GOLD COAST PARKLANDS – EARLY WORKS AND TRUNK INFRASTRUCTURE Water Servicing Strategy

Upload: others

Post on 20-Apr-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

GOLD COAST PARKLANDS – EARLY WORKS AND TRUNK INFRASTRUCTURE Water Servicing Strategy

Page 2: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76
Page 3: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76
Page 4: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76
Page 5: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page i http://aus.hybis.info/projects0/gc/awarded/aa005621/f_reports/f0001-aa005621-aar-01 - wna.docx

CONTENTS

1 Summary ....................................................................................................................................... 1

2 Proposed Development ................................................................................................................. 2

3 Existing Water Supply Infrastructure ............................................................................................. 3

3.1 Exisitng Hydraulic Grade Line ........................................................................................................... 3

4 Proposed Water Supply Network .................................................................................................. 5

4.1 Desired Standards of Service ............................................................................................................ 5

4.2 Clarifications ...................................................................................................................................... 5

5 Water Network Analysis Modelling ................................................................................................ 6

5.1 Calculated Demands ......................................................................................................................... 6

5.2 Water Network Model ........................................................................................................................ 7

6 Modelling Results .......................................................................................................................... 8

7 Conclusion ..................................................................................................................................... 9

FIGURES Figure 2-1 Site Locality Plan ............................................................................................................................... 2

Figure 3-2 Existing Water Network Infrastructure ............................................................................................... 3

TABLES Table 3-1 HGLs at the Proposed Connection Points ......................................................................................... 4

Table 4-1 GCCC Desired Standards of Service ................................................................................................. 5

Table 5-1 Potable Water Supply Average Day Demand and Peaking Factors .................................................. 6

Table 5-2 Assessment of Site During 2018 Commonwealth Games ................................................................. 6

Page 6: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Page ii Hyder Consulting Pty Ltd-ABN 76 104 485 289 http://aus.hybis.info/projects0/gc/awarded/aa005621/f_reports/f0001-aa005621-aar-01 - wna.docx

APPENDICES

Appendix A

Appendix B

Appendix C

Appendix D

Appendix E

Plan of Development

Engineering Drawings

ET and Demand Calculation Table

WaterCAD Network Reports

Gold Coast Water Correspondence

Page 7: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 1 http://aus.hybis.info/projects0/gc/awarded/aa005621/f_reports/f0001-aa005621-aar-01 - wna.docx

1 SUMMARY Hyder have been commissioned by Economic Development Queensland (EDQ) to provide a Water Servicing Strategy as part of the early works package for the proposed Commonwealth Games Village located at the Gold Coast Parklands, Southport, Queensland. The proposed development of the site considers the demands due to the 2018 Commonwealth Games Village as well as the ‘legacy’ development, and the extents and sizes of the potable water network that will be required to service the site once it has been fully developed for future use. This report will demonstrate that a potable water supply can be provided to service the development in accordance with Gold Coast City Council requirements.

The development is located on the corner of Smith Street and Parklands Drive and ultimately is proposed to consist of low rise residential accommodation, retail and commercial precincts and a ‘Health and Knowledge Precinct’ which features areas planned for medical research institutes, biopharmaceutical manufacturing facilities and health and medical commercial type uses. Connections to the existing Council potable water network are proposed at the intersection of Parklands Drive and Innovation Drive and at the western end of Melia Court.

A water supply network modelling exercise has been performed by Hyder using WaterCAD version 8i software. The process and results of this modelling exercise are presented within this report, and confirms that the proposed development is able to provide an adequate water reticulation network in accordance with the Gold Coast City Council requirements for fire flow, residual pressure and pipe velocity.

It is proposed to construct a potable water network which consists of 250, 150 and 100mm diameter uPVC mains. It is proposed for a ‘ring main’ of 250mm diameter to run from both connection points and follow the alignment of Main Street and Hospital Boulevard. Pipe diameters of 150mm are proposed in all other areas with the exception of an inter-connecting pipe of 100mm in the residential area of the site. External works to construct 250mm diameter mains are also proposed in Parklands Drive from Main Street to Innovation Drive and from Hospital Boulevard at the northern site boundary to Melia Court in order to connect the proposed development to existing infrastructure.

Page 8: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Page 2 Hyder Consulting Pty Ltd-ABN 76 104 485 289 http://aus.hybis.info/projects0/gc/awarded/aa005621/f_reports/f0001-aa005621-aar-01 - wna.docx

2 PROPOSED DEVELOPMENT The development is located within Southport on the Gold Coast, on the corner of Smith Street and Parklands Drive. The site is located over the following block of land:

Lot 460 SP222438 (1 Parklands Drive, Southport)

A site locality plan is shown below in Figure 2-1. The proposed development consists of low rise residential accommodation, retail and commercial precincts and a ‘Health and Knowledge Precinct’. The site is will be home the Commonwealth Games Village in 2018 before it is utilised in its ‘legacy’ capacity. The exact configuration of the proposed development is subject to detailed design in conjunction with the QLD Government Developer Partner delivery model, however the latest plan of development is included within Appendix A.

Figure 2-1 Site Locality Plan

A bulk earthworks model of the site has been completed which shows that the proposed surface elevation of the site will vary from approximately 9m AHD in the central areas of the site surrounding the proposed open space area to 25m AHD at the western boundary of the site at Parklands Drive. The site forms a gully with low lying portions of the development located in the centre of the site, following the alignment of Hospital Boulevard.

Page 9: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 3 http://aus.hybis.info/projects0/gc/awarded/aa005621/f_reports/f0001-aa005621-aar-01 - wna.docx

3 EXISTING WATER SUPPLY INFRASTRUCTURE There are existing 250mm diameter potable water mains located within the road reserve of Parklands Drive and Melia Court, which are proposed to act as the connection points to the site. External works within Parklands Drive from Innovation Drive to Main Street and from Hospital Boulevard at the site boundary to the Gold Coast University Hospital (GCUH) to Melia Court shall be necessary to connect the site to the existing water network.

Figure 3-2 below shows the location of the existing potable water network infrastructure surrounding the Parklands site.

Figure 3-2 Existing Water Network Infrastructure

3.1 EXISITNG HYDRAULIC GRADE LINE The existing hydraulic grade lines at the proposed connection points were sourced from the Gold Coast City Council H2OMAP Water model. Table 3-1 below shows the hydraulic grade line at each of the two (2) connection points.

Page 10: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Page 4 Hyder Consulting Pty Ltd-ABN 76 104 485 289 http://aus.hybis.info/projects0/gc/awarded/aa005621/f_reports/f0001-aa005621-aar-01 - wna.docx

Table 3-1 HGLs at the Proposed Connection Points

Network Location HGL

Potable Parklands Drive / Innovation Drive 52.7m

Melia Court 52.5m

Page 11: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 5 http://aus.hybis.info/projects0/gc/awarded/aa005621/f_reports/f0001-aa005621-aar-01 - wna.docx

4 PROPOSED WATER SUPPLY NETWORK It is proposed to provide the development with potable water while meeting GCCC’s Desired Standards of Service (DSS) These standards predominately include the provision of maximum hour demands as well as requirements for minimum and maximum pressure, maximum velocities and requirements for fire flow demands of 30L/s.

It is proposed to supply potable water to all areas of the pipe network while complying with the DSS via a network of 250, 150 and 100mm diameter uPVC potable water mains which generally follow the alignment of the road network internal to the site.

4.1 DESIRED STANDARDS OF SERVICE The DSS as specified in Policy 11: Land Development Guidelines, Section 4 Water Reticulation – Design Requirements of the GCCC Planning Scheme are as follows:

Table 4-1 GCCC Desired Standards of Service

Minimum Pressure 22 meters head

Maximum Pressure 80 meters head

Fire Fighting Network Pressure 12 meters head in the main at the nearest hydrant point

Fire Flow Commercial/Industrial Lot 30L/s for a duration of 4 hours

Maximum Velocity 2.5m/s

4.2 CLARIFICATIONS Gold Coast Water have confirmed in correspondence dated Wednesday 15th May enclosed in Appendix E that the GCCC model for the Coombabah catchment has made an adequate allowance for growth in order to accommodate the future parklands development site and that all surrounding infrastructure are of a sufficient capacity to service the development site with potable water. On this basis it has been assumed that no infrastructure upgrades will be required external to the site.

The modelling exercise performed in this study is intended to demonstrate that the proposed internal reticulation network is of adequate capacity to service the development in accordance with GCCC standards via the specified HGLs at the proposed connection points. External infrastructure has been assessed only where it is necessary to provide a connection between the existing Council connection point and the proposed internal parklands water network.

It is acknowledged that the final development layout may differ slightly from that currently proposed as a result of the detailed design of the development. It is noted however that the “Early Works’ package currently being delivered will establish the trunk infrastructure within Hospital Boulevard and Main Street. This report is intended to provide a strategy for the provision of suitable water reticulation to the remaining development areas. The alignment of mains within the development areas may differ however it is expected that the sizing of infrastructure shall generally be in accordance with this strategy.

Page 12: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Page 6 Hyder Consulting Pty Ltd-ABN 76 104 485 289 http://aus.hybis.info/projects0/gc/awarded/aa005621/f_reports/f0001-aa005621-aar-02 - wna.docx

5 WATER NETWORK ANALYSIS MODELLING The network modelling has been undertaken using WaterCAD Version 8i software. Two (2) models have been established for the proposed development to determine the adequacy of the potable water network during the Commonwealth Games in 2018 and in the fully developed ‘legacy’ scenario. It is intended to demonstrate that the proposed network is of adequate capacity to provide each serviceable area of the development with maximum hour demands and fire flow requirements.

5.1 CALCULATED DEMANDS The potable water network demands and peaking factors are listed below in Table 5-1 and are reproduced as they are seen in Table 4.2 – A Potable Water Supply Average Day Demand and Peaking Factors of GCCC’s Policy 11: Land Development Guidelines Section 4 Water Reticulation – Design Requirements

Table 5-1 Potable Water Supply Average Day Demand and Peaking Factors

Item Design Criteria

Property Type

Case L/ET/day = ADD

Peaking Factors

MDMM MD MH

PW1 Distribution System

RMF Residential Multi Family

Case 1 880 1.14 1.31 2.67

Commercial Public

Case 1 880 1.06 1.12 2.32

A yield development table was used to calculate the number of Equivalent Tenements proposed on site and architectural plans were used to determine where these loadings should be applied. The total demand at each junction is shown in the engineering drawings in Appendix B. The ET and demand calculation table are included in Appendix C.

An analysis has also been completed to assess the site during its use as the Commonwealth Games Village in 2018. Using a conversion of 2.7 equivalent persons per equivalent tenement the following table presents the assessment of the site during the Games.

Table 5-2 Assessment of Site During 2018 Commonwealth Games

Calculated Equivalent Tenements for ‘Legacy’ Development (ET) 2,122

Estimated people to use the site during the 2018 Commonwealth Games (EP)

6,500

Number of Equivalent Persons (EP) per Equivalent Tenement (ET) 2.7

Calculated Equivalent Tenements for ‘Games’ Development (ET) 2,407

The above table illustrates that the demand on the proposed infrastructure during the 2018 Commonwealth Games is greater than in the ‘legacy’ scenario. Both cases have been modelled

Page 13: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 7 http://aus.hybis.info/projects0/gc/awarded/aa005621/f_reports/f0001-aa005621-aar-02 - wna.docx

as part of the water servicing strategy. As part of a sensitive analysis loads during the Games scenario have concentrated on nodes along Main Street. No issues are identified in this sensitivity analysis and all desired standards of service are met for the potable water network.

5.2 WATER NETWORK MODEL Full details of the water network model, including pipe diameters, demands, junction elevations and connections to the existing surrounding network are shown in the engineering drawings attached in Appendix B.

Page 14: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Page 8 Hyder Consulting Pty Ltd-ABN 76 104 485 289 http://aus.hybis.info/projects0/gc/awarded/aa005621/f_reports/f0001-aa005621-aar-01 - wna.docx

6 MODELLING RESULTS Four (4) sets of results have been generated for the junction details, pipe details, reservoir details and fire flow details for the potable water network. These results show that the proposed network has enough capacity to satisfy the specified flow and residual pressure requirements, taking into consideration the demand of each of the proposed development areas and the head losses which result from internal pipe friction. The WaterCAD network reports are included in Appendix D.

The junction table provides a register of each junction within the network and details the elevation, demand, hydraulic grade and pressure.

The pipe details table provides a register of the pipes used within the system with physical measurements as well as calculated flow, velocity and headloss gradient.

The reservoir table details the specifications at the connection points used for the network, including the elevation, net outflow and hydraulic grade.

The fire flow report details each of the junctions within the network and provides details of the total flow needed and total flow available, as well as measurements of residual pressure and the maximum velocity of the pipes. The network has been iteratively optimised to ensure that all fire flow constraints are satisfied and that the systems all operate within the defined standards and requirements.

These results are presented in Appendix D and provide all relevant information regarding the capacity and servicing requirements of the proposed networks.

Page 15: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 9 http://aus.hybis.info/projects0/gc/awarded/aa005621/f_reports/f0001-aa005621-aar-01 - wna.docx

7 CONCLUSION This report has demonstrated that the proposed development of the Commonwealth Games Village and legacy development at the Gold Coast Parklands, Southport can be adequately serviced with water via the existing 250mm diameter potable water mains located in Parklands Drive and Melia Court.

A servicing strategy which comprises an internal reticulation network has been presented, providing piped water service to all relevant areas of the development. The internal reticulation network is to consist of 250mm, 150mm and 100mm diameter uPVC mains. The network follows the alignment of the proposed internal road network. The proposed network has been modelled to ensure there is sufficient capacity to service all relevant areas of the development and has been demonstrated to be compliant with all relevant standards and statutory guidelines.

It is acknowledged that the detailed design of the proposed development may vary the alignment of the water network within the development areas outside of Hospital Boulevard and Main Street. The findings of this strategy however should inform any future planning decisions or design regarding the internal potable water network. Any construction should be consistent with the findings included within this strategy.

Page 16: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Page 10 Hyder Consulting Pty Ltd-ABN 76 104 485 289 http://aus.hybis.info/projects0/gc/awarded/aa005621/f_reports/f0001-aa005621-aar-01 - wna.docx

APPENDIX A

PLAN OF DEVELOPMENT

Page 17: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

69066m†

LAND USE - OPTION 2 MP-120 HArchipelago [email protected] +617 3236 4606 PO BOX 16063 CITY EAST, QLD 4002 AUSTRALIA

ARCHIPELAGO ARCHITECTS PTY LTD ACN 141051158

Archipelago Architects Pty Ltd. CONCEPT DRAWING ONLY.

or copied by any means without the written permission of

All rights reserved. This work is copyright and cannot be reproduced

Scale @ A3 RevisionDrawing NumberDrawing NameProject Name

50 200m0

1:5000

25 100 SCALE 1:5000 @ A3

Client

DEVELOPMENT QUEENSLANDECONOMIC

PARKLANDS REDEVELOPMENTGOLD COAST

08.05.13

527m†

5714m†

4305m†

3870m†

3172m†

3172m†

2560m†9125m†

5220m†

4251m†

8828m†

5106m†

5106m†

7060m†

11185m†

8484m†

12200m†

4819m†

5391m†

5122m†

5122m†

3097m†

2667m†

3768m†

5803m†

6755m†

9410m†

10961m†

4305m†

2043m†

510m†

2662m†

2444m†

116m†

123m†

2

527m

2

51969m

2

16185m

2

69066m

2

94119m

2

70725m

RESIDENTIAL

MIXED USE

KNOWLEDGE

OPEN SPACE

LEGEND

ROAD RESERVE

UNDEFINED LAND

Page 18: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 11 http://aus.hybis.info/projects0/gc/awarded/aa005621/f_reports/f0001-aa005621-aar-01 - wna.docx

APPENDIX B

ENGINEERING DRAWINGS

Page 19: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76
Page 20: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76
Page 21: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76
Page 22: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76
Page 23: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76
Page 24: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76
Page 25: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76
Page 26: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76
Page 27: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Page 12 Hyder Consulting Pty Ltd-ABN 76 104 485 289 http://aus.hybis.info/projects0/gc/awarded/aa005621/f_reports/f0001-aa005621-aar-01 - wna.docx

APPENDIX C

ET AND DEMAND CALCULATION TABLE

Page 28: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Legacy Development by Development Site - Business Case 2012

1 Bedroom 2 Bedroom 3 Bedroom Residential Retail

Commercial,

Health &

Knowledge

Other

Apartments Residential Residential 3,842 0 76 25 0 0 101 8,225 8,225 70

Apartments Residential Residential 6,016 33 103 8 75 0 219 12,148 12,148 123

Apartments Residential Residential 5,622 51 90 0 75 0 216 11,355 11,355 116

Apartments Residential Residential 5,357 14 107 16 0 0 137 10,411 10,411 88

Apartments Residential Residential 6,016 24 116 8 75 0 223 12,628 12,628 127

Apartments Residential Residential 5,622 59 90 0 75 0 224 11,795 11,795 120

Retail & Commercial Residential Mixed Use 3,028 800 5,850 6,650 40

Apartments & Commercial Mixed Use Mixed Use 3,595 19 66 6 0 16 107 8,041 800 650 9,491 79

Apartments & Commercial Mixed Use Mixed Use 3,544 18 72 6 0 16 112 8,436 800 650 9,886 82

Apartments & Commercial Mixed Use Mixed Use 2,649 6 30 0 0 16 52 4,020 500 650 5,170 43

Retail & Commercial H & K H & K 3,030 1,600 5,800 7,400 44

Retail & Commercial Commercial Commercial 3,060 2,500 5,000 7,500 45

Retail & Commercial Commercial Commercial 3,716 1,000 7,800 8,800 53

Retail & Commercial Public Plaza Commercial 1,886 1,200 4,000 5,200 31

Biopharmaceutical

manufacturing facility Games Overlay H & K 10,763 23,000 23,000 138 Biopharmaceutical

manufacturing facility Games Overlay H & K 8,957 21,150 21,150 127

Centre for research Games Overlay H & K 5,445 13,200 13,200 79

Health & Medical Commercial Games Overlay H & K 6,602 13,785 13,785 83 Research Institute, H &K

Commercial Games Overlay H & K 8,842 21,000 21,000 126 Research Institute, H &K

Commercial Games Overlay H & K 9,324 23,300 23,300 140

Research Institute, H &K

Commercial Games Overlay H & K 10,676 800 14,100 14,900 89

QH I ha H & K H & K 10,231 15,000 15,000 90

Centre for research Games Overlay H & K 10,352 26,000 26,000 156

Parkland

Parkland and

Religious Centre

Parkland and

Community

Facility 70,834 2,006 2,006 32

TOTAL 209,009 224 750 69 300 48 1,391 87,059 10,000 200,935 2,006 300,000 2,122

Games Scenario - Business Case 2012

It is estimated that 6,500 people are occupy the Commonwealth Games Village during the 2018 games. This equates to 6,500EP, or 2,407ET.

ET

GFA (m2)Apartments

Single Uni Lodge

Student Unit

4 Bedroom

Student

Accomodation

Total

Units/Apartment

s

Total GFA

Developmen

t Lot

Number

Proposed UseLand Use in 2018

Games

Land Use Post

2018 Games

Development Lot

Site Area (m2)

Page 29: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Node Land Use Area (m2) ET1 - 0 Land Use Category Total Area (m2) Total ET2 Residential 2,553 32 Residential 51,969 644

Residential 2,611 32 Mixed Use 16,185 4183 Residential 3,192 40 Knowledge 94,119 1,060

Residential 4,149 51 21224 Residential 4,679 58

Residential 3,606 45Residential 4,954 61 Land Use Category Conversion Rate Assessment Unit

5 Residential 3,149 39 Residential 0.01239 ET/m2Residential 6,029 75 Mixed Use 0.02583 ET/m2Residential 4,766 59 Knowledge 0.01126 ET/m2Residential 2,553 32

6 Residential 2,553 32Residential 4,659 58Knowledge 4,226 48Mixed Use 1,765 46

7 Residential 2,553 32Mixed Use 1,765 46Mixed Use 2,417 62

8 Mixed Use 2,368 61Knowledge 2,853 32Knowledge 3,870 44

9 Mixed Use 2,097 54Knowledge 2,610 29Knowledge 3,172 36Knowledge 2,853 32

ET Conversion Rates

COMMONWEALTH GAMES VILLAGE - PARKLANDSLegacy Scenario ET Calculations

Total ET and Area

Total

Page 30: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

10 Knowledge 4,297 48Knowledge 3,172 36Knowledge 2,559 29

11 Mixed Use 2,243 58Mixed Use 1,765 46Knowledge 2,561 29Knowledge 2,610 29

12 Mixed Use 1,765 46Knowledge 4,279 48Knowledge 5,546 62Knowledge 2,561 29

13 Knowledge 2,561 29Knowledge 5,633 63Knowledge 6,658 75Knowledge 1,348 15

14 Knowledge 2,236 25Knowledge 2,561 29Knowledge 1,348 15Knowledge 749 8

15 Knowledge 3,767 42Knowledge 2,015 23Knowledge 1,371 15

16 Knowledge 978 11Knowledge 1,348 15Knowledge 2,666 30Knowledge 2,668 30

17 Knowledge 2,153 24Knowledge 1,348 15Knowledge 5,541 62

19 GCPH - 225Total 162,309 2,347

Page 31: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Node Land Use ET's ADD (L/ET/day) Flow (L/s) MDMM (L/s) MD (L/s) MH (L/s)1 - 0 880 0.00 0.00 0.00 0.00 Land Use Category ADD MDMM MD MH2 Residential 32 880 0.32 0.37 0.42 0.86 RMF - Case 1 880 1.14 1.31 2.67

Residential 32 880 0.33 0.38 0.43 0.88 Commercial/Public - Case 1 880 1.06 1.12 2.32Total 64 0.65 0.74 0.85 1.74

3 Residential 40 880 0.40 0.46 0.53 1.08Residential 51 880 0.52 0.60 0.69 1.40

Total 91 0.93 1.06 1.21 2.474 Residential 58 880 0.59 0.67 0.77 1.58

Residential 45 880 0.46 0.52 0.60 1.22Residential 61 880 0.63 0.71 0.82 1.67

Total 164 1.67 1.90 2.19 4.465 Residential 39 880 0.40 0.45 0.52 1.06

Residential 75 880 0.76 0.87 1.00 2.03Residential 59 880 0.60 0.69 0.79 1.61Residential 32 880 0.32 0.37 0.42 0.86

Total 204 2.08 2.37 2.73 5.566 Residential 32 880 0.32 0.37 0.42 0.86

Residential 58 880 0.59 0.67 0.77 1.57Knowledge 48 880 0.48 0.51 0.54 1.12Mixed Use 46 880 0.46 0.49 0.52 1.08

Total 183 1.86 2.04 2.26 4.637 Residential 32 880 0.32 0.37 0.42 0.86

Mixed Use 46 880 0.46 0.49 0.52 1.08Mixed Use 62 880 0.64 0.67 0.71 1.48

Total 140 1.42 1.53 1.65 3.418 Mixed Use 61 880 0.62 0.66 0.70 1.45

Knowledge 32 880 0.33 0.35 0.37 0.76Knowledge 44 880 0.44 0.47 0.50 1.03

Total 137 1.39 1.48 1.56 3.239 Mixed Use 54 880 0.55 0.58 0.62 1.28

Knowledge 29 880 0.30 0.32 0.34 0.69Knowledge 36 880 0.36 0.39 0.41 0.84Knowledge 32 880 0.33 0.35 0.37 0.76

Total 151 1.54 1.63 1.73 3.5810 Knowledge 48 880 0.49 0.52 0.55 1.14

Knowledge 36 880 0.36 0.39 0.41 0.84Knowledge 29 880 0.29 0.31 0.33 0.68

Total 113 1.15 1.22 1.29 2.67

COMMONWEALTH GAMES VILLAGE - PARKLANDSLegacy Scenario Potable Water Demands

Potable Water Supply ADD and Peaking

Page 32: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

11 Mixed Use 58 880 0.59 0.63 0.66 1.37Mixed Use 46 880 0.46 0.49 0.52 1.08Knowledge 29 880 0.29 0.31 0.33 0.68Knowledge 29 880 0.30 0.32 0.34 0.69

Total 162 1.65 1.75 1.85 3.8212 Mixed Use 46 880 0.46 0.49 0.52 1.08

Knowledge 48 880 0.49 0.52 0.55 1.14Knowledge 62 880 0.64 0.67 0.71 1.48Knowledge 29 880 0.29 0.31 0.33 0.68

Total 185 1.88 2.00 2.11 4.3713 Knowledge 29 880 0.29 0.31 0.33 0.68

Knowledge 63 880 0.65 0.68 0.72 1.50Knowledge 75 880 0.76 0.81 0.86 1.77Knowledge 15 880 0.15 0.16 0.17 0.36

Total 182 1.86 1.97 2.08 4.3114 Knowledge 25 880 0.26 0.27 0.29 0.59

Knowledge 29 880 0.29 0.31 0.33 0.68Knowledge 15 880 0.15 0.16 0.17 0.36Knowledge 8 880 0.09 0.09 0.10 0.20

Total 78 0.79 0.84 0.89 1.8315 Knowledge 42 880 0.43 0.46 0.48 1.00

Knowledge 23 880 0.23 0.24 0.26 0.54Knowledge 15 880 0.16 0.17 0.18 0.36

Total 81 0.82 0.87 0.92 1.9016 Knowledge 11 880 0.11 0.12 0.13 0.26

Knowledge 15 880 0.15 0.16 0.17 0.36Knowledge 30 880 0.31 0.32 0.34 0.71Knowledge 30 880 0.31 0.32 0.34 0.71

Total 86 0.88 0.93 0.98 2.0417 Knowledge 24 880 0.25 0.26 0.28 0.57

Knowledge 15 880 0.15 0.16 0.17 0.36Knowledge 62 880 0.64 0.67 0.71 1.47

Total 188 1.92 2.03 2.15 2.4119 Knowledge 225 880 2.29 2.43 2.57 5.32

Page 33: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Node Land Use Area (m2) ET1 - 0 Land Use Category Total Area (m2) Total ET Total EP2 Residential 2,553 36 Residential (Proposed) 51,969 731 1,973

Residential 2,611 37 Mixed Use (Proposed) 16,185 474 1,2813 Residential 3,192 45 Knowledge (Proposed) 94,119 1,202 3,246

Residential 4,149 58 2,407 6,5004 Residential 4,679 66

Residential 3,606 51Residential 4,954 70 Land Use Category Conversion Rate Assessment Unit

5 Residential 3,149 44 Residential (Proposed) 0.01407 ET/m2Residential 6,029 85 Mixed Use (Proposed) 0.02929 ET/m2Residential 4,766 67 Knowledge (Proposed) 0.01277 ET/m2Residential 2,553 36

6 Residential 2,553 36 A conversion rate of 2.7EP per ET has been adoptedResidential 4,659 66Knowledge 4,226 54Mixed Use 1,765 52

7 Residential 2,553 36Mixed Use 1,765 52Mixed Use 2,417 71

8 Mixed Use 2,368 69Knowledge 2,853 36Knowledge 3,870 49

9 Mixed Use 2,097 61Knowledge 2,610 33Knowledge 3,172 41Knowledge 2,853 36

Total

ET Conversion Rates

COMMONWEALTH GAMES VILLAGE - PARKLANDSGames Scenario ET Calculations

Total ET and Area

Page 34: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

10 Knowledge 4,297 55Knowledge 3,172 41Knowledge 2,559 33

11 Mixed Use 2,243 66Mixed Use 1,765 52Knowledge 2,561 33Knowledge 2,610 33

12 Mixed Use 1,765 52Knowledge 4,279 55Knowledge 5,546 71Knowledge 2,561 33

13 Knowledge 2,561 33Knowledge 5,633 72Knowledge 6,658 85Knowledge 1,348 17

14 Knowledge 2,236 29Knowledge 2,561 33Knowledge 1,348 17Knowledge 749 10

15 Knowledge 3,767 48Knowledge 2,015 26Knowledge 1,371 18

16 Knowledge 978 12Knowledge 1,348 17Knowledge 2,666 34Knowledge 2,668 34

17 Knowledge 2,153 27Knowledge 1,348 17Knowledge 5,541 71

19 GCPH - 225Total 162,309 2,633

Page 35: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Node Land Use ET's ADD (L/ET/day) Flow (L/s) MDMM (L/s) MD (L/s) MH (L/s)1 - 0 880 0.00 0.00 0.00 0.00 Land Use Category ADD MDMM MD MH2 Residential 36 880 0.37 0.42 0.48 0.98 RMF - Case 1 880 1.14 1.31 2.67

Residential 37 880 0.37 0.43 0.49 1.00 Commercial/Public - Case 1 880 1.06 1.12 2.32Total 73 0.74 0.84 0.97 1.98

3 Residential 40 880 0.40 0.46 0.53 1.08Residential 51 880 0.52 0.60 0.69 1.40

Total 91 0.93 1.06 1.21 2.474 Residential 66 880 0.67 0.76 0.88 1.79

Residential 51 880 0.52 0.59 0.68 1.38Residential 70 880 0.71 0.81 0.93 1.89

Total 186 1.90 2.16 2.48 5.065 Residential 44 880 0.45 0.51 0.59 1.20

Residential 85 880 0.86 0.98 1.13 2.31Residential 67 880 0.68 0.78 0.89 1.82Residential 36 880 0.37 0.42 0.48 0.98

Total 232 2.36 2.69 3.10 6.316 Residential 36 880 0.37 0.42 0.48 0.98

Residential 66 880 0.67 0.76 0.87 1.78Knowledge 54 880 0.55 0.58 0.62 1.28Mixed Use 52 880 0.53 0.56 0.59 1.22

Total 207 2.11 2.32 2.56 5.267 Residential 36 880 0.37 0.42 0.48 0.98

Mixed Use 52 880 0.53 0.56 0.59 1.22Mixed Use 71 880 0.72 0.76 0.81 1.67

Total 158 1.61 1.74 1.88 3.878 Mixed Use 69 880 0.71 0.75 0.79 1.64

Knowledge 36 880 0.37 0.39 0.42 0.86Knowledge 49 880 0.50 0.53 0.56 1.17

Total 155 1.58 1.68 1.77 3.679 Mixed Use 61 880 0.63 0.66 0.70 1.45

Knowledge 33 880 0.34 0.36 0.38 0.79Knowledge 41 880 0.41 0.44 0.46 0.96Knowledge 36 880 0.37 0.39 0.42 0.86

Total 172 1.75 1.85 1.96 4.06

COMMONWEALTH GAMES VILLAGE - PARKLANDSGames Scenario Potable Water Demands

Potable Water Supply ADD and Peaking

Page 36: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

10 Knowledge 55 880 0.56 0.59 0.63 1.30Knowledge 41 880 0.41 0.44 0.46 0.96Knowledge 33 880 0.33 0.35 0.37 0.77

Total 128 1.30 1.38 1.46 3.0311 Mixed Use 66 880 0.67 0.71 0.75 1.55

Mixed Use 52 880 0.53 0.56 0.59 1.22Knowledge 33 880 0.33 0.35 0.37 0.77Knowledge 33 880 0.34 0.36 0.38 0.79

Total 183 1.87 1.98 2.09 4.3312 Mixed Use 52 880 0.53 0.56 0.59 1.22

Knowledge 55 880 0.56 0.59 0.62 1.29Knowledge 71 880 0.72 0.76 0.81 1.67Knowledge 33 880 0.33 0.35 0.37 0.77

Total 210 2.14 2.27 2.39 4.9613 Knowledge 33 880 0.33 0.35 0.37 0.77

Knowledge 72 880 0.73 0.78 0.82 1.70Knowledge 85 880 0.87 0.92 0.97 2.01Knowledge 17 880 0.18 0.19 0.20 0.41

Total 207 2.11 2.23 2.36 4.8914 Knowledge 29 880 0.29 0.31 0.33 0.67

Knowledge 33 880 0.33 0.35 0.37 0.77Knowledge 17 880 0.18 0.19 0.20 0.41Knowledge 10 880 0.10 0.10 0.11 0.23

Total 88 0.90 0.95 1.00 2.0815 Knowledge 48 880 0.49 0.52 0.55 1.14

Knowledge 26 880 0.26 0.28 0.29 0.61Knowledge 18 880 0.18 0.19 0.20 0.41

Total 91 0.93 0.99 1.04 2.1616 Knowledge 12 880 0.13 0.13 0.14 0.30

Knowledge 17 880 0.18 0.19 0.20 0.41Knowledge 34 880 0.35 0.37 0.39 0.80Knowledge 34 880 0.35 0.37 0.39 0.81

Total 98 1.00 1.06 1.12 2.3117 Knowledge 27 880 0.28 0.30 0.31 0.65

Knowledge 17 880 0.18 0.19 0.20 0.41Knowledge 71 880 0.72 0.76 0.81 1.67

Total 213 2.17 2.30 2.43 2.7319 GCPH 225 880 2.29 2.43 2.57 5.32

Page 37: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76 104 485 289 Page 13 http://aus.hybis.info/projects0/gc/awarded/aa005621/f_reports/f0001-aa005621-aar-01 - wna.docx

APPENDIX D

WATERCAD NETWORK REPORTS

Page 38: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

PROJECT: Parklands Project Engineer: B.F

PROJECT NUMBER: AA005621 Software: WaterCad v8i

DATE: 18/06/2013

SCENARIO:

Label Elevation (m) Demand (L/s) Hydraulic Grade (m) Pressure (m H2O)

J-1 9 (N/A) (N/A) (N/A)

J-2 9.5 1.74 51.31 41.7

J-3 10 2.47 51.19 41.1

J-4 15.5 4.46 51.18 35.6

J-5 14 5.56 51.2 37.1

J-6 12 4.63 51.41 39.3

J-7 9.5 3.41 51.62 42

J-8 9 3.23 51.76 42.7

J-9 13 3.58 51.63 38.6

J-10 13 2.67 51.61 38.5

J-11 12.5 3.82 51.62 39

J-12 10.5 4.37 51.48 40.9

J-13 13.5 4.31 51.54 38

J-14 18 1.83 51.65 33.6

J-15 19.5 1.9 51.65 32.1

J-16 21 2.04 51.71 30.6

J-17 16.5 2.41 51.57 35

J-18 19.5 0 51.57 32

J-19 24.5 5.32 51.85 27.3

J-20 10 0 52.31 42.2

J-22 10 0 52.19 42.1

J-23 11 0 51.18 40.1

J-24 16 0 51.18 35.1

J-25 20 0 51.2 31.1

POTABLE WATER NETWORK ANALYSIS - JUNCTION PRESSURES

Legacy

Page 39: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

PROJECT: Parklands Project Engineer: B.F

PROJECT NUMBER: AA005621 Software: WaterCad v8i

DATE: 18/06/2013

SCENARIO: Legacy

Label Length (m) Diameter (mm) Material Hazen-Williams C Flow (L/s) Velocity (m/s) Headloss Gradient (m/m)

P-1 365 100 uPVC 100 (N/A) (N/A) (N/A)

P-2 15 150 uPVC 110 (N/A) (N/A) (N/A)

P-3 114 150 uPVC 110 5.05 0.29 0.001

P-4 109 150 uPVC 110 1.68 0.1 0

P-5 170 150 uPVC 110 -1.88 0.11 0

P-6 124 100 uPVC 100 1.42 0.18 0.001

P-7 124 150 uPVC 110 8.21 0.46 0.002

P-8 122 150 uPVC 100 -6.02 0.34 0.002

P-9 124 150 uPVC 110 6.62 0.37 0.002

P-10 188 250 uPVC 110 16.27 0.33 0.001

P-11 258 250 uPVC 110 25.51 0.52 0.002

P-12 86 150 uPVC 110 6.02 0.34 0.001

P-13 90 150 uPVC 110 2.67 0.15 0

P-14 149 150 uPVC 110 1.51 0.09 0

P-15 92 250 uPVC 110 1.97 0.04 0

P-16 93 150 uPVC 100 -4.03 0.23 0.001

P-17 124 150 uPVC 110 -5.26 0.3 0.001

P-18 119 150 uPVC 100 -3.14 0.18 0.001

P-19 119 250 uPVC 110 9.54 0.19 0

P-20 108 150 uPVC 110 -1.74 0.1 0

P-21 124 150 uPVC 110 -4.65 0.26 0.001

P-21 99 150 uPVC 110 -0.47 0.03 0

P-22 71 150 uPVC 100 -2.8 0.16 0

P-23 23 150 uPVC 110 0 0 0

P-24 124 150 uPVC 110 -5.21 0.29 0.001

P-25 72 250 uPVC 110 16.49 0.34 0.001

P-26 79 250 uPVC 110 -26.92 0.55 0.002

P-27 128 150 uPVC 110 -3.17 0.18 0

P-28 324 250 uPVC 110 32.24 0.66 0.003

P-29 66 250 uPVC 110 -25.51 0.52 0.002

P-30 115 250 uPVC 110 -25.51 0.52 0.002

P-31 109 150 uPVC 110 0.9 0.05 0

P-32 93 150 uPVC 110 0.9 0.05 0

P-33 145 150 uPVC 110 0.9 0.05 0

P-34 142 150 uPVC 110 0 0 0

POTABLE WATER NETWORK ANALYSIS - PIPE VELOCITY

Page 40: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

PROJECT: Parklands Project Engineer: B.F

PROJECT NUMBER: AA005621 Software: WaterCad v8i

DATE: 18/06/2013

SCENARIO:

Label Elevation (m) Flow (Out net) (L/s)Hydraulic Grade (m)

R-1 52.5 25.51 52.5

R-2 52.8 (N/A) (N/A)

R-3 52.7 32.24 52.7

POTABLE WATER NETWORK ANALYSIS - RESERVOIR DETAILS

Legacy

Page 41: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

PROJECT: Parklands Project Engineer: B.F

PROJECT NUMBER: AA005621 Software: WaterCad v8i

DATE: 18/06/2013

SCENARIO:

Label

Satisfies Fire

Flow

Constraints?

Fire Flow (Total

Needed) (L/s)

Fire Flow (Total

Available) (L/s)

Pressure (Calculated

Residual) (m H2O)

Velocity of

Maximum Pipe (m/s)

J-1 (N/A) (N/A) (N/A) (N/A) (N/A)

J-2 TRUE 31.74 60.4 32.1 2.5

J-3 TRUE 32.47 67.31 25.4 2.5

J-4 TRUE 34.46 71.03 18.6 2.5

J-5 TRUE 35.56 74.75 23.1 2.5

J-6 TRUE 34.63 98.1 27.1 2.5

J-7 TRUE 33.41 186 26.5 2.5

J-8 TRUE 33.23 181.17 29.8 2.5

J-9 TRUE 33.58 105.85 28.8 2.5

J-10 TRUE 32.67 44.18 30.9 2.5

J-11 TRUE 33.82 180.48 24.7 2.5

J-12 TRUE 34.37 112.4 27.7 2.5

J-13 TRUE 34.31 110.42 25.1 2.5

J-14 TRUE 31.83 170.91 21 2.5

J-15 TRUE 31.9 121.4 19.6 2.5

J-16 TRUE 32.04 165.67 19.3 2.5

J-17 TRUE 32.41 85.29 24 2.5

J-18 TRUE 30 44.18 26.6 2.5

J-19 TRUE 35.32 157.91 18.1 2.5

J-20 TRUE 30 124.62 38.9 2.5

J-22 TRUE 30 137.84 36.8 2.5

J-23 TRUE 30 65.31 19.7 2.5

J-24 TRUE 30 65.44 14.1 2.5

J-25 TRUE 30 44.18 16 2.5

POTABLE WATER NETWORK ANALYSIS - FIREFLOW REPORT

Legacy

Page 42: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

PROJECT: Parklands Project Engineer: B.F

PROJECT NUMBER: AA005621 Software: WaterCad v8i

DATE: 18/06/2013

SCENARIO:

Label Elevation (m) Demand (L/s) Hydraulic Grade (m) Pressure (m H2O)

J-1 9 (N/A) (N/A) (N/A)

J-2 9.5 1.98 51.01 41.4

J-3 10 2.47 50.87 40.8

J-4 15.5 5.06 50.85 35.3

J-5 14 6.31 50.88 36.8

J-6 12 5.26 51.13 39.1

J-7 9.5 3.87 51.39 41.8

J-8 9 3.67 51.56 42.5

J-9 13 4.06 51.41 38.3

J-10 13 3.03 51.37 38.3

J-11 12.5 4.33 51.39 38.8

J-12 10.5 4.96 51.22 40.6

J-13 13.5 4.89 51.29 37.7

J-14 18 2.08 51.43 33.4

J-15 19.5 2.16 51.43 31.9

J-16 21 2.31 51.5 30.4

J-17 16.5 2.73 51.33 34.8

J-18 19.5 0 51.33 31.8

J-19 24.5 5.32 51.68 27.1

J-20 10 0 52.26 42.2

J-22 10 0 52.11 42

J-23 11 0 50.86 39.8

J-24 16 0 50.86 34.8

J-25 20 0 50.88 30.8

POTABLE WATER NETWORK ANALYSIS - JUNCTION PRESSURES

Games

Page 43: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

PROJECT: Parklands Project Engineer: B.F

PROJECT NUMBER: AA005621 Software: WaterCad v8i

DATE: 18/06/2013

SCENARIO: Games

Label Length (m) Diameter (mm) Material Hazen-Williams C Flow (L/s) Velocity (m/s) Headloss Gradient (m/m)

P-1 365 100 uPVC 100 (N/A) (N/A) (N/A)

P-2 15 150 uPVC 110 (N/A) (N/A) (N/A)

P-3 114 150 uPVC 110 5.56 0.31 0.001

P-4 109 150 uPVC 110 2.01 0.11 0

P-5 170 150 uPVC 110 -1.97 0.11 0

P-6 124 100 uPVC 100 1.6 0.2 0.001

P-7 124 150 uPVC 110 9.14 0.52 0.003

P-8 122 150 uPVC 100 -6.68 0.38 0.002

P-9 124 150 uPVC 110 7.45 0.42 0.002

P-10 188 250 uPVC 110 18.39 0.37 0.001

P-11 258 250 uPVC 110 28.89 0.59 0.002

P-12 86 150 uPVC 110 6.82 0.39 0.002

P-13 90 150 uPVC 110 3.03 0.17 0

P-14 149 150 uPVC 110 1.68 0.1 0

P-15 92 250 uPVC 110 2.06 0.04 0

P-16 93 150 uPVC 100 -4.49 0.25 0.001

P-17 124 150 uPVC 110 -5.94 0.34 0.001

P-18 119 150 uPVC 100 -3.52 0.2 0.001

P-19 119 250 uPVC 110 10.65 0.22 0

P-20 108 150 uPVC 110 -1.94 0.11 0

P-21 124 150 uPVC 110 -5.26 0.3 0.001

P-21 99 150 uPVC 110 -0.54 0.03 0

P-22 71 150 uPVC 100 -3.15 0.18 0.001

P-23 23 150 uPVC 110 0 0 0

P-24 124 150 uPVC 110 -5.88 0.33 0.001

P-25 72 250 uPVC 110 18.53 0.38 0.001

P-26 79 250 uPVC 110 -30.28 0.62 0.002

P-27 128 150 uPVC 110 -3.57 0.2 0.001

P-28 324 250 uPVC 110 35.6 0.73 0.003

P-29 66 250 uPVC 110 -28.89 0.59 0.002

P-30 115 250 uPVC 110 -28.89 0.59 0.002

P-31 109 150 uPVC 110 1.08 0.06 0

P-32 93 150 uPVC 110 1.08 0.06 0

P-33 145 150 uPVC 110 1.08 0.06 0

P-34 142 150 uPVC 110 0 0 0

POTABLE WATER NETWORK ANALYSIS - PIPE VELOCITY

Page 44: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

PROJECT: Parklands Project Engineer: B.F

PROJECT NUMBER: AA005621 Software: WaterCad v8i

DATE: 18/06/2013

SCENARIO:

Label Elevation (m) Flow (Out net) (L/s)Hydraulic Grade (m)

R-1 52.5 28.89 52.5

R-2 52.8 (N/A) (N/A)

R-3 52.7 35.6 52.7

POTABLE WATER NETWORK ANALYSIS - RESERVOIR DETAILS

Games

Page 45: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

PROJECT: Parklands Project Engineer: B.F

PROJECT NUMBER: AA005621 Software: WaterCad v8i

DATE: 18/06/2013

SCENARIO:

Label

Satisfies Fire

Flow

Constraints?

Fire Flow (Total

Needed) (L/s)

Fire Flow (Total

Available) (L/s)

Pressure (Calculated

Residual) (m H2O)

Velocity of

Maximum Pipe (m/s)

J-1 (N/A) (N/A) (N/A) (N/A) (N/A)

J-2 TRUE 31.98 59.28 31.7 2.5

J-3 TRUE 32.47 65.62 25.2 2.5

J-4 TRUE 35.06 69.99 18.5 2.5

J-5 TRUE 36.31 74.32 22.6 2.5

J-6 TRUE 35.26 96.86 26.8 2.5

J-7 TRUE 33.87 179.44 26.6 2.5

J-8 TRUE 33.67 175.77 29.8 2.5

J-9 TRUE 34.06 105.08 28.4 2.5

J-10 TRUE 33.03 44.18 30.6 2.5

J-11 TRUE 34.33 174.3 24.8 2.5

J-12 TRUE 34.96 111.56 27.2 2.5

J-13 TRUE 34.89 109.88 24.7 2.5

J-14 TRUE 32.08 164.85 21 2.5

J-15 TRUE 32.16 121.43 19 2.5

J-16 TRUE 32.31 159.84 19.3 2.5

J-17 TRUE 32.73 84.85 23.6 2.5

J-18 TRUE 30 44.18 26.2 2.5

J-19 TRUE 35.32 152.07 18.1 2.5

J-20 TRUE 30 118.47 38.9 2.5

J-22 TRUE 30 132.32 36.8 2.5

J-23 TRUE 30 63.65 19.7 2.5

J-24 TRUE 30 63.8 14.2 2.5

J-25 TRUE 30 44.18 15.3 2.5

POTABLE WATER NETWORK ANALYSIS - FIREFLOW REPORT

Games

Page 46: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Page 14 Hyder Consulting Pty Ltd-ABN 76 104 485 289 http://aus.hybis.info/projects0/gc/awarded/aa005621/f_reports/f0001-aa005621-aar-01 - wna.docx

APPENDIX E

GOLD COAST WATER CORRESPONDENCE

Page 47: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

1

Ben Frost

From: ADINA Anton <[email protected]>

Sent: 14 May 2013 4:24 PM

To: Ben Frost

Cc: Travis Seresheff; AA005621; KHAN Sayedur; HOSSAIN Shahadat; ADINA Anton

Subject: RE: Parklands Water and Sewer Models

Hi Ben, The following ETs that you have queried below are for Lot 460SP222438 (Parklands Site), Lot

1SP227574 & Lot 3SP227574 at the Model Node W15-03662V. 2011: 35.93

2016: 1389.38

2021: 2423.19 PSD: 3228.31

However, only Lot 460SP222438 (Parklands Site) should be considered in your study which have

ETs below. These ET's will be the same for both water and sewerage. 2011: 0 2016: 807.1

2021: 1,614.7

PSD: 2,419.8

With your calculated ET of 2,122 for the site, external network modelling will not be required for both

water and sewer as ET allowed from our study is higher than the required calculated ET. However, you will need to size your internal infrastructure using your calculated ET and include any

infrastructure that will connect to the GCCC's existing Water and Sewer infrastructure.

Cheers.

Anton Adina

Coordinator Infrastructure Planning Gold Coast Water City of Gold Coast T: 07 55828949 PO Box 5042 Gold Coast Mail Centre Qld 9729 cityofgoldcoast.com.au

From: Ben Frost [mailto:[email protected]]

Sent: Friday, 10 May 2013 11:41 To: ADINA Anton Cc: Travis Seresheff; AA005621

Subject: RE: Parklands Water and Sewer Models

Hi Anton,

Page 48: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

1

Ben Frost

From: ADINA Anton <[email protected]>

Sent: 15 May 2013 4:45 PM

To: Ben Frost

Cc: KHAN Sayedur; HOSSAIN Shahadat; Travis Seresheff; ADINA Anton

Subject: FW: Parklands HGL Levels for Internal Water Network Infrastructure

Hi Ben, Below are the minimum HGLs (minimum pressure + elevation) from GCCC's existing water

infrastructure junctions for possible connection of your internal infrastructure. Node SW14494 - 52.7m Node NA1 - 52.5m Node W15-04382N - 52.8m You can not use those 4 junctions mentioned in your email below as these are future infrastructures

from SKM study. You should extend your water infrastructure design up to your source, ie. the existing

GCCC's water infrastructure. Please note that those future water pipes provided in the model should not be used in your design. I hope this make sense to you, if not please let me know. Cheers. Kind Regards, Anton Adina

Coordinator Infrastructure Planning Gold Coast Water City of Gold Coast T: 07 55828949 PO Box 5042 Gold Coast Mail Centre Qld 9729 cityofgoldcoast.com.au

From: Ben Frost [mailto:[email protected]] Sent: Wednesday, 15 May 2013 10:44 To: ADINA Anton

Cc: Travis Seresheff; AA005621 Subject: Parklands HGL Levels for Internal Water Network Infrastructure

Hi Anton,

I just wanted to confirm with you HGL levels that I have obtained from H2OMAP which I intend to use when sizing

the internal potable water infrastructure. These levels are taken from the ‘2056MD_MOL_OPT2, 2056 MD scenario

with Augmentation’ after a 3 Day Run time setting. The proposed connection points and minimum pressures are:

Page 49: GOLD COAST PARKLANDS - Department of State Development ... · Gold Coast Parklands - Early Works and Trunk Infrastructure—Water Servicing Strategy Hyder Consulting Pty Ltd-ABN 76

1

Ben Frost

From: ADINA Anton <[email protected]>

Sent: 5 June 2013 11:57 AM

To: Ben Frost

Cc: HOSSAIN Shahadat; Mark Hargraves ([email protected])

([email protected]); Travis Seresheff; KHAN Sayedur

Subject: RE: Parklands Trunk Infrastructure

Hi Ben, I can confirm that conversion of EP to ET is 2.73 as per GCW DSS. Also, external network modelling is not required as equivalent ET from the assumed 6,500 EP is 2,407ET which is lower than what we have in the Coombabah Master Plan model. Cheers. Kind Regards, Anton Adina

Coordinator Infrastructure Planning Gold Coast Water City of Gold Coast T: 07 55828949 PO Box 5042 Gold Coast Mail Centre Qld 9729 cityofgoldcoast.com.au

From: Ben Frost [mailto:[email protected]] Sent: Wednesday, 5 June 2013 11:25 To: ADINA Anton

Cc: HOSSAIN Shahadat; Mark Hargraves ([email protected]) ([email protected]); Travis Seresheff Subject: Parklands Trunk Infrastructure

Hi Anton,

I just wanted to confirm our conversation yesterday that the conversion rate of 2.7EP per ET should be used when

assessing the loadings during the 2018 Games scenario. Assuming that there will be 6,500EP on site during the

games this results in 2,407ET, which is more than 2,122ET in the legacy case. I will therefore include an additional

scenario which models the loading due to the games. I note that in previous emails you quoted that 2,419ET had

been used for assessing external infrastructure. Can you please confirm that external network modelling is still not

required due to the 2018 games scenario and that the 2.7EP per ET rate is correct?

Regards,

Ben Frost Civil Engineer