 FROM JUST E OF SR-3 (US-31) (MP 0.034)TO STAAM-100060689 THE JUNCTION OF I-65 (MP 3.677) IN CLANTON; DUNN CONSTRUCTION COMPANY, INC. STPAA-0145(505) CHILTON SR-145

05-017 8.011 MI PLANING, RESURFACING AND TRAFFIC STRPE ON SR-6 (US-82) FROM THE BIBB COUNTY LINE THROUGH HSIPE-100053171 MAPLESVILLE TO EAST OF MULBERRY CREEK (MP 106.885)ASPHALT CONTRACTORS, INC. NH01M-100053171 NH-HSIP-0006(544) CHILTON SR-6

05-018 1.403 MI RESURF, GUARDRAIL, CULVERT REPLACEMENT & STRIPING ON CR-28 (LAKE MITCHELL RD) FROM NELL ST A1RDY-100058411 TO JUST W OF I-65; CHILTON CONTRACTORS, INC. ACNU58411-ATRP(001) CHILTON CR-28

05-019 7.061 MI RESURFACING AND TRAFFIC STRIPE ON CR-59 FROM THE CSX RAILROAD W RIGHT OF WAY LIMITS IN A1RDY-100058473 VERBENA TO CR-24; WIREGRASS CONSTRUCTION CO. INC. ACNU58473-ATRP(001) CHILTON CR-59

05-020 10.870 MI SAFETY WIDENING, RESURFACING AND TRAFFICSTRIPE ON SR-171 FROM THE TUSCALOOSA CO LINE TO STAAM-100060685 0.158 MI NORTH OF SR-159; S. T. BUNN CONSTRUCTION COMPANY, INC. HS31M-100060685 STPAA-HSIP-0171(512) FAYETTE SR-171

05-021 6.471 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-129 FROM NEAR HUBBERTVILLE (MP 7.200) TO STOAE-100057138 SR-233 AT THE MARION COUNTY LINE; S.T. BUNN CONSTRUCTION COMPANY, INC. STPOA-0129(503) FAYETTE SR-129

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 50 FIFTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 05-022 0.085 MI SLIDE CORRECTION & STRUCTURE REPLACEMENT ON CR-26 APPROXIMATELY 1.96 MI S OF SR-18 (US-43) STNUM-100062137 E OF FAYETTE; CORNERSTONE CIVIL CONTRACTORS, LLC STPNU-2914(250) FAYETTE CR-26

05-023 12.255 MI; RESURFACING, WIDENING & TRAFFIC STRIPE ON SR-159 FROM THE PICKENS CO LINE TO THE JUNCTION HSIPM-100059134 OF SR-171; S.T. BUNN CONSTRUCTION COMPANY, INC. STNUM-100059134 STPNU-HSIP-0159(500) FAYETTE SR-159

05-030 MAINTENANCE ROADSIDE MOWING ON I-59 FROM SUMTER COUNTY LINE TO TUSCALOOSA COUNTY LINE; 99054-100056101 (SALAZAR CONTRACTING, LLC) 99-405-323-659-111 GREENE

05-031 0.045 MI BRIDGE REPLACEMENTS (2 CULVERTS) AND APPROACHES ON KIRKWOOD DR AT WILLOW CREEK & ON BRDH -100047204 CLARK DRIVE AT UNNAMED CREEK IN EUTAW; (GLASGOW CONSTRUCTION CO., INC.) BRD-3200(204) GREENE

05-032 & STPNU-3201(201); 15.454 MI RESURFACING AND TRAFFIC STRIPE ON CR-20 FROM CR-72 THROUGH BOLIGEE A1RDY-100058477 TO CR-117; S.T. BUNN CONSTRUCTION COMPANY, INC. STNUM-100056497 ACNU58477-ATRP(001) GREENE CR-20

05-033 3.800 MI RESURFACING & TRAFFIC STRIPE ON CR-60 FROM CR-183 AT MORROWS GROVE TO CR-208 AT MANTUA; EBSPE-100054697 (S.T. BUNN CONSTRUCTION CO., INC.) EB-3215(201) GREENE

05-034 0.300 MI INFRASTRUCTURE IMPROVEMENTS (SIDEWALK IMPROVEMENTS) ALONG ELM ST, OLIVER AVE & ON SR-13 SRIE1-00058797 (US-43) IN EUTAW; TRIPLE J CONSTRUCTION, LLC SRTS-SR13(910) GREENE

05-035 7.399 MI RESURFACING & TRAFFIC STRIPE ON CR-131 FROM CR-20 TO THE EUTAW CITY LIMIT; STOAE-100057125 (S.T. BUNN CONSTRUCTION CO., INC.) STPOA-3204(200) GREENE

05-036 0.020 MI. BRIDGE REPLACEMENTS (BRIDGE CULVERT & PRECAST BRIDGE) ON CR#208 AT A BRUSH CREEK TRIBUTARY GRBN1-100041369 & AT A TRUSSELS CREEK TRIBUTARY NORTH OF UNION. ( WARRIOR CONSTRUCTORS, INC. ) ACGBBR-3260(200) GREENE CR#208

05-037 10.599 MI WIDENING, RESURFACING AND TRAFFIC STRIPEON CR-208 FROM THE N RIGHT-OF-WAY LIMITS OF THE A1RDY-100059368 I-20/I-59 INTERCHANGE TO THE INTERSECTION OF CR-60S. T. BUNN CONSTRUCTION COMPANY, INC. ACNU59368-ATRP(001) GREENE CR-208

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 51 FIFTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 05-038 28.060 MI MAINTENANCE ROADSIDE MOWING ALONG I-59 FROM THE SUMTER COUNTY LINE TO THE TUSCALOOSA CO 99054-100053018 LINE; (COOK CONTRACTORS, INC.) 99-405-323-659-911 GREENE

05-039 14.673 MI WIDENING, RESURFACING AND TRAFFIC STRIPEON CR-181 FROM THE SR-14 INTERCHANGE TO THE A1RDY-100059388 PICKENS COUNTY LINE; S. T. BUNN CONSTRUCTION COMPANY, INC. ACNU59388-ATRP(001) GREENE CR-181

05-042 3.998 MI; PLANING, WIDENING, RESURFACING & TRAFFICSTRIPE ON SR-14 FROM W OF CR-21 (MP 64.990) TO E HSIPM-100059136 OF SR-61 (MP 68.988) IN GREENSBORO; S.T. BUNN CONSTRUCTION COMPANY, INC. STNUM-100059136 STPNU-HSIP-0014(531) HALE SR-14

05-043 7.920 MI FULL DEPTH RECLAMATION, RESURFACING AND TRAFFIC STRIPE ON CR-2 FROM THE MARENGO CO LINE TO STNUM-100060028 THE JUNCTION OF SR-69; THE MILLER PAVING GROUP, INC. STPNU-3300(211) HALE CR-2

05-050 1.327 MI SIDEWALKS, CROSSWALKS & SIGNING ALONG WOLF RD, VALLEY RD, MARY LOU ST, PAUL ST, BROWN ST SRIE1-00055106 & CREST RD IN SULLIGENT AT SITES AS INDICATED BY THE PLANS; GLASGOW CONSTRUCTION CO., INC. SRTS-SR09(925) LAMAR

05-051 2.804 MI PLANING, SAFETY WIDENING, RESURFACING ANDTRAFFIC STRIPE ON SR-96 FROM MP 18.740 TO W OF THE S30AC-100059137 FAYETTE CO LINE (MP 21.545); S. T. BUNN CONSTRUCTION COMPANY, INC. 24AC1-00059137 STPAA-HSIP-0096(504) LAMAR SR-96 HSIPM-100059137

05-053 12.154 MI RESURFACING & TRAFFIC STRIPE ON CR-35 FROM THE INTERSECTION OF SR-17 TO THE MARION CO A1RDY-100058485 LINE; S. T. BUNN CONSTRUCTION COMPANY, INC. ACNU58485-ATRP(001) LAMAR CR-35

05-054 0.150 MI BRIDGE REPLACEMENT (PRECAST) & APPROACHESON CR-49 AT HELL'S CREEK NE OF KINGVILLE; A1BR1-00058483 GLASGOW CONSTRUCTION COMPANY, INC. ACBR58483-ATRP(001) LAMAR CR-49

05-055 1.000 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-18 FROM 10TH ST TO THE JUNCTION OF SR-17 IN STAAM-100059141 VERNON; S. T. BUNN CONSTRUCTION COMPANY, INC. STPAA-0018(504) LAMAR SR-18

05-056 12.799 MI LEVELING, RESURFACING AND TRAFFIC STRIPEON CR-49 FROM THE INTERSECTION OF CR-36 TO THE A1RDY-100058489 INTERSECTION OF CR-16 THROUGH BEAVERTON; S. T. BUNN CONSTRUCTION COMPANY, INC. ACNU58489-ATRP(001) LAMAR CR-49

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 52 FIFTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 05-057 7.959 MI SAFETY WIDENING, RESURFACING AND TRAFFIC STRIPE ON SR-118 FROM THE TOWN LIMITS OF CREWS TO HS31M-100060692 THE MARION COUNTY LINE; S. T. BUNN CONSTRUCTION COMPANY, INC. RECAM-100060692 RECA-HSIP-0118(510) LAMAR SR-118

05-058 0.089 MI BRIDGE REPLACEMENT ON CR-172(STEEDLEY RD)OVER MUD CREEK; GLASGOW CONSTRUCTION COMPANY, INC. BROFM-100061871

BRZ-3800(213) LAMAR CR-172

05-060 4.900 MI FULL DEPTH RECLAMATION, RESURFACING AND TRAFFIC STRIPE ON CR-23 FROM SR-183 TO CR-24 WEST EBSPE-100056313 OF MARION; (THE MILLER GROUP, INC.) EB-5307(200) PERRY

05-061 5.247 MI FULL DEPTH RECLAMATION, RESURFACING, GUARDRAIL REPLACEMENT & TRAFFIC STRIPE ON CR-20 A1RDY-100058492 FROM THE HALE CO LINE TO THE JUNCTION OF CR-23; THE MILLER PAVING GROUP, INC. ACNU58492-ATRP(010) PERRY CR-20

05-067 3.699 MI RESURFACING AND TRAFFIC STRIPE ON CR-24 FROM CR-23 TO SR-14 WEST OF MARION; STOAE-100058609 ASPHALT CONTRACTORS, INC. STPOA-5307(201) PERRY CR 24

05-069 (206) 0.083 MI. BRIDGE REPLACEMENTS ( 1 BRIDGE CULVERT & 3 PRECASTS) ON VARIOUS COUNTY ROADS GRBN1-100044902 AS INDICATED ON THE PLANS (GLASGOW CONSTRUCTION CO.,INC.) GRBN1-100044903 ACGBBRZ-3300(203)(204)(205) HALE VARIOUS GRBN1-100044904 GRBN1-100044905

05-070 7.126 MI RESURFACING, TRAFFIC STRIPE & GUARDRAIL INSTALLATION ON CR-35 FROM SR-86 IN CARROLLTON TO STNUM-100060060 0.217 MI SOUTH OF CR-37; S.T. BUNN CONSTRUCTION COMPANY, INC. STPNU-5408(201) PICKENS CR-35

05-071 9.963 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR14 FROM N OF SR86 (MP 9.297) IN PICKENSVILLE HSIPE-100057137 TO SR17; S.T. BUNN CONSTRUCTION CO. INC. L03AC-100057137 RECA-HSIP-0014(527) PICKENS SR 14 RECAE-100057137

05-072 4.363 MI RESURFACING AND TRAFFIC STRIPE ON CR-4 FROM SR-159 AT GORDO TO THE TUSCALOOSA CO LINE; A1RDY-100058493 S.T. BUNN CONSTRUCTION COMPANY, INC. ACNU58493-ATRP(001) PICKENS CR-4

05-073 11.761 MI RESURFACING AND TRAFFIC STRIPE ON CR-2 FROM SR-14 SOUTH OF ALICEVILLE TO CR-63 STNUL-100050334 ST BUNN CONSTRUCTION CO., INC., 1904 UNIVERSITY BLVD., TUSCALOOSA, AL 35401 STPNU-5404(201) PICKENS CR-63

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 53 FIFTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 05-074 0.466 MI SIDEWALKS, CROSSWALKS AND SIGNING ALONG 4TH ST SW, 7TH AVE SW AND 10TH AVE SW IN REFORM AT SRIE1-00052486 SITES AS INDICATED BY THE PLANS; BURNETT CIVIL CONTRACTING, LLC SRTS-SR09(908) PICKENS 4TH ST

05-078 4.993 MI FULL DEPTH RECLAMATION, RESURFACING AND TRAFFIC STRIPE ON CR-85 FROM SUMTER CO LINE TO STNUC-100054347 SR-17 NEAR COCHRANE; (S.T. BUNN CONSTRUCTION COMPANY, INC.) STMNU-RECA-5422(200) PICKENS

05-080 45.515 MI MAINTENANCE ROADSIDE MOWING ALONG I-59 FROM THE GREENE CO LINE TO THE JEFFERSON CO LINE; 99054-100053016 (BENTLEY TURN & LANDSCAPE, INC.) 99-405-632-659-911 TUSCALOOSA

05-081 0.010 MI BRIDGE REPLACEMENT ON CR-238 (HARGROVE RD) OVER LYE BRANCH; MSE BUILDING COMPANY, INC. BROFM-100060306

BRZ-6300(220) TUSCALOOSACR-238

05-082 0.302 MI SAFETY WIDENING, RESURFACING AND TRAFFIC STRIPE ON SR-216 (INTERSECTION IMPROVEMENTS AT HPPH1-100052878 CONNIE DR IN LAKEVIEW); E. O. BYARS CONSTRUCTION, INC. HPPL1-100052878 HPP-0216(502) TUSCALOOSASR-216

05-083 0.094 MI SLIDE REPAIR ON I-20/59 AT MP 80.100 IN TUSCALOOSA; W. S. NEWELL & SONS, INC. IM01M-100061607

IM-I059(374) TUSCALOOSAI-20/59

05-084 0.207 MI BRIDGE REPLACEMENT ON OLD JASPER RD AT GIN BRANCH NORTH OF SAMANTHA; RACON, INC. BROFR-100054006

BRZ-6300(219) TUSCALOOSAJASPER

05-085 SLIDE REPAIR ON I-20/59 AT MP 79.700 AND MP 80.900IN TUSCALOOSA; W. S. NEWELL & SONS, INC. IM01M-100061606

IM-I059(373) TUSCALOOSAI-20/59

05-086 0.094 MI; SLIDE REPAIR ON I-20/59 AT MP 78.300 IN TUSCALOOSA; CHILTON CONTRACTORS, INC. IM01M-100061605

IM-I059(372) TUSCALOOSAI-20/59

05-087 4.356 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-6 (US-82) FROM W OF SR-13 (US-43)(MP 44.790) NH01M-100059045 IN NORTHPORT TO RICE MINE RD (MP 49.146); S.T. BUNN CONSTRUCTION COMPANY, INC. NH-0006(553) TUSCALOOSASR-6

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 54 FIFTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 05-088 DYNAMIC MESSAGE SIGNS AT VARIOUS LOCATIONS IN TUSCALOOSA & NORTHPORT AS INDICATED ON THE PLANS. IT58 -100039486 ( TOOMER ELECTRICAL CO., INC. ) ITS-9801(103) TUSCALOOSA SITES

05-089 0.387 MI BRIDGE REPLACEMENT AND APPROACHES ON SR- 216 OVER DAVIS CREEK AT ABERNANT; BROPE-100013143 (MCINNIS CONSTRUCTION, LLC) BR-7920(600) TUSCALOOSA

05-090 BRIDGE COATING AT VARIOUS BRIDGES ON I-20/59; GULF COAST CONTRACTING, LLC 99005-100060006

99-508-601-059-323 SUMTER

05-091 0.056 MI BRIDGE REPLACEMENT (PRECAST) ON HOPKINS ST OVER UNNAMED TRIBUTARY IN LIVINGSTON; A1RDY-100058472 NEWELL & BUSH, INC. ACNU58472-ATRP(001) SUMTER

05-092 0.146 MI INTERSECTION IMPROVEMENTS (GRADE, DRAIN, PAVE AND SIGNAL) ON SR-69 AT CR-65 (BEAR CREEK RD) HSIPE-100050729 AT TAYLORVILLE; E. O. BYARS CONSTRUCTION, INC. HSIP-0069(517) TUSCALOOSASR-69

05-093 5.075 MI FULL DEPTH RECLAMATION, RESURFACING AND TRAFFIC STRIPE ON CR-85 FROM CR-34 AT WARSAW TO A1RDY-100058474 THE PICKENS COUNTY LINE; S. T. BUNN CONSTRUCTION COMPANY, INC. ACNU58474-ATRP(001) SUMTER CR-85

05-094 8.045 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-17 FROM 0.360 MI N OF I-20/59 TO THE JUNCTION STAAM-100060822 OF SR-28; S. T. BUNN CONSTRUCTION COMPANY, INC. STPAA-0017(553) SUMTER SR-17

05-097 0.022 MI.BRIDGE REPLACEMENTS (2) (BRIDGE CULVERTS) ON OLD MARION ROAD OVER BEAR CK. BRANCH & LITTLE GRBN1-100043351 SANDY CREEK SOUTH OF TUSCALOOSA. ( ECON, INC. ) ACGBBRZ-6300(207) TUSCALOOSAROAD

05-098 0.738 MI INTERCHANGE IMPROVEMENTS (GRADE, DRAINAGEAND PAVEMENT) ON I 59 AT SR 216 W OF BUCKSVILLE; STAAE-100045375 E. O. BYARS CONSTRUCTION, INC IM04E-100045375 IM-STPAAF-I059(338) TUSCALOOSAI 59

05-099 10.030 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR171 FROM N OF CR1861 (BROWNVILLE RD) HSIPE-100053245 (MP 13.600) TO THE FAYETTE CO LINE; S.T. BUNN CONSTRUCTION COMPANY, INC. STAAE-100053245 STPAA-HSIP-0171(510) TUSCALOOSASR171

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 55 FIFTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 05-100 5.977 MI SAFETY WIDENING, RESURFACING AND TRAFFIC STRIPE ON SR-191 FROM THE JUNCTION OF SR-22 TO MP HS31M-100059142 6.000; DUNN CONSTRUCTION COMPANY, INC. STAAM-100059142 STPAA-HSIP-0191(501) CHILTON SR-191 24AC1-00059142

05-101 0.159 MI INTERSECTION IMPROVEMENTS ON SR-3(US-31) AT SR-22 AND SR-145 IN CLANTON; STAAM-100046333 CHILTON CONTRACTORS, INC. STPAA-0003(522) CHILTON SR-3

05-102 5.751 MI SAFETY WIDENING, RESURFACING AND TRAFFIC STRIPE ON SR-22 FROM THE JUNCTION OF SR-139 IN HS31M-100059138 MAPLESVILLE TO MP 58.250; ASPHALT CONTRACTORS, INC. STAAM-100059138 STPAA-HSIP-0022(519) CHILTON SR-22

05-103 0.356 MI INFRASTRUCTURE IMPROVEMENTS (SIDEWALKS) ALONG 26TH AVE, 28TH ST AND MAYFIELD WAY IN SRIE1-00058799 NORTHPORT; CORNERSTONE CIVIL CONTRACTORS, LLC SRTS-SR13(912) TUSCALOOSA26TH AV

05-104 1.476 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-215 (UNIVERSITY BLVD) FROM THE E END OF THE ABS 24AC1-00059140 RAILROAD OVERPASS TO 200 FT N OF BROOKHILL RD; MIDSOUTH PAVING INC. STAAM-100059140 STPAA-0215(502) TUSCALOOSASR-215

05-105 0.283 MI INTERSECTION IMPROVEMENTS ON SR-216 AT CR-60 (ROCKHOUSE RD/WOODLAND LAKE RD) WEST OF HSPR1-00051701 LAKEVIEW; E. O. BYARS CONSTRUCTION, INC. HSIP-0216(501) TUSCALOOSASR-216

05-106 & CHILTON COUNTY; BRIDGE PAINTING ON SR-22 & SR-6 (US-82) AT SITES AS INDICATED IN THE PLANS; 99005-100060437 GULF COAST CONTRACTING, LLC 99-505-690-950-301 TUSCALOOSASR-22

05-107 0.512 MI DRAINAGE, SIDEWALK, PAVEMENT, LIGHTING & SIGNALS ON SR-215 (GREENSBORO AVE) FROM HARGROVE TLSTC-100054000 RD TO 15TH STREET IN TUSCALOOSA; (GFC CONSTRUCTION, INC.) STMOA-CN10(922) TUSCALOOSA

05-108 28.258 MI MICRO-MILLING AND TRAFFIC STRIPE ON I-20/59 FROM THE SUMTER COUNTY LINE TO THE IM01M-100062292 TUSCALOOSA COUNTY LINE; S. T. BUNN CONSTRUCTION COMPANY, INC. IM-I059(379) GREENE I-20/59

05-109 0.560 MI WIDENING, RESURFACING AND REALIGNMENT ON LOOP RD FROM FAIRMONT DR TO WOODLAND RD IN A1RDY-100058494 TUSCALOOSA; DRM UTILITIES, LLC ACOA58494-ATRP(001) TUSCALOOSALOOP RD

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 56 FIFTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 05-110 0.316 MI SIDEWALK IMPROVEMENTS ALONG W AVE AND FORNISS ST IN UNIONTOWN AT SITES AS INDICATED BY SRIL1-00056006 THE PLANS; TRIPLE J CONSTRUCTION, LLC SRTS-SR11(917) PERRY W AVE

05-111 0.007 MI BRIDGE REPLACEMENT ON CR-1323(MOCCASIN BRANCH RD) OVER UNNAMED TRIBUTARY; A1BRZ-100058496 CARTER'S CONTRACTING SERVICES, INC. ACBRZ58496-ATRP(001) TUSCALOOSACR-1323

05-112 8.259 MI WIDENING, RESURFACING AND TRAFFIC STRIPE ON SR-159 FROM N MAIN ST (MP 0.440) IN GORDO TO N S30AC-100059130 OF CR-49 AT MP 8.700; S. T. BUNN CONSTRUCTION CO. INC. 24AC1-00059130 STPAA-HSIP-0159(501) PICKENS SR-159

05-113 6.107 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON I-59(I-20)FROM THE SUMTER CO LINE TO MP 33.400 IM01M-100055572 IN BOLIGEE; S. T. BUNN CONSTRUCTION COMPANY, INC. IM04E-100055572 IM-I059(364) GREENE I-59 IM04R-100055572

05-114 9.296 MI PLANING, WIDENING, RESURFACING & TRAFFIC STRIPE ON SR-14 FROM THE MISSISSIPPI STATE LINE TO HSIPM-100059133 THE WESTERN CITY LIMITS OF PICKENSVILLE; S. T. BUNN CONSTRUCTION COMPANY, INC. 24AC1-00059133 STPAA-HSIP-0014(532) PICKENS SR-14

05-115 1.408 MI ADDITIONAL LANES AND BRIDGE REPLACEMENT ON I-59/I-20 FROM S OF SR-7 (US-11) TO S OF CR-32; IM01M-100061787 MIDSOUTH PAVING, INC. NH01M-100061787 IM-NHF-I059(377) TUSCALOOSAI-59

05-116 0.478 MI SIDEWALK IMPROVEMENTS ON 4TH ST NW, 4TH AVE NW AND SR-159 IN GORDO; BALLARD BUILDERS, INC. SRIE1-00058796

SRTS-SR13(911) PICKENS

05-118 0.090 MI BRIDGE REPLACEMENT (PRECAST) & APPROACHESON CR-4 OVER RICE CREEK NORTHEAST OF HAMBURG; A1BRZ-100058490 NEWELL & BUSH, INC. ACBRZ58490-ATRP(001) PERRY CR-4

05-119 8.989 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-7 (US-11) FROM THE MISSISSIPPI STATE LINE TO HSIPE-100058995 N OF MALLARD DR (MP 8.990) IN YORK; S.T. BUNN CONSTRUCTION COMPANY, INC. STAAM-100058995 STPAA-HSIP-0007(535) SUMTER SR-7

05-120 5.426 MI ADDITIONAL LANES (GRADE, DRAINAGE, PAVEMENT AND BRIDGES) ON SR-8 (US-80) FROM US-11 BROPE-100004512 IN CUBA TO SR-17; W.S. NEWELL & SONS, INC. EOAP1-00004512 EOAPF-HWYPF-BRF-0008(529) SUMTER SR-8 LHIP1-00004512

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 57 FIFTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 05-121 1.855 MI PLANING, RESURFACING, GUARDRAIL INSTALLATION AND STRIPING ON CRESCENT RIDGE RD A1RDY-100058499 (CR-45) FROM ALABAMA AVE NE TO VALLEY HILLS DR IN TUSCALOOSA; S.T. BUNN CONSTRUCTION CO. INC. ACOA58499-ATRP(001) TUSCALOOSA

05-122 0.757 MI INTERSECTION IMPROVEMENTS ON SR-7 (US-11)AT THE JUNCTION OF SR-5 IN WOODSTOCK; HPPL1-100051796 APAC MID-SOUTH, INC. STNUM-100051796 HPP-STPNU-A146(900) BIBB SR-7

05-131 6.456 MI RESURFACING & TRAFFIC STRIPE ON CR-32 FROM SR-69 TO SR-25 NORTHEAST OF GREENSBORO; STNUC-100054599 (S.T. BUNN CONSTRUCTION CO., INC.) STMNU-STPNU-3314(200) HALE

05-132 11.771 MI RESURFACING & TRAFFIC STRIPE ON CR-50 FROM SR-69 IN MOUNDVILLE TO CR-49; STOAL-100052234 (APAC MID-SOUTH, INC.,) STPOA-3319(201) HALE

05-133 28.060 MI MAINTENANCE ROADSIDE MOWING ALONG I-59 FROM THE SUMTER COUNTY LINE TO THE TUSCALOOSA CO 99054-100053018 LINE; (COOK CONTRACTORS, INC.) 99-405-323-659-911 (RENEWAL) GREENE

05-154 MAINTENANCE ROADSIDE MOWING ON I-59 FROM SUMTER COUNTY LINE TO TUSCALOOSA COUNTY LINE; 99054-100056101 (SALAZAR CONTRACTING, LLC) 99-405-323-659-111 (1ST RENEW)GREENE

05-155 MAINTENANCE ROADSIDE MOWING ALONG I-59 FROM THE GREENE COUNTY LINE TO JEFFERSON COUNTY LINE; 99054-100056102 (SALAZAR CONTRACTING, LLC) 99-405-632-659-111 (1ST RENEW)TUSCALOOSA

05-156 3.627 MI RESURFACING & TRAFFIC STRIPE ON CR-35 FROM 0.217 MI SOUTH OF CR-37 THROUGH MCSHAN TO CR- EBEXE-100056596 30; (S.T. BUNN CONSTRUCTION CO., INC.) EB-5408(200) PICKENS

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPOA-0417(200) BIBB 4.45 % 05-001 WIREGRASS CON 726,609 45 W 000 000 00-00-00 0 38,624.58 866,929 10,616 0 10,616

SRTS-SR10(900) BIBB 0.00 % 05-002 WALKER PATTON 148,373 100 W 000 000 00-00-00 0 .00 0 0 0 0

STPNU-0417(201) BIBB CR-10 1.96 % 05-003 WIREGRASS CON 1,259,141 35 W 000 000 00-00-00 0 37,346.54 1,904,074 0 0 0

HPP-A146(901) BIBB 25.72 % 05-004 APAC MID-SOUT 1,095,443 60 W 000 000 00-00-00 0 369,635.98 1,436,748 37,358 0 37,358

NHF-0006(530) BIBB 14.07 % 05-005 RACON, INC. 12,150,000 400 W 088 099 01-15-13 13,452,759 2,235,329.87 15,876,952 222,049 0 222,049

BRF-0006(541) BIBB SR-6 0.00 % 05-006 TOMLIN CONSTR 2,481,336 145 W 000 000 00-00-00 0 .00 0 0 0 0

99-505-999-950-101 BIBB 3.31 % 05-007 P & H STUCCO 537,416 100 W 000 000 00-00-00 0 19,601.31 591,158 0 0 0

NHF-0006(545) BIBB SR-6 3.20 % 05-008 WIREGRASS 13,487,303 300 W 000 000 00-00-00 0 597,957.48 18,664,169 105,279 0 105,279

STPAA-HSIP-0219(505) BIBB SR-219 4.02 % 05-009 WIREGRASS 2,124,462 75 W 000 000 00-00-00 0 23,714.22 588,707 9,153 0 9,153

IM-HSIPF-I065(428) CHILTON I-65 4.25 % 05-010 RMD HOLDINGS 1,549,932 1214 D 000 000 00-00-00 0 104,188.65 2,447,481 59,710 0 59,710

BR-0145(502) CHILTON SR-145 0.00 % 05-011 THE BRIDGE BU 3,236,642 255 W 000 000 00-00-00 0 .00 0 0 0 0

STPOA-HRRR-1111(201) CHILTON 3.52 % 05-012 WIREGRASS CON 1,653,191 40 W 090 100 09-03-10 1,340,175 54,528.86 1,546,776 0 0 0

STPOA-1118(200) CHILTON CR-29 3.92 % 05-014 WIREGRASS 837,682 30 W 000 000 00-00-00 0 42,940.22 1,094,637 0 0 0

STPNU-HSIP-0022(517) CHILTON SR-22 4.40 % 05-015 ASPHALT CONTR 2,798,616 90 W 000 000 00-00-00 0 206,058.52 4,672,703 14,775 0 14,775

STPAA-0145(505) CHILTON SR-145 0.08 % 05-016 DUNN CONSTRUC 2,233,944 80 W 000 000 00-00-00 0 2,444.94 2,896,926 0 0 0

NH-HSIP-0006(544) CHILTON SR-6 11.62 % 05-017 ASPHALT CONTR 1,501,015 55 W 000 000 00-00-00 0 218,183.08 1,876,164 7,650 0 7,650

ACNU58411-ATRP(001) CHILTON CR-28 5.38 % 05-018 CHILTON CONTR 436,576 90 W 000 000 00-00-00 0 25,859.02 480,121 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACNU58473-ATRP(001) CHILTON CR-59 2.00 % 05-019 WIREGRASS CON 1,246,982 45 W 000 000 00-00-00 0 28,780.13 1,434,030 0 0 0

STPAA-HSIP-0171(512) FAYETTE SR-171 0.95 % 05-020 S. T. BUNN CO 3,171,042 115 W 000 000 00-00-00 0 35,230.44 3,700,604 0 0 0

STPOA-0129(503) FAYETTE SR-129 11.77 % 05-021 S.T. BUNN 1,422,591 75 W 000 000 00-00-00 0 209,300.31 1,778,140 0 0 0

STPNU-2914(250) FAYETTE CR-26 0.00 % 05-022 CORNERSTONE C 562,043 60 W 000 000 00-00-00 0 .00 0 0 0 0

STPNU-HSIP-0159(500) FAYETTE SR-159 5.60 % 05-023 S.T. BUNN 4,140,542 90 W 000 000 00-00-00 0 303,153.29 5,410,632 20,076 0 20,076

99-405-323-659-111 GREENE 0.02 % 05-030 SALAZAR CONTR 77,712 3111 D 022 075 11-11-11 58,255 41.94 161,293 0 0 0

BRD-3200(204) GREENE 14.18 % 05-031 GLASGOW CONST 356,626 100 W 070 100 10-26-10 349,523 62,484.27 440,447 4,102 0 4,102

ACNU58477-ATRP(001) GREENE CR-20 2.59 % 05-032 S.T. BUNN 3,070,001 50 W 000 000 00-00-00 0 89,059.33 3,428,883 22,298 0 22,298

EB-3215(201) GREENE 4.69 % 05-033 S.T. BUNN CON 829,427 30 W 000 000 00-00-00 0 46,425.03 989,601 0 0 0

SRTS-SR13(910) GREENE 0.00 % 05-034 TRIPLE J CONS 106,409 45 W 000 000 00-00-00 0 .00 0 0 0 0

STPOA-3204(200) GREENE 4.80 % 05-035 S.T. BUNN CON 1,548,805 30 W 000 000 00-00-00 0 88,759.80 1,847,903 0 0 0

ACGBBR-3260(200) GREENE CR#208 19.13 % 05-036 WARRIOR CONST 268,612 100 W 100 098 02-03-02 266,445 62,960.43 329,050 0 0 0

ACNU59368-ATRP(001) GREENE CR-208 4.52 % 05-037 S. T. BUNN 2,185,997 50 W 000 000 00-00-00 0 103,918.32 2,295,298 0 0 0

99-405-323-659-911 GREENE 0.02 % 05-038 COOK CONTRACT 83,146 60 W 050 100 12-30-09 63,065 42.29 146,233 0 0 0

ACNU59388-ATRP(001) GREENE CR-181 2.51 % 05-039 S. T. BUNN 2,998,501 50 W 000 000 00-00-00 0 74,191.16 2,950,410 0 0 0

STPNU-HSIP-0014(531) HALE SR-14 8.36 % 05-042 S.T. BUNN 1,775,658 60 W 000 000 00-00-00 0 185,737.42 2,219,448 0 0 0

STPNU-3300(211) HALE CR-2 3.59 % 05-043 THE MILLER PA 1,234,949 45 W 000 000 00-00-00 0 57,938.90 1,613,764 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

SRTS-SR09(925) LAMAR 0.00 % 05-050 GLASGOW CONST 263,824 50 W 000 000 00-00-00 0 .00 0 0 0 0

STPAA-HSIP-0096(504) LAMAR SR-96 13.66 % 05-051 S. T. BUNN 1,271,296 45 W 000 000 00-00-00 0 20,977.59 153,462 0 0 0

ACNU58485-ATRP(001) LAMAR CR-35 1.37 % 05-053 S. T. BUNN 1,377,163 50 W 000 000 00-00-00 0 20,731.05 1,505,885 0 0 0

ACBR58483-ATRP(001) LAMAR CR-49 0.00 % 05-054 GLASGOW CONST 958,077 110 W 000 000 00-00-00 0 .00 0 0 0 0

STPAA-0018(504) LAMAR SR-18 5.88 % 05-055 S. T. BUNN 397,442 30 W 000 000 00-00-00 0 28,238.33 480,026 0 0 0

ACNU58489-ATRP(001) LAMAR CR-49 0.33 % 05-056 S. T. BUNN 1,421,657 50 W 000 000 00-00-00 0 5,258.74 1,589,648 0 0 0

RECA-HSIP-0118(510) LAMAR SR-118 0.29 % 05-057 S.T. BUNN 2,010,953 70 W 000 000 00-00-00 0 6,490.83 2,232,382 0 0 0

BRZ-3800(213) LAMAR CR-172 0.22 % 05-058 GLASGOW 412,139 60 W 000 000 00-00-00 0 1,373.26 599,491 0 0 0

EB-5307(200) PERRY 6.98 % 05-060 THE MILLER GR 1,070,100 45 W 000 000 00-00-00 0 93,427.21 1,337,550 0 0 0

ACNU58492-ATRP(010) PERRY CR-20 0.04 % 05-061 THE MILLER PA 1,239,195 45 W 000 000 00-00-00 0 639.51 1,348,015 0 0 0

STPOA-5307(201) PERRY CR 24 8.01 % 05-067 ASPHALT CONTR 661,453 30 W 000 000 00-00-00 0 69,248.91 864,350 0 0 0

ACGBBRZ-3300(203)(204)(205) HALE VARIOUS 3.03 % 05-069 GLASGOW CONST 1,041,279 355 C 089 100 01-11-06 3,262,689 38,610.84 1,270,397 0 2,221,409 2,221,409

STPNU-5408(201) PICKENS CR-35 1.16 % 05-070 S.T. BUNN 1,573,562 45 W 000 000 00-00-00 0 21,896.57 1,877,441 0 0 0

RECA-HSIP-0014(527) PICKENS SR 14 10.62 % 05-071 S.T. BUNN 3,347,411 75 W 000 000 00-00-00 0 327,814.20 3,084,517 0 0 0

ACNU58493-ATRP(001) PICKENS CR-4 2.94 % 05-072 S.T. BUNN 849,633 45 W 000 000 00-00-00 0 26,275.82 892,115 0 0 0

STPNU-5404(201) PICKENS CR-63 0.79 % 05-073 ST BUNN 1,193,791 45 W 091 100 10-01-10 1,201,192 9,959.22 1,253,481 0 0 0

SRTS-SR09(908) PICKENS 4TH ST 0.00 % 05-074 BURNETT CIVIL 164,015 80 W 000 000 00-00-00 0 .00 0 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STMNU-RECA-5422(200) PICKENS 1.55 % 05-078 S.T. BUNN CON 1,229,802 45 W 111 100 10-28-10 1,324,372 4,112.98 265,000 39,750 0 39,750

99-405-632-659-911 TUSCALOOSA 1.91 % 05-080 BENTLEY TURF 126,129 80 W 036 100 01-14-10 126,129 5,091.89 266,195 0 0 0

BRZ-6300(220) TUSCALOOSA CR-238 9.38 % 05-081 MSE BUILDING 287,502 75 W 000 000 00-00-00 0 78,876.76 840,637 0 0 0

HPP-0216(502) TUSCALOOSA SR-216 24.78 % 05-082 E. O. BYARS 647,216 60 W 000 000 00-00-00 0 170,518.82 688,028 0 0 0

IM-I059(374) TUSCALOOSA I-20/59 6.25 % 05-083 W. S. NEWELL 1,501,310 314 D 000 000 00-00-00 0 80,575.56 1,288,286 20,107 0 20,107

BRZ-6300(219) TUSCALOOSA JASPER 7.95 % 05-084 RACON, INC 694,243 150 W 000 000 00-00-00 0 68,089.09 855,958 0 0 0

IM-I059(373) TUSCALOOSA I-20/59 5.38 % 05-085 W. S. NEWELL 2,323,340 314 D 000 000 00-00-00 0 158,972.84 2,951,767 45,806 0 45,806

IM-I059(372) TUSCALOOSA I-20/59 7.35 % 05-086 CHILTON CONTR 1,634,887 614 D 000 000 00-00-00 0 120,697.49 1,641,385 30,269 0 30,269

NH-0006(553) TUSCALOOSA SR-6 9.81 % 05-087 S.T. BUNN 2,591,936 80 W 000 000 00-00-00 0 318,005.46 3,239,738 29,290 0 29,290

ITS-9801(103) TUSCALOOSA SITES 37.26 % 05-088 TOOMER ELECTR 1,622,663 200 W 113 098 10-31-04 1,623,167 542,076.12 1,454,670 61,651 0 61,651

BR-7920(600) TUSCALOOSA 26.23 % 05-089 MCINNIS CONST 3,121,057 190 W 000 000 00-00-00 0 1,069,891.44 4,078,412 102,630 0 102,630

99-508-601-059-323 SUMTER 0.00 % 05-090 GULF COAST 449,449 100 W 000 000 00-00-00 0 14.14 516,866 0 0 0

ACNU58472-ATRP(001) SUMTER 16.23 % 05-091 NEWELL & BUSH 305,920 45 W 000 000 00-00-00 0 49,065.06 302,249 3,936 0 3,936

HSIP-0069(517) TUSCALOOSA SR-69 25.80 % 05-092 E. O. BYARS 494,048 35 W 000 000 00-00-00 0 166,627.38 645,594 30,543 0 30,543

ACNU58474-ATRP(001) SUMTER CR-85 4.03 % 05-093 S. T. BUNN 1,114,767 45 W 000 000 00-00-00 0 22,521.58 557,600 0 0 0

STPAA-0017(553) SUMTER SR-17 5.21 % 05-094 S. T. BUNN 2,169,495 70 W 000 000 00-00-00 0 139,023.50 2,664,339 11,970 0 11,970

ACGBBRZ-6300(207) TUSCALOOSA ROAD 1.54 % 05-097 ECON, INC. 265,241 100 W 043 090 01-15-04 226,749 4,712.79 305,629 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

IM-STPAAF-I059(338) TUSCALOOSA I 59 20.35 % 05-098 E. O. BYARS 1,720,230 1412 D 000 000 00-00-00 0 457,580.51 2,247,902 99,567 0 99,567

STPAA-HSIP-0171(510) TUSCALOOSA SR171 12.79 % 05-099 S.T. BUNN 2,829,495 75 W 000 000 00-00-00 0 452,404.37 3,536,670 6,200 0 6,200

STPAA-HSIP-0191(501) CHILTON SR-191 1.99 % 05-100 DUNN CONSTRUC 2,490,500 100 W 000 000 00-00-00 0 60,374.19 3,028,095 0 0 0

STPAA-0003(522) CHILTON SR-3 0.05 % 05-101 CHILTON CONTR 1,456,027 140 W 000 000 00-00-00 0 1,060.00 1,838,146 0 0 0

STPAA-HSIP-0022(519) CHILTON SR-22 0.07 % 05-102 ASPHALT CONTR 2,071,968 80 W 000 000 00-00-00 0 1,948.29 2,624,557 0 0 0

SRTS-SR13(912) TUSCALOOSA 26TH AV 0.00 % 05-103 CORNERSTONE C 103,750 35 W 000 000 00-00-00 0 .00 0 0 0 0

STPAA-0215(502) TUSCALOOSA SR-215 15.50 % 05-104 MIDSOUTH PAVI 632,850 30 W 000 000 00-00-00 0 122,988.25 793,222 0 0 0

HSIP-0216(501) TUSCALOOSA SR-216 0.00 % 05-105 E. O. BYARS C 496,934 30 W 000 000 00-00-00 0 .00 0 0 0 0

99-505-690-950-301 TUSCALOOSA SR-22 0.03 % 05-106 GULF COAST CO 385,988 50 W 000 000 00-00-00 0 139.24 424,857 0 0 0

STMOA-CN10(922) TUSCALOOSA 3.62 % 05-107 GFC CONSTRUCT 3,320,663 180 W 100 097 12-12-12 3,307,937 62,553.32 1,725,290 0 0 0

IM-I059(379) GREENE I-20/59 4.10 % 05-108 S. T. BUNN 1,256,515 75 W 000 000 00-00-00 0 76,152.74 1,853,632 0 0 0

ACOA58494-ATRP(001) TUSCALOOSA LOOP RD 0.67 % 05-109 DRM UTILITIES 2,436,925 100 W 000 000 00-00-00 0 18,814.16 2,802,464 6,450 0 6,450

SRTS-SR11(917) PERRY W AVE 0.00 % 05-110 TRIPLE J CONS 112,210 60 W 000 000 00-00-00 0 .00 0 0 0 0

ACBRZ58496-ATRP(001) TUSCALOOSA CR-1323 0.17 % 05-111 CARTER'S CONT 230,001 75 W 000 000 00-00-00 0 514.22 292,065 0 0 0

STPAA-HSIP-0159(501) PICKENS SR-159 0.01 % 05-112 S. T. BUNN 3,052,068 65 W 000 000 00-00-00 0 76.52 558,782 0 0 0

IM-I059(364) GREENE I-59 0.22 % 05-113 S. T. BUNN 4,183,651 75 W 000 000 00-00-00 0 10,955.38 4,809,726 0 0 0

STPAA-HSIP-0014(532) PICKENS SR-14 41.69 % 05-114 S.T. BUNN CON 2,565,736 60 W 000 000 00-00-00 0 185,771.61 445,602 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

IM-NHF-I059(377) TUSCALOOSA I-59 0.00 % 05-115 MIDSOUTH PAVI 23,958,790 480 W 000 000 00-00-00 0 .00 0 0 0 0

SRTS-SR13(911) PICKENS 0.00 % 05-116 BALLARD BUILD 64,861 30 W 000 000 00-00-00 0 .00 0 10,680 0 10,680

ACBRZ58490-ATRP(001) PERRY CR-4 17.27 % 05-118 NEWELL & BUSH 445,210 80 W 000 000 00-00-00 0 88,457.57 511,991 10,000 0 10,000

STPAA-HSIP-0007(535) SUMTER SR-7 9.39 % 05-119 S. T. BUNN 2,205,367 50 W 000 000 00-00-00 0 271,225.83 2,886,852 0 0 0

EOAPF-HWYPF-BRF-0008(529) SUMTER SR-8 15.49 % 05-120 W.S. NEWELL & 24,675,374 475 W 095 087 07-31-13 21,448,715 1,161,993.60 7,498,896 286,967 0 286,967

ACOA58499-ATRP(001) TUSCALOOSA 6.01 % 05-121 S. T. BUNN 849,330 30 W 000 000 00-00-00 0 58,771.97 976,730 0 0 0

HPP-STPNU-A146(900) BIBB SR-7 2.33 % 05-122 APAC MID-SOUT 1,640,039 45 W 000 000 00-00-00 0 50,108.40 2,143,113 0 0 0

STMNU-STPNU-3314(200) HALE 1.40 % 05-131 S.T. BUNN CON 899,099 45 W 093 096 08-10-10 882,296 7,464.39 530,000 0 0 0

STPOA-3319(201) HALE 3.66 % 05-132 APAC MID-SOUT 1,126,913 45 W 087 100 04-09-10 1,021,310 43,390.61 1,183,259 0 0 0

99-405-323-659-911 (RENEWAL) GREENE 0.02 % 05-133 COOK CONTRACT 83,146 60 W 050 100 11-16-10 40,163 42.29 146,233 0 0 0

99-405-323-659-111 (1ST RENEW) GREENE 0.02 % 05-154 SALAZAR CONTR 77,712 3111 D 000 000 00-00-00 0 41.94 161,293 0 0 0

99-405-632-659-111 (1ST RENEW) TUSCALOOSA 1.25 % 05-155 SALAZAR CONTR 135,472 3111 D 000 000 00-00-00 0 3,476.05 276,727 0 0 0

EB-5408(200) PICKENS 2.57 % 05-156 S.T. BUNN CON 729,556 45 W 000 000 00-00-00 0 21,339.77 830,088 0 0 0 DIVISION TOTALS: 199,405,099 49,994,941 168,866,586 1,308,882 2,221,409 3,530,291 12,151,896.53

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 58 SIXTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-001 0100(201) 0.097 MI. BRIDGE REPLACEMENTS (2) (PRECAST) ON CR#57 & CR#10 AT BRIDGE CREEK NORTHWEST OF GRBN1-100042393 PRATTVILLE. ( WARRIOR CONSTRUCTORS, INC. ) GRBN1-100042392 AACGBBR-0108(201) & ACGBBRZ-01AUTAUGA CR#57

06-002 2.407 MI ADDITIONAL LANES (GRADE, DRAINAGE, PAVEMENT AND SIGNALS) ON SR 6 (US 82) FROM NEAR NH04E-100004427 SR 206 TO SR 14 IN PRATTVILLE; WIREGRASS CONSTRUCTION CO. INC. NHF-0006(535) AUTAUGA SR 6

06-003 9.412 MI RESURFACING AND TRAFFIC STRIPE ON CR-21 FROM CR-40 THROUGH WHITE CITY TO THE CHILTON CO STOAL-100051855 LINE; (ASPHALT CONTRACTORS, INC.) STPOA-0119(200) AUTAUGA

06-004 6.245 MI RESURFACING & TRAFFIC STRIPE ON CR-24 FROM CR-37 IN BILLINGSLEY TO CR-21; STNUR-100055445 (APAC MID-SOUTH, INC.) STPNU-0127(200) AUTAUGA

06-005 MONTGOMERY & ELMORE CO.; INSTALLATION OF DYNAMIC MESSAGE SIGNS ON I-65 CORRIDOR WITHIN THE IT581-00036855 MONTGOMERY REGIONAL AREA AT SITES AS INDICATED BY THE PLANS; THE CONTACT NETWORK, INC. STAAM-100036855 ITS-STPAAF-9901(001) AUTAUGA I-65

06-006 1.467 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-75 (MCQUEEN SMITH RD) FROM CR-2 (EAST MAIN ST) MNSTC-100053770 SR-14; (ASPHALT CONTRACTORS, INC.) STMOA-7812(601) AUTAUGA

06-007 3.671 MI WIDENING, LEVELING, RESURFACING & TRAFFICSTRIPE ON CR-85 FROM THE JUNCTION OF CR-59 TO THE STMNM-100059728 JUNCTION OF SR-3 (US-31) N OF PRATTVILLE; APAC MID-SOUTH, INC. STPMN-0111(201) AUTAUGA CR-85

06-008 0.347 MI. ADDITIONAL LANES INCLUDING SIGNAL ON EAST MAIN STREET FROM WEST OF ADELL STREET TO EAST MTST -100042030 OF SHADY OAK LANE IN PRATTVILLE (R.E. GRILLS CONSTRUCTION CO.,INC) STPMT-7804(600) AUTAUGA E MAIN

06-009 BULLOCK, BUTLER, DALLAS, LOWNDES & MACON COUNTIES;BRIDGE SCOUR REPAIR AT VARIOUS STRUCTURES AS 99055-100058055 INDICATED BY THE PLANS; GRADY RALLS & SONS, INC. 99-506-690-000-202 AUTAUGA

06-010 11.468 MI RESURFACING AND TRAFFIC STRIPE ON CR 40 FROM CR 21 AT OLD KINGSTON TO THE ELMORE COUNTY STNUE-100058111 LINE; APAC MID-SOUTH, INC. STPNU-0116(200) AUTAUGA CR 40

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 59 SIXTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-011 ELMORE COUNTY; 1.594 MI ADDITIONAL LANES (GRADE, DRAINAGE, PAVEMENT, SIGNAL & SIGNS) ON CR-29 (OLD STOAL-100052056 FARM LANE) FROM THE PRATTVILLE CITY LIMITS TO SR- 14; NEWELL ROADBUILDERS, INC. STPOAF-7814(602) AUTAUGA CR-29

06-012 1.371 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SHEILA BLVD FROM SR-3 (US-31/S MEMORIAL DR) TO AAMN1-00056011 CR-2 (E MAIN ST) IN PRATTVILLE; KELLY ROAD BUILDERS, INC. STPAA-7819(600) AUTAUGA

06-013 000-802,&99-406-004-000-801(2ND RENEWAL) MAINTENANCE ROADSIDE MOWING AT VARIOUS SITES 99054-100051400 AS INDICATED ON THE PLANS. (BENTLEY TURF & LANDSCAPE, INC.) 99-406-001-000-803,99-406-005-DIV.WIDE

06-014 7.574 MI PLANING, WIDENING, RESURFACING & TRAFFIC STRIPE ON SR-110 FROM 0.4 MI E OF CR-7 TO THE STAAM-100055910 INTERSECTION OF SR-6 (US-82) IN LOFIELD; WIREGRASS CONSTRUCTION COMPANY, INC. STPAA-HSIP-0110(503) BULLOCK SR-110

06-016 0.567 MI. BRIDGE REPLACEMENTS (3) (PRECAST) & APPROACHES ON CR#31 OVER CONECUH RIVER, LITTLE CONECUH GRBN1-100043354 RIVER & RELIEF SOUTH OF UNION SPRINGS. ( MURPHREE BRIDGE CORPORATION ) ACGBBR-0625(200) BULLOCK CR#31

06-020 STMAA-0055(505); 6.384 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-3 (US-31) AND SR-55 AT VARIOU STAAC-100052879 SITES INDICATED ON PLANS; (BULLARD EXCAVATING, INC.) STAAC-100052880 STMAA-0003(550) BUTLER

06-021 8.928 MI LEVELING, RESURFACING AND TRAFFIC STRIPE ON (CR-50) HONORAVILLE RD FROM THE JUNCTION OF A1RDY-100058340 SR-10 E OF GREENVILLE TO THE CRENSHAW CO LINE; APAC MID-SOUTH, INC. ACNU58340-ATRP(001) BUTLER CR-50

06-022 (201) 0.310 MI. BRIDGE REPLACEMENTS(3 PRECASTS) & APPROACHES ON CR#8 AT BOGUE CHITTA CK. & LITTLE SA GRBN1-100043790 NDY CK. E. OF PEROTE & ON CR#53 AT DOUBLE CK. E. OF TANYARD. ( MURPHREE BRIDGE CORPORATION ) GRBN1-100043789 ACGBBR-0603(200)& ACGBBRZ-0600BULLOCK CR#8

06-023 7.629 MI PLANING, RESURFACING AND TRAFFIC COUNTINGUNITS ON I-65 FROM 0.7 MI S OF BEAVER CREEK (MP IM01M-100055198 124.490) TO THE N END OF THE CSX RAILROAD BRIDGE (MP 132.120); WIREGRASS CONSTRUCTION CO., INC. IM-I065(441) BUTLER I-65

06-024 7.902 MI RESURFACING AND TRAFFIC STRIPE ON CR-15 FROM SR-106 AT STARLINGTON TO CR-38; STNUC-100054670 (APAC MID-SOUTH, INC.) STMNU-STPNU-0707(200) BUTLER

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 60 SIXTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-025 SCHOOL IMPROVEMENTS (SIDEWALKS AND SIGNS) AT VARIOUS LOCATIONS NEAR MCKENZIE SCHOOL AS SRIR1-00058788 INDICATED IN THE PLANS; ROBBIE'S DOZER & CONSTRUCTION SERVICES, LLC SRIL1-00058788 SRTS-SR13(913) BUTLER

06-026 11.203 MI WIDENING, RESURFACING & TRAFFIC STRIPE ON CR-65 FROM THE JUNCTION OF CR-59 TO THE JUNCTIO STNUM-100061734 OF CR-62; MIDSOUTH PAVING INC. STPNU-0714(250) BUTLER CR-65

06-027 0.625 MI. INTERSECTION IMPROVEMENTS INCLUDING SIGNAL UPGRADE ON SR 14 AT SR 143 IN STATC-100050216 ROBINSON SPRINGS (STONE ELECTRIC CO., INC.) ST-026-014-001 ELMORE SR 14

06-028 1.592 MI RESURFACING AND TRAFFIC STRIPE ON CONECUHST FROM SR-10 TO SR-3 (US-31) IN GREENVILLE; A1RDY-100058338 MIDSOUTH PAVING INC. ACOA58338-ATRP(001) BUTLER

06-029 PEDESTRIAN SAFETY IMPROVEMENTS AT VARIOUS LOCATIONIN THE SIXTH DIVISION. TEST -100039208 ( SAFETY GUIDE OF ALABAMA, L..L.C. ) STPTE-CN01(926) 6TH DIV. SITES

06-030 & BRF-0008(564); 1.256 MI BRIDGE & CULVERT REPLACEMENT AND APPROACHES ON SR-8 (US-80) WBR AT BROPE-100050025 MUD CREEK RELIEF W OF BROWNS AND AT KENDRICKS BRANCH NEAR MASSILLION; CARCEL & G. CONSTRUCTION BROPE-100052579 BRF-0008(557) DALLAS SR-8

06-031 2.702 MI PLANING, RESURFACING, GUARDRAIL & TRAFFICSTRIPE ON OLD CAHABA RD FROM OLD MARION JCT RD TO A1RDY-100058341 KING ST AND ON MEDICAL CENTER PKWY FROM OLD CAHABARD TO SR-8; ASPHALT CONTRACTORS, INC. ACOA58341-ATRP(001) DALLAS

06-032 1.923 MI RESURFACING, TRAFFIC STRIPE & GUARDRAIL INSTALLATION ON CR-115 FROM THE JUNCTION OF CR-988 A1RDY-100058342 TO THE INTERSECTION OF CR-33 S OF ORRVILLE; ASPHALT CONTRACTORS, INC. ACNU58342-ATRP(001) DALLAS CR-115

06-033 4.199 MI PLANING, RESURFACING AND TEMPORARY TRAFFIC STRIPE ON SR-8 (US-80) FROM EAST OF HSIPM-100056468 SOAPSTONE CREEK (MP 95.060) TO WEST OF THE LOWNDESCO LINE (MP 99.259); WIREGRASS CONSTRUCTION CO. IN NH01M-100056468 NH-HSIP-0008(565) DALLAS SR-8

06-034 2.180 MI RESURFACING & TRAF STRIPE ON CR-45 FROM THE NORTHERN RIGHT-OF-WAY LIMITS OF THE CSX RR STNUM-100061742 NEAR SR-22 TO APPROXIMATELY 700' N OF CR-188; ASPHALT CONTRACTORS, INC. STPNU-2414(250) DALLAS CR-45

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 61 SIXTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-035 5.321 MI WIDENING, RESURFACING & TRAFFIC STRIPE ONCR-37 FROM THE INTERSECTION OF CR-16 TO THE STNUM-100062018 JUNCTION OF CR-222; ASPHALT CONTRACTORS, INC. STPNU-2414(251) DALLAS CR-37

06-036 MONTGOMERY; BRIDGE PAINTING ON VARIOUS STRUCTURES WITHIN THE SIXTH DIVISION; 99055-100060259 K. V. K. CONTRACTING, INC. 99-506-690-000-302 DALLAS

06-039 0.716 MI FULL DEPTH RECLAMATION, RESURFACING AND TRAFFIC STRIPE ON CR-45 N OF HAZEN FROM APPROX. STNUE-100058814 1.50 MI N OF CR-188 TO S OF CR-189; POZZOLANIC CONTRACTING & SUPPLY CO. INC. STPNU-2412(200) DALLAS CR 45

06-040 & 99-406-261-009-202; 8.267 MI WIDENING, PLANING, RESURFACING & TRAFFIC STRIPE ON SR-9 FROM SR-21 HSIPM-100058745 (US-231)TO CR-435(POWELL LOOP RD)& ADDITIONAL LANEON SR-14 AT THE INTERSECTION OF SR-9 (US-231) STAAM-100058745 STPAA-HSIP-0009(548) ELMORE SR-9 99046-100059042

06-041 37.019 MI MICRO-SURFACING TREATMENT, TRAFFIC STRIPE & GUARDRAIL ON VARIOUS ROUTES AS INDICATED A1RDY-100060061 IN THE PLANS; VANCE BROTHERS, INC. ACAA60061-ATRP(001) ELMORE

06-042 2.534 MI WIDENING, PLANING, LEVELING, RESURFACING & TRAFFIC STRIPE ON CR-008 (GRANDVIEW RD) FROM THE STMNM-100057516 JUNCTION OF SR-14 E TO THE JUNCTION OF SR-143 IN MILLBROOK; APAC MID-SOUTH, INC. STPMN-7911(600) ELMORE CR-008

06-043 & 99-406-261-170-301; 11.823 MI WIDENING, PLANING,RESURFACING & ADDITIONAL TURN LANES ON SR-170 FROM STAAM-100058666 SR-9(US-231)(MP 0.000)TO SR-63(MP 11.680) & ON SR-170 & SR-9 (US-231); ASPHALT CONTRACTORS, INC. HSIPM-100058666 STPAA-HSIP-0170(500) ELMORE SR-170 99046-100061183

06-044 2.715 MI RESURFACING AND TRAFFIC STRIPE ON CR-161 (LITTLE ROAD) FROM THE TALLASSEE CITY LIMITS TO STNUE-100059155 SR-229; APAC MID-SOUTH, INC. STPNU-2649(200) ELMORE CR-161

06-045 0.083 MI BRIDGE REPLACEMENT ON CR-29 AT WEOKA CREEK SOUTHEAST OF TITUS; STOAH-100047400 NEWELL & BUSH, INC., PO BOX 240397, MONTGOMERY, AL36124 STPOA-2618(200) ELMORE

06-046 45.169 MI WIDENING, RESURFACING AND TRAFFIC STRIPEON VARIOUS ROUTES AS INDICATED IN THE PLANS; A1RDY-100060062 WIREGRASS CONSTRUCTION COMPANY, INC. ACAA60062-ATRP(002) ELMORE

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 62 SIXTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-047 2.818 MI RESURFACING & TRAFFIC STRIPE ON CR-49 (BALM RD) FROM SR-9 NORTHEAST OF WETUMPKA TO MOUNT MNST -100056014 ZION ROAD; (GARY INGRAM GRADING & PAVING, INC.) STPOA-2613(200) ELMORE

06-048 3.019 MI RESURF & TRAFF STRIPE ON CR-73(N ANN ST) FROM THE X-SECTION OF CR-44(MAIN ST)IN ECLECTIC TO STNUH-100062134 THE X-SECTION OF CR-407(E COTTON RD); ASPHALT CONTRACTORS, INC. STNUM-100062134 STPNU-2614(250) ELMORE CR-73

06-049 3.787 MI. RESURFACING AND TRAFFIC STRIPE ON CR 7 FROM CR 14 TO SR 6 (U.S. 82) AT STOA -100046865 HECTOR (ASPHALT CONTRACTORS, INC.) STPOA-0606(200) BULLOCK CR 7

06-050 7.499 MI RESURFACING AND TRAFFIC STRIPE ON CR-13 FROM CR-17 TO MAIN ST AND ON CR-2 FROM MAIN ST TO STNUE-100060602 SR-21 IN MOSSES; WIREGRASS CONSTRUCTION COMPANY, INC. STPNU-4300(204) LOWNDES CR-13

06-051 2.684 MI. ADDITIONAL LANES (INCLUDING SIGNALS) ON SR#14 FROM I-65 TO SR#143 AT ROBINSON SPRINGS. AAST -100008929 ( SOURHEAST CHEROKEE CONSTRUCTION CO., INC.) STPAA-201(523) ELMORE SR#14

06-052 1.419 MI BRIDGE REPLACEMENT (GRADE, DRAIN, BASE & PAVE) ON THE WESTBOUND ROADWAY OF SR-8 (US-80) BRNM1-00002664 OVER TALLAWASSEE CREEK E OF LOWNDESBORO; MCINNIS CONSTRUCTION, LLC BRF-0008(567) LOWNDES

06-053 2.037 MI RESURFACING & TRAFFIC STRIPE ON CEMETERY RD, OLD LETOHATCHEE RD, OLD SWAMP RD, PECAN ST & STP10-100055241 W S STREET IN HAYNEVILLE; S & C MATERIALS & PAVINGINC. DE-A204(936) LOWNDES

06-054 0.884 MI BRIDGE REPLACEMENT, APPROACHES & RDWAY IMPROVEMENTS ON SR-8(US-80)OVER OLD TOWN CREEK & BRNM1-00039980 FROM W OF 4TH ST TO E OF 4TH ST IN BENTON; W.S. NEWELL & SONS, INC/NEWELL & BUSH INC. (JOINT VENTU NHSP1-00054173 BRF-0008(553) & NH-0008(570) LOWNDES SR-8

06-059 0.362 MI. INTERSECTION REALIGNMENT ON SR 229 AT SR 50 AND CASTAWAY ISLAND ROAD IN RED HILL RECA -100009070 (TEN-T CORPORATION) RECA-0229(501) ELMORE SR 229

06-060 2.979 MI RESURFACING AND TRAFFIC STRIPE ON CR40 FROM THE SHORTER CITY LIMITS TO SR229; STOAE-100058479 APAC MID-SOUTH, INC. STPOA-426(200) MACON CR40

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 63 SIXTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-061 2.238 MI LEVELING, RESURFACING AND TRAFFIC STRIPE ON CR-54 (E MAIN ST) FROM RAILROAD AVE E TO A1RDY-100059639 WHITMAN HILL RD IN NOTASULGA; EAST ALABAMA PAVING COMPANY, INC. ACNU59639-ATRP(001) MACON CR-54

06-062 7.098 MI LEVELING, RESURFACING & TRAFFIC STRIPE ONCR-2 FROM SR-15 (US-29) IN FORT DAVIS TO JUST E OF A1RDY-100059634 ROBA RD IN ROBA; EAST ALABAMA PAVING COMPANY, INC. ACNU59634-ATRP(001) MACON CR-2

06-063 DRAINAGE IMPROVEMENTS IN THE CITY OF TUSKEGEE AT SITES AS INDICATED BY THE PLANS; DUBOSE APL04-100046986 CONSTRUCTION CO. LLC STAAE-100046986 DE-APL-STPAA-A165(925) MACON CITY GSPHD-100046986

06-064 ACBR60157-ATRP(001) & ACBR60158-ATRP(001);0.531 MIBRIDGE REPLACEMENTS, APPROACHES & GUARDRAIL END A1BR1-00060156 ANCHORS ON CR-9 OVER OLD TOWN CREEK & OLD TOWN CREEK RELIEFS W OF THE BULLOCK CO LINE; MURPHREE A1BR1-00060157 ACBR60156-ATRP(001) MACON CR-9 A1BR1-00060158

06-065 SIDEWALK, TRAFFIC CONTROL MARKINGS AND SIGNS AT THE TUSKEGEE INSTITUTE MIDDLE SCHOOL AND THE SRIR1-00055988 TUSKEGEE PUBLIC ELEMENTARY SCHOOL IN TUSKEGEE; BURNETT CIVIL CONTRACTING, LLC SRTS-SR11(904) MACON

06-066 3.926 MI RESURFACING AND TRAFFIC STRIPE ON CR-54 FROM THE JUNCTION OF SR-199 E TO THE NOTASULGA A1RDY-100059631 CITY LIMITS; EAST ALABAMA PAVING COMPANY, INC. ACNU59631-ATRP(001) MACON CR-54

06-067 14.736 MI, MACON & MONTGOMERY COUNTIES, PLANING, RESURFACING, DRAINAGE AND TRAFFIC STRIPE ON I-85 GSPH5-100054913 FROM MP 18.280 TO MP 21.502 IN SHORTER & FROM MP 35.836 TO THE LEE CO LINE (MP 47.460);WIREGRASS IM-I085(334) MACON I-85

06-068 10.219 MI RESURFACING AND TRAFFIC STRIPE ON SR-199FROM N OF SR-81 (MP 0.00) TO THE JUNCTION OF SR-14 99044-100062073 EAST ALABAMA PAVING COMPANY, INC. 99-406-442-199-401 MACON SR-199

06-069 2.663 MI PATCHING, LEVELING, RESURFACING AND TRAFFIC STRIPE ON CR-13 FROM THE JUNCTION OF CR-19 STNUM-100059795 TO THE JUNCTION OF SR-8 (US-80) IN LA PLACE; WIREGRASS CONSTRUCTION COMPANY, INC. STPNU-4406(200) MACON CR-13

06-070 99-306-513-053-001; 4.639 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-53 (US-231) FROM PINE LEVEL HSIPE-100052164 (MP 96.360) TO SOUTH OF ATHEY RD (MP 101.000); (WIREGRASS CONSTRUCTION COMPANY, INC.) 99603-100055246 HSIP-0053(536) MONTGOMERY

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 64 SIXTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-071 3.223 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON CR-12 (HICKORY GROVE RD) FROM CR-19 (PETTUS RD) STNUM-100058155 TO CR-48 (BOYD SPRINGS RD); APAC MID-SOUTH, INC. STPNU-5100(204) MONTGOMERYCR-12

06-072 1.360 MI ADDITIONAL LANES & CONCRETE PAVEMENT RE- HABILITATION ON I-65 FROM MILL ST BRIDGE TO THE EBSPL-100049484 ALABAMA RIVER BRIDGE IN MONTGOMERY; (WIREGRASS CONSTRUCTION COMPANY, INC.) IM04L-100049484 IM-EBF-I065(386) MONTGOMERY

06-073 00-401 MAINTENANCE ROADSIDE MOWING ON VARIOUS ROUTES IN THE SIXTH DIVISION AS INDICATED ON THE PLANS 99054-100044459 ( BENTLEY TURF & LANDSCAPE, INC. ) 99054-100044460 99-406-001-000-401 & 99-406-0 6TH DIV. RTS

06-074 & IAR-051-000-005; 1.886 MI PLANING, RESURFACING, STRIPING & FIBER OPTIC AND SIGNALS ON W. L. MTST1-00056092 DICKINSON DR FROM CSX RAILROAD TO 0.23 MI S OF SR-9 (US-231); ASPHALT CONTRACTORS, INC. IARA1-00056069 STPMN-7780(600) MONTGOMERY

06-075 9.506 MI PLANING, SAFETY WIDENING, RESURF & TRAF STRIPE ON SR-9(US-331)FROM THE CRENSHAW CO LINE TO HS31M-100060035 THE BEGINNING OF THE 4-LANE SECTION(MP 83.500); WIREGRASS CONSTRUCTION COMPANY, INC. NH01M-100060035 NH-HSIP-0009(553) MONTGOMERYSR-9

06-076 0.481 MI PEDESTRIAN IMPROVEMENTS AT CHISHOLM ELEMENTARY, HARRISON ELEMENTARY & CARVER SRIL -100055093 ELEMENTARY SCHOOLS IN MONTGOMERY; (BURNETT CIVIL CONTRACTING, LLC) SRTS-SR09(912) MONTGOMERY

06-077 7.094 MI PLANING, RESURFACING & TRAFFIC STRIPE ON CR-85 (OLD CARTER HILL/PIKE RD) FROM US-82 TO A1RDY-100058359 CR-83 (WALLAHATCHIE RD); WIREGRASS CONSTRUCTION COMPANY, INC. ACAA58359-ATRP(001) MONTGOMERYCR-85

06-078 0.331 MI X-SECTION IMPROVEMENTS(GRADE, DRAIN, BASEPAVE, STRIPE, SIGN) ON SR-110 AT CR-83 STATE-100052653 (WALLAHATCHIE RD); NEWELL ROADBUILDERS, INC. ST-051-110-004 MONTGOMERYSR-110

06-079 5.905 MI PLANING, RESURFACING & TRAFFIC STRIPE ON CR-36(HAYNEVILLE RIDGE RD) FROM SR-6 (US-82) TO STNUM-100061620 THE BULLOCK CO LINE; WIREGRASS CONSTRUCTION CO. INC. STPNU-5100(205) MONTGOMERYCR-36

06-080 PARKING LOT RESURFACING AT DRAPER, ELMORE, STATON,TUTWILER AND KILBY CORRECTIONAL FACILITIES AT SITE CSWA3-100055956 INDICATED BY PLANS; (APAC MID-SOUTH, INC.) SWA-DOC-001 MONTGOMERY

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 65 SIXTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-081 & 99-406-513-009-114; INTERSECTION IMPROVEMENTS (GRADE, DRAIN, BASE & PAVE)ON SR-6(US-82)(SOUTHERN 99044-100056145 BLVD)(SITES 1-3) & SR-9(US-231)(EASTERN BYPASS) (SITES 4-14) IN MONTGOMERY; WIREGRASS CONSTRUCTION 99044-100056165 99-406-513-006-111 MONTGOMERYSR-6

06-082 0.234 MI GEOTECHNICAL REPAIR AT THE RAMP 5 BRIDGE OVER RAMP 7 WITHIN THE I-65/SR-8 (US-80) IM04L-100054963 INTERCHANGE (EXIT 167) IN MONTGOMERY; SOUTHEAST CHEROKEE CONSTRUCTION, INC. IM-I065(410) MONTGOMERY

06-083 TRIMPF-0035(512), HPP-0035(513) & HPP-TRIMPF-0035 (521) 5.500 MI GRADE, DRAINAGE, PARTIAL PAVEMENT HPPL2-100016434 & BRIDGES ON MONTGOMERY OUTER LOOP FROM SR-110 TO I-85; (R.R. DAWSON BRIDGE COMPANY, LLC) HPPL2-100016433 HHP-0035(510) MONTGOMERY HPPHW-100016433 HPPL2-100054089 TRIMP-100054089 06-084 5.500 KILOMETERS BASE, PAVE, SIGNING & TRAFFIC STRIPE ON THE MONTGOMERY OUTER LOOP FROM S OF SR- HPPL2-100016431 110 THRU THE I-85 INTERCHANGE; MIDSOUTH PAVING, INC. HPP-0035(511) MONTGOMERY

06-085 BRIDGE JOINT REPAIR AND CONCRETE SLAB REPLACEMENT ON I 85 FROM I 65 TO HALL STREET IN MONTGOMERY; IM04E-100051732 GULF EQUIPMENT CORP. IM-I085(337) MONTGOMERYI 85

06-086 & 99-406-513-006-401; 8.189 MI WIDENING, PLANING, PIPE & CULVERT EXTENSION & RESURFACING ON SR-6(US- HSIPM-100058206 82)FROM E OF SR-53(US-231)(MP 171.145) TO THE BULLOCK CO LINE(MP 179.335;ASPHALT CONTRACTORS,INC STAAM-100058206 STPAA-HSIP-0006(548) MONTGOMERYSR-6 99044-100061484

06-087 7.884 MI PLANING, SAFETY WIDENING, RESURFACING & TRAFFIC STRIPE ON SR-110 FROM E OF CHANTILLY PKWAY HSIPM-100059040 (MP 4.650) TO THE BULLOCK CO LINE (MP 14.127); WIREGRASS CONSTRUCTION COMPANY, INC. STPAA-HSIP-0110(505) MONTGOMERYSR-110

06-088 & 99-406-513-053-402; 4.329 MI PLANING, WIDENING, RESURFACING, PIPE EXTENSIONS AND STRIPING ON SR-53 NH01M-100060017 (US-231) FROM ATHEY RD (MP 101.000) TO JUST S OF SR-6(US-82)(MP 105.330);ASPHALT CONTRACTORS, INC. HS31M-100060017 NH-HSIP-0053(569) MONTGOMERYSR-53 99044-100061628

06-089 1.900 MI PLANING, RESURF AND TRAFFIC STRIPE ON SR-9(US-231)JUST N OF BROOKS RD TO THE END OF THE 7 99044-100062074 LANE SECTION; ASPHALT CONTRACTORS, INC. 99-406-513-009-401 MONTGOMERYSR-9

06-091 0.022 MI BRIDGE REPLACEMENT (PRECAST) ON CR-43 AT COSSEY BRANCH NORTH OF SOCIETY HILL; BROPE-100055059 (MCINNIS CONSTRUCTION, LLC BR-4414(202) MACON

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 66 SIXTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-093 0.529 MI. INTERCHANGE MODIFICATIONS (GRADE, DRAIN, PAVE, SIGNING, SIGNALS & LIGHT) ON I-85 AT THE SR IM98 -100005090 #271 (TAYLOR ROAD) INTERCHANGE IN MONTGOMERY. ( REESE & HOWELL, INC. ) IM-85-1(143) MONTGOMERYI-85

06-094 12.600 MI ADAPTIVE TRAFFIC SIGNAL CONTROL AT THIRTY FIVE INTERSECTIONS ALONG SR 21 (US231/US80) EBEXE-100057893 FROM THE MOBILE HIGHWAY TO ROY HODGES BLVD IN MONTGOMERY; WORLD FIBER TECHNOLOGIES, INC. EBF-0021(538) MONTGOMERYSR 21

06-099 0.829 MI WIDENING (GRADE, DRAIN, PAVEMENT, SIGNALS& LIGHTING) ON BELL ST (CR-235) FROM E OF WASHINGT STOAL-100046477 FERRY RD TO THE CSXT RAILROAD BRIDGE IN MONTGOMERY(SOUTHEAST CHEROKEE CONSTRUCTION CO.) STPOA-7777(600) MONTGOMERY

06-100 99-406-690-000-601 & 99-406-513-110-701; 24.770 MISHOULDER PAVING, DRAINAGE AND GUARDRAIL ON SR-110 99044-100051444 AT VARIOUS SITES INDICATED ON THE PLANS; (CARDWELL CORPORATION) 99044-100048688 99-406-062-110-801 BULLOCK 99014-100050355

06-101 7.905 MI WIDENING, RESURFACING & TRAFFIC STRIPE ON CR-57 FROM THE PRATTVILLE CITY LIMITS TO CR-40; A1RDY-100059586 WIREGRASS CONSTRUCTION COMPANY, INC. ACAA59586-ATRP(001) AUTAUGA CR-57

06-102 7.745 MI LEVELING, RESURFACING AND TRAFFIC STRIPE ON CR-40 FROM THE INTERSECTION OF CR-1 TO THE A1RDY-100059584 INTERSECTION OF CR-19; ASPHALT CONTRACTORS, INC. ACNU59584-ATRP(001) AUTAUGA CR-40

06-103 0.757 MI RESURFACING AND TRAFFIC STRIPE ON CR-2 (COBBS FORD RD) FROM CR-75 (MCQUEEN SMITH RD) TO AAMN1-00054294 SR-6 (US-82) IN PRATTVILLE; MIDSOUTH PAVING, INC. STPAA-7804(602) AUTAUGA CR-2

06-104 SOUTHSIDE MIDDLE SCHOOL SIDEWALK IMPROVEMENTS AT VARIOUS SITES IN TALLASSEE AS INDICATED BY SRIE1-00057445 THE PLANS; BURNETT CIVIL CONTRACTING, LLC SRTS-SR12(906) ELMORE VARIOUS

06-105 1.072 MI RESURFACING AND TRAFFIC STRIPE ON CR-2 (WETUMPKA ST) FROM THE JCT OF CR-2 (N WASHINGTON AAMN1-00056010 ST) TO THE JCT OF SR-3 (US-31/S MEMORIAL DR); WIREGRASS CONSTRUCTION COMPANY, INC. STPAA-7806(600) AUTAUGA CR-2

06-106 6.559 MI RESURFACING AND TRAFFIC STRIPE ON CR-165 FROM SR-14 IN AUTAUGAVILLE TO THE INTERSECTION OF A1RDY-100059583 SR-6 (US-82); ASPHALT CONTRACTORS, INC. ACAA59583-ATRP(001) AUTAUGA CR-165

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 67 SIXTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-107 & 99-406-011-003-401; 5.679 MI PLANING, SAFETY WIDENING, RESURF, STRIP & TURN LANES ON SR-3(US-31 HS31M-100060909 FROM THE N END OF PINE CREEK BRIDGE(MP 187.055)TO JUST N OF CR-12(MP 192.735);MIDSOUTH PAVING INC. NH01M-100060909 NH-HSIP-0003(583) AUTAUGA SR-3 99044-100061708

06-108 10.400 KM CONCERTE RUBBLIZING, PAVEMENT REHABILITATION, GUARDRAIL REPLACEMENT & RAISING BRIDGES ON I IM98 -100001674 -65 FROM KMP 258.971 TO KMP 269.371 SOUTH OF MONTGOMERY. ( WIREGRASS CONSTRUCTION CO., INC.) IM-65-1(239) MONTGOMERYI-65

06-109 0.275 MI TURN LANES (GRADE, DRAINAGE, PAVEMENT & SIGNING) ON SR-3 (US-31) AT NEW SCHOOL GEORGIANA; STATC-100051726 (BULLARD EXCAVATING, INC.,) ST-007-003-001 BUTLER

06-110 1.935 MI RESURFACING AND TRAFFIC STRIPE ON 6TH ST FROM CR-57(LOWER KINGSTON RD)TO SR-3(US-31) IN AAMN1-00057517 PRATTVILLE; MIDSOUTH PAVING INC. STPAA-UR12(600) AUTAUGA 6TH ST

06-111 SIDEWALK REPLACEMENT AND FLASHING BEACONS AT THE W. O. PARMER ELEMENTARY SCHOOL IN GREENVILLE; SRIE1-00057457 ROBBIE'S DOZER & CONSTRUCTION SERVICES, LLC SRTS-SR12(918) BUTLER

06-112 3.466 MI. ADDITIONAL LANES (GRADE, DRAINAGE, BRIDGE, & BRIDGE CULVERTS) ON U.S.#331 FROM NEAR PLEASA MGSP -100004578 NT GROVE ROAD TO SNOWDON. ( W. S. NEWELL & SONS, INC. ) MGF-0009(500) MONTGOMERYU.S.331

06-113 ADDITIONAL LANES INCLUDING BRIDGES AND SIGNALS ON TEAGUE ROAD FROM SR#3 (US#31) NEAR HOPE HULL TO SR AAST -100042233 #9 (US#331). ( NEWELL ROADBUILDERS, INC. ) AAST -100042234 STPAA-5114(201) & (202) MONTGOMERYSR#3

06-114 5.492 MI RESURFACING AND TRAFFIC STRIPE ON CR 7 (DEATSVILLE HIGHWAY) FROM THE MILLBROOK CITY LIMIT MNST1-00056016 TO SR 143; WIREGRASS CONSTRUCTION CO. INC. STPOA-CN12(213) ELMORE CR 7

06-115 3.694 MI WIDENING, RESURFACING AND TRAFFIC STRIPE ON CR-37 FROM THE INTERSECTION OF SR-6(US-82)TO A1RDY-100059585 THE INTERSECTION OF CR-77 IN BILLINGSLEY; MIDSOUTH PAVING INC. ACNU59585-ATRP(001) AUTAUGA CR-37

06-116 SIDEWALK REHABILITATION AT VARIOUS SITES ON THE CAMPUS OF ALABAMA STATE UNIVERSITY IN MONTGOMERY GSPH5-100055862 AS INDICATED BY THE PLANS; BURNETT CIVIL CONTRACTING, LLC DE-AL80(933) MONTGOMERY

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 68 SIXTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-117 SIDEWALKS, TRAFFIC CONTROL MARKINGS AND SIGNS IN THE CITY OF WHITE HALL AT SITES AS INDICATED BY SRIE1-00055989 THE PLANS; H & L CONSTRUCTION, INC. SRTS-SR11(905) LOWNDES

06-118 2.757 MI RESURFACING AND TRAFFIC STRIPE ON CR 155 (CHEROKEE TRAIL) FROM SR 14 AT NEMAN TO SR 229; STOAE-100058192 WIREGRASS CONSTRUCTION COMPANY, INC. STPOA-2642(201) ELMORE CR 155

06-119 2.079 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR 6 (US82) FROM E OF SR 3 (US31) (MP 142.901) NH04E-100056110 IN PRATTVILLE TO COBBS FORD RD; WIREGRASS CONSTRUCTION COMPANY, INC. NH-0006(543) ELMORE SR 6

06-120 0.984 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON CR 116 (CHAPMAN RD) FROM SR 143 (MAIN ST) IN MNST1-00057511 ROBINSON SPRINGS TO AIRPORT RD; WIREGRASS CONSTRUCTION COMPANY, INC. STPOA-7909(600) ELMORE CR 116

06-121 0.872 MI MONTGY & ELMORE CO. ADDITIONAL LANE(GRADEDRAIN, PAVEMENT, BRIDGE & SIGNALS)ON SR53(US231) BROPE-100045612 FROM S OF THE TALLAPOOSA RIVER BRIDGE TO REDLAND RD N OF MONTGOMERY; MCINNIS CONSTRUCTION, LLC NH04E-100045612 NHF-BRF-0009(532) MONTGOMERYSR 53

06-122 & ACNU59672-ATRP(003);20.176 MI RESURF & TRAFF STRON CR-45 & CR-59 FROM SR-3 TO THE PIGEON CREEK BRI A1RDY-100059671 & ON CR-45 FROM THE JUNCTION OF CR-59 TO THE X- SECTION OF SR-106;THE MILLER PAVING GROUP, INC. A1RDY-100059672 ACNU59671-ATRP(003) BUTLER CR-45

06-123 6.156 MI. RESURFACE & TRAFFIC STRIPE ON CR#92 FROM U.S.#231 NORTH TO THE WETUMPKA CITY LIMITS & ON C STNUH-100044492 R#97 FROM CR#92 EAST TO CR#8 SOUTH OF WETUMPKA. ( APAC-SOUTHEAST, INC. ) ACGBSTPNU-CN04(205) ELMORE CR#92

06-124 3.459 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-14 FROM SR-212 TO SR-9 & ON SR-212 FROM SR-111 STAAC-100051863 IN WETUMPKA; (APAC MID-SOUTH, INC.) STMAA-CN09(908) ELMORE

06-125 4.695 MI RESURFACING AND TRAFFIC STRIPE ON CR-4 FROM THE JUNCTION OF SR-14 TO THE CSX RAILROAD IN A1RDY-100059587 PRATTVILLE; MIDSOUTH PAVING, INC. ACAA59587-ATRP(003) AUTAUGA CR-4

06-126 9.439 MI RESURFACING & TRAFFIC STRIPE ON CR-59 FROM PRATTVILLE CITY LIMITS TO CR-40 & ON CR-59 MNSTH-100050964 FROM CR-40 TO CR-59 SPUR (WIREGRASS CONSTRUCTION COMPANY, INC.) STPOA-CN08(266) AUTAUGA

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 69 SIXTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-128 0.075 MI SLIDE REPAIR ON CR-37 AT APPROXIMATELY 3 MILES NORTH OF SR-185 NORTHEAST OF FORT DEPOSIT; L24AC-100054083 W.S. NEWELL & SONS, INC. ERPR-8910(937) LOWNDES CR-37

06-131 3.780 MI SHOULDER PAVING & TRAFFIC STRIPE ON CR-59FROM 0.085 MI NORTH OF CR-8 TO SR-14 EAST OF MNST -100054297 WETUMPKA; (GARY INGRAM GRADING & PAVING, INC.) STPOA-2624(201) ELMORE

06-135 4.888 MI RESURFACING AND TRAFFIC STRIPE ON CR 407 (E COTTON RD) FROM SR 63 N OF ECLECTIC TO SR 229; A1RDY-100058344 WIREGRASS CONSTRUCTION COMPANY, INC. ACNU58344-ATRP(001) ELMORE CR 407

06-136 14.116 MI RESURFACING AND TRAFFIC STRIPE ON CR-1 FROM SR-14 NEAR BURNSVILLE TO SR-6 (US-82) NEAR A1RDY-100058333 BILLINGSLEY; ASPHALT CONTRACTORS, INC. ACNU58333-ATRP(001) AUTAUGA CR 1

06-139 0.087 MI SLIDE REPAIR ALONG I-65 (NORTHBOUND OUTSIDE SHOULDER) ONE MILE S OF THE CR-33 IM04L-100055185 UNDERPASS NE OF FORT DEPOSIT; CHILTON CONTRACTORS,INC. IM-I065(413) LOWNDES I-65

06-141 3.613 MI RESURFACING AND TRAFFIC STRIPE ON CR-17 (MITCHELL YOUNG RD) FROM SR-8 (US-80) WEST OF THE A1RDY-100058358 MONTGOMERY CITY LIMITS TO CR-54 (OLD SELMA RD); APAC MID-SOUTH, INC. ACNU58358-ATRP(001) MONTGOMERYCR 17

06-146 0.814 MI INTERCHANGE IMPROVEMENTS ON I-85 AT PERRYHILL ROAD (EXIT 4) IN MONTGOMERY; NH01M-100051237 SCOTT BRIDGE COMPANY, INC. NHF-I085(327) MONTGOMERYI-85

06-147 4.660 MI RELOCATION (GRADE, DRAINAGE, PARTIAL BASE& PAVE & BRIDGE) ON SR-55 FROM 2 MI S OF GEORGIANA STOAL-100009080 TO SR-106 JUST WEST OF GEORGIANA; (NEWELL ROADBUILDERS, INC.) STPOA-0055(501) BUTLER

06-150 0.066 MI BRIDGE REPLACEMENT (BRIDGE CULVERT) AND APPROACHES ON CR-18 AT SPRING CREEK NE OF SMUTEYE; BROFL-100051115 H&L CONSTRUCTION, INC., P.O. BOX 243, TROY, AL 36081 BRZ-0600(203) BULLOCK

06-151 0.086 MI. BRIDGE REPLACEMENT (PRECAST) & ON CR 61 AT LITTLE INDIAN CREEK NORTHEAST GRBN1-100044955 OF SMUTEYE (MURPHREE BRIDGE CORPORATION) ACGBBRZ-0600(202) BULLOCK CR 61

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 70 SIXTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-153 6.144 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-6 (US-82) FROM BEGINNING OF DIVIDED 4-LANE E HSIPE-100058204 OF CR-40 IN UNION SPRINGS TO THE END OF DIVIDED 4-LANE; EAST ALABAMA PAVING COMPANY, INC. STAAM-100058204 STPAA-HSIP-0006(547) BULLOCK SR-6

06-155 14.242 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-6 (US-82) FROM THE MONTGOMERY CO LINE (MP HSIPM-100058205 179.335) TO BOWLIN CREEK (MP 193.578); ASPHALT CONTRACTORS, INC. STAAM-100058205 STPAA-HSIP-0006(549) BULLOCK SR-6

06-156 10.606 MI PLANING, RESURFACING AND WIDENING ON SR-110 FROM MONTGOMERY CO LINE (MP 14.077) TO CR-7 HSIPM-100058201 (MP 24.684); WIREGRASS CONSTRUCTION COMPANY, INC. STAAM-100058201 STPAA-HSIP-0110(504) BULLOCK SR-110

06-157 2.255 MI RESURFACING AND TRAFFIC STRIPE ON CR-69 FROM ECLECTIC S CITY LIMIT TO JEAN ST IN ECLECTIC; STNUL-100053621 (APAC MID-SOUTH, INC.) STPNU-2650(200) ELMORE

06-158 6.558 MI SHOULDER PAVING & TRAFFIC STRIPE ON CR-4 FROM CR-8 TO MITCHELL CREEK ROAD SOUTHEAST OF MNSTC-100053865 WETUMPKA; (ASPHALT CONTRACTORS, INC.) STMOA-2601(201) ELMORE

06-160 8.323 MI. RESURFACING AND TRAFFIC STRIPE ON CR 17 FROM CR 12 TO SR 8 (US 80) AT STOAH-100050649 WHITE HALL (APAC-SOUTHEAST, INC.) STPOA-4308(200) LOWNDES CR 17

06-161 10.010 MI RESURFACING & TRAFFIC STRIPE ON CR-29 FROM SR-53 (US-231) AT RIDDLE TO THE COOSA CO LINE MNST -100055828 (ASPHALT CONTRACTORS, INC.) STNUE-100055828 STPOA-STPNU-2618(201) ELMORE

06-163 2.840 MI RESURFACING & TRAFFIC STRIPE ON CR-37 FROM CR-24 IN BILLINGSLEY TO CHILTON COUNTY LINE; STNUC-100054157 (APAC MID-SOUTH, INC.) STMNU-STPNU-0123(200) AUTAUGA

06-164 0.174 MI BRIDGE REPLACEMENT (PRECAST) & APPROACHESON CR-53 AT A TRIBUTARY OF PATSALIGA CREEK SE OF A1BRZ-100058339 THE TOWN OF INDUSTRY, AL ; F & W CONSTRUCTION COMPANY, INC. ACBRZ58339-ATRP(001) BUTLER CR-53

06-165 4.633 MI WIDENING, RESURFACING AND TRAFFIC STRIPE ON JACKSON/OLD WARE RD (CR-103) FROM PEACH CHURCH MNST1-00057525 RD N TO REDLAND RD N OF OLD BINGHAM; ASPHALT CONTRACTORS, INC. STPOA-2644(200) ELMORE CR-103

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 71 SIXTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-166 6.079 MI PLANING, RESURFACING AND WIDENING ON SR-97 FROM N OF SR-21 (MP 23.700) IN HAYNEVILLE TO S30AC-100058663 S OF SR-8 (US-80) (MP 29.780) IN LOWNDESBORO; APAC MID-SOUTH, INC. 24AC1-00058663 STPAA-HSIP-0097(504) LOWNDES SR-97

06-167 0.265 MI BRIDGE REPLACEMENT ON SR-106 OVER PIGEON CREEK AT MP 22.977 E OF CR-45; NEWLL & BUSH, INC. NH01M-100050027

BR-0106(500) BUTLER SR-106

06-168 5.791 MI PLANING, RESURFACING, WIDENING AND FULL DEPTH RECLAMATION ON SR-106 FROM THE JUNCTION OF HSIPM-100058744 CR-45(MP 20.630) TO THE CRENSHAW CO LINE(MP 26.688EAST GEORGIANA; WIREGRASS CONSTRUCTION CO., INC. STNUM-100058744 STPNU-HSIP-0106(503) BUTLER SR-106

06-169 0.108 MI GRADE, DRAIN, BASE AND PAVE ON SR-14 FROMTHE INTERSECTION OF CR-7 (DEATSVILLE HWY) TO JUST 99044-100056146 W OF WINN DIXIE IN MILLBROOK; CHILTON CONTRACTORS,INC. 99-406-261-014-112 ELMORE SR-14

06-172 0.511 MI ADDITIONAL LANES (GRADE, DRAIN, PAVEMENT & BRIDGE WIDENING ON PERRY HILL ROAD FROM I-85 TO MNSTC-100040820 HARRISON RD IN MONTGOMERY; (DUBOSE CONSTRUCTION COMPANY, LLC) STMOA-7724(601) MONTGOMERY

06-174 7.329 MI MICRO-MILLING, RESURFACING AND TRAFFIC STRIPE ON I-65 FROM THE N END OF CR-41 UNDERPASS IM01M-100055196 BRIDGE TO 0.6 MI S OF THE LOWNDES CO LINE; APAC MID-SOUTH, INC. IM-I065(442) BUTLER I-65

06-176 4.654 MI; WIDENING, LEVELING, RESURFACING AND TRAFFIC STRIPE ON CR-39 FROM THE ELMORE CO LINE TO STMNM-100059852 CR-85 N OF PRATTVILLE; APAC MID-SOUTH, INC STPMN-CN13(204) AUTAUGA CR-39

06-177 7.491 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-9 (US-231) FROM TALLAPOOSA RIVER BRIDGE TO SR- HSIPE-100051864 21 IN WETUMPKA; (ASPHALT CONTRACTORS, INC.) NH04E-100051864 NH-HSIP-0009(527) ELMORE

06-179 0.146 MI GRADE, DRAIN, BASE, PAVE AND BRIDGE REPLACEMENT ON SR-22 OVER VALLEY CREEK IN SELMA; BRNM1-00002692 NEWELL & BUSH, INC. BR-0022(503) DALLAS SR-22

06-181 3.008 MI LEVELING, RESURFACING AND TRAFFIC STRIPE ON ROCK SPRINGS DR (CR-75) FROM RIFLE RANGE RD TO STNUM-100059802 REDLAND RD E OF WARE; GARY INGRAM GRADING & PAVINGINC. STPNU-2600(209) ELMORE CR-75

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 72 SIXTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-183 1.520 MI RESURFACING & TRAFFIC STRIPE ON ALABAMA RIVER PARKWAY FROM SR-143 EAST OF PRATTVILLE CITY MNSTC-100053771 LIMIT TO JACKSON LAKE ROAD; (ASPHALT CONTRACTORS, INC.) STMOA-7804(601) ELMORE

06-186 1.371 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON CR-75 S (MCQUEEN SMITH RD)FROM CR-2 (E MAIN ST) STMNM-100056012 TO SR-6 (US-82) IN PRATTVILLE; ASPHALT CONTRACTORSINC. STPMN-7812(602) AUTAUGA CR-75

06-187 1.241 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON CR-30 (FRANKLIN RD) FROM CR-95 (MOTLEY LANE) TO A1RDY-100058349 CR-126 (OLD MONTGOMERY RD) IN TUSKEGEE; APAC MID-SOUTH, INC. ACOA58349-ATRP(001) MACON CR-30

06-188 3.662 MI RESURFACING & TRAFFIC STRIPE ON CR-62 FROM BUTLER CO LINE TO SR-3 (US-31) SOUTH OF STNUR-100055314 SANDY RIDGE; (WIREGRASS CONSTRUCTION CO., INC.) STPNU-CN10(219) LOWNDES

06-189 & 99-406-074-106-220; 1.349 MI PLANING, RESURFACINWIDENING AND SLOPE REPAIR ON SR-106 FROM 0.5 MI E HSIPM-100058202 OF CR-17 (MP 9.450) TO THE JUNCTION OF SR-55 (MP 10.800) NEAR GEORGIANA; APAC MID-SOUTH, INC. STAAM-100058202 STPAA-HSIP-0106(504) BUTLER SR-106 99044-100058826

06-190 & MONTGOMERY COUNTY; 9.325 MI PLANING, RESURFACINGTRAFFIC STRIPE AND COUNTING UNITS ON I-65 FROM 0.5 IM01M-100055192 MI S OF SR-97 (MP 150.560) TO THE RELIEF BRIDGE BEFORE PINTLALA CREEK(MP 159.886); WIREGRASS IM-I065(437) LOWNDES I-65

06-205 6.519 MI FULL DEPTH RECLAMATION ON C-7 FROM CR-16 IN FOSTORIA TO THE DALLAS COUNTY LINE; STNUE-100057831 (ASPHALT CONTRACTORS, INC.) STPNU-4316(201) LOWNDES

06-206 2.654 MI SHOULDER PAVING & TRAFFIC STRIPE ON REDLAND RD FROM FIRETOWER RD TO MARSHELL RD SE OF MNST -100054295 WETUMPKA; (APAC MID-SOUTH, INC.) STPOA-2603(203) ELMORE

06-207 5.356 MI PAVEMENT REHABILITATION & RAMP WIDENING ON I-65 FROM N OF CRESCENT LAKE BRIDGE (MP 177.115 IM04E-100054914 TO NORTH OF AUTAUGA CO LINE (MP 182.472); (WIREGRASS CONST. CO., INC.) IM-I065(408) ELMORE

06-210 6.291 MI RESURFACING & TRAFFIC STRIPE ON REDLAND ROAD FROM MARSHELL RD EAST OF WETUMPKA TO FRIEND- STOAE-100056621 SHIP ROAD; (WIREGRASS CONSTRUCTION COMPANY, INC.) STPOA-2603(204) ELMORE

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 73 SIXTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 06-211 4.982 MI PARTIAL GRADE AND DRAIN, BASE, PAVEMENT AND SIGNING ON RELOCATION OF SR-55 FROM 2 MI S OF L24AC-100009079 GEORGIANA TO NEW LOCATION OF SR-106; (NEWELL ROADBUILDERS, INC.) ACSTPAA-0055(506) BUTLER

06-212 1.872 MI SANITARY SEWER LIFT STATION AND FORCE MAIN FOR REST AREAS ON I-65 NORTH OF GREENVILLE; IM04R-100056005 (GOLDMAN CONTRACTORS, LLC) IM-I065(424) BUTLER

06-213 1.667 MI WIDENING (GRADE, DRAINAGE & PAVEMENT) ON SR-14 FROM CALLAWAY CREEK TO EXISTING FOUR LANE EBSPE-100008917 WEST OF WETUMPKA; (GRADY RALLS & SONS, INC.) EB-0014(503) ELMORE

06-214 4.391 MI RESURFACING & TRAFFIC STRIPE ON COOSADA RD FROM MAIN ST IN MILLBROOK TO BLACKWELL DRIVE; MNST -100055826 (WIREGRASS CONSTRUCTION COMPANY, INC.) STPOA-7906(601) ELMORE

06-215 3.143 MI RESURFACING & TRAFFIC STRIPE ON CR-42 FROM CR-71 WEST OF GREENVILLE TO CR-54; STNUE-100056301 (APAC MID-SOUTH, INC.) STPNU-0715(200) BUTLER

06-216 4.306 MI RESURFACING & TRAFFIC STRIPE ON CR-54 FROM DICKENS FIELD ROAD TO CR-42 NW OF GREENVILLE; STNUE-100056300 (APAC MID-SOUTH, INC.) STPNU-0715(201) BUTLER

06-218 11.194 MI PLANING, RESURFACING & TRAFFIC STRIPE ONI-65 FROM S OF THE LOWNDES CO LINE (MP 139.365) TO IM04E-100054915 S OF SR-97 (EXIT 151) MP 150.560) AT LETOHATCHEE; (APAC MID-SOUTH, INC.) IM04R-100054915 IM-I065(409) BUTLER

06-219 3.153 MI RESURFACING AND TRAFFIC STRIPE ON COOSADAPARKWAY FROM ALABAMA PARKWAY TO COOSADA ROAD IN MNST -100055825 COOSADA; (WIREGRASS CONSTRUCTION COMPANY, INC.) STPOA-7905(601) ELMORE

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

AACGBBR-0108(201) & ACGBBRZ-01 AUTAUGA CR#57 1.04 % 06-001 WARRIOR CONST 989,933 150 W 081 100 05-01-04 963,069 12,476.36 1,194,988 0 0 0

NHF-0006(535) AUTAUGA SR 6 9.89 % 06-002 WIREGRASS CON 4,634,059 175 W 063 046 07-31-14 2,275,406 598,958.87 6,055,533 14,078 0 14,078

STPOA-0119(200) AUTAUGA 5.33 % 06-003 ASPHALT CONTR 801,310 30 W 078 100 07-31-09 760,153 47,047.04 881,441 0 0 0

STPNU-0127(200) AUTAUGA 5.96 % 06-004 APAC MID-SOUT 601,102 30 W 067 100 02-28-11 584,878 44,830.16 751,345 0 0 0

ITS-STPAAF-9901(001) AUTAUGA I-65 2.40 % 06-005 THE CONTACT N 2,088,869 114 D 090 049 03-01-14 1,031,085 44,506.22 1,851,203 148,741 0 148,741

STMOA-7812(601) AUTAUGA 11.52 % 06-006 ASPHALT CONTR 435,797 30 W 086 100 08-02-10 312,057 80,099.07 695,101 0 0 0

STPMN-0111(201) AUTAUGA CR-85 7.32 % 06-007 APAC MID-SOUT 498,657 30 W 000 000 00-00-00 0 39,064.00 533,123 0 0 0

STPMT-7804(600) AUTAUGA E MAIN 17.19 % 06-008 RE GRILLS CON 1,035,676 0 273 100 10-01-05 866,722 191,100.70 1,111,272 18,064 0 18,064

99-506-690-000-202 AUTAUGA 25.54 % 06-009 GRADY RALLS & 594,663 75 W 135 099 12-04-13 541,069 167,106.71 654,129 0 0 0

STPNU-0116(200) AUTAUGA CR 40 5.35 % 06-010 APAC MID-SOUT 1,542,205 30 W 000 000 00-00-00 0 98,454.84 1,840,028 0 0 0

STPOAF-7814(602) AUTAUGA CR-29 7.86 % 06-011 NEWELL ROADBU 5,680,100 250 W 049 032 08-08-14 1,895,347 558,570.14 7,099,728 112,929 0 112,929

STPAA-7819(600) AUTAUGA 0.00 % 06-012 KELLY ROAD BU 592,245 35 W 000 000 00-00-00 0 .00 0 0 0 0

99-406-001-000-803,99-406-005- DIV.WIDE 0.36 % 06-013 BENTLEY TURF 490,006 114 W 000 000 00-00-00 0 1,045.39 289,921 0 0 0

STPAA-HSIP-0110(503) BULLOCK SR-110 1.90 % 06-014 WIREGRASS CON 2,477,106 75 W 000 000 00-00-00 0 49,496.35 2,602,912 0 0 0

ACGBBR-0625(200) BULLOCK CR#31 27.84 % 06-016 MURPHREE BRID 1,010,104 85 W 069 100 05-07-04 987,160 48,997.77 175,958 0 0 0

STMAA-0003(550) BUTLER 7.96 % 06-020 BULLARD EXCAV 2,314,579 65 W 100 100 03-03-10 2,124,543 200,961.58 2,524,130 0 0 0

ACNU58340-ATRP(001) BUTLER CR-50 3.74 % 06-021 APAC MID-SOUT 1,274,336 45 W 000 000 00-00-00 0 50,154.43 1,338,053 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACGBBR-0603(200)& ACGBBRZ-0600 BULLOCK CR#8 1.84 % 06-022 MURPHREE BRID 1,272,740 360 C 100 100 08-01-05 1,329,895 28,681.85 1,552,788 0 57,155 57,155

IM-I065(441) BUTLER I-65 4.68 % 06-023 WIREGRASS CON 5,486,320 3114 D 000 000 07-31-14 0 311,161.57 6,645,185 46,833 0 46,833

STMNU-STPNU-0707(200) BUTLER 16.69 % 06-024 APAC MID-SOUT 845,704 45 W 053 100 09-07-10 853,353 44,246.58 265,000 0 0 0

SRTS-SR13(913) BUTLER 0.00 % 06-025 ROBBIE'S DOZE 74,719 30 W 027 066 05-01-14 49,408 .00 0 9,150 0 9,150

STPNU-0714(250) BUTLER CR-65 2.65 % 06-026 MIDSOUTH PAVI 1,076,422 50 W 000 000 00-00-00 0 32,592.50 1,227,703 0 0 0

ST-026-014-001 ELMORE SR 14 94.25 % 06-027 STONE ELECTRI 256,884 40 W 015 100 08-31-08 58,125 254,493.27 270,000 31,252 0 31,252

ACOA58338-ATRP(001) BUTLER 1.36 % 06-028 MIDSOUTH PAVI 409,975 40 W 000 000 00-00-00 0 6,093.80 445,282 0 0 0

STPTE-CN01(926) 6TH DIV. SITES 20.35 % 06-029 SAFETY GUIDE 407,313 90 W 081 100 06-20-03 368,601 94,294.52 463,247 0 0 0

BRF-0008(557) DALLAS SR-8 19.70 % 06-030 CARCEL & G. C 2,771,985 220 W 071 081 03-01-14 2,771,984 713,869.68 3,622,277 44,760 0 44,760

ACOA58341-ATRP(001) DALLAS 1.92 % 06-031 ASPHALT CONTR 862,079 60 W 000 000 00-00-00 0 19,044.03 991,391 27,360 0 27,360

ACNU58342-ATRP(001) DALLAS CR-115 3.65 % 06-032 ASPHALT CONTR 397,850 30 W 000 000 00-00-00 0 15,712.42 430,171 697 0 697

NH-HSIP-0008(565) DALLAS SR-8 7.55 % 06-033 WIREGRASS 2,766,927 90 W 100 100 01-20-14 2,602,888 261,226.04 3,458,465 29,148 0 29,148

STPNU-2414(250) DALLAS CR-45 1.83 % 06-034 ASPHALT CONTR 584,109 45 W 000 000 00-00-00 0 13,081.89 711,791 0 0 0

STPNU-2414(251) DALLAS CR-37 0.35 % 06-035 ASPHALT CONTR 1,032,928 30 W 000 000 00-00-00 0 4,477.83 1,268,262 93,668 0 93,668

99-506-690-000-302 DALLAS 0.00 % 06-036 K. V. K. CONT 625,495 130 W 000 000 00-00-00 0 .00 772,061 0 0 0

STPNU-2412(200) DALLAS CR 45 11.12 % 06-039 POZZOLANIC CO 400,935 30 W 000 000 00-00-00 0 56,911.63 511,447 0 0 0

STPAA-HSIP-0009(548) ELMORE SR-9 6.23 % 06-040 ASPHALT CONTR 2,577,479 90 W 000 000 00-00-00 0 251,188.91 4,025,486 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACAA60061-ATRP(001) ELMORE 3.84 % 06-041 VANCE BROTHER 1,806,960 90 W 000 000 00-00-00 0 72,900.05 1,897,309 0 0 0

STPMN-7911(600) ELMORE CR-008 11.96 % 06-042 APAC MID-SOUT 473,219 30 W 000 000 00-00-00 0 62,266.33 520,541 0 0 0

STPAA-HSIP-0170(500) ELMORE SR-170 0.66 % 06-043 ASPHALT CONTR 3,879,341 125 W 000 000 00-00-00 0 42,343.00 6,367,557 0 0 0

STPNU-2649(200) ELMORE CR-161 11.52 % 06-044 APAC MID-SOUT 313,679 30 W 000 000 00-00-00 0 43,117.25 374,255 0 0 0

STPOA-2618(200) ELMORE 7.73 % 06-045 NEWELL & BUSH 1,846,174 100 W 100 100 02-12-09 1,736,454 148,532.75 1,919,882 0 0 0

ACAA60062-ATRP(002) ELMORE 0.12 % 06-046 WIREGRASS CON 9,147,495 165 W 000 000 00-00-00 0 13,503.86 10,418,505 0 0 0

STPOA-2613(200) ELMORE 12.24 % 06-047 GARY INGRAM G 384,237 30 W 000 000 00-00-00 0 56,149.41 458,439 0 0 0

STPNU-2614(250) ELMORE CR-73 0.20 % 06-048 ASPHALT CONTR 515,905 30 W 000 000 00-00-00 0 1,239.44 593,466 0 0 0

STPOA-0606(200) BULLOCK CR 7 3.63 % 06-049 ASPHALT CONTR 337,269 30 W 100 100 01-31-06 340,313 12,834.98 352,996 0 -3,044 -3,044

STPNU-4300(204) LOWNDES CR-13 3.36 % 06-050 WIREGRASS 939,957 30 W 000 000 00-00-00 0 50,644.53 1,505,208 -6,250 0 -6,250

STPAA-201(523) ELMORE SR#14 11.12 % 06-051 SE. CHEROKEE 5,179,871 240 C 099 100 05-01-04 5,841,704 728,368.97 6,549,039 30,650 0 30,650

BRF-0008(567) LOWNDES 0.00 % 06-052 MCINNIS CONST 2,888,554 180 W 000 000 02-28-15 0 .00 0 0 0 0

DE-A204(936) LOWNDES 3.54 % 06-053 S & C MATERIA 246,806 30 W 000 000 00-00-00 0 9,631.80 271,486 0 0 0

BRF-0008(553) & NH-0008(570) LOWNDES SR-8 0.00 % 06-054 W. S. NEWELL 5,266,168 200 W 000 000 00-00-00 0 .00 0 0 0 0

RECA-0229(501) ELMORE SR 229 12.84 % 06-059 TEN-T CORP. 1,046,106 270 C 092 100 06-28-05 1,230,022 186,219.94 1,450,301 4,000 161,694 165,694

STPOA-426(200) MACON CR40 7.06 % 06-060 APAC MID-SOUT 479,658 40 W 000 000 00-00-00 0 44,268.73 626,791 0 0 0

ACNU59639-ATRP(001) MACON CR-54 5.24 % 06-061 EAST ALABAMA 272,021 40 W 000 000 00-00-00 0 16,393.57 312,824 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACNU59634-ATRP(001) MACON CR-2 4.91 % 06-062 EAST ALABAMA 990,563 40 W 000 000 00-00-00 0 53,551.96 1,089,620 0 0 0

DE-APL-STPAA-A165(925) MACON CITY 15.51 % 06-063 DUBOSE CONSTR 1,549,311 100 W 079 100 02-06-13 1,922,120 276,446.37 1,781,708 1,250 0 1,250

ACBR60156-ATRP(001) MACON CR-9 0.00 % 06-064 MURPHREE BRID 2,010,775 170 W 000 000 00-00-00 0 .00 0 0 0 0

SRTS-SR11(904) MACON 0.00 % 06-065 BURNETT CIVIL 63,532 30 W 100 100 07-31-12 66,739 .00 0 0 0 0

ACNU59631-ATRP(001) MACON CR-54 0.05 % 06-066 EAST ALABAMA 532,810 40 W 000 000 00-00-00 0 333.42 664,110 0 0 0

IM-I085(334) MACON I-85 7.44 % 06-067 WIREGRASS CON 16,827,995 114 D 074 069 06-01-14 11,562,859 1,441,848.29 19,378,688 241,338 0 241,338

99-406-442-199-401 MACON SR-199 0.29 % 06-068 EAST ALABAMA 1,258,062 30 W 000 000 00-00-00 0 4,133.92 1,383,868 0 0 0

STPNU-4406(200) MACON CR-13 7.84 % 06-069 WIREGRASS CON 416,967 40 W 000 000 00-00-00 0 40,893.69 521,180 0 0 0

HSIP-0053(536) MONTGOMERY 6.10 % 06-070 WIREGRASS CON 2,894,044 90 W 100 100 05-10-11 2,977,549 195,804.26 3,208,547 6,939 0 6,939

STPNU-5100(204) MONTGOMERY CR-12 2.44 % 06-071 APAC MID-SOUT 330,816 30 W 000 000 00-00-00 0 9,654.10 394,702 0 0 0

IM-EBF-I065(386) MONTGOMERY 12.26 % 06-072 WIREGRASS CON 15,667,812 1240 D 100 100 05-03-12 19,373,919 2,503,541.96 20,415,942 227,843 0 227,843

99-406-001-000-401 & 99-406-0 6TH DIV. RTS 0.00 % 06-073 BENTLEY TURF 176,560 69 W 038 067 10-15-04 80,096 .00 178,038 0 0 0

STPMN-7780(600) MONTGOMERY 0.00 % 06-074 ASPHALT CONTR 2,334,562 150 W 007 003 09-30-14 75,714 .00 0 1,819 0 1,819

NH-HSIP-0009(553) MONTGOMERY SR-9 0.03 % 06-075 WIREGRASS CON 3,219,505 85 W 000 000 01-31-15 0 1,467.33 4,037,335 0 0 0

SRTS-SR09(912) MONTGOMERY 9.64 % 06-076 BURNETT CIVIL 116,569 45 W 096 100 11-02-11 78,511 12,369.46 128,225 -8,287 0 -8,287

ACAA58359-ATRP(001) MONTGOMERY CR-85 4.01 % 06-077 WIREGRASS 1,228,477 45 W 000 000 00-00-00 0 71,293.51 1,776,475 0 0 0

ST-051-110-004 MONTGOMERY SR-110 2.78 % 06-078 NEWELL ROADBU 674,267 75 W 000 000 00-00-00 0 24,616.19 885,036 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPNU-5100(205) MONTGOMERY CR-36 3.47 % 06-079 WIREGRASS CON 694,473 35 W 000 000 00-00-00 0 35,406.93 1,018,086 0 0 0

SWA-DOC-001 MONTGOMERY 3.11 % 06-080 APAC MID-SOUT 359,744 30 W 090 100 05-31-11 377,169 13,598.25 437,004 0 0 0

99-406-513-006-111 MONTGOMERY SR-6 16.52 % 06-081 WIREGRASS 1,189,799 100 W 074 085 03-20-14 1,042,213 330,055.75 1,996,778 57,940 0 57,940

IM-I065(410) MONTGOMERY 16.03 % 06-082 SOUTHEAST CHE 236,281 60 W 077 100 07-16-13 309,182 49,516.51 308,758 0 0 0

HHP-0035(510) MONTGOMERY 8.44 % 06-083 R.R. DAWSON B 65,846,200 114 D 073 080 12-01-14 58,630,290 5,107,995.43 60,514,556 505,918 0 505,918

HPP-0035(511) MONTGOMERY 0.39 % 06-084 MIDSOUTH PAVI 13,430,498 255 W 000 000 12-31-15 0 67,632.70 16,976,589 0 0 0

IM-I085(337) MONTGOMERY I 85 26.59 % 06-085 GULF EQUIPMEN 850,469 180 C 100 100 12-31-13 859,864 285,252.62 1,072,564 14,750 0 14,750

STPAA-HSIP-0006(548) MONTGOMERY SR-6 6.47 % 06-086 ASPHALT CONTR 2,918,827 150 W 000 000 00-00-00 0 293,045.97 4,523,675 0 0 0

STPAA-HSIP-0110(505) MONTGOMERY SR-110 52.14 % 06-087 WIREGRASS 3,584,607 85 W 000 000 00-00-00 0 129,899.16 249,125 0 0 0

NH-HSIP-0053(569) MONTGOMERY SR-53 1.12 % 06-088 ASPHALT CONTR 3,195,217 100 W 000 000 11-08-14 0 49,905.11 4,422,931 4,800 0 4,800

99-406-513-009-401 MONTGOMERY SR-9 0.00 % 06-089 ASPHALT CONTR 827,096 30 W 000 000 00-00-00 0 .00 0 0 0 0

BR-4414(202) MACON 17.56 % 06-091 MCINNIS CONST 295,008 50 W 086 100 12-01-10 286,101 59,590.66 339,259 0 0 0

IM-85-1(143) MONTGOMERY I-85 16.17 % 06-093 REESE & HOWEL 1,408,331 110 W 155 100 02-27-05 1,738,465 261,999.98 1,619,580 2,700 0 2,700

EBF-0021(538) MONTGOMERY SR 21 16.44 % 06-094 WORLD FIBER 1,841,570 1612 D 105 094 03-16-14 17,230,130 395,749.59 2,406,462 388,554 0 388,554

STPOA-7777(600) MONTGOMERY 22.35 % 06-099 SE CHEROKEE C 6,836,812 318 W 111 098 03-01-12 8,406,485 1,934,975.15 8,655,644 440,702 0 440,702

99-406-062-110-801 BULLOCK 26.96 % 06-100 CARDWELL CORP 1,186,776 118 W 124 100 10-31-10 1,005,898 379,479.79 1,407,213 15,730 0 15,730

ACAA59586-ATRP(001) AUTAUGA CR-57 5.06 % 06-101 WIREGRASS 897,659 30 W 000 000 00-00-00 0 65,981.81 1,303,529 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACNU59584-ATRP(001) AUTAUGA CR-40 4.11 % 06-102 ASPHALT CONTR 783,915 45 W 000 000 00-00-00 0 42,637.72 1,035,675 0 0 0

STPAA-7804(602) AUTAUGA CR-2 0.00 % 06-103 MIDSOUTH PAVI 482,203 30 W 000 000 00-00-00 0 .00 0 9,600 0 9,600

SRTS-SR12(906) ELMORE VARIOUS 0.00 % 06-104 BURNETT CIVIL 83,892 30 W 110 100 01-31-13 85,404 .00 0 0 0 0

STPAA-7806(600) AUTAUGA CR-2 0.00 % 06-105 WIREGRASS CON 224,332 30 W 000 000 00-00-00 0 .00 0 0 0 0

ACAA59583-ATRP(001) AUTAUGA CR-165 3.70 % 06-106 ASPHALT CONTR 674,428 30 W 000 000 00-00-00 0 32,579.62 880,430 0 0 0

NH-HSIP-0003(583) AUTAUGA SR-3 1.07 % 06-107 MIDSOUTH PAVI 4,006,018 85 W 000 000 12-31-14 0 50,028.53 4,661,260 0 0 0

IM-65-1(239) MONTGOMERY I-65 8.87 % 06-108 WIREGRASS CON 11,324,037 240 W 114 100 05-25-04 13,987,227 1,219,042.30 13,739,420 118,484 0 118,484

ST-007-003-001 BUTLER 21.92 % 06-109 BULLARD EXCAV 432,454 75 W 099 100 08-06-10 436,247 129,343.95 590,000 0 850 850

STPAA-UR12(600) AUTAUGA 6TH ST 0.00 % 06-110 MIDSOUTH PAVI 532,367 45 W 000 000 00-00-00 0 .00 0 0 0 0

SRTS-SR12(918) BUTLER 0.00 % 06-111 ROBBIE'S DOZE 35,392 30 W 060 100 11-10-12 35,681 .00 0 0 0 0

MGF-0009(500) MONTGOMERY U.S.331 16.58 % 06-112 W.S. NEWELL & 3,937,851 225 W 045 100 01-12-06 4,852,497 885,694.77 5,340,123 527,400 914,646 1,442,046

STPAA-5114(201) & (202) MONTGOMERY SR#3 14.24 % 06-113 NEWELL ROADBU 7,434,836 689 C 101 100 03-14-06 8,335,544 1,744,143.93 12,247,650 258,195 0 258,195

STPOA-CN12(213) ELMORE CR 7 0.00 % 06-114 WIREGRASS 760,642 45 W 000 000 00-00-00 0 .00 0 0 0 0

ACNU59585-ATRP(001) AUTAUGA CR-37 4.04 % 06-115 MIDSOUTH PAVI 610,622 30 W 000 000 00-00-00 0 26,436.42 654,355 0 0 0

DE-AL80(933) MONTGOMERY 3.29 % 06-116 BURNETT 112,617 45 W 000 000 00-00-00 0 4,817.84 146,333 0 0 0

SRTS-SR11(905) LOWNDES 0.00 % 06-117 H & L 160,778 45 W 000 000 00-00-00 0 .00 0 -7,010 0 -7,010

STPOA-2642(201) ELMORE CR 155 7.75 % 06-118 WIREGRASS CON 356,977 30 W 000 000 00-00-00 0 33,050.23 425,915 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

NH-0006(543) ELMORE SR 6 4.76 % 06-119 WIREGRASS CON 1,646,954 40 W 093 100 12-19-12 1,480,256 98,144.92 2,058,577 0 0 0

STPOA-7909(600) ELMORE CR 116 0.00 % 06-120 WIREGRASS 180,876 30 W 000 000 00-00-00 0 .00 0 0 0 0

NHF-BRF-0009(532) MONTGOMERY SR 53 8.01 % 06-121 MCINNIS 4,195,075 1713 D 060 020 06-17-13 4,583,630 439,145.44 5,481,893 89,495 0 89,495

ACNU59671-ATRP(003) BUTLER CR-45 0.00 % 06-122 THE MILLER PA 4,875,305 130 W 000 000 00-00-00 0 143.57 5,021,109 0 0 0

ACGBSTPNU-CN04(205) ELMORE CR#92 5.06 % 06-123 APAC-SOUTHEAS 537,946 45 W 113 100 09-08-04 493,956 28,597.40 564,843 0 -43,990 -43,990

STMAA-CN09(908) ELMORE 15.55 % 06-124 APAC MID-SOUT 997,395 30 W 117 100 10-31-10 889,796 178,561.45 1,147,836 0 0 0

ACAA59587-ATRP(003) AUTAUGA CR-4 0.06 % 06-125 MIDSOUTH PAVI 799,081 30 W 000 000 00-00-00 0 467.69 771,903 0 0 0

STPOA-CN08(266) AUTAUGA 4.13 % 06-126 WIREGRASS CON 1,034,814 60 W 040 100 02-01-09 649,224 47,028.49 1,138,295 0 0 0

ERPR-8910(937) LOWNDES CR-37 0.00 % 06-128 W.S. NEWELL & 1,068,550 60 W 000 000 00-00-00 0 25.68 1,228,873 0 0 0

STPOA-2624(201) ELMORE 20.21 % 06-131 GARY INGRAM G 150,355 30 W 087 100 02-25-11 122,127 36,255.71 179,391 -7,456 0 -7,456

ACNU58344-ATRP(001) ELMORE CR 407 7.01 % 06-135 WIREGRASS CON 643,764 30 W 063 099 02-28-13 584,107 47,417.50 675,952 1,733 0 1,733

ACNU58333-ATRP(001) AUTAUGA CR 1 4.94 % 06-136 ASPHALT CONTR 1,946,848 45 W 000 000 00-00-00 0 76,930.60 1,556,690 0 0 0

IM-I065(413) LOWNDES I-65 43.46 % 06-139 CHILTON CONTR 408,556 60 W 100 100 07-24-13 437,321 238,213.86 548,008 10,227 0 10,227

ACNU58358-ATRP(001) MONTGOMERY CR 17 3.11 % 06-141 APAC MID-SOUT 803,264 45 W 000 000 00-00-00 0 26,265.23 843,428 0 0 0

NHF-I085(327) MONTGOMERY I-85 9.12 % 06-146 SCOTT BRIDGE 8,434,036 2114 D 054 036 11-21-14 3,189,572 1,005,565.33 11,021,134 137,505 0 137,505

STPOA-0055(501) BUTLER 20.34 % 06-147 NEWELL ROADBU 6,982,938 300 W 117 100 08-01-11 11,087,728 1,756,153.33 8,632,203 896,000 2,082,447 2,978,447

BRZ-0600(203) BULLOCK 7.40 % 06-150 H&L CONSTRUCT 289,777 60 W 099 100 01-30-09 305,452 22,537.75 304,267 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACGBBRZ-0600(202) BULLOCK CR 61 0.63 % 06-151 MURPHREE BRID 523,000 80 W 096 100 04-30-06 525,225 3,832.25 600,880 0 0 0

STPAA-HSIP-0006(547) BULLOCK SR-6 8.59 % 06-153 EAST ALABAMA 3,997,990 110 W 078 092 02-28-14 3,812,196 429,366.03 4,997,207 141,229 0 141,229

STPAA-HSIP-0006(549) BULLOCK SR-6 8.52 % 06-155 ASPHALT CONTR 4,477,822 135 W 093 100 12-30-13 4,487,846 498,692.23 5,848,369 0 0 0

STPAA-HSIP-0110(504) BULLOCK SR-110 7.58 % 06-156 WIREGRASS CON 2,744,791 80 W 093 099 11-30-13 2,858,233 290,715.41 3,830,321 140,798 0 140,798

STPNU-2650(200) ELMORE 22.03 % 06-157 APAC MID-SOUT 147,999 30 W 100 100 11-14-09 138,004 34,240.87 155,399 0 0 0

STMOA-2601(201) ELMORE 13.85 % 06-158 ASPHALT CONTR 225,268 30 W 063 100 03-05-10 213,819 37,741.13 272,494 0 0 0

STPOA-4308(200) LOWNDES CR 17 5.95 % 06-160 APAC-SOUTHEAS 861,360 50 W 100 100 09-30-08 730,574 55,102.82 924,895 0 0 0

STPOA-STPNU-2618(201) ELMORE 7.59 % 06-161 ASPHALT CONTR 1,061,627 45 W 100 100 07-05-11 983,111 86,927.72 1,145,095 0 0 0

STMNU-STPNU-0123(200) AUTAUGA 8.04 % 06-163 APAC MID-SOUT 290,515 30 W 080 100 04-09-10 273,799 21,322.17 265,000 0 0 0

ACBRZ58339-ATRP(001) BUTLER CR-53 13.89 % 06-164 F & W CONSTRU 414,431 80 W 000 000 00-00-00 0 60,453.74 435,153 -6,276 0 -6,276

STPOA-2644(200) ELMORE CR-103 0.00 % 06-165 ASPHALT CONTR 912,741 45 W 000 000 00-00-00 0 .00 0 0 0 0

STPAA-HSIP-0097(504) LOWNDES SR-97 0.04 % 06-166 APAC MID-SOUT 2,817,360 90 W 095 099 02-15-14 2,822,674 425.23 853,703 -11,427 0 -11,427

BR-0106(500) BUTLER SR-106 0.08 % 06-167 NEWELL & BUSH 1,815,965 1714 D 025 032 01-17-14 787,210 2,296.08 2,599,362 674,426 0 674,426

STPNU-HSIP-0106(503) BUTLER SR-106 8.72 % 06-168 WIREGRASS 2,689,025 80 W 083 099 12-15-13 2,598,811 301,264.03 3,452,719 0 0 0

99-406-261-014-112 ELMORE SR-14 14.09 % 06-169 CHILTON CONTR 183,268 45 W 000 000 00-00-00 0 39,238.32 278,312 1,275 0 1,275

STMOA-7724(601) MONTGOMERY 26.37 % 06-172 DUBOSE CONST. 1,695,426 125 W 084 100 11-01-11 1,951,709 514,198.63 1,949,740 0 0 0

IM-I065(442) BUTLER I-65 8.26 % 06-174 APAC MID-SOUT 4,426,612 2213 D 100 097 02-28-14 4,292,020 478,077.15 5,784,454 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPMN-CN13(204) AUTAUGA CR-39 3.51 % 06-176 APAC MID-SOUT 615,279 45 W 000 000 00-00-00 0 22,702.42 646,043 0 0 0

NH-HSIP-0009(527) ELMORE 10.11 % 06-177 ASPHALT CONTR 3,369,990 125 W 094 100 10-29-11 3,270,886 411,772.62 4,069,903 31,171 0 31,171

BR-0022(503) DALLAS SR-22 0.00 % 06-179 NEWELL & BUSH 2,153,245 114 D 072 082 05-01-14 2,153,245 .00 0 2,365 0 2,365

STPNU-2600(209) ELMORE CR-75 4.66 % 06-181 GARY INGRAM 372,331 30 W 000 000 00-00-00 0 19,905.81 426,517 0 0 0

STMOA-7804(601) ELMORE 10.20 % 06-183 ASPHALT CONTR 404,207 30 W 110 100 09-09-10 348,591 43,595.25 427,311 0 0 0

STPMN-7812(602) AUTAUGA CR-75 10.63 % 06-186 ASPHALT CONTR 394,033 45 W 000 000 00-00-00 0 48,203.67 453,138 0 0 0

ACOA58349-ATRP(001) MACON CR-30 2.67 % 06-187 APAC MID-SOUT 774,980 90 W 000 000 00-00-00 0 23,879.25 891,226 58,400 0 58,400

STPNU-CN10(219) LOWNDES 5.45 % 06-188 WIREGRASS CON 587,366 35 W 100 100 06-02-11 592,515 38,261.40 700,795 0 0 0

STPAA-HSIP-0106(504) BUTLER SR-106 7.68 % 06-189 APAC MID-SOUT 1,497,269 60 W 030 014 06-01-14 211,255 142,919.11 1,859,743 23,600 0 23,600

IM-I065(437) LOWNDES I-65 6.57 % 06-190 WIREGRASS CON 5,467,805 114 D 086 095 03-01-14 5,215,007 469,478.89 7,145,026 0 0 0

STPNU-4316(201) LOWNDES 3.97 % 06-205 ASPHALT CONTR 949,151 45 W 000 000 00-00-00 0 44,983.24 1,132,447 0 0 0

STPOA-2603(203) ELMORE 19.12 % 06-206 APAC MID-SOUT 119,276 30 W 000 000 00-00-00 0 27,211.04 142,310 0 0 0

IM-I065(408) ELMORE 7.21 % 06-207 WIREGRASS CON 7,477,135 212 D 024 001 11-02-12 60,902 705,226.94 9,770,709 18,633 0 18,633

STPOA-2603(204) ELMORE 5.10 % 06-210 WIREGRASS CON 808,579 30 W 000 000 00-00-00 0 49,262.10 964,729 0 0 0

ACSTPAA-0055(506) BUTLER 15.21 % 06-211 NEWELL ROADBU 9,153,003 320 W 093 098 04-01-14 11,985,497 1,819,613.60 11,960,642 233,432 0 233,432

IM-I065(424) BUTLER 27.33 % 06-212 GOLDMAN CONTR 382,762 43 W 093 100 07-01-12 355,743 136,702.38 500,172 15,005 0 15,005

EB-0014(503) ELMORE 29.10 % 06-213 GRADY RALLS & 5,305,609 240 W 100 100 12-16-13 5,502,466 2,017,562.04 6,933,079 131,857 0 131,857

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPOA-7906(601) ELMORE 3.26 % 06-214 WIREGRASS CON 583,032 30 W 067 100 11-16-11 510,066 22,726.13 695,624 0 0 0

STPNU-0715(200) BUTLER 5.49 % 06-215 APAC MID-SOUT 408,346 30 W 100 100 11-30-11 398,890 26,761.67 487,204 0 0 0

STPNU-0715(201) BUTLER 3.96 % 06-216 APAC MID-SOUT 548,550 30 W 100 100 11-30-11 491,032 25,922.28 654,483 0 0 0

IM-I065(409) BUTLER 8.27 % 06-218 APAC MID-SOUT 10,479,661 1712 D 106 100 01-25-13 10,388,932 1,133,681.08 13,694,245 7,559 0 7,559

STPOA-7905(601) ELMORE 8.62 % 06-219 WIREGRASS CON 643,156 30 W 100 100 10-30-11 559,022 66,202.26 767,359 0 0 0 DIVISION TOTALS: 388,554,885 275,622,589 431,584,618 6,003,296 3,169,758 9,173,054 38,244,096.88

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 74 SEVENTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 07-001 DRAINAGE EXTENSION ON US-431 NORTH OF HUNTER'S INLET ROAD IN EUFAULA; BURNETT CIVIL CONTRACTING STATC-100040827 LLC, P.O. BOX 6154, MONTGOMERY, AL 36111 ST-003-001-002 BARBOUR

07-002 ER-8910(938); 0.059 MI BRIDGE CULVERT MODIFICATION& RIPRAP PLACEMENT ON CR-36 AT JOHNSON'S CREEK E L24AC-100054038 OF OZARK & ON CR-64 AT W FORK OF CHOCTAWATCHEE RIVER EAST OF SKIPPERVILLE;(HILTON COOPER CONT) ER9X8-100054041 ER-8910(940) DALE

07-003 COFFEE, GENEVA & PIKE COUNTIES; PILE ENCASEMENTS AND RIPRAP PLACEMENT ON VARIOUS BRIDGES IN THE 99015-100060024 7TH DIVISION; CARTER'S CONTRACTING SERVICES, INC. 99-507-690-000-301 BARBOUR

07-004 5.486 MI PLANING, SAFETY WIDENING, RESURFACING & TRAFFIC STRIPE ON SR-10 FROM THE PIKE CO LINE TO HS31M-100060433 REYNOLDS ST IN CLIO; WIREGRASS CONSTRUCTION CO. INC. STAAM-100060433 STPAA-HSIP-0010(536) BARBOUR SR-10

07-005 2.842 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-248 FROM SR-27 TO COMMON DRIVE IN ENTERPRISE 99703-100050848 BULLARD EXCAVATING, INC., 13264 EVA DRIVE, ANDALUSIA, AL 36420 99-307-162-248-804 COFFEE SR-248

07-006 5.582 MI ADDITIONAL LANES (GRADE, DRAINAGE, BRIDGEAND RUST REMOVAL) ON SR-12 (US-84 FROM SR-141 TO EBSPL-100004564 CR-364 IN ELBA; (S.A. GRAHAM CO., INC., PO BOX 726, BRUNDIDGE, AL) EBF-0012(510) COFFEE

07-007 BRIDGE REPLACEMENT ON SR#95 AT WHITE OAK CK. S. OF EUFAULA. ONBR -100012345 ( F & W CONSTRUCTION CO., INC. ) BR-3419(200) 7TH DIV.CO SR#95

07-008 21.678 MI BITUMINOUS SURFACE TREATMENT & TRAFFIC STRIPE ON CR-75 FROM THE HENRY CO LINE TO SR-131; STNUM-100061828 CR-79 FROM SR-1 TO SR-131;CR-24 FROM SR-30 TO CR- 79;CR-28 FROM BROWDER ST TO CR-79;CHARLES E. WATTS STPNU-0314(250) BARBOUR CR-75

07-009 ACOA61086-ATRP & ACOA61087-ATRP(001);8.976 MI RESURFACING & TRAFFIC STRIPE ON CR-97(GAMMAGE RD), A1RDY-100061085 CR-93(FOX RIDGE RD), & CR-32(COTTONHILL RD)IN EUFAULA;MIDSOUTH PAVING, INC. A1RDY-100061086 ACOA61085-ATRP(001) BARBOUR CR-97 A1RDY-100061087

07-010 26.659 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON VARIOUS ROUTES AS INDICATED IN THE PLANS; A1RDY-100059986 WIREGRASS CONSTRUCTION COMPANY, INC. A1RDY-100058510 ACNU59986-ATRP(001), ETC. COFFEE A1RDY-100058512 A1RDY-100058526 A1RDY-100058511

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 75 SEVENTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 07-011 COVINGTON & GENEVA CO.; ABANDONED RAILROAD CROSSING REMOVAL ON VARIOUS ROUTES IN COFFEE, RHSTR-100059921 COVINGTON & GENEVA COUNTIES AS INDICATED IN THE PLANS; WIREGRASS CONSTRUCTION COMPANY, INC. RRSTR-100059921 STPRR-STPRH-RR13(902) COFFEE STRRE-100059921

07-012 1.902 MI PAVEMENT REHABILITATION ON TIGER DR FROM SR-166 TO CR-364 (TAYLOR MILL RD) IN ELBA; STATO-100060491 W. S. NEWELL & SONS, INC. ST-016-999-014 COFFEE

07-013 2.421 MI RESURFACING AND TRAFFIC STRIPE ON CR-537 FROM THE JUNCTION OF CR-555 TO THE JUNCTION OF STNUM-100061647 SR-134 IN ENTERPRISE; WIREGRASS CONSTRUCTION CO. INC. STPNU-1600(228) COFFEE CR-537

07-014 0.007 MI BRIDGE REPLACEMENT ON CR-637 OVER WHISKEYBRANCH; G. W. NORRELL CONTRACTING COMPANY, INC. A1BRZ-100059407

ACBRZ59407-ATRP(001) COFFEE CR-637

07-015 4.122 MI ADDITIONAL LANES (GRADE, DRAIN & PARTIAL BASE & PAVE) ON SR-12 (US-84) FROM W OF DOUBLE HPPH1-100004087 BRIDGES CREEK AT NEW BROCKTON TO ENTERPRISE BYPASS(MCINNIS CONSTRUCTION, LLC) HPPL1-100004087 NHF-HPP-0012(517) COFFEE

07-016 58532,58528, 58509,58513 & 58508;24.784 MI RESURF & TRAFFIC STRIPE ON CR-410, CR-107, CR-355/364 A1RDY-100058530 (TAYLOR MILL RD), CR-330 & CR-143; WIREGRASS CONSTRUCTION COMPANY, INC. A1RDY-100058532 ACNU58530-ATRP(003) COFFEE CR-410 A1RDY-100058528 A1RDY-100058509 A1RDY-100058513 07-017 DALE, GENEVA & HENRY COUNTIES; PILE ENCASEMENT ANDRIPRAP PLACEMENT ON VARIOUS BRIDGES AT SITES AS 99015-100058203 INDICATED BY THE PLANS; GRADY RALLS & SONS, INC. 99-507-690-000-201 COFFEE

07-018 27.965 MI MICRO-SURFACING TREATMENT AND TRAFFIC STRIPE ON VARIOUS COUNTY ROUTES AS INDICATED IN A1RDY-100061063 THE PLANS; STRAWSER CONSTRUCTION INC. ACNU61063-ATRP(001) COFFEE

07-020 4.242 MI. BASE, PAVE & PARTIAL GRADE & DRAIN ON THE RELOCATION OF SR 12 (U.S. 84) FROM MGEXH-100004084 CR 507 TO WEST OF DOUBLE BRIDGES CREEK IN NEW BROCKTON (APAC-SOUTHEAST, INC.) MGF-0012(509) COFFEE SR 12

07-021 & CONECUH COUNTY; 10.276 MI PLANING, RESURFACING &TRAFFIC STRIPE ON SR-55 FROM THE N CITY LIMITS OF EBSPE-100059630 RED LEVEL TO THE CONECUH/BUTLER CO LINE; WIREGRASS CONSTRUCTION COMPANY, INC. EB-0055(510) COVINGTON SR-55

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 76 SEVENTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 07-022 7.519 MI RESURFACING AND TRAFFIC STRIPE ON CR 70 FROM CR 49 TO CR 77 NORTHEAST OF ANDALUSIA; A1RDY-100058543 WIREGRASS CONSTRUCTION COMPANY, INC. ACNU58543-ATRP(001) COVINGTON CR 70

07-023 0.785 MI BRIDGE REPLACEMENTS AND APPROACHES ON SR-12 (US-84) (EBR) AT YELLOW RIVER AND RELIEF BROPE-100053031 SE OF SANFORD; MURPHREE BRIDGE CORP. BRF-0012(547) COVINGTON SR 12

07-025 2.630 MI WIDENING, LEVELING & RESURFACING ON CR-73FROM CR-47 TO SR-12 (US-84) WEST OF BABBIE; A1RDY-100059447 WIREGRASS CONSTRUCTION COMPANY, INC. ACNU59447-ATRP(001) COVINGTON CR-73

07-026 15.747 MI RESURFACING ON CR-42 FROM THE CONECUH COLINE TO THE ANDALUSIA CITY LIMITS; A1RDY-100058544 WIREGRASS CONSTRUCTION COMPANY, INC. ACNU58544-ATRP(001) COVINGTON CR-42

07-027 0.992 MI SURFACE TREATMENT, LEVELING & RESURFACINGON CR-45 FROM E OF THE ANDALUSIA CITY LIMITS TO A1RDY-100058540 HEAD FARM RD; WIREGRASS CONSTRUCTION COMPANY, INC. ACNU58540-ATRP(001) COVINGTON CR-45

07-028 & ACNU59450-ATRP(001); 8.361 MI WIDENING, LEVELINGAND RESURFACING ON CR-42 FROM SR-12 (US-84) TO A1RDY-100059449 CR-77 & ON CR-42 FROM CR-77 TO THE OPP CITY LIMITS; MIDSOUTH PAVING INC. A1RDY-100059450 ACNU59449-ATRP(001) COVINGTON CR-42

07-029 3.089 MI PLANING, RESURFACING, TRAFFIC STRIPE AND PAVEMENT MARKERS ON W CUMMINGS AVE FROM SR-12 A1RDY-100058536 (US-84) TO SR-9 (MAIN ST) IN OPP; WIREGRASS CONSTRUCTION COMPANY, INC. ACNU58536-ATRP(001) COVINGTON

07-030 & ACBR58548-ATRP(001); 0.253 MI BRIDGE REPLACEMENT(PRECAST) AND APPROACHES ON CR-50 OVER SWEETWATER A1BR1-00058550 AND LITTLE PATSALIGA CREEKS E OF HONORAVILLE; GULF EQUIPMENT CORPORATION A1BR1-00058548 ACBR58550-ATRP(001) CRENSHAW CR-50

07-032 6.409 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-106 FROM THE BUTLER CO LINE TO THE PATSALIGA EBEXE-100059856 RIVER BRIDGE; WIREGRASS CONSTRUCTION COMPANY, INC. EB-0106(505) CRENSHAW SR-106

07-033 & ACBR58545-ATRP(001); 0.211 MI BRIDGE REPLACEMENTAND APPROACHES ON CR-59 OVER CEDAR CREEK AND BEE A1BR1-00058547 CREEK N OF LUVERNE; H & L CONSTRUCTION, INC. A1BR1-00058545 ACBR58547-ATRP(001) CRENSHAW CR-59

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 77 SEVENTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 07-040 0.123 MI BRIDGE REPLACEMENT ON CR-36 (ROY PARKER RD) OVER LITTLE CLAYBANK CREEK IN OZARK; A1RDY-100058565 G. W. NORRELL CONTRACTING COMPANY, INC. ACBR58565-ATRP(001) DALE CR-36

07-041 9.052 MI PLANING, SAFETY WIDENING, RESURFACING & TRAFFIC STRIPE ON SR-105 FROM JUST N OF JONES ST S30AC-100060326 IN OZARK TO JUST N OF CR-33 IN SKIPPERVILLE; WIREGRASS CONSTRUCTION COMPANY, INC. 24AC1-00060326 STPAA-HSIP-0105(502) DALE SR-105 HSIPM-100060326

07-042 3.230 MI RESURFACING AND TRAFFIC STRIPE ON CR-18 FROM SR-53 (US-231) AT BAGWELLS CROSSROADS TO A1RDY-100058573 SR-27; WIREGRASS CONSTRUCTION COMPANY, INC. ACNU58573-ATRP(001) DALE CR-18

07-043 0.647 MI RESURFACING AND TRAFFIC STRIPE ON CR-59 FROM THE INTERSECTION OF SR-53 (US-231) TO HINTON DTST1-00057884 WATERS AVENUE IN MIDLAND CITY; WIREGRASS CONSTRUCTION COMPANY, INC. STPOA-9441(605) DALE CR-59

07-044 3.006 MI RESURFACING AND TRAFFIC STRIPE ON CR-91 FROM THE JUNCTION OF CR-29 TO THE JUNCTION OF CR- A1RDY-100058571 34 SW OF OZARK; WIREGRASS CONSTRUCTION CO., INC. ACOA58571-ATRP(001) DALE CR-91

07-045 1.355 MI RESURFACING AND TRAFFIC STRIPE ON CR-114 (OLD SR-134)FROM THE DEAD END W OF SR-37(TANK HILL A1RDY-100058569 RD)TO THE JUNCTION OF SR-85(DALEVILLE AVE); WIREGRASS CONSTRUCTION COMPANY, INC. ACNU58569-ATRP(001) DALE CR-114

07-046 0.151 MI SLIDE REPAIR ON SR-123 NEAR CR-108 (DILLARD RD) NORTH OF OZARK; CARSENN CONSTRUCTION STAAL-100055320 COMPANY, INC. ERPR-8930(923) DALE SR-123

07-047 8.412 MI RESURFACING AND TRAFFIC STRIPE ON CR-15 FROM THE JUNCTION OF SR-105 NE OF OZARK TO THE A1RDY-100058572 BARBOUR CO LINE; WIREGRASS CONSTRUCTION COMPANY, INC. ACNU58572-ATRP(002) DALE CR-15

07-048 28.838 MI RESURFACING AND GUARDRAIL ON VARIOUS COUNTY ROADS AT SITES AS INDICATED BY THE PLANS; STOAE-100057829 S & C MATERIALS & PAVING, INC. STOAE-100058022 STPOA-CN12(209)&STPOA-CN12(215DALE

07-049 4.726 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-134 FROM CR-67 IN MIDLAND CITY TO THE HENRY CO HSIPE-100053247 LINE; (LEWIS, INC.) STAAE-100053247 STPAA-HSIP-0134(504) DALE

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 78 SEVENTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 07-050 99-407-312-054-801 & 99-507-312-054-801; 7.403 MI PLANING, SAFETY WIDENING, RESUFACING & BRIDGE HSIPM-100055587 CULVERTS ON SR-54 FROM THE COVINGTON CO LINE TO THE PAVEMENT JOINT JUST W OF SR-52;WIREGRASS CONST STAAM-100055587 STPAA-HSIP-0054(500) GENEVA SR-54 99044-100051490 99075-100051492

07-051 10.375 MI PLANING, RESURFACING, SAFETY WIDENING & TRAFFIC STRIPE ON SR-87 FROM THE FLORIDA STATE HSPR1-00058998 LINE TO THE N CITY LIMITS OF SAMSON; WIREGRASS CONSTRUCTION COMPANY, INC. STOAE-100058998 STPOA-HSIP-0087(511) GENEVA SR-87

07-052 1) 3.544 MI.ADDITIONAL LANES & BRIDGE REPLACEMENTS (3) ON SR#12 (US#84) FROM SR#100 IN ANDALUSIA TO ONBR -100038275 NEAR CR#67 IN SANFORD. ( BULLARD EXCAVATING, INC. ) OAST -100003965 BRF-0006(015) & STPOAF-0012(50COVINGTON SR#12

07-053 NHF-HSIPF-0053(535); 3.465 MI ADDITIONAL LANES (GRADE, DRAINAGE, PAVEMENT & SIGNALS) ON SR-53 NH04L-100038201 (US-231) FROM SR-210 (ROSS CLARK CIRCLE) IN DOTHANTO TROY UNIVERSITY'S DRIVEWAY; (WIREGRASS CONST) 99703-100050712 NHF-0053(522) HOUSTON

07-054 8.980 MI SAFETY WIDENING, RESURFACING AND TRAFFIC STRIPE ON SR-153 FROM THE FLORIDA STATE LINE TO HSIPM-100059857 THE INTERSECTION OF SR-52; WIREGRASS CONSTRUCTION COMPANY, INC. STAAM-100059857 STPAA-HSIP-0153(500) GENEVA SR-153

07-055 DALE COUNTY; 12.232 MI RESURFACING, SAFETY WIDEN- ING AND TRAFFIC STRIPE ON SR-85 FROM THE JUNCTION HSIPM-100059855 OF SR-27 IN GENEVA TO THE JUNCTION OF SR-167; WIREGRASS CONSTRUCTION COMPANY, INC. STAAM-100059855 STPAA-HSIP-0085(501) GENEVEA SR-85

07-056 7.125 MI RESURFACING AND TRAFFIC STRIPE ON CR10, CR40, CR89 AND CR45 AT SITES AS INDICATED BY THE STOAE-100058255 PLANS, STPNU-3103(200) & STPNU-3122(200); WIREGRASS CONSTRUCTION CO. INC. STOAE-100058256 STPOA-3116(201),STPOA-3124(201GENEVA STNUE-100058246 STNUE-100058258

07-057 4.220 MI RESURFACING AND TRAFFIC STRIPE ON CR-49 FROM THE FLORIDA STATE LINE TO SR-103 SE OF AC232-100061661 SLOCOMB; MIDSOUTH PAVING INC. STNUM-100061661 STPNU-3114(250) GENEVA CR-49

07-058 0.077 MI SIDEWALK IMPROVEMENTS & STREET LIGHTING UPDATES ON SR-52 (MAIN ST) FROM RIPLEY ST TO BROAD TCSPL-100059714 ST IN SAMSON; GEISLER CONTRACTING, INC. TCSP-12AL(001) GENEVA SR-52

07-059 3.109 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-248 FROM THE END OF THE FIVE LANE IN STAAL-100053128 ENTERPRISE TO THE FORT RUCKER GATE; (MERCHANTS BONDING COMPANY (MUTUAL)) STPAA-0248(500) COFFEE

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 79 SEVENTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 07-060 8.545 MI PLANING, WIDENING, RESURFACING & TRAFFIC STRIPE ON SR-95 FROM THE HOUSTON CO LINE TO HSPR1-00059000 HALEBURG (MP 32.867); WIREGRASS CONSTRUCTION COMPANY, INC. STOAE-100059000 HSIP-STPOA-0095(502) HENRY SR-95

07-061 11.679 MI PLANING, SAFETY WIDENING, RESURFACING & TRAFFIC STRIPE ON SR-95 FROM THE N TOWN LIMITS OF HSIPM-100060431 HALEBURG TO 0.9 MI N OF LISENBY RD IN ABBEVILLE; WIREGRASS CONSTRUCTION CO. INC. STPAA-HSIP-0095(503) HENRY SR-95

07-062 5.319 MI PLANING, RESURFACING & TRAFFIC STRIPE ON CR-99 FROM SR-1 (US-431) IN HEADLAND TO CR-12 IN A1RDY-100059465 TUMBLETON; WIREGRASS CONSTRUCTION COMPANY, INC. ACOA59465-ATRP(001) HENRY CR-99

07-063 0.570 MI RESURFACING AND TRAFFIC STRIPE ON CR-237 FROM THE INTERSECTION OF SR-10 TO THE INTERSECTION A1RDY-100059466 OF CR-46 N OF SHORTERVILLE; WIREGRASS CONSTRUCTIONCOMPANY, INC. ACNU59466-ATRP(001) HENRY CR-237

07-064 1.403 MI RESURFACING AND TRAFFIC STRIPE ON CR-241 (S MAIN ST) FROM 0.3 MI S OF WOODS/SOLOMON RD TO A1RDY-100059467 KING ST IN HEADLAND; WIREGRASS CONSTRUCTION COMPANY, INC. ACOA59467-ATRP(001) HENRY CR-241

07-065 7.369 MI PLANING, LEVELING, RESURFACING, GUARDRAILAND TRAFFIC STRIPE ON CR-99 FROM CR-12 TO CR-41 S A1RDY-100060545 OF ABBEVILLE; WIREGRASS CONSTRUCTION COMPANY, INC. ACNU60545-ATRP(001) HENRY CR-99

07-066 5.410 MI RESURFACING AND TRAFFIC STRIPE ON CR-26 FROM CR-53(BROWN'S CROSSROADS E)TO CR-65 & ON CR- A1RDY-100060544 65 FROM CR-26 N TO SR-95 N OF HALEBURG; WIREGRASS CONSTRUCTION COMPANY, INC. ACNU60544-ATRP(001) HENRY CR-26

07-070 0.385 MI SUPERELEVATION IMPROVEMENTS ON SR-12 (US-84) AT SANITARY DAIRY ROAD IN COWARTS; HS31M-100061755 WIREGRASS CONSTRUCTION COMPANY, INC. HSIP-0012(558) HOUSTON SR-12

07-071 & ACNU59472-ATRP(001); 18.841 MI RESURFACING AND TRAFFIC STRIPE ON CR-22, CR-33 & NUCLEAR RD AS A1RDY-100059468 INDICATED IN THE PLANS; APAC MID-SOUTH, INC. A1RDY-100059472 ACNU59468-ATRP(001) HOUSTON

07-072 4.418 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON CR-10 FROM CR-3 TO SR-1; ON CR-40 FROM WOODLAND A1RDY-100060203 DR TO 6TH AVE; AND ON MONTANA DR FROM SR-12 TO SR-53 IN DOTHAN; APAC MID-SOUTH, INC. ACOA60203-ATRP(001) HOUSTON CR-10

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 80 SEVENTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 07-073 8.768 MI RESURFACING, TRAFFIC STRIPE & BRIDGE RAILRETROFITTING ON SR-12(US-84)FROM W OF CR-75 TO THE NH01M-100060432 E END OF THE CHATTAHOOCHEE RIVER BRIDGE & THE WBL OF THE RIVER BRIDGE; MIDSOUTH PAVING INC. NH-0012(557) HOUSTON SR-12

07-074 0.895 MI SIDEWALK IMPROVEMENTS ON SOUTH PARK AVE FROM FORTNER ST TO W SELMA ST AND ON WOODLAND DR SREE1-00058821 FROM VALLEY FORGE RD TO S PARK AVE IN DOTHAN; GEISLER CONTRACTING, INC. SRER1-00058821 SRTS-SR13(914) HOUSTON

07-075 & ACNU59474-ATRP(001); 14.244 MI SURFACE TREATMENTLEVELING, RESURFACING AND TRAFFIC STRIPE ON CR-36 A1RDY-100059473 FROM CR-203 TO JORDAN AVE & ON CR-55(STATELINE RD)FROM SR-1(US-231) TO SEALLY WELLS RD;MIDSOUTH PAVI A1RDY-100059474 ACOA59473-ATRP(001) HOUSTON CR-36

07-077 9.794 MI RESURFACING AND TRAFFIC STRIPE ON SR-109 FROM THE FLORIDA STATE LINE TO THE PAVEMENT JOINT STAAM-100060688 AT SR-1 (US-231); MIDSOUTH PAVING INC. STPAA-0109(500) HOUSTON SR-109

07-078 58534 & 61074;11.378 MI RESURF & TRAFF STRIPE CR- 44 FROM JORDAN AVE TO BRACKLIN RD;CR-15 FROM A1RDY-100058535 MALVERN RD TO NATIONAL GUARD RD;ON WEBB RD FROM ROSS CLARK CIRCLE TO WEBB;MIDSOUTH PAVING, INC. A1RDY-100058534 ACOA58535-ATRP(002) HOUSTON CR-44 A1RDY-100061074

07-079 STPAA-HSIP-0123(508); HOUSTON; 9.051 MI PLANING, SAFETY WIDENING, RESURFACING AND TRAFFIC STRIPE HSIPE-100057594 ON SR-123 FROM JUST N OF CR-69 THROUGH WICKSBURG TO SR-12 (US-84); APAC MID-SOUTH, INC. STAAM-100057594 STPAA-HSIP-0123(507) & GENEVA & SR-123 HSIPE-100057595 STAAM-100057595

07-080 2.588 MI RESURFACING AND TRAFFIC STRIPE ON SR-53 (US-231)FROM S OF THE JUNCTION OF SR-93(MP 64.292) NH01M-100060691 TO N OF VETERANS BOULEVARD(MP 66.880)BRUNDIDGE; MIDSOUTH PAVING INC. NH-0053(570) PIKE SR-53

07-081 & ACNU58556-ATRP(001);6.932 MI FULL DEPTH RECLAMATION, RESURFACING & TRAFFIC STRIPE ON CR- A1RDY-100058560 2238 FROM CR-2243 TO CR-2290 E OF GOSHEN & ON CR- 7708 FROM CR-7711 TO CR-7707 IN CHINA GROVE A1RDY-100058556 ACNU58560-ATRP(001) PIKE CR-2238

07-082 & STPNU-5528(201; 3.738 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON CR-5513 FROM CR-5511 TO STNUE-100059001 SR-93 S OF BANKS AND ON CR-7708 FROM CR-7734 TO CR-7719 N OF TROY; APAC MID-SOUTH, INC. STNUE-100059002 STPNU-5500(214) PIKE

07-083 ACNU58563-ATRP(001) & ACNU58561-ATRP(001); 15.022 MI PLANING, WIDENING, RESURFACING, GUARDRAIL & A1RDY-100058553 TRAFFIC STRIPE ON CR-5513 FROM CR-5516 TO CR-5511;ON CR-3316 FROM SR-167 TO CR-3310 IN BRUNDIDGE A1RDY-100058563 ACOA58553-ATRP(001) PIKE CR-5513 A1RDY-100058561

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 81 SEVENTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 07-085 & ACNU58554-ATRP(001); 9.249 MI PATCHING, RESUR- FACING, TRAFFIC STRIPE & GUARDRAIL ON CR-6600 FROM A1RDY-100058558 SR-223 N TO CR-6602 NE OF TROY & ON CR-7702 FROM THE MONTGOMERY CO LINE TO CR-7707;MIDSOUTH PAVING A1RDY-100058554 ACNU58558-ATRP(001) PIKE CR-6600

07-086 & ACBR58557-ATRP(001); 7.453 MI PLANING, RESURFACING, TRAFFIC STRIPE & BRIDGE REPLACEMENT A1RDY-100058562 ON CR-2201 & ON CR-2214 AT SITES AS INDICATED BY THE PLANS; APAC MID-SOUTH, INC. A1BR1-00058557 ACNU58562-ATRP(001) PIKE CR-2201

07-087 6.219 MI RESURFACING, SAFETY WIDENING AND TRAFFIC STRIPE ON SR-125 FROM THE COFFEE CO LINE TO THE HSIPM-100053158 JUNCTION OF SR-53 (US-231); WIREGRASS CONSTRUCTION COMPANY, INC. STAAM-100053158 STPAA-HSIP-0125(502) PIKE SR-125

07-088 5.627 MI WIDENING, PLANING, RESURFACING & TRAFFIC STRIPE ON CR-3363 (ENZOR RD) FROM CR-3304 TO SR-87 A1RDY-100060714 AND ON CR-2290 (HENDERSON HIGHWAY) FROM CR-2221 TOKW RD IN TROY; MIDSOUTH PAVING, INC. ACOA60714-ATRP(001) PIKE CR-3363

07-090 0.007 MI. BRIDGE REPLACEMENT (PRECAST) ON HOWARD ROAD AT PINE KNOT CREEK SOUTHEAST OF PICKENSVILLE. GRBN1-100043899 ( PHILLIPS CONTRACTING CO., INC. ) ACGBBRZ-5400(208) PICKENS ROAD

07-095 1.100 MI WIDENING, PLANING, RESURFACING AND TRAFFIC STRIPE ON E MADISON ST, MONTGOMERY ST AND A1RDY-100058551 S 3 NOTCH ST (SR-15/US-29) IN TROY; WIREGRASS CONSTRUCTION COMPANY, INC. ACOA58551-ATRP(001) PIKE

07-100 3.259 MI LEVELING, RESURFACING AND GUARDRAIL INSTALLATION ON CR-70 FROM CR-77 TO SR-9 (US-331) A1RDY-100059453 NORTH OF OPP; WIREGRASS CONSTRUCTION COMPANY, INC. ACNU59453-ATRP(001) COVINGTON CR-70

07-101 3.654 MI ADDITIONAL LANES (GRADE, DRAINAGE AND PAVEMENT) ON SR-52 FROM CR-59 IN TAYLOR TO CR-300 AAST -100008855 IN MALVERN; (W.S. NEWELL & SONS, INC.) STAAE-100008855 STPAA-0052(504) HOUSTON

07-102 99-307-351-095-801; 1.076 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-95 FROM SR-52 TO HENRY CO HSIP -100051690 LINE IN COLUMBIA; LEWIS, INC., P.O. BOX 254, HEADLAND, AL 36345 HSIP-0095(500) HOUSTON

07-103 2.143 MI RESURFACING, SAFETY WIDENING AND TRAFFIC STRIPE ON SR-15 FROM THE INTERSECTION OF SR-55 TO HSIPM-100059854 E 3 NOTCH ST IN ANDALUSIA; WIREGRASS CONSTRUCTION COMPANY, INC. STAAM-100059854 STPAA-HSIP-0015(524) COVINGTON SR-15

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 82 SEVENTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 07-104 3.901 MI SURFACE TREATMENT, LEVELING & RESURFACINGON CR-4 FROM SR-54 TO THE GENEVA CO LINE; A1RDY-100059435 WIREGRASS CONSTRUCTION COMPANY, INC. ACNU59435-ATRP(001) COVINGTON CR-4

07-109 4.860 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-10 FROM BLUE SPRINGS EAST TOWN LIMITS TO THE HSIPE-100053123 HENRY COUNTY LINE; (WIREGRASS CONSTRUCTION COMPANY, INC.) STAAE-100053123 STPAA-HSIP-0010(525) BARBOUR

07-111 3.770 KM. ADDITIONAL LANES (GRADE, DRAINAGE, PAVEMENT AND SIGNALS) ON WESTGATE PARKWAY STOAH-100008611 FROM SR 53 (US 231) TO HARRISON ROAD (CR 10) IN DOTHAN (APAC-SOUTHEAST, INC.) STPOA-9412(600) HOUSTON PKWAY

07-112 4.696 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR 192 FROM SR 27 TO SR 12 (US 84) IN HSIPE-100057489 ENTERPRISE; WIREGRASS CONSTRUCTION CO. INC. EBSPE-100057489 EB-HSIP-0192(501) COFFEE SR 192

07-114 99-307-162-051-806; 10.293 MI RESURFACING, TRAFFICSTRIPE & DRAINAGE EXTENSION ON SR-51 FROM SR-167 HSIP -100051467 TO DALE COUNTY LINE; WIREGRASS CONSTRUCTION CO., INC., P.O. BOX 48, ARITON, AL 36311 HSIP-0051(502) & COFFEE

07-122 BARBOUR, COFFEE, COVINGTON, CRENSHAW, DALE, GENEVAHOUSTON & PIKE COUNTIES SCORING BITUMINOUS HSIPE-100056192 PAVEMENT SURFACE (SHOULDERS) ON VARIOUS ROUTES THROUGHOUT THE 7TH DIV; SURFACE PREPARATION TECH HSIP-CN12(906) BARBOUR VARIOUS

07-124 0.047 KILOMETERS CULVERT EXTENSION AND SLOPE RECONSTRUCTION ON CR99 N OF CR40 AND S OF ERJ80-100055262 ABBEVILLE; HILTON COOPER CONTRACTING, INC. ERPR-8930(903) HENRY CR99

07-129 5.582 MI ADDITIONAL LANES (PARTIAL GRADE AND DRAINAND PAVEMENT) ON SR-12 (US-84) FROM W OF SR-141 TO NH04E-100004563 CR-362/SR-203 IN ELBA; W.S. NEWELL & SONS, INC. NHF-0012(544) COFFEE SR 12

07-130 3.063 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-1 (US-431) FROM THE HEADLAND SOUTH CITY STOAC-100052434 LIMIT (MP 23.232) TO NORTH OF SR-173 (MP 26.295); (LEWIS, INC.) STMOA-0001(543) HENRY

07-131 STPAA-HSIP-0189(502); 23.088 MI PLANING, RESURFACE& TRAFFIC STRIPE ON SR-189 FROM SR-134 THRU ELBA STAAE-100053147 TO THE CRENSHAW COUNTY LINE; (WIREGRASS CONSTRUCTION CO., INC.) HSIP -100053147 STPAA-HSIP-0189(501) COFFEE STAAE-100053249 HSIPE-100053249

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 83 SEVENTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 07-138 PILE ENCASEMENT & RIPRAP PLACEMENT ON SR-10 AT THEEAST FORK OF CHOCTAWHATCHEE RIVER, ON SR-10 AT 99055-100056131 VAN MILL CREEK & ON SR-95 AT ABBIE CREEK; (F&W CONSTRUCTION COMPANY, INC.) 99-507-346-000-101 HENRY

07-140 13.246 MI RESURFACING AND TRAFFIC STRIPE ON CR-41 FROM SR-52 EAST OF GENEVA TO THE HOUSTON COUNTY A1RDY-100058584 LINE; WIREGRASS CONSTRUCTION COMPANY, INC. ACNU58584-ATRP(001) GENEVA CR-41

07-145 0.336 MI FLOOD DAMAGE REPAIR ON SR-87 NEAR THE PEA RIVER BRIDGE SOUTH OF SAMSON; ERH05-100054488 (BURNETT CIVIL CONTRACTING, LLC) ERD09-100054488 ER-8910(925) GENEVA

07-146 NH-HSIP-0210(503); 3.602 MI PLANING, RESURFACING, TRAFFIC STRIPE & BRIDGE RAIL RETROFIT ON SR-210 NH04E-100052414 (ROSS CLARK CIRCLE) FROM W OF SR-1 (US-231) TO N OF SR-12 (US-84) IN DOTHAN; (APAC MID-SOUTH, INC.) HSIPE-100052413 NH-0210(502) HOUSTON NH04E-100052413

07-148 8.388 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-134 FROM CR-55 TO THE HOUSTON CO LINE; HSIPE-100056204 WIREGRASS CONSTRUCTION COMPANY, INC. STAAM-100056204 STPAA-HSIP-0134(506) HENRY SR-134

07-151 & STPNU-1600(227); 2.450 MI RESURFACING & TRAFFIC STRIPE ON CR-353 FROM CR-364 TO SR-189 & ON CR-106 STNUM-100059545 FROM CR-109 TO SR-53 (US-231); WIREGRASS CONSTRUCTION COMPANY, INC. STNUM-100059544 STPNU-1600(226) COFFEE CR-353

07-152 3.090 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-87 FROM THE PAVEMENT JOINT N OF SR-189 TO STAAM-100058593 THE N END OF THE PEA CREEK BRIDGE; WIREGRASS CONSTRUCTION COMPANY, INC. STPAA-0087(510) COFFEE SR-87

07-153 2.136 MI WIDENING, LEVELING, RESURFACING AND TRAFFIC STRIPE ON SR-25 FROM THE JUNCTION OF CR-40 STNUM-100059275 TO THE JUNCTION OF SR-10 W OF ABBEVILLE; APAC MID-SOUTH, INC. STPNU-3400(206) HENRY SR-25

07-162 8.128 MI PLANING, SAFETY WIDENING, RESURFACING ANDTRAFFIC STRIPE ON SR-51 FROM THE DALE CO LINE TO HSIPM-100058999 THE PAVEMENT JOINT N OF KELLY RD; WIREGRASS CONSTRUCTION COMPANY, INC. STNUM-100058999 STPNU-HSIP-0051(509) BARBOUR SR-51

07-164 6.018 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-10 FROM BARBOUR CO LINE TO 0.4 MILES WEST OF HSIPE-100055589 CR-25 NW OF ABBEVILLE; (LEWIS, INC.) STAAE-100055589 STPAA-HSIP-0010(530) HENRY

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 84 SEVENTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 07-166 ER-8910(939); 0.118 MI PILE ENCASEMENTS & SLOPE STABILIZATION ON CR-24 AT CLAYBANK CREEK IN ER9V8-100054023 DALEVILLE & ON CR-9 AT MOSSY CAMP BRANCH SOUTH OF NEWTON; (MCINNIS CONSTRUCTION, LLC) ER9V8-100054036 ER-8910(941) DALE

07-168 7.729 MI RESURFACING AND TRAFFIC STRIPE ON CR-24 E OF THE CONECUH NATIONAL FOREST FROM THE JCT OF STNUM-100059952 SR-137 TO THE JCT OF SR-55; WIREGRASS CONSTRUCTION COMPANY, INC. STPNU-2020(200) COVINGTON CR-24

07-169 & NH-0012(555); HOUSTON; 7.655 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-12 (US-84) NH01M-100058591 FROM THE DALE CO LINE TO E OF SR-123 & FROM E OF ARMORY RD TO THE HOUSTON CO LINE; APAC MID-SOUTH NH01M-100058592 NH-0012(554) DALE SR-12

07-170 99-307-341-134-001; 6.224 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-134 FROM DALE CO LINE TO HSIPE-100053246 SR-1 (US-431) IN HEADLAND; (LEWIS, INC.) 99703-100055289 HSIP-0134(503) HENRY

07-172 0.608 MI SIDEWALK IMPROVEMENTS ON N BROAD ST FROM W MAIN ST (SR-52) TO JOHNSON ST AT SAMSON SRIE1-00058820 ELEMENTARY SCHOOL; GEISLER CONTRACTING, INC. SRTS-SR13(916) GENEVA

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ST-003-001-002 BARBOUR 142.98 % 07-001 BURNETT CIVIL 97,991 40 200 100 11-24-08 127,065 214,483.34 150,000 2,100 29,074 31,174

ER-8910(940) DALE 6.46 % 07-002 HILTON COOPER 168,777 60 W 092 100 02-10-12 122,476 3,418.81 52,891 0 -46,301 -46,301

99-507-690-000-301 BARBOUR 15.76 % 07-003 CARTER'S CONT 649,433 75 W 055 085 09-15-14 641,400 117,706.07 746,848 0 0 0

STPAA-HSIP-0010(536) BARBOUR SR-10 0.05 % 07-004 WIREGRASS CON 1,579,929 50 W 000 000 10-31-14 0 1,032.56 2,047,490 0 0 0

99-307-162-248-804 COFFEE SR-248 0.00 % 07-005 BULLARD 693,076 35 W 071 100 06-03-08 671,006 11.28 751,558 0 -22,070 -22,070

EBF-0012(510) COFFEE 17.76 % 07-006 S.A. GRAHAM C 8,488,619 285 W 497 100 08-05-11 10,313,856 1,867,938.73 10,512,603 147,984 1,677,253 1,825,237

BR-3419(200) 7TH DIV.CO SR#95 25.80 % 07-007 F & W CONS. C 3,713,947 421 C 189 100 08-29-07 3,387,854 946,819.04 3,668,430 -33,130 426,978 393,848

STPNU-0314(250) BARBOUR CR-75 0.36 % 07-008 CHARLES E. WA 558,423 30 W 030 021 09-30-14 117,716 2,611.14 723,380 0 0 0

ACOA61085-ATRP(001) BARBOUR CR-97 0.10 % 07-009 MIDSOUTH PAVI 1,479,423 40 W 000 000 09-30-14 0 1,619.00 1,550,672 0 0 0

ACNU59986-ATRP(001), ETC. COFFEE 4.53 % 07-010 WIREGRASS 3,970,240 180 W 067 097 09-30-14 4,011,580 88,580.79 1,952,849 0 0 0

STPRR-STPRH-RR13(902) COFFEE 8.39 % 07-011 WIREGRASS 747,593 70 W 096 099 09-30-14 1,479,824 96,228.05 1,146,353 0 0 0

ST-016-999-014 COFFEE 3.98 % 07-012 W.S.NEWELL & 1,204,768 125 W 018 016 11-17-14 192,476 58,436.06 1,464,601 0 0 0

STPNU-1600(228) COFFEE CR-537 1.62 % 07-013 WIREGRASS 413,562 30 W 047 086 09-30-14 354,663 8,182.97 504,576 0 0 0

ACBRZ59407-ATRP(001) COFFEE CR-637 7.23 % 07-014 G. W. NORRELL 197,999 50 W 072 086 09-30-14 169,885 17,132.89 236,736 0 0 0

NHF-HPP-0012(517) COFFEE 24.31 % 07-015 MCINNIS CONST 11,449,460 300 W 104 099 09-30-14 19,804,235 604,725.08 2,487,200 146,509 0 146,509

ACNU58530-ATRP(003) COFFEE CR-410 0.06 % 07-016 WIREGRASS CON 3,369,639 120 W 000 000 00-00-00 0 2,075.00 3,294,887 0 0 0

99-507-690-000-201 COFFEE 7.31 % 07-017 GRADY RALLS & 337,154 115 W 092 100 04-30-15 291,363 34,933.48 477,700 0 -45,791 -45,791

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACNU61063-ATRP(001) COFFEE 0.11 % 07-018 STRAWSER CONS 1,134,251 60 W 000 000 12-31-14 0 1,568.49 1,327,967 0 0 0

MGF-0012(509) COFFEE SR 12 12.14 % 07-020 APAC-SOUTHEAS 8,835,474 461 C 172 100 05-30-08 9,578,183 1,150,284.26 9,469,862 91,625 699,859 791,484

EB-0055(510) COVINGTON SR-55 2.73 % 07-021 WIREGRASS 897,155 30 W 083 100 02-04-14 876,716 32,321.49 1,180,876 0 -20,439 -20,439

ACNU58543-ATRP(001) COVINGTON CR 70 2.56 % 07-022 WIREGRASS CON 1,025,619 30 W 097 099 09-30-14 1,025,619 21,583.27 842,374 4,375 0 4,375

BRF-0012(547) COVINGTON SR 12 16.57 % 07-023 MURPHREE BRID 3,526,200 190 W 094 100 05-09-14 3,496,800 763,960.39 4,607,844 35,775 -6,375 29,400

ACNU59447-ATRP(001) COVINGTON CR-73 2.27 % 07-025 WIREGRASS CON 398,569 30 W 037 097 09-30-14 398,790 9,540.07 418,498 0 0 0

ACNU58544-ATRP(001) COVINGTON CR-42 0.05 % 07-026 WIREGRASS CON 2,127,481 45 W 000 000 09-30-14 0 1,239.99 2,252,813 0 0 0

ACNU58540-ATRP(001) COVINGTON CR-45 4.90 % 07-027 WIREGRASS 174,055 30 W 030 097 09-30-14 169,420 8,960.67 182,758 0 0 0

ACNU59449-ATRP(001) COVINGTON CR-42 1.35 % 07-028 MIDSOUTH PAVI 1,087,568 40 W 068 099 09-30-14 1,135,875 16,475.39 1,214,717 0 0 0

ACNU58536-ATRP(001) COVINGTON 6.69 % 07-029 WIREGRASS CON 634,509 60 W 060 092 09-30-14 581,213 48,818.61 729,686 0 0 0

ACBR58550-ATRP(001) CRENSHAW CR-50 0.00 % 07-030 GULF EQUIPMEN 1,218,038 100 W 097 099 09-30-14 1,227,980 .00 0 0 0 0

EB-0106(505) CRENSHAW SR-106 9.86 % 07-032 WIREGRASS CON 807,706 30 W 100 100 04-30-14 783,087 104,147.57 1,055,466 0 24,619 24,619

ACBR58547-ATRP(001) CRENSHAW CR-59 0.00 % 07-033 H & L CONSTRU 467,878 100 W 080 099 09-30-14 507,634 .00 0 0 0 0

ACBR58565-ATRP(001) DALE CR-36 10.31 % 07-040 G. W. NORRELL 617,720 100 W 088 094 09-30-14 592,633 86,044.52 834,237 0 0 0

STPAA-HSIP-0105(502) DALE SR-105 0.92 % 07-041 WIREGRASS 2,293,029 110 W 029 027 12-31-14 59,142 7,798.31 847,426 0 0 0

ACNU58573-ATRP(001) DALE CR-18 2.63 % 07-042 WIREGRASS 469,608 30 W 053 099 09-30-14 471,917 13,622.95 516,569 0 0 0

STPOA-9441(605) DALE CR-59 0.00 % 07-043 WIREGRASS 147,658 30 W 017 070 10-31-14 105,063 .00 0 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACOA58571-ATRP(001) DALE CR-91 0.08 % 07-044 WIREGRASS 432,025 30 W 000 000 09-30-14 0 388.19 455,011 0 0 0

ACNU58569-ATRP(001) DALE CR-114 0.41 % 07-045 WIREGRASS CON 289,688 30 W 000 000 00-00-00 0 1,156.52 279,436 0 0 0

ERPR-8930(923) DALE SR-123 0.03 % 07-046 CARSENN CONST 1,018,807 90 W 111 099 09-30-14 1,314,328 380.10 1,126,046 91,769 0 91,769

ACNU58572-ATRP(002) DALE CR-15 0.02 % 07-047 WIREGRASS CON 1,306,338 30 W 000 000 00-00-00 0 392.60 1,324,485 0 0 0

STPOA-CN12(209)&STPOA-CN12(215 DALE 1.09 % 07-048 S & C MATERIA 1,246,758 60 W 097 100 03-03-14 1,219,672 17,125.93 1,558,360 0 -27,086 -27,086

STPAA-HSIP-0134(504) DALE 13.00 % 07-049 LEWIS, INC. 1,213,352 45 W 084 100 06-01-12 1,180,196 206,141.97 1,585,542 0 -33,156 -33,156

STPAA-HSIP-0054(500) GENEVA SR-54 3.00 % 07-050 WIREGRASS CON 3,694,542 140 W 015 002 02-28-15 81,202 139,412.67 4,645,375 0 0 0

STPOA-HSIP-0087(511) GENEVA SR-87 5.55 % 07-051 WIREGRASS 3,487,257 90 W 099 099 09-30-14 3,605,114 191,771.04 3,450,220 0 0 0

BRF-0006(015) & STPOAF-0012(50 COVINGTON SR#12 17.29 % 07-052 BULLARD EXCAV 5,482,820 320 W 130 100 03-01-06 2,219,696 1,238,160.10 7,159,348 -5,865 149,583 143,718

NHF-0053(522) HOUSTON 12.13 % 07-053 WIREGRASS CON 13,671,828 310 W 097 100 08-17-11 14,038,689 2,104,034.79 17,337,944 0 366,861 366,861

STPAA-HSIP-0153(500) GENEVA SR-153 5.81 % 07-054 WIREGRASS CON 3,027,438 75 W 068 099 09-30-14 3,002,875 227,238.24 3,906,381 0 0 0

STPAA-HSIP-0085(501) GENEVEA SR-85 1.29 % 07-055 WIREGRASS CON 3,857,237 100 W 023 045 10-31-14 1,776,233 70,433.83 5,443,992 0 0 0

STPOA-3116(201),STPOA-3124(201 GENEVA 2.92 % 07-056 WIREGRASS 563,825 45 W 049 100 07-14-14 506,745 19,703.16 672,708 0 -64,943 -64,943

STPNU-3114(250) GENEVA CR-49 1.67 % 07-057 MIDSOUTH PAVI 664,424 30 W 067 090 09-30-14 600,337 14,923.76 890,089 0 0 0

TCSP-12AL(001) GENEVA SR-52 22.02 % 07-058 GEISLER CONTR 143,303 45 W 067 090 09-30-14 128,810 46,891.24 212,911 0 0 0

STPAA-0248(500) COFFEE 11.83 % 07-059 LEWIS, INC. 1,022,853 30 W 140 100 09-08-10 1,024,508 159,418.70 1,347,470 0 1,655 1,655

HSIP-STPOA-0095(502) HENRY SR-95 6.23 % 07-060 WIREGRASS 2,727,829 70 W 064 097 09-30-14 2,646,968 168,882.62 2,709,078 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPAA-HSIP-0095(503) HENRY SR-95 0.31 % 07-061 WIREGRASS CON 3,139,317 75 W 016 030 10-31-14 2,686,403 3,583.81 1,126,379 0 0 0

ACOA59465-ATRP(001) HENRY CR-99 1.87 % 07-062 WIREGRASS CON 1,327,473 40 W 088 099 09-30-14 1,368,683 28,606.77 1,526,594 35,695 0 35,695

ACNU59466-ATRP(001) HENRY CR-237 3.92 % 07-063 WIREGRASS CON 106,105 30 W 053 099 09-30-14 1,001,742 4,785.56 122,020 0 0 0

ACOA59467-ATRP(001) HENRY CR-241 8.87 % 07-064 WIREGRASS 494,351 45 W 098 100 05-21-14 463,330 50,444.36 568,504 0 -31,021 -31,021

ACNU60545-ATRP(001) HENRY CR-99 1.56 % 07-065 WIREGRASS CON 1,911,492 45 W 098 099 09-30-14 1,928,650 31,440.91 2,007,067 0 0 0

ACNU60544-ATRP(001) HENRY CR-26 1.78 % 07-066 WIREGRASS 771,947 30 W 100 099 09-30-14 702,366 15,233.74 853,744 0 0 0

HSIP-0012(558) HOUSTON SR-12 1.15 % 07-070 WIREGRASS CON 339,590 30 W 000 000 10-31-14 0 4,699.91 407,796 0 0 0

ACNU59468-ATRP(001) HOUSTON 4.28 % 07-071 APAC MID-SOUT 3,964,840 70 W 079 097 09-30-14 2,322,236 192,655.36 4,496,244 0 0 0

ACOA60203-ATRP(001) HOUSTON CR-10 7.15 % 07-072 APAC MID-SOUT 1,206,330 60 W 089 100 04-23-14 1,254,862 99,235.61 1,387,280 0 48,532 48,532

NH-0012(557) HOUSTON SR-12 0.49 % 07-073 MIDSOUTH PAVI 4,043,005 100 W 000 000 01-31-15 228,928 23,961.16 4,862,707 0 0 0

SRTS-SR13(914) HOUSTON 0.00 % 07-074 GEISLER 171,201 75 W 056 065 09-30-14 154,553 .00 0 0 0 0

ACOA59473-ATRP(001) HOUSTON CR-36 3.41 % 07-075 MIDSOUTH PAVI 3,567,825 75 W 052 093 09-30-14 3,323,883 130,431.94 3,817,573 0 0 0

STPAA-0109(500) HOUSTON SR-109 4.21 % 07-077 MIDSOUTH PAVI 2,260,944 45 W 007 009 10-31-14 1,615,466 119,671.30 2,836,028 0 0 0

ACOA58535-ATRP(002) HOUSTON CR-44 0.10 % 07-078 MIDSOUTH PAVI 2,122,699 75 W 000 000 01-31-15 0 2,447.98 2,276,222 0 0 0

STPAA-HSIP-0123(507) & GENEVA & SR-123 7.86 % 07-079 APAC MID-SOUT 2,509,662 70 W 086 100 04-24-14 2,390,672 258,029.53 3,279,488 0 -118,990 -118,990

NH-0053(570) PIKE SR-53 0.04 % 07-080 MIDSOUTH PAVI 2,025,581 60 W 000 000 11-30-14 0 1,387.96 3,174,079 0 0 0

ACNU58560-ATRP(001) PIKE CR-2238 5.57 % 07-081 THE MILLER PA 1,187,646 60 W 050 099 09-30-14 1,526,590 71,745.22 1,286,081 52,022 0 52,022

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPNU-5500(214) PIKE 8.57 % 07-082 APAC MID-SOUT 516,500 45 W 053 099 09-30-14 877,277 52,828.24 616,244 24,000 0 24,000

ACOA58553-ATRP(001) PIKE CR-5513 2.74 % 07-083 APAC MID-SOUT 3,439,503 60 W 090 099 09-30-14 3,437,749 98,464.16 3,590,824 0 0 0

ACNU58558-ATRP(001) PIKE CR-6600 3.00 % 07-085 MIDSOUTH PAVI 1,875,787 60 W 036 098 09-30-14 1,595,278 59,108.10 1,969,577 0 0 0

ACNU58562-ATRP(001) PIKE CR-2201 4.74 % 07-086 APAC MID-SOUT 1,721,608 120 W 100 099 11-01-14 1,740,617 52,932.00 1,115,652 75,322 0 75,322

STPAA-HSIP-0125(502) PIKE SR-125 5.96 % 07-087 WIREGRASS CON 1,658,935 50 W 100 099 09-30-14 1,616,886 140,699.91 2,358,064 0 0 0

ACOA60714-ATRP(001) PIKE CR-3363 5.80 % 07-088 MIDSOUTH PAVI 1,190,823 60 W 053 090 09-30-14 1,043,220 79,439.15 1,369,448 0 0 0

ACGBBRZ-5400(208) PICKENS ROAD 2.80 % 07-090 PHILLIPS CONT 112,621 30 W 000 000 12-14-04 0 3,515.61 125,454 0 0 0

ACOA58551-ATRP(001) PIKE 4.30 % 07-095 WIREGRASS 1,187,137 90 W 028 012 09-30-14 51,560 61,735.60 1,433,430 0 0 0

ACNU59453-ATRP(001) COVINGTON CR-70 1.44 % 07-100 WIREGRASS 492,114 30 W 093 098 09-30-14 481,034 7,478.54 516,720 0 0 0

STPAA-0052(504) HOUSTON 13.45 % 07-101 W.S. NEWELL & 10,941,310 320 W 099 100 01-30-13 12,600,643 1,522,983.60 11,320,225 400,834 1,258,449 1,659,283

HSIP-0095(500) HOUSTON 1.07 % 07-102 LEWIS, INC., 345,359 30 W 100 100 06-02-09 303,355 366.80 34,216 0 -42,004 -42,004

STPAA-HSIP-0015(524) COVINGTON SR-15 16.26 % 07-103 WIREGRASS 797,601 40 W 073 100 07-14-14 817,849 180,825.78 1,112,037 0 20,248 20,248

ACNU59435-ATRP(001) COVINGTON CR-4 1.60 % 07-104 WIREGRASS 594,099 30 W 050 099 09-30-14 588,595 10,024.19 623,804 0 0 0

STPAA-HSIP-0010(525) BARBOUR 7.58 % 07-109 WIREGRASS CON 1,024,767 35 W 074 100 07-14-10 1,026,466 93,011.88 1,225,559 0 -673 -673

STPOA-9412(600) HOUSTON PKWAY 13.59 % 07-111 APAC-SOUTHEAS 9,046,516 340 W 100 100 07-30-10 10,854,456 1,547,149.19 11,382,666 56,237 0 56,237

EB-HSIP-0192(501) COFFEE SR 192 6.99 % 07-112 WIREGRASS CON 1,787,331 60 W 100 099 09-30-14 1,824,525 163,321.87 2,335,585 0 0 0

HSIP-0051(502) & COFFEE 0.00 % 07-114 WIREGRASS CON 1,787,316 55 W 098 100 07-17-09 2,148,845 29.20 885,390 7,567 353,962 361,529

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

HSIP-CN12(906) BARBOUR VARIOUS 16.61 % 07-122 SURFACE 232,925 100 W 052 100 12-11-12 188,965 50,569.97 304,374 0 -43,960 -43,960

ERPR-8930(903) HENRY CR99 20.92 % 07-124 HILTON COOPER 47,615 60 W 073 099 09-30-14 47,366 12,488.20 59,673 0 0 0

NHF-0012(544) COFFEE SR 12 7.94 % 07-129 W.S. NEWELL & 14,787,502 350 W 093 094 09-30-14 13,951,077 1,534,598.36 19,323,494 0 0 0

STMOA-0001(543) HENRY 9.04 % 07-130 LEWIS, INC. 1,337,796 75 W 085 100 09-30-10 1,432,980 161,480.09 1,786,186 0 95,184 95,184

STPAA-HSIP-0189(501) COFFEE 4.91 % 07-131 WIREGRASS CON 5,940,632 140 W 099 099 09-30-14 6,332,783 381,505.07 7,762,891 0 0 0

99-507-346-000-101 HENRY 8.49 % 07-138 F&W CONST. CO 394,076 120 W 135 100 10-25-12 288,114 38,708.92 455,739 0 -105,962 -105,962

ACNU58584-ATRP(001) GENEVA CR-41 3.42 % 07-140 WIREGRASS 1,874,610 45 W 089 100 12-26-13 2,030,657 67,460.68 1,968,340 30,659 156,047 186,706

ER-8910(925) GENEVA 37.85 % 07-145 BURNETT CIVIL 114,102 30 W 097 100 02-08-11 98,730 52,055.70 137,528 0 -15,372 -15,372

NH-0210(502) HOUSTON 6.25 % 07-146 APAC MID-SOUT 2,770,412 115 W 072 100 08-01-11 2,401,881 225,071.06 3,598,484 7,193 361,338 368,531

STPAA-HSIP-0134(506) HENRY SR-134 6.85 % 07-148 WIREGRASS CON 2,385,951 55 W 089 100 08-27-13 2,397,268 213,765.57 3,117,830 0 11,317 11,317

STPNU-1600(226) COFFEE CR-353 7.67 % 07-151 WIREGRASS 569,626 45 W 078 099 09-30-14 591,922 53,153.69 692,950 0 0 0

STPAA-0087(510) COFFEE SR-87 2.98 % 07-152 WIREGRASS CON 939,053 30 W 137 100 10-11-13 837,466 36,602.74 1,227,103 0 -101,587 -101,587

STPNU-3400(206) HENRY SR-25 2.87 % 07-153 APAC MID-SOUT 301,431 30 W 063 100 10-11-13 302,714 10,332.07 359,641 0 1,283 1,283

STPNU-HSIP-0051(509) BARBOUR SR-51 8.70 % 07-162 WIREGRASS 2,534,924 55 W 096 100 05-05-14 2,439,489 288,400.71 3,312,499 0 -95,435 -95,435

STPAA-HSIP-0010(530) HENRY 10.63 % 07-164 LEWIS, INC. 1,376,300 60 W 095 100 12-02-11 1,471,114 191,294.77 1,798,473 0 94,814 94,814

ER-8910(941) DALE 3.97 % 07-166 MCINNIS CONST 135,745 60 W 050 100 06-22-11 118,303 6,675.29 168,119 0 -17,442 -17,442

STPNU-2020(200) COVINGTON CR-24 1.98 % 07-168 WIREGRASS 887,065 40 W 082 099 09-30-14 883,939 21,026.31 1,058,370 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

NH-0012(554) DALE SR-12 8.90 % 07-169 APAC MID-SOUT 3,397,380 85 W 096 100 04-16-14 3,385,728 395,380.74 4,439,510 0 0 0

HSIP-0134(503) HENRY 0.12 % 07-170 LEWIS, INC. 1,482,265 60 W 072 100 06-03-11 1,460,002 2,173.97 1,769,081 0 -22,263 -22,263

SRTS-SR13(916) GENEVA 0.00 % 07-172 GEISLER CONTR 123,281 45 W 013 100 11-15-13 116,801 .00 0 0 -6,480 -6,480 DIVISION TOTALS: 220,134,901 198,794,862 240,737,249 1,170,671 4,909,706 6,080,377 19,793,774.58

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 85 EIGHTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 08-001 2.900 MI RESURFACING & TRAFFIC STRIPE ON CR-14 FROM UTSEY SMITH ROAD TO SR-17 IN GILBERTOWN; STNUE-100057522 (HOSEA O. WEAVER & SONS, INC.) STPNU-1203(201) CHOCTAW

08-002 8.770 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-17 FROM THE S END OF THE TUCKABUM CREEK STAAM-100060679 BRIDGE (MP 116.255) TO THE SUMTER CO LINE (MP 125.036); HOSEA O. WEAVER & SONS, INC. STPAA-0017(555) CHOCTAW SR-17

08-003 0.096 MI BRIDGE REPLACEMENT (BRIDGE CULVERT) AND APPROACHES ON CR-2 AT RED CREEK SOUTHWEST OF SILAS A1BRZ-100058468 H & L CONSTRUCTION, INC. ACBRZ58468-ATRP(001) CHOCTAW CR-2

08-004 0.103 MI. BRIDGE REPLACEMENT (BRIDGE CULVERT) AND APPROACHES ON CR 32 AT YANTLEY CREEK EAST BROPH-100047134 OF YANTLEY (GLASGOW CONSTRUCTION CO., INC.) GRBN1-100047134 ACGBBR-BR-1205(200) CHOCTAW CR 32

08-005 7.323 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-17 FROM N OF SR-10 IN BUTLER (MP 108.934) STAAM-100059016 TO THE S END OF THE TUCKABUM CREEK BRIDGE (MP 116.257); MOBILE ASPHALT COMPANY, LLC STPAA-0017(548) CHOCTAW SR-17

08-006 7.438 MI RESURF AND TRAFFIC STRIPE ON CR-25 FROM THE JUNCTION OF CR-9 TO THE INTERSECTION OF COPPER A1RDY-100059332 LANE; MOBILE ASPHALT COMPANY, LLC ACNU59332-ATRP(001) CHOCTAW CR-25

08-007 4.430 MI RESURFACING AND TRAFFIC STRIPE ON CR-32 FROM CR-45 TO CR-9 EAST OF YANTLEY; STNUM-100059255 S.T. BUNN CONSTRUCTION COMPANY, INC. STPNU-1205(202) CHOCTAW CR-32

08-008 0.005 MI BRIDGE (CULVERT) REPLACEMENT ON HENRY DOHERTY RD (CR-119) OVER TUCKABUM CREEK NEAR A1BRZ-100058469 LISHMAN; ARRINGTON CURB & EXCAVATION, INC. ACBRZ58469-ATRP(001) CHOCTAW

08-009 BRIDGE COATING ON SR-17 AT YANTLEY AND SOUWILPA CREEKS; GULF COAST CONTRACTING, LLC 99005-100061773

99-508-120-017-423 CHOCTAW SR-17

08-010 7.493 MI RESURFACING, GUARDRAIL AND TRAFFIC STRIPEON SR-17 FROM S OF SOUWILPA CREEK BRIDGE (MP HSIPM-100059009 83.866) IN SILAS TO N OF LITTLE MILL CREEK BRIDGE (MP 91.360); MOBILE ASPHALT COMPANY, LLC STAAM-100059009 STPAA-HSIP-0017(549) CHOCTAW SR-17

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 86 EIGHTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 08-011 6.871 MI RESURFACING AND TRAFFIC STRIPE ON CR-9 (BROAD ST)FROM THE JUNCTION OF SR-10(CROWELL DR)IN A1RDY-100059330 LISMAN TO THE INTERSECTION OF CR-32; S. T. BUNN CONSTRUCTION COMPANY, INC. ACNU59330-ATRP(002) CHOCTAW CR-9

08-014 0.615 MI BRIDGE REPLACEMENT AND APPROACHES ON SR- 10 AT SPEAR CREEK IN BUTLER; BRONL-100044063 (MCINNIS CONSTRUCTION LLC) BR-0010(506) CHOCTAW

08-015 5.989 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-12 (US-84) FROM W OF CR-22 TO E OF SR-295 NH01M-100060198 AND SR-295 FROM S OF SR-13 (US-43) TO N OF SR-13 (US-43); HOSEA O. WEAVER & SONS, INC. STAAM-100060197 NH-0012(556) & STPAA-0295(500)CLARKE SR-12

08-016 1.107 MI BRIDGE REPLACEMENTS AND APPROACHES ON CR-15 OVER BASSETT CREEK; MCINNIS CONSTRUCTION, A1RDY-100058498 LLC ACBR58498-ATRP(001) CLARKE CR-15

08-017 8.526 MI PLANING, RESURFACING AND WEIGH IN MOTION STATION ON SR12 (US 84) FROM SR 295 IN GROVE HILL ACR05-100053535 TO E OF CR 35 (MP 52.700); MOBILE ASPHALT CO. LLC NH04E-100053535 NH-0012(548) CLARKE SR 12

08-018 3.707 MI WIDENING, PLANING, DRAINAGE IMPROVEMENTS & RESURFACING ON SR-13 (US-43) FROM N OF THE NH01M-100059017 JUNCTION OF SR-5 IN THOMASVILLE TO THE MARENGO CO LINE; MOBILE ASPHALT COMPANY, LLC HSIPM-100059017 NH-HSIP-0013(583) CLARKE SR-13

08-019 0.667 MI BRIDGE REPLACEMENTS (GRADE, DRAIN, BASE &PAVE) ON SR-69 OVER JACKSON CREEK; BRSM1-00041298 MCINNIS CONSTRUCTION, LLC BR-0069(502) CLARKE SR-69

08-020 3.907 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-13 (US-43) FROM 0.15 MI N OF CR-29 TO JUST N NH01M-100060673 OF SR-295 N IN GROVE HILL; MOBILE ASPHALT COMPANY, LLC NH-0013(589) CLARKE SR-13

08-021 3.655 MI RESURFACING AND TRAFFIC STRIPE ON CR-35 (MORNING STAR RD)FROM THE INTERSECTION OF SIMMONS A1RDY-100059333 CREEK RD TO THE JUNCTION OF SR-12 (US-84); H. O. WEAVER & SONS, INC. ACNU59333-ATRP(002) CLARKE CR-35

08-022 0.094 MI EMERGENCY SLIDE REPAIRS SR-69 SLIDE REP NEAR MP 8.000 FROM APP 0.8 MI N OF JACKSON CREEK ER96 -100053711 TO SOUTH OF MAYS CROSS ROADS; (SOUTHWEST ALABAMA CONSTURCTION, LLC) ER09S-100053711 ER-8910(906) CLARKE

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 87 EIGHTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 08-023 0.920 MI LIGHTING IMPROVEMENTS ON US-43 IN THOMASVILLE; STONE ELECTRIC COMPANY, INC. STP09-100054284

DE-A198(927) CLARKE US-43

08-024 8.261 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-13 (US-43) FROM 0.32 MI N OF CR-3 (MCVAY RD) NH01M-100060674 TO 0.15 MI N OF CR-29; MOBILE ASPHALT COMPANY, LLC NH-0013(590) CLARKE SR-13

08-025 4.176 MI SAFETY WIDENING, PLANING, RESURFACING ANDTRAFFIC STRIPE ON SR-13 (US-84) FROM W OF CR-23 HSIPM-100059020 (MP 36.150) TO W OF CR-22 (MP 40.326) W OF GROVE HILL; HOSEA O. WEAVER & SONS, INC. NH01M-100059020 NH-HSIP-0012(553) CLARKE SR-13

08-026 13.889 MI RESURFACING AND TRAFFIC STRIPE ON CR-3 (WINN RD) FROM CR-3 (MCVAY RD) TO SR-12 (US-84); A1RDY-100059334 HOSEA O. WEAVER & SONS, INC. ACNU59334-ATRP(001) CLARKE CR-3

08-027 5.506 MI RESURF & TRAFF STRIPE ON CR-30(BROOKSVILLRD) FROM THE JUNCTION OF CR-27(OLD CR-5)TO THE A1RDY-100059335 JUNCTION OF CR-35(OLD LINE RD)NEAR FULTON; H. O. WEAVER & SONS, INC. ACNU59335-ATRP(003) CLARKE CR-30

08-030 6.365 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-8 (US-80) FROM 0.28 MI E OF THE INTERSECTION 01AC1-00060672 AT SR-28 TO E OF CR-28; S.T. BUNN CONSTRUCTION COMPANY, INC. NH01M-100060672 NH-0008(575) MARENGO SR-8

08-031 0.071 MI CULVERT EXTENSION ON SR-13 (US-43) AT MP 117.25 IN LINDEN; C. THORNTON, INC. 99044-100059998

99-408-462-013-312 MARENGO SR-13

08-032 & 99-408-462-008-236; 2.510 MI PLANING, RESURFACINLIME STABILIZATION & TRAFFIC STRIPE ON SR-8(US-80) NH01M-100053108 FROM JUST E OF CR-28 TO 0.65 MI W OF SR-13(US-43) IN DEMOPOLIS; S.T. BUNN CONSTRUCTION CO. INC. 99004-100059115 NH-0008(574) MARENGO SR-8

08-041 4.949 MI RESURFACING & TRAFFIC STRIPE ON CR-16 FROM CR-7 IN SWEET WATER TO SR-13 (US-43); STNUE-100056139 (S.T. BUNN CONSTRUCTION CO., INC.) STPNU-4603(200) MARENGO

08-044 9.333 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR25 FROM THE MERIDIAN & BIGBEE RAILROAD IN HSIPE-100053543 THOMASTON (MP 21.020) TO S OF CR12 (MP 30.354); HOSEA O. WEAVER & SONS, INC. EBEXE-100053543 EB-HSIP-0025(531) MARENGO SR 25 EBEXL-100053543

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 88 EIGHTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 08-045 4.856 MI LEVELING, RESURFACING, GUARDRAIL INSTALLATION & TRAFFIC STRIPE ON CR-42 FROM THE A1RDY-100058470 JUNCTION OF SR-41 TO CR-30; HOSEA O. WEAVER & SONSINC. ACNU58470-ATRP(001) MONROE CR-42

08-046 & STPAA-HSIP-0047(503); 8.592 MI 2FT WIDENING, RESURFACING & TRAFFIC STRIPE ON SR-21/SR-47 FROM S HSIPM-100060595 OF THE BEATRICE CITY LIMITS TO THE JCT OF SR-47 & ON SR-47 FROM THE JCT OF SR-21 TO CR-9;MOBILE ASPH STAAM-100060595 STPAA-HSIP-0021(545) MONROE SR-21 HSIPM-100060597 STAAM-100060597

08-047 0.085 MI CULVERT REPLACEMENT AND APPROACHES ON CR 23 AT A TRIBUTARY OF BEAR CREEK IN FRISCO STOAR-100056136 CITY; H & L CONSTRUCTION, INC. STPOA-5015(201) MONROE CR 23

08-048 5.577 MI LEVELING, RESURFACING, GUARDRAIL & TRAFFIC STRIPE ON CR-8 FROM SR-59 TO THE A1RDY-100060037 INTERSECTION OF CR-1 & CR-8 (TOWER RD); MOBILE ASPHALT COMPANY, LLC ACNU60037-ATRP(001) MONROE CR-8

08-049 & STPAA-HSIP-0083(502);4.867 MI SAFETY WIDENING, RESURFACING & TRAFFIC STRIPE ON SR-47 FROM N OF CR HS31M-100060676 -9 TO N OF SR-83 & ON SR-83 & ON SR-83 FROM THE CONECUH CO LINE TO SR-47 IN MIDWAY;MOBILE ASPHALT STAAM-100060676 STPAA-HSIP-0047(504) MONROE SR-47 HS31M-100060677 STAAM-100060677

08-050 0.160 MI SLIDE REPAIR ON SR47 WEST OF SR 41 IN MONROEVILLE; JRD CONTRACTING, INC. ER09J-100055381 L24AC-100055381 ERPR-8930(915) MONROE SR 47

08-051 0.890 MI INTERSECTION IMPROVEMENTS (GRADE, DRAINAGE AND PAVEMENT) ON SR-21/SR-47 AT CR-42 EBSPE-100058039 NORTHEAST OF TUNNEL SPRINGS; GRADY RALLS & SONS, INC. EB-0021(539) MONROE

08-052 0.194 MI SLIDE REPAIR ON SR-41 FROM APPROXIMATELY 1 MILE S OF LIMESTONE CREEK TO APPROXIMATELY 1.8 STAAL-100055802 MILES N OF SR-47 N OF MONROEVILLE; GRADY RALLS & SONS, INC. ERPR-8930(916) MONROE SR 41

08-053 ACNU59347-ATRP(001) & ACNU59348-ATRP(001);1.593 MIRESURFACING & TRAFFIC STRIPE ON S MOUNT PLEASANT A1RDY-100059346 DR;GOLF/BROOKHILL DR;& ON CR-27(CLAUSELL RD) IN MONROEVILLE AS INDICATED IN THE PLANS;HOSEA O.WEAV A1RDY-100059347 ACNU59346-ATRP(001) MONROE A1RDY-100059348

08-054 & 99-408-663-041-315;WILCOX CO; 6.553 MI SAFETY WIDENING, RESURF & TRAFFIC STRIPE ON SR-41 & HS31M-100060675 INTERSECTION IMPROVEMENTS AT CR-8 FROM 0.055 MI S OF THE MONROE CL TO 1.340 MI N OF CR-12;HOSEA O. STAAM-100060675 STPAA-HSIP-0041(513) MONROE SR-41 99044-100060001

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 89 EIGHTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 08-055 & ACNU61364-ATRP(003);1.566 MI RESURF & TRAF STRIPON E CALIBORNE ST FROM THE JCT OF WINSTON ST TO A1RDY-100059345 THE JCT OF SR-21;CR-27 FROM THE JCT OF WHITING DR TO THE JCT OF SR-47;H.O. WEAVER & SONS, INC. A1RDY-100061364 ACNU59345-ATRP(004) MONROE

08-057 & STPAA-0047(502); 9.043 MI WIDENING, RESURFACING AND TRAFFIC STRIPE ON SR-41 FROM SR-47 (MP 47.448) HSIPM-100059007 NW OF MONROEVILLE SQUARE TO THE N BRIDGE END OF FLAT CREEK (MP 56.037); MOBILE ASPHALT CO., LLC STAAM-100059007 STPAA-HSIP-0041(510) MONROE SR-41 STAAM-100059008

08-058 & ACNU59342-ATRP(001); 0.686 MI RESURFACING AND TRAFFIC STRIPE ON CR-23 FROM CR-18 TO THE EXCEL A1RDY-100059341 TOWN LIMITS(SITE 1)AND ON CR-18 FROM CR-23 TO 500 FT S OF THE EXCEL TOWN LIMITS;HOSEA O. WEAVER & SO A1RDY-100059342 ACNU59341-ATRP(001) MONROE CR-23

08-059 0.085 MI CULVERT REPLACEMENT AND APPROACHES ON CR-23 AT A TRIBUTARY OF BEAR CREEK IN FRISCO CITY; STOAR-100056136 (STARFISH, INC.) STPOA-5015(201) MONROE

08-060 5.053 MI RESURFACING AND TRAFFIC STRIPE ON CR-23 FROM THE FRISCO CITY LIMITS TO THE JUNCTION OF A1RDY-100061365 SR-12(US-84); HOSEA O. WEAVER & SONS, INC. ACNU61365-ATRP(002) MONROE CR-23

08-062 BRF-0008(543) 7.118 MI ADDITIONAL LANES (GRADE, DRAINAGE, PAVEMENT & BRIDGES) ON SR-8 (US-80) FROM ACHPL-100004511 SR-17 S OF YORK TO CR-71 (BELLAMY RD); (W.S. NEWELL & SONS, INC.) HPPH1-100004511 NHF-HPP-0008(505) SUMTER BRONL-100048866

08-065 25.250 MI RESURFACING AND TRAFFIC STRIPE ON CR-34 FROM SR-17 IN MILLRY TO SR-13 (US-43) IN LEROY; A1RDY-100058478 MOBILE ASPHALT COMPANY, LLC ACNU58478-ATRP(001) WASHINGTONCR-34

08-066 7.649 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-17 FROM SR-57 (US-45) TO 1.37 MI S OF CR-20 STAAM-100060680 SOUTH OF TIBBIE; MOBILE ASPHALT COMPANY, LLC STPAA-0017(551) WASHINGTONSR-17

08-067 0.159 MI BRIDGE AND TWO RELIEF BRIDGE REPLACEMENTSON CR-8 OVER THE ESCATAWPA RIVER; A1BRZ-100058475 NEWELL & BUSH, INC. ACBRZ58475-ATRP(001) WASHINGTONCR-8

08-068 0.045 MI BRIDGE REPLACEMENT ON CR-6 OVER ARMSTRONGCREEK; NEWELL & BUSH, INC. A1BRZ-100059349

ACBRZ59349-ATRP(001) WASHINGTONCR-6

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 90 EIGHTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 08-069 6.893 MI RESURFACING AND TRAFFIC STRIPE ON CR-35 FROM THE MOBILE CO LINE TO THE INTERSECTION OF A1RDY-100061487 CR-4 IN SIMS CHAPEL; JOHN G. WALTON CONSTRUCTION COMPANY, INC. ACNU61487-ATRP(001) WASHINGTONCR-35

08-070 0.035 MI BRIDGE REPLACEMENT ON CR-9 OVER LITTLE CREEK NORTHWEST OF CITRONELLE; MURPHREE BRIDGE BROFE-100058605 CORP. BRZ-6500(208) WASHINGTONCR 9

08-071 5.375 MI RESURFACING AND TRAFFIC STRIPE ON CR-36 FROM THE MISSISSIPPI STATE LINE TO THE INTERSECTIO A1RDY-100061485 OF CR-34 IN SHADY GROVE; MOBILE ASPHALT COMPANY, LLC STNUM-100061485 ACNU61485-ATRP(002) WASHINGTONCR-36

08-072 12.948 MI SAFETY WIDENING, RESURFACING & TRAFFIC STRIPE ON SR-56 FROM THE MISSISSIPPI STATE LINE TO HS31M-100060681 JUST E OF THE INTERSECTION OF CR-1 IN CHATOM; HOSEA O. WEAVER & SONS, INC. STAAM-100060681 STPAA-HSIP-0056(502) WASHINGTONSR-56

08-080 0.264 MI BRIDGE REPLACEMENT ON CR-11 OVER JAMES CREEK; NEWELL & BUSH, INC. A1BRZ-100060441

ACBRZ60441-ATRP(001) WILCOX CR-11

08-081 5.093 MI SAFETY WIDENING, RESURFACING & TRAFFIC STRIPE ON SR-21 FROM 100 FT N OF SR-10 IN OAK HILL HS31M-100060678 TO THE JUNCTION OF SR-28; ASPHALT CONTRACTORS, INC STAAM-100060678 STPAA-HSIP-0021(547) WILCOX SR-21

08-083 0.187 MI GRADE, DRAINAGE & PAVEMENT ON WILCOX CO INDUSTRIAL ACCESS RD OFF OF SR-28 NORTH OF CAMDEN; GSPH5-100057248 (JRD CONTRACTING, INC.) STNUE-100057248 DE-STPNU-A106(924) WILCOX

08-084 0.578 MI GRADE, DRAIN, PAVEMENT AND BRIDGE ON INDUSTRIAL ACCESS RD FROM 0.7 MI S OF CR-27 TO IARA1-00058108 SR-5 0.5 MI N OF CR-1 NEAR SUNNY SOUTH; MCINNIS CONSTRUCTION, LLC IAR-066-000-001 WILCOX

08-093 11.358 MI PLANING, RESURFACING & TRAFFIC STRIPE ONSR-28 FROM E OF SR-5 (MP 65.851) NEAR CATHERINE TO STAAL-100052791 WEST OF SR-162 (MP 71.529) (ASPHALT CONTRACTORS, INC.) STPAA-0028(505) WILCOX

08-105 6.396 MI RESURFACING AND TRAFFIC STRIPE ON CR-47 FROM CR-30 IN MAGNOLIA TO CR-33 IN OCTAGON; EBEXE-100058589 HOSEA O. WEAVER & SONS, INC. EB-4606(202) MARENGO CR-47

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 91 EIGHTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 08-106 1.003 MI BRIDGE REPLACEMENT (WBR) AND APPROACHES ON SR-8 (US-80) AT FRENCH CREEK EAST OF DEMOPOLIS; BROPE-100042920 ALABAMA BRIDGE BUILDERS, INC. BRF-0008(528) MARENGO SR-8

08-107 0.025 MI BRIDGE REPLACEMENT (PRECAST) ON CR-28 OVER BULL HALL CREEK NE OF THE TOWN OF HOBSON; BROFE-100058606 F & W CONSTRUCTION COMPANY, INC. BRZ-6500(209) WASHINGTONCR-28

08-108 4.849 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-8 (US-80) FROM E OF SR-13 (US-43)(MP 36.124) NH01M-100059018 TO THE HALE CO LINE (MP 40.974); S.T. BUNN CONSTRUCTION COMPANY, INC. NH-0008(569) MARENGO SR-8

08-109 SIDEWALKS AND CROSSWALKS IN THE TOWN OF EXCEL AS INDICATED IN THE PLANS ASSEMBLY; CTS CONSTRUCTION SRIE1-00058913 COMPANY, INC. SRTS-SR13(917) MONROE

08-110 5.492 MI SAFETY WIDENING, RESURFACING AND TRAFFIC STRIPE ON SR-13 (US-43) FROM THE CLARK CO LINE HSIPM-100059019 (MP 96.823) TO N OF SR-10 (MP 102.365); HOSEA O. WEAVER & SONS, INC. NH01M-100059019 NH-HSIP-0013(585) MARENGO SR-13

08-111 12.962 MI WIDENING, RESURFACING, GUARDRAIL AND TRAFFIC STRIPE ON SR-59 FROM THE N END OF THE HSIPM-100058917 LITTLE RIVER BRIDGE TO THE JUNCTION OF SR-21 IN URIAH; HOSEA O. WEAVER & SONS, INC. AAST1-00058917 STPAA-HSIP-0059(510) MONROE SR-59 STAAH-100058917

08-151 NH-0017(521); 1.363 MI BRIDGE REPLACEMENT, CULVERTEXTENSIONS & APPROACHES ON SR-17 (US-45) AT LONG BROPE-100043255 BRANCH & FLAT BRANCH SOUTHEAST OF DEER CREEK; (HOSEA O. WEAVER & SONS, INC.) NH04E-100050297 BRF-0017(506) WASHINGTON

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPNU-1203(201) CHOCTAW 3.45 % 08-001 HOSEA O. WEAV 581,125 30 W 060 100 06-08-12 582,748 23,961.54 693,350 0 0 0

STPAA-0017(555) CHOCTAW SR-17 2.11 % 08-002 HOSEA O. WEAV 1,595,024 65 W 040 087 10-01-14 1,426,966 40,693.37 1,920,739 0 0 0

ACBRZ58468-ATRP(001) CHOCTAW CR-2 16.39 % 08-003 H & L CONSTRU 278,092 60 W 100 100 10-16-13 292,023 52,423.26 319,807 0 0 0

ACGBBR-BR-1205(200) CHOCTAW CR 32 3.27 % 08-004 GLASGOW CONST 533,883 45 W 097 100 09-05-06 499,250 19,194.12 585,710 0 0 0

STPAA-0017(548) CHOCTAW SR-17 5.16 % 08-005 MOBILE ASPHAL 1,416,594 40 W 165 099 05-22-14 1,859,823 112,114.38 2,169,967 0 0 0

ACNU59332-ATRP(001) CHOCTAW CR-25 0.04 % 08-006 MOBILE ASHPAL 1,519,735 45 W 000 000 00-00-00 0 705.57 1,663,707 0 0 0

STPNU-1205(202) CHOCTAW CR-32 1.36 % 08-007 S.T. BUNN 963,733 30 W 097 098 09-20-13 972,575 15,653.93 1,149,844 0 0 0

ACBRZ58469-ATRP(001) CHOCTAW 12.96 % 08-008 ARRINGTON CUR 192,437 60 W 098 100 10-31-13 194,409 28,695.19 221,302 0 0 0

99-508-120-017-423 CHOCTAW SR-17 0.00 % 08-009 GULF COAST CO 247,600 50 W 000 000 00-00-00 0 4,083.44 0 0 0 0

STPAA-HSIP-0017(549) CHOCTAW SR-17 5.63 % 08-010 MOBILE ASPHAL 1,614,715 50 W 124 099 05-31-14 2,000,753 153,233.58 2,720,285 5,635 0 5,635

ACNU59330-ATRP(002) CHOCTAW CR-9 0.12 % 08-011 S. T. BUNN 1,391,748 30 W 000 000 00-00-00 0 1,775.79 1,399,632 0 0 0

BR-0010(506) CHOCTAW 21.81 % 08-014 MCINNIS CONST 4,248,432 207 W 107 100 05-31-13 5,662,845 1,174,095.25 5,381,546 169,140 0 169,140

NH-0012(556) & STPAA-0295(500) CLARKE SR-12 4.89 % 08-015 HOSEA O. WEAV 1,584,252 65 W 097 097 05-31-14 1,533,933 94,633.90 1,935,199 0 0 0

ACBR58498-ATRP(001) CLARKE CR-15 5.39 % 08-016 MCINNIS CONST 5,986,036 400 W 038 032 11-30-15 2,104,820 376,318.43 6,981,179 34,254 0 34,254

NH-0012(548) CLARKE SR 12 6.87 % 08-017 MOBILE ASPHAL 2,623,681 80 W 095 100 08-23-13 2,719,066 235,839.82 3,428,482 9,795 0 9,795

NH-HSIP-0013(583) CLARKE SR-13 14.39 % 08-018 MOBILE ASPHAL 1,214,924 80 W 083 099 07-31-14 1,367,667 246,788.70 1,714,197 0 0 0

BR-0069(502) CLARKE SR-69 0.00 % 08-019 MCINNIS CONST 4,128,771 240 W 037 033 04-30-15 1,604,226 .00 0 15,068 0 15,068

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

NH-0013(589) CLARKE SR-13 3.79 % 08-020 MOBILE ASPHAL 1,336,044 35 W 086 095 05-31-14 1,266,651 73,830.50 1,944,051 0 0 0

ACNU59333-ATRP(002) CLARKE CR-35 0.17 % 08-021 H. O. WEAVER 374,778 60 W 000 000 00-00-00 0 771.71 441,728 0 0 0

ER-8910(906) CLARKE 94.78 % 08-022 SOUTHWEST AL 117,585 30 W 043 100 11-20-09 229,940 71,674.03 75,620 10,000 0 10,000

DE-A198(927) CLARKE US-43 9.84 % 08-023 STONE ELECTRI 304,416 60 W 075 098 07-31-14 290,675 31,480.14 319,637 -8,000 0 -8,000

NH-0013(590) CLARKE SR-13 0.27 % 08-024 MOBILE ASPHAL 3,470,868 80 W 000 000 00-00-00 0 11,871.41 4,264,425 0 0 0

NH-HSIP-0012(553) CLARKE SR-13 10.95 % 08-025 HOSEA O. WEAV 753,907 30 W 077 100 09-17-13 746,362 107,877.99 985,164 4,915 0 4,915

ACNU59334-ATRP(001) CLARKE CR-3 5.18 % 08-026 HOSEA O. WEAV 1,070,548 30 W 050 095 07-31-14 1,015,573 68,788.87 1,326,513 0 0 0

ACNU59335-ATRP(003) CLARKE CR-30 0.00 % 08-027 H.O. WEAVER & 537,087 40 W 000 000 00-00-00 0 .00 0 0 0 0

NH-0008(575) MARENGO SR-8 0.88 % 08-030 S. T. BUNN 2,868,072 55 W 076 088 08-31-14 2,572,085 31,723.90 3,573,238 0 0 0

99-408-462-013-312 MARENGO SR-13 4.96 % 08-031 C. THORNTON 249,943 40 W 073 059 09-30-14 156,188 14,283.05 287,413 0 0 0

NH-0008(574) MARENGO SR-8 0.78 % 08-032 S. T. BUNN 2,078,251 95 W 009 005 11-30-14 133,542 18,139.21 2,299,240 0 0 0

STPNU-4603(200) MARENGO 2.07 % 08-041 S.T. BUNN CON 858,019 30 W 073 100 09-08-11 778,254 23,240.52 1,121,212 0 0 0

EB-HSIP-0025(531) MARENGO SR 25 8.19 % 08-044 HOSEA O. WEAV 1,885,099 55 W 082 100 12-10-13 2,160,915 202,078.71 2,465,787 0 0 0

ACNU58470-ATRP(001) MONROE CR-42 3.47 % 08-045 HOSEA O. WEAV 1,216,952 40 W 068 096 06-27-14 721,672 44,361.00 1,277,799 0 0 0

STPAA-HSIP-0021(545) MONROE SR-21 6.52 % 08-046 MOBILE ASPHAL 1,710,619 45 W 149 099 09-30-14 1,691,244 150,745.30 2,311,423 0 0 0

STPOA-5015(201) MONROE CR 23 3.93 % 08-047 H & L CONSTRU 377,615 50 W 000 000 00-00-00 0 18,568.42 471,992 20,146 0 20,146

ACNU60037-ATRP(001) MONROE CR-8 1.45 % 08-048 MOBILE ASPHAL 1,208,653 40 W 035 092 08-10-14 1,016,037 18,474.16 1,269,087 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPAA-HSIP-0047(504) MONROE SR-47 7.92 % 08-049 MOBILE ASPHAL 980,685 45 W 049 071 09-30-14 703,504 81,905.69 1,033,916 0 0 0

ERPR-8930(915) MONROE SR 47 6.80 % 08-050 JRD CONTRACTI 530,699 60 W 107 100 06-17-13 546,376 41,386.64 608,414 0 0 0

EB-0021(539) MONROE 11.34 % 08-051 GRADY RALLS 2,279,217 180 W 071 099 11-30-13 2,459,947 337,974.33 2,978,356 28,573 0 28,573

ERPR-8930(916) MONROE SR 41 0.03 % 08-052 GRADY RALLS & 716,405 80 W 038 100 09-03-13 763,103 265.38 823,866 0 0 0

ACNU59346-ATRP(001) MONROE 0.54 % 08-053 HOSEA O. WEAV 208,726 40 W 055 084 07-21-14 176,659 1,450.49 264,225 0 0 0

STPAA-HSIP-0041(513) MONROE SR-41 0.09 % 08-054 HOSEA O. WEAV 1,235,900 45 W 000 000 00-00-00 0 1,342.71 1,404,646 0 0 0

ACNU59345-ATRP(004) MONROE 0.00 % 08-055 H.O. WEAVER & 668,253 80 W 000 000 00-00-00 0 .00 0 0 0 0

STPAA-HSIP-0041(510) MONROE SR-41 7.31 % 08-057 MOBILE ASPHAL 2,576,248 60 W 192 099 04-30-14 3,025,535 273,303.26 3,733,811 0 0 0

ACNU59341-ATRP(001) MONROE CR-23 0.36 % 08-058 HOSEA O. WEAV 156,797 30 W 043 011 09-09-14 17,694 756.28 209,703 0 0 0

STPOA-5015(201) MONROE 3.93 % 08-059 STARFISH, INC 496,697 75 W 096 100 12-17-13 382,828 18,568.42 471,992 0 0 0

ACNU61365-ATRP(002) MONROE CR-23 0.05 % 08-060 HOSEA O. WEAV 1,096,213 40 W 000 000 00-00-00 0 630.81 1,178,104 0 0 0

NHF-HPP-0008(505) SUMTER 15.89 % 08-062 W.S. NEWELL & 30,444,921 610 W 100 099 04-30-13 35,677,384 814,545.29 5,125,235 2,093,702 0 2,093,702

ACNU58478-ATRP(001) WASHINGTON CR-34 0.15 % 08-065 MOBILE ASPHAL 4,352,804 100 W 089 037 11-24-14 1,723,902 7,920.14 5,005,724 0 0 0

STPAA-0017(551) WASHINGTON SR-17 2.63 % 08-066 MOBILE ASPHAL 1,218,008 40 W 055 096 09-30-14 1,190,198 48,588.06 1,843,847 0 0 0

ACBRZ58475-ATRP(001) WASHINGTON CR-8 1.72 % 08-067 NEWELL & BUSH 1,935,723 240 W 035 030 10-05-15 670,281 46,328.33 2,690,351 0 0 0

ACBRZ59349-ATRP(001) WASHINGTON CR-6 0.23 % 08-068 NEWELL & BUSH 560,933 90 W 036 040 12-09-14 242,747 1,606.65 684,266 0 0 0

ACNU61487-ATRP(001) WASHINGTON CR-35 2.69 % 08-069 JOHN G. WALTO 1,332,853 45 W 100 089 09-01-14 1,182,155 46,484.62 1,724,791 0 0 0

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

BRZ-6500(208) WASHINGTON CR 9 11.84 % 08-070 MURPHREE BRID 771,520 90 W 098 099 08-31-13 811,959 119,444.70 1,008,180 0 0 0

ACNU61485-ATRP(002) WASHINGTON CR-36 0.04 % 08-071 MOBILE ASPHAL 1,170,797 60 W 000 000 00-00-00 0 625.56 1,377,753 0 0 0

STPAA-HSIP-0056(502) WASHINGTON SR-56 0.06 % 08-072 HOSEA O. WEAV 1,942,288 40 W 000 000 00-00-00 0 1,334.35 2,172,111 0 0 0

ACBRZ60441-ATRP(001) WILCOX CR-11 0.08 % 08-080 NEWELL & BUSH 756,182 70 W 016 007 10-29-14 95,511 765.47 936,089 0 0 0

STPAA-HSIP-0021(547) WILCOX SR-21 0.40 % 08-081 ASPHALT CONTR 1,257,609 40 W 025 009 09-30-14 135,268 6,100.87 1,513,010 0 0 0

DE-STPNU-A106(924) WILCOX 18.39 % 08-083 JRD CONTRACTI 249,506 75 W 075 099 05-31-13 249,853 52,022.83 282,859 0 0 0

IAR-066-000-001 WILCOX 0.00 % 08-084 MCINNIS CONST 3,911,568 3014 D 125 099 09-30-14 4,308,121 .00 0 81,880 0 81,880

STPAA-0028(505) WILCOX 0.88 % 08-093 ASPHALT CONTR 1,472,908 30 W 150 100 11-30-10 1,503,221 15,544.57 1,764,254 1,644 0 1,644

EB-4606(202) MARENGO CR-47 3.17 % 08-105 HOSEA O. WEAV 881,924 30 W 099 099 05-31-13 853,827 36,767.23 1,158,131 0 0 0

BRF-0008(528) MARENGO SR-8 7.67 % 08-106 ALABAMA BRIDG 4,187,964 180 W 100 100 08-01-14 4,166,631 419,793.52 5,472,601 28,558 0 28,558

BRZ-6500(209) WASHINGTON CR-28 11.82 % 08-107 F & W CONSTRU 389,048 90 W 087 096 12-31-13 374,433 60,092.17 508,386 0 0 0

NH-0008(569) MARENGO SR-8 5.66 % 08-108 S.T. BUNN 1,351,656 30 W 087 100 12-19-13 1,304,103 100,052.91 1,766,270 0 0 0

SRTS-SR13(917) MONROE 0.00 % 08-109 CTS CONSTRUCT 54,552 40 W 063 079 09-30-13 48,265 .00 0 0 0 0

NH-HSIP-0013(585) MARENGO SR-13 7.45 % 08-110 HOSEA O. WEAV 1,009,650 30 W 077 099 07-22-14 895,698 98,420.05 1,319,354 0 0 0

STPAA-HSIP-0059(510) MONROE SR-59 4.43 % 08-111 HOSEA O. WEAV 2,028,288 55 W 100 099 06-25-14 2,117,772 29,777.30 671,595 0 0 0

BRF-0017(506) WASHINGTON 11.77 % 08-151 HOSEA O WEAVE 5,494,138 2413 D 098 100 05-20-13 5,396,044 845,673.84 7,179,438 45,373 0 45,373 DIVISION TOTALS: 128,259,918 106,623,261 113,630,553 2,540,683 0 2,540,683 6,977,591.66

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 92 NINTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 09-001 8.555 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-42 (US-98) FROM SR-104 (MP 43.685) TO CR-98 STOAM-100059891 (MP 52.241) IN BARNWELL; JOHN G. WALTON CONSTRUCTION COMPANY, INC. STPOA-0042(525) BALDWIN SR-42

09-002 3.653 MI GRADE, DRAIN, PAVEMENT, SIGNALS, RUST REMOVAL AND BRIDGE ON CR-83 FROM US-90 TO CR-64 HPPL2-100048106 NE OF ROBERTSDALE; (HOSEA O. WEAVER & SONS, INC.) HPPH2-100048106 HPP-STPAA-STPNU-RECA-1702(905)BALDWIN

09-003 3.229 MI RESURFACING & TRAFFIC STRIPE ON SR-16(US-90)FROM JUST E OF THE I-10/SR-16(US-90)EBOUND RAMP STAAM-100060984 (MP 44.748)TO JUST W OF SR-181(MP 47.978); JOHN G. WALTON CONSTRUCTION COMPANY, INC. STPAA-0016(514) BALDWIN SR-16

09-004 0.183 MI BRIDGE REPLACEMENT & APPROACHES ON CR-71 (COLLEGE AVE) OVER ROCK CREEK IN ROBERTSDALE; A1BRZ-100058307 GULF EQUIPMENT CORPORATION ACBRZ58307-ATRP(001) BALDWIN CR-71

09-005 2.262 MI WIDENING, RESURFACING, BIKE LANE ADDITION& TRAFFIC STRIPE ON CR-4 (COTTON CREEK DR)FROM THE A1RDY-100058426 INTERSECTION OF SR-59 TO COTTON CREEK BRIDGE IN GULF SHORES; MOBILE ASPHALT COMPANY, LLC ACOA58426-ATRP(001) BALDWIN CR-4

09-006 1.070 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-181 FROM NEAR SR-16 (US-90)(MP 16.493) TO THE STAAM-100060981 INTERSECTION OF SR-3 (US-31)(MP 18.260); JOHN G. WALTON CONSTRUCTION COMPANY, INC. STPAA-0181(506) BALDWIN SR-181

09-007 1.226 MI RESURFACING AND TRAFFIC STRIPE ON WINDSORDR AND RIDGEWOOD DR FROM N MAIN ST TO BAYVIEW DR A1RDY-100061155 IN DAPHNE; HOSEA O. WEAVER & SONS, INC. ACOA61155-ATRP(001) BALDWIN

09-008 0.378 MI GRADE, DRAIN, BASE, PAVE, BRIDGE AND SEAWALL REPLACEMENT ON SR-182 OVER LITTLE LAGOON BRNM1-00040116 PASS (LEE CALLOWAY BRIDGE) IN GULF SHORES; SCOTT BRIDGE COMPANY, INC. BR-0182(502) BALDWIN SR-182

09-009 3.305 MI RESURFACING AND TRAFFIC STRIPE ON SR-180 FROM 0.28 MI W OF THE FOLEY BEACH EXPRESS TO E OF STAAM-100060959 SR-161 IN ORANGE BEACH; HOSEA O. WEAVER & SONS,INC STPAA-0180(505) BALDWIN SR-180

09-010 0.057 MI STORM DRAINAGE REPAIRS ON CHURCH ST FROM FELS AVE TO MORPHY AVE IN FAIRHOPE; A1RDY-100058424 SUNSET CONTRACTING, INC. ACOA58424-ATRP(001) BALDWIN

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 93 NINTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 09-011 MAINTENANCE DREDGING AT LITTLE LAGOON PASS IN GULFSHORES; GULF EQUIPMENT CORP. 99075-100061597

99-509-022-182-400 BALDWIN

09-012 0.356 MI INTERSECTION IMPROVEMENTS (GRADE, DRAIN, BASE, PAVE & SIGNS) AT SR-59 AND CR-48 IN A1RDY-100061164 ROBERTSDALE; JOHN G. WALTON CONSTRUCTION COMPANY, INC. ACOA61164-ATRP(001) BALDWIN SR-59

09-013 0.424 MI RESURFACING AND TRAFFIC STRIPE ON S HOYLEAVE FROM CR-57 (BRADY RD) TO THE L & N RR RIGHT-OF A1RDY-100061154 -WAY (ROW) IN BAY MINETTE; MOBILE ASPHALT COMPANY,LLC ACOA61154-ATRP(001) BALDWIN

09-014 0.047 MI EMERGENCY BRIDGE REPAIR ON THE I-65 NBOUND LANE OF THE DELTA RIVER BRIDGE OVER THE L24AC-100062344 MIDDLE RIVER; MCINNIS CONSTRUCTION, LLC ERLF1-00062344 ERF-8990(900) BALDWIN I-65

09-015 0.052 MI ROADWAY AND BRIDGE REPAIRS ON THE I-10 EASTBOUND ENTRANCE RAMP AT EXIT 30; IM01M-100062855 NEWELL & BUSH, INC. IM-I010(335) BALDWIN I-10

09-017 6.734 MI GRADE, DRAINAGE, PAVEMENT, BRIDGES AND BRIDGE CULVERTS ON CR-83 (BALDWIN BEACH EXPRESS) L24AC-100048102 FROM CR-32 (DIXIE RD) TO SR-16 (US-90) EAST OF ROBERTSDALE; (RACON, INC.) ACSTPAA-1702(904) BALDWIN

09-025 7.393 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-42 (US-98) FROM CR-65 (MP 63.007) TO THE STAAM-100058769 EAST CITY LIMITS OF ELBERTA (MP 70.522); MOBILE ASPHALT COMPANY, LLC STPAA-0042(524) BALDWIN SR-42

09-026 1.084 MI GRADE, DRAIN, BASE AND PAVE, SIGNS AND BRIDGES ON THE I-10 INTERCHANGE AT CR-68 WITH IM01M-100047689 CONNECTOR TO BALDWIN BEACH EXPRESS; MCINNIS CONSTRUCTION, LLC IM-I010(319) BALDWIN I-10

09-028 6.057 MI PLANING, RESURFACING & TRAFFIC STRIPE ON I-65 FROM GUNNISON CREEK (MP 19.923) IN CREOLA TO IM04E-100049177 NORTH OF SR-226 (MP 32.054); (HOSEA O. WEAVER & SONS, INC.) IM-I065(398) BALDWIN

09-030 12.304 MI PLANING, RESURFACING & TRAFFIC STRIPE ONI-65 FROM MURDER CREEK THROUGH EVERGREEN TO BUTLER IM04E-100055401 CO LINE; (MOBILE ASPHALT COMPANY, LLC) IM-I065(414) CONECUH

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 94 NINTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 09-031 3.800 MI RESUFACING AND TRAFFIC STRIPE ON CR-15 FROM APPROXIMATELY 0.53 MI N OF THE JUNCTION OF STNUM-100060264 GEORGE LEE RD TO THE INTERSECTION OF SR-12(US-84);APAC MID-SOUTH, INC. STPNU-1803(201) CONECUH CR-15

09-032 ACBRZ58316-ATRP(001);0.070 MI BRIDGE REPLACEMENTS ON CR-30 OVER MURDER CREEK & ON CR-22 OVER A1BRZ-100058315 TRIBUTARY TO CANE CREEK NEAR LYEFFION; H & L CONSTRUCTION, INC. A1BRZ-100058316 ACBRZ58315-ATRP(001) CONECUH CR-30

09-033 12.831 MI RESURFACING AND TRAFFIC STRIPE ON CR-5 FROM SR-12 (US-84) IN REPTON TO CR-30 IN BURNT A1RDY-100058317 CORN & FROM MURDER CREEK TO THE PIPKIN BYPASS IN SKINNERTON, APAC MID-SOUTH, INC. ACNU58317-ATRP(001) CONECUH CR-5

09-034 1.449 MI PLANING, RESURFACING, TRAFFIC STRIPE AND CULVERT EXTENSION ON CR-42 (BROOKLYN RD/S MAIN ST) A1RDY-100058308 FROM THE S CITY LIMITS OF EVERGREEN TO SR-12 (US- 84) IN EVERGREEN; APAC MID-SOUTH, INC. ACNU58308-ATRP(001) CONECUH CR-42

09-035 24.038 MI WIDENING, RESURFACING & TRAFFIC STRIPE ON CR-6, CR-5, CR-7, CR-49, CR-73 AND CR-95; A1RDY-100061172 MIDSOUTH PAVING, INC. ACNU61172-ATRP(002) CONECUH CR-6

09-036 20.049 MI RESURF & TRAFFIC STRIPE ON CR-21 FROM SR-83 TO CR-30;ON CR-30 FROM CR-5 TO CR-22;& ON A1RDY-100061169 CR-15 FROM SR-12(US-84)TO CR-5; MIDSOUTH PAVING, INC. ACNU61169-ATRP(003) CONECUH CR-21

09-037 9.902 MI RESURFACING AND TRAFFIC STRIPE ON CR-29 FROM THE INTERSECTION OF SR-83 IN EVERGREEN TO THE A1RDY-100058319 SEPULGA RIVER; APAC MID-SOUTH, INC. ACNU58319-ATRP(001) CONECUH CR-29

09-038 5.200 MI RESURFACING AND TRAFFIC STRIPE ON CR-20 FROM THE INTERSECTION OF CR-15 TO THE INTERSECTION A1RDY-100058320 OF IVEY CEMETERY RD NORTH OF BELLEVILLE; APAC MID-SOUTH, INC. ACNU58320-ATRP(001) CONECUH CR-20

09-039 10.268 MI PLANING, RESURFACING, TRAFFIC STRIPE, DRAINAGE AND GUARDRAIL ON I-65 FROM NEAR THE CR-6 IM01M-100053840 INTERCHANGE TO MURDER CREEK IN EVERGREEN; MOBILE ASPHALT COMPANY, LLC IM-I065(412) CONECUH I-65

09-040 1.730 MI RESURFACING AND TRAFFIC STRIPE ON CR-251 (WILD AVE) FROM SR-83 TO SR-3 (US-84) IN EVERGREEN A1RDY-100059522 MIDSOUTH PAVING INC. ACNU59522-ATRP(001) CONECUH CR-251

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 95 NINTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 09-042 21.458 MI PLANING, RESURFACING & TRAFFIC STRIPE ONSR-83 FROM THE INTERSECTION OF SR-3(US-31)(MP STAAM-100060978 0.009)TO THE MONROE CO LINE(MP 21.628); MIDSOUTH PAVING INC. STPAA-0083(501) CONECUH SR-83

09-050 1.150 MI RESURFACING(HIGH PERFORMANCE CHIP SEAL) &TRAFFIC STRIPE ON SR-3(US-31)FROM 0.39 MI E OF THE NH01M-100060980 R.R. OVERPASS TO 0.27 MI W OF THE LITTLE ESCAMBIA CREEK BRIDGE; CHARLES E. WATTS, INC. NH-0003(586) ESCAMBIA SR-3

09-051 7.376 MI RESURFACING & TRAFFIC STRIPE ON CR-22 (RIDGE RD) FROM THE E BREWTON CITY LIMITS TO THE A1RDY-100059523 JUNCTION OF SR-15 (US-29); MOBILE ASPHALT COMPANY, LLC ACOA59523-ATRP(001) ESCAMBIA CR-22

09-052 5.808 MI WIDENING, RESURFACING, GUARDRAIL REPLACE-MENT AND STRIPING ON CR-6 (WOLFLOG RD) FROM THE A1RDY-100059996 INTERSECTION OF SR-113 TO THE INTERSECTION OF SR-3(US-31) NE OF FLOMATON; MOBILE ASPHALT CO., LLC ACNU59996-ATRP(001) ESCAMBIA CR-6

09-053 4.450 MI WIDENING, RESURFACING AND TRAFFIC STRIPE ON CR-12 (WOODS RD & ROBINSVILLE RD) FROM THE A1RDY-100059994 INTERSECTION OF CR-1 TO THE INTERSECTION OF CR-27 IN ROBINSONVILLE; MOBILE ASPHALT COMPANY, LLC ACNU59994-ATRP(001) ESCAMBIA CR-12

09-054 3.390 MI WIDENING, RESURFACING & TRAFFIC STRIPE ONCR-5 (CANOE RD N) FROM THE INTERSECTION OF SR-3 A1RDY-100058430 (US-31) TO THE INTERSECTION OF CR-27(ROBINSONVILLERD) IN CANOE; MOBILE ASPHALT COMPANY, LLC ACNU58430-ATRP(001) ESCAMBIA CR-5

09-055 3.229 MI GRADE, DRAIN, BASE, PAVE, RESURFACING & BRIDGE REPLACEMENT ON CR-99 (ATMOSPHERE RD) FROM A1BRZ-100058328 CR-1 (JACK SPRINGS RD) TO CR-4 (POARCH RD) IN POARCH; MOBILE ASPHALT COMPANY, LLC ACBRZ58328-ATRP(001) ESCAMBIA CR-99

09-056 10.760 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-21 FROM 0.2 MI S OF I-65 (MP 7.947) TO THE STAAM-100060983 S ABUTMENT OF THE LITTLE RIVER BRIDGE; MOBILE ASPHALT COMPANY, LLC STPAA-0021(546) ESCAMBIA SR-21

09-057 3.617 MI RESURFACING AND TRAFFIC STRIPE ON PEA RIDGE RD FROM W OF THE BREWTON CITY LIMITS TO THE A1RDY-100059995 INTERSECTION OF SR-41; MOBILE ASPHALT COMPANY, LLC ACNU59995-ATRP(001) ESCAMBIA

09-058 0.093 MI INDUSTRIAL PARK IMPROVEMENTS (GRADE, DRAIN, BASE AND PAVE) ON WIND RIVER RD EXTENSION DEM04-100058035 FROM CR-14 TO WIND RIVER RD S IN ATMORE; GRADY RALLS & SONS, INC. DE-AL66(938) ESCAMBIA

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 96 NINTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 09-059 5.870 MI RESURFACING AND TRAFFIC STRIPE ON CR-55 (JAY RD) FROM THE FLORIDA STATE LINE TO THE A1RDY-100059525 INTERSECTION OF SR-41 IN RIVERVIEW; MOBILE ASPHALT COMPANY, LLC ACNU59525-ATRP(001) ESCAMBIA CR-55

09-060 6.463 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-41 FROM THE FL STATE LINE TO 400 FT S OF THE STAAM-100060964 SR-15(US-29)PAVEMENT JOINT IN BREWTON; ROADS, INC.OF NWF STPAA-0041(512) ESCAMBIA SR-41

09-061 2.935 MI RESURFACING AND TRAFFIC STRIPE ON OLD US-31 FROM THE JUNCTION OF SR-3(US-31) N OF A1RDY-100061559 POLLARD TO THE JUNCTION OF SR-3(US-31)NEAR KEEGO; MOBILE ASPHALT COMPANY, LLC ACNU61559-ATRP(016) ESCAMBIA US-31

09-066 1.338 MI CULVERT EXTENSIONS AND SLIDE REPAIRS ON I-65 AT VARIOUS LOCATIONS INDICATED BY THE PLANS; L24AC-100055836 (WALKER PATTON COMPANY, INC.) ER-8930(917) ESCAMBIA

09-067 2.365 MI PLANING, RESURFACING & TRAFFIC STRIPE ON SR-41 FROM SR-3 (US-31) IN BREWTON TO NORTH OF STAAE-100057569 BURNT CORN CREEK (MP 10.161); (HOSEA O. WEAVER & SONS, INC.) STPAA-0041(507) ESCAMBIA

09-070 3.831 MI ADDITIONAL LANES (GRADE, DRAIN, PAVEMENT,SIGNS & BRIDGES)ON I-10 FROM W OF CAROL PLANTATION BROPE-100004939 RD (MP 14.655) TO E OF HALLS MILL CREEK IN MOBILE;(JOHN G. WALTON CONSTRUCTION CO., INC.) EOAP -100004939 STPAAF-EOAPF-BRF-I010(301) MOBILE

09-071 12.290 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-217 FROM SR-17 (US-45) IN PRICHARD TO S OF STAAE-100053071 CR-764 JIM TOM CIRCLE (MP 12.48); HOSEA O. WEAVER & SONS, INC. STPAA-0217(503) MOBILE SR-217

09-072 WELCOME CENTER REPLACEMENT ON I-10 AT THE ALABAMA/MISSISSIPPI STATE LINE; BEN M. RADCLIFF CONTRACTOR IMD11-100053297 INC. IM01M-100053297 IM-IMD-I010(323) MOBILE I-10

09-073 0.435 MI RESURFACING AND TRAFFIC STRIPE ON W LEE ST FROM GRAND BLVD TO KANSAS ST IN CHICKASAW; A1RDY-100061181 MOBILE ASPHALT COMPANY, LLC ACAA61181-ATRP(003) MOBILE

09-074 2.949 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR 16 (US 90) FROM SR 163 TO BROAD ST AND ON EBEXE-100053075 SR 42 (US 98) FROM BROAD ST TO THE BANKHEAD TUNNELIN MOBILE; HOSEA O. WEAVER & SONS, INC. EBEXE-100054014 EB-0016(510) & EB-0042(520) MOBILE SR 16

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 97 NINTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 09-075 8.908 MI RESURFACING, TRAFFIC STRIPE & DRAINAGE EXTENSIONS ON CR-56 (AIRPORT BLVD) FROM THE EBEXE-100055677 MISSISSIPPI STATE LINE TO WEST OF SNOW ROAD; (MOBILE ASPHALT COMPANY, LLC) EB-4910(200) MOBILE

09-076 0.709 MI CONCRETE PAVEMENT REMOVAL, GRADE, DRAIN, BASE AND PAVE ON BROAD ST FROM 15TH ST TO A1RDY-100060255 APPROXIMATELY 700 FT S OF I-10 IN MOBILE JOHN G. WALTON CONSTRUCTION COMPANY, INC. ACAA60255-ATRP(001) MOBILE

09-077 8.710 MI PLANING, RESURFACING & TRAFFIC STRIPE ON I-65 FROM I-10 IN MOBILE TO N OF SR-17 (US-45); IM04E-100049171 (MOBILE ASPHALT COMPANY, LLC) IM-I065(396) MOBILE

09-078 0.222 MI ADDITIONAL TURN LANES ON ADDSCO ROAD ONTOSR-16 (US-90/98) IN MOBILE; STATE-100060054 JOHN G. WALTON CONSTRUCTION COMPANY, INC. ST-049-016-010 MOBILE

09-079 14.091 MI PLANING, RESURFACING, GUARDRAIL REPLACE-MENT & STRIPING ON CR-96(COY SMITH HWY)FROM SCHOOL A1RDY-100058304 ST IN CITRONELLE TO SR-13 (US-43) IN MOUNT VERNON;JOHN G. WALTON CONSTRUCTION COMPANY, INC. ACNU58304-ATRP(001) MOBILE CR-96

09-080 0.496 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-188 FROM 0.1 MI N OF I-10 TO THE N ABUTMENT STAAM-100060971 OF THE FRANKLIN CREEK BRIDGE N OF GRAND BAY; MOBILE ASPHALT COMPANY, LLC STPAA-0188(503) MOBILE SR-188

09-081 3.446 MI GRADE, DRAIN, BASE, PAVE, BRIDGE REPLACEMENT AND SIGNALS ON THE 5 LANE SECTION OF A1RDY-100040611 SCHILLINGER RD FROM HOWELLS FERRY RD TO JUST N OF THE INTERSECTION OF SR-42(US-98); FRANK TURNER CON STAAM-100040611 ACAA59064F-STPMBF-7503(600) MOBILE STMBE-100040611

09-082 8.676 MI PLANING, RESURFACING, GUARDRAIL, BRIDGE JACKING & REMOVAL ON I-10 FROM HALLS MILL CREEK IMD11-100049182 TO THE W END OF THE GEORGE WALLACE TUNNEL; HOSEA O. WEAVER & SONS, INC. IMD02-100049182 IM-IMD-I010(328) MOBILE I-10 IM01M-100049182

09-083 0.056 MI BRIDGE REPLACEMENT AND APPROACHES ON SR-213 AT NORTON CREEK IN SARALAND; BROPE-100049579 MURPHREE BRIDGE CORP. BR-0213(501) MOBILE SR 213

09-084 2.477 MI RECONSTRUCTION(GRADE, DRAIN, BASE, PAVE, SIGNS & SIGNALS) ON WILSON AVE FROM SR-17 (ST A1RDY-100058277 STEPHENS RD) TO 12TH AVE IN THE CITIES OF PRICHARDMOBILE AND CHICKASAW; MOBILE ASPHALT COMPANY, LLC ACAA58277-ATRP(001) MOBILE

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 98 NINTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 09-085 MAINTENANCE ROADSIDE MOWING AT SITES I-10, I-165 & AS INDICATED ON THE PLANS. 99054-100044548 ( BENTLEY TURF & LANDSCAPE, INC. ) 99-409-491-000-450 MOBILE SITES

09-086 0.100 MI INTERSECTION IMPROVEMENTS ON CR-358 (THREE NOTCH RD); CR-328 (DAWES LANE); AND CR-328 HSIPM-100061621 (DAWES LANE EXTENSION) IN MOBILE; SOUTHERN LAND DEVELOPMENT, L.L.C. HSIP-4914(250) MOBILE CR-358

09-089 5.203 MI RESURFACING AND TRAFFIC STRIPE ON SR-16 (US-90) FROM THE HALLS MILL CREEK BRIDGE TO THE NH01M-100060979 PAVEMENT JOINT AT PINEHILL DRIVE IN MOBILE; JOHN G. WALTON CONSTRUCTION COMPANY, INC. NH-0016(515) MOBILE SR-16

09-090 0.794 MI SIDEWALKS AND CROSSWALKS INSTALLATION ON 12TH AVENUE AND KANSAS STREET IN CHICKASAW; SRIL1-00058786 C. THORNTON, INC. SRTS-SR13(918) MOBILE 12TH AV

09-091 2.482 MI SAFETY WIDENING, RESURFACING & TRAFFIC STRIPE ON SR-163 FROM THE JUNCTION OF SR-193 TO HS31M-100060985 THE S ABUTMENT OF THE DOG RIVER BRIDGE E OF THEODORE;MOBILE ASPHALT CO., LLC NH01M-100060985 NH-HSIP-0163(502) MOBILE SR-163

09-092 16.609 MI RESURFACING AND TRAFFIC STRIPE ON SR-17 (US-45) FROM CR-63(CHUNCHULA-GEORGETOWN RD) TO THE NH01M-100060973 WASHINGTON COUNTY LINE;JOHN G. WALTON CONSTRUCTIONCOMPANY, INC. NH-0017(552) MOBILE SR-17

09-106 8.941 MI PLANING, RESURFACING, DRAINAGE AND BRIDGERAIL RETROFIT ON I 10 FROM SR 59 N OF LOXLEY TO CR IM04E-100049175 64; MOBILE ASPHALT CO. LLC IM-I010(324) BALDWIN I 10

09-112 0.184 MI BRIDGE REPLACEMENT AND APPROACHES ON CR 91 AT NARROW GAP CREEK NW OF LILLIAN; BROFR-100053638 NEWELL & BUSH, INC BRZ-0200(214) BALDWIN CR 91

09-114 0.406 MI BRIDGE REPLACEMENT AND APPROACHES ON CR-134 (TRUCK ROUTE 17) AT HOLLINGER CREEK SW OF A1BRZ-100058314 GATESWOOD; MCINNIS CONSTRUCTION, LLC ACBRZ58314-ATRP(001) BALDWIN CR 134

09-121 BALDWIN, ESCAMBIA & CONECUH COUNTIES; EMERGENCY REPAIRS (GRADE AND DRAINAGE) AT ELEVEN SITES AS ER941-00055937 INDICATED BY THE PLANS; REMEDIAL SERVICES, INC. STAAL-100055937 ERPRF-8930(920) BALDWIN

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 99 NINTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 09-123 14.477 MI RESURFACING AND TRAFFIC STRIPE ON SR-193FROM THE NORTH END OF THE DAULPHIN ISLAND BRIDGE HSIPM-100053072 TO CR-24 (LAURENDINE RD) SOUTH OF MOBILE; HOSEA O. WEAVER & SONS, INC. STAAM-100053072 STPAA-HSIP-0193(504) MOBILE SR-193

09-124 11.077 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-188 FROM CR-19 TO SR-193 AT ALABAMA PORT; HSIPM-100052972 HOSEA O. WEAVER & SONS, INC. STAAM-100052972 STPAA-HSIP-0188(502) MOBILE SR-188

09-126 12.250 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON CR-96 (BEVERLY JEFFERIES HWY AND PRINE RD) AT A1RDY-100058306 SITES AS INDICATED BY THE PLANS; MOBILE ASPHALT COMPANY, LLC ACNU58306-ATRP(001) MOBILE CR-96

09-128 6.340 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON I-65 FROM N OF SR-158 (MP 13.648) IN SARALAND DEM04-100049173 TO N OF SR-13 (US-43) (MP 19.988); HOSEA O. WEAVER & SONS, INC. GSPH5-100049173 IM-I065(405) MOBILE I-65 IM01M-100049173

09-131 0.982 MI GRADE, DRAIN, BASE AND PAVE ON BROAD ST FROM MICHIGAN AVE TO 15TH ST W OF I-10 IN MOBILE; A1RDY-100058299 HOSEA O. WEAVER & SONS, INC. ACAA58299-ATRP(001) MOBILE BROAD S

09-132 SIDEWALKS AND DRAINAGE ON 7TH ST, 2ND AVE & 1ST STIN THE TOWN OF SILVERHILL; PEAVY CONSTRUCTION CO. SRIE1-00058789 INC. SRTS-SR13(919) BALDWIN 7TH ST

09-140 SIDEWALKS AND DRAINAGE ON CLEVELAND RD, 1ST AVE, AND PINE ST FOR SARALAND ELEMENTARY SCHOOL IN THE SRIE1-00057452 CITY OF SARALAND; PEAVY CONSTRUCTION COMPANY, INC. SRTS-SR12(916) MOBILE

09-142 6.148 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-59 FROM 0.4 MILE S OF I-10 IN LOXLEY TO THE NH01M-100053076 JUNCTION OF SR-3 (US-31) AND 0.2 MILE N OF SR-3; HOSEA O. WEAVER & SONS, INC. NH-0059(511) BALDWIN SR-59

09-143 2.606 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON SR-16 (US-90) FROM MP 54.320 TO MP 55.837 AND NH01M-100059803 ON SR-59 FROM MP 27.830 TO MP 28.945 IN LOXLEY; HOSEA O. WEAVER & SONS, INC. NH01M-100059842 NH-0016(513) & NH-0059(512) BALDWIN SR-16

09-144 0.950 MI ROAD RELOCATION AND ROADWAY IMPROVEMENTS ROAD RELOCATION AND ROADWAY IMPROVEMENTS ON I-65 A1RDY-100058773 AT FRONTAGE RD AND SR-158 IN SARALAND; JOHN G. WALTON CONSTRUCTION COMPANY, INC. ACOA58773-ATRP(001) MOBILE

REPORT NBR-HDCS0002 ALABAMA DEPARTMENT OF TRANSPORTATION RUN DATE--09/15/14 CONSTRUCTION BUREAU RUN TIME--10.36.28 CONSTRUCTION STATUS REPORT PAGE 100 NINTH DIVISION

CONSTRUCTION CONTRACTS (CODE. PROJECT NO.; COUNTY DESCRIPTION): 09-145 1.188 MI WIDENING (GRADE, DRAIN, BASE & PAVE) ON SR-181 FROM SOUTH OF CR-48 TO SOUTH OF CR-30 IN STATE-100057190 FAIRHOPE; JOHN G. WALTON CONSTRUCTION COMPANY, INC ST-002-181-010 BALDWIN SR-181

09-146 1.894 MI PLANING, RESURFACING AND TRAFFIC STRIPE ON BAYVIEW DR AND RIDGEWOOD DR EAST OF N MAIN ST A1RDY-100059010 IN DAPHNE; HOSEA O. WEAVER & SONS, INC. ACOA59010-ATRP(001) BALDWIN

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STPOA-0042(525) BALDWIN SR-42 8.34 % 09-001 JOHN G. WALTO 2,227,885 80 W 101 089 09-30-14 2,115,058 227,084.10 2,721,412 3,257 -11,246 -7,989

HPP-STPAA-STPNU-RECA-1702(905) BALDWIN 9.13 % 09-002 HOSEA O WEAVE 10,984,893 740 C 122 100 08-15-13 13,953,534 722,835.63 7,912,031 152,804 2,871,998 3,024,802

STPAA-0016(514) BALDWIN SR-16 5.74 % 09-003 JOHN G. WALTO 715,389 40 W 083 075 08-31-14 714,921 56,916.50 990,447 0 41,643 41,643

ACBRZ58307-ATRP(001) BALDWIN CR-71 21.94 % 09-004 GULF EQUIPMEN 498,301 80 W 093 099 07-28-14 511,580 125,780.27 573,047 0 16,371 16,371

ACOA58426-ATRP(001) BALDWIN CR-4 11.96 % 09-005 MOBILE ASPHAL 1,914,538 180 W 076 070 10-31-14 1,381,867 272,113.18 2,274,296 0 0 0

STPAA-0181(506) BALDWIN SR-181 0.14 % 09-006 JOHN G. WALTO 997,748 45 W 031 041 10-01-14 409,428 1,931.53 1,293,769 0 19,244 19,244

ACOA61155-ATRP(001) BALDWIN 0.02 % 09-007 HOSEA O. WEAV 1,849,019 95 W 000 000 00-00-00 0 471.87 1,901,615 0 0 0

BR-0182(502) BALDWIN SR-182 0.00 % 09-008 SCOTT BRIDGE 12,169,710 235 W 063 048 12-31-14 5,634,163 .00 0 -493,439 -130,996 -624,435

STPAA-0180(505) BALDWIN SR-180 6.44 % 09-009 HOSEA O. WEAV 1,359,392 60 W 110 094 09-30-14 1,273,996 116,123.77 1,802,211 0 1,972 1,972

ACOA58424-ATRP(001) BALDWIN 15.45 % 09-010 SUNSET CONTRA 131,299 30 W 140 099 09-30-14 149,326 23,335.06 150,993 0 13,570 13,570

99-509-022-182-400 BALDWIN 0.03 % 09-011 GULF EQUIPMEN 539,550 365 C 053 026 02-18-15 137,790 201.94 580,016 0 0 0

ACOA61164-ATRP(001) BALDWIN SR-59 7.41 % 09-012 JOHN G. WALTO 967,788 85 W 085 069 10-01-14 673,875 78,970.67 1,064,567 0 58,541 58,541

ACOA61154-ATRP(001) BALDWIN 1.12 % 09-013 MOBILE ASPHAL 247,204 45 W 093 099 09-01-14 197,452 2,751.83 243,989 0 1,183 1,183

ERF-8990(900) BALDWIN I-65 1.31 % 09-014 MCINNIS CONST 2,277,711 1514 D 052 099 07-15-14 2,877,711 14,036.52 1,063,750 0 0 0

IM-I010(335) BALDWIN I-10 0.00 % 09-015 NEWELL & BUSH 718,601 30 W 000 000 00-00-00 0 .00 0 0 0 0

ACSTPAA-1702(904) BALDWIN 10.55 % 09-017 RACON, INC. 38,474,357 2214 D 106 099 06-22-14 51,082,173 5,304,853.38 50,276,160 245,038 12,656,214 12,901,252

STPAA-0042(524) BALDWIN SR-42 9.84 % 09-025 MOBILE ASPHAL 2,132,339 70 W 100 100 04-22-14 2,324,291 256,323.84 2,604,700 0 202,803 202,803

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

IM-I010(319) BALDWIN I-10 9.86 % 09-026 MCINNIS CONST 10,577,901 1614 D 091 093 10-16-14 11,627,275 1,364,242.62 13,822,619 178,543 1,700,529 1,879,072

IM-I065(398) BALDWIN 5.98 % 09-028 HOSEA O WEAVE 8,644,876 111 D 100 100 08-08-12 9,011,011 675,601.15 11,296,648 33,348 369,453 402,801

IM-I065(414) CONECUH 6.56 % 09-030 MOBILE ASPHAL 21,303,757 113 D 111 099 08-01-13 19,643,298 1,826,769.08 27,838,578 -919,044 45,952 -873,092

STPNU-1803(201) CONECUH CR-15 11.24 % 09-031 APAC MID-SOUT 371,376 40 W 088 099 06-24-14 369,280 54,552.63 485,293 0 13,441 13,441

ACBRZ58315-ATRP(001) CONECUH CR-30 7.97 % 09-032 H & L CONSTRU 436,777 80 W 061 099 07-31-14 471,410 40,666.21 509,952 0 53,713 53,713

ACNU58317-ATRP(001) CONECUH CR-5 3.18 % 09-033 APAC MID-SOUT 1,409,475 45 W 084 099 07-15-14 1,454,122 49,450.13 1,550,422 0 44,647 44,647

ACNU58308-ATRP(001) CONECUH CR-42 1.80 % 09-034 APAC MID-SOUT 431,182 60 W 068 091 09-15-14 393,779 9,759.71 539,536 0 907 907

ACNU61172-ATRP(002) CONECUH CR-6 0.10 % 09-035 MIDSOUTH PAVI 2,729,777 75 W 000 000 12-31-14 0 3,490.21 3,285,300 0 0 0

ACNU61169-ATRP(003) CONECUH CR-21 0.00 % 09-036 MIDSOUTH PAVI 2,284,364 80 W 000 000 00-00-00 0 .00 0 0 0 0

ACNU58319-ATRP(001) CONECUH CR-29 2.29 % 09-037 APAC MID-SOUT 1,050,413 60 W 053 099 07-16-14 1,057,984 26,561.59 1,155,455 0 7,571 7,571

ACNU58320-ATRP(001) CONECUH CR-20 2.24 % 09-038 APAC MID-SOUT 527,497 40 W 090 099 07-15-14 507,741 13,019.24 580,247 0 -19,756 -19,756

IM-I065(412) CONECUH I-65 6.15 % 09-039 MOBILE ASPHAL 17,062,508 114 D 099 090 09-01-14 15,340,731 1,372,927.63 22,296,347 57,000 1,261,127 1,318,127

ACNU59522-ATRP(001) CONECUH CR-251 2.45 % 09-040 MIDSOUTH PAVI 413,180 30 W 090 099 07-31-14 369,441 11,643.91 475,157 0 -43,757 -43,757

STPAA-0083(501) CONECUH SR-83 1.91 % 09-042 MIDSOUTH PAVI 4,273,738 85 W 048 054 12-31-14 2,303,848 91,371.56 4,767,015 0 30,396 30,396

NH-0003(586) ESCAMBIA SR-3 2.59 % 09-050 CHARLES E. WA 118,629 30 W 043 099 07-31-14 115,818 3,793.34 145,991 0 3,787 3,787

ACOA59523-ATRP(001) ESCAMBIA CR-22 4.03 % 09-051 MOBILE ASPHAL 1,029,620 35 W 080 099 09-30-14 970,588 47,810.98 1,184,063 0 14,344 14,344

ACNU59996-ATRP(001) ESCAMBIA CR-6 5.09 % 09-052 MOBILE ASPHAL 1,032,752 40 W 065 096 09-30-14 1,006,094 60,543.99 1,187,666 0 26,063 26,063

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACNU59994-ATRP(001) ESCAMBIA CR-12 4.29 % 09-053 MOBILE ASPHAL 768,317 35 W 083 099 09-30-14 660,178 37,982.61 883,564 0 6,939 6,939

ACNU58430-ATRP(001) ESCAMBIA CR-5 4.22 % 09-054 MOBILE ASPHAL 585,462 30 W 083 099 09-30-14 539,990 26,736.11 632,299 0 19,244 19,244

ACBRZ58328-ATRP(001) ESCAMBIA CR-99 14.93 % 09-055 MOBILE ASPHAL 1,806,239 120 W 088 092 08-31-14 1,686,994 289,914.57 1,941,707 28,440 6,625 35,065

STPAA-0021(546) ESCAMBIA SR-21 0.25 % 09-056 MOBILE ASPHAL 2,141,699 45 W 044 000 10-31-14 0 6,850.63 2,735,210 0 0 0

ACNU59995-ATRP(001) ESCAMBIA 5.83 % 09-057 MOBILE ASPHAL 544,762 30 W 060 099 09-30-14 532,978 34,324.29 588,343 0 12,286 12,286

DE-AL66(938) ESCAMBIA 0.16 % 09-058 GRADY RALLS & 315,912 45 W 053 037 09-26-14 117,882 681.39 406,458 0 0 0

ACNU59525-ATRP(001) ESCAMBIA CR-55 0.04 % 09-059 MOBILE ASPHAL 884,807 35 W 000 000 12-31-14 0 505.81 1,071,662 0 0 0

STPAA-0041(512) ESCAMBIA SR-41 0.10 % 09-060 ROADS, INC. O 1,020,133 45 W 020 000 10-31-14 0 1,314.60 1,218,687 0 0 0

ACNU61559-ATRP(016) ESCAMBIA US-31 0.07 % 09-061 MOBILE ASPHAL 553,181 30 W 000 000 00-00-00 0 473.91 630,304 0 0 0

ER-8930(917) ESCAMBIA 0.21 % 09-066 WALKER PATTON 1,794,180 1512 D 115 100 06-28-13 1,831,642 5,029.10 2,344,535 -150 57,689 57,539

STPAA-0041(507) ESCAMBIA 0.00 % 09-067 HOSEA O WEAVE 779,846 50 W 100 100 10-31-12 770,273 .00 13,782 6,895 40,154 47,049

STPAAF-EOAPF-BRF-I010(301) MOBILE 8.48 % 09-070 JOHN G. WALTO 26,394,942 213 D 117 099 07-02-13 32,368,664 1,887,072.89 22,243,206 130,661 5,943,580 6,074,241

STPAA-0217(503) MOBILE SR-217 4.90 % 09-071 HOSEA O. WEAV 1,969,958 75 W 083 100 07-08-13 1,893,286 118,150.42 2,406,348 6,000 -30,264 -24,264

IM-IMD-I010(323) MOBILE I-10 0.27 % 09-072 BEN M. RADCLI 17,371,771 1516 D 015 003 05-15-16 557,250 65,483.90 23,954,635 0 8,645 8,645

ACAA61181-ATRP(003) MOBILE 0.00 % 09-073 MOBILE ASPHAL 339,030 45 W 000 000 00-00-00 0 .00 0 0 0 0

EB-0016(510) & EB-0042(520) MOBILE SR 16 9.66 % 09-074 HOSEA O. WEAV 962,952 75 W 097 100 10-07-13 848,140 113,731.64 1,176,267 0 -114,542 -114,542

EB-4910(200) MOBILE 1.95 % 09-075 MOBILE ASPHAL 3,555,784 140 W 110 099 12-31-13 3,648,075 85,892.26 4,403,268 67,500 93,615 161,115

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACAA60255-ATRP(001) MOBILE 4.72 % 09-076 JOHN G. WALTO 3,591,597 3114 D 108 054 07-31-14 1,931,900 214,610.05 4,545,325 0 0 0

IM-I065(396) MOBILE 4.66 % 09-077 MOBILE ASPHAL 22,437,938 112 D 106 100 07-31-13 21,899,573 1,369,158.09 29,320,663 56,911 -1,107,331 -1,050,420

ST-049-016-010 MOBILE 12.94 % 09-078 JOHN G. WALTO 239,344 60 W 102 099 07-11-14 240,433 51,781.84 400,000 3,600 2,985 6,585

ACNU58304-ATRP(001) MOBILE CR-96 8.27 % 09-079 JOHN G. WALTO 3,760,687 115 W 093 095 09-30-14 4,211,668 357,946.89 4,324,790 0 563,296 563,296

STPAA-0188(503) MOBILE SR-188 16.97 % 09-080 MOBILE ASPHAL 195,664 40 W 075 100 05-14-14 215,695 42,610.88 251,048 0 20,031 20,031

ACAA59064F-STPMBF-7503(600) MOBILE 2.84 % 09-081 FRANK TURNER 19,974,889 425 W 016 026 08-31-16 5,284,445 544,365.39 19,120,796 53,391 127,804 181,195

IM-IMD-I010(328) MOBILE I-10 0.97 % 09-082 HOSEA O. WEAV 14,681,568 2215 D 036 019 07-22-15 2,802,730 187,102.91 19,180,812 78,000 78,000 156,000

BR-0213(501) MOBILE SR 213 29.22 % 09-083 MURPHREE BRID 831,112 110 W 096 094 12-06-13 777,818 317,445.30 1,086,051 0 55,151 55,151

ACAA58277-ATRP(001) MOBILE 0.08 % 09-084 MOBILE ASPHAL 3,493,340 280 W 011 003 06-01-15 103,978 3,211.27 3,992,494 0 0 0

99-409-491-000-450 MOBILE SITES 0.00 % 09-085 BENTLEY TURF 204,096 100 W 053 100 12-16-05 404,096 .00 404,852 0 0 0

HSIP-4914(250) MOBILE CR-358 0.42 % 09-086 SOUTHERN LAND 536,225 100 W 036 045 11-01-14 240,020 2,969.30 703,814 1,860 -5,085 -3,225

NH-0016(515) MOBILE SR-16 1.03 % 09-089 JOHN G. WALTO 2,242,538 130 W 018 004 11-26-14 87,434 34,024.22 3,291,017 0 2,898 2,898

SRTS-SR13(918) MOBILE 12TH AV 0.00 % 09-090 C. THORNTON, 145,429 45 W 060 091 08-31-14 134,206 .00 0 0 -7,937 -7,937

NH-HSIP-0163(502) MOBILE SR-163 0.66 % 09-091 MOBILE ASPHAL 780,837 40 W 030 036 09-12-14 282,396 6,514.60 980,760 0 14,755 14,755

NH-0017(552) MOBILE SR-17 0.03 % 09-092 JOHN G. WALTO 3,696,865 135 W 000 000 00-00-00 0 1,412.40 4,513,091 0 0 0

IM-I010(324) BALDWIN I 10 11.60 % 09-106 MOBILE ASPHAL 12,123,996 1513 D 108 099 10-15-13 12,766,813 1,838,008.65 15,842,971 10,082 968,763 978,845

BRZ-0200(214) BALDWIN CR 91 9.17 % 09-112 NEWELL & BUSH 764,371 80 W 096 100 10-31-13 726,029 87,536.71 953,969 2,094 -50,929 -48,835

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

ACBRZ58314-ATRP(001) BALDWIN CR 134 6.28 % 09-114 MCINNIS CONST 1,828,706 190 W 098 100 11-30-13 1,782,065 120,615.84 1,920,142 0 -46,642 -46,642

ERPRF-8930(920) BALDWIN 22.38 % 09-121 REMEDIAL SERV 1,307,139 175 W 090 099 06-30-14 1,260,246 162,796.97 727,246 0 212,242 212,242

STPAA-HSIP-0193(504) MOBILE SR-193 4.55 % 09-123 HOSEA O. WEAV 1,999,595 70 W 269 100 01-31-14 2,205,127 111,177.55 2,442,550 26,165 279,555 305,720

STPAA-HSIP-0188(502) MOBILE SR-188 6.42 % 09-124 HOSEA O. WEAV 1,668,559 65 W 102 100 01-17-14 1,836,006 147,170.10 2,288,876 8,000 93,923 101,923

ACNU58306-ATRP(001) MOBILE CR-96 8.51 % 09-126 MOBILE ASPHAL 2,409,112 130 W 100 099 08-31-14 2,486,208 235,964.26 2,770,479 0 103,182 103,182

IM-I065(405) MOBILE I-65 18.12 % 09-128 HOSEA O. WEAV 7,031,708 114 D 105 095 07-22-14 7,301,541 1,294,338.31 7,139,423 118,219 839,784 958,003

ACAA58299-ATRP(001) MOBILE BROAD S 29.40 % 09-131 HOSEA O. WEAV 1,488,151 113 D 199 099 12-03-13 2,402,855 503,307.28 1,711,374 498,244 503,782 1,002,026

SRTS-SR13(919) BALDWIN 7TH ST 0.00 % 09-132 PEAVY CONSTRU 125,608 40 W 100 090 10-07-13 113,625 .00 0 771 -5,708 -4,937

SRTS-SR12(916) MOBILE 0.00 % 09-140 PEAVY CONSTRU 146,430 50 W 102 100 04-30-14 145,455 .00 0 0 8,751 8,751

NH-0059(511) BALDWIN SR-59 4.81 % 09-142 HOSEA O. WEAV 2,277,684 65 W 135 099 06-30-14 2,350,663 154,810.28 3,213,676 0 213,292 213,292

NH-0016(513) & NH-0059(512) BALDWIN SR-16 11.51 % 09-143 HOSEA O. WEAV 741,482 30 W 157 100 05-30-14 681,308 104,286.82 905,736 0 -26,822 -26,822

ACOA58773-ATRP(001) MOBILE 1.91 % 09-144 JOHN G WALTON 4,439,491 114 D 135 087 05-11-14 3,995,539 99,642.52 5,215,341 44,573 0 44,573

ST-002-181-010 BALDWIN SR-181 9.14 % 09-145 JOHN G. WALTO 766,882 75 W 109 099 09-30-14 779,759 146,382.41 1,600,000 13,186 -335 12,851

ACOA59010-ATRP(001) BALDWIN 3.54 % 09-146 HOSEA O. WEAV 2,181,161 110 W 109 099 10-01-14 1,963,421 88,851.90 2,508,335 35,941 38 35,979 DIVISION TOTALS: 331,804,725 274,947,989 374,579,198 447,890 28,131,128 28,579,018 23,758,120.94

PROJ. NO. CONT. AMOUNT E & I TOTAL SUPPLEMEN- ITEM AND TOTAL ORIGINAL TIME: % % EST. PERFORMED CHARGED CONTRACT TAL AGREE. OTHER CONTRACT CONT. CONTRACTOR CONTRACT INCL. TIME PROJ. COMP. TO TO BUDGET: INCREASES/ OVERRUNS/ OVERRUNS/ CODE AMOUNT EXT. USED COMP. DATE DATE DATE INCL. E&I DECREASES UNDERRUNS UNDERRUNS

STATE WIDE TOTALS: ORIGINAL CONTRACT AMOUNT 2,916,868,025 AMOUNT PERFORMED TO DATE 2,203,681,754 E & I CHARGED TO DATE 233,760,905.77 TOTAL CONTRACT BUDGET 3,053,982,234 SUPPLEMENTAL AGREE 36,977,034 ITEM AND OTHER 134,399,633 TOTAL CONTRACT O/U RUN 171,376,667