trayotrayogroup.com/wp-content/uploads/2017/03/globe-profile.pdf · reliance industries limited...

76
TRAYO GROUP GLOBE OFFSHORE SERVICES Profile

Upload: others

Post on 01-Sep-2019

11 views

Category:

Documents


0 download

TRANSCRIPT

TRAYOGROUP

GLOBE OFFSHORE

S E R V I C E S���������� ������� � ��� �� �

����� ���� � ��� ��� ������ ��������� � ������ ��� ���� � �� ��� �� ��������� � !� ���� � ""�"�� #� �� �����$ �%&���� '���� '���� ���������� � � ((")*(**� +����� � �� ,�- ��.� ��/��� �� ����

�������

GLOBE OFFSHORE SERVICES (A UNIT OF TRAYO GROUP)

INDEX

An Introduction

Executed Photographs Job Statutory

Manpower Recourses

Equipment Recourses

Quality Policy

Safety Policy

P F Registration Copy

Permanent Account Number

Service Tax Certificate

Executed Photographs

Work order copies:

Afcons Infrastructure Ltd. Pipavav Shipyard Ltd. Reliance Industries Limited Reliance Engineering Associates Ltd IVRCL Infrastructures & Project Ltd.

GLOBE OFFSHORE SERVICES (A UNIT OF TRAYO GROUP)

AN INTRODUCTION

We ourselves would like to introduce as M/S GLOBE OFFSHORE SERVICES is one of

the Constituents of TRAYO GROUP located at Jamnagar with annual group

turnover of Rs.14.61 crores. Presently we are working in all over India in

Construction Jobs, we have achieved various mile stones by executing various types

of mechanical jobs like Fabrication & Erection of Structural works, Underground

Cross Country pipeline, Above Ground Pipeline, Oil & Gas refinery, Rack, Sleeper &

Unit piping, Structure Fabrication, erection & alignment of Static & Rotary

Equipment, etc.

We commit to improve the quality job with

the development of our employees at all

project levels by providing key training to

achieve the Clients requirement & satisfaction

by not keeping any stone unturned to the best

of our Knowledge, ability & with our valuable

experienced on roll staff (more than 200).

We are not proving ourselves in the Mechanical field but achieving our mile stones

in CIVIL & OFFSHORE field also, so that we can render our services to our client

under one roof with best of our competence, knowledge & aptitude.

AREA OF EXCELLENCE:

Fabrication & Erection of Structures and Piping as per schedule and in achieving milestones, respective of size and volume of work.

Shutdown jobs as per requirement of Clients. Adherence to QA/QC & HSSE Compliance. Strict Compliance of Safety Norms & Regulations. Mobilization of equipment’s & manpower as per requirement of project

schedule.

Kindly note that we have more than 200 experienced supervisor and Technicians with this organization and we are interested to execute the mechanical jobs.

TRUSES FABRICATION WORK

Pipavav Shipyard Ltd. Site

BEARTH MODIFICATION WORK

���������� �� ������ �� ����� ������������ ���� ���������

350 MT TUBULAR STRUCTURE MOORING FABRICATION WORK

���������� �� ������ �� ����� ������������ ���� ���������

GLOBE OFFSHORE SERVICES (A UNIT OF TRAYO GROUP)

JOBS SATUATORY

Fabrication & Erection of all type of NIBR Piping jobs (CS, MS, SS, GI Etc.) respect of firewater, Cooling Water, Under Ground OSU / CSU piping, Utility piping, Rack & Sleeper Piping and Unit Piping.

Erection & Alignment of Rotary & Static Equipment of various

types & Capacity with related piping accessories. Fabrication & Erection of Structural Works likes Gantry, Girders,

Crane Girders, Conveyers, Light & Heavy Trusses, and Dehydrators etc. in Various Plants like Power Sector, Cement Plant, Fertilizer Unit and Chemical Industries.

Fabrication & Erection of Circular, Cross Over Platforms,

Handrails & Cages-ladders. Fabrication of Cargo & Passenger ship & Shipbuilding Piping.

Offshore Structures like Offshore Platforms, Pile Pipe and Pile Cap. Onshore & Offshore Scaffolding Making & Dismantling.

Cross Country Water, Oil & Gas Pipeline.

GLOBE OFFSHORE SERVICES (A UNIT OF TRAYO GROUP)

Man Power Resources:

MANAGEMENT STAFF SR. NO. CATEGORY NOS REMARKS

1 PROJECT MANAGER 1

2 SITE IN CHARGE 3

3 QUALITY IN CHARGE 1

4 SAFETY IN CHARGE 1

5 PLANNING ENGINEER 2

6 QUALITY CONTROL ENGG. 1

7 QA/QC SUPERVISOR 4

8 EXECUTION SUPERVISOR 8

9 RIGGER FOREMAN 4

10 SAFETY SUPERVISOR 3

11 ADMINISTRATION 2

12 STORE IN CHARGE 1

13 STORE KEEPER 5

14 MATERIAL CHASER 4

TOTAL 40

TECHNICIANS

1 FABRICATOR 4

2 FITTER 10

3 WELDER 25

4 GRINDER 20

5 GAS CUTTER 10

6 RIGGER 40

7 HELPER 45

8 DRILLER 2

9 ELECTRICIAN 4

10 DRIVER 3

11 UNSKILLED 20

TOTAL 183

GLOBE OFFSHORE SERVICES (A UNIT OF TRAYO GROUP)

Equipment Resources

SR.NO. Description uom Quantity Remarks

1 Hydra crane 8 & 10 MT Nos 3

2 D.G Set 82 KVA Nos 3

3 D.G Set125 KVA Nos 2

4 Trailer Nos 1

5 Tractor with Trolley Nos 3

6 Welding machine (Memco & Quality) Nos 50

7 Grinding machine AG-7 Nos 30

8 Grinding machine AG-5 Nos 12

9 Grinding machine GQ -4 Nos 6

10 Grinding machine FF-2 Nos 2

11 Magnetic Drill Machine Nos 2

12 Hand Drill machine Nos 6

13 Fitter tools Set 15

14 Welder Tools Set 25

15 Welding Cable Mtr 1500

16 Cutting Set Nos 10

17 Pug Cutting Set Nos 5

18 Spanner Set 6 to 32 D & Ring Set 20

19 Hammering Spanner set up to 60 size Nos 5

20 Torque Wrench (200-1000 NM) Nos 5

21 Chain Pulley Block Nos 10

22 Cabinet Oven 500 Deg. Nos 4

23 Portable Oven 250 Deg. Nos 25

24 Oxygen Regulator Nos 12

25 DA Regulator Nos 15

26 Flash Back arrestor oxygen & Da Nos 25

27 D Shackles 1 - 50 MT. Nos 22

QUALITY POLICY

����� ��������� ������ �� ��������� �� ����� ��� �������

� �������� �� ��� ������������ �������� ����� �� ���������� �������

���������� �������

�� ��� ����� �������� ������������ �� �������� ����� ���

������� �� ��� ������������ ��������� ��� ���������� ������������ ��� ��

�� ������� �������� ��������� ������������ ��� ���������������

�� ���� ����� ��� ����� ��������� ���������� �� ���

�������� ���������� ������������ ���� �� ��������� ��� ����������� ���

�������� ���� �������������������

�� ���� �������� ��� ������ �� ����������� �� ��� ����� ���� ��

�������������

QUALITY OBJECTIVES

!� "��������� �� �������� �������������

#� $����� ���������� �� %��&����

'� "������� %������� ������������� �������

(� "������� )����*������������������

+� ��������� ,��������� �� %���������� �� ��� *���������

-� *�������� �� ������ �� ��&�� ����������������������

TRAYOGROUP

�� �� �����

������ ��� ���

��� � ����������

�������� � ��

Proven Safety Records

GLOBE OFFSHORE SERVICES (GOS) will provide craftsmen that are reliable, safety-minded, and verifiably skilled. GOS has a reputation for the highest safety standards in our industry and we are very proud of these ratings.

Our Program Includes:

Random worksite safety inspections Pre-employment, post-accident and random drug testing Weekly Toolbox Safety Talks OSHA 10 and 30 hour certification training Site specific safety coordination with Clients First Aid, CPR and AED training Confined Space training Use of Personal Protective Equipment Other specialized topics as per Clients and OSHA requirements LOTO and HAZCOM

GLOBE OFFSHORE SERVICES #1 goal for its

services is the protection of personnel,

equipment, and the environment. By

maintaining comprehensive guidelines for

proper EHS management of our personnel,

we provide the safest and most regulatory

compliant personnel in the industry. Our

emphasis on safety starts at the top of the organization and is taught to all personnel

as the major basis for project performance. Our EHS guidelines provide the basis for

all site specific programs that are used throughout the world. With a high level of

safety consciousness, PMR personnel maintain high levels of productivity and get the

job done either on time or early.

FORM ST-2

Shri/Ms. GLOBE OFFSHORE SER-VICES,MADHAVSQUAREOFFICENO330LIMDALANECORNERJAMNAGAR361001GUJARA

T having undertaken to comply with the conditions prescribed in Chapter V of the FinanceAct,1994 read with the Service Tax Rules,1994,and any orders issued thereunder is herebycertified to have been registered with the Central Excise Department.The Service Tax Code

and other details are mentioned hereunder.Name : GLOBE OFFSHORE SERVICES

Address : MADHAVSQUAREOFFI-CENO330LIMDALANECORNERJAMNAGAR361001GUJARAT

PAN No : AAHFG4830HName as in PAN : GLOBE OFFSHORE SERVICES

Nature of registration : Registration of a single premiseService Tax Code(Registration

Number) :AAHFG4830HSD002

Taxable services : Consulting engineer services, Manpower recruitment/supply agency service, Cargohandling service, Maintenance or repair service, Construction services other than res-idential complex, including commercial/industrial buildings or civil structures, Workscontract service

ADDRESS OF BUISNESS PREMISES

Name Of Premises/Building : MADHAV SQUARE Flat / Door / Block No : OFFICE NO.330Road / Street / Lane : LIMDA LANE Village / Area / Lane : LIMDA LANE

Block / Taluk / Sub-Division /Town :

JAMNAGAR Post Office : GPO-JAMNAGAR

City / District : JAMNAGAR State / Union Territory : GUJARATPIN : 361001 Phone Number-1 : 9913869616

Phone Number-2 : Fax Number-1 :Fax Number 2 : Email Address : [email protected]

Premises Code : 170002A002Sl No Types of Services Accounting Codes

Tax Collection Other Receipts(Interest)

Penalties

1 Consulting engineer services 00440057 004400582 Manpower recruitment/supply agency service 00440060 004400613 Cargo handling service 00440189 004401904 Maintenance or repair service 00440245 004402465 Construction services other than residential complex,

including commercial/industrial buildings or civil struc-tures

00440290 00440291

6 Works contract service 00440410 00440411

CESSES

1 EDUCATION CESS 00440298 00440299 004414862 SECONDARY AND HIGHER EDUCATION CESS 00440426 00440427 00441487

Note :1. In case the registrant starts providing any other taxable service (other than those mentioned above), he shall in-timate the department.2. In case the registrant starts billing from other premises (other than those mentioned above), he shall intimatethe department.3. These intimations and any other information which registrant wishes to bring to the notice of the departmentcan be submitted on-line by the registrant after logging on to web-site.

Page 1 of 2

Signed Copy

Page 1/9

Reference No. :

Registered Office:

AFCONS INFRASTRUCTURE LTD

Post Box No. 11978, AFCONS House,16, Shah

Industrial Estate, Veera Desai Road, Azadnagar

P.O., Mumbai 400053 Maharashtra India

Tel.No: 91-22-6719 1000

Fax.No: 91-22-2673 0047/ 2673 0026

WORK ORDER

Sub Contractor name:

200917 Globe Offshore Services

LIMDA LANE CORNER, OFFICE NO.330, 3RD FLOOR, MADHAV

SQUARE, Sikka,Jamnagar 361001 Gujarat India

PAN No: AAHFG4830H

VAT TIN No:

CST TIN No:

Tel No: 9913869616 9913791111

Fax No:

Email: [email protected]

Contact Person: ANIL SINGH

WO Number: 4600006267 WO Date: 25.10.2013

W.O.Name : FABRICATION & ERECTION WORK IN J3

PROJECTS

Project: 2274 Civil and Struct Work for MTF JAMNAGAR

Contact:

Project Office: Afcons Infrastructure Ltd. Gujarat India

Work Start Date: 26.10.2015 Work End Date: 31.12.2016

WO Value: Rs. 42189401.88 Penalty Clause: No

S.No. Act.Ref Description of Work Unit Quantity Quote Rate Total Amount

1 40000660 / 5561 L/C for YARD - WELD LIGHT STEEL STRUC

1000015 S/C Structural Steel Fabrication

TO 1.000 8,000.00 8,000.00

2 40000660 / 5571 L/C for YARD - WELD MEDIUM STEEL STRUC

1000015 S/C Structural Steel Fabrication

TO 6.000 7,000.00 42,000.00

3 40000660 / 5581 L/C for YARD - WELD HEAVY STEEL STRUC

1000015 S/C Structural Steel Fabrication

TO 4.000 6,800.00 27,200.00

4 40000660 / 5591 L/C for YARD-WELD EXTRA HEAVY STEEL STRU

1000015 S/C Structural Steel Fabrication

TO 5.000 6,000.00 30,000.00

5 40000660 / 5551 L/C for FLD EREC-STRUC 0-10M-GL

2000343 PRW Erection Work

MTO 310.000 5,610.00 1,739,100.00

7 40000660 / 9253 FLD EREC-STRUC 0-20M-GL

2000343 PRW Erection Work

MTO 303.000 5,775.00 1,749,825.00

8 40000660 / 5151 MOU BROWNFIELD - Daily Permit

1000467 S/C Other Works - LS

LS 1,700,000.0

00

0.32 544,000.00

9 40000660 / 5161 MOU BROWNFIELD - Weekly Permit

1000467 S/C Other Works - LS

LS 1,500,000.0

00

0.18 270,000.00

10 40000660 / 7903 FABRICATION OF LIGHT STEEL SHAPES

2000042 PRW Structural Steel Fabrication

TO 8.000 8,000.00 64,000.00

6 40000660 / 7913 FABRICATION-MEDIUM STEEL SHAPES

2000042 PRW Structural Steel Fabrication

TO 30.000 7,000.00 210,000.00

11 40000660 / 7923 FABRICATION-HEAVY STEEL SHAPES

2000042 PRW Structural Steel Fabrication

TO 10.000 6,800.00 68,000.00

12 40000660 / 7953 FLD EREC-STRUC 0-10M-GL

2000343 PRW Erection Work

MTO 259.000 5,610.00 1,452,990.00

13 40000660 / 5281 MOU-L/C FOR ERECTION OF SCAFF.-15M HT M3 10,000.000 18.00 180,000.00

>>>>

Invoices must be submitted as per AFCONS INFRASTRUCTURE LTD prescribed format.

Please refer to sub contract document for general and specific terms and conditions.

All works must be executed under strict compliance of specifications and terms and Conditions instructions from engineer.

The above quantities may be approximate. Payment will be made based on actual work measured at site.

Sub Contractor Engineer EIC / Authorized Signatory

WORK ORDERSigned Copy

WO No : 4600006267

WO Date 25.10.2013

Page 2/9

Registered Office:

AFCONS INFRASTRUCTURE LTD

Post Box No. 11978, AFCONS House,16, Shah

Industrial Estate, Veera Desai Road, Azadnagar

P.O., Mumbai 400053 Maharashtra India

Tel.No: 91-22-6719 1000

Fax.No: 91-22-2673 0047/ 2673 0026

S.No. Act.Ref Description of Work Unit Quantity Quote Rate Total Amount

2000028 PRW Staging Fixing - Sides

14 40000660 / 5291 DISMANTLE SCAFF. UPTO 15 M HGT

2000030 PRW Staging Removing

M3 5,500.000 10.60 58,300.00

15 40000660 / 6231 EREC & DISMANTLE OF PLATFORM

2000238 PRW Platform making

M2 1,500.000 20.00 30,000.00

16 40000660 / 6241 EREC & DISMANTLE OF COMP HANDRAIL

SYSTEM

2000058 PRW Safety Hand Rail Fixing

M 500.000 15.00 7,500.00

17 40000660 / 8523 FABRICATION OF TEMPPORARY BED

2000042 PRW Structural Steel Fabrication

TO 100.000 3,000.00 300,000.00

18 40000660 / 9252 FABRICATION OF RECTANGULAR PLATFORM

/ACC

2000042 PRW Structural Steel Fabrication

TO 16.000 8,900.00 142,400.00

19 40000660 / 9251 YARD-WELD-CIRCULAR /HANDRAIL

PLATFORM/LA

2000042 PRW Structural Steel Fabrication

TO 24.000 15,525.00 372,600.00

20 40000660 / 7373 RACK PPNG EREC NIBR >6" TO <=24" NB

2000462 Rack Piping Erection NIBR

INM 200.000 119.00 23,800.00

21 40000660 / 7463 L/C FABRICATION OF RECTANGULATR

PLATFORM

1000015 S/C Structural Steel Fabrication

TO 15.000 8,900.00 133,500.00

22 40000660 / 8023 PIPE SUPPORT ERECTION - CS

2000343 PRW Erection Work

MTO 2.000 11,402.00 22,804.00

23 40000660 / 7473 OFFSHORE ERECTION-SCAFF ELEV 0-15M, FIM

2000028 PRW Staging Fixing - Sides

M3 10,126.000 60.00 607,560.00

24 40000660 / 7483 OFSHORE DISMNTLING-SCAFF ELEV 0-15M, FIM

2000030 PRW Staging Removing

M3 40,000.000 30.00 1,200,000.00

25 40000660 / 8313 FLD EREC-STRUC 0-10M-GL

2000343 PRW Erection Work

MTO 1.500 5,100.00 7,650.00

26 40000660 / 9022 FABRICATION OF GOAL POST STRUCTURE

WITH

2000042 PRW Structural Steel Fabrication

TO 2.000 18,000.00 36,000.00

27 40000660 / 9026 OFFSHORE-ERECTION OF GOAL POST

STRUCTURE

2000343 PRW Erection Work

MTO 8.000 41,000.00 328,000.00

28 40000660 / 9096 TUBULAR STRUCTURE ERECTION (incl. WELDIN

2000035 Inst - PRW in Mton

TO 22.000 58,000.00 1,276,000.00

>>>>

Invoices must be submitted as per AFCONS INFRASTRUCTURE LTD prescribed format.

Please refer to sub contract document for general and specific terms and conditions.

All works must be executed under strict compliance of specifications and terms and Conditions instructions from engineer.

The above quantities may be approximate. Payment will be made based on actual work measured at site.

Sub Contractor Engineer EIC / Authorized Signatory

WORK ORDERSigned Copy

WO No : 4600006267

WO Date 25.10.2013

Page 3/9

Registered Office:

AFCONS INFRASTRUCTURE LTD

Post Box No. 11978, AFCONS House,16, Shah

Industrial Estate, Veera Desai Road, Azadnagar

P.O., Mumbai 400053 Maharashtra India

Tel.No: 91-22-6719 1000

Fax.No: 91-22-2673 0047/ 2673 0026

S.No. Act.Ref Description of Work Unit Quantity Quote Rate Total Amount

29 40000660 / 9575 L/c "RACK-WELD CS-NIBR <2"" T <10MM" (OF

2000461 L/c for Welding (ID)

ID 200.000 265.00 53,000.00

30 40000660 / 9576 L/c RACK PPNG EREC NIBR >=2" TO <=6" NB

2000461 L/c for Welding (ID)

ID 110.000 125.00 13,750.00

31 40000660 / 9544 L/c PIPE SUPPORT ERECTION - SS

2000343 PRW Erection Work

MTO 0.500 23,249.00 11,624.50

32 40000660 / 9573 L/c ERECTION OF GRATINGS <=20M HEIGHT

2000034 Inst - PRW in M2

M2 20.000 306.00 6,120.00

33 40000660 / 9572 L/c GROUT 12MM REBAR,

16MMHOLEX120-145MM

2000042 PRW Structural Steel Fabrication

TO 2.500 15,525.00 38,812.50

34 40000660 / 9577 L/c YARD-WELD MED.STEEL STRUCT.

1000015 S/C Structural Steel Fabrication

TO 2.000 7,000.00 14,000.00

35 40000660 / 9578 L/c YARD-WELD HEAVY STEEL STRUCT.

1000015 S/C Structural Steel Fabrication

TO 10.000 6,800.00 68,000.00

36 40000660 / 9574 L/c ERECTION OF RECTANGULAR

PLATFORM/ACC

1000016 S/C Structural Steel Erection

TO 1.500 10,260.00 15,390.00

37 40000660 / 9504 CHARGES FOR SUPPLY OF UNSKILLED

LABOUR F

3000001 Supply of UnSkilled Labour

DAY 150.000 315.00 47,250.00

38 40000660 / 9505 CHARGES FOR SUPPLY OF UNSKILLED

LABOUR F

3000007 Supply of unskilled Labour - Hours

H 500.000 79.00 39,500.00

39 40000660 / 7633 OSBL#UG PIPE WELD

CS#NIBR>=2",15<=T<19MM

2000461 L/c for Welding (ID)

ID 85.000 188.00 15,980.00

40 40000660 / 7643 OSBL#UG PIPE WELD

CS#NIBR>=2",10<=T<12MM

2000461 L/c for Welding (ID)

ID 100.000 145.00 14,500.00

41 40000660 / 9132 OSBL#UG PIPE WELD

CS#NIBR>=2",12<=T<15MM

2000461 L/c for Welding (ID)

ID 250.000 165.00 41,250.00

42 40000660 / 8043 OSBL # UG PIPE LAYING > 24"

2000462 Rack Piping Erection NIBR

INM 37,000.000 35.00 1,295,000.00

43 40000660 / 9383 FULL TIG-UNIT WELD INCOLOY >=2" <=6MM

2000461 L/c for Welding (ID)

ID 20.000 822.00 16,440.00

44 40000660 / 8113 BROWNFIELD - DAILY PERMIT LS 1,977,272.4 0.32 632,727.17

>>>>

Invoices must be submitted as per AFCONS INFRASTRUCTURE LTD prescribed format.

Please refer to sub contract document for general and specific terms and conditions.

All works must be executed under strict compliance of specifications and terms and Conditions instructions from engineer.

The above quantities may be approximate. Payment will be made based on actual work measured at site.

Sub Contractor Engineer EIC / Authorized Signatory

WORK ORDERSigned Copy

WO No : 4600006267

WO Date 25.10.2013

Page 4/9

Registered Office:

AFCONS INFRASTRUCTURE LTD

Post Box No. 11978, AFCONS House,16, Shah

Industrial Estate, Veera Desai Road, Azadnagar

P.O., Mumbai 400053 Maharashtra India

Tel.No: 91-22-6719 1000

Fax.No: 91-22-2673 0047/ 2673 0026

S.No. Act.Ref Description of Work Unit Quantity Quote Rate Total Amount

1000467 S/C Other Works - LS 00

45 40000660 / 9491 L/c "RACK-WELD CS-NIBR >=2"" T <10MM"

2000461 L/c for Welding (ID)

ID 4,637.000 204.00 945,948.00

46 40000660 / 9512 L/c RACK-WELD SS-NIBR >=2"" T <10MM

2000461 L/c for Welding (ID)

ID 500.000 386.00 193,000.00

47 40000660 / 9511 L/c RACK-WELD CS-IBR >=2"" T <10MM

2000461 L/c for Welding (ID)

ID 2,200.000 224.00 492,800.00

48 40000660 / 9509 L/c RACK-WELD CS-IBR >=2"" 12<=T<15MM

2000461 L/c for Welding (ID)

ID 800.000 302.00 241,600.00

49 40000660 / 9510 L/c RACK-WELD CS-IBR >=2"" 15<=T<19MM

2000461 L/c for Welding (ID)

ID 600.000 347.00 208,200.00

50 40000660 / 9495 L/c RACK PPNG EREC NIBR >=2" TO <=6" NB

2000462 Rack Piping Erection NIBR

INM 20,000.000 77.00 1,540,000.00

51 40000660 / 9514 L/c RACK PPNG EREC IBR >=2" TO <=6" NB

2000462 Rack Piping Erection NIBR

INM 3,000.000 80.00 240,000.00

52 40000660 / 9515 L/c RACK PPNG EREC IBR >6" TO <=24" NB

2000462 Rack Piping Erection NIBR

INM 20,000.000 76.00 1,520,000.00

53 40000660 / 9545 L/c RACK PPNG EREC NIBR >=24"" NB

2000462 Rack Piping Erection NIBR

INM 13,000.000 66.00 858,000.00

54 40000660 / 9598 L/c "FULL TIG-RACK WELD CS-NIBR =2'', T<

2000461 L/c for Welding (ID)

ID 1,500.000 265.00 397,500.00

55 40000660 / 9595 L/c MOU-DISMANTLE HANGING SCAFF 12M - 18

2000461 L/c for Welding (ID)

ID 200.000 264.00 52,800.00

56 40000660 / 9599 L/c MOU-WEAR PLT WELD CS T >8 MM to <=10

2000036 Inst - PRW in Meter

M 400.000 467.00 186,800.00

57 40000660 / 9600 L/c MOU-WEAR PLT WELD SS T <1=8 MM

2000036 Inst - PRW in Meter

M 100.000 656.00 65,600.00

58 40000660 / 9470 L/c YARD PIPE SUPPORT FABRICATION CS

2000042 PRW Structural Steel Fabrication

TO 30.000 12,938.00 388,140.00

59 40000660 / 9596 L/c EREC OF DANCING PLATFORM FROM

12-18M

2000343 PRW Erection Work

MTO 30.000 11,402.00 342,060.00

60 40000660 / 9260 YARD - WELD LIGHT STEEL STRUC

2000042 PRW Structural Steel Fabrication

TO 1.000 8,000.00 8,000.00

61 40000660 / 9261 YARD - WELD MEDIUM STEEL STRUC

1000015 S/C Structural Steel Fabrication

TO 1.000 7,000.00 7,000.00

62 40000660 / 9262 YARD - WELD HEAVY STEEL STRUC TO 1.000 6,800.00 6,800.00

>>>>

Invoices must be submitted as per AFCONS INFRASTRUCTURE LTD prescribed format.

Please refer to sub contract document for general and specific terms and conditions.

All works must be executed under strict compliance of specifications and terms and Conditions instructions from engineer.

The above quantities may be approximate. Payment will be made based on actual work measured at site.

Sub Contractor Engineer EIC / Authorized Signatory

WORK ORDERSigned Copy

WO No : 4600006267

WO Date 25.10.2013

Page 5/9

Registered Office:

AFCONS INFRASTRUCTURE LTD

Post Box No. 11978, AFCONS House,16, Shah

Industrial Estate, Veera Desai Road, Azadnagar

P.O., Mumbai 400053 Maharashtra India

Tel.No: 91-22-6719 1000

Fax.No: 91-22-2673 0047/ 2673 0026

S.No. Act.Ref Description of Work Unit Quantity Quote Rate Total Amount

1000015 S/C Structural Steel Fabrication

63 40000660 / 9249 FLD EREC-STRUC 10-20M-GL

2000343 PRW Erection Work

MTO 401.000 5,775.00 2,315,775.00

64 40000660 / 9256 MOU-L/C FOR ERECTION OF SCAFF.-15M HT.

2000028 PRW Staging Fixing - Sides

M3 21,000.000 18.00 378,000.00

65 40000660 / 9498 L/c DISMANTLE SCAFF. UPTO 15 M HGT

2000030 PRW Staging Removing

M3 1,800.000 10.60 19,080.00

66 40000660 / 9257 EREC & DISMANTLE OF PLATFORM

2000238 PRW Platform making

M2 3,000.000 20.00 60,000.00

67 40000660 / 9258 EREC & DISMANTLE OF COMP HANDRAIL

SYSTEM

2000058 PRW Safety Hand Rail Fixing

M 2,200.000 15.00 33,000.00

68 40000660 / 9507 L/c EREC OF HANGING PLATFORM FROM

12-18M

2000036 Inst - PRW in Meter

M 842.000 100.00 84,200.00

69 40000660 / 9506 L/c EREC OF DANCING PLATFORM FROM 6-12M

2000036 Inst - PRW in Meter

M 310.000 135.00 41,850.00

70 40000660 / 9593 L/c EREC OF DANCING PLATFORM FROM

12-18M

2000034 Inst - PRW in M2

M2 4,348.000 150.00 652,200.00

71 40000660 / 9259 MOU-FIXING OF GI/PP SHEETING WORKS.

2000034 Inst - PRW in M2

M2 450.000 100.00 45,000.00

72 40000660 / 9589 L/c MOU - ERE. OF HANGING SCAFF 6M - 12M

2000034 Inst - PRW in M2

M2 30.000 111.00 3,330.00

73 40000660 / 9337 MOU JOB CARD EXPENSE

1000239 S/C Miscellaneous

LS 3,900,000.0

00

1.00 3,900,000.00

74 40000660 / 9208 FLD EREC-STRUC 0-20M-GL

2000343 PRW Erection Work

MTO 124.000 5,775.00 716,100.00

75 40000660 / 9371 EREC OF RECTAN P.FRM/ACCESS/HR/LDR<=

10H

2000343 PRW Erection Work

MTO 22.000 6,270.00 137,940.00

76 40000660 / 9372 EREC OF RECTAN P.FRM/ACCESS/HR/LDR<=

20H

2000343 PRW Erection Work

MTO 5.000 6,710.00 33,550.00

77 40000660 / 5281 MOU-L/C FOR ERECTION OF SCAFF.-15M HT

2000028 PRW Staging Fixing - Sides

M3 10,000.000 19.80 198,000.00

78 40000660 / 5291 DISMANTLE SCAFF. UPTO 15 M HGT M3 15,000.000 11.70 175,500.00

>>>>

Invoices must be submitted as per AFCONS INFRASTRUCTURE LTD prescribed format.

Please refer to sub contract document for general and specific terms and conditions.

All works must be executed under strict compliance of specifications and terms and Conditions instructions from engineer.

The above quantities may be approximate. Payment will be made based on actual work measured at site.

Sub Contractor Engineer EIC / Authorized Signatory

WORK ORDERSigned Copy

WO No : 4600006267

WO Date 25.10.2013

Page 6/9

Registered Office:

AFCONS INFRASTRUCTURE LTD

Post Box No. 11978, AFCONS House,16, Shah

Industrial Estate, Veera Desai Road, Azadnagar

P.O., Mumbai 400053 Maharashtra India

Tel.No: 91-22-6719 1000

Fax.No: 91-22-2673 0047/ 2673 0026

S.No. Act.Ref Description of Work Unit Quantity Quote Rate Total Amount

2000030 PRW Staging Removing

79 40000660 / 6231 EREC & DISMANTLE OF PLATFORM

2000238 PRW Platform making

M2 3,000.000 22.00 66,000.00

80 40000660 / 6241 EREC & DISMANTLE OF COMP HANDRAIL

SYSTEM

2000058 PRW Safety Hand Rail Fixing

M 1,600.000 16.50 26,400.00

81 40000660 / 9635 L/c MOU - ERE OF HANGING SCAFF 12M-18M H

2000028 PRW Staging Fixing - Sides

M3 250.000 137.00 34,250.00

82 40000660 / 9633 L/c ERECTION OF GRATINGS <=20M HEIGHT

2000034 Inst - PRW in M2

M2 400.000 187.00 74,800.00

83 40000660 / 9634 L/c ERECTION-CABLE TRAY SUPPORT

2000343 PRW Erection Work

MTO 7.000 12,650.00 88,550.00

84 40000660 / 9639 L/c UNIT-WELD CS-NIBR >=2" T<10MM

2000461 L/c for Welding (ID)

ID 400.000 282.00 112,800.00

85 40000660 / 8713 Relocation of Electrical Pole

1000239 S/C Miscellaneous

LS 6,600.000 2.50 16,500.00

86 40000660 / 8713 Relocation of Electrical Pole

1000239 S/C Miscellaneous

LS 7,000.000 3.00 21,000.00

87 40000660 / 6901 ERECTION-SCAFF. UPTO 15 M HGT

2000028 PRW Staging Fixing - Sides

M3 270.000 18.00 4,860.00

88 40000660 / 7383 EREC & DISMANTLE OF PLATFORM

2000238 PRW Platform making

M2 60.000 20.00 1,200.00

89 40000660 / 7393 EREC & DISMANTLE OF COMP HANDRAIL

SYSTEM

2000058 PRW Safety Hand Rail Fixing

M 600.000 15.00 9,000.00

90 40000660 / 8313 FLD EREC-STRUC 0-10M-GL

2000343 PRW Erection Work

MTO 3.000 5,610.00 16,830.00

91 40000660 / 9027 OFFSHORE-RACK-WELD CS#NIBR>=2",T<10MM

2000461 L/c for Welding (ID)

ID 400.000 319.00 127,600.00

92 40000660 / 9377 FLNGD VLV EREC <6"NB; <=300#

2000461 L/c for Welding (ID)

ID 5.000 213.00 1,065.00

93 40000660 / 9378 FLNGD VLV EREC >=6"NB; <=300#

2000461 L/c for Welding (ID)

ID 30.000 256.00 7,680.00

94 40000660 / 9496 L/c RACK PPNG EREC NIBR >6" TO <=24" NB

2000462 Rack Piping Erection NIBR

INM 28,895.000 73.00 2,109,335.00

95 40000660 / 9548 L/C RACK-WELD CS-NIBR >=2" 12<=T<15MM

2000461 L/c for Welding (ID)

ID 300.000 275.00 82,500.00

>>>>

Invoices must be submitted as per AFCONS INFRASTRUCTURE LTD prescribed format.

Please refer to sub contract document for general and specific terms and conditions.

All works must be executed under strict compliance of specifications and terms and Conditions instructions from engineer.

The above quantities may be approximate. Payment will be made based on actual work measured at site.

Sub Contractor Engineer EIC / Authorized Signatory

WORK ORDERSigned Copy

WO No : 4600006267

WO Date 25.10.2013

Page 7/9

Registered Office:

AFCONS INFRASTRUCTURE LTD

Post Box No. 11978, AFCONS House,16, Shah

Industrial Estate, Veera Desai Road, Azadnagar

P.O., Mumbai 400053 Maharashtra India

Tel.No: 91-22-6719 1000

Fax.No: 91-22-2673 0047/ 2673 0026

S.No. Act.Ref Description of Work Unit Quantity Quote Rate Total Amount

96 40000660 / 9256 MOU-L/C FOR ERECTION OF SCAFF.-15M HT.

2000028 PRW Staging Fixing - Sides

M3 19,260.000 19.80 381,348.00

97 40000660 / 9498 L/c DISMANTLE SCAFF. UPTO 15 M HGT

2000030 PRW Staging Removing

M3 15,000.000 11.70 175,500.00

98 40000660 / 9257 EREC & DISMANTLE OF PLATFORM

2000238 PRW Platform making

M2 5,000.000 22.00 110,000.00

99 40000660 / 9258 EREC & DISMANTLE OF COMP HANDRAIL

SYSTEM

2000058 PRW Safety Hand Rail Fixing

M 4,000.000 16.50 66,000.00

100 40000660 / 9507 L/c EREC OF HANGING PLATFORM FROM

12-18M

2000036 Inst - PRW in Meter

M 3,886.000 123.00 477,978.00

101 40000660 / 9499 L/c ERECTION-CABLE TRAY SUPPORT

2000343 PRW Erection Work

MTO 20.000 12,650.00 253,000.00

102 40000660 / 9591 L/c DISMANTLING OF HANGING SCAFF.ABOVE 1

2000034 Inst - PRW in M2

M2 100.000 79.00 7,900.00

103 40000660 / 9665 L/c EREC.OF DANCING PLATFORM ABOVE 18M

T

2000034 Inst - PRW in M2

M2 563.000 160.00 90,080.00

104 40000660 / 9715 L/c FLD EREC-CANTILVR/OVRHD STRUC<=20M

H

1000016 S/C Structural Steel Erection

TO 10.000 7,370.00 73,700.00

105 40000660 / 6901 ERECTION-SCAFF. UPTO 15 M HGT

2000028 PRW Staging Fixing - Sides

M3 1,200.000 19.80 23,760.00

106 40000660 / 7383 EREC & DISMANTLE OF PLATFORM

2000238 PRW Platform making

M2 300.000 22.00 6,600.00

107 40000660 / 7393 EREC & DISMANTLE OF COMP HANDRAIL

SYSTEM

2000058 PRW Safety Hand Rail Fixing

M 300.000 16.50 4,950.00

108 40000660 / 6871 "RACK-WELD SS-NIBR >=2"" 12 <=T <15MM"

2000461 L/c for Welding (ID)

ID 300.000 756.00 226,800.00

109 40000660 / 9725 L/c PIPING DISMANTLING NIBR/IBR >6" TO <

2000462 Rack Piping Erection NIBR

INM 4,000.000 60.00 240,000.00

110 40000660 / 9741 FULL TIG-RACK WELD CS IBR =2" T<=6MM

2000461 L/c for Welding (ID)

ID 2,000.000 291.00 582,000.00

111 40000660 / 9746 L/c RACK PPNG EREC IBR <2" NB

2000462 Rack Piping Erection NIBR

INM 600.000 95.00 57,000.00

>>>>

Invoices must be submitted as per AFCONS INFRASTRUCTURE LTD prescribed format.

Please refer to sub contract document for general and specific terms and conditions.

All works must be executed under strict compliance of specifications and terms and Conditions instructions from engineer.

The above quantities may be approximate. Payment will be made based on actual work measured at site.

Sub Contractor Engineer EIC / Authorized Signatory