relocity corporate presentation 2010

14
THE PULSE IN YOUR THE PULSE IN YOUR BUILDINGS BUILDINGS Built Environment Built Environment Support Services Support Services

Upload: mapstone

Post on 30-Jun-2015

1.049 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Relocity Corporate Presentation   2010

THE PULSE IN YOUR THE PULSE IN YOUR BUILDINGSBUILDINGS

Built Environment Support Built Environment Support ServicesServices

Page 2: Relocity Corporate Presentation   2010

Incorporated 2004 to deliver Built environment support services

Operate UK-wide Developing MENA operation

55 Engineering staff :-

Project management

Multi-disciplined FM and IT service delivery

Security-cleared staff

World-class compliance in H&S, Quality and Environmental processes & procedures

Relocity Corporate History

Page 3: Relocity Corporate Presentation   2010

Relocity’s expertise is delivering integrated workplace & facilities solutions to Government, military and commercial clients.

The business focuses upon technically sophisticated projects which combine both FM and IT disciplines frequently in security-cleared environments.

Relocity deliver projects, responsive works and consultancy support to multi-site occupiers and major FM companies. Activities include :-

• Technical property surveys & occupation space accountancy  • Connectivity for voice, power & data networks  • Mechanical & electrical installations including HVAC  • Corporate interiors & office furnishing  • Refurbishment, dilapidations & decoration  • Move management & relocation services

Relocity’s accreditations include ISO9001, ISO14001, Safe Contractor, Constructionline, Considerate Contractor, CHAS, Exor, Link-up and Achillies.

The Pulse in your Buildings

Page 4: Relocity Corporate Presentation   2010

Contingency Planning

Furniture, Fixtures & Equipment

Bid and life-cycle costing

Space & Occupancy

Strategic accommodation Planning

Design engineering Building

Infrastructure design

On-site & mobile teams

Property consultancy

Cost consultancy

Specification &

procurement

2nd stage fit-out &

refurbishment

Defects Liabilities

Operations & maintenance

Fit-outDesign & Build

Site Handover

Responsive Repairs

Planned Preventative Maintenance

Building and Facilities Life-Cycle

Page 5: Relocity Corporate Presentation   2010

• UK Ministry of Defence (Military facilities)• British Airports Authority (Airports)• Heathrow Express(Rail)• UK Home Office estate (Commercial)• Transport for London (Infrastructure)• London Metropolitan Police (IT & Communications)• University of Greenwich, London (Education)• Boeing (Defence & military)• Kendle(Heathcare & Pharmaceutical) • QinetiQ (Military)

Operational sectors

Page 6: Relocity Corporate Presentation   2010

• Design, installation and commissioning of a new Fibre Optic CCTV system for NATO facility• New pit and Duct routes across the entire site.• Installation of 100% redundant fibre optic ring.• Implementation of site wide CCTV over fibre optic conversion.• All works carried out with complete SCIDA approval to JSP 440 and 480.• Approximately 10,000m of OM3 fibre installed across the site.

NATO – CCTV installation

Page 7: Relocity Corporate Presentation   2010

• Design and fit-out new operational facility for 250 staff• De-cant staff into temporary facilities to ensure 24-hour operation• Accommodation include mess & shower facilities, a/c, new IT• Fast-track 3-week project with 24-hour operation

Birmingham Highways – Operational hub

Page 8: Relocity Corporate Presentation   2010

• Space accountancy consultancy design project• 8-building, 27,000 SqFt facility delivering 34,000 training days PA• Re-design proposal saved 27% of occupied space• Re-design allowed £Million in saved life-cycle maintenance costs

Aspire Defence – Strategic planning

Page 9: Relocity Corporate Presentation   2010

• Design & Build of mission-critical communications rooms.• Cross site fibre optic links at 26 RAF bases.• Installation of horizontal Category 5e cabling at 26 RAF bases.• Small power distribution.• Office furnishing and data presentation to 400 workstations.

Ministry of Defence Contract

Page 10: Relocity Corporate Presentation   2010

• Responsive repairs and maintenance contract to Heathrow Express, Terminals 4 & 5• Full range Mechanical & Electrical, Fabric repairs and project work• Projects include digital advertising displays, LED lighting, ticket counter design and build

London Heathrow Airport

Page 11: Relocity Corporate Presentation   2010

• Design & installation of infrastructure for state of the art real time global defence simulator.• Utilised cutting edge copper and Blolite Blown fibre.• Installation carried out under laboratory conditions throughout.• All works carried out with complete SCIDA approval to JSP 440 and 480.

QinetiQ – Boeing Warfare Simulator

Page 12: Relocity Corporate Presentation   2010

Projects

Page 13: Relocity Corporate Presentation   2010

Relocity Cherry StudiosGreenhills EstateTilfordSurreyGU10 2DZUK

T: +44 1252 795 550F: +44 1252 795 525E: [email protected]

WWW.RELOCITY.CO.UK

Contact us

Page 14: Relocity Corporate Presentation   2010

THE PULSE IN YOUR THE PULSE IN YOUR BUILDINGSBUILDINGS