northeast regional logistics council accelerating...

60
NORTHEAST REGIONAL LOGISTICS COUNCIL AUGUST 2015 ACCELERATING MANUFACTURING EXCELLENCE THROUGH WORLD-CLASS LOGISTICS

Upload: others

Post on 15-Mar-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

NORTHEAST REGIONAL LOGISTICS COUNCIL

AUGUST 2015

ACCELERATING MANUFACTURING EXCELLENCE THROUGH WORLD-CLASS LOGISTICS

Page 2: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

Conexus Indiana is the state’s advanced manufacturing

and logistics initiative, dedicated to making Indiana

a global leader in these high-growth, high-tech industries.

The mission of CILC is to work with a sense of urgency to

strengthen the logistics sector in Indiana by identifying and

acting on concrete opportunities for enhancement, which

better positions the State to grow existing business, attract

new business, and thereby create new jobs.

Page 3: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

I

CONEXUS INDIANA

NORTHEAST REGIONAL

LOGISTICS COUNCIL

CHAIR

*Geary BuchananPresident

Buchanan Hauling & Rigging

Fort Wayne

(Public Policy, Chair)

Lance AdamsCEO

Kruse Worldwide Courier

Fort Wayne

Don BenderPresident

Fischer Trucking, Inc.

Fort Wayne

Chuck BillsPresident & CEO

I-69 Logistics

Gas City

John Boyer IIIPresident

Boyer Transportation Services

Fort Wayne

Tiziano BriozzoGeneral Manager

Valbruna Slater Stainless Inc.

Fort Wayne

*Andy BrooksPresident

Brooks Construction

Company, Inc.

Fort Wayne

(Infrastructure, Chair)

Vince BuchananExecutive Director

Regional Chamber of Northeast Indiana

Fort Wayne

Jason CombsVP, Indiana Operations

CJ International, Inc.

Fort Wayne

Andrew CoolidgeExecutive VP

Sirva

Fort Wayne

Bruce CoxVP, Sales & Marketing

TransWorks

Fort Wayne

John DockreyDirector of Business Development

Martin Riley Architects

Fort Wayne

Jim EvansPresident

Evans Trucking

Butler

Greg FieldsLogistics & Compliance Manager

Vera Bradley

Roanoke

Charles FosterDistribution Center Manager

Coca-Cola

Fort Wayne

Mark FritschPresident

ZOOM Information Systems

Fort Wayne

Michael GlinskiPlant Manager

General Motors

Fort Wayne

Larry HallVP, Transportation

Heidtman Steel

Butler

Scott HindermanExecutive Director

Fort Wayne/Allen County Airport

Fort Wayne

Todd R. JohnsonSupply Chain Director

General Motors

Fort Wayne

Steve KimmelExecutive Director

Huntington Chamber

of Commerce

Huntington

Wes KuntzmanExecutive Director

Decatur Chamber of Commerce

Decatur

Matthew LockRegional Manager

Logistics Insight Corp.

Roanoke

Page 4: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

II

Jon MeyerVP, Operations/CFO

Meyer Trucking-East Haven Truck Leasing

New Haven

Jim NewtonPresident

Triple Crown Services

Fort Wayne

Gregg ParrishPresident

Commercial Warehouse & Cartage, Inc.

Fort Wayne

Chip ParrishGeneral Manager

Parrish Dedicated Services, Inc.

Fort Wayne

Sam RykardVP & General Manager

Brothers Express

Fort Wayne

John SampsonPresident & CEO

Northeast Indiana Partnership

Fort Wayne

John SniderRetired VP, Retail Logistics Services

Do It Best Corp.

Fort Wayne

(Workforce Development, Chair)

Brad SturgesPresident

CBRE Sturges

Fort Wayne

Jim ThompsonCEO

JAT of Fort Wayne

Fort Wayne

Vince Tippmann, Jr.Owner

Tippmann & Associates

New Haven

Chuck VerbaRecruiting &

Safety Manager

Performance Food Group

Kendallville

Tony WintersVP

Klink Trucking, Inc.

Ashley

*Stan ZiherlPresident

Five Star Distributing

Columbia City

* Conexus Indiana Logistics Council Member

Page 5: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

III

Page 6: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

IV

LETTER FROM CONEXUS

NORTHEAST REGIONAL

LOGISTICS COUNCIL CHAIR

Accelerating Manufacturing Excellence Through World-Class Logistics was created by leading members of the logistics users community throughout Northeast Indiana.

The logistics users community within Northeast Indiana, made up of the four modes of transportation, including air, rail, truck and water, and advanced manufacturing, infrastructure, service providers and warehouse/distribution companies, gathered and agreed unanimously on the “future initiatives” that should be implemented to provide seamless transportation solutions to Northeast Indiana. This report represents the work of each of these areas, with a strong focus on our local region.

The Conexus Indiana Logistics Council (CILC), partnering with the Northeast Indiana Partnership, the Regional Chamber of Northeast Indiana, local economic development groups and chambers of commerce in Northeast Indiana created the Northeast Regional Logistics Council (NERLC) and was a catalyst in creating a forum for logistics executives to discuss issues affecting their industry and to build a common agenda across all logistics sectors, including both private and public. We believe that by achieving alignment of priorities in the areas of infrastructure, public policy and workforce development Northeast Indiana will be able to maximize short-term and long-term success for the logistics sector in this region.

Accelerating Manufacturing Excellence Through World-Class Logistics has ownership by the logistics industry, ensuring that those things necessary for the Northeast Region’s success are in place to enhance the environment for companies to grow their business, create a more attractive business climate to locate in Indiana, and create high-paying jobs for citizens in this region.

If the strategies, goals and tactics developed in this plan are implemented by the private and public sectors, we believe that the Northeast Region will continue to grow its reputation as a manufacturing and logistics hub, and ensure future success.

The countless hours and dedication of the volunteer executives from NERLC provide the Conexus Indiana Logistics Council, the Indiana Department of Transportation (INDOT), the Ports of Indiana, the Indiana Economic Development Corporation, along with regional and local economic groups and chambers of commerce, with a strong foundation to make the goals outlined in this plan a reality. A talented and dedicated staff at Conexus Indiana and the regional and local economic groups and chambers of commerce will carry out these initiatives and will drive the implementation of the tactics necessary to ensure the plan’s success.

We look forward to continuing the conversations on how to further develop the resources and infrastructure in the Northeast Region, and will continue our work by updating the plan on a regular basis making this a “living, breathing document.” We are committed to continue creating innovation, engagement, and vision ensuring economic results and impact for our region.

Respectfully,

Geary Buchanan President, Buchanan Hauling & Rigging, Inc.Chair, Northeast Regional Logistics Council

Page 7: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

V

TABLE OF CONTENTS

EXECUTIVE SUMMARY .....................................................................................1

PROBLEM STATEMENT ..............................................................................................1

MISSION STATEMENT .............................................................................................1

OBJECTIVES ............................................................................................................2

LOGISTICS STRATEGIES ....................................................................................3

INFRASTRUCTURE GOALS .........................................................................................3

PUBLIC POLICY GOALS .............................................................................................4

PUBLIC AWARENESS GOALS .....................................................................................4

WORKFORCE DEVELOPMENT GOALS ........................................................................4

IMPLEMENTATION TACTICS ............................................................................5

INFRASTRUCTURE .....................................................................................................5Regional Tactics .....................................................................................................5 Local Tactics ..........................................................................................................9

PUBLIC POLICY ......................................................................................................37

PUBLIC AWARENESS ..............................................................................................37

WORKFORCE DEVELOPMENT .................................................................................38

LOGISTICS MARKET ANALYSIS ....................................................................39

TRANSPORTATION MODE SWOT ANALYSIS .............................................................39

PUBLIC POLICY SWOT ANALYSIS .............................................................................43

WORKFORCE DEVELOPMENT SWOT ANALYSIS ........................................................47

PUBLIC AWARENESS SWOT ANALYSIS .....................................................................48

NORTHEAST REGION INFRASTRUCTURE DATA ...........................................................49

Page 8: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

1

EXECUTIVE SUMMARY:

NORTHEAST REGIONAL

LOGISTICS COUNCIL

The Conexus Indiana Northeast Regional Logistics Council (NERLC) is a forum of 36 logistics

executives and thought leaders from throughout Northeast Indiana representing the following

logistics sectors: air, infrastructure, rail, trucking, warehousing/distribution, waterborne, advanced

manufacturing and services firms. Logistics users are manufacturers, distributors/warehousing, and

third-party providers.

NERLC is working to:

◆◆ Enhance the environment for companies in advanced manufacturing and logistics to grow their business, taking advantage of Indiana’s position at the heart of the global supply chain;

◆◆ Create a more attractive environment for manufacturing and logistics companies to relocate to or expand in the Northeast Region, thereby creating jobs and increasing State and local revenue; and

◆◆ Create high paying jobs for Hoosiers – the average wage of Indiana manufacturing and logistics jobs is more than 33% higher than the State’s median income.

PROBLEM STATEMENT

The Northeast Region’s transportation network has opportunities for improvement due to

transportation “bottlenecks”; lack of direct rail service; underutilized air facilities with little

international freight movement; lack of efficient mode-to-mode connectivity (e.g. road to rail; road

to water; road to air; rail to water); a decaying lock and dam infrastructure; and lack of dredging

that prohibits barges/ships to maximize capacity. This disconnect has created higher costs,

potential environmental impacts, inefficient freight movement, loss of productivity for Northeast

Region businesses, and safety impacts.

MISSION STATEMENT

The mission of the Northeast Regional Logistics Council is to foster economic growth by driving

the development of the logistics industry in Northeast Indiana.

Page 9: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

2

OBJECTIVES

1. Executive Forum: Provide a forum for Northeast Region logistics executives to discuss

issues affecting the industry;

2. Infrastructure: Develop a comprehensive plan to strengthen the Northeast Region’s public

and private logistics infrastructure;

3. Public Awareness: Develop paid and earned media to promote the sector;

4. Public Policy: Identify State, Federal and local public policy areas that impact the logistics

industry and work with State and Federal thought leaders from government, academia

and associations to enhance the sector;

5. Workforce Development: Develop and implement strategies to build the human capital

needed to support the growing demand for logistics services through innovative workforce

programs in the Northeast Region.

Page 10: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

3

LOGISTICS STRATEGIES

◆◆ Increase the flow of goods originating, terminating, and adding value within the Northeast Region over the next five years, thereby, creating an increase of net new jobs and growing the logistics sector.

◆◆ Provide a broad-based forum, consisting of Northeast Region business executives throughout the logistics industry, for collectively vetting critical relevant logistics public policy issues of commonality, therefore optimizing the business climate.

◆◆ Strengthen and grow the logistics qualified workforce in the Northeast Region by creating portable skills curricula leading to academic degrees/certifications that will increase the pipeline of qualified workers over the next five years.

◆◆ Increase the public’s awareness of the importance of the logistics industry on the Northeast Region’s economy.

INFRASTRUCTURE GOALS

1. Reduce bottlenecks in the Northeast Region to improve the reliability and efficiency

of freight movement leading to less congestion, reduced infrastructure repairs, and

lower emissions.

2. Ensure global access by connecting Northeast Region cities based on impact and

potential to Interstate-like access.

3. Create better connectivity of Indiana’s water ports via roads and rail modes and improve the

reliability and efficiency of water freight movement to and from the Northeast Region.

4. Develop a fast and efficient process for unplanned economic development

infrastructure needs.

5. Develop and implement transportation networks that provide direct rail, truck access and

air cargo expansion leading to the improvement and establishment of multimodal and

intermodal service and air cargo facilities.

Page 11: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

4

PUBLIC POLICY GOALS

1. Ensure Federal, State and local Government do not legislate or regulate barriers to the

safe, efficient, and innovative movement of goods and resources that are necessary to

support the growth of the logistics sector.

2. Ensure Federal, State and local Government provide the necessary funding for the public

infrastructure needed to support the efficient and cost effective operation of the Northeast

Region’s logistics sector.

3. Ensure NERLC is recognized by governmental entities as a resource of first resort and the

voice for the logistics industry within the Northeast Region.

PUBLIC AWARENESS GOALS

1. Develop brand awareness of NERLC.

2. Create general public understanding of logistics by ensuring that the population has a

basic understanding of logistics.

3. Increase the perception of the need to improve/expand the Northeast

Region’s infrastructure.

4. Highlight the Northeast Region’s logistics companies by bringing awareness to their

products and services.

5. Increase the public’s understanding of the positive impact of global trade on the Northeast

Region’s economy and jobs.

WORKFORCE DEVELOPMENT GOALS

1. Increase the skill levels of the Northeast Region’s logistics workers through workforce

education programs.

2. Increase the upward mobility and job prospects of current and future Northeast Region

logistics workers.

Page 12: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

5

IMPLEMENTATION TACTICS

REGIONAL TACTICS IN SUPPORT OF ACHIEVING NERLC

INFRASTRUCTURE GOALS

◆ REGIONAL TACTICS IN SUPPORT OF ACHIEVING AVIATION GOALS

◆◆ Air Cargo Volume Study: Conduct a private sector study on air cargo volume for integrated and non-integrated freight and air passenger travel

◆ REGIONAL PRIORITY PROJECTS

PROJECT NUMBER COUNTY NORTHEAST REGIONAL PROJECTS TIER 1 TIER 2 TIER 3 TIER 4

0201 Allen, Whitley US 30 Limited Access

0202 Allen, Noble, Whitley US 33 Limited Access

3501 Allen, Huntington, Whitley, Noble, DeKalb I-469 Loop

1701/1702 DeKalb US 6 Limited Access and Heavy Truck Corridor

1704 Whitley, Allen, Noble, DeKalb SR 205 Improvements

2701/3502 Grant, Huntington, Whitley, Noble, LaGrange SR 9 Improvements

3802 Adams, Jay US 27 Improvements

9001/9002 Wells, Huntington Bluffton Connector

9004 Adams, Wells US 224 Improvements

3801 Blackford, Jay SR 26 Improvements

1703 DeKalb, Noble SR 8 Improvements

4407 Noble, LaGrange SR 5 Improvements

Page 13: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

!!

!

!

!

!

¹º»¼

!

¹º»¼

!

¬«727

¬«201

¬«106

¬«115

¬«110

¬«524

¬«23

¬«933

¬«22

¬«827

¬«127

¬«4

¬«10

¬«427

¬«301

¬«119

¬«167¬«931

¬«109

¬«930

¬«105

¬«67

¬«213

¬«116

¬«8

¬«331

¬«37

¬«205

¬«25

¬«327

¬«28

¬«14

¬«218

¬«114

¬«101

¬«16

¬«3

¬«5

¬«18¬«9

¬«124

¬«1

¬«120

¬«15

¬«26

¬«19

¬«13

£¤35

£¤224

£¤33

£¤30

£¤31

£¤24

£¤27

£¤6

£¤20

§̈¦469

§̈¦TOLL

§̈¦69

G R A N T

J A Y

A D A M S

W E L L S

CASS

B L A C K F O R D

S T E U B E N

D E K A L B

F U L T O N

T I P T O N D E L A W A R EM A D I S O N

N O B L E

MARSHALL

K O S C I U S K O

W A B A S HH U N T I N G T O N

M I A M I

R A N D O L P H

W H I T L E Y

A L L E N

H O W A R D

L A G R A N G E

E L K H A R T

ST JOSEPH

020

8

3803

050

1

440

3

7605

0201

350

3

9009

0206

9005

440

4

900

3

7603

3504

0211

920

2

4402

1703

7604

4406

020

7

0505

3502

0202

9004

020

9

1702

2701

850

1

3802

1701

9001

440

7

9008

1704

0202

3801

3502

3501

3502

76017602

0203

0210

4401

0204

0212

9002

0503

1705

Ü0 105

Miles

Coordinate System: NAD 1983 UTM Zone 16NProjection: Transverse MercatorDatum: North American 1983False Easting: 500,000.0000False Northing: 0.0000Central Meridian: -87.0000Scale Factor: 0.9996Latitude Of Origin: 0.0000Units: Meter

Private Sector Identified Regional NeedsNortheast Region

IdentifiedEnhancementCategories for Localand State Facilities

Mobility Improvements(Added travel lanes,freeway upgrade)

State Facility

New Terrain, State

Facility

Local Facility

New Terrain, Local

Facility

New Rail Capacity(new rail line or added

capacity)

OperationalImprovements(Intersectionimprovements, newinterchange, interchangemodification, and spotimprovements)

! State Facility

! Local Facility

¹º»¼Rail Crossing

Improvement

Multi-ModalEnhancements

o Airport Improvements

!Î Port Improvements

Other Facilities

Non-Interstate

Interstate

Existing Rail

Navigable Streams

Corp. Limits

Data; Indiana GIS Library & Stakeholder Input

INDOT Engineering & Asset Management

Please Note: This map depicts non-committed, non-funded, conceptual regional transportationinfrastructure needs identified by the private sector. These needs are displayed as placeholdersfor graphic representation. Use of this map should be limited to preliminary planning purposesonly. Additional planning, environmental study, and cost-benefit analysis is needed to identifyoptimum alternatives, actual corridor alignments, and system impact to support further decisionmaking. Also note, the data used to create this map are from the best known source at thetime and is subject to change.

State Facilities are US, StateRoute, or US Highway funded with state and federal funds.

Local Facilities are non-statejursidiction facilities that canuse state or local funds.

Date: 6/22/2015

Page 14: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

7

◆ REGIONAL TACTICS IN SUPPORT OF ACHIEVING INTERSTATE/HIGHWAY GOALS

◆◆ Project 0201: US 30 Limited Access – Convert the existing 4-lane highway to a 4-lane full access-controlled freeway with interchanges at major intersections. Reason: Relieve the combined bottleneck truck and passenger car congestion on US 30 creating better truck traffic flow for the movement of cargo.

Estimated Cost: $933.5 million

◆◆ Project 0202: US 33 Limited Access – Convert the existing 2-lane highway to 4-lane full access-controlled freeway with interchanges at major intersections from the Ohio State line to Elkhart, Indiana. Reason: Safety of trucks moving cargo ensuring better truck traffic flow for the movement of cargo and also creates economic development by allowing for easier truck access to and from Fort Wayne and North Central Indiana.

Estimated Cost: $1.55 billion

◆◆ Project 1701/1702: US 6 Limited Access and Heavy Truck Corridor – Upgrade the existing 2-lane highway to 4-lane full access-controlled freeway with interchanges at major intersections from West of Kendallville to Ohio Border and designate it a heavy haul route. Reason: Relieve the combined bottleneck truck and passenger car congestion ensuring safety of trucks on US 6 creating better truck traffic flow for the movement of cargo and create economic development by allowing easier truck access from US 6 to I-69 and the State of Ohio.

Estimated Cost: $135 million (1701); $178.4 million (1702)

◆◆ Project 1703: SR 8 Improvements – Improve and widen SR 8 from SR 3 to SR 327. Reason: Safety of trucks moving cargo ensuring better truck traffic flow for the movement of cargo and also creates economic development by allowing for easier truck access to and from Garrett, Indiana, and Auburn, Indiana.

Estimated Cost: $18.4 million

◆◆ Project 1704: SR 205 Improvements – Improve and widen SR 205 from US 30 in Columbia City to I-69. Reason: Safety of trucks moving cargo ensuring better truck traffic flow for the movement of cargo.

Estimated Cost: $103.3 million

◆◆ Project 2701/3502: SR 9 Improvements – Improve and widen SR 9 to a “Super-2” from Marion, Indiana, to I-80/90 Toll Road. Reason: Safety of trucks moving cargo ensuring better truck traffic flow for the movement of cargo and also creates economic development by allowing for easier truck access to and from communities from Marion, Indiana, to I-80/90 Toll Road.

Estimated Cost: $303.8 million

Page 15: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

8

◆◆ Project 3501: I-469 Loop – Extend from the Roanoke exit at I-69 to East of Columbia City extending to the Auburn exit at I-69. Reason: Relieve the combined bottleneck truck and passenger car congestion on I-69, US 24, US 30, and US 33 creating better truck traffic flow for the movement of cargo and create economic development by allowing for easier truck access around Fort Wayne and surrounding cities and towns.

Estimated Cost: $736 million

◆◆ Project 3801: SR 26 Improvements – Improve and widen SR 26 to a “Super-2” from I-69 to US 27. Reason: Create economic development by allowing for easier truck access to and from Portland, Indiana.

Estimated Cost: $144 million

◆◆ Project 3802: US 27 Improvements – Improve and widen US 27 to a “Super-2” from Monroe, Indiana, to I-70 in Richmond, Indiana. Reason: Safety of trucks moving cargo ensuring better truck traffic flow for the movement of cargo and also creates economic development by allowing for easier truck access to and from communities from Fort Wayne, Indiana, to Richmond, Indiana.

Estimated Cost: $249 million

◆◆ Project 4407: SR 5 Improvements – Improve and widen SR 5 from I-80/90 to US 33 at Ligonier, Indiana. Reason: Safety of trucks moving cargo ensuring better truck traffic flow for the movement of cargo.

Estimated Cost: $60.5 million

◆◆ Project 9001/9002: Bluffton Connector – Convert the existing SR 124 2-lane highway to a 4-lane full access-controlled freeway with interchanges at major intersections and a new interchange from I-69 to Bluffton, Indiana. Reason: Ensure global access by connecting cities based on impact and potential to Interstate-like access.

Estimate Cost: $141 million

◆◆ Project 9004: US 224 Improvements – Improve and widen US 224 from I-69 to US 27. Reason: Safety of trucks moving cargo ensuring better truck traffic flow for the movement of cargo.

Estimated Cost: $90.4 million

◆◆ Project N/A: Edgerton, Ohio Rail Grade Separation – Build and design a rail grade separation on US 6 near Indiana Street and Ash Street. Reason: Relieve the bottleneck of combined truck and passenger car congestion creating better truck traffic flow for the movement of cargo.

Estimated Cost: Not Available

◆ REGIONAL TACTICS IN SUPPORT OF ACHIEVING RAIL GOALS

◆◆ Project 0212: Fort Wayne Intermodal – Expand the Triple Crown Rail Yard in Fort Wayne, Indiana, that would provide East Coast intermodal rail service from Norfolk, Virginia, (through Columbus, Ohio) via Norfolk Southern Railway. Reason: Provide direct rail access leading to the improvement and establishment of intermodal service facilities.

Estimated Cost: $22.7 million

Page 16: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

9

◆ LOCAL PRIORITY PROJECTS

PROJECT NUMBER COUNTY NORTHEAST LOCAL PROJECTS TIER 1 TIER 2 TIER 3 TIER 4

0203 Allen US 24/I-69 Interchange Improvements

0212 Allen Fort Wayne Intermodal

7601 Steuben I-80/90 I-69 Interchange Improvements

0204 Allen Adams Center Road/I-469 Interchange Improvements

0205 Allen Ryan/Bruick Road Improvements

0206 Allen CR 900 North/Lafayette Center Road Improvements

0207 Allen Adams Center Road Improvements

0208 Allen Anthony Boulevard Rail Grade Separation

0209 Allen West County Line Road/CR South 800 East Improvements

0211 Allen Ryan Road/US 24 Interchange Improvements

1705 DeKalb SR 8/I-69 Interchange Improvements

3803 Jay SR 67 and SR 26 Intersection Upgrade

7602 Steuben I-80/90 SR 327 Interchange

7603 Steuben SR 120 Improvements

7604 Steuben South Angola Bypass

9003 Wells SR 1 Improvements

0210 Allen Coverdale Road Interchange

0502 Blackford SR 26 Reconfiguration

0505 Blackford SR 18 Improvements

4402 LaGrange CR West 600 South Improvements

4403 LaGrange SR 5/CR West 700 South Truck Turn Lane

4404 LaGrange CR 600 West Improvements

4406 LaGrange CR West 200 North Improvements

7605 Steuben East CR 200 North/East Wendell Jacob Avenue Improvements

7608 Steuben I-69/US 20 Frontage Roads

8501 Wabash CR 500 East Improvements

Page 17: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

10

PROJECT NUMBER COUNTY NORTHEAST LOCAL PROJECTS TIER 1 TIER 2 TIER 3 TIER 4

9005 Wells East CR 200 South Truck Corridor

9006 Wells Harvest Road Extension

9007 Wells Western Avenue Relocation

9008 Wells Wabash Central Railroad Improvements

9009 Wells East CR 850 North Improvements

N/A Out of State Edgerton, Ohio Rail Grade Separation

0501 Blackford Hartford City Industrial Park Rail Grade Separation

0503 Blackford Norfolk Southern Hartford City Industry Rail Spurs

3503 Huntington Markle Industrial Park Improvements

3504 Huntington Waterworks Road Realignment

4401 LaGrange Fawn River Crossing Industrial Park Improvements

7606 Steuben North Baker Road Improvements

7607 Steuben West Maple Street Extension

9201 Whitley Lincolnway Improvements

9202 Whitley CR 600 East Improvements

Page 18: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

11

ADAMS COUNTYPROJECTS

◆◆ *Project 0202: US 33 Limited Access – This is a regional project reflected on the map on page 6.

◆◆ *Project 3802: US 27 Improvements – This is a regional project reflected on the map on page 6.

◆◆ *Project 9004: US 224 Improvements – This is a regional project reflected on the map on page 6.

* These projects are reflected in other sections of this report.

Page 19: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

Berne

Monroe

Decatur

Geneva

¬«201

¬«101

¬«101

¬«101

¬«301

¬«116

¬«124

¬«218

9004

3802

0202

£¤224

£¤33

£¤224

£¤27

Private Sector Identified Regional NeedsNortheast Region: Adams County

Ü0 2.51.25

MilesCoordinate System: NAD 1983 UTM Zone 16NProjection: Transverse MercatorDatum: North American 1983False Easting: 500,000.0000False Northing: 0.0000Central Meridian: -87.0000Scale Factor: 0.9996Latitude Of Origin: 0.0000Units: Meter

Please Note: This map depicts non-committed, non-funded, conceptual regionaltransportation infrastructure needs identified by the private sector. These needs are displayed as placeholders for graphic representation. Use of this map should belimited to preliminary planning purposes only. Additional planning, environmentalstudy, and cost-benefit analysis is needed to identify optimum alternatives, actual corridor alignments, and system impact to support further decision making. Also note, the data used to create this map are from the best known source at the time and issubject to change.

Date: 4/14/2015

Identified

Enhancement

Categories for Local

and State Facilities

Mobility Improvements(Added travel lanes,freeway upgrade)

State Facility

New Terrain, StateFacility

Local Facility

New Terrain, LocalFacility

New Rail Capacity(new rail line or

added capacity)

Operational Improvements(Intersection improvement,

new interchange,interchange modification,

and spot improvements)

! State Facility

! Local Facility

¹º»¼Rail CrossingImprovement

Multi-ModalEnhancements

oAirportImprovements

!Î Port Improvements

Other Facilities

Existing Rail

Non-Interstate

Interstate

Navigable Streams

Corp. Limits

Data; Indiana GIS Library & Stakeholder Input

INDOT Engineering & Asset Management

State Facilities are US, StateRoute, or US Highway funded with state and federal funds.

Local Facilities are non-statejursidiction facilities that can use state or local funds.

0202

Page 20: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

13

ALLEN

CO

UN

TY

PRO

JEC

TS

◆◆*P

roje

ct 0

201: U

S 30 L

imite

d A

cces

s –

This is

a reg

iona

l pro

ject

re

flect

ed o

n th

e m

ap o

n pa

ge 6

.

◆◆*P

roje

ct 0

202: U

S 33 L

imite

d A

cces

s –

This is

a reg

iona

l pro

ject

re

flect

ed o

n th

e m

ap o

n pa

ge 6

.

◆◆Pr

ojec

t 020

3: U

S 24

/I-6

9 In

terc

hang

e Im

prov

emen

ts –

Re-

engi

neer

, re

confi

gure

and

rede

sign

US

24 in

terc

hang

e at

I-69 in

to c

love

rleaf

des

ign.

Re

ason

: Re

lieve

the

bottlen

eck

of c

ombi

ned

truck

and

pas

seng

er c

ar

cong

estio

n cr

eatin

g be

tter t

ruck

traf

fic fl

ow fo

r the

mov

emen

t of c

argo

.Es

timat

ed C

ost:

$4

0 m

illio

n

◆◆Pr

ojec

t 020

4: A

dam

s C

ente

r Ro

ad/I

-469

Inte

rcha

nge

Impr

ovem

ents –

Re

-eng

inee

r, re

confi

gure

and

rede

sign

Ada

ms

Cen

ter R

oad

inte

rcha

nge

at

I-469 in

to c

love

rleaf

des

ign.

Rea

son:

Rel

ieve

the

bottle

neck

of c

ombi

ned

truck

and

pas

seng

er c

ar c

onge

stion

cre

atin

g be

tter t

ruck

traf

fic fl

ow fo

r the

m

ovem

ent o

f car

go.

Estim

ated

Cos

t: $

20

mill

ion

◆◆Pr

ojec

t 020

5: R

yan/

Brui

ck R

oad

Impr

ovem

ents –

Impr

ove

and

wid

en

Ryan

/Br

uick

Roa

d fro

m U

S 24 to

US

30. Re

ason

: Re

lieve

the

bottlen

eck

of

com

bine

d tru

ck a

nd p

asse

nger

car

con

gesti

on c

reat

ing

bette

r tru

ck tr

affic

flo

w fo

r the

mov

emen

t of c

argo

and

cre

ate

econ

omic

dev

elop

men

t by

allo

win

g fo

r eas

ier t

ruck

acc

ess

to a

nd fr

om F

ort W

ayne

indu

stry.

Estim

ated

Cos

t: $

20

mill

ion

◆◆*P

roje

ct 0

206:

CR

900

Nor

th/L

afay

ette

Cen

ter

Road

Impr

ovem

ents –

Thi

s is a

loca

l pro

ject

refle

cted

in th

e H

untin

gton

Cou

nty

map

on

page

22.

◆◆Pr

ojec

t 0207: A

dam

s C

ente

r Ro

ad Im

prov

emen

ts –

Impr

ove,

wid

en

and

incl

ude

cent

er tu

rn la

ne fr

om S

R 930

to I-

46

9.

Reas

on:

Relie

ve th

e bo

ttlen

eck

of c

ombi

ned

truck

and

pas

seng

er c

ar c

onge

stio

n cr

eatin

g be

tter tru

ck tr

affic

flow

for th

e m

ovem

ent o

f car

go.

Estim

ated

Cos

t: $

42

.4 m

illio

n

◆◆Pr

ojec

t 0208:

Ant

hony

Bou

leva

rd R

ail G

rade

Sep

arat

ion

– Bu

ild a

nd

design

a rai

l gra

de s

epar

atio

n on

Sou

th A

ntho

ny B

oule

vard

Sou

th o

f H

ayde

n St

reet

. A

lso,

re-

engi

neer

, re

confi

gure

and

red

esig

n th

e vi

aduc

t on

Sou

th A

ntho

ny B

oule

vard

Nor

th o

f Cre

ight

on A

venu

e. Re

ason

: Re

lieve

the

com

bine

d bo

ttlen

eck

truck

and

pas

seng

er c

ar c

onge

stio

n an

d en

sure

saf

ety

of tr

ucks

on

Ant

hony

Bou

leva

rd c

reat

ing

bette

r tru

ck tr

affic

flo

w fo

r th

e m

ovem

ent o

f car

go.

Estim

ated

Cos

t: $

20

mill

ion

◆◆Pr

ojec

t 0209:

Wes

t Cou

nty

Line

Roa

d/C

R So

uth

80

0 E

ast I

mpr

ovem

ents

Impr

ove

and

wid

en W

est C

ount

y Lin

e Ro

ad/

CR

Sout

h 8

00

Eas

t fro

m

US

30

to U

S 2

4.

Rea

son:

Saf

ety

of tr

ucks

mov

ing

carg

o en

surin

g be

tter

truck

traf

fic fl

ow fo

r th

e m

ovem

ent o

f car

go.

Estim

ated

Cos

t: $

34

mill

ion

◆◆Pr

ojec

t 0210:

Cov

erda

le R

oad

Inte

rcha

nge

– D

esig

n an

d bu

ild a

new

in

terc

hang

e co

nnec

ting

I-46

9 to

Cov

erda

le R

oad.

Re

ason

: C

reat

e ec

onom

ic d

evel

opm

ent b

y al

low

ing

for ea

sier

truc

k ac

cess

to a

nd fr

om

the

Fort

Way

ne In

tern

atio

nal A

irpor

t.Es

timat

ed C

ost:

Not

Ava

ilabl

e

◆◆Pr

ojec

t 0211:

Ryan

Roa

d/U

S 2

4 In

terc

hang

e Im

prov

emen

ts –

Re-

engi

neer

, re

confi

gure

and

red

esig

n Ry

an R

oad

inte

rcha

nge

at U

S 2

4

into

clo

verle

af d

esig

n. R

easo

n: R

elie

ve th

e bo

ttlen

eck

of c

ombi

ned

truck

an

d pa

ssen

ger ca

r co

nges

tion

and

ensu

re s

afet

y of

truc

ks m

ovin

g ca

rgo

crea

ting

bette

r tru

ck tr

affic

flow

for th

e m

ovem

ent o

f car

go.

◆◆*P

roje

ct 0

212:

Fort

Way

ne In

term

odal

– T

his

is a

reg

iona

l pro

ject

re

flect

ed o

n th

e m

ap o

n pa

ge 6

.

◆◆*P

roje

ct 1

704:

SR 2

05 Im

prov

emen

ts –

Thi

s is a

reg

iona

l pro

ject

re

flect

ed o

n th

e m

ap o

n pa

ge 6

.

◆◆*P

roje

ct 3

501:

I-469 L

oop

– Th

is is

a reg

iona

l pro

ject

refl

ecte

d on

the

map

on

page

6.

◆◆*P

roje

ct 9

003:

SR 1

Impr

ovem

ents

– T

his

is a

loca

l pro

ject

refl

ecte

d in

the

Wel

ls C

ount

y m

ap o

n pa

ge 3

4.

* Th

ese

proj

ects a

re refl

ecte

d in

oth

er s

ectio

ns o

f thi

s re

port.

Page 21: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

!

!

!

¹º»¼

¬ «9

¬ «1

¬ «114

¬ «14

¬ «3

¬ «930

¬ «1

¬ «37¬ «20

5

¬ «101

¬ «101

£ ¤30

£ ¤24

£ ¤30

£ ¤24

£ ¤33

£ ¤27

§̈ ¦469

§̈ ¦469

§̈ ¦69

§̈ ¦69

Hunte

rtow

n

Fort

Wayne

Leo-C

edarv

ille

Gra

bill

New

Haven

Zan

esvill

e

Wo

odburn

Monro

evill

e

0205

0208

90030206

0201

0202

0211

0207 0202

1704

0209

3501

0203

0210

0204

0212

Ü 03.5

1.7

5

Mile

s

Da

te:

4/1

3/2

01

5

Coo

rdin

ate

Syste

m: N

AD

19

83

UT

M Z

one

16

NP

roje

ctio

n:

Tra

nsve

rse

Me

rca

tor

Datu

m:

No

rth

Am

erica

n 1

98

3F

als

e E

astin

g: 5

00

,00

0.0

00

0F

als

e N

ort

hin

g:

0.0

00

0C

en

tra

l M

eri

dia

n:

-87.0

00

0S

cale

Fa

cto

r: 0

.99

96

La

titu

de

Of O

rig

in:

0.0

00

0U

nits:

Me

ter

Pri

va

te S

ecto

r Id

en

tified

Reg

ion

al N

ee

ds

Data

: In

dia

na

GIS

Lib

rary

& S

take

ho

lde

r In

pu

t

IND

OT

Eng

ine

eri

ng

& A

sse

t M

an

ag

em

en

t

Ple

ase

No

te:

This

ma

p d

epic

ts n

on-c

om

mitte

d,

no

n-f

un

de

d, co

nce

ptu

al re

gio

nal tr

an

sp

ort

atio

nin

fra

str

uctu

re n

ee

ds id

en

tifie

d b

y t

he

pri

va

te s

ecto

r. T

he

se

ne

ed

s a

re d

isp

layed

as p

lace

ho

lde

rsfo

r gra

ph

ic r

ep

rese

nta

tio

n.

Use

of

this

ma

p s

ho

uld

be

lim

ite

d t

o p

relim

inary

pla

nn

ing p

urp

ose

son

ly.

Ad

ditio

nal p

lan

nin

g, e

nvir

on

me

nta

l stu

dy,

an

d c

ost-

be

nefit

ana

lysis

is n

ee

de

d to

id

entify

op

tim

um

alte

rna

tive

s, a

ctu

al co

rrid

or

alig

nm

en

ts,

an

d s

yste

m im

pact

to s

up

port

fu

rth

er

de

cis

ion

makin

g.

Als

o n

ote

, th

e d

ata

use

d t

o c

rea

te t

his

ma

p a

re f

rom

th

e b

est

kn

ow

n s

ou

rce

at

the

tim

e a

nd

is s

ub

ject

to c

ha

ng

e.

No

rth

ea

st

Re

gio

n ;

Alle

n C

ou

nty

Ide

nti

fie

d E

nh

an

ce

me

nt

Ca

teg

ori

es

fo

r L

oc

al

an

d

Sta

te F

ac

ilit

ies

Ce

ntr

al

Mo

bil

ity

Im

pro

ve

me

nts

(Ad

de

d t

rav

el

lan

es

,

free

wa

y u

pg

rad

e)

Sta

te F

acili

ty

New

Te

rra

in,

Sta

te

Fa

cili

ty

Lo

ca

l F

acili

ty

New

Te

rra

in,

Lo

ca

l

Fa

cili

ty

New

Ra

il C

ap

acity

(ne

w r

ail

line

or

ad

de

d

ca

pa

city)

Op

era

tio

na

l Im

pro

ve

me

nts

(In

ters

ec

tio

n i

mp

rove

me

nts

,

ne

w i

nte

rch

an

ge

,

inte

rch

an

ge m

od

ific

ati

on

,an

d s

po

t im

pro

ve

me

nts

)

!S

tate

Fa

cili

ty

!Lo

ca

l F

acili

ty

¹º»¼R

ail

Cro

ssin

gIm

pro

ve

me

nt

Mu

lti-

Mo

da

l

En

han

cem

en

ts

oA

irp

ort

Im

pro

ve

me

nts

!ÎP

ort

Im

pro

ve

me

nts

Sta

te F

acili

tie

s a

re U

S,

Sta

teR

ou

te,

or

US

Hig

hw

ay f

un

de

d

with

sta

te a

nd f

ed

era

l fu

nd

s.

Lo

ca

l F

acili

tie

s a

re n

on

-sta

teju

rsid

iction

fa

cili

tie

s t

ha

t ca

nuse

sta

te o

r lo

ca

l fu

nd

s.

Oth

er

Fa

cilit

ies

Exis

tin

g R

ail

No

n-I

nte

rsta

te

Inte

rsta

te

Na

vig

ab

le S

tre

am

s

Co

rp. L

imits

3501

Page 22: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

15

BLA

CK

FO

RD

CO

UN

TY

PRO

JEC

TS

◆◆Pr

ojec

t 05

01

: H

artfo

rd C

ity In

dust

rial

Par

k Ra

il G

rade

Se

para

tion

– Ex

tend

Nor

th W

abas

h A

venu

e fro

m F

rank

lin

Stre

et to

Was

hing

ton

Stre

et.

Also,

bui

ld a

nd d

esig

n a

rail

grad

e se

para

tion

over

the

Cen

tral R

ailro

ad C

o.

of In

dian

apol

is rai

l lin

e.

Reas

on:

Cre

ate

econ

omic

de

velo

pmen

t by

allo

win

g fo

r ea

sier

truc

k ac

cess

to a

nd fr

om

the

Har

ford

City

Indu

stria

l Par

k.Es

timat

ed C

ost:

$7

mill

ion

◆◆Pr

ojec

t 05

02

: SR

26

Rec

onfig

urat

ion

– Re

-eng

inee

r, re

confi

gure

and

red

esig

n SR

26

nea

r Ea

st W

ashi

ngto

n St

reet

to

elim

inat

e tw

o 9

turn

s. R

easo

n: R

elie

ve th

e bo

ttlen

eck

of

com

bine

d tru

ck a

nd p

asse

nger

car

con

gestio

n an

d en

sure

sa

fety

of t

ruck

s m

ovin

g ca

rgo

crea

ting

bette

r tru

ck tr

affic

flow

fo

r th

e m

ovem

ent o

f car

go.

Estim

ated

Cos

t: $

4 m

illio

n

◆◆Pr

ojec

t 05

03

: N

orfo

lk S

outh

ern

Har

tford

City

Indu

stry

Rai

l Sp

urs

– D

esig

n an

d bu

ild rai

l spu

rs a

long

Nor

folk

Sou

ther

n ra

il lin

e ne

ar U

S 2

6.

Reas

on:

Cre

ate

econ

omic

dev

elop

men

t by

giv

ing

furth

er rai

l acc

ess

to H

artfo

rd C

ity in

dustry

.Es

timat

ed C

ost:

$3

mill

ion

◆◆Pr

ojec

t 05

05

: SR

18

Impr

ovem

ents

– Im

prov

e an

d w

iden

SR

18

from

Mon

tpel

ier W

est t

o I-6

9.

Reas

on:

Relie

ve th

e bo

ttlen

eck

of c

ombi

ned

truck

and

pas

seng

er c

ar c

onge

stio

n cr

eatin

g be

tter tru

ck tr

affic

flow

for th

e m

ovem

ent o

f car

go.

Estim

ated

Cos

t: $

14

8.8

mill

ion

◆◆*P

roje

ct 3

801:

SR

26 Im

prov

emen

ts –

Thi

s is a

regi

onal

pr

ojec

t refl

ecte

d on

the

map

on

page

6.

* Th

ese

proj

ects a

re refl

ecte

d in

oth

er s

ectio

ns o

f thi

s re

port.

Page 23: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

¹º»¼

¬ «26

¬ «22

¬ «167

¬ «5

¬ «3¬ «3

¬ «1¬ «1

¬ «18¬ «18

¬ «26¬ «26

Sham

rock

Lake

s

Montp

elie

r

Hart

ford

City

0505

0502

0501

3801

0503

Ü 02

1

Mile

s

Da

te:

4/1

3/2

01

5

Coo

rdin

ate

Syste

m: N

AD

19

83

UT

M Z

one

16

NP

roje

ctio

n:

Tra

nsve

rse

Me

rca

tor

Datu

m:

No

rth

Am

erica

n 1

98

3F

als

e E

astin

g: 5

00

,00

0.0

00

0F

als

e N

ort

hin

g:

0.0

00

0C

en

tra

l M

eri

dia

n:

-87.0

00

0S

cale

Fa

cto

r: 0

.99

96

La

titu

de

Of O

rig

in:

0.0

00

0U

nits:

Me

ter

Pri

va

te S

ecto

r Id

en

tified

Reg

ion

al N

ee

ds

Data

: In

dia

na

GIS

Lib

rary

& S

take

ho

lde

r In

pu

t

IND

OT

Eng

ine

eri

ng

& A

sse

t M

an

ag

em

en

t

Ple

ase

No

te:

This

ma

p d

epic

ts n

on-c

om

mitte

d,

no

n-f

un

de

d, co

nce

ptu

al re

gio

nal tr

an

sp

ort

atio

nin

fra

str

uctu

re n

ee

ds id

en

tifie

d b

y t

he

pri

va

te s

ecto

r. T

he

se

ne

ed

s a

re d

isp

layed

as p

lace

ho

lde

rsfo

r gra

ph

ic r

ep

rese

nta

tio

n.

Use

of

this

ma

p s

ho

uld

be

lim

ite

d t

o p

relim

inary

pla

nn

ing p

urp

ose

son

ly.

Ad

ditio

nal p

lan

nin

g, e

nvir

on

me

nta

l stu

dy,

an

d c

ost-

be

nefit

ana

lysis

is n

ee

de

d to

id

entify

op

tim

um

alte

rna

tive

s, a

ctu

al co

rrid

or

alig

nm

en

ts,

an

d s

yste

m im

pact

to s

up

port

fu

rth

er

de

cis

ion

makin

g.

Als

o n

ote

, th

e d

ata

use

d t

o c

rea

te t

his

ma

p a

re f

rom

th

e b

est

kn

ow

n s

ou

rce

at

the

tim

e a

nd

is s

ub

ject

to c

ha

ng

e.

No

rth

ea

st

Re

gio

n ;

Bla

ckfo

rd C

ou

nty

Ide

nti

fie

d E

nh

an

ce

me

nt

Ca

teg

ori

es

fo

r L

oc

al

an

d

Sta

te F

ac

ilit

ies

Ce

ntr

al

Mo

bil

ity

Im

pro

ve

me

nts

(Ad

de

d t

rav

el

lan

es

,

free

wa

y u

pg

rad

e)

Sta

te F

acili

ty

New

Te

rra

in,

Sta

te

Fa

cili

ty

Lo

ca

l F

acili

ty

New

Te

rra

in,

Lo

ca

l

Fa

cili

ty

New

Ra

il C

ap

acity

(ne

w r

ail

line

or

ad

de

d

ca

pa

city)

Op

era

tio

na

l Im

pro

ve

me

nts

(In

ters

ec

tio

n i

mp

rove

me

nts

,

ne

w i

nte

rch

an

ge

,

inte

rch

an

ge m

od

ific

ati

on

,an

d s

po

t im

pro

ve

me

nts

)

!S

tate

Fa

cili

ty

!Lo

ca

l F

acili

ty

¹º»¼R

ail

Cro

ssin

gIm

pro

ve

me

nt

Mu

lti-

Mo

da

l

En

han

cem

en

ts

oA

irp

ort

Im

pro

ve

me

nts

!ÎP

ort

Im

pro

ve

me

nts

Sta

te F

acili

tie

s a

re U

S,

Sta

teR

ou

te,

or

US

Hig

hw

ay f

un

de

d

with

sta

te a

nd f

ed

era

l fu

nd

s.

Lo

ca

l F

acili

tie

s a

re n

on

-sta

teju

rsid

iction

fa

cili

tie

s t

ha

t ca

nuse

sta

te o

r lo

ca

l fu

nd

s.

Oth

er

Fa

cilit

ies

Exis

tin

g R

ail

No

n-I

nte

rsta

te

Inte

rsta

te

Na

vig

ab

le S

tre

am

s

Co

rp. L

imits

Page 24: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

17

◆◆*P

roje

ct 1

70

1/1

70

2:

US

6 L

imite

d A

cces

s an

d H

eavy

Tru

ck

Cor

rido

r –

This is

a reg

iona

l pro

ject

refl

ecte

d on

the

map

on

page

6.

◆◆*P

roje

ct 1

70

3:

SR 8

Impr

ovem

ents

– T

his

is a

reg

iona

l pr

ojec

t refl

ecte

d on

the

map

on

page

6.

◆◆*P

roje

ct 1

70

4:

SR 2

05

Impr

ovem

ents

– T

his

is a

reg

iona

l pr

ojec

t refl

ecte

d on

the

map

on

page

6.

◆◆Pr

ojec

t 17

05

: SR

8/I

-69

Inte

rcha

nge

Impr

ovem

ents

– R

e-en

gine

er, re

confi

gure

and

red

esig

n SR

8 in

terc

hang

e at

I-6

9.

Reas

on:

Safe

ty o

f tru

cks

mov

ing

carg

o en

surin

g be

tter

truck

traf

fic fl

ow fo

r th

e m

ovem

ent o

f car

go a

nd a

lso

crea

tes

econ

omic

dev

elop

men

t by

allo

win

g fo

r ea

sier

truc

k ac

cess

to

and

from

Gar

rett,

Indi

ana,

and

Aub

urn,

Indi

ana.

Estim

ated

Cos

t: $

2 m

illio

n

◆◆*P

roje

ct 3

501:

I-46

9 Lo

op –

Thi

s is a

regi

onal

pro

ject

re

flect

ed o

n th

e m

ap o

n pa

ge 6

.

DEK

ALB

CO

UN

TY

PRO

JEC

TS

* Th

ese

proj

ects a

re refl

ecte

d in

oth

er s

ectio

ns o

f thi

s re

port.

Page 25: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

!

¬ «8

¬ «37

¬ «8

¬ «3

¬ «101

¬ «327

¬ «327

¬ «205

¬ «427

¬ «3

¬ «8¬ «8

¬ «1

¬ «1

£ ¤6£ ¤6

§̈ ¦69

§̈ ¦69

Butler

Alto

na

St. J

oe

Coru

nna

Wate

rlo

o

Garr

ett

Ash

ley

Auburn

1704

1703

1704

3501

1702

1701

1705

Ü 02.5

1.2

5

Mile

s

Da

te:

4/1

3/2

01

5

Coo

rdin

ate

Syste

m: N

AD

19

83

UT

M Z

one

16

NP

roje

ctio

n:

Tra

nsve

rse

Me

rca

tor

Datu

m:

No

rth

Am

erica

n 1

98

3F

als

e E

astin

g: 5

00

,00

0.0

00

0F

als

e N

ort

hin

g:

0.0

00

0C

en

tra

l M

eri

dia

n:

-87.0

00

0S

cale

Fa

cto

r: 0

.99

96

La

titu

de

Of O

rig

in:

0.0

00

0U

nits:

Me

ter

Pri

va

te S

ecto

r Id

en

tified

Reg

ion

al N

ee

ds

Data

: In

dia

na

GIS

Lib

rary

& S

take

ho

lde

r In

pu

t

IND

OT

Eng

ine

eri

ng

& A

sse

t M

an

ag

em

en

t

Ple

ase

No

te:

This

ma

p d

epic

ts n

on-c

om

mitte

d,

no

n-f

un

de

d, co

nce

ptu

al re

gio

nal tr

an

sp

ort

atio

nin

fra

str

uctu

re n

ee

ds id

en

tifie

d b

y t

he

pri

va

te s

ecto

r. T

he

se

ne

ed

s a

re d

isp

layed

as p

lace

ho

lde

rsfo

r gra

ph

ic r

ep

rese

nta

tio

n.

Use

of

this

ma

p s

ho

uld

be

lim

ite

d t

o p

relim

inary

pla

nn

ing p

urp

ose

son

ly.

Ad

ditio

nal p

lan

nin

g, e

nvir

on

me

nta

l stu

dy,

an

d c

ost-

be

nefit

ana

lysis

is n

ee

de

d to

id

entify

op

tim

um

alte

rna

tive

s, a

ctu

al co

rrid

or

alig

nm

en

ts,

an

d s

yste

m im

pact

to s

up

port

fu

rth

er

de

cis

ion

makin

g.

Als

o n

ote

, th

e d

ata

use

d t

o c

rea

te t

his

ma

p a

re f

rom

th

e b

est

kn

ow

n s

ou

rce

at

the

tim

e a

nd

is s

ub

ject

to c

ha

ng

e.

No

rth

ea

st

Re

gio

n ;

De

ka

lb C

ou

nty

Ide

nti

fie

d E

nh

an

ce

me

nt

Ca

teg

ori

es

fo

r L

oc

al

an

d

Sta

te F

ac

ilit

ies

Ce

ntr

al

Mo

bil

ity

Im

pro

ve

me

nts

(Ad

de

d t

rav

el

lan

es

,

free

wa

y u

pg

rad

e)

Sta

te F

acili

ty

New

Te

rra

in,

Sta

te

Fa

cili

ty

Lo

ca

l F

acili

ty

New

Te

rra

in,

Lo

ca

l

Fa

cili

ty

New

Ra

il C

ap

acity

(ne

w r

ail

line

or

ad

de

d

ca

pa

city)

Op

era

tio

na

l Im

pro

ve

me

nts

(In

ters

ec

tio

n i

mp

rove

me

nts

,

ne

w i

nte

rch

an

ge

,

inte

rch

an

ge m

od

ific

ati

on

,an

d s

po

t im

pro

ve

me

nts

)

!S

tate

Fa

cili

ty

!Lo

ca

l F

acili

ty

¹º»¼R

ail

Cro

ssin

gIm

pro

ve

me

nt

Mu

lti-

Mo

da

l

En

han

cem

en

ts

oA

irp

ort

Im

pro

ve

me

nts

!ÎP

ort

Im

pro

ve

me

nts

Sta

te F

acili

tie

s a

re U

S,

Sta

teR

ou

te,

or

US

Hig

hw

ay f

un

de

d

with

sta

te a

nd f

ed

era

l fu

nd

s.

Lo

ca

l F

acili

tie

s a

re n

on

-sta

teju

rsid

iction

fa

cili

tie

s t

ha

t ca

nuse

sta

te o

r lo

ca

l fu

nd

s.

Oth

er

Fa

cilit

ies

Exis

tin

g R

ail

No

n-I

nte

rsta

te

Inte

rsta

te

Na

vig

ab

le S

tre

am

s

Co

rp. L

imits

Page 26: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

19

◆◆*P

roje

ct 0

50

5:

SR 1

8 Im

prov

emen

ts –

Thi

s is a

loca

l pro

ject

re

flect

ed in

the

Blac

kfor

d C

ount

y m

ap o

n pa

ge 1

6.

◆◆*P

roje

ct 2

70

1:

SR 9

Impr

ovem

ents

– T

his

is reg

iona

l pro

ject

re

flect

ed o

n th

e m

ap o

n pa

ge 6

.

◆◆*P

roje

ct 3

80

1:

SR 2

6 Im

prov

emen

ts –

Thi

s is a

reg

iona

l pr

ojec

t refl

ecte

d on

the

map

on

page

6.

◆◆*P

roje

ct 9

00

8:

Wab

ash

Cen

tral

Rai

lroad

Impr

ovem

ents

This is

a lo

cal p

roje

ct refl

ecte

d in

the

Wel

ls C

ount

y m

ap o

n pa

ge 3

4.

GR

AN

T C

OU

NTY

PRO

JEC

TS

* Th

ese

proj

ects a

re refl

ecte

d in

oth

er s

ectio

ns o

f thi

s re

port.

Page 27: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

¬ «105

¬ «19

¬ «218

¬ «15

¬ «22

¬ «18

¬ «15

¬ «37

¬ «5

¬ «3¬ «3

¬ «13¬ «13

¬ «9

¬ «9

¬ «18¬ «18

¬ «26

¬ «26

£ ¤35

£ ¤35

§̈ ¦69§̈ ¦69

Jone

sbo

ro

Fair

mount

Van

Bure

n

Sw

eets

er

Matthew

s

Gas C

ity

Marion

Sw

ayzee

Upla

nd

Conve

rse

Fow

lert

on

0505

9008

2701

3801

Ü 02.5

1.2

5

Mile

s

Da

te:

4/1

3/2

01

5

Coo

rdin

ate

Syste

m: N

AD

19

83

UT

M Z

one

16

NP

roje

ctio

n:

Tra

nsve

rse

Me

rca

tor

Datu

m:

No

rth

Am

erica

n 1

98

3F

als

e E

astin

g: 5

00

,00

0.0

00

0F

als

e N

ort

hin

g:

0.0

00

0C

en

tra

l M

eri

dia

n:

-87.0

00

0S

cale

Fa

cto

r: 0

.99

96

La

titu

de

Of O

rig

in:

0.0

00

0U

nits:

Me

ter

Pri

va

te S

ecto

r Id

en

tified

Reg

ion

al N

ee

ds

Data

: In

dia

na

GIS

Lib

rary

& S

take

ho

lde

r In

pu

t

IND

OT

Eng

ine

eri

ng

& A

sse

t M

an

ag

em

en

t

Ple

ase

No

te:

This

ma

p d

epic

ts n

on-c

om

mitte

d,

no

n-f

un

de

d, co

nce

ptu

al re

gio

nal tr

an

sp

ort

atio

nin

fra

str

uctu

re n

ee

ds id

en

tifie

d b

y t

he

pri

va

te s

ecto

r. T

he

se

ne

ed

s a

re d

isp

layed

as p

lace

ho

lde

rsfo

r gra

ph

ic r

ep

rese

nta

tio

n.

Use

of

this

ma

p s

ho

uld

be

lim

ite

d t

o p

relim

inary

pla

nn

ing p

urp

ose

son

ly.

Ad

ditio

nal p

lan

nin

g, e

nvir

on

me

nta

l stu

dy,

an

d c

ost-

be

nefit

ana

lysis

is n

ee

de

d to

id

entify

op

tim

um

alte

rna

tive

s, a

ctu

al co

rrid

or

alig

nm

en

ts,

an

d s

yste

m im

pact

to s

up

port

fu

rth

er

de

cis

ion

makin

g.

Als

o n

ote

, th

e d

ata

use

d t

o c

rea

te t

his

ma

p a

re f

rom

th

e b

est

kn

ow

n s

ou

rce

at

the

tim

e a

nd

is s

ub

ject

to c

ha

ng

e.

No

rth

ea

st

Re

gio

n ;

Gra

nt

Co

un

ty

Ide

nti

fie

d E

nh

an

ce

me

nt

Ca

teg

ori

es

fo

r L

oc

al

an

d

Sta

te F

ac

ilit

ies

Ce

ntr

al

Mo

bil

ity

Im

pro

ve

me

nts

(Ad

de

d t

rav

el

lan

es

,

free

wa

y u

pg

rad

e)

Sta

te F

acili

ty

New

Te

rra

in,

Sta

te

Fa

cili

ty

Lo

ca

l F

acili

ty

New

Te

rra

in,

Lo

ca

l

Fa

cili

ty

New

Ra

il C

ap

acity

(ne

w r

ail

line

or

ad

de

d

ca

pa

city)

Op

era

tio

na

l Im

pro

ve

me

nts

(In

ters

ec

tio

n i

mp

rove

me

nts

,

ne

w i

nte

rch

an

ge

,

inte

rch

an

ge m

od

ific

ati

on

,an

d s

po

t im

pro

ve

me

nts

)

!S

tate

Fa

cili

ty

!Lo

ca

l F

acili

ty

¹º»¼R

ail

Cro

ssin

gIm

pro

ve

me

nt

Mu

lti-

Mo

da

l

En

han

cem

en

ts

oA

irp

ort

Im

pro

ve

me

nts

!ÎP

ort

Im

pro

ve

me

nts

Sta

te F

acili

tie

s a

re U

S,

Sta

teR

ou

te,

or

US

Hig

hw

ay f

un

de

d

with

sta

te a

nd f

ed

era

l fu

nd

s.

Lo

ca

l F

acili

tie

s a

re n

on

-sta

teju

rsid

iction

fa

cili

tie

s t

ha

t ca

nuse

sta

te o

r lo

ca

l fu

nd

s.

Oth

er

Fa

cilit

ies

Exis

tin

g R

ail

No

n-I

nte

rsta

te

Inte

rsta

te

Na

vig

ab

le S

tre

am

s

Co

rp. L

imits

Page 28: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

21

HUNTINGTON COUNTYPROJECTS

◆◆ Project 0206: CR 900 North/Lafayette Center Road Improvements – Improve and widen CR 900 North/Lafayette Center Road from US 24 to I-69. Reason: Safety of trucks moving cargo ensuring better truck traffic flow for the movement of cargo and also creates economic development by allowing for easier truck access to and from Fort Wayne, Indiana.

Estimated Cost: $26 million

◆◆ *Project 2701/3502: SR 9 Improvements – This is regional project reflected on the map on page 6.

◆◆ *Project 3501: I-469 Loop – This is a regional project reflected on the map on page 6.

◆◆ Project 3503: Markle Industrial Park Improvements – Improve and widen North 500 East from East 100 North to US 224 and North 400 East from East 100 North to US 224. Reason: Create economic development by allowing for easier truck access to and from the Industrial Park.

Estimated Cost: $3.2 million

◆◆ Project 3504: Waterworks Road Re-alignment – Design and build a route at Waterworks Road and Etna Avenue. Reason: Safety of trucks moving cargo ensuring better truck traffic flow for the movement of cargo and also relieves the bottleneck of combined truck and passenger car congestion in Huntington creating better truck traffic flow for the movement of cargo.

Estimated Cost: $18.6 million

◆◆ *Project 9001/9002: Bluffton Connector – This is a regional project reflected on the map on page 6.

◆◆ *Project 9004: US 224 Improvements – This is a regional project reflected on the map on page 6.

◆◆ *Project 9008: Wabash Central Railroad Improvements – This is a local project reflected in the Wells County map on page 34.

* These projects are reflected in other sections of this report.

Page 29: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

!

Markle

Roanoke

Warren

MountEtna

Huntington

Andrews

¬«218

¬«116

¬«16

¬«9

¬«218

¬«5

¬«105

¬«3

¬«105

¬«114

¬«9

¬«5

¬«124

9002

3503

9004

0206

3504

2701

3501

9001

9008

3502

£¤224

£¤24

§̈¦69

Private Sector Identified Regional NeedsNortheast Region: Huntington County

Ü0 2.51.25

MilesCoordinate System: NAD 1983 UTM Zone 16NProjection: Transverse MercatorDatum: North American 1983False Easting: 500,000.0000False Northing: 0.0000Central Meridian: -87.0000Scale Factor: 0.9996Latitude Of Origin: 0.0000Units: Meter

Please Note: This map depicts non-committed, non-funded, conceptual regionaltransportation infrastructure needs identified by the private sector. These needs are displayed as placeholders for graphic representation. Use of this map should belimited to preliminary planning purposes only. Additional planning, environmentalstudy, and cost-benefit analysis is needed to identify optimum alternatives, actual corridor alignments, and system impact to support further decision making. Also note, the data used to create this map are from the best known source at the time and issubject to change.

Date: 4/14/2015

Identified

Enhancement

Categories for Local

and State Facilities

Mobility Improvements(Added travel lanes,freeway upgrade)

State Facility

New Terrain, StateFacility

Local Facility

New Terrain, LocalFacility

New Rail Capacity(new rail line or

added capacity)

Operational Improvements(Intersection improvement,

new interchange,interchange modification,and spot improvements)

! State Facility

! Local Facility

¹º»¼Rail CrossingImprovement

Multi-ModalEnhancements

oAirportImprovements

!Î Port Improvements

Other Facilities

Existing Rail

Non-Interstate

Interstate

Navigable Streams

Corp. Limits

Data; Indiana GIS Library & Stakeholder Input

INDOT Engineering & Asset Management

State Facilities are US, StateRoute, or US Highway funded with state and federal funds.

Local Facilities are non-statejursidiction facilities that can use state or local funds.

3502

Page 30: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

23

◆◆*P

roje

ct 3

80

1:

SR 2

6 Im

prov

emen

ts –

Thi

s is a

reg

iona

l pr

ojec

t refl

ecte

d on

the

map

on

page

6.

◆◆*P

roje

ct 3

80

2:

US

27

Impr

ovem

ents

– T

his

is a

reg

iona

l pr

ojec

t refl

ecte

d on

the

map

on

page

6.

◆◆Pr

ojec

t 38

03

: SR

67

and

SR

26

Inte

rsec

tion

Upg

rade

Des

ign

and

build

a n

ew in

ters

ectio

n at

SR

67

and

SR

26

. Re

ason

: Sa

fety

of t

ruck

s m

ovin

g ca

rgo

ensu

ring

bette

r tru

ck

traffi

c flo

w fo

r th

e m

ovem

ent o

f car

go.

Estim

ated

Cos

t: $

1 m

illio

n.

JAY

CO

UN

TY

PRO

JEC

TS

* Th

ese

proj

ects a

re refl

ecte

d in

oth

er s

ectio

ns o

f thi

s re

port.

Page 31: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

¬ «26

¬ «67

¬ «26

¬ «26

¬ «167

¬ «28

¬ «67

¬ «18¬ «18

¬ «1¬ «1

£ ¤27

£ ¤27

Port

land

Pennvill

e

Bry

an

t

Sala

monia

Redke

y

Dunkir

k

3803

3802

3802

3801

Ü 02.5

1.2

5

Mile

s

Da

te:

4/1

4/2

01

5

Coo

rdin

ate

Syste

m: N

AD

19

83

UT

M Z

one

16

NP

roje

ctio

n:

Tra

nsve

rse

Me

rca

tor

Datu

m:

No

rth

Am

erica

n 1

98

3F

als

e E

astin

g: 5

00

,00

0.0

00

0F

als

e N

ort

hin

g:

0.0

00

0C

en

tra

l M

eri

dia

n:

-87.0

00

0S

cale

Fa

cto

r: 0

.99

96

La

titu

de

Of O

rig

in:

0.0

00

0U

nits:

Me

ter

Pri

va

te S

ecto

r Id

en

tified

Reg

ion

al N

ee

ds

Data

: In

dia

na

GIS

Lib

rary

& S

take

ho

lde

r In

pu

t

IND

OT

Eng

ine

eri

ng

& A

sse

t M

an

ag

em

en

t

Ple

ase

No

te:

This

ma

p d

epic

ts n

on-c

om

mitte

d,

no

n-f

un

de

d, co

nce

ptu

al re

gio

nal tr

an

sp

ort

atio

nin

fra

str

uctu

re n

ee

ds id

en

tifie

d b

y t

he

pri

va

te s

ecto

r. T

he

se

ne

ed

s a

re d

isp

layed

as p

lace

ho

lde

rsfo

r gra

ph

ic r

ep

rese

nta

tio

n.

Use

of

this

ma

p s

ho

uld

be

lim

ite

d t

o p

relim

inary

pla

nn

ing p

urp

ose

son

ly.

Ad

ditio

nal p

lan

nin

g, e

nvir

on

me

nta

l stu

dy,

an

d c

ost-

be

nefit

ana

lysis

is n

ee

de

d to

id

entify

op

tim

um

alte

rna

tive

s, a

ctu

al co

rrid

or

alig

nm

en

ts,

an

d s

yste

m im

pact

to s

up

port

fu

rth

er

de

cis

ion

makin

g.

Als

o n

ote

, th

e d

ata

use

d t

o c

rea

te t

his

ma

p a

re f

rom

th

e b

est

kn

ow

n s

ou

rce

at

the

tim

e a

nd

is s

ub

ject

to c

ha

ng

e.

No

rth

ea

st

Re

gio

n ;

Ja

y C

ou

nty

Ide

nti

fie

d E

nh

an

ce

me

nt

Ca

teg

ori

es

fo

r L

oc

al

an

dS

tate

Fa

cil

itie

s

Ce

ntr

al

Mo

bil

ity

Im

pro

ve

me

nts

(Ad

de

d t

rav

el

lan

es

,

free

wa

y u

pg

rad

e)

Sta

te F

acili

ty

New

Te

rra

in,

Sta

teF

acili

ty

Lo

ca

l F

acili

ty

New

Te

rra

in,

Lo

ca

l

Fa

cili

ty

New

Ra

il C

ap

acity

(ne

w r

ail

line

or

ad

de

d

ca

pa

city)

Op

era

tio

na

l Im

pro

ve

me

nts

(In

ters

ec

tio

n i

mp

rove

me

nts

,n

ew

in

terc

han

ge

,

inte

rch

an

ge m

od

ific

ati

on

,

an

d s

po

t im

pro

ve

me

nts

)

!S

tate

Fa

cili

ty

!Lo

ca

l F

acili

ty

¹º»¼R

ail

Cro

ssin

g

Imp

rove

me

nt

Mu

lti-

Mo

da

l

En

han

cem

en

ts

oA

irp

ort

Im

pro

ve

me

nts

!ÎP

ort

Im

pro

ve

me

nts

Sta

te F

acili

tie

s a

re U

S,

Sta

teR

ou

te,

or

US

Hig

hw

ay f

un

de

d

with

sta

te a

nd f

ed

era

l fu

nd

s.

Lo

ca

l F

acili

tie

s a

re n

on

-sta

teju

rsid

iction

fa

cili

tie

s t

ha

t ca

nuse

sta

te o

r lo

ca

l fu

nd

s.

Oth

er

Fa

cilit

ies

Exis

tin

g R

ail

No

n-I

nte

rsta

te

Inte

rsta

te

Na

vig

ab

le S

tre

am

s

Co

rp. L

imits

Page 32: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

25

◆◆*P

roje

ct 3

50

2:

SR 9

Impr

ovem

ents

– T

his

is reg

iona

l pro

ject

re

flect

ed o

n th

e m

ap o

n pa

ge 6

.

◆◆Pr

ojec

t 44

01

: Fa

wn

Rive

r C

ross

ing

Indu

stri

al P

ark

Impr

ovem

ents

– Im

prov

e an

d w

iden

CR

75

0 N

orth

Eas

t of

SR 9

. R

easo

n: S

afet

y of

truc

ks m

ovin

g ca

rgo

ensu

ring

bette

r tru

ck tr

affic

flow

for th

e m

ovem

ent o

f car

go.

Estim

ated

Cos

t: $

.02

mill

ion

◆◆Pr

ojec

t 440

2: C

R W

est 6

00 S

outh

Impr

ovem

ents –

Impr

ove

and

wid

en C

R W

est 6

00 S

outh

from

CR

1200 W

est t

o SR

5. R

easo

n: S

afet

y of

truc

ks m

ovin

g ca

rgo

ensu

ring

bette

r tru

ck

traffi

c flo

w fo

r the

mov

emen

t of c

argo

and

also

relie

ves

the

bottlen

eck

of c

ombi

ned

truck

and

pas

seng

er c

ar c

onge

stion

cr

eatin

g be

tter t

ruck

traf

fic fl

ow fo

r the

mov

emen

t of c

argo

.Es

timat

ed C

ost:

$1

6.8

mill

ion

◆◆Pr

ojec

t 44

03

: SR

5/C

R W

est 7

00

Sou

th T

ruck

Tur

n La

ne

– D

esig

n an

d bu

ild a

new

truc

k tu

rn la

ne a

t SR

5 a

nd C

R W

est 7

00

Sou

th g

oing

Nor

th o

n SR

5.

Reas

on:

Safe

ty o

f tru

cks

mov

ing

carg

o en

surin

g be

tter tru

ck tr

affic

flow

for th

e m

ovem

ent o

f car

go.

Estim

ated

Cos

t: $

.3 m

illio

n

◆◆Pr

ojec

t 44

04

: C

R 6

00 W

est I

mpr

ovem

ents

– Im

prov

e an

d w

iden

CR

60

0 W

est f

rom

CR

Wes

t 20

0 S

outh

to U

S 2

0

with

add

ed tu

rn la

nes

at W

estv

iew

Juni

or a

nd S

enio

r H

igh

Scho

ol.

Reas

on:

Safe

ty o

f tru

cks

mov

ing

carg

o en

surin

g be

tter tru

ck tr

affic

flow

for th

e m

ovem

ent o

f car

go.

Estim

ated

Cos

t: $

8.4

mill

ion

◆◆Pr

ojec

t 44

06

: C

R W

est 2

00 N

orth

Impr

ovem

ents

– Im

prov

e an

d w

iden

CR

Wes

t 20

0 N

orth

from

CR

Nor

th 5

00

Wes

t to

SR 9

. Re

ason

: Sa

fety

of t

ruck

s m

ovin

g ca

rgo

ensu

ring

bette

r tru

ck tr

affic

flow

for th

e m

ovem

ent o

f car

go.

Estim

ated

Cos

t: $

21

mill

ion

◆◆*P

roje

ct 4

40

7: SR

5 Im

prov

emen

ts –

Thi

s is a

reg

iona

l pr

ojec

t refl

ecte

d on

the

map

on

page

6.

Estim

ated

Cos

t: $

60

.5 m

illio

n

LA

GR

AN

GE C

OU

NTY

PRO

JEC

TS

* Th

ese

proj

ects a

re refl

ecte

d in

oth

er s

ectio

ns o

f thi

s re

port.

Page 33: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

!

¬ «327

¬ «5

¬ «5¬ «3

¬ «3

¬ «9

¬ «9

¬ «120

¬ «120

£ ¤131

£ ¤20

£ ¤20

§̈ ¦TOL

L

§̈ ¦TOL

L

Sh

ipsh

ew

an

a

Tope

ka

Wo

lcott

vill

e

Lag

ran

ge

4403

4404

440

2

440

6

44074407

3502

3502

440

1

Ü 02.5

1.2

5

Mile

s

Date

: 6

/22/2

015

Coo

rdin

ate

Syste

m:

NA

D 1

98

3 U

TM

Zo

ne 1

6N

Pro

jectio

n: T

ran

sve

rse

Me

rca

tor

Datu

m:

No

rth

Am

eri

can

19

83

Fa

lse

Eastin

g:

50

0,0

00

.000

0F

als

e N

ort

hin

g:

0.0

00

0C

en

tral M

erid

ian

: -8

7.0

00

0S

cale

Facto

r: 0

.99

96

La

titu

de

Of

Ori

gin

: 0

.00

00

Units:

Me

ter

Priva

te S

ecto

r Id

entified R

egio

nal N

ee

ds

Data

: In

dia

na

GIS

Lib

rary

& S

takeh

old

er

Inpu

t

IND

OT

Eng

ine

erin

g &

Asset

Ma

na

gem

en

t

Ple

ase N

ote

: T

his

ma

p d

ep

icts

non

-co

mm

itte

d,

no

n-f

un

de

d,

con

ce

ptu

al re

gio

na

l tr

anspo

rtation

infr

astr

uctu

re n

ee

ds ide

ntifie

d b

y th

e p

rivate

se

cto

r. T

hese

ne

ed

s a

re d

ispla

ye

d a

s p

lace

hold

ers

for

gra

phic

re

pre

se

nta

tio

n. U

se o

f th

is m

ap s

ho

uld

be

lim

ited

to

pre

limin

ary

pla

nn

ing

pu

rposes

on

ly.

Ad

ditio

na

l p

lan

nin

g,

en

vir

onm

en

tal stu

dy,

an

d c

ost-

be

nefit a

naly

sis

is n

eed

ed t

o id

en

tify

op

tim

um

alte

rnative

s,

actu

al corr

idor

alig

nm

en

ts, a

nd s

yste

m im

pact to

su

pp

ort

fu

rth

er

de

cis

ion

makin

g. A

lso

no

te,

the

da

ta u

se

d to

cre

ate

th

is m

ap a

re f

rom

th

e b

est

kn

ow

n s

ou

rce

at

the

tim

e a

nd

is s

ub

ject to

ch

an

ge

.

Nort

heast R

egio

n ; L

agra

nge

Coun

ty

Ide

nti

fie

d E

nh

an

cem

en

tC

ate

go

ries

fo

r L

oc

al a

nd

Sta

te F

ac

ilit

ies

Ce

ntr

al

Mo

bil

ity

Im

pro

ve

me

nts

(Ad

ded

tra

ve

l la

ne

s,

free

wa

y u

pg

rad

e)

Sta

te F

acili

ty

New

Te

rra

in,

Sta

teF

acili

ty

Lo

ca

l F

acili

ty

New

Te

rra

in,

Lo

cal

Fa

cili

ty

New

Ra

il C

ap

acity

(new

ra

il lin

e o

r a

dd

ed

ca

pa

city)

Op

era

tio

na

l Im

pro

ve

men

ts(I

nte

rse

cti

on

im

pro

ve

me

nts

,n

ew

in

terc

han

ge

,in

terc

ha

ng

e m

od

ific

ati

on

,an

d s

po

t im

pro

vem

en

ts)

!S

tate

Facili

ty

!Lo

ca

l F

acili

ty

¹º»¼R

ail

Cro

ssin

gIm

pro

ve

me

nt

Mu

lti-

Mo

dal

En

ha

nc

em

en

ts

oA

irpo

rt I

mp

rovem

en

ts

!ÎP

ort

Im

pro

ve

me

nts

Sta

te F

acili

tie

s a

re U

S,

Sta

teR

ou

te, o

r U

S H

ighw

ay f

und

ed

w

ith

sta

te a

nd f

ed

era

l fu

nd

s.

Lo

ca

l F

acili

tie

s a

re n

on

-sta

teju

rsid

ictio

n f

acili

tie

s th

at

can

use

sta

te o

r lo

ca

l fu

nd

s.

Oth

er

Fa

cil

itie

s

Exis

tin

g R

ail

No

n-I

nte

rsta

te

Inte

rsta

te

Na

vig

ab

le S

tre

am

s

Co

rp. L

imits

Page 34: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

27

◆◆*P

roje

ct 0

20

2:

US

33

Lim

ited

Acc

ess

– Th

is is

a reg

iona

l pr

ojec

t refl

ecte

d on

the

map

on

page

6.

◆◆*P

roje

ct 1

70

2:

US

6 L

imite

d A

cces

s an

d H

eavy

Tru

ck

Cor

rido

r –

This is

a reg

iona

l pro

ject

refl

ecte

d on

the

map

on

page

6.

◆◆Pr

ojec

t 17

03

: SR

8 Im

prov

emen

ts –

Thi

s is a

reg

iona

l pro

ject

re

flect

ed o

n th

e m

ap o

n pa

ge 6

.

◆◆*P

roje

ct 1

70

4:

SR 2

05

Impr

ovem

ents

– T

his

is a

reg

iona

l pr

ojec

t refl

ecte

d on

the

map

on

page

6.

◆◆*P

roje

ct 3

50

1:

I-46

9 L

oop

– Th

is is

a reg

iona

l pro

ject

re

flect

ed o

n th

e m

ap o

n pa

ge 6

.

◆◆*P

roje

ct 3

50

2:

SR 9

Impr

ovem

ents

– T

his

is reg

iona

l pro

ject

re

flect

ed o

n th

e m

ap o

n pa

ge 6

.

◆◆*P

roje

ct 4

40

7:

SR 5

Impr

ovem

ents

– T

his

is a

loca

l pro

ject

th

at is

refl

ecte

d in

the

LaG

rang

e C

ount

y m

ap o

n pa

ge 2

6.

NO

BLE C

OU

NTY

PRO

JEC

TS

* Th

ese

proj

ects a

re refl

ecte

d in

oth

er s

ectio

ns o

f thi

s re

port.

Page 35: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

¬ «4

¬ «8

¬ «109

¬ «3¬ «9

¬ «13

¬ «5¬ «32

7

¬ «13

¬ «205

¬ «8

¬ «5¬ «9

¬ «3

¬ «3

£ ¤33

£ ¤33

£ ¤6£ ¤6

Lig

onie

r

Rom

eC

ity

Ke

nda

llvill

e

Avill

a

Wo

lcott

vill

e

Cro

mw

ell

Alb

ion

0202

0202

3501

170

3

170

2

1704

4407

3502

350

2

Ü 02.5

1.2

5

Mile

s

Date

: 6

/22/2

015

Coo

rdin

ate

Syste

m:

NA

D 1

98

3 U

TM

Zo

ne 1

6N

Pro

jectio

n: T

ran

sve

rse

Me

rca

tor

Datu

m:

No

rth

Am

eri

can

19

83

Fa

lse

Eastin

g:

50

0,0

00

.000

0F

als

e N

ort

hin

g:

0.0

00

0C

en

tral M

erid

ian

: -8

7.0

00

0S

cale

Facto

r: 0

.99

96

La

titu

de

Of

Ori

gin

: 0

.00

00

Units:

Me

ter

Priva

te S

ecto

r Id

entified R

egio

nal N

ee

ds

Data

: In

dia

na

GIS

Lib

rary

& S

takeh

old

er

Inpu

t

IND

OT

Eng

ine

erin

g &

Asset

Ma

na

gem

en

t

Ple

ase N

ote

: T

his

ma

p d

ep

icts

non

-co

mm

itte

d,

no

n-f

un

de

d,

con

ce

ptu

al re

gio

na

l tr

anspo

rtation

infr

astr

uctu

re n

ee

ds ide

ntifie

d b

y th

e p

rivate

se

cto

r. T

hese

ne

ed

s a

re d

ispla

ye

d a

s p

lace

hold

ers

for

gra

phic

re

pre

se

nta

tio

n. U

se o

f th

is m

ap s

ho

uld

be

lim

ited

to

pre

limin

ary

pla

nn

ing

pu

rposes

on

ly.

Ad

ditio

na

l p

lan

nin

g,

en

vir

onm

en

tal stu

dy,

an

d c

ost-

be

nefit a

naly

sis

is n

eed

ed t

o id

en

tify

op

tim

um

alte

rnative

s,

actu

al corr

idor

alig

nm

en

ts, a

nd s

yste

m im

pact to

su

pp

ort

fu

rth

er

de

cis

ion

makin

g. A

lso

no

te,

the

da

ta u

se

d to

cre

ate

th

is m

ap a

re f

rom

th

e b

est

kn

ow

n s

ou

rce

at

the

tim

e a

nd

is s

ub

ject to

ch

an

ge

.

Nort

heast R

egio

n ; N

ob

le C

ounty

Ide

nti

fie

d E

nh

an

cem

en

tC

ate

go

ries

fo

r L

oc

al a

nd

Sta

te F

ac

ilit

ies

Ce

ntr

al

Mo

bil

ity

Im

pro

ve

me

nts

(Ad

ded

tra

ve

l la

ne

s,

free

wa

y u

pg

rad

e)

Sta

te F

acili

ty

New

Te

rra

in,

Sta

teF

acili

ty

Lo

ca

l F

acili

ty

New

Te

rra

in,

Lo

cal

Fa

cili

ty

New

Ra

il C

ap

acity

(new

ra

il lin

e o

r a

dd

ed

ca

pa

city)

Op

era

tio

na

l Im

pro

ve

men

ts(I

nte

rse

cti

on

im

pro

ve

me

nts

,n

ew

in

terc

han

ge

,in

terc

ha

ng

e m

od

ific

ati

on

,an

d s

po

t im

pro

vem

en

ts)

!S

tate

Facili

ty

!Lo

ca

l F

acili

ty

¹º»¼R

ail

Cro

ssin

gIm

pro

ve

me

nt

Mu

lti-

Mo

dal

En

ha

nc

em

en

ts

oA

irpo

rt I

mp

rovem

en

ts

!ÎP

ort

Im

pro

ve

me

nts

Sta

te F

acili

tie

s a

re U

S,

Sta

teR

ou

te, o

r U

S H

ighw

ay f

und

ed

w

ith

sta

te a

nd f

ed

era

l fu

nd

s.

Lo

ca

l F

acili

tie

s a

re n

on

-sta

teju

rsid

ictio

n f

acili

tie

s th

at

can

use

sta

te o

r lo

ca

l fu

nd

s.

Oth

er

Fa

cil

itie

s

Exis

tin

g R

ail

No

n-I

nte

rsta

te

Inte

rsta

te

Na

vig

ab

le S

tre

am

s

Co

rp. L

imits

020

2

Page 36: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

29

◆◆Pr

ojec

t 76

01

: I-8

0/9

0 I-

69

Inte

rcha

nge

Impr

ovem

ents

Re-e

ngin

eer,

reco

nfigu

re a

nd red

esig

n I-6

9 in

terc

hang

e at

I-8

0/

90

. Re

ason

: Re

lieve

the

bottlen

eck

of c

ombi

ned

truck

an

d pa

ssen

ger ca

r co

nges

tion

crea

ting

bette

r tru

ck tr

affic

flo

w fo

r th

e m

ovem

ent o

f car

go.

Estim

ated

Cos

t: $

40

mill

ion

◆◆Pr

ojec

t 76

02

: I-8

0/9

0 S

R 3

27

Inte

rcha

nge

– D

esig

n an

d bu

ild a

new

inte

rcha

nge

conn

ectin

g SR

32

7 a

t I-8

0/

90

. Re

ason

: C

reat

e ec

onom

ic d

evel

opm

ent b

y al

low

ing

truck

ac

cess

into

Orla

nd.

Estim

ated

Cos

t: $

28

mill

ion

◆◆Pr

ojec

t 76

03

: SR

12

0 Im

prov

emen

ts –

Impr

ove

and

wid

en

SR 1

20

from

Vistu

la P

ark

in F

rem

ont t

o I-6

9.

Reas

on:

Relie

ve th

e bo

ttlen

eck

of c

ombi

ned

truck

and

pas

seng

er c

ar

cong

estio

n cr

eatin

g be

tter tru

ck tr

affic

flow

for th

e m

ovem

ent

of c

argo

.Es

timat

ed C

ost:

$5

8.4

mill

ion

◆◆Pr

ojec

t 760

4: S

outh

Ang

ola

Bypa

ss –

Des

ign

and

build

a S

outh

by

pass

from

US

20 E

ast t

o U

S 20 W

est.

Reas

on: Re

lieve

the

bottle

neck

of c

ombi

ned

truck

and

pas

seng

er c

ar c

onge

stion

cr

eatin

g be

tter t

ruck

traf

fic fl

ow fo

r the

mov

emen

t of c

argo

.Es

timat

e C

ost:

$3

5 m

illio

n

◆◆Pr

ojec

t 76

05

: Ea

st C

R 200 N

orth

/Eas

t Wen

dell

Jaco

b A

venu

e Im

prov

emen

ts –

Impr

ove

and

wid

en E

ast C

R 2

00

N

orth

/Ea

st W

ende

ll Ja

cob

Ave

nue

from

Kel

lygr

een

Driv

e in

Ang

ola

to S

R 8

27. Re

ason

: Re

lieve

the

bottlen

eck

of

com

bine

d tru

ck a

nd p

asse

nger

car

con

gestio

n cr

eatin

g be

tter

truck

traf

fic fl

ow fo

r th

e m

ovem

ent o

f car

go.

Estim

ated

Cos

t: $

2.5

mill

ion

◆◆Pr

ojec

t 76

06

: N

orth

Bak

er R

oad

Impr

ovem

ents

– Im

prov

e,

wid

en a

nd a

dd tu

rn la

ne (e

ast s

ide

of I-

69

) fro

m O

ld U

S 2

7

to N

orth

Van

Gui

lder

Roa

d. R

easo

n: R

elie

ve th

e bo

ttlen

eck

of

com

bine

d tru

ck a

nd p

asse

nger

car

con

gestio

n cr

eatin

g be

tter

truck

traf

fic fl

ow fo

r th

e m

ovem

ent o

f car

go.

Estim

ated

Cos

t: $

4 m

illio

n

◆◆Pr

ojec

t 760

7: W

est M

aple

Stre

et E

xten

sion

– D

esig

n an

d bu

ild a

n ex

tens

ion

of W

est M

aple

Stre

et fr

om O

rland

Indu

stria

l Pa

rk to

SR

120. R

easo

n: R

elie

ve th

e bo

ttlen

eck

of c

ombi

ned

truck

and

pas

seng

er c

ar c

onge

stion

thro

ugh

Orla

nd c

reat

ing

bette

r tru

ck tr

affic

flow

for t

he m

ovem

ent o

f car

go.

Estim

ated

Cos

t: $

1.7

mill

ion

STEU

BEN

CO

UN

TY

PRO

JEC

TS

Page 37: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

!

!

¬ «727

¬ «427

¬ «427

¬ «827

¬ «127

¬ «1

¬ «327 ¬ «32

7

¬ «120

¬ «120

£ ¤20

£ ¤20

§̈ ¦69

§̈ ¦69

§̈ ¦TOL

L

§̈ ¦TOL

L

Cle

ar

Lake

Fre

mo

nt

Hudso

n

Angola

Ham

ilton

Orlan

d7607

7605

7606

7603

7604

7601

7602

Ü 02.5

1.2

5

Mile

s

Da

te:

4/1

4/2

01

5

Coo

rdin

ate

Syste

m: N

AD

19

83

UT

M Z

one

16

NP

roje

ctio

n:

Tra

nsve

rse

Me

rca

tor

Datu

m:

No

rth

Am

erica

n 1

98

3F

als

e E

astin

g: 5

00

,00

0.0

00

0F

als

e N

ort

hin

g:

0.0

00

0C

en

tra

l M

eri

dia

n:

-87.0

00

0S

cale

Fa

cto

r: 0

.99

96

La

titu

de

Of O

rig

in:

0.0

00

0U

nits:

Me

ter

Pri

va

te S

ecto

r Id

en

tified

Reg

ion

al N

ee

ds

Data

: In

dia

na

GIS

Lib

rary

& S

take

ho

lde

r In

pu

t

IND

OT

Eng

ine

eri

ng

& A

sse

t M

an

ag

em

en

t

Ple

ase

No

te:

This

ma

p d

epic

ts n

on-c

om

mitte

d,

no

n-f

un

de

d, co

nce

ptu

al re

gio

nal tr

an

sp

ort

atio

nin

fra

str

uctu

re n

ee

ds id

en

tifie

d b

y t

he

pri

va

te s

ecto

r. T

he

se

ne

ed

s a

re d

isp

layed

as p

lace

ho

lde

rsfo

r gra

ph

ic r

ep

rese

nta

tio

n.

Use

of

this

ma

p s

ho

uld

be

lim

ite

d t

o p

relim

inary

pla

nn

ing p

urp

ose

son

ly.

Ad

ditio

nal p

lan

nin

g, e

nvir

on

me

nta

l stu

dy,

an

d c

ost-

be

nefit

ana

lysis

is n

ee

de

d to

id

entify

op

tim

um

alte

rna

tive

s, a

ctu

al co

rrid

or

alig

nm

en

ts,

an

d s

yste

m im

pact

to s

up

port

fu

rth

er

de

cis

ion

makin

g.

Als

o n

ote

, th

e d

ata

use

d t

o c

rea

te t

his

ma

p a

re f

rom

th

e b

est

kn

ow

n s

ou

rce

at

the

tim

e a

nd

is s

ub

ject

to c

ha

ng

e.

No

rth

ea

st

Re

gio

n ;

Ste

ub

en

Co

un

ty

Ide

nti

fie

d E

nh

an

ce

me

nt

Ca

teg

ori

es

fo

r L

oc

al

an

dS

tate

Fa

cil

itie

s

Ce

ntr

al

Mo

bil

ity

Im

pro

ve

me

nts

(Ad

de

d t

rav

el

lan

es

,

free

wa

y u

pg

rad

e)

Sta

te F

acili

ty

New

Te

rra

in,

Sta

teF

acili

ty

Lo

ca

l F

acili

ty

New

Te

rra

in,

Lo

ca

l

Fa

cili

ty

New

Ra

il C

ap

acity

(ne

w r

ail

line

or

ad

de

d

ca

pa

city)

Op

era

tio

na

l Im

pro

ve

me

nts

(In

ters

ec

tio

n i

mp

rove

me

nts

,n

ew

in

terc

han

ge

,

inte

rch

an

ge m

od

ific

ati

on

,

an

d s

po

t im

pro

ve

me

nts

)

!S

tate

Fa

cili

ty

!Lo

ca

l F

acili

ty

¹º»¼R

ail

Cro

ssin

g

Imp

rove

me

nt

Mu

lti-

Mo

da

l

En

han

cem

en

ts

oA

irp

ort

Im

pro

ve

me

nts

!ÎP

ort

Im

pro

ve

me

nts

Sta

te F

acili

tie

s a

re U

S,

Sta

teR

ou

te,

or

US

Hig

hw

ay f

un

de

d

with

sta

te a

nd f

ed

era

l fu

nd

s.

Lo

ca

l F

acili

tie

s a

re n

on

-sta

teju

rsid

iction

fa

cili

tie

s t

ha

t ca

nuse

sta

te o

r lo

ca

l fu

nd

s.

Oth

er

Fa

cilit

ies

Exis

tin

g R

ail

No

n-I

nte

rsta

te

Inte

rsta

te

Na

vig

ab

le S

tre

am

s

Co

rp. L

imits

Page 38: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

31

WABASH COUNTYPROJECTS

◆◆ Project 8501: CR 500 East Improvements – Improve and widen CR 500 East from SR 114 to US 24. Reason: Relieve the bottleneck of combined truck and passenger car congestion creating better truck traffic flow for the movement of cargo.

Estimated Cost: $43.6 million

Page 39: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

Roann

Lagro

La Fontaine

NorthManchester

Wabash

¬«218

¬«115

¬«524

¬«19

¬«5

¬«9¬«218

¬«15

¬«105

¬«105

¬«15

¬«16

¬«124

¬«114

¬«13

8501

£¤24

Private Sector Identified Regional NeedsNortheast Region: Wabash County

Ü0 31.5

MilesCoordinate System: NAD 1983 UTM Zone 16NProjection: Transverse MercatorDatum: North American 1983False Easting: 500,000.0000False Northing: 0.0000Central Meridian: -87.0000Scale Factor: 0.9996Latitude Of Origin: 0.0000Units: Meter

Please Note: This map depicts non-committed, non-funded, conceptual regionaltransportation infrastructure needs identified by the private sector. These needs are displayed as placeholders for graphic representation. Use of this map should belimited to preliminary planning purposes only. Additional planning, environmentalstudy, and cost-benefit analysis is needed to identify optimum alternatives, actual corridor alignments, and system impact to support further decision making. Also note, the data used to create this map are from the best known source at the time and issubject to change.

Date: 4/14/2015

Identified

Enhancement

Categories for Local

and State Facilities

Mobility Improvements(Added travel lanes,freeway upgrade)

State Facility

New Terrain, StateFacility

Local Facility

New Terrain, LocalFacility

New Rail Capacity(new rail line or

added capacity)

Operational Improvements(Intersection improvement,

new interchange,interchange modification,and spot improvements)

! State Facility

! Local Facility

¹º»¼Rail CrossingImprovement

Multi-ModalEnhancements

oAirportImprovements

!Î Port Improvements

Other Facilities

Existing Rail

Non-Interstate

Interstate

Navigable Streams

Corp. Limits

Data; Indiana GIS Library & Stakeholder Input

INDOT Engineering & Asset Management

State Facilities are US, StateRoute, or US Highway funded with state and federal funds.

Local Facilities are non-statejursidiction facilities that can use state or local funds.

Page 40: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

33

WELLS COUNTYPROJECTS

◆◆ *Project 9001: Bluffton Connector – This is a regional project reflected on the map on page 6.

◆◆ Project 9003: SR 1 Improvements – Improve and widen SR 1 from East CR 300 North, North of Bluffton to I-469. Reason: Relieve the bottleneck of combined truck and passenger car congestion creating better truck traffic flow for the movement of cargo.

Estimated Cost: $48.3 million

◆◆ *Project 9004: US 224 Improvements – This is a regional project reflected on the map on page 6.

◆◆ Project 9005: East CR 200 South Truck Corridor – Improve and widen East CR 200 South from SR 1 to Adams Street in Bluffton. Reason: Relieve the bottleneck of combined truck and passenger car congestion creating better truck traffic flow for the movement of cargo.

Estimated Cost: $7.6 million

◆◆ Project 9006: Harvest Road Extension – Design and build an extension of Harvest Road from JaSun Industrial Park to South CR 200 East. Reason: Relieve the bottleneck of combined truck and passenger car congestion through Bluffton creating better truck traffic flow for the movement of cargo.

Estimated Cost: $1.6 million

◆◆ Project 9007: Western Avenue Relocation – Re-engineer, reconfigure and redesign Western Avenue from Decker Drive to South Adams Street. Reason: Create economic development by allowing for expansion of industries south of Western Avenue.

Estimated Cost: $2.1 million

◆◆ Project 9008: Wabash Central Railroad Improvements – Install new rail road ties to allow for heavier rail cars of at least 286,000 lbs. Reason: Create economic development by allowing for heavier rail cargo shipments.

Estimated Cost: $15 million

◆◆ Project 9009: East CR 850 North Improvements – Improve and widen East CR 850 North from SR 1 to North CR 150 East in Ossian. Reason: Relieve the bottleneck of combined truck and passenger car congestion creating better truck traffic flow for the movement of cargo.

Estimated Cost: $6.2 million

* These projects are reflected in other sections of this report.

Page 41: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

!

Poneto

Ossian

VeraCruz

Bluffton

Zanesville

Uniondale

¬«201

¬«124

¬«116

¬«301

¬«116

¬«5

¬«218

¬«124

¬«3

¬«18

¬«1

9006

9007

9009

9005

9003

9004

£¤24

£¤224

§̈¦69

Private Sector Identified Regional NeedsNortheast Region: Wells County

Ü0 2.51.25

MilesCoordinate System: NAD 1983 UTM Zone 16NProjection: Transverse MercatorDatum: North American 1983False Easting: 500,000.0000False Northing: 0.0000Central Meridian: -87.0000Scale Factor: 0.9996Latitude Of Origin: 0.0000Units: Meter

Please Note: This map depicts non-committed, non-funded, conceptual regionaltransportation infrastructure needs identified by the private sector. These needs are displayed as placeholders for graphic representation. Use of this map should belimited to preliminary planning purposes only. Additional planning, environmentalstudy, and cost-benefit analysis is needed to identify optimum alternatives, actual corridor alignments, and system impact to support further decision making. Also note, the data used to create this map are from the best known source at the time and issubject to change.

Date: 4/14/2015

Identified

Enhancement

Categories for Local

and State Facilities

Mobility Improvements(Added travel lanes,freeway upgrade)

State Facility

New Terrain, StateFacility

Local Facility

New Terrain, LocalFacility

New Rail Capacity(new rail line or

added capacity)

Operational Improvements(Intersection improvement,

new interchange,interchange modification,and spot improvements)

! State Facility

! Local Facility

¹º»¼Rail CrossingImprovement

Multi-ModalEnhancements

oAirportImprovements

!Î Port Improvements

Other Facilities

Existing Rail

Non-Interstate

Interstate

Navigable Streams

Corp. Limits

Data; Indiana GIS Library & Stakeholder Input

INDOT Engineering & Asset Management

State Facilities are US, StateRoute, or US Highway funded with state and federal funds.

Local Facilities are non-statejursidiction facilities that can use state or local funds.

9001

9008

Page 42: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

35

◆◆*P

roje

ct 0

20

1:

US

30

Lim

ited

Acc

ess

– Th

is is

a reg

iona

l pr

ojec

t refl

ecte

d on

the

map

on

page

6.

◆◆*P

roje

ct 0

20

2:

US

33

Lim

ited

Acc

ess

– Th

is is

a reg

iona

l pr

ojec

t refl

ecte

d on

the

map

on

page

6.

◆◆Pr

ojec

t 02

09

: W

est C

ount

y Li

ne R

oad/

CR

Sout

h 8

00

Eas

t Im

prov

emen

ts –

Thi

s is a

loca

l pro

ject

refl

ecte

d in

the

Alle

n C

ount

y m

ap o

n pa

ge 1

4.

◆◆*P

roje

ct 1

70

4:

SR 2

05

Impr

ovem

ents

– T

his

is a

reg

iona

l pr

ojec

t refl

ecte

d on

the

map

on

page

6.

◆◆*P

roje

ct 3

50

1:

I-46

9 L

oop

– Th

is is

a reg

iona

l pro

ject

re

flect

ed o

n th

e m

ap o

n pa

ge 6

.

◆◆*P

roje

ct 3

50

2:

SR 9

Impr

ovem

ents

– T

his

is reg

iona

l pro

ject

re

flect

ed o

n th

e m

ap o

n pa

ge 6

.

◆◆Pr

ojec

t 92

02

: C

R 6

00

Eas

t Im

prov

emen

ts –

Impr

ove

and

wid

en C

R 6

00

Eas

t fro

m L

inco

ln W

ay R

oad

to S

R 1

4.

Re

ason

: C

reat

e ec

onom

ic d

evel

opm

ent b

y al

low

ing

bette

r tru

ck a

cces

s to

indu

strie

s.Es

timat

ed C

ost:

$1

6.4

mill

ion

WH

ITLEY

CO

UN

TY

PRO

JEC

TS

* Th

ese

proj

ects a

re refl

ecte

d in

oth

er s

ectio

ns o

f thi

s re

port.

Page 43: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

¬ «3

¬ «105

¬ «205

¬ «14

¬ «109

¬ «205

¬ «205

¬ «14¬ «14

¬ «9¬ «9

¬ «114

¬ «5

¬ «5

¬ «13

¬ «13

£ ¤24

£ ¤33

£ ¤30

£ ¤30

§̈ ¦69

South

Whitle

y

Colu

mbia

City

Churu

busco

Larw

ill

0202

0201

0201

9202

3502

3502

1704

3502

3501

3501

Ü 03

1.5

Mile

s

Da

te:

4/1

4/2

01

5

Coo

rdin

ate

Syste

m: N

AD

19

83

UT

M Z

one

16

NP

roje

ctio

n:

Tra

nsve

rse

Me

rca

tor

Datu

m:

No

rth

Am

erica

n 1

98

3F

als

e E

astin

g: 5

00

,00

0.0

00

0F

als

e N

ort

hin

g:

0.0

00

0C

en

tra

l M

eri

dia

n:

-87.0

00

0S

cale

Fa

cto

r: 0

.99

96

La

titu

de

Of O

rig

in:

0.0

00

0U

nits:

Me

ter

Pri

va

te S

ecto

r Id

en

tified

Reg

ion

al N

ee

ds

Data

: In

dia

na

GIS

Lib

rary

& S

take

ho

lde

r In

pu

t

IND

OT

Eng

ine

eri

ng

& A

sse

t M

an

ag

em

en

t

Ple

ase

No

te:

This

ma

p d

epic

ts n

on-c

om

mitte

d,

no

n-f

un

de

d, co

nce

ptu

al re

gio

nal tr

an

sp

ort

atio

nin

fra

str

uctu

re n

ee

ds id

en

tifie

d b

y t

he

pri

va

te s

ecto

r. T

he

se

ne

ed

s a

re d

isp

layed

as p

lace

ho

lde

rsfo

r gra

ph

ic r

ep

rese

nta

tio

n.

Use

of

this

ma

p s

ho

uld

be

lim

ite

d t

o p

relim

inary

pla

nn

ing p

urp

ose

son

ly.

Ad

ditio

nal p

lan

nin

g, e

nvir

on

me

nta

l stu

dy,

an

d c

ost-

be

nefit

ana

lysis

is n

ee

de

d to

id

entify

op

tim

um

alte

rna

tive

s, a

ctu

al co

rrid

or

alig

nm

en

ts,

an

d s

yste

m im

pact

to s

up

port

fu

rth

er

de

cis

ion

makin

g.

Als

o n

ote

, th

e d

ata

use

d t

o c

rea

te t

his

ma

p a

re f

rom

th

e b

est

kn

ow

n s

ou

rce

at

the

tim

e a

nd

is s

ub

ject

to c

ha

ng

e.

No

rth

ea

st

Re

gio

n ;

Wh

itle

y C

ou

nty

Ide

nti

fie

d E

nh

an

ce

me

nt

Ca

teg

ori

es

fo

r L

oc

al

an

dS

tate

Fa

cil

itie

s

Ce

ntr

al

Mo

bil

ity

Im

pro

ve

me

nts

(Ad

de

d t

rav

el

lan

es

,

free

wa

y u

pg

rad

e)

Sta

te F

acili

ty

New

Te

rra

in,

Sta

teF

acili

ty

Lo

ca

l F

acili

ty

New

Te

rra

in,

Lo

ca

l

Fa

cili

ty

New

Ra

il C

ap

acity

(ne

w r

ail

line

or

ad

de

d

ca

pa

city)

Op

era

tio

na

l Im

pro

ve

me

nts

(In

ters

ec

tio

n i

mp

rove

me

nts

,n

ew

in

terc

han

ge

,

inte

rch

an

ge m

od

ific

ati

on

,

an

d s

po

t im

pro

ve

me

nts

)

!S

tate

Fa

cili

ty

!Lo

ca

l F

acili

ty

¹º»¼R

ail

Cro

ssin

g

Imp

rove

me

nt

Mu

lti-

Mo

da

l

En

han

cem

en

ts

oA

irp

ort

Im

pro

ve

me

nts

!ÎP

ort

Im

pro

ve

me

nts

Sta

te F

acili

tie

s a

re U

S,

Sta

teR

ou

te,

or

US

Hig

hw

ay f

un

de

d

with

sta

te a

nd f

ed

era

l fu

nd

s.

Lo

ca

l F

acili

tie

s a

re n

on

-sta

teju

rsid

iction

fa

cili

tie

s t

ha

t ca

nuse

sta

te o

r lo

ca

l fu

nd

s.

Oth

er

Fa

cilit

ies

Exis

tin

g R

ail

No

n-I

nte

rsta

te

Inte

rsta

te

Na

vig

ab

le S

tre

am

s

Co

rp. L

imits

0209

Page 44: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

37

TACTICS IN SUPPORT OF ACHIEVING PUBLIC POLICY GOALS

◆◆ Air Pilot Duty Time (Federal)

◆◆ Reduce the “First Officer Qualification (FOQ) Rule” or 1,500 Hour Rule without compromising flight safety through Federal legislation or regulation

◆◆ Truck Driver Hours of Service (Federal)

◆◆ Increase the driver hours of service with the Federal Motor Carrier Safety Administrations regulation without compromising highway safety through Federal legislation or regulation

◆◆ Setback and Stoplight Policies (State)

◆◆ Pass State legislation to create a setback and traffic light policy on high trafficked Federal Interstates and State highways in Indiana

TACTICS IN SUPPORT OF ACHIEVING PUBLIC AWARENESS GOALS

◆◆ “Did You Know Stories” in the Northeast Region to educate the public on the importance of logistics industry to the Northeast Region and therefore the need for world-class logistics infrastructure

◆◆ Newspaper/magazine online opinion pieces in the Northeast Region to educate the public on the importance of the logistics industry

◆◆ Editorial boards in the Northeast Region to educate the public on the importance of the logistics industry

◆◆ NERLC Strategic Plan launch press conferences; editorial boards; newspaper/online opinion pieces to educate the public on the importance of the logistics industry to the Northeast Region

◆◆ TV/Radio interviews to educate the public on the importance of the logistics industry to the

Northeast Region

Page 45: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

38

TACTICS IN SUPPORT OF ACHIEVING WORKFORCE

DEVELOPMENT GOALS

◆◆ Create a plan of action to address the logistics shortages of air cargo pilots; truck drivers; warehouse/logistics maintenance technicians; and 4-year degree supervisors and supply chain graduates

◆◆ Support the concept of implementing a statewide CDL+ Program

◆◆ Support and expand the Conexus Indiana A+ Partners Program and implement the Conexus Indiana HIRE Tech curriculum into high schools to develop job skills in logistics and operations

◆◆ Increase and expand the visibility and curriculum for the truck driver certification program at Ivy Tech Community College

◆◆ Increase and expand the visibility, curriculum and capacity of the Aviation Airframe and Powerplant Mechanics Certification Program at Ivy Tech Community College

Page 46: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

39

LOGISTICS MARKET

ANALYSIS

TRANSPORTATION MODE SWOT ANALYSIS

Strengths, Weaknesses, Opportunities, Threats (SWOT) for Indiana’s Northeast Regional

Logistics Sector

INFRASTRUCTURE SWOT

STRENGTHS:

◆◆ Air:

◆◆ Strong network of air facilities

◆◆ Existing air capacity

◆◆ 1 of top 125 cargo airports: Fort Wayne International Airport #91

◆◆ Total of 12 Regional Public Airports: DeKalb County Airport; Fort Wayne International Airport; Harrold Airport; Huntington Municipal Airport; Kendallville Municipal Airport; Marion Municipal Airport; Miller Airport; Portland Municipal Airport; Smith Field Airport; Tri-State Steuben County Airport; Wabash Municipal Airport; Walker-Rowe Waterloo Airport

◆◆ 1 airport with 11,900 feet or more of runway: Fort Wayne International Airport

◆◆ Midwest location

◆◆ Strategic geographic coverage of aviation facilities located around the Northeast Region

◆◆ US Customs Office

◆◆ Foreign Trade Zone

◆◆ 33 acre cargo ramp at Fort Wayne International Airport

◆◆ Rail:

◆◆ Two Class I railroads: CSX Transportation and Norfolk Southern Railway

◆◆ Eight Class II and Class III freight railroads: Central Railroad of Indianapolis; Chicago, Fort Wayne and Eastern Railroad; City of Auburn Port Authority; Indiana Northeastern Railroad; Kendallville Terminal Railroad; Maumee and Western Railroad; Pigeon River Railroad; and Wabash Central Railroad

◆◆ Intermodal Triple Crown Service in Fort Wayne

Page 47: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

40

◆◆ Trucking (Roads):

◆◆ Four major Interstates and eight major highways: I-69, I-80, I-90, I-469, US 6, US 20, US 24, US 27, US 30, US 33, US 35, US 224

◆◆ Strong Midwest location: borders Ohio and Michigan

◆◆ Reputation as “Crossroads of America”

◆◆ Waterborne:

◆◆ Proximity to public port on Lake Michigan – Burns Harbor and public port on Lake Erie - Toledo-Lucas County Port

◆◆ General:

◆◆ Indiana has a trade surplus

◆◆ Leader in exports/imports of important commodities (coal, iron/steel products, grain, food products, scrap metal, etc.)

WEAKNESSES:

◆◆ Air:

◆◆ Northeast Region airports have minimal international/domestic air cargo business

◆◆ Reliant on Chicago O’Hare Airport for international/domestic air cargo

◆◆ Not a US port of entry

◆◆ Rail:

◆◆ Primarily pass through region for rail intermodal

◆◆ Lack of large volume intermodal facilities

◆◆ Trucking (Roads):

◆◆ Lack of adequate capacity on Indiana’s Interstate highways

◆◆ Waterborne:

◆◆ Decaying lock infrastructure on Great Lakes and Ohio River

◆◆ Dredging issues for ports and waterways on Great Lakes and Ohio River

◆◆ Limited rail access to ports

◆◆ General:

◆◆ Lack of import/export diversification

◆◆ Lack of freight forwarders

◆◆ Lack of US Customs brokers

◆◆ Lack of USDA field agents for agriculture clearing

Page 48: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

41

OPPORTUNITIES:

◆◆ Air:

◆◆ Position the Northeast Region as a reliever airport for domestic/international air cargo by utilizing excess air capacity

◆◆ Create a strategy to better utilize the Northeast Region airports

◆◆ Utilize runways and facilities at several airports to accommodate air shipping opportunities

◆◆ Rail:

◆◆ Freight tonnage will nearly double by 2035, according to the United States Department of Transportation (USDOT)

◆◆ Complete additions to the Northeast Region’s multimodal rail system

◆◆ East coast intermodal access at Triple Crown Rail Yard in Fort Wayne

◆◆ Movement of cargo from West to East coast

◆◆ Utilize rail access at Casad Depot in New Haven

◆◆ Rail spurs off of Class I railroads

◆◆ Trucking (Roads):

◆◆ Freight tonnage will nearly double by 2035, according to USDOT

◆◆ Relieve bottlenecks around Northeast Region

◆◆ Upgrade Northeast Region strategic bridges that are structurally deficient or functionally obsolete

◆◆ Build dedicated truck lanes that separate trucks from passenger cars

◆◆ Allow increase in truck weight limits

◆◆ Move freight from local roads to main artery roads

◆◆ Waterborne:

◆◆ Better utilization of the Ports of Indiana – Burns Harbor and the Toledo/Lucas County Port Authority Toledo Seaport in Toledo, Ohio

◆◆ Movement of cargo from West to East coast

◆◆ General:

◆◆ Tonnage will nearly double by 2035, according to USDOT

◆◆ The value of US imports and exports is expected to be equivalent to 60 percent of GDP by 2030

◆◆ Work for diversification of exports/imports

Page 49: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

42

THREATS:

◆◆ Air:

◆◆ Continued underutilization of the Northeast Region’s airports

◆◆ Dependence on bottlenecks leading to inefficient air cargo service

◆◆ Lack of State funding to meet infrastructure needs

◆◆ Continued industry trend toward belly hold cargo

◆◆ Freight forwarders’ continued reliance on Chicago O’Hare

◆◆ Rail:

◆◆ Continuation of Northeast Region as pass through region for rail

◆◆ Lack of ownership by public entities of intermodal opportunities

◆◆ Surrounding states pushing for rail investment

◆◆ Rail cargo offloading before arrival in Northeast Indiana

◆◆ Trucking (Roads):

◆◆ Lack of funding to build roads to relieve bottlenecks or traffic congestion

◆◆ Lack of funding to upgrade statewide strategic bridges that are structurally deficient or functionally obsolete

◆◆ Waterborne:

◆◆ Decaying lock infrastructure on Great Lakes and Ohio River

◆◆ Dredging issues for ports and waterways on Great Lakes and Ohio River

◆◆ Limited rail access to ports

◆◆ General:

◆◆ Lack of diversification of exports/imports

◆◆ Lack of funding for all infrastructure modes

◆◆ Impact of Federal government energy policy on all modes of transportation

Page 50: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

43

PUBLIC POLICY SWOT

STRENGTHS:

◆◆ Air:

◆◆ Federal government reimburses up to 90% of costs for qualified airport projects

◆◆ Rail:

◆◆ Ports of Indiana bonding authority for rail facilities

◆◆ Trucking (Roads):

◆◆ P3 funding for Indiana highways and roads

◆◆ State of Indiana focus on road construction

◆◆ Waterborne:

◆◆ Ports of Indiana bonding authority for port activity

◆◆ General:

◆◆ Transportation and Logistics Tax Credit

◆◆ Tax abatement for vacant buildings

WEAKNESSES:

◆◆ Air:

◆◆ Lack of ownership by public entities on air cargo movement

◆◆ Lack of Federal/State air funding

◆◆ Pilot shortages

◆◆ Federal limitation on use of airport land

◆◆ Rail:

◆◆ Lack of private rail investment compared to surrounding states

◆◆ Lack of ownership by public entities on rail freight movement

◆◆ Lack of Federal/State funding

Page 51: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

44

◆◆ Trucking (Roads):

◆◆ Federal/State use of gas taxes for other general Federal/State revenue needs

◆◆ Lower truck weight limits compared to Ohio and Michigan

◆◆ Inefficiencies in collection of fuel taxes

◆◆ Changes to Hours of Service regulations

◆◆ Truck driver shortages

◆◆ Waterborne:

◆◆ Environmental Protection Agency and U.S. Army Corps of Engineers joint rule putting more small bodies of water under federal jurisdiction

◆◆ Use of Harbor Maintenance Tax for other general fund revenue needs

◆◆ Lack of “ownership” by public entities on waterborne shipping

◆◆ Lack of Federal/State funding

◆◆ Lack of public legislator understanding of importance of locks infrastructure

◆◆ Boat pilot requirements

◆◆ Barge captain shortages

◆◆ General:

◆◆ Increase in unemployment insurance (UI) tax on State level

OPPORTUNITIES:

◆◆ Air:

◆◆ Dedicated air fund creating more Federal funding

◆◆ Rail:

◆◆ Federal and State investment tax credit incentivizing private rail investment

◆◆ Funding for inter/multimodal rail development

◆◆ Trucking (Roads):

◆◆ Federal and State firewall on fuel taxes for highway use only

◆◆ Dedicated truck lanes

◆◆ Allow increase of truck weight limits at Michigan and Ohio borders

◆◆ Use of State sales tax on fuel

◆◆ New innovative funding mechanisms for roads

Page 52: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

45

◆◆ Waterborne:

◆◆ Adequate funding for locks projects

◆◆ Federal firewall on Harbor Maintenance Tax for waterways use only

◆◆ General:

◆◆ Reduction of personal property tax

THREATS:

◆◆ Air:

◆◆ Surrounding state of Michigan offers grants/loans/tax credits for air economic development/private investment

◆◆ Loss of matching dollars from Federal Government because of lack of State investment

◆◆ Federal cap and trade legislation

◆◆ Rail:

◆◆ Surrounding states of Michigan and Ohio offer grants/loans/tax credits for rail economic development/private investment

◆◆ Loss of private rail investment to surrounding states

◆◆ Federal cap and trade legislation

◆◆ Trucking (Roads):

◆◆ Surrounding state of Michigan offers grants/loans/tax credits for trucking economic development/private investment

◆◆ Lack of Federal/State highway dollars for new/existing roads

◆◆ Continued use of fuel taxes for other general Federal/State revenue needs

◆◆ Competitiveness issues due to higher truck weight limits

◆◆ Continued inefficient collection of fuel taxes

◆◆ Federal cap and trade legislation

◆◆ Waterborne:

◆◆ Continued use of waterways taxes for other general Federal revenue needs

◆◆ Lack of Federal/State funding for locks infrastructure repair

Page 53: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

46

◆◆ Warehousing/Distribution:

◆◆ Surrounding states of Michigan and Ohio offer grants/loans/tax credits for warehousing/real estate economic development/private investment

◆◆ Further State tax increases for UI

◆◆ Lack of speculative buildings for warehousing/distribution

◆◆ Current use of vacant warehouse/distribution facilities

◆◆ General:

◆◆ Lack of policy action leading to loss of private investment

◆◆ Lack of a State fund for unexpected economic development infrastructure needs

◆◆ Continued lack of growth in national economy

Page 54: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

47

WORKFORCE DEVELOPMENT SWOT

STRENGTHS:

◆◆ Public/private postsecondary institutions with ability to reach mass of workers

◆◆ Entrepreneurs creating online curriculum programs

◆◆ State government officials who understand importance of up-skilling Hoosier works

◆◆ Growth of logistics firms in the Northeast Region

WEAKNESSES:

◆◆ Lack of skilled workers

◆◆ Public misconception of dirty warehouse jobs

◆◆ Assorted logistics education curriculum not meeting industry needs

◆◆ Air cargo pilot, truck driver, and boat captain shortages

◆◆ Warehouse/Logistics maintenance technician shortages

◆◆ 4-year logistics degree supervisor shortages

◆◆ Lack of heavy equipment certifications (fork lifts, etc.)

OPPORTUNITIES:

◆◆ Identify job skills gap areas

◆◆ Curriculum development with postsecondary education to meet job skills gap areas

◆◆ Create online program to up-skill Indiana logistics worker from places of employment

◆◆ Continued growth of logistics jobs in the Northeast Region

◆◆ Alternate insurance for CDL truck drivers under 21

THREATS:

◆◆ Loss of logistics economic development due to workforce gaps

◆◆ Continued perception of logistics industry as undesirable work

◆◆ Lower skill workers remaining in lower level positions

◆◆ Lack of 4-year degree student interest in logistics careers

◆◆ Lack of air cargo pilots, truck drivers, and boat captains

◆◆ Lack of warehouse logistics maintenance technicians

◆◆ Lack of 4-year logistics supervisors

Page 55: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

48

PUBLIC AWARENESS SWOT

STRENGTHS:

◆◆ Positive visibility of trucking

◆◆ Viewed as a center for surrounding major cities

WEAKNESSES:

◆◆ Lack of public understanding of logistics

◆◆ Lack of public understanding of need for infrastructure expansion/improvement

◆◆ Public misperception of logistics/supply chain jobs

◆◆ Public misperception of global trade & positive impact on the Northeast Region

◆◆ Lack of awareness of importance for air, rail & water transportation modes

OPPORTUNITIES:

◆◆ Educate public on positive impacts of logistics industry

◆◆ Explain the facts on how the logistics industry impacts everyday life

◆◆ Educate public on need for infrastructure expansion/improvement

◆◆ Educate public on high-skill, high-wage jobs in logistics

◆◆ Educate public on positive impacts of global trade

◆◆ Increase understanding of importance for air, rail & water transportation modes

THREATS:

◆◆ Continued public misperception of the importance of the logistics industry

◆◆ Lack of awareness of need for infrastructure expansion/improvement

◆◆ Continued public misperception of logistics jobs

◆◆ Continued public belief of negative impacts of global trade

Page 56: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

49

NORTHEAST REGION INFRASTRUCTURE DATA

◆◆ Air

◆◆ 12 Northeast Regional Public Airports

◆◆ Top 125 Cargo Airports: Fort Wayne International Airport #91 nationally

◆◆ Commercial Service Airports: Fort Wayne International Airport #158 nationally

◆◆ Rail

◆◆ Two Class I Railroads

◆◆ Eight Class II and III Railroads

◆◆ Intermodal Facility

◆◆ Trucking:

◆◆ Four Major Interstates and Eight Major Highways

◆◆ Waterborne

◆◆ Close Proximity to Two Public Ports

Page 57: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

FOR MORE INFORMATION

CONTACT:

DAVID W. HOLT Vice President Operations & Business Development

Conexus Indiana111 Monument Circle

Suite 1800Indianapolis, IN 46204

Phone: (317)638-2108email: [email protected]

www.conexusindiana.com

Brought to you in part by

Page 58: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class
Page 59: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class
Page 60: NORTHEAST REGIONAL LOGISTICS COUNCIL ACCELERATING ...bloximages.newyork1.vip.townnews.com/kpcnews.com/content/tncms/assets/... · Accelerating Manufacturing Excellence Through World-Class

111 Monument Circle, Suite 1800 Indianapolis, IN 46204 317-638-2108

www.conexusindiana.com