R&M Work 7 Months 22.08.2014 NEW Work 10 Months 22.11.2014 Progress Report of Special Plan(BRGF) Total No. of New PSS in scope:- 2 nos. Sl. No. Name of new PSS 1 Barh-2 2x10 2 Parsa-Bazaar 2x10 Total No. of Augmentation PSS in scope:-12 nos. Sl. No. Name of PSS 1 Masaurhi New PSS 3x5MVA 1X10+2x5=20 2 Kura Nawada PSS. 2 X 5 MVA + 1 X 3.15 MVA 1X10+1x5+1x3.15=18.15 3 Sampatchak PSS- 2 X 5 MVA + 1 X 3.15 MVA 2X10+1x3.15=23.15 4 Air-Force PSS. 2x5+1x1.6 MVA 1X10+1x5 +1x1.6=16.6 5 Bihta-old PSS 2 X 5 MVA + 2X 3.15 MVA 1X10+1x5+2x3.15=21.3 6 Paliganj PSS 1x5+2x3.15 MVA 1X10+2x3.15=13.15 7 Mokama PSS 2 X 5 MVA 1X10+1x5=15 8 Fatuha PSS 3 X 5 MVA + 1 X 10 MVA 3X10+1X5=35 9 Barh PSS 5 X 5MVA 1X10+4X5=30 10 Hatidah PSS 3x5+1x3.15MVA MVA 1X10+2X5+1x3.15=23.15 12 Sabalpur 13 Bakhtiyarpur South Bihar Power Distribution Company L Achievement Vs Target(Supply + Erection ) for (New & R&M Works) under Sp Name of Agency: M/s East India Udyog limited,Ghaziabad Districts: Patna LOA No & Date: 1483 & 1484 Date :-29.11.13 Date of Agreement/Effective date: 23.01.14 Package Cost: 95.98 Crores Date of Complet ion Capacity (in MVA) Availability of land Proposal Laying at DM office Land Acquired on dated 15.05.2014 Present Capacity (in MVA) Proposed Capacity (in MVA)

Upload: abhishek-tiwari

Post on 22-Dec-2015

269 views

Category:

Documents


4 download

DESCRIPTION

it is about how to prepare PSS report.

TRANSCRIPT

Page 1: PSS Report206

Date:- 26.03.15

R&M Work 7 Months 22.08.2014

NEW Work 10 Months 22.11.2014

Progress Report of Special Plan(BRGF) Phase I Total No. of New PSS in scope:- 2 nos.

Sl. No. Name of new PSS Availability of land Current work status

1 Barh-2 2x10

2 Parsa-Bazaar 2x10

Total No. of Augmentation PSS in scope:-12 nos.

Sl. No. Name of PSS Current work status

1 Masaurhi New PSS 3x5MVA 1X10+2x5=20 Installed (1 No.)2 Kura Nawada PSS. 2 X 5 MVA + 1 X 3.15 MVA 1X10+1x5+1x3.15=18.15 Installed (1 No.)3 Sampatchak PSS- 2 X 5 MVA + 1 X 3.15 MVA 2X10+1x3.15=23.15 Installed (1 No.)4 Air-Force PSS. 2x5+1x1.6 MVA 1X10+1x5 +1x1.6=16.6 Installed (1 No.)5 Bihta-old PSS 2 X 5 MVA + 2X 3.15 MVA 1X10+1x5+2x3.15=21.36 Paliganj PSS 1x5+2x3.15 MVA 1X10+2x3.15=13.15 Installed (1 No.)7 Mokama PSS 2 X 5 MVA 1X10+1x5=15 Installed (1 No.)8 Fatuha PSS 3 X 5 MVA + 1 X 10 MVA 3X10+1X5=35 Installed (2 No.)9 Barh PSS 5 X 5MVA 1X10+4X5=30 Installed (1 No.)

10 Hatidah PSS 3x5+1x3.15MVA MVA 1X10+2X5+1x3.15=23.15 Installed (1 No.)12 Sabalpur Installed (1 No.)13 Bakhtiyarpur Installed (1 No.)

South Bihar Power Distribution Company Limited:PatnaAchievement Vs Target(Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-I

Name of Agency: M/s East India Udyog limited,Ghaziabad

Districts: PatnaLOA No & Date: 1483 & 1484 Date :-29.11.13

Date of Agreement/Effective date: 23.01.14

Package Cost: 95.98 Crores

Date of Complet

ion

Capacity(in MVA)

Proposal Laying at DM office

Land Acquired on dated 15.05.2014

Work started at Parsa Bazar New PSS- 1),Boundary wall completed ,control room , gaurd room, roof casting , perapet work Completed & Equipment foundation of 33 KV side has been completed upto Power Transformer remaing 11 KV side under

progress

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 2: PSS Report206

Page 2 of 44

Date:- 26.03.15

Award Cost- 207.3 Crore

Date of Completion 04.10.2015

Progress Report of Special Plan(BRGF) Phase II Total No. of New PSS in scope:- 1 nos.

Sl. No. Name of new PSS Availability of land Current work status

1 Devkuli 2x10 Proposal lying with DM

Total No. of Augmentation PSS in scope:- 05 nos.

Sl. No. Name of PSS Current work status

1 Fatuha PSS 3 X 5 MVA + 1 X 10 MVA 2X10+2X5=30 Installed (1 No.)2 Biharibigha PSS 1 X 5 MVA + 1 X 3.15 MVA 2X5=103 kanpa PSS 2 X 3. 15 MVA + 1 X 1.6 MVA 3X3.15=9.45

Additional Power Transformer

1 Dhanarua PSS 2x3.15 MVA 1x10+2X3.15=16.302 kewta Dariyapur PSS 1 X3.1 5 MVA 1X5+1X3.15=8.15 Installed (1 No.)

South Bihar Power Distribution Company Limited:PatnaAchievement Vs Target(Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase II

Name of Agency: M/s Supreme-VPIL JV

Districts: Patna

LOA No & Date: 583 & 584 Date :-25.02.14

Date of Agreement/Effective date: 03.04.14

Capacity(in MVA)

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 3: PSS Report206

Page 3 of 44

Date:- 26.03.15

Total No. of Augmentation PSS in scope:- 05 nos.

Sl. No. Name of PSS Current work status

1 Nalanda 3x5+1x3.15 MVA 1X10+2X5+1x3.15=23.15 Installed (1 No.)

2 Rajgir PSS- 01 Nos. 3x5MVA+1x10 MVA 2X10+2X5=20 Installed (1 No.)3 Ekangersarai PSS- 01 Nos 2 X 5 MVA 1X10+1X5=15 Installed (1 No.)4 Chandi PSS- 01 Nos. 1X5+1x3.15 1X10+1X3.15=13.15 Installed (1 No.)5 Raitar PSS- 01 nos. 2 X 5 MVA 1x10+1X5=15 Installed (1 No.)

South Bihar Power Distribution Company Limited:PatnaAchievement Vs Target(Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-I

Name of Agency: M/s East India Udyog limited,Ghaziabad

Districts: NalandaLOA No & Date: 1483 & 1484 Date :-29.11.13

Date of Agreement/Effective date: 23.01.14

Package Cost: 95.98 Crores

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 4: PSS Report206

Page 4 of 44

3*5MVA,1*3.15MVA

Page 5: PSS Report206

Page 5 of 44

Date:- 26.03.15

Award Cost-168.6 Crore

Date of Completion 23.10.2015

Total No. of Augmentation PSS in scope:- 02 nos.

Sl. No. Name of PSS Current work status

1 Nalanda PSS 3 X 5 MVA + 1 X 3.15 MVA 1X10+2X5+1X3.15=23.15

2 Silao PSS 2X 3.15 MVA 1X5+1X3.15=8.15

Additional Power Transformer - 2 nos.3 Islampur PSS 1 X 5 MVA + 1X 3.15 MVA 1X10+1X5+1X3.15=18.154 Dhamauli PSS 1 x 3.15 MVA 1X5+1X3.15=8.15

South Bihar Power Distribution Company Limited:PatnaAchievement Vs Target(Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II

Name of Agency: M/s GOPIKRISHNA INFRASTRUCTURE PVT. LTD

Districts: Nalanda

LOA No & Date: 581 & 582 Date :-25.02.14

Date of Agreement/Effective date: 24.04.14

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 6: PSS Report206

Page 6 of 44

Date:- 26.03.15

Date of Completion R&M Work 7 Months 06.08.2014

NEW Work 10 Months 06.11.2014

Progress Report of Special Plan(BRGF) Phase I

Total No. of Augmentation PSS in scope:- 2 nos.

Sl. No. Name of PSS Current work status

1 Tekari PSS 2 X 5 MVA 1X10+1X5=15 Installed (1 No.)

2 Belaganj PSS 2 X 5 MVA 1X10+1X5=15 Installed (1 No.)

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-I

Name of Agency: M/s GKC -APL joint venture,Hydrabad

Districts: Gaya

LOA No & Date: 1545 & 1546 Date :-09.12.13

Date of Agreement/Effective date: 07.01.14

Package Cost: 85.20 Crores

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 7: PSS Report206

Page 7 of 44

Date:- 26.03.15

Award Cost-170.04 Crore

Date of Completion 01.10.2015

Progress Report of Special Plan(BRGF) Phase II

Total No. of Augmentation PSS in scope:- Nil

Sl. No. Name of PSS Current work status

1 NIL

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-II

Name of Agency: M/s Shirdi Sai Electricals Limited.

Districts: GAYA

LOA No & Date: 585 & 586 Date :-25.02.14

Date of Agreement/Effective date: 05.04.14

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 8: PSS Report206

Page 8 of 44

Date:- 26.03.15

Date of Completion R&M Work 7 Months 06.08.2014

NEW Work 10 Months 06.11.2014

Progress Report of Special Plan(BRGF) Phase I

Total No. of New PSS in scope:- 2 nos.

Sl. No. Name of new PSS Availability of land Current work status

1 Majhwe 2x10 Land Made available

2 Mayabigha 2x10 Land Made available

Total No. of Augmentation PSS in scope:- 1 nos.

Sl. No. Name of PSS Current work status

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-I

Name of Agency: M/s GKC -APL joint venture,Hydrabad

Districts: Nawada

LOA No & Date: 1545 & 1546 Date :-09.12.13

Date of Agreement/Effective date: 07.01.14

Package Cost: 85.20 Crores

Capacity(in MVA)

Boundary wall work Completed,MS Angle fixing &

Plastering Under Process

Boundary wall work Completed,MS Angle fixing &

Plastering Under Process

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 9: PSS Report206

Page 9 of 44

1 Govindpur PSS 2 x 3.15 MVA 2x5=10

Page 10: PSS Report206

Page 10 of 44

Date:- 26.03.15

Award Cost-168.6 Crore

Date of Completion 23.10.2015

Total No. of Augmentation PSS in scope:- 5 nos.

Sl. No. Name of PSS Current work status

1 Rajauli PSS 2 X 5 MVA 1X10+1X5=152 Hisua PSS 1x3.15 1x5=53 Kauakol PSS 1 X 1.65 + 1 X 3.15 2X3.15=6.3

Additional Power transformer 4 Nawada New PSS 1 X 5 MVA + 1 X 10 MVA 2x10+1X5=255 orhanpur PSS 1 X 5 MVA 2x5=10

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special

Plan(BRGF) Phase-II

Name of Agency: M/s GOPIKRISHNA INFRASTRUCTURE PVT. LTD

Districts: Nawada

LOA No & Date: 581 & 582 Date :-25.02.14

Date of Agreement/Effective date: 24.04.14

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 11: PSS Report206

Page 11 of 44

Date:- 26.03.15

Date of CompletionR&M Work 7 Months 06.08.2014

NEW Work 10 Months 06.11.2014

Progress Report of Special Plan(BRGF) Phase I

Total No. of New PSS in scope:- 1

Sl. No. Name of new PSS Availability of land Current work status

1 Dakshini Jehanabad

Total No. of Augmentation PSS in scope:- 5

Sl. No. Name of PSS Current work status

1 Jehanabad PSS-01 Nos. 3X 5 MVA 1X10+2X5=25 Installed (1 No.)

2 Erki PSS- 01 Nos. 2 X 5 MVA 1X10+1X5=15 Installed (1 No.)

3 Makhdumpur PSS- 01 Nos 1 X 5 MVA + 1 X 3.15 MVA 1X10+1X3.15=13.15 Installed (2 No.), (10MVA-1 No., 5MVA-1No.)

4 Kako PSS- 01 Nos. 1X3.15 MVA 1X5=5

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-I

Name of Agency: M/s GKC -APL joint venture,Hydrabad

Districts: Jahanabad

LOA No & Date: 1545 & 1546 Date :-09.12.13

Date of Agreement/Effective date: 07.01.14

Package Cost: 85.20 Crores

Capacity(in MVA)

2x10 MVALand made available-

11.09.2014

Boundary wall of PSS Completed. Equipment foundation of 33 KV side has been completed upto transformer remaining 11 KV side equipment foundations under progress & construction of control room under progress .

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 12: PSS Report206

Page 12 of 44

5 Sakurabad PSS- 02 Nos 2X 3.15 MVA 2X5=106 Tehta PSS-1 No. Installed (5MVA-1No.)

Page 13: PSS Report206

Page 13 of 44

Date:- 26.03.15

Package Cost:

Date of Completion

Progress Report of Special Plan(BRGF) Phase II

Total No. of New PSS in scope:- 1

Sl. No. Availability of land Current work status

1 NIL

Total No. of Augmentation PSS in scope:- Nil

Sl. No. Name of PSS Current work status

1 NIL

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-II

Name of Agency: M/s

Districts: Jahanabad

LOA No & Date:

Date of Agreement/Effective date:

Name of new PSS

Capacity(in MVA)

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 14: PSS Report206

Page 14 of 44

Date:- 26.03.15

Date of CompletionR&M Work 7 Months 02.09.2014

NEW Work 10 Months 02.12.2014

Total No. of Augmentation PSS in scope:- 2 nos.

Sl. No. Name of PSS Current work status

1 Arwal PSS 2 X 3.15 MVA 2X5 Installed (2 No. 5 MVA)

2 Ataullah PSS 2 X 3.15 MVA 2X5 Installed (2 No . 5 MVA)3 Kurtha PSS 1 X 3.15 MVA 1X5

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for Erection (New & R&M Works) under Special Plan(BRGF) Phase-I

Name of Agency: M/s Supreme & co.-Utkal Glavanizers JV Kolkata

Districts: Arwal

LOA No & Date: 1689 & 1690 Date :-26.12.13

Date of Agreement/Effective date: 03.02.14

Package Cost: 64.33 Crores

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 15: PSS Report206

Page 15 of 44

Date:- 26.03.15

Date of Completion

Progress Report of Special Plan(BRGF) Phase II

Total No. of New PSS in scope:- Nil

Sl. No. Name of new PSS Availability of land Current work status

1 NIL

Total No. of Augmentation PSS in scope:- Nil

Sl. No. Name of PSS Current work status

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for Erection (New & R&M Works) under Special Plan(BRGF) Phase-II

Name of Agency: M/s Supreme & co.-Utkal Glavanizers JV Kolkata

Districts: Arwal

LOA No & Date: 1689 & 1690 Date :-26.12.13

Date of Agreement/Effective date: 03.02.14

Package Cost: 64.33 Crores

Capacity(in MVA)

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 16: PSS Report206

Page 16 of 44

1 NIL

Page 17: PSS Report206

Page 17 of 44

Date:- 26.03.15

Date of CompletionR&M Work 7 Months 02.09.2014

NEW Work 10 Months 02.12.2014

Progress Report of Special Plan(BRGF) Phase I

Total No. of New PSS in scope:- 01

Sl. No. Name of new PSS Availability of land Current work status

1 G.T. Road Land Acquired by 07.11.2014

2

Total No. of Augmentation PSS in scope:- 07

Sl. No. Name of PSS Current work status

1 Aurangabad PSS-01 Nos. 4x5 MVA Installed (1 No. 10 MVA)

2 Rafiganj PSS- 01 Nos. 2 X 5 MVA 1X10+1X5=15 Installed (1 No. 10 MVA)3 Barun PSS- 01 Nos 2 X 5 MVA + 1 X 3.15 MVA Installed (1 No. 10 MVA)5 Amba PSS- 01 Nos. 2 X 3.15 MVA 1x5+1X3.15=8.15

5 Madanpur PSS- 01 Nos. 1 x 3.15 MVA 1x5=5

6 Nabinagar PSS- 01 Nos. 1 X 5MVA + 1 X 1.6 MVA 2x5=10

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for Erection (New & R&M Works) under Special Plan(BRGF) Phase-I

Name of Agency: M/s Supreme & co.-Utkal Glavanizers JV Kolkata

Districts: Aurangabad

LOA No & Date: 1689 & 1690 Date :-26.12.13

Date of Agreement/Effective date: 03.02.14

Package Cost: 64.33 Crores

Capacity(in MVA)

2x10 Soil Testing and Contour Survey done

Present Capacity(in MVA)

Proposed Capacity(in MVA)

1X10+3x5=25

1X10+1X5+1X3.15=18.15

Page 18: PSS Report206

Page 18 of 44

7 Gangti 2 x 3.15 MVA Installed (1 No. 5 MVA)1 x 3.15+1x5=8.15

Page 19: PSS Report206

Date:- 26.03.15

Date of Completion

Progress Report of Special Plan(BRGF) Phase II

Total No. of New PSS in scope:- 03

Sl. No. Availability of land Current work status

1 Bairiya

2 Mali 2x5 DM Returned file to civil SDO

3 Deohara 2x5 Proposal Sent to Commissioner

Total No. of Augmentation PSS in scope:- Nil

Sl. No. Name of PSS Current work status

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for Erection (New & R&M Works) under Special Plan(BRGF) Phase-II

Name of Agency: M/s Supreme & co.-Utkal Glavanizers JV Kolkata

Districts: Aurangabad

LOA No & Date: 1689 & 1690 Date :-26.12.13

Date of Agreement/Effective date: 03.02.14

Package Cost: 64.33 Crores

Name of new PSS

Capacity(in MVA)

2x10 NOC issued by CO, Nabinagar on dated-07.11.2014.

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 20: PSS Report206

1 NIL

Page 21: PSS Report206

Page 21 of 44

Date:- 26.03.15

R&M Work 7 Months 30.07.2014

NEW Work 10 Months 30.10.2014

Progress Report of Special Plan(BRGF) Phase I

Total No. of New PSS in scope:- 02

Sl. No. Name of new PSS Availability of land Current work status

1 S.P. Jain

2 Agrair Dehri.

Total No. of Augmentation PSS in scope:- 16

Sl. No. Name of PSS Current work status

1 Beda PSS 4x5 MVA Installed (1 No.)

2 Takiya PSS 2 x 5MVA+1 x10 MVA 1x5+2x10=25 Installed (1 No.)3 BMP PSS 3X5+1x10 MVA 2x5+2x10=30 Installed (1 No.)4 Bikramganj PSS 1 x 3.15+2 x 5MVA Installed (1 No.)5 Akodhi-Gola PSS 1x3.15+1x5 Installed (1 No.)

6 Indrapuri PSS 3x5+1x3.15=18.15

7 Kripabal 2 x 5+ 1 x 3.15MVA Installed (1 No.)

8 Nokha 1 x 3.15+1 x 5MVA Installed (1 No.)11 Dinara 2 x 3.15 Installed (1 No.)12 Karbandhiya 2x3.15 MVA 1x5+1x3.15=8.1513 Suryapur 2 x 3.15 2x5=1014 Parsathua PSS 2 x 3.15 2x5=1015 Naugain PSS 1 x 3.15+1 x 5MVA 2x5=10

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-I

Name of Agency: M/s Vijay Electricals Limited Hyderabad Districts: Rohtas LOA No & Date: 1487 & 1488 Date :-29.11.13

Date of Agreement/Effective date: 31.12.13

Package Cost: 97.64 Crores

Date of Completion

Capacity(in MVA)

2x10 Proposal Sent by DM to Commissioner vide letter No. 139 dated 27.1.2015.

2x10 Proposal sent from land & Revenue Department to CE irrigation department, Dehri.

Present Capacity(in MVA)

Proposed Capacity(in MVA)

1x10+3x5=25

1x10+1x5+1X3.15=18.151X10+1x3.15=13.15

2x5+1x3.15+1x1.5 MVA

1x10+1x5+1x3.15=18.15

1x10 +1x3.15=13.151x10+1x3.15=13.15

Page 22: PSS Report206

Page 22 of 44

16 Chenari 1 x 3.15MVA+ 1 x 5MVA Installed (1 No.)1x10+1x5=15

Page 23: PSS Report206

Name of Agency: M/s Shirdi Sai Electricals Limited. Date:- 26.03.15Districts: ROHTASLOA No & Date: 585 & 586 Date :-25.02.14

Date of Agreement/Effective date: 05.04.14Award Cost-170.04 Crore

Date of Completion - 01.10.2015

Progress Report of Special Plan(BRGF) Phase II

Total No. of New PSS in scope:- 02

Sl. No. Availability of land Current work status

1 Matrayan

2 Natwar 2x5

Total No. of Augmentation PSS in scope:- 3

Sl. No. Name of PSS Current work status

1 BMP 2x5 +2x10 MVA 1x5+3x10 MVA

2 Indrapuri 2x5+1x3.15+1x1.5 MVA 2X5+2X3.15=16.30

3 Kochas 2x5+ 1x3.15 MVA 3x5=15 MVA

Additional Power Transformer1 Nokha 1x10+1x3.15 MVA 2x10+1x3.15 MVA

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II

Name of new PSS

Capacity(in MVA)

2x10 Land Acquired on dated

25.07.14Boundary Wall completed , structure foundation under progress & pit excavation of Control room going on.

Proposal returned from Commissioner to DM with query

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 24: PSS Report206

2 Kochas 2x5+1x3.15 MVA 3x5+1x3.15 MVA

Page 25: PSS Report206

Page 25 of 44

Name of Agency: M/s Vijay Electricals Limited Hyderabad Date:- 26.03.15Districts: Kaimur

LOA No & Date: 1487 & 1488 Date :-29.11.13

Date of Agreement/Effective date: 31.12.13

Package Cost: 97.64 Crores

Date of CompletionR&M Work 7 Months 30.07.2014

NEW Work 10 Months 30.10.2014

Total No. of Augmentation PSS in scope:- 09

Sl. No. Name of PSS Current work status

1 Mohaniya PSS 3X5 1X10+2X5=20 Installed (1 Nos.)2 Ramgarh PSS 3X5 1X10+2X5=20 Installed (1 Nos.)3 Nuaon PSS 2X3.15 1X5+1X3.15=8.15

4 Kalyanpur PSS 1X3.15 1X5=5

5 Chaurasia PSS 1X3.15 1X5=5

6 Kudra PSS 3x5 1x10+2X5=20 Installed (1 Nos.)

7 Bhabhua New 2x5 1x10+1X5=15 Installed (1 Nos.)

8 Chainpur 2X3.15 2x5=10

9 Karmchak 1x1.6 1x5=5

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-I

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 26: PSS Report206

Page 26 of 44

Date:- 26.03.15

Date of Completion

Progress Report of Special Plan(BRGF) Phase II Total No. of New PSS in scope:- 04

Sl. No. Name of new PSS Availability of land Current work status

1 Sarhaulla

2 Bhagwanpur Land Acquired Land Acquired

3 Pusauli-2

4 Kalani 2X5

Total No. of Augmentation PSS in scope:- Nil

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II

Name of Agency: M/s Vijay Electricals Limited Hyderabad Districts: Kaimur

LOA No & Date: 1487 & 1488 Date :-29.11.13

Date of Agreement/Effective date: 31.12.13

Package Cost: 97.64 Crores

Capacity(in MVA)

2x10 Proposal with Commissioner

Commissioner returned proposal to DM with letter no. 1148 dt.30.07.14

2x10

2x10 Proposal with Commissioner

Commissioner returned proposal to DM with letter no. 1149 dt.30.07.14

Proposal with Commissioner

Commissioner returned proposal to DM with letter no. 1150 dt.30.07.14

Page 27: PSS Report206

Page 27 of 44

Sl. No. Name of PSS Current work status

1 NIL

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 28: PSS Report206

Page 28 of 44

Name of Agency: M/s Bajaj Electricals Limited: Mumbai Date:- 26.03.15Districts: Bhojpur

LOA No & Date: 1485& 1486 dated 29.11.2013

Date of Agreement/Effective date: 31.12.2013

Package Cost: 65.45 Crores

Total No. of Augmentation PSS in scope:- 9

Sl. No. Name of PSS Current work status

1 Koilwar PSS ( 2 x 5+ 1X3.15)MVA 1X10+2x5=30 Installed ( 1 Nos.)

2 Bihiya PSS 2 X 5 MVA 2X10=20 Installed ( 2 Nos.)

3 SHAHPUR ( 2 x 3.15) MVA 1x10+1x3.15=13.15 Installed (1 No.)

4 Zero-mile PSS 2 X 5 MVA 1x10+1X5=15 Installed (1 No.)

5 Garhani PSS. (1 x3.15 + 1x 1.6)MVA 1X5+1x1.6=6.6 Installed (1 No.)

6 Sandash PSS 5 MVA Installed (1 No.)

7 Terari PSS (2 x 3.15 ) 1X5+1x3.15=8.15

8 Saraiya PSS ( 2 x 3.15 )MVA 2X5=10

9 Japani-farm PSS ( 1 x 5 + 2 X10 )MVA 3X10=30

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-I

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 29: PSS Report206

Page 29 of 44

Date:- 26.03.15

Award Cost- 207.3 Crore

Date of Completion 16.10.2015

Total No. of Augmentation PSS in scope:- 02

Sl. No. Name of PSS Current work status

1 Piro PSS 1 x 5 + 1x3.15 MVA 1X10+1x3.15=13.5 Installed (1 No. 10 MVA)

2 Garhani PSS 1X3.15 1X5=5Additional Power Transformer

1 Gidha PSS 4 X 5MVA 4 X 5 + 1X10 =30

2 Shahpur PSS 2 x 3.15 MVA 1 X 5 + 2 X 3.15 = 11.30 Received

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II

Name of Agency: M/s Supreme-VPIL JVDistricts: Bhojpur

LOA No & Date: 583 & 584 Date :-25.02.14

Date of Agreement/Effective date: 03.04.14

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 30: PSS Report206

Name of Agency: M/s Bajaj Electricals Limited: Mumbai Date:- 26.03.15Districts: Buxar

LOA No & Date: 1485& 1486 dated 29.11.2013

Date of Agreement/Effective date: 31.12.2013

Package Cost: 65.45 Crores

Date of Completion

Progress Report of Special Plan(BRGF) Phase I Total No. of New PSS in scope:- 02

Sl. No. Availability of land Current work status

1 Pratapsagar Land Available

Total No. of Augmentation PSS in scope:- 02

Sl. No. Name of PSS Current work status

1 Simri ( 2 X 3.15)MVA 1X10+1X5=15 5 MVA & 10 MVA Installed (1 No.)

2 Dumraon (2x5MVA) 1X10 + 1x 5 =15 Installed (1 No. 10 MVA)

3 Murar 1 X 3.15 MVA 1x5=5 Installed (1 No. 10 MVA)

4 Chausa 1x5+2x1.6=8.2 Installed (1 No. 10 MVA)

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-I

Name of new PSS

Capacity(in MVA)

2x10 Soil testing & Contour Survey done. Boundary wall, stricture & equipment foundation & control room work started simultaneously , Boundary wall completed 0.5 meter from ground level

Present Capacity(in MVA)

Proposed Capacity(in MVA)

2 X 1.6 + 1X 3.15 MVA

Page 31: PSS Report206

Page 31 of 44

Name of Agency: M/s Bajaj Electricals Limited: Mumbai Date:- 26.03.15

LOA No & Date: 1485& 1486 dated 29.11.2013Date of Agreement/Effective date: 31.12.2013Package Cost: 65.45 Crores

Date of Completion

Progress Report of Special Plan(BRGF) Phase II Total No. of New PSS in scope:- 02

Sl. No. Name of new PSS Availability of land Current work status

1 Rajpur Land Acquired

2 Kesath

Total No. of Augmentation PSS in scope:- Nil

Sl. No. Name of PSS Current work status

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II

Districts: Buxar

Capacity(in MVA)

2x5

2x5 Proposal lying With DM

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 32: PSS Report206

Page 32 of 44

1 NIL

Page 33: PSS Report206

Page 33 of 44

Date:- 26.03.15

Date of Completion R&M Work 7 Months 30.07.2014NEW Work 10 Months 30.10.2014

Progress Report of Special Plan(BRGF) Phase I Total No. of New PSS in scope:- 01

Sl. No. Name of new PSS Availability of land Current work status

1 Dogachhi 2X10 Under Identification

Total No. of Augmentation PSS in scope:- 3 Nos.

Sl. No. Name of PSS Current work status

1 Sultanganj PSS 3 X 5 MVA Installed (1 No. 10 MVA)

2 Bihpur PSS 2 X 3. 15 MVA Installed (1 No. MVA)3 Naugachiya 2X5+1X3.15MVA Installed (1 No. 10 MVA)

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-I

Name of Agency: M/s Bajaj Electricals Limited: Mumbai

Districts: Bhagalpur

LOA No & Date: 1543 & 1544 dated 09.12.2013

Date of Agreement/Effective date: 31.12.2013

Package Cost: 86.51 Crores

Capacity(in MVA)

Present Capacity(in MVA)

Proposed Capacity(in MVA)

1X10+2X5=20

1X5+1X3.15=8.151x10+1x5+1x3.15 =18.15

Page 34: PSS Report206

Page 34 of 44

Date:- 26.03.15

Date of Completion

Progress Report of Special Plan(BRGF) Phase II Total No. of New PSS in scope:- 01

Sl. No. Name of new PSS Availability of land Current work status

1 Gopalpur

Total No. of Augmentation PSS in scope:- Nil

Sl. No. Name of PSS Current work status

1NIL

2

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-II

Name of Agency: M/s Bajaj Electricals Limited: Mumbai

Districts: Bhagalpur

LOA No & Date: 1543 & 1544 dated 09.12.2013

Date of Agreement/Effective date: 31.12.2013

Package Cost: 86.51 Crores

Capacity(in MVA)

2x5

Letter has been sent by DCLR for

released of payment.

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 35: PSS Report206

Page 35 of 44

Date:- 26.03.15

Date of Completion R&M Work 7 Months 30.07.2014

NEW Work 10 Months 30.10.2014

Progress Report of Special Plan(BRGF) Phase I

Total No. of New PSS in scope:- 01

Sl. No. Name of new PSS Availability of land Current work status

1 Nehru colony

2X10

Total No. of Augmentation PSS in scope:- 1

Sl. No. Name of PSS Current work status

1 Chanan PSS- 01 Nos. 2 X 3. 15 MVA 1X5+1X3.15=8.15

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-I

Name of Agency: M/s Bajaj Electricals Limited: Mumbai

Districts: Banka

LOA No & Date: 1543 & 1544 dated 09.12.2013

Date of Agreement/Effective date: 31.12.2013

Package Cost: 86.51 Crores

Capacity(in MVA)

Proposal sent to cabinet on 15.12.2014

Land Made Available 31.12.2015, Boundary wall piling complete

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 36: PSS Report206

Page 36 of 44

Date:- 26.03.15

Award Cost-168.6 Crore

Date of Completion 23.10.2015

Progress Report of Special Plan(BRGF) Phase II

Total No. of New PSS in scope:- Nil

Sl. No. Name of new PSS Availability of land Current work status

1 NIL

Total No. of Augmentation PSS in scope:- Nil

Sl. No. Name of PSS Current work status

1 NIL

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-II

Name of Agency: M/s GOPIKRISHNA INFRASTRUCTURE PVT. LTD

Districts: Banka

LOA No & Date: 581 & 582 Date :-25.02.14

Date of Agreement/Effective date: 24.04.14

Capacity(in MVA)

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 37: PSS Report206

Page 37 of 44

Date:- 26.03.15

Date of CompletionR&M Work 7 Months 30.07.2014NEW Work 10 Months 30.10.2014

Progress Report of Special Plan(BRGF) Phase I Total No. of New PSS in scope:- 01

Sl. No. Name of new PSS Availability of land Current work status

1 Shankerpur PSS2X10

Land Made Available 07.05.2014

Total No. of Augmentation PSS in scope:- 08 Nos.

Sl. No. Name of PSS Current work status

1 Bariyarpur PSS 1 X 5 MVA 1X10=10 Installed (1 No. 10 MVA)2 Tarapur PSS 2X5 MVA 1X10+1x5=15 Installed (1 No. 10 MVA)3 Karanchaura PSS 1 X 10 MVA + 2 X 5 MVA 3X10=30 Installed (2 No. 10 MVA)4 Bindwara PSS 2 X 5 MVA 1X10+1X5=15 Installed (1 No. 10 MVA)5 Nandlalpur PSS 2X5 Installed (2 No. 10 MVA)6 Safiabad PSS 2x5+2x3.15 MVA 3x5+1x3.15 MVA7 Kaharagpur PSS 2X3.15 2X5=108 Dharhara PSS 2X3.15 2X5=10

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-I

Name of Agency: M/s Bajaj Electricals Limited: Mumbai

Districts: MungerLOA No & Date: 1543 & 1544 dated 09.12.2013Date of Agreement/Effective date: 31.12.2013Package Cost: 86.51 Crores

Capacity(in MVA)

Land Made Available 07.05.2014 -(Boundary wall completed and control room, structure foundation, equipment foundation work under progress.)

Present Capacity(in MVA)

Proposed Capacity(in MVA)

2X10=20

Page 38: PSS Report206

Page 38 of 44

Date:- 26.03.15

Date of Completion

Progress Report of Special Plan(BRGF) Phase II

Total No. of New PSS in scope:- 01

Sl. No. Name of new PSS Availability of land Current work status

1 Safiabad-2 PSS Land Identified

Total No. of Augmentation PSS in scope:- Nil

Sl. No. Name of PSS Current work status

1 NIL

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-II

Name of Agency: M/s Bajaj Electricals Limited: Mumbai

Districts: Munger

LOA No & Date: 1543 & 1544 dated 09.12.2013

Date of Agreement/Effective date: 31.12.2013

Package Cost: 86.51 Crores

Capacity(in MVA)

2x10

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 39: PSS Report206

Page 39 of 44

Name of Agency: M/s Techno Fab – gamon Joint Ventures Limited: New Delhi Date:- 26.03.15

LOA No & Date: 2014-579 & 580 dated 25.02.14

Date of Agreement/Effective date: 27.03.14

Package Cost: 83.86 Crores

Date of CompletionR&M Work 7 Months 26.10.2014

NEW Work 10 Months 26.01.2015

Total No. of Augmentation PSS in scope:- 6

Sl. No. Name of PSS Current work status

1 Karyanand nagar PSS 3 X 5 MVA 2X10+1x5=25 Installed-01 No 10 MVA.

2 Salempur PSS 2 X 5 MVA 2X10=20 Installed-02 Nos 10 MVA.

3 Barahiya PSS 1X5+1x3.15 1X10+1X3.15=13.15 Installed-01 No 10 MVA.

4 Court Area PSS 1x3.15+1x10 MVA 2x10 MVA=20MVA Installed-01 No 10 MVA.5 Haibatganj PSS 2 X 3. 15 MVA + 1 X 1.6 MVA 2X5+1X1.6=11.66 Aure PSS 2 X 3. 15 MVA 1X5+1X3.15=8.15

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-I

Districts: Lakhisarai

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 40: PSS Report206

Page 40 of 44

Name of Agency: M/s Techno Fab – gamon Joint Ventures Limited: New Delhi Date:- 26.03.15

LOA No & Date: 2014-579 & 580 dated 25.02.14

Date of Agreement/Effective date: 27.03.14

Package Cost: 83.86 Crores

Date of Completion

Progress Report of Special Plan(BRGF) Phase II

Total No. of New PSS in scope:- 01

Sl. No. Name of new PSS Availability of land Current work status

1 Pipariya NOC Granted from DM

Total No. of Augmentation PSS in scope:- Nil

Sl. No. Name of PSS Current work status

1 NIL

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II

Districts: Lakhisarai

Capacity(in MVA)

2x5

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 41: PSS Report206

Page 41 of 44

Name of Agency: M/s Techno Fab – gamon Joint Ventures Limited: New Delhi Date:- 26.03.15

LOA No & Date: 2014-579 & 580 dated 25.02.14

Date of Agreement/Effective date: 27.03.14

Package Cost: 83.86 Crores

Date of CompletionR&M Work 7 Months 26.10.2014

NEW Work 10 Months 26.01.2015

Progress Report of Special Plan(BRGF) Phase I

Total No. of New PSS in scope:- 01

Sl. No. Name of new PSS Availability of land Current work status

1 Khairama PSS

2X10

Land made available

Total No. of Augmentation PSS in scope:- 07

Sl. No. Name of PSS Current work status

1 Jamui PSS-01 Nos. 3x5 + 1x 3.15 MVA 1X10+3X5=252 Jhajha PSS- 01 Nos. 1 X 5 MVA + 1 X 3.15 MVA 1X10+1X5=15 PTR Received3 Khaira PSS- 02 Nos. 2 X 3.15 MVA 2X5=104 Laxmipur PSS- 02 Nos. 2 X 3.15 MVA 2X5=105 Sono PSS- 01 Nos. (1x5 + 1x 3.15 +1x1.6 MVA 3x5= 15

6 Sikandra PSS- 01 Nos. 1x3.15 MVA 1x10=10 Installed-01 Nos.

7 Chakai PSS- 01 Nos. 2 X 3.15 MVA 1X5+1X3.15=8.15

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-I

Districts: Jamui

Capacity(in MVA)

Boundary wall and control room work under progress

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 42: PSS Report206

Page 42 of 44

Name of Agency: M/s Techno Fab – gamon Joint Ventures Limited: New Delhi Date:- 26.03.15

LOA No & Date: 2014-579 & 580 dated 25.02.14

Date of Agreement/Effective date: 27.03.14

Package Cost: 83.86 Crores

Date of Completion

Progress Report of Special Plan(BRGF) Phase II

Total No. of New PSS in scope:- 01

Sl. No. Name of new PSS Availability of land Current work status

1 Jhajha-2 PSS

Total No. of Augmentation PSS in scope:- Nil

Sl. No. Name of PSS Current work status

1 NIL

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II

Districts: Jamui

Capacity(in MVA)

2x10Letter lying with Commissioner

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 43: PSS Report206

Page 43 of 44

Name of Agency: M/s Techno Fab – gamon Joint Ventures Limited: New Delhi Date:- 26.03.15Districts: SeikhpuraLOA No & Date: 2014-579 & 580 dated 25.02.14Date of Agreement/Effective date: 27.03.14Package Cost: 83.86 Crores

Date of CompletionR&M Work 7 Months 26.10.2014

NEW Work 10 Months 26.01.2015

Total No. of Augmentation PSS in scope:- 04

Sl. No. Name of PSS Current work status

1 Sheikhpura PSS-01 Nos. 2 x 5+1 x 3.15 MVA 1X10+1X5+1x3.15=18.15 Installed-01 Nos.2 Ariyari PSS- 01 Nos. 1 X 5 MVA 1X10=10 Installed-01 Nos.3 Bhalua PSS- 01 Nos. 1 x 3.15 MVA 1X5=54 Onama PSS- 01 Nos. 2 X 3.15 MVA 1X5+1X3.15=8.15

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-I

Present Capacity(in MVA)

Proposed Capacity(in MVA)

Page 44: PSS Report206

Page 44 of 44

Name of Agency: M/s Techno Fab – gamon Joint Ventures Limited: New Delhi Date:- 26.03.15Districts: SeikhpuraLOA No & Date: 2014-579 & 580 dated 25.02.14Date of Agreement/Effective date: 27.03.14Package Cost: 83.86 Crores

Date of Completion

Progress Report of Special Plan(BRGF) Phase II Total No. of New PSS in scope:- 01

Sl. No. Name of new PSS Availability of land Current work status

1 Kashera PSS Land Acquired

Total No. of Augmentation PSS in scope:- Nil

Sl. No. Name of PSS Current work status

1 NIL

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II

Capacity(in MVA)

2x5

Present Capacity(in MVA)

Proposed Capacity(in MVA)