proton interrogation

11
Slide 1 Operated by Los Alamos National Security, LLC for NNSA U N C L A S S I F I E D Proton Interrogation Proposal 20081923 Steven Greene, P-25 2/5/2008

Upload: yaron

Post on 12-Feb-2016

67 views

Category:

Documents


0 download

DESCRIPTION

Proton Interrogation. Proposal 20081923 Steven Greene, P-25 2/5/2008. Proposal 20081923: Short Range Proton Interrogation. Co-Investigators Chris Morris, P-25 ( Principal Investigator ) Steve Greene, P-25 Fesseha Mariam, P-25 David Clark, P-22 Mark Makela, P-25 Greg Canavan, P-DO - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Proton Interrogation

Slide 1

Operated by Los Alamos National Security, LLC for NNSA

U N C L A S S I F I E D

Proton Interrogation

Proposal 20081923

Steven Greene, P-25

2/5/2008

Page 2: Proton Interrogation

Slide 2

Operated by Los Alamos National Security, LLC for NNSA

U N C L A S S I F I E D

Proposal 20081923: Short Range Proton Interrogation Co-Investigators• Chris Morris, P-25 (Principal Investigator)• Steve Greene, P-25• Fesseha Mariam, P-25• David Clark, P-22• Mark Makela, P-25• Greg Canavan, P-DO• Randy Spaulding, ISU• Lori Waters, D-5• Jay Elson, D-5

Page 3: Proton Interrogation

Slide 3

Operated by Los Alamos National Security, LLC for NNSA

U N C L A S S I F I E D

Delayed neutron measurement Materials spanning the periodic

chart - 12C to 238U Simple targets

• 10s or 100s of gram samples

Simple counters• 3He gas mixture proportional counter• LaBr

Vacuum Beam Pipe

He3 detector andLaBr detector

34-in target distance

Target ladder for small “bare”targets

Page 4: Proton Interrogation

Slide 4

Operated by Los Alamos National Security, LLC for NNSA

U N C L A S S I F I E D

Proton interrogation of materials pRad facility is well suited.

• Pulse on demand• Current monitor• Beam profile from cameras

Beta-delayed emissions diagnostic for uranium

0.00001

0.0001

0.001

0.01

0.1

1

10

100

1000

0 10 20 30 40 50 60 70 80 90 100Time (sec)

Cross section (mb/sec)

238U

235U

Lead

Tungsten

Iron

Copper

Aluminum

18O

Carbon

16O

0.00001

0.0001

0.001

0.01

0.1

1

10

100

1000

0.01 0.1 1 10 100

Time (sec)

Cross section (mb/sec)

238U

235U

Lead

Tungsten

Iron

Copper

Aluminum

18O

Carbon

16O

Page 5: Proton Interrogation

Slide 5

Operated by Los Alamos National Security, LLC for NNSA

U N C L A S S I F I E D

Delayed neutron cross sections vs. A Delayed neutrons from Pb, Hg, Au

appear to arise from fission. 18O has the highest delayed neutron

production of all targets measured. Typical background materials like

iron and Aluminum have cross sections ~1/100th of Uranium

0.01

0.1

1

10

100

0 50 100 150 200 250

Atomic Mass

Cross section (mb)

Page 6: Proton Interrogation

Slide 6

Operated by Los Alamos National Security, LLC for NNSA

U N C L A S S I F I E D

Compound targets Preliminary investigation of

shielding effects• ‘Environmental’ clutter• Intentional shielding

DU: 1”x4”x4”

Pb: 2”x4”x8”

Null

Quad He3 detector315-cm target distance

310

He3 detector andLaBr detector

173-cm target distance440

Proton Beam centerline

22.50

ShieldingWater, Al, Steel, PbVarious thicknesses

Page 7: Proton Interrogation

Slide 7

Operated by Los Alamos National Security, LLC for NNSA

U N C L A S S I F I E D

Relative neutron yields from compound targets

Page 8: Proton Interrogation

Slide 8

Operated by Los Alamos National Security, LLC for NNSA

U N C L A S S I F I E D

Present Proposal Detector development

• Multi-layered array• Neutron energy binning

Gamma signal Additional targets

• Simple, A = 100-150• Compound

~4’ x 4’ detectorlocations

Page 9: Proton Interrogation

Slide 9

Operated by Los Alamos National Security, LLC for NNSA

U N C L A S S I F I E D

Detector Development 3He mixture proportional tubes CH2 moderator Layered for energy binning

Page 10: Proton Interrogation

Slide 10

Operated by Los Alamos National Security, LLC for NNSA

U N C L A S S I F I E D

Targeting A = 100 - 150

• Pd, Ag, Sn, I, Cs, La, Sm, Gd

Compound Targets• Materials in front of targets• Materials around targets• Materials behind targets

Page 11: Proton Interrogation

Slide 11

Operated by Los Alamos National Security, LLC for NNSA

U N C L A S S I F I E D

Time Request 30 - 50 targets and scenarios Average of ~1 target per hour, including setup & overhead Repeat some measurements at multiple detector distances Time is ~ 60 hours ‘Cycle B’ Fridays work