Date:- 26.03.15
R&M Work 7 Months 22.08.2014
NEW Work 10 Months 22.11.2014
Progress Report of Special Plan(BRGF) Phase I Total No. of New PSS in scope:- 2 nos.
Sl. No. Name of new PSS Availability of land Current work status
1 Barh-2 2x10
2 Parsa-Bazaar 2x10
Total No. of Augmentation PSS in scope:-12 nos.
Sl. No. Name of PSS Current work status
1 Masaurhi New PSS 3x5MVA 1X10+2x5=20 Installed (1 No.)2 Kura Nawada PSS. 2 X 5 MVA + 1 X 3.15 MVA 1X10+1x5+1x3.15=18.15 Installed (1 No.)3 Sampatchak PSS- 2 X 5 MVA + 1 X 3.15 MVA 2X10+1x3.15=23.15 Installed (1 No.)4 Air-Force PSS. 2x5+1x1.6 MVA 1X10+1x5 +1x1.6=16.6 Installed (1 No.)5 Bihta-old PSS 2 X 5 MVA + 2X 3.15 MVA 1X10+1x5+2x3.15=21.36 Paliganj PSS 1x5+2x3.15 MVA 1X10+2x3.15=13.15 Installed (1 No.)7 Mokama PSS 2 X 5 MVA 1X10+1x5=15 Installed (1 No.)8 Fatuha PSS 3 X 5 MVA + 1 X 10 MVA 3X10+1X5=35 Installed (2 No.)9 Barh PSS 5 X 5MVA 1X10+4X5=30 Installed (1 No.)
10 Hatidah PSS 3x5+1x3.15MVA MVA 1X10+2X5+1x3.15=23.15 Installed (1 No.)12 Sabalpur Installed (1 No.)13 Bakhtiyarpur Installed (1 No.)
South Bihar Power Distribution Company Limited:PatnaAchievement Vs Target(Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-I
Name of Agency: M/s East India Udyog limited,Ghaziabad
Districts: PatnaLOA No & Date: 1483 & 1484 Date :-29.11.13
Date of Agreement/Effective date: 23.01.14
Package Cost: 95.98 Crores
Date of Complet
ion
Capacity(in MVA)
Proposal Laying at DM office
Land Acquired on dated 15.05.2014
Work started at Parsa Bazar New PSS- 1),Boundary wall completed ,control room , gaurd room, roof casting , perapet work Completed & Equipment foundation of 33 KV side has been completed upto Power Transformer remaing 11 KV side under
progress
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 2 of 44
Date:- 26.03.15
Award Cost- 207.3 Crore
Date of Completion 04.10.2015
Progress Report of Special Plan(BRGF) Phase II Total No. of New PSS in scope:- 1 nos.
Sl. No. Name of new PSS Availability of land Current work status
1 Devkuli 2x10 Proposal lying with DM
Total No. of Augmentation PSS in scope:- 05 nos.
Sl. No. Name of PSS Current work status
1 Fatuha PSS 3 X 5 MVA + 1 X 10 MVA 2X10+2X5=30 Installed (1 No.)2 Biharibigha PSS 1 X 5 MVA + 1 X 3.15 MVA 2X5=103 kanpa PSS 2 X 3. 15 MVA + 1 X 1.6 MVA 3X3.15=9.45
Additional Power Transformer
1 Dhanarua PSS 2x3.15 MVA 1x10+2X3.15=16.302 kewta Dariyapur PSS 1 X3.1 5 MVA 1X5+1X3.15=8.15 Installed (1 No.)
South Bihar Power Distribution Company Limited:PatnaAchievement Vs Target(Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase II
Name of Agency: M/s Supreme-VPIL JV
Districts: Patna
LOA No & Date: 583 & 584 Date :-25.02.14
Date of Agreement/Effective date: 03.04.14
Capacity(in MVA)
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 3 of 44
Date:- 26.03.15
Total No. of Augmentation PSS in scope:- 05 nos.
Sl. No. Name of PSS Current work status
1 Nalanda 3x5+1x3.15 MVA 1X10+2X5+1x3.15=23.15 Installed (1 No.)
2 Rajgir PSS- 01 Nos. 3x5MVA+1x10 MVA 2X10+2X5=20 Installed (1 No.)3 Ekangersarai PSS- 01 Nos 2 X 5 MVA 1X10+1X5=15 Installed (1 No.)4 Chandi PSS- 01 Nos. 1X5+1x3.15 1X10+1X3.15=13.15 Installed (1 No.)5 Raitar PSS- 01 nos. 2 X 5 MVA 1x10+1X5=15 Installed (1 No.)
South Bihar Power Distribution Company Limited:PatnaAchievement Vs Target(Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-I
Name of Agency: M/s East India Udyog limited,Ghaziabad
Districts: NalandaLOA No & Date: 1483 & 1484 Date :-29.11.13
Date of Agreement/Effective date: 23.01.14
Package Cost: 95.98 Crores
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 4 of 44
3*5MVA,1*3.15MVA
Page 5 of 44
Date:- 26.03.15
Award Cost-168.6 Crore
Date of Completion 23.10.2015
Total No. of Augmentation PSS in scope:- 02 nos.
Sl. No. Name of PSS Current work status
1 Nalanda PSS 3 X 5 MVA + 1 X 3.15 MVA 1X10+2X5+1X3.15=23.15
2 Silao PSS 2X 3.15 MVA 1X5+1X3.15=8.15
Additional Power Transformer - 2 nos.3 Islampur PSS 1 X 5 MVA + 1X 3.15 MVA 1X10+1X5+1X3.15=18.154 Dhamauli PSS 1 x 3.15 MVA 1X5+1X3.15=8.15
South Bihar Power Distribution Company Limited:PatnaAchievement Vs Target(Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II
Name of Agency: M/s GOPIKRISHNA INFRASTRUCTURE PVT. LTD
Districts: Nalanda
LOA No & Date: 581 & 582 Date :-25.02.14
Date of Agreement/Effective date: 24.04.14
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 6 of 44
Date:- 26.03.15
Date of Completion R&M Work 7 Months 06.08.2014
NEW Work 10 Months 06.11.2014
Progress Report of Special Plan(BRGF) Phase I
Total No. of Augmentation PSS in scope:- 2 nos.
Sl. No. Name of PSS Current work status
1 Tekari PSS 2 X 5 MVA 1X10+1X5=15 Installed (1 No.)
2 Belaganj PSS 2 X 5 MVA 1X10+1X5=15 Installed (1 No.)
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-I
Name of Agency: M/s GKC -APL joint venture,Hydrabad
Districts: Gaya
LOA No & Date: 1545 & 1546 Date :-09.12.13
Date of Agreement/Effective date: 07.01.14
Package Cost: 85.20 Crores
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 7 of 44
Date:- 26.03.15
Award Cost-170.04 Crore
Date of Completion 01.10.2015
Progress Report of Special Plan(BRGF) Phase II
Total No. of Augmentation PSS in scope:- Nil
Sl. No. Name of PSS Current work status
1 NIL
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-II
Name of Agency: M/s Shirdi Sai Electricals Limited.
Districts: GAYA
LOA No & Date: 585 & 586 Date :-25.02.14
Date of Agreement/Effective date: 05.04.14
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 8 of 44
Date:- 26.03.15
Date of Completion R&M Work 7 Months 06.08.2014
NEW Work 10 Months 06.11.2014
Progress Report of Special Plan(BRGF) Phase I
Total No. of New PSS in scope:- 2 nos.
Sl. No. Name of new PSS Availability of land Current work status
1 Majhwe 2x10 Land Made available
2 Mayabigha 2x10 Land Made available
Total No. of Augmentation PSS in scope:- 1 nos.
Sl. No. Name of PSS Current work status
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-I
Name of Agency: M/s GKC -APL joint venture,Hydrabad
Districts: Nawada
LOA No & Date: 1545 & 1546 Date :-09.12.13
Date of Agreement/Effective date: 07.01.14
Package Cost: 85.20 Crores
Capacity(in MVA)
Boundary wall work Completed,MS Angle fixing &
Plastering Under Process
Boundary wall work Completed,MS Angle fixing &
Plastering Under Process
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 9 of 44
1 Govindpur PSS 2 x 3.15 MVA 2x5=10
Page 10 of 44
Date:- 26.03.15
Award Cost-168.6 Crore
Date of Completion 23.10.2015
Total No. of Augmentation PSS in scope:- 5 nos.
Sl. No. Name of PSS Current work status
1 Rajauli PSS 2 X 5 MVA 1X10+1X5=152 Hisua PSS 1x3.15 1x5=53 Kauakol PSS 1 X 1.65 + 1 X 3.15 2X3.15=6.3
Additional Power transformer 4 Nawada New PSS 1 X 5 MVA + 1 X 10 MVA 2x10+1X5=255 orhanpur PSS 1 X 5 MVA 2x5=10
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special
Plan(BRGF) Phase-II
Name of Agency: M/s GOPIKRISHNA INFRASTRUCTURE PVT. LTD
Districts: Nawada
LOA No & Date: 581 & 582 Date :-25.02.14
Date of Agreement/Effective date: 24.04.14
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 11 of 44
Date:- 26.03.15
Date of CompletionR&M Work 7 Months 06.08.2014
NEW Work 10 Months 06.11.2014
Progress Report of Special Plan(BRGF) Phase I
Total No. of New PSS in scope:- 1
Sl. No. Name of new PSS Availability of land Current work status
1 Dakshini Jehanabad
Total No. of Augmentation PSS in scope:- 5
Sl. No. Name of PSS Current work status
1 Jehanabad PSS-01 Nos. 3X 5 MVA 1X10+2X5=25 Installed (1 No.)
2 Erki PSS- 01 Nos. 2 X 5 MVA 1X10+1X5=15 Installed (1 No.)
3 Makhdumpur PSS- 01 Nos 1 X 5 MVA + 1 X 3.15 MVA 1X10+1X3.15=13.15 Installed (2 No.), (10MVA-1 No., 5MVA-1No.)
4 Kako PSS- 01 Nos. 1X3.15 MVA 1X5=5
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-I
Name of Agency: M/s GKC -APL joint venture,Hydrabad
Districts: Jahanabad
LOA No & Date: 1545 & 1546 Date :-09.12.13
Date of Agreement/Effective date: 07.01.14
Package Cost: 85.20 Crores
Capacity(in MVA)
2x10 MVALand made available-
11.09.2014
Boundary wall of PSS Completed. Equipment foundation of 33 KV side has been completed upto transformer remaining 11 KV side equipment foundations under progress & construction of control room under progress .
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 12 of 44
5 Sakurabad PSS- 02 Nos 2X 3.15 MVA 2X5=106 Tehta PSS-1 No. Installed (5MVA-1No.)
Page 13 of 44
Date:- 26.03.15
Package Cost:
Date of Completion
Progress Report of Special Plan(BRGF) Phase II
Total No. of New PSS in scope:- 1
Sl. No. Availability of land Current work status
1 NIL
Total No. of Augmentation PSS in scope:- Nil
Sl. No. Name of PSS Current work status
1 NIL
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-II
Name of Agency: M/s
Districts: Jahanabad
LOA No & Date:
Date of Agreement/Effective date:
Name of new PSS
Capacity(in MVA)
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 14 of 44
Date:- 26.03.15
Date of CompletionR&M Work 7 Months 02.09.2014
NEW Work 10 Months 02.12.2014
Total No. of Augmentation PSS in scope:- 2 nos.
Sl. No. Name of PSS Current work status
1 Arwal PSS 2 X 3.15 MVA 2X5 Installed (2 No. 5 MVA)
2 Ataullah PSS 2 X 3.15 MVA 2X5 Installed (2 No . 5 MVA)3 Kurtha PSS 1 X 3.15 MVA 1X5
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for Erection (New & R&M Works) under Special Plan(BRGF) Phase-I
Name of Agency: M/s Supreme & co.-Utkal Glavanizers JV Kolkata
Districts: Arwal
LOA No & Date: 1689 & 1690 Date :-26.12.13
Date of Agreement/Effective date: 03.02.14
Package Cost: 64.33 Crores
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 15 of 44
Date:- 26.03.15
Date of Completion
Progress Report of Special Plan(BRGF) Phase II
Total No. of New PSS in scope:- Nil
Sl. No. Name of new PSS Availability of land Current work status
1 NIL
Total No. of Augmentation PSS in scope:- Nil
Sl. No. Name of PSS Current work status
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for Erection (New & R&M Works) under Special Plan(BRGF) Phase-II
Name of Agency: M/s Supreme & co.-Utkal Glavanizers JV Kolkata
Districts: Arwal
LOA No & Date: 1689 & 1690 Date :-26.12.13
Date of Agreement/Effective date: 03.02.14
Package Cost: 64.33 Crores
Capacity(in MVA)
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 16 of 44
1 NIL
Page 17 of 44
Date:- 26.03.15
Date of CompletionR&M Work 7 Months 02.09.2014
NEW Work 10 Months 02.12.2014
Progress Report of Special Plan(BRGF) Phase I
Total No. of New PSS in scope:- 01
Sl. No. Name of new PSS Availability of land Current work status
1 G.T. Road Land Acquired by 07.11.2014
2
Total No. of Augmentation PSS in scope:- 07
Sl. No. Name of PSS Current work status
1 Aurangabad PSS-01 Nos. 4x5 MVA Installed (1 No. 10 MVA)
2 Rafiganj PSS- 01 Nos. 2 X 5 MVA 1X10+1X5=15 Installed (1 No. 10 MVA)3 Barun PSS- 01 Nos 2 X 5 MVA + 1 X 3.15 MVA Installed (1 No. 10 MVA)5 Amba PSS- 01 Nos. 2 X 3.15 MVA 1x5+1X3.15=8.15
5 Madanpur PSS- 01 Nos. 1 x 3.15 MVA 1x5=5
6 Nabinagar PSS- 01 Nos. 1 X 5MVA + 1 X 1.6 MVA 2x5=10
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for Erection (New & R&M Works) under Special Plan(BRGF) Phase-I
Name of Agency: M/s Supreme & co.-Utkal Glavanizers JV Kolkata
Districts: Aurangabad
LOA No & Date: 1689 & 1690 Date :-26.12.13
Date of Agreement/Effective date: 03.02.14
Package Cost: 64.33 Crores
Capacity(in MVA)
2x10 Soil Testing and Contour Survey done
Present Capacity(in MVA)
Proposed Capacity(in MVA)
1X10+3x5=25
1X10+1X5+1X3.15=18.15
Page 18 of 44
7 Gangti 2 x 3.15 MVA Installed (1 No. 5 MVA)1 x 3.15+1x5=8.15
Date:- 26.03.15
Date of Completion
Progress Report of Special Plan(BRGF) Phase II
Total No. of New PSS in scope:- 03
Sl. No. Availability of land Current work status
1 Bairiya
2 Mali 2x5 DM Returned file to civil SDO
3 Deohara 2x5 Proposal Sent to Commissioner
Total No. of Augmentation PSS in scope:- Nil
Sl. No. Name of PSS Current work status
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for Erection (New & R&M Works) under Special Plan(BRGF) Phase-II
Name of Agency: M/s Supreme & co.-Utkal Glavanizers JV Kolkata
Districts: Aurangabad
LOA No & Date: 1689 & 1690 Date :-26.12.13
Date of Agreement/Effective date: 03.02.14
Package Cost: 64.33 Crores
Name of new PSS
Capacity(in MVA)
2x10 NOC issued by CO, Nabinagar on dated-07.11.2014.
Present Capacity(in MVA)
Proposed Capacity(in MVA)
1 NIL
Page 21 of 44
Date:- 26.03.15
R&M Work 7 Months 30.07.2014
NEW Work 10 Months 30.10.2014
Progress Report of Special Plan(BRGF) Phase I
Total No. of New PSS in scope:- 02
Sl. No. Name of new PSS Availability of land Current work status
1 S.P. Jain
2 Agrair Dehri.
Total No. of Augmentation PSS in scope:- 16
Sl. No. Name of PSS Current work status
1 Beda PSS 4x5 MVA Installed (1 No.)
2 Takiya PSS 2 x 5MVA+1 x10 MVA 1x5+2x10=25 Installed (1 No.)3 BMP PSS 3X5+1x10 MVA 2x5+2x10=30 Installed (1 No.)4 Bikramganj PSS 1 x 3.15+2 x 5MVA Installed (1 No.)5 Akodhi-Gola PSS 1x3.15+1x5 Installed (1 No.)
6 Indrapuri PSS 3x5+1x3.15=18.15
7 Kripabal 2 x 5+ 1 x 3.15MVA Installed (1 No.)
8 Nokha 1 x 3.15+1 x 5MVA Installed (1 No.)11 Dinara 2 x 3.15 Installed (1 No.)12 Karbandhiya 2x3.15 MVA 1x5+1x3.15=8.1513 Suryapur 2 x 3.15 2x5=1014 Parsathua PSS 2 x 3.15 2x5=1015 Naugain PSS 1 x 3.15+1 x 5MVA 2x5=10
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-I
Name of Agency: M/s Vijay Electricals Limited Hyderabad Districts: Rohtas LOA No & Date: 1487 & 1488 Date :-29.11.13
Date of Agreement/Effective date: 31.12.13
Package Cost: 97.64 Crores
Date of Completion
Capacity(in MVA)
2x10 Proposal Sent by DM to Commissioner vide letter No. 139 dated 27.1.2015.
2x10 Proposal sent from land & Revenue Department to CE irrigation department, Dehri.
Present Capacity(in MVA)
Proposed Capacity(in MVA)
1x10+3x5=25
1x10+1x5+1X3.15=18.151X10+1x3.15=13.15
2x5+1x3.15+1x1.5 MVA
1x10+1x5+1x3.15=18.15
1x10 +1x3.15=13.151x10+1x3.15=13.15
Page 22 of 44
16 Chenari 1 x 3.15MVA+ 1 x 5MVA Installed (1 No.)1x10+1x5=15
Name of Agency: M/s Shirdi Sai Electricals Limited. Date:- 26.03.15Districts: ROHTASLOA No & Date: 585 & 586 Date :-25.02.14
Date of Agreement/Effective date: 05.04.14Award Cost-170.04 Crore
Date of Completion - 01.10.2015
Progress Report of Special Plan(BRGF) Phase II
Total No. of New PSS in scope:- 02
Sl. No. Availability of land Current work status
1 Matrayan
2 Natwar 2x5
Total No. of Augmentation PSS in scope:- 3
Sl. No. Name of PSS Current work status
1 BMP 2x5 +2x10 MVA 1x5+3x10 MVA
2 Indrapuri 2x5+1x3.15+1x1.5 MVA 2X5+2X3.15=16.30
3 Kochas 2x5+ 1x3.15 MVA 3x5=15 MVA
Additional Power Transformer1 Nokha 1x10+1x3.15 MVA 2x10+1x3.15 MVA
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II
Name of new PSS
Capacity(in MVA)
2x10 Land Acquired on dated
25.07.14Boundary Wall completed , structure foundation under progress & pit excavation of Control room going on.
Proposal returned from Commissioner to DM with query
Present Capacity(in MVA)
Proposed Capacity(in MVA)
2 Kochas 2x5+1x3.15 MVA 3x5+1x3.15 MVA
Page 25 of 44
Name of Agency: M/s Vijay Electricals Limited Hyderabad Date:- 26.03.15Districts: Kaimur
LOA No & Date: 1487 & 1488 Date :-29.11.13
Date of Agreement/Effective date: 31.12.13
Package Cost: 97.64 Crores
Date of CompletionR&M Work 7 Months 30.07.2014
NEW Work 10 Months 30.10.2014
Total No. of Augmentation PSS in scope:- 09
Sl. No. Name of PSS Current work status
1 Mohaniya PSS 3X5 1X10+2X5=20 Installed (1 Nos.)2 Ramgarh PSS 3X5 1X10+2X5=20 Installed (1 Nos.)3 Nuaon PSS 2X3.15 1X5+1X3.15=8.15
4 Kalyanpur PSS 1X3.15 1X5=5
5 Chaurasia PSS 1X3.15 1X5=5
6 Kudra PSS 3x5 1x10+2X5=20 Installed (1 Nos.)
7 Bhabhua New 2x5 1x10+1X5=15 Installed (1 Nos.)
8 Chainpur 2X3.15 2x5=10
9 Karmchak 1x1.6 1x5=5
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-I
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 26 of 44
Date:- 26.03.15
Date of Completion
Progress Report of Special Plan(BRGF) Phase II Total No. of New PSS in scope:- 04
Sl. No. Name of new PSS Availability of land Current work status
1 Sarhaulla
2 Bhagwanpur Land Acquired Land Acquired
3 Pusauli-2
4 Kalani 2X5
Total No. of Augmentation PSS in scope:- Nil
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II
Name of Agency: M/s Vijay Electricals Limited Hyderabad Districts: Kaimur
LOA No & Date: 1487 & 1488 Date :-29.11.13
Date of Agreement/Effective date: 31.12.13
Package Cost: 97.64 Crores
Capacity(in MVA)
2x10 Proposal with Commissioner
Commissioner returned proposal to DM with letter no. 1148 dt.30.07.14
2x10
2x10 Proposal with Commissioner
Commissioner returned proposal to DM with letter no. 1149 dt.30.07.14
Proposal with Commissioner
Commissioner returned proposal to DM with letter no. 1150 dt.30.07.14
Page 27 of 44
Sl. No. Name of PSS Current work status
1 NIL
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 28 of 44
Name of Agency: M/s Bajaj Electricals Limited: Mumbai Date:- 26.03.15Districts: Bhojpur
LOA No & Date: 1485& 1486 dated 29.11.2013
Date of Agreement/Effective date: 31.12.2013
Package Cost: 65.45 Crores
Total No. of Augmentation PSS in scope:- 9
Sl. No. Name of PSS Current work status
1 Koilwar PSS ( 2 x 5+ 1X3.15)MVA 1X10+2x5=30 Installed ( 1 Nos.)
2 Bihiya PSS 2 X 5 MVA 2X10=20 Installed ( 2 Nos.)
3 SHAHPUR ( 2 x 3.15) MVA 1x10+1x3.15=13.15 Installed (1 No.)
4 Zero-mile PSS 2 X 5 MVA 1x10+1X5=15 Installed (1 No.)
5 Garhani PSS. (1 x3.15 + 1x 1.6)MVA 1X5+1x1.6=6.6 Installed (1 No.)
6 Sandash PSS 5 MVA Installed (1 No.)
7 Terari PSS (2 x 3.15 ) 1X5+1x3.15=8.15
8 Saraiya PSS ( 2 x 3.15 )MVA 2X5=10
9 Japani-farm PSS ( 1 x 5 + 2 X10 )MVA 3X10=30
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-I
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 29 of 44
Date:- 26.03.15
Award Cost- 207.3 Crore
Date of Completion 16.10.2015
Total No. of Augmentation PSS in scope:- 02
Sl. No. Name of PSS Current work status
1 Piro PSS 1 x 5 + 1x3.15 MVA 1X10+1x3.15=13.5 Installed (1 No. 10 MVA)
2 Garhani PSS 1X3.15 1X5=5Additional Power Transformer
1 Gidha PSS 4 X 5MVA 4 X 5 + 1X10 =30
2 Shahpur PSS 2 x 3.15 MVA 1 X 5 + 2 X 3.15 = 11.30 Received
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II
Name of Agency: M/s Supreme-VPIL JVDistricts: Bhojpur
LOA No & Date: 583 & 584 Date :-25.02.14
Date of Agreement/Effective date: 03.04.14
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Name of Agency: M/s Bajaj Electricals Limited: Mumbai Date:- 26.03.15Districts: Buxar
LOA No & Date: 1485& 1486 dated 29.11.2013
Date of Agreement/Effective date: 31.12.2013
Package Cost: 65.45 Crores
Date of Completion
Progress Report of Special Plan(BRGF) Phase I Total No. of New PSS in scope:- 02
Sl. No. Availability of land Current work status
1 Pratapsagar Land Available
Total No. of Augmentation PSS in scope:- 02
Sl. No. Name of PSS Current work status
1 Simri ( 2 X 3.15)MVA 1X10+1X5=15 5 MVA & 10 MVA Installed (1 No.)
2 Dumraon (2x5MVA) 1X10 + 1x 5 =15 Installed (1 No. 10 MVA)
3 Murar 1 X 3.15 MVA 1x5=5 Installed (1 No. 10 MVA)
4 Chausa 1x5+2x1.6=8.2 Installed (1 No. 10 MVA)
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-I
Name of new PSS
Capacity(in MVA)
2x10 Soil testing & Contour Survey done. Boundary wall, stricture & equipment foundation & control room work started simultaneously , Boundary wall completed 0.5 meter from ground level
Present Capacity(in MVA)
Proposed Capacity(in MVA)
2 X 1.6 + 1X 3.15 MVA
Page 31 of 44
Name of Agency: M/s Bajaj Electricals Limited: Mumbai Date:- 26.03.15
LOA No & Date: 1485& 1486 dated 29.11.2013Date of Agreement/Effective date: 31.12.2013Package Cost: 65.45 Crores
Date of Completion
Progress Report of Special Plan(BRGF) Phase II Total No. of New PSS in scope:- 02
Sl. No. Name of new PSS Availability of land Current work status
1 Rajpur Land Acquired
2 Kesath
Total No. of Augmentation PSS in scope:- Nil
Sl. No. Name of PSS Current work status
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II
Districts: Buxar
Capacity(in MVA)
2x5
2x5 Proposal lying With DM
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 32 of 44
1 NIL
Page 33 of 44
Date:- 26.03.15
Date of Completion R&M Work 7 Months 30.07.2014NEW Work 10 Months 30.10.2014
Progress Report of Special Plan(BRGF) Phase I Total No. of New PSS in scope:- 01
Sl. No. Name of new PSS Availability of land Current work status
1 Dogachhi 2X10 Under Identification
Total No. of Augmentation PSS in scope:- 3 Nos.
Sl. No. Name of PSS Current work status
1 Sultanganj PSS 3 X 5 MVA Installed (1 No. 10 MVA)
2 Bihpur PSS 2 X 3. 15 MVA Installed (1 No. MVA)3 Naugachiya 2X5+1X3.15MVA Installed (1 No. 10 MVA)
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-I
Name of Agency: M/s Bajaj Electricals Limited: Mumbai
Districts: Bhagalpur
LOA No & Date: 1543 & 1544 dated 09.12.2013
Date of Agreement/Effective date: 31.12.2013
Package Cost: 86.51 Crores
Capacity(in MVA)
Present Capacity(in MVA)
Proposed Capacity(in MVA)
1X10+2X5=20
1X5+1X3.15=8.151x10+1x5+1x3.15 =18.15
Page 34 of 44
Date:- 26.03.15
Date of Completion
Progress Report of Special Plan(BRGF) Phase II Total No. of New PSS in scope:- 01
Sl. No. Name of new PSS Availability of land Current work status
1 Gopalpur
Total No. of Augmentation PSS in scope:- Nil
Sl. No. Name of PSS Current work status
1NIL
2
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-II
Name of Agency: M/s Bajaj Electricals Limited: Mumbai
Districts: Bhagalpur
LOA No & Date: 1543 & 1544 dated 09.12.2013
Date of Agreement/Effective date: 31.12.2013
Package Cost: 86.51 Crores
Capacity(in MVA)
2x5
Letter has been sent by DCLR for
released of payment.
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 35 of 44
Date:- 26.03.15
Date of Completion R&M Work 7 Months 30.07.2014
NEW Work 10 Months 30.10.2014
Progress Report of Special Plan(BRGF) Phase I
Total No. of New PSS in scope:- 01
Sl. No. Name of new PSS Availability of land Current work status
1 Nehru colony
2X10
Total No. of Augmentation PSS in scope:- 1
Sl. No. Name of PSS Current work status
1 Chanan PSS- 01 Nos. 2 X 3. 15 MVA 1X5+1X3.15=8.15
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-I
Name of Agency: M/s Bajaj Electricals Limited: Mumbai
Districts: Banka
LOA No & Date: 1543 & 1544 dated 09.12.2013
Date of Agreement/Effective date: 31.12.2013
Package Cost: 86.51 Crores
Capacity(in MVA)
Proposal sent to cabinet on 15.12.2014
Land Made Available 31.12.2015, Boundary wall piling complete
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 36 of 44
Date:- 26.03.15
Award Cost-168.6 Crore
Date of Completion 23.10.2015
Progress Report of Special Plan(BRGF) Phase II
Total No. of New PSS in scope:- Nil
Sl. No. Name of new PSS Availability of land Current work status
1 NIL
Total No. of Augmentation PSS in scope:- Nil
Sl. No. Name of PSS Current work status
1 NIL
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-II
Name of Agency: M/s GOPIKRISHNA INFRASTRUCTURE PVT. LTD
Districts: Banka
LOA No & Date: 581 & 582 Date :-25.02.14
Date of Agreement/Effective date: 24.04.14
Capacity(in MVA)
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 37 of 44
Date:- 26.03.15
Date of CompletionR&M Work 7 Months 30.07.2014NEW Work 10 Months 30.10.2014
Progress Report of Special Plan(BRGF) Phase I Total No. of New PSS in scope:- 01
Sl. No. Name of new PSS Availability of land Current work status
1 Shankerpur PSS2X10
Land Made Available 07.05.2014
Total No. of Augmentation PSS in scope:- 08 Nos.
Sl. No. Name of PSS Current work status
1 Bariyarpur PSS 1 X 5 MVA 1X10=10 Installed (1 No. 10 MVA)2 Tarapur PSS 2X5 MVA 1X10+1x5=15 Installed (1 No. 10 MVA)3 Karanchaura PSS 1 X 10 MVA + 2 X 5 MVA 3X10=30 Installed (2 No. 10 MVA)4 Bindwara PSS 2 X 5 MVA 1X10+1X5=15 Installed (1 No. 10 MVA)5 Nandlalpur PSS 2X5 Installed (2 No. 10 MVA)6 Safiabad PSS 2x5+2x3.15 MVA 3x5+1x3.15 MVA7 Kaharagpur PSS 2X3.15 2X5=108 Dharhara PSS 2X3.15 2X5=10
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-I
Name of Agency: M/s Bajaj Electricals Limited: Mumbai
Districts: MungerLOA No & Date: 1543 & 1544 dated 09.12.2013Date of Agreement/Effective date: 31.12.2013Package Cost: 86.51 Crores
Capacity(in MVA)
Land Made Available 07.05.2014 -(Boundary wall completed and control room, structure foundation, equipment foundation work under progress.)
Present Capacity(in MVA)
Proposed Capacity(in MVA)
2X10=20
Page 38 of 44
Date:- 26.03.15
Date of Completion
Progress Report of Special Plan(BRGF) Phase II
Total No. of New PSS in scope:- 01
Sl. No. Name of new PSS Availability of land Current work status
1 Safiabad-2 PSS Land Identified
Total No. of Augmentation PSS in scope:- Nil
Sl. No. Name of PSS Current work status
1 NIL
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-II
Name of Agency: M/s Bajaj Electricals Limited: Mumbai
Districts: Munger
LOA No & Date: 1543 & 1544 dated 09.12.2013
Date of Agreement/Effective date: 31.12.2013
Package Cost: 86.51 Crores
Capacity(in MVA)
2x10
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 39 of 44
Name of Agency: M/s Techno Fab – gamon Joint Ventures Limited: New Delhi Date:- 26.03.15
LOA No & Date: 2014-579 & 580 dated 25.02.14
Date of Agreement/Effective date: 27.03.14
Package Cost: 83.86 Crores
Date of CompletionR&M Work 7 Months 26.10.2014
NEW Work 10 Months 26.01.2015
Total No. of Augmentation PSS in scope:- 6
Sl. No. Name of PSS Current work status
1 Karyanand nagar PSS 3 X 5 MVA 2X10+1x5=25 Installed-01 No 10 MVA.
2 Salempur PSS 2 X 5 MVA 2X10=20 Installed-02 Nos 10 MVA.
3 Barahiya PSS 1X5+1x3.15 1X10+1X3.15=13.15 Installed-01 No 10 MVA.
4 Court Area PSS 1x3.15+1x10 MVA 2x10 MVA=20MVA Installed-01 No 10 MVA.5 Haibatganj PSS 2 X 3. 15 MVA + 1 X 1.6 MVA 2X5+1X1.6=11.66 Aure PSS 2 X 3. 15 MVA 1X5+1X3.15=8.15
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-I
Districts: Lakhisarai
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 40 of 44
Name of Agency: M/s Techno Fab – gamon Joint Ventures Limited: New Delhi Date:- 26.03.15
LOA No & Date: 2014-579 & 580 dated 25.02.14
Date of Agreement/Effective date: 27.03.14
Package Cost: 83.86 Crores
Date of Completion
Progress Report of Special Plan(BRGF) Phase II
Total No. of New PSS in scope:- 01
Sl. No. Name of new PSS Availability of land Current work status
1 Pipariya NOC Granted from DM
Total No. of Augmentation PSS in scope:- Nil
Sl. No. Name of PSS Current work status
1 NIL
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II
Districts: Lakhisarai
Capacity(in MVA)
2x5
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 41 of 44
Name of Agency: M/s Techno Fab – gamon Joint Ventures Limited: New Delhi Date:- 26.03.15
LOA No & Date: 2014-579 & 580 dated 25.02.14
Date of Agreement/Effective date: 27.03.14
Package Cost: 83.86 Crores
Date of CompletionR&M Work 7 Months 26.10.2014
NEW Work 10 Months 26.01.2015
Progress Report of Special Plan(BRGF) Phase I
Total No. of New PSS in scope:- 01
Sl. No. Name of new PSS Availability of land Current work status
1 Khairama PSS
2X10
Land made available
Total No. of Augmentation PSS in scope:- 07
Sl. No. Name of PSS Current work status
1 Jamui PSS-01 Nos. 3x5 + 1x 3.15 MVA 1X10+3X5=252 Jhajha PSS- 01 Nos. 1 X 5 MVA + 1 X 3.15 MVA 1X10+1X5=15 PTR Received3 Khaira PSS- 02 Nos. 2 X 3.15 MVA 2X5=104 Laxmipur PSS- 02 Nos. 2 X 3.15 MVA 2X5=105 Sono PSS- 01 Nos. (1x5 + 1x 3.15 +1x1.6 MVA 3x5= 15
6 Sikandra PSS- 01 Nos. 1x3.15 MVA 1x10=10 Installed-01 Nos.
7 Chakai PSS- 01 Nos. 2 X 3.15 MVA 1X5+1X3.15=8.15
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-I
Districts: Jamui
Capacity(in MVA)
Boundary wall and control room work under progress
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 42 of 44
Name of Agency: M/s Techno Fab – gamon Joint Ventures Limited: New Delhi Date:- 26.03.15
LOA No & Date: 2014-579 & 580 dated 25.02.14
Date of Agreement/Effective date: 27.03.14
Package Cost: 83.86 Crores
Date of Completion
Progress Report of Special Plan(BRGF) Phase II
Total No. of New PSS in scope:- 01
Sl. No. Name of new PSS Availability of land Current work status
1 Jhajha-2 PSS
Total No. of Augmentation PSS in scope:- Nil
Sl. No. Name of PSS Current work status
1 NIL
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II
Districts: Jamui
Capacity(in MVA)
2x10Letter lying with Commissioner
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 43 of 44
Name of Agency: M/s Techno Fab – gamon Joint Ventures Limited: New Delhi Date:- 26.03.15Districts: SeikhpuraLOA No & Date: 2014-579 & 580 dated 25.02.14Date of Agreement/Effective date: 27.03.14Package Cost: 83.86 Crores
Date of CompletionR&M Work 7 Months 26.10.2014
NEW Work 10 Months 26.01.2015
Total No. of Augmentation PSS in scope:- 04
Sl. No. Name of PSS Current work status
1 Sheikhpura PSS-01 Nos. 2 x 5+1 x 3.15 MVA 1X10+1X5+1x3.15=18.15 Installed-01 Nos.2 Ariyari PSS- 01 Nos. 1 X 5 MVA 1X10=10 Installed-01 Nos.3 Bhalua PSS- 01 Nos. 1 x 3.15 MVA 1X5=54 Onama PSS- 01 Nos. 2 X 3.15 MVA 1X5+1X3.15=8.15
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-I
Present Capacity(in MVA)
Proposed Capacity(in MVA)
Page 44 of 44
Name of Agency: M/s Techno Fab – gamon Joint Ventures Limited: New Delhi Date:- 26.03.15Districts: SeikhpuraLOA No & Date: 2014-579 & 580 dated 25.02.14Date of Agreement/Effective date: 27.03.14Package Cost: 83.86 Crores
Date of Completion
Progress Report of Special Plan(BRGF) Phase II Total No. of New PSS in scope:- 01
Sl. No. Name of new PSS Availability of land Current work status
1 Kashera PSS Land Acquired
Total No. of Augmentation PSS in scope:- Nil
Sl. No. Name of PSS Current work status
1 NIL
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II
Capacity(in MVA)
2x5
Present Capacity(in MVA)
Proposed Capacity(in MVA)