SPP.org 1

Regional and Inter-Regional Planning UpdateEntergy Transmission Summit

July 29, 2008Astor Crown PlazaNew Orleans, Louisiana

SPP.org 3

• SERTP/RPSG: Southeast Regional Transmission Planning / Regional Planning Stakeholder Group

• www.southeasternrtp.com

• SIRPP: Southeast Inter-Regional Participation Process

• www.southeastirpp.com

• JCSP: Joint Coordinated System Plan

Presentation Overview

SPP.org 4

SERTP / RPSG Meetings

• 3/24/2008

• Formation of RPSG and Selection of Sensitivity Studies for 2008

• 6/25/2008

• Preliminary 10-Year Expansion Plans of SE Region Transmission Owners

• 9/23/2008

• Preliminary Results

• November Transmission Summit

• Final Study Results

SPP.org 5

RPSG Sensitivity Studies

1000 MWMobile Atlanta

Entergy GITS

Alabama Florida

Entergy Alabama

GITS Santee CooperSCEG

2000 MW

1000 MW

1000 MW

1000 MW

SPP.org 6

Southeastern Region Reliability Planning

Load Forecast

External Models

Generation Resources

Regional Assess. & Trans

Exp Plans

Inter-Regional Simultaneous Assessment of System Plans

Inter-Regional Issues Identified

Coordinated Planning Through Reliability

Coordination Agreements

Stakeholder

Input

Stakeholder

Input

Stakeholder

Input

SPP.org 7

SIRPP Activity

• April 3, 2008- Stakeholders Organizational Meeting

• June 10, 2008 Meeting

• Stakeholder Group was formed

• Economic Studies selected

• Coordinate on study assumptions

• October, 2008 Conference Call

• Review preliminary study results

• January, 2009

• Review final study results and draft report

• February, 2009- Final report issued

SPP.org 8

SIRPP Step 1 Economic Studies for 2008

2000 MWEntergy GITS

PJM+MISO Southern

Southern PJM

PJM (classic) Southern

SPP (JCSP)

2000 MW

3000 MW

3000 MW

5000 MW Southern

SPP.org 9

Joint Coordinated System Plan

• Scope of Work

• Perform Eastern Interconnect wide study

1. Reliability Study – 2018 model

2. Economic Analysis – 2024 model

• Incorporate DOE Eastern Wind Integration & Transmission Study objectives

• Future Scenarios

1. Reference (today’s reference values)

2. 20% Wind (by 2024)

SPP.org 10

Joint Coordinated System Plan

• Timeline

• Initial Meeting – November 1, 2007

• Economic Analysis – March 1, 2008

• HV Transmission Overlay Development– December, 2008

• Reliability Assessment – August 2009

• Cost Allocation Analysis – October, 2009

SPP.org 11

Joint Coordinated System Plan

• Current Status

• Preliminary transmission plans for each future have been completed

• Beginning to test transmission plans for robustness

• Testing and consolidation of transmission plans to be completed by December, 2008

Questions / Comments

spp.issuetrak.comQuick Pick: ICT Planning – Base Plan

Steve PurdyLead Engineer, ICT Planning

[email protected]

Doug BowmanLead Engineer, ICT Planning