QUAVAC VACUFLOW OPERATION - Easy to Understand Steps

Download QUAVAC VACUFLOW OPERATION - Easy to Understand Steps

Post on 21-Aug-2015

22 views

Category:

Engineering

6 download

Embed Size (px)

TRANSCRIPT

  1. 1. -wvvvv.quavac.com STOP LEVEL ~II ready for the next cycle . . '. The stop level is reached and the Vacuflow valve is closed by turning off the starter valve ~II ... ...' ~ ~;" water out" ' IIThe waste water collected as a water-air mixture is transported out of the bufferpot in the piping network. -: START LEVEL " ' .;' . . .:.." " incoming water through gravity If) The starting level is reached and the Vacuflow valve is opened by the starter valve on the float mechanism. '.'... . ',...." " , ." ..;-. ,,4' .,- " ~..' ~'.~ ... ~._(J_I_ll _ ., 1-HI-+-I-~------,.j' Waste water flows under gravity into the bufferpot. The Vacuflow valve is closed in this situation. ' '..;~ ~. ... ~n-r-II- .": :.;.~; U'--~ ". -., .. _'. ..' , ..~. incoming water through gravity Operation in 4 steps acu interface unit