proposed comprehensive residential and commercial ... · proposed comprehensive residential and...
TRANSCRIPT
MTR Corporation Limited
Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00
Final | July 2016
This report takes into account the particular instructions and requirements of our client.
It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number 248118
Ove Arup & Partners Hong Kong Ltd Level 5 Festival Walk 80 Tat Chee Avenue Kowloon Tong Kowloon Hong Kong www.arup.com
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016
Contents
Page
1 Basic Information 1
1.1 Project Title 1
1.2 Purpose and Nature of the Project 1
1.3 Name of Project Proponent 1
1.4 Location, Scale of Project and History of the Site 2
1.5 Number and Types of Designated Projects to be Covered by the Project Profile 3
1.6 Name and Telephone Number of Contact Persons 3
2 Outline of Planning and Implementation Programme 4
2.1 Planning and Implementation 4
2.2 Study Programme 4
2.3 Potential Interface with Other Projects 4
3 Possible Impact on the Environment 5
3.1 General 5
3.2 Air Quality 5
3.3 Noise 5
3.4 Water Quality 6
3.5 Waste 7
3.6 Land Contamination 7
3.7 Ecology 8
3.8 Landscape and Visual 8
3.9 Hazard-to-Life 9
4 Major Elements of the Surrounding Environment 10
4.1 General 10
4.2 Air Quality 11
4.3 Noise 11
4.4 Water Quality 12
4.5 Ecology 12
4.6 Landscape and Visual 12
4.7 Hazard-to-Life 12
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016
5 Environmental Mitigation Measures to be Incorporated in the Design and Any Further Environmental Implications 13
5.1 Measures to Minimize Environmental Impacts 13
5.2 Air Quality 13
5.3 Noise 14
5.4 Water Quality 15
5.5 Waste 16
5.6 Land Contamination 17
5.7 Ecology 17
5.8 Landscape and Visual 17
5.9 Hazard-to-Life 18
5.10 Severity, Distribution and Duration of Environmental Effects and Further Implications 18
6 Use of Approved EIA Reports 19
Figure 1.1 Location of Project
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016 Page 1
1 Basic Information
1.1 Project Title
1.1.1 Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot, Lantau.
1.2 Purpose and Nature of the Project
1.2.1 In the 2016 Policy Address, the Chief Executive announced the initiative to actively explore with MTR Corporation (the Corporation) the development potential of stations and related sites along the existing and future rail lines, including the Siu Ho Wan Depot (SHD).
1.2.2 The Lantau Development Advisory Committee (LanDAC) has proposed “Strategic Economic and Housing Development” as the planning theme for the North Lantau Corridor. The proposed comprehensive development atop SHD (the Project) is in line with the planning theme, which has been earmarked as one of the medium-term projects in the First-term Working Report published by LanDAC in January 2016.
1.2.3 The Corporation is currently conducting a study to formulate a technically feasible development scheme for the Project to optimise housing supply. A new Siu Ho Wan (SHO) Station has been proposed along the Tung Chung Line (TCL) tracks to meet transport needs of the development and enable building of a sustainable community.
1.2.4 This Project Profile is prepared to provide information of the Project to enable the determination of the scope of the Environmental Impact Assessment (EIA) Study, which is aimed to establish the environmental acceptability of the Project and to meet relevant statutory requirements under the EIA Ordinance (Cap. 499).
1.3 Name of Project Proponent
1.3.1 The Project Proponent is MTR Corporation Limited1.
1 In line with the 2016 Policy Address, the Government is actively exploring with MTR Corporation the development potential of stations and related sites along existing and future rail lines. To this end, the Corporation will carry out the EIA to explore the development potential of the subject site. The arrangements for implementation of the Project will be separately considered by the Government in due course, subject to successful completion of the EIA and other relevant studies.
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016 Page 2
1.4 Location, Scale of Project and History of the Site
1.4.1 SHD, with an area of about 30 hectares, is situated on reclaimed land formed in the 1990s at approximately 5km east of Tung Chung New Town along the Northshore Lantau. It is bounded by a seawall with a service road to its north/northwest, and the Lautau Airport Railway (LAR), North Lantau Highway (NLH) and Tuen Mun – Chek Lap Kok Link slip road (under construction) to its south/southeast. Location of SHD and the indicative location (for illustration purpose) of the proposed SHO Station is shown in Figure 1.1.
1.4.2 SHD provides essential maintenance and support facilities for the entire fleet of TCL, Airport Express Line (AEL) and Disneyland Resort Line (DRL), including stabling tracks, workshops, and running/heavy maintenance facilities as well as infrastructure maintenance facilities.
1.4.3 The Project comprises residential towers of building height of about +86mPD to about +106mPD to provide about 14,000 flats, along with commercial/retail facilities, schools and kindergartens, car parking and loading/unloading facilities, public transport interchange (PTI), utility plant rooms and other supporting facilities, situated on a podium deck over the SHD. The development parameters, including the building height and the flat number, are subject to revision in the light of on-going studies to explore the scope for further increase in development intensity to maximize the use of the site.
1.4.4 The Project will be implemented by phase which involve the following key construction activities:
Depot replanning in 4 major phases within the existing site boundary;
Podium deck and property enabling works;
Topside development including podium, towers, supporting facilities, and associated utilities; and
A new SHO Station and the associated track works.
1.4.5 To facilitate the construction of the topside development, the existing railway depot will undergo a replanning while continue to provide maintenance and support services to the existing TCL, AEL and DRL. The depot operation will be maintained with arrangements to be made to relocate the existing furniture and facilities within the existing depot to make room for the phased construction of the concrete slab and topside development.
1.4.6 Sewage generated from the railway depot is currently conveyed to the nearby Siu Ho Wan Sewage Treatment Works (SHWSTW) for treatment and disposal. It is expected that the sewerage system will be upgraded with installation of new sewage pumping stations (SPSs) as required to cater for sewage generated from the Project. The upgrading works to the existing sewerage network for conveyance of the sewage from SHD to Government sewage treatment works will be carried out under the Project.
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016 Page 3
1.4.7 It is expected that the Project would require at least one major SPS with capacity of “up to 4,000m3/day” per development phase (total 4 major phases) and SPSs of smaller capacity to serve individual development package, SHO Station and the replanned depot, together with the final SPS of about 12,000m3/day for the topside development, subject to detailed planning and design.
1.5 Number and Types of Designated Projects to be Covered by the Project Profile
1.5.1 The Project is classified as a Designated Project (DP) under Schedule 3 of the EIA Ordinance:
Item 1 – Engineering feasibility study of urban development projects with a study area covering more than 20 hectares or involving a total population of more than 100,000.
1.5.2 Sewage pumping stations within the Project may be classified as DP under Schedule 2 of the EIA Ordinance:
Item F.3(b) – A sewage pumping station with an installed capacity of more than 2,000m3 per day and a boundary of which is less than 150m from an existing or planned residential area or educational institution.
1.5.3 The proposed new SHO Station is a DP under Item A.2, Schedule 2 of the EIA Ordinance.
1.5.4 The replanned depot will be operated within a podium deck hence no adverse environmental impact is anticipated on full implementation of the Project. A detailed examination will be conducted in accordance with the requirements stipulated in Section 6 of the Technical Memorandum on EIA process (TM-EIAO) on whether the works incurred would result in material change to its existing operation.
1.6 Name and Telephone Number of Contact Persons
1.6.1 All queries regarding the Project can be addressed to:
Mr. Simon Chan (Chief Project Manager - Property)
MTR Corporation Limited
MTR Headquarters Building, Telford Plaza
Kowloon Bay, Kowloon
Tel.: 2993 3805
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016 Page 4
2 Outline of Planning and Implementation Programme
2.1 Planning and Implementation
2.1.1 The Project will be implemented by engaging relevant professionals throughout the planning, design, construction and implementation stages.
2.1.2 The construction works including depot replanning works, site formation and superstructure works etc. will be carried out by professional contractors to be appointed under various works contracts.
2.2 Study Programme
2.2.1 This EIA is targeted for completion within 2017. The outline implementation programme of the Project, including the associated infrastructure, will be determined during the study.
2.3 Potential Interface with Other Projects
2.3.1 Major committed projects on Lantau that may have potential interface with the Project have been identified as listed below. Any cumulative impact from these concurrent projects including but not limited to the followings during both construction and operational phases of the Project, will be addressed in the EIA as appropriate.
Tung Chung New Town Extension and its associated infrastructure;
Tuen Mun – Chek Lap Kok Link;
Organic Waste Treatment Facilities Phase I (OWTF);
Hong Kong Boundary Crossing Facilities (HKBCF) of the Hong Kong-Zhuhai-Macao Bridge (HZMB);
Topside development at the HKBCF Island;
HZMB Hong Kong Link Road;
Hong Kong International Airport (HKIA) Three-Runway System (3RS); and
North Commercial District at the HKIA.
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016 Page 5
3 Possible Impact on the Environment
3.1 General
3.1.1 All the prevailing statutory requirements will be considered in the EIA to assess the possible environment impacts.
3.2 Air Quality
Construction Phase
3.2.1 Dust generated from construction activities such as site clearance, excavation, backfilling, wind erosion of exposed area, temporary storage and handling of spoil, demolition and superstructure works, etc. will be controlled by implementing suitable practices and mitigation measures (see Section 5). Potential impact on air sensitive receivers (ASRs) within the Project during interim stages, along with those in the vicinity, will be controlled to within relevant standards.
Operational Phase
3.2.2 Sufficient buffer distance will be allowed for ASRs within the Project from the existing and committed external road network to ensure compliance of the Hong Kong Air Quality Objectives (HKAQOs). Internal traffic will be primarily contained within the podium with effective air ventilation design, hence air quality impact on ASRs is expected to be insignificant.
3.2.3 Sewage pumping stations within the Project will be enclosed with appropriate measures to minimise potential nuisance to future occupants. Potential odour impact from SHWSTW and OWTF is expected to be insignificant, given the distance separation of over 400m and 600m, respectively. Air quality impact on SHD due to external stationary emission sources, if any, will be addressed in the EIA. No existing/planned marine emission source has been identified within 500m of SHD.
3.3 Noise
Construction Phase
3.3.1 Construction noise generated from the use of Powered Mechanical Equipment during site clearance, excavation, backfilling, demolition and superstructure works etc. will be mitigated by suitable practices and precautionary measures (see Section 5). Potential impact on noise sensitive receivers (NSRs) within the Project during interim stages, as well as visitors at the Lantau North (Extension) Country Park, will be controlled to within relevant standards.
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016 Page 6
Operational Phase
3.3.2 Self-protecting building design coupled with noise mitigation measures will be adopted to ensure compliance of relevant noise standards from the existing and committed road and rail networks including the proposed SHO Station, as well as nearby fixed noise sources, for NSRs within the Project. Potential noise impact from the operating depot on NSRs within the Project during interim stages will be mitigated.
3.3.3 SHD is located outside the Noise Exposure Forecast 25 contour of the HKIA as presented in the approved HKIA 3RS EIA Report, hence is considered suitable for noise sensitive uses in accordance with the Hong Kong Planning Standards and Guidelines (HKPSG) requirement. Car parking and loading/unloading facilities, PTI, utility plant rooms etc. will be located predominantly within the podium. Other fixed noise sources within the Project such as sewage pumping stations and utilities will be enclosed or equipped with appropriate measures to minimise potential nuisance to future occupants.
3.4 Water Quality
Construction Phase
3.4.1 Wastewater and site runoff generated from construction activities will be properly pre-treated prior to discharge into the public stormwater system as far as feasible to minimise adverse water quality impact. Potential environmental impacts associated with the upgrading works to the existing sewerage network for conveyance of the sewage from the Project will be mitigated.
Operational Phase
3.4.2 Sewage generated from the Project, estimated to be about 13,200m3/day average dry weather flow (ADWF), including about 12,000m3/day from the topside development, 1,000m3/day from the depot operation and about 200m3/day from the proposed SHO Station, subject to detailed planning and design, will be conveyed to Government sewage treatment works for treatment and disposal. It is expected that the existing sewerage system will be upgraded, including installation of new sewage pumping stations as required, to cater for the additional sewage flow. Preventive measures to be considered to avoid emergency discharge from new sewage pumping stations including standby/spare pumps and backup power supply. No local discharge of wastewater is expected from the Project.
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016 Page 7
3.5 Waste
Construction Phase
3.5.1 Solid waste generated from construction activities includes construction and demolition (C&D) materials, chemical waste, general refuse etc. Sediment may also be generated due to foundation and excavation works. Good site practices will be implemented to avoid or minimise potential environmental impacts associated with handling, collection and disposal of wastes.
Operational Phase
3.5.2 Municipal solid waste generated from the Project will be properly handled to minimise potential nuisance to future occupants during storage, collection and transportation. Potential environmental impact due to municipal solid waste is expected to be insignificant.
3.6 Land Contamination
3.6.1 Operation of SHD will not cause significant land contamination. There has been no historic leakage or spillage of oil or chemical during storage, handling and logistics at SHD. Site appraisal will be conducted to identify potential location(s) of land contamination while maintaining the depot operation. Site investigation plan will be formulated in accordance with EPD’s guidance notes, if required, to facilitate further studies in the detailed design and implementation stages.
3.6.2 Wastewater generated from land decontamination, if any, will be properly handled in accordance with the Water Pollution Control Ordinance (Cap. 358) – Technical Memorandum. Chemical waste generated from the process, such as wastewater containing chemical waste residues will be disposed of in accordance with the Waste Disposal (Chemical Waste) (General) Regulation (Cap. 354C).
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016 Page 8
3.7 Ecology
Construction Phase
3.7.1 No natural habitat of flora and fauna has been identified within SHD hence direct ecological impact during construction phase is expected to be insignificant (see Section 4). Indirect ecological impact on the closest sensitive receiver of Tai Ho Priority Site is also expected to be insignificant, given the distance separation of about 100m. No reclamation is required for the Project hence no impact on marine environment is expected.
Operational Phase
3.7.2 The replanned railway depot will be decked over by a landscaped podium hence potential noise will be largely avoided. Light generated by future residential premises will be relatively insignificant. As no ecological sensitive receiver is located in close proximity to the SHD, disturbance to wildlife due to increase in human activities is expected to be insignificant.
3.8 Landscape and Visual
Construction Phase
3.8.1 Major landscape resources in the vicinity include the water body at Tai Ho Wan and woodland on slopes between the NLH and the Country Park. Existing trees within SHD are common species, including Acacia confusa, Bauhinia blakeana, Cinnamomum camphora, Ficus virens, Hibiscus tiliaceus and Livistona chinensis etc., which may be affected by the Project. Visual character of SHD will be gradually transformed from low-rise industrial to a suburban development node.
Operational Phase
3.8.2 Major visual resources in the vicinity include the Lantau North (Extension) Country Park and the Tai Ho Stream Site of Special Scientific Interest (SSSI). Building height ranges from about +86mPD to about +106mPD. The building height is subject to revision in the light of on-going studies to explore the scope for further increase in development intensity to maximize the use of the site. Reference will be made to the Sustainable Building Design Guidelines promulgated by Buildings Department in the development scheme design to promote quality and sustainable built environment.
3.8.3 The proposed residential towers of the Project may intercept views of the visually sensitive receivers. Visually sensitive receivers in the vicinity are primarily transient in nature. Due consideration will be given to the surrounding context and the public viewers in the scheme design of the Project, with provision of visual corridors, buffer planting and landscaped terrace at strategic locations to enhance visual permeability. Specifically, the prominent view corridor from Tai Ho Wan will not be affected by the Project. Potential landscape and visual impact due to the Project is not expected to be substantial.
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016 Page 9
3.9 Hazard-to-Life
3.9.1 Siu Ho Wan Water Treatment Works (SHWWTW) is a Potentially Hazardous Installation due to its storage of chlorine, with a consultation zone (CZ) of about 1km-radius (excluding areas 50m above it). A small portion of SHD is within the SHWWTW CZ. Due consideration will be given on construction and development planning within the CZ to minimise potential exposure of the construction workers and future occupants. Potential societal risk contribution from the Project is expected to be insignificant.
3.9.2 Potential hazard due to biogas generation and storage at the OWTF, situated at some 670m from SHD, is expected to be insignificant, as the maximum hazard distance is only some 116m according to the environmental permit information of the OWTF (Dec 2015).
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016 Page 10
4 Major Elements of the Surrounding Environment
4.1 General
4.1.1 SHD is surrounded by a combination of transport infrastructure, Government facilities and natural landscape. Major land uses in the vicinity include the following:
Siu Ho Wan Government Maintenance Depot, Discovery Bay Tunnel Administration Building and New Lantao Bus Company Siu Ho Wan Depot at about 70-90m to the east/southeast;
Tai Ho Priority Site under New Nature Conservation Policy at about 100m to the south/southwest;
Tai Ho Offtake and Pigging Station at about 210m to the south;
Lantau North (Extension) Country Park at about 250m to the south, with the Lo Fu Tau Country Trail and the Hong Kong Olympic Trail at over 1.5km from SHD;
Siu Ho Wan Sewage Treatment Works at about 420m to the east;
Organic Waste Treatment Facilities under construction, at about 670m to the northeast;
Siu Ho Wan Vehicle Pound Vehicle Examination Centre and Weigh Station at about 680m to the northeast;
Siu Ho Wan Water Treatment Works at about 740m to the east;
Luk Hop Yuen Kung, a Taoist temple, at about 780m to the south;
Tai Ho Stream Site of Special Scientific Interest (SSSI) at about 820m to the southwest;
North Lantau Refuse Transfer Station at about 1km to the northeast;
Pak Mong Village at about 1.2km to the southwest;
The Tung Chung East New Town Extension (under planning) at about 1.2km to the southwest; and
The Topside Development at the HKBCF Island (under planning) at about 2.1km to the northwest.
4.1.2 Further, two potential public columbarium sites are located at Sham Shui Kok Drive at about 1km to the northeast of SHD according to Planning Department.
4.1.3 Environmental sensitive receivers have been identified based on existing and committed developments in the vicinity, with details provided in the following sections.
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016 Page 11
4.2 Air Quality
4.2.1 Air Sensitive Receiver (ASR) is defined in Annex 12 of the TM-EIAO as “domestic premises, hotel, hostel, hospital, clinic, nursery, temporary housing accommodation, school, educational institution, office, factory, shop, shopping centre, place of public worship, library, court of law, sports stadium or performing arts centre”, as well as “any other premises or place with which, in terms of duration or number of people affected, has a similar sensitivity to the air pollutants as the aforelisted premises and places”.
4.2.2 ASRs that may be affected by construction of the Project, including initial phases of the topside development, will be included in the air quality impact assessment. Potential external ASRs include offices/factories of Siu Ho Wan Government Maintenance Depot, Discovery Bay Tunnel Administration Building and New Lantao Bus Company Siu Ho Wan Depot.
4.2.3 Air quality impact on ASRs located within the Project due to mainly vehicular emissions from the nearby road network will be included in the air quality impact assessment. No major source of air pollutant emission is expected from operation of the Project.
4.3 Noise
4.3.1 Noise Sensitive Receiver (NSR) is defined in Annex 13 of the TM-EIAO as “domestic premises, educational institution, hospital, medical clinic, homes for the aged, convalescent homes, place of public worship, library, court of law, performing arts centre, auditoria, amphitheatre, hostel and country park”.
4.3.2 NSRs that may be affected by construction of the Project and depot operation/replanning works during interim stages, including initial phases of the development, will be included in the noise impact assessment. Although the Lantau North (Extension) Country Park is located at about 250m from SHD, the Lo Fu Tau Country Trail and the Hong Kong Olympic Trail are located at over 1.5km away hence noise impact on the country park visitors should not be significant.
4.3.3 Noise impact on NSRs located within the Project due to mainly road traffic, railway operation and nearby facilities such as Siu Ho Wan Government Maintenance Depot, Tai Ho Offtake and Pigging Station etc. will be included in the noise impact assessment. As the railway depot will be covered by the podium deck, and the car parking and loading/unloading facilities, PTI, utility plant rooms etc. will be located predominantly within the podium, no major source of noise emission is expected from operation of the Project.
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016 Page 12
4.4 Water Quality
4.4.1 Siu Ho Wan is located within the North Western Water Control Zone. Major Water Sensitive Receivers (WSRs) in the vicinity including Tai Ho Stream SSSI, marine park and coral communities in the Brothers Islands, Ma Wan fish culture zone, seawater intake point at Sunny Bay, as well as gazetted beaches at Tuen Mun. As wastewater arising from operation of the Project will be discharged into the communal sewerage, no adverse impact on the WSRs is expected.
4.5 Ecology
4.5.1 Ecological sensitive receivers located in the vicinity including Tai Ho Priority Site, Tai Ho Stream SSSI and Lantau North (Extension) Country Park will be included in the ecological impact assessment.
4.6 Landscape and Visual
4.6.1 Major landscape and visual resources in the vicinity include the Lantau North (Extension) Country Park, the Tai Ho Stream SSSI and the open sea to the north. Existing trees within SHD are common species (see Section 3). No landscape sensitive receiver has been identified within the Project. Landscaping features will be provided on the future podium deck to create a pleasant environment.
4.6.2 Representative visually sensitive receivers within the visual envelope including Pak Mong Village, hikers at the country trails, travellers at nearby road and railway network, ferry passengers in the open sea, residents in Tung Chung New Town and Tuen Mun, visitors and workers in HKBCF, and workers in existing facilities in Siu Ho Wan across NLH etc. will be included in the visual impact assessment.
4.7 Hazard-to-Life
4.7.1 Potential contribution to the societal risk due to construction and operation of the Project within the CZ of SHWWTW will be included in the risk assessment.
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016 Page 13
5 Environmental Mitigation Measures to be Incorporated in the Design and Any Further Environmental Implications
5.1 Measures to Minimize Environmental Impacts
5.1.1 Practicable and effective mitigation measures will be adopted for construction and operation of the Project, as necessary, to ensure compliance of relevant environmental standards. Possible key measures to be adopted, subject to studies, are listed below.
5.2 Air Quality
Construction Phase
5.2.1 Dust mitigation measures as stipulated in the Air Pollution Control (Construction Dust) Regulation (Cap. 311R) will be implemented to control fugitive dust emission. Possible key measures include:
Regular watering on all exposed and unpaved surface, particularly during dry weather;
Frequent watering for particularly dusty construction areas and areas close to ASRs;
Minimise temporary storage of stockpiles on site;
Cover excavated or stockpile of dusty material by impervious sheeting or spraying with water to maintain the entire surface wet;
Wheel washing facilities at the exit points of the site;
Cover dusty materials on vehicles leaving the site; and
Dust suppression measures.
Operational Phase
5.2.2 Sufficient buffer distance will be allowed for ASRs within the Project from the existing and committed external road network to ensure compliance of the HKAQOs. Internal traffic will be contained mainly within the podium. Fresh air intake for commercial/retail and educational facilities will be planned at location(s) of satisfactory air quality.
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016 Page 14
5.3 Noise
Construction Phase
5.3.1 Possible key measures to reduce construction noise impact include:
Quiet plants, silencers or mufflers on construction equipment;
Movable and temporary barriers to screen particular items of plant or noisy operations;
Noise screening structures or purpose-built noise barriers along the site boundary;
Good site practices such as locate noisy equipment and activities at farthest practicable distance, schedule noisy activities to minimise noise exposure, proper maintenance of construction plant, devise quiet methods of working, and regular noise monitoring; and
Proper planning of construction vehicle travelling route.
Operational Phase
5.3.2 Possible key measures to reduce operational noise impact include:
Self-protecting building design coupled with direct noise mitigation measures. Acoustic insulation of buildings will be considered as the “last-resort” option in accordance with the HKPSG;
Purpose-built noise barriers/canopies along development boundary; and
Careful siting of noisy machinery with enclosure and/or acoustic louver/silencer, acoustic door, absorptive wall lining etc.
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016 Page 15
5.4 Water Quality
Construction Phase
5.4.1 Possible key measures to control water quality impact include:
Good site practice in accordance with the ProPECC PN 1/94 Construction Site Drainage and Recommended Pollution Control Clauses for Construction Contracts, and Environment, Transport and Works Bureau Technical Circular (Works) (TCW) No. 5/2005 Protection of Natural Stream / Rivers from Adverse Impact arising from Construction Works;
Collection of construction runoffs for treatment by properly maintained silt trap and oil interceptor to remove oil, lubricants, grease, silt, grit and debris etc. to ensure compliance of Water Pollution Control Ordinance (Cap. 358);
Cover open stockpiles of materials with tarpaulin or similar fabric during rainstorms;
Minimise works entailing soil excavation during rainy season;
Properly maintained oil interceptors for collecting spillage or leakages from site workshops, with waste oil to be collected by licensed collectors;
Mobile toilets or other appropriate means to store sewage before disposal through licensed collection agent or discharging to communal sewerage system; and
Employ a licensed chemical waste collector for the collection and disposal/treatment of the wastewater from decontamination in accordance with the Waste Disposal (Chemical Waste) (General) Regulation (Cap. 354C).
Operational Phase
5.4.2 Possible key measures to control water quality impact include:
Properly maintained sand/silt and oil/grease traps will be provided to prevent ingress of pollutants to the stormwater drainage system; and
Preventive measures including standby/spare pumps and backup power supply to avoid any emergency discharge of raw sewage from the new Sewage Pumping Stations to the water bodies.
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016 Page 16
5.5 Waste
5.5.1 Possible key measures to reduce the quantities of C&D materials, chemical waste, general refuse etc. for offsite disposal and to handle the sediment include:
C&D Materials, Chemical Waste and General Refuse
Sorting and reuse on site as far as practicable;
Handle by registered and licensed waste hauliers under Waste Disposal Ordinance (Cap. 354) and Waste Disposal (Chemical Waste) (General) Regulation (Cap. 354C);
Nomination of an approved person for waste management;
Separate chemical wastes for handling and treatment at licensed facilities;
Proper record system for wastes generated, recycled and disposed of;
Ticket-trip system in accordance with Development Bureau Technical Circular No. 6/2010 Trip Ticket System for Disposal of Construction & Demolition Materials;
Waste Management Plan in accordance with ETWB TCW No. 19/2005 Environmental Management on Construction Sites;
Segregate different types of waste for storage;
Recycle unused chemicals with remaining functional capacity;
Use of non-timber form work; and
Proper storage and site practices.
Sediment
Handle in accordance with ETWB TCW No. 34/2002 Management of Dredged/Excavated Sediment;
Cover contaminated sediments with tarpaulin for stockpiling and transportation; and
Properly designed and maintained construction plant and equipment to minimise release of silt, sediments, contaminants or other pollutants.
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016 Page 17
5.6 Land Contamination
5.6.1 Possible key measures to minimise potential exposure of soil or groundwater contamination include:
Protective clothing and mask;
Remove contaminated materials with mechanical equipment;
Provide adequate washing facilities;
Storage of excavated soil on impermeable surfaces;
Handle by licensed waste hauliers for transportation and disposal at disposal site(s); and
Obtain necessary waste disposal permits in accordance with Waste Disposal Ordinance (Cap. 354) and Waste Disposal (Chemical Waste) (General) Regulation (Cap. 354C).
5.7 Ecology
5.7.1 Due consideration will be given to avoid potential impact on ecological resources as far as practicable. Good site practices and mitigation measures proposed will help to minimise potential impacts on the general environment.
5.7.2 In the event if important ecological resource is identified during the baseline survey, mitigation measures will be formulated such as translocation of important species, confining works in specific area/season, alternative design/construction methods etc.
5.8 Landscape and Visual
5.8.1 Possible key measures to reduce potential landscape and visual impacts include:
Construction Phase
Minimise construction phase impact by optimising construction activities and extent of temporary works area and installation of site hoardings.
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016 Page 18
Operational Phase
Adopt urban design principles in scheme design such as sensitive design and disposition of building block, building height profile, terraced podium design, air ventilation permeability, façade treatment and landscaped open space, etc. as stipulated in the HKPSG in the development scheme design;
Establish visual and landscaped corridors and buffer planting in the development scheme design; and
Tree preservation in accordance with Lands Administration Office Practice Note No. 7/2007 – Tree Preservation and Tree Removal Application for Building Development in Private Projects and Development Bureau Technical Circular (Works) No. 7/2015 – Tree Preservation.
5.9 Hazard-to-Life
5.9.1 Possible key measure to minimise potential risk to construction workers and future occupants include:
Limit working hours and number of workers within the SHWWTW CZ; and
Minimise population within the SHWWTW CZ.
5.10 Severity, Distribution and Duration of Environmental Effects and Further Implications
5.10.1 Subject to the findings of assessments, effective control and mitigation measures will be identified to ensure the impacts to acceptable level. The possible severity, distribution and duration of environmental effects such as beneficial and adverse effects; short and long term effects; secondary and induced effects; cumulative effects and trans-boundary effects from committed projects, and further implications will be considered and addressed in the EIA, where applicable.
MTR Corporation Limited Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
Project Profile
248118-REP-001-00 | Final | July 2016 Page 19
6 Use of Approved EIA Reports
6.1.1 The following reports are considered relevant and will be referred to in the EIA as appropriate. Other relevant information will also be considered and documented in the EIA where applicable.
Register No.
Title Date of Approval
Relevance to the Project
AEIAR-082/2004
Siu Ho Wan Water Treatment Works Extension
15 Dec 2004 Baseline ecological information
AEIAR-146/2009
Tuen Mun - Chek Lap Kok Link
23 Oct 2009 Road alignment and environmental mitigation measures
AEIAR-149/2010
Organic Waste Treatment Facilities, Phase I
24 Feb 2010 Cumulative Air Quality and Odour Impact Assessment
Hazard Assessment
AEIAR-158/2011
Integration of Siu Ho Wan and Silver Mine Bay Water Treatment Works
13 Jan 2011 Baseline ecological information
Hazard Assessment
AEIAR-185/2014
Expansion of Hong Kong International Airport into a Three-Runway System
7 Nov 2014 Cumulative Air Quality Impact Assessment
Noise Exposure Forecast
AEIAR-196/2016
Tung Chung New Town Extension
8 Apr 2016 Cumulative Sewerage and Sewage Implications
Alignment of Road P1 (Tung Chung - Tai Ho Section) and environmental mitigation measures
Figure 1.1
Location of Project
¤pÄ®Æ
Siu Ho Wan Depot
20
30
Äx²
°±¨
Basketball C
ourt
Car
Park
¾É
¾É
¾É
¾É
¾É
Pipelines
Pipelines
Pipelines
Pipelines
Pipelines
CUL
CUL
CUL CUL
´ä
´ä
´ä
´ä
ÅK¡]
¾÷
´ä
MTR
MTR
MTR
MTR
(Airp
ort
Expr
ess)
MTR
®ü
¸H
±Æ¤
¸H
¸H
Seaw
all
HWM
Rubble
Outfall
Rubble
HWM
Rubble
5.6
5.7
6.1
5.7
6.0
5.3
6.2
5.4
6.0
5.9
5.5
6.3
6.3
5.9
5.9
5.9
6.1
5.9
5.8
5.7
5.6
6.1
5.65.95.4
5.8
5.6
6.06.4
5.8
6.1
5.6
5.95.1
5.75.4
5.75.6
5.5
6.0
6.3
5.5 5.8
5.75.6
5.8
6.1
5.3
10.8
5.6
5.46.1
5.7 5.8
5.6
5.9
5.95.5
5.6
5.7
9.85.2 5.9
6.0
11.0
5.3
11.6
6.0
5.2
10.7
5.3 5.6
10.84.9
5.4
6.0
5.7
11.5
7.6
5.9
9.3
4.9
5.2
5.1
L
L
L
LH
L
L
L
LH
L
L
L
L
L
H
L
L
L
L
H
L
L
L
L
L
L
L
L
LL
L
LL
L
L
LL
L
L
LL
L
LL
L
LL
L
L
L
LL
L
L
L
L
LL
LL
L
L
LL
L
L
LL
L
¨®
¼t
¦æ
¬
«n°
±¨
®
µ¾ª
¥_¤j
À¬
MAI
N DEPO
T RO
AD
SOUTH
ROAD
AD
MINIS
TR
ATIO
N
RO
AD
CA
R P
AR
K
RO
AD
NO
RT
H LAN
TAU
HIG
HW
AY
CHEUNG
TUNG
RO
AD
¹D
¹D
¹D
¹D
¹D
Road
Road
Roa
d
Road
Roa
d
¤ë
¤ë
Platform
Platform
TS
CUL
CUL
CUL
CUL
CUL
CUL
CUL
CULCUL
CUL
CULCUL
CULCUL
CUL
CUL
CUL
CUL
¸ô
´ä
ÅK¡]ª
´ä
ÅK¡]
¾÷
¸ô
´ä
ÅK¡]ª
´ä
ÅK¡]
¾÷
¸ô
Rail
MTR
(Tun
g Chu
ng Line)
MTR
(Airp
ort
Expr
ess)
Rail
MTR
(Tun
g Chu
ng Line)
MTR
(Airp
ort
Expr
ess)
Rail
¸H
±Æ¤
¸H
±Æ¤
¸H
±Æ
¤
H
±Æ¤
¸H
HW
M
Rubble
Outfall
Rubble
HWM
Outfall
HWM
Rubble
Outfall
Rubble
Outfall HWM
Rubble
HWM
5.5
14.2
6.7
14.4
6.1
6.1
6.2
6.0
5.9
6.2
6.3
6.6
7.8 5.9
6.06.2
6.2
6.0
6.06.3
6.1
15.7
14.26.4
6.3
6.3
6.07.3
6.26.16.4
6.6
6.3
6.2
6.3
6.2
6.2
5.9
7.3 6.2
6.3
6.3 6.2
6.06.8
12.5
5.7
6.3
6.1
6.1
6.26.1
7.1
6.3
7.0
14.56.1
6.810.0
5.86.1
6.0
6.26.8
6.0
6.7
6.1
6.16.4
6.15.9
8.2
6.2
6.97.96.0
6.6
6.7
8.0
5.9
6.06.7
6.16.0
5.8 7.06.9 8.45.7
7.3
6.07.0
6.1
6.1
8.5
8.5 6.0
8.3 7.7
6.1
5.8
8.4
5.96.0
8.16.0
5.88.3
6.2
6.06.1
8.26.08.5
L
L
L
L
L
H
L
LL
L
L
L
LL
NORTH LANTAU
HIGHW
AY
CHEUNG TUNG
ROAD
¥_¤jÀ¬
µ¾ª
°ª
¬[
¹D
¹D
¹D
¹D
¹D
Road
Roa
d
Road
Road
Road
¤jÄ®·Ñ¤ÎÀË
Tai Ho OfftakeAnd Pigging Station
400
20
40
60
80
20
100
40
120
128
60
80
100
20
120
40
60
140
80
154
120
100
120
124
122
¤pÄ®Æ
¤jÄ
Siu Ho Wan Depot
ESS
TAI HO WAN
¾É
¾É
¾É
¾É
½Ý
CUL
CUL
Pipeline
CUL
CUL
CUL
Pipeline
Pipelin
e
CUL
CUL
Pipeline
CULCUL
CUL
CUL
CULCUL
CULCUL
CUL
VS
CUL
CUL
CUL
CUL
CUL
CUL
CUL
CUL
B
G
´äÅK¡
]¾÷
´ä
´ä
ÅK¡]ª
´ä
ÅK¡]
¾÷
MTR (Airp
ort
Expr
ess)
MTR
MTR
(Tun
g Chu
ng Line)
MTR
(Airp
ort
Expr
ess)
¸H
¸H
H
¥
H
Rubble
HW
M
Rubble
Rubble
HWM FlatRock
Rubble
HW
M
5.7
5.8
7.85.8
8.06.0
5.58.6
4.2
7.3
5.2
6.05.6
5.2
5.4
6.4
5.8
6.0
5.6 6.1
5.5
5.9
6.4
6.3
6.25.9
5.7
5.7
5.87.3
5.8
6.26.5
6.1
5.9
5.9
6.4
6.1
5.6
6.47.0
6.7
5.25.8
6.9
5.8
6.4
6.3
5.96.3
5.8
6.0
7.4
6.2 7.0
6.3
5.8
6.2
7.9
10.3 107.5
6.55.8
14.9 124.2122.8
8.16.6
5.9
14.6
6.1
5.46.1
7.66.1
97.6
5.6
7.5
15.0
6.2 14.9
7.3
6.1
5.6
7.5 7.0
15.0
6.9
17.0
4.8
129.2
103.8
6.7
6.0
6.3
6.3
6.5
6.3
5.9
102.5
119.3
114.5
71.0
116.1
123.7
124.2
124.5
LL
L
LLL
L
L
L
L
L
L
LL
L
L
LL
L
L
L
L
L
L
L
LL
L
L
L
L L
L
L
L
L LH
H
LL
L L
L
L L
L
L
LL
LL
E
L
L
L
L
L
HL
HL
L
H
L
L
L
E
E
L
E
L
E
ET
E
E
E
°±¨
®
¨®
¼t
«n
¦è
¬~¨
µ¾ª
¥_¤j
À¬
µª
MAIN
DEP
OT
RO
AD
CA
R P
AR
K
RO
AD
SOUTH
ROAD
WES
T
WAS
H P
LA
NT
RO
AD
NORTH
LANTAU HI
GHW
AY
CHEU
NG T
UN
G R
OAD
CHEUNGT
UN
GR
OA
D
¹D
¹D
¹D
¹D
°ª
¬[
Road
Road
Road
Ele
vated
Road
Road
Ele
vated
Road
FP
FP
78
30
60 120
100
40
80
40
60
60
80
100
120
140
160
134
140
160 18
0
180
200
200
220
220
240
240
260260 254262
ESS
CUL
CUL
CULCUL
CUL
CUL
G
©¥Rocky Area
23.6
22.6
24.9
24.4
21.5
22.925.2
22.6
30.2
48.1
37.8 47.3
55.7
79.6
60.954.8 55.6
53.5
55.1
52.1 54.5
68.7
69.351.1
54.2
54.3
176.6
229.9
L
E
E
L
ET
L
L L H
LL
LL
LL
H H HL LL
ETL
LL
E
ET
E
¹D
¹D
¹D
Road
FP
FP
FP
Road
Road
FP
FP
FP
260
280
280
300
280
300
300
320
340
320
340
300
280
360
340
360
240
260
280
380
300
320
340
360380
400
372
316380
ºhª
LAU FA TUNG©¥
Rocky Area
262.1
281.5
266.5
283.0
261.0
307.0
311.0
305.7
305.8
324.2
320.6
324.5
307.0
307.1
340.5
312.9
317.7
340.9
330.4315.1
325.9
316.6
325.5339.8
324.4
340.8
333.6
373.5
334.5
352.7
349.9
344.1
378.0
332.5
356.3
357.0
328.9
329.3
342.6
354.6344.4
337.5
329.6
360.0
354.8
279.0
361.3
366.7
366.8368.2
365.0
363.2
344.8
361.3 341.5
370.8
331.5
335.3
285.4
397.4
364.9
395.0
372.3
FP
FP
FP
FP
FP
TS
TS
TS
TS
TS
TS
´r´º
ÆW
ÀG¹
¤pÄ®ÆW¬F
Discovery Bay Tunnel
Ad
ministratio
n Building
Siu Ho Wan Government Maintenance Depot
530
520
10
20
40
60
20
40
80
40
60
60
100
80
116
100
2080
100
100
12040
126
120
11652 126
112
¤pÄ®Æ ·s¤jÀ¬¤s¤Ú¤h¦³¤½¥q¤p
¦¬¶
¤ûÀ
Siu Ho Wan Depot
ESS
Tollg
ate
NGAU TAU WAN
¾É
¾É
¾É
¾É
¨R·
Pipeline
CUL
CUL
Pipelin
es
WT
CUL
Pipelines
CUL
Pipeline
CUL
CULCULCUL
CUL
CULCUL
CUL
CUL
CUL
CUL
CUL
CUL
CULCUL
CUL
CULCUL
CUL
CUL
CUL
CUL
CUL
CUL
CUL
CUL
CUL
CUL
CUL
CUL
Washed-outArea
´ä
´ä
ÅK¡]
¾÷
´ä
´ä
ÅK¡]
¾÷
MTR
MTR
(Airp
ort
Expr
ess)
MTR
MTR
(Airp
ort
Expr
ess)
±Æ¤
¸H
±Æ¤
¸H
¸H
®ü
´
´
Outfall
Rubble
HWM
Outfall
Rubble
HWM
Rubble
Seaw
all
Nulla
h
Nullah
6.56.3
5.6
5.1 6.0
5.6
5.96.25.6
6.05.3
5.6 5.3
6.0 5.85.26.2
6.36.1 6.5
5.1
6.25.5
6.3 6.15.9
5.15.8 6.1
5.95.85.8
6.1 6.35.2
5.76.4
5.9
6.0
6.16.7
5.8
6.66.0
6.5
4.9
6.1
6.96.5
6.2
5.7 5.9 6.4
5.96.3
5.96.8 6.45.5
6.9
6.76.0 7.7
6.5
5.86.2 6.6
6.1
6.87.5
6.4
8.76.97.36.0
6.0
7.07.36.8
6.66.0
7.26.2
6.1 8.06.5
7.35.6
6.0 5.9
7.07.3
6.6
5.9
5.95.8
7.76.1
8.7 6.2 6.27.4
5.9
6.35.9
8.06.1
6.4
7.78.95.7 6.5 7.8
6.1
5.7
8.1
5.8 8.0
6.0
5.8
6.19.35.7
10.1
5.6
5.76.69.06.2 8.1
8.4
8.18.4 8.49.7
5.4
6.2 5.6
9.2
8.1
8.2
6.25.95.8
6.0
8.6
5.9 5.5
12.4
6.06.4 12.1
10.88.9
8.7 9.19.5
9.2
5.5
9.7
6.1 6.06.26.1
5.36.1
9.1
11.16.6 6.2
6.1
6.59.711.6
5.46.1
6.06.0
9.75.311.6
5.7
10.26.5
10.3
5.9
5.56.4
5.9
6.5
6.2 10.4
11.2
6.1 5.6
5.8 10.7 6.05.9
6.25.7
5.76.36.0
12.46.4
5.4
11.2
6.0 11.211.111.7
5.75.5
6.0 7.27.0
8.6
11.96.1 12.3
5.5
12.7
6.2
12.3
12.95.6
12.7
6.2
13.3
13.213.2
20.6
6.4
13.5
13.6 28.3
13.5
14.212.1
36.1
13.513.2
13.2
44.213.4
12.1 51.513.1
57.9
12.3
66.043.3 58.4
35.0
12.012.1
27.0
18.7
41.8
55.1
27.7
33.8
98.6
51.2
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L LL
L
L
L
L
L
L
H
L
L
LL
L
L L
L
L L
L
LH
L
L
L LL
L
L
HL L LL
L
L
L LL
L
H
L
H L
L
L
L H
LH
LL L
L
L
LH
LH L
HL
LL
L
LL
LL
LL
L
HL
L
L
L L H
L
L
L
L
L
L
LL
L
L
L
LL L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
L
L
L
LL
L
L
L
L
L
L
®¼t
ô°
µ¾ª
¥_¤j
À¬
«n
MAIN DEPOT ROAD
PERMANENT WAY ROAD
CHEUNG TUNG
ROAD
NORTH
LANTAU HI
GHWAY
SOUTH
ROAD
¹D
¹D
¹D
¹D
¹D
¹D
¹D
¹D
Road
Road
CW
Road
Road
Road
Road
Road
Road
FP
FP
¹j¿
¤J¤
TS
TS
TS
Screen House
r ºÆ
¬¦©ÐÅ
26
20
20
20
40
20
20
40
20
40
60
60
60
80
60
80
100
80
100
80
100100 12
0120
120
120100
140
140
140
120
140
160
140
160
160
180
160
180
200
180
114
158
180
194
220
198
¤pÀÚÆW¦Ã
¤pÄ
Siu Ho Wan Sewage Treatment Works
ESS
SIU HO WAN
Âo¤ Âo¤
½Ý
¾É
¾É
¨R·
CUL
CUL
Filter Bed Filter Bed
CUL
CUL
CUL
ShaftCUL
Pipelin
e
CUL
CUL
Pip
eline
CULCUL CUL
CUL
CUL
CUL
CUL
CUL
CUL
CUL
CULCUL
CULCUL
CUL
CULCUL
CUL
CUL
CUL
CUL
Washed-outArea
©¥
©¥
©¥
©¥
©¥
Rocky Area
Rocky Area
Rocky Area
Rocky Area
RockyArea
6.0
5.7
23.56.0
6.024.0
7.424.1
6.1
23.5
6.0
5.7
10.5
7.0
8.09.0
6.2
5.6
5.6
8.4
5.9
7.0
7.5
9.9
13.5
5.4
9.45.8 8.1
9.68.2
5.89.37.4
5.7 7.0
16.1
5.9
10.3
7.8
5.5
18.15.9
7.4
5.45.7
7.5 9.28.2
5.8 7.2
8.2
9.25.9
18.0
5.9
7.6
5.8
5.95.5
7.623.3
5.9
7.6
5.9
22.65.8
5.6 6.2
5.8
33.0
5.9 5.45.9
35.2
5.6
32.45.9
5.85.7 6.0
5.9
5.6
5.8 5.828.4
37.26.2
6.35.9
6.5
35.96.9
6.9
6.05.915.3
5.9 50.1
16.7
6.0
34.216.3
5.7
6.3
15.1
17.6
19.5
36.817.8
47.115.0
6.1
21.0
45.7
43.4
23.3
41.1
25.7
39.3
28.7
35.630.1
32.3
101.777.5
77.8
99.0
105.9
105.7
145.5
122.2
148.7
149.3
132.9
157.5
174.2
158.4
144.1
144.6145.1
203.6
151.0154.5
165.4
159.3
LL
LL L L
H
H
LL L
LH
L
LLL L
L
L
L L
H
HLL
LL
LL L
L L
L
L
LL LL
L LH H
LH
L LH
H
LL
EL
H
HL
LE
H
L
L
H
LLL
LH
H
LL
L L L
LL
LHHL
L
L
HH L
L
E
L
LL
L
HL
L
LLL
HL
L L
HL
L LL
L
H L
LL
L LL
HL
L
H
HLL L
L
L LE
LL
LH
E
ET
ET
E
ET
ET
µ¾ª
CHEUNG
TUNG
RO
AD
¹D
¹D
¹D
¹D
¹D
¹D¹
D
¹D
¹D°ª¬[
¹D
Road
FP
Road
Road
FP
FP
Road
Road
FB
Road
Road
Road
Elevat
ed Roa
d
Road
Road
FP
FP
FP
FP
106100 10450 50
100
60
106
120
140
80
40120
120
100
160
60
140
120
140
80
140
160
76
16
0
180
100
160
180
120
180
140
200
160
200
200
220
180
200
220
126
192
246
240240
250
274
124
220
218
206
200200
200 24
0
180 180
260
160
160
280
140 296
140
138
124
©¥
©¥
Rocky Area
Rocky Area
109.0
128.8
118.9
143.8 129.1128.4
87.0
89.3
130.1
133.4
112.6130.8
157.0
167.5
97.8
183.1
187.1
190.7
190.7
198.6
182.7
183.8
191.0
210.5160.8
200.8199.5
208.1
150.3
211.0
202.1
217.0
150.1
188.5
212.1
211.4
209.0
213.6
191.5
219.0192.2
235.8
238.2
206.4
247.5
179.1
177.6
174.6172.8
245.5
250.1
249.9
247.0171.4 195.0
190.8
228.5
181.3
247.0
169.4
227.4196.0
245.5229.7
227.3
214.7
219.2
177.1
217.5
205.8
239.4
234.8
226.3
204.2203.5
207.4
233.1
203.1
234.8
235.0
199.4
216.2
166.8
157.3
187.3
290.4
178.5
251.1 274.5
237.1
ET
ET
E
E
ET
ET
E
E
E
E
E
ET
ET
FP
FP
FP
FP
FP
FP
FP
FP
FP
220156130
180
200
180140
240
200
160
200
220
180
260
220
200
164
240
240
220
260
280
260
240
280
280
260
300
296
280
320
300
300
330
320
240320
340
260 340
340300
340
280
360
360
320
320
340
280
380380
320
360
260
3
0
0
340
400
320
360
412
332
386
370
378
ºhªLAU FA TUNG
¥Û
¥Û
Rocky Strea
m
Bed
Rocky Strea
m
Bed
162.1
209.2
229.5
240.6
264.6 269.7242.9
272.6
249.6240.5
244.8 242.0
252.6
271.2
272.9
271.1
270.8
276.3
292.5
223.8 280.2
282.5
282.1
308.4
284.5277.0
278.1
283.5
265.2
283.0
293.3
293.0
297.0
276.7
281.3
295.2
334.4
328.5
331.5
294.4
328.6
294.3
298.2
336.9
297.8
341.5340.5
340.6
341.5
339.6
342.5340.9
342.6
341.8
339.0
284.2317.1
346.9
285.0 349.0
286.7
285.9282.5
316.7
360.6
273.2
283.5
327.0
371.1358.9
322.6287.4
324.4291.0
318.7369.9
381.5378.6
323.0
373.0 373.5
380.5382.5
383.0377.5
382.2
384.3384.0299.6
377.4
381.0
317.0
320.6
321.3
329.7
367.1
413.5394.7
297.8 391.5
411.5
383.2
333.3
387.7
329.5288.5
ET
ET
ET
ET
E
E
FP
FP
FP
FP
FP
FP
² ¤ô ¤
Sham Shui Kok S
ubstation
40
60
80
40
100
60
120
140
80
160
174
20
CUL
CUL
CUL
CUL
CUL
CUL
CUL
CUL
CULCUL
CUL
CUL
CUL CUL
CULCUL
CULCUL
©¥
©¥
©¥
©¥
Rocky Area
Rocky Area
Rocky Area
Rocky Area
16.729.3
11.912.0
20.7
12.6
13.6 26.1
12.0
21.311.8
11.6
28.6
40.0
50.7
36.0
56.111.4 43.4
11.0
94.3
96.4
28.3
70.6
137.8
153.3
160.7
168.362.8
110.8
174.4
130.8 177.3
124.8
L
L
ET
L
E
LL
E
L
E
E
L
L
E
E
EL
E
E
E
E
EE
E
E
EE
EE
E
E E
E
EE
E
µ¾ª
¥_¤j
À¬
FP
¤p
Ä®
ÆW¹
Siu
Ho
Wan
Water Treat
ment
Works
144
200
180
160
140
120
100
80
60
4020
12
200
180
160
14012
0
100
80
60
160
40
140
74
28
CUL
CUL
CUL
CUL
CUL
CUL
CULCUL
CUL
©¥
©¥
©¥
Rocky Area
Rocky Area
Rocky Area
129.9
186.2
198.3
204.1
201.1
204.7
62.0
179.7
218.9
33.1
62.7
222.6151.7
196.2211.9
186.1208.0
178.3182.8
35.9
149.4
149.9146.4
138.8129.8
54.0
141.9194.8
193.484.9
167.5
172.3
153.7
153.9166.5
173.4
177.5169.1
169.3
30.3
115.949.4
196.5
97.7
94.2
95.9
30.0
40.3
83.4
41.8
81.4
30.2
52.1
60.367.0
30.3
138.2
92.5
65.6
26.8
147.2
23.4
E
E
E
EE
E
E
E
EE
E
E
E
EE
E
EE E
E
H
E
EE
EE
E
H
L
E
E
¹D
FP
FP
Road
¤ë
¤ë
TS
Platf
orm
TS
Platf
orm
¥_¤j
À¬¤s
¼North Lantau
Refuse Transfer Statio
n
20
20
16
²`¤ô¨¤´â
Sham Shui Kok ChlorineLoading And Unloading Area
ÀG¹
ÀG¹
¿é°
CUL
CUL
CUL
CUL
CUL
CUL
CUL
CUL
CUL
CUL
Tun
nel P
ortal
CUL
CUL
WT
WT
CUL
CUL
Conveyor
CUL
WT
¤Ñ
¤Ñ
Antenna
Antenna
´ä
ÅK¡]
¾÷
MT
R (Airport
Express)
±Æ
¤¸H
®ü
¸H
Outfall
RubbleHWM
Seawall
HW
M
Rubble
5.7
5.7
6.0
5.9
5.9
10.5 6.0
8.45.7
6.0
8.95.85.9
5.86.1 14.1
7.1
6.0
5.5
12.25.8
5.511.2
10.9
6.05.4
5.86.1
11.9
5.8
9.9
5.3
5.8 5.2 9.92.7
10.3
5.5
6.3
6.1
10.9
9.9
5.8 6.1
6.2
8.78.9
9.46.0
-1.6
6.28.4
7.8
9.7
9.2
5.9
5.8
6.7
7.6
7.2
5.4
3.96.6
8.38.6
19.47.3
L
L
H
LL
H
LL
L
LL
L L
L
LL
L
L
L
L
L L
LL
L
L
H
L
LL
LL
LL
L LL
L
H L
LL
L
L
L
L
LL
L
L
L
L
L
L
L
L
L
E
²¤ ®
¥_¤j
À¬
µ¾ª
NO
RT
HL
ANT
AU
HI
GH
WA
Y
CHE
UN
G
TU
NG
RO
AD
SH
AM
SH
UI K
OK
DRIV
E
°¬¹¸
¹D
À¹
¹D
Eleva
ted
Road
Road
TunnelR
oad
´ä
MTR
¸H
Rubble
HWM
7.0
6.76.4
6.7
6.4
6.26.8
¹D
Road
¤ë
¤u³õ
TS
TS
Platf
orm
TS
PH
TS
TS
TS
TS
TS
TS
TS
Workshop Hall
TSTSTS
¤pÀÚÆW
µ¾ªF¸ô¢
¦æ¬F
Siu Ho Wan Treatment Works
640 CHEUNG TUNG ROAD
Ad
ministratio
n Building
1
3
2
20
30
20
20
10
4
22
«°¤Ú¦³¤pĮƤEÀs¤Ú¤h
¤pÄ®Æ
¤p
Ä®
ÆW¨
®½ø¦
©¯d
©Ò
¤p
¤pÀÚÆW¦Ã
ESS
ESS
City Bus Ltd.Siu Ho Wan Bus DepotThe Kowloon Motor Bus Co. Ltd.
Siu Ho Wan Bus Depot
Siu
Ho
Wan
Vehicle Pound
Vehicle Exa
mination Centre
And
Weig
h Station
Siu Ho
Siu Ho WanSewage Treatment Works
ESS
ESS
ÀG¹
ÀG¹
¾É
Âo¤ Âo¤
¾É
½Ý
Âo¤
Âo¤
WTCULW
T
CUL
CUL
G
CUL
CUL
CUL
CUL
CUL
Tunnel P
ortal
CUL
CULCULCUL
CUL
CUL
CUL
Tunnel P
ortal
CULCUL
CULCUL
CUL
CULPipeline CUL
CUL
CUL
Filter BedsFilter Beds
Pipeline
CUL
CUL
CUL
CUL
CUL
Shaft
WT
Filter Bed
CUL
CUL CUL
CULFilter Bed
CUL
CUL
´ä
ÅK¡]
¾÷
¸ô
¸ô
´ä
ÅK¡]
¾÷
MT
R (Airport
Express)
Rail
Rail
MTR(
Airport
Express)
±Æ¤
¸H
±Æ¤
¸H
HW
M
Outfall
Rubble
HW
M
Outfall
HW
M
Rubble
8.8
6.7
6.7
8.6
6.9
6.96.6
6.9
6.7
8.2 6.3
7.9
6.2
6.1
6.4
6.63.8 6.2
6.6
6.16.2
6.2
6.2
6.5
7.65.7
6.16.66.2
6.2
7.9
5.9
6.36.1 6.4
7.1 7.8
7.4
6.8
7.4
6.0
5.96.5
6.2
6.37.06.7 6.0
6.3
6.9
6.26.2
7.26.6
6.56.7
6.56.0
6.1 6.25.9
6.0
6.0 6.17.0
6.46.4
8.3
6.2
6.56.3
6.5
6.3
6.1
6.26.6
6.3 6.16.2
6.9
6.16.2
5.9
11.7
6.76.0
6.56.55.9
6.2
10.4 6.0
6.4 6.1
6.36.6
11.5
6.7
6.4
6.0
6.36.4
5.9
6.2
12.77.1
7.0 6.4
6.9
6.5
6.46.0
6.4
6.6
6.630.1
6.86.36.0
6.5 18.66.529.7
6.7
29.2
13.86.5
6.730.5
30.6
29.9
6.7
7.06.4
6.7
6.0 30.9
30.57.36.3
28.86.4
28.56.7
15.87.112.712.66.5
28.816.2
6.5
28.8
7.5 30.6
30.77.2
7.3
7.428.7
28.5
8.6
5.7
11.4
6.5
6.5
6.0
7.3
6.5 28.8
28.531.4
11.86.9
8.1
6.9
6.4 30.06.8
6.66.0 26.814.1
5.26.0
7.5
31.57.4
29.4
8.2 7.26.1
6.86.4
6.330.1
18.4 27.528.8
5.9
6.7
22.45.9
5.8
29.8
25.7 30.128.05.8
5.7 30.35.7
6.5
30.26.3
7.0
30.1
6.55.7
30.3
5.9
30.330.46.1
6.4
6.4
5.9
6.0 30.76.8
30.0
30.1
6.6
6.6
6.56.2
6.2 30.2 30.3
6.26.1
5.96.4
32.56.0
6.46.5
30.430.16.5 5.9
6.430.3
5.4
6.8
6.85.9
6.430.2
6.1 23.45.8
5.9
L
L
L
L
L
L
L
H
H
L
L
H
L
H
L
L
L
L
HL
L
L
L
L
L
L
L
L
H
LL
H
LH
LH
LL
L
L
L
LL
HL
LL
L
LLL
LLH
L L
L
L L
HL
LH
LH
LL
LL
LL L
L
LLL L
LL
L LLL
LH
LLH
LL
H
LLLL L
LL
L
LL L
L L E
LL
HL L
L LH
LLL
H
L LLL LE
HL
H HL LL
²¤®
²`
Â
¥_¤j
À¬
µ¾ª
¥_¤j
À¬
µ¾ª
SHAM SHUI KOK DRIVE
CH
EU
NG
TU
NG
RO
AD
NO
RT
HL
AN
TA
UHI
GH
WA
Y
SH
AM FU
NG
RO
AD
NORT
HL
ANT
AU
HI
GH
WA
Y
CHEU
NG T
UN
G R
OAD
¹D
¹D
¹D
¹D
¹D¹
D¹D
¹D
¹D
Road
Road
CW
Road
Road
Road
Road
Road
Road
Road
P
RCP
P
TS
TSTS
TSTS
TS
TS
TSTS
20
4
4
40
10
20
60
40
80
½X
Pier
ESS
¾É
¾É
CUL
CUL
CUL
CUL CUL
CUL
CUL
CUL
pipeline
CUL
pipeline
CUL
CULCUL
CUL
CUL
CUL
CUL
CUL
CUL
CUL
CUL
GG
G
G
GGG
GG
G
G
G
G
¤Ñ
¤Ñ
¤Ñ
LT
Antenna
Antenna
Antenna
SHR
äÅK¡]ª
äÅK¡]ª
äÅK¡]¾÷
MTR (Tun
g Chun
g Line)
MTR (Tun
g Chun
g Line)
MTR (Airp
ort Ex
press)
H
H
®ü
H
®ü
H
®ü
¸H
Rubble
HWM
Rubble
HWM
Sea
wallRub
ble
Sea
wall
HWM
HWM
Rubble
Sea
wall
Rubble
HWM
6.2
6.1
6.57.2
6.2
4.2 6.7
6.4
6.5
7.7
8.4
7.2
7.4
7.38.2
11.2
8.64.3 6.4
8.7 6.6
8.88.6
6.4
9.3
6.2
9.18.9
8.69.06.5 6.88.2
8.7
6.1
8.6
6.2
8.77.3
6.9
6.1
8.69.0
7.2
6.7
7.8
8.58.4
7.0
8.9
6.0
6.8 7.3
5.7
8.1
7.88.0
8.6
8.0
9.0
8.17.9
5.5
8.8
7.7
8.78.7 7.6 7.9
7.9
8.78.5
8.3
8.6
7.5 7.35.5
8.47.2
8.5
8.5
7.1
9.85.5
7.86.5
6.1
6.27.7
7.95.3
5.3
7.8
6.2
6.2 5.4
5.3
5.3
7.2
12.9
4.1
3.920.5
19.6
4.2
25.6
4.5
25.1 3.7
26.722.1
21.7 4.6
23.53.1
3.45.2
33.719.2
4.9
3.7
4.0
4.4
43.942.9 5.04.5
5.34.8
45.2
7.0
5.65.7
4.8
37.5
6.3
6.8
50.6
8.5
7.9
5.1
11.5
9.7
4.9
7.7
5.6
9.5
L
L
L
L
L
L L
L
H
L
L
L
LH
L
L
L
L
L
L
L
L
H
LL
L
L
L
L
L H
LL
L L
L
L
L
E
L
L
E
LE
L
L
L
L
L
EL
EL
L
E
E
¥_¤jÀ¬
µ¾ª
NORTH LANTAU HIGHWAY
CHEUNG TUNG ROAD
¹D
¦æ
¤H
¹D
¹D
Road
CW
CW
Sub
way
Road
CW
Road
FP
FP
FB
FP
FP
FB
FP
420
400
440
460
380
360
340
320
300
440
420
400
380
360
34
0
320
300
280
260
240
220
¦ÑªLO FU TAU
©¥©¥
©¥
©¥
©¥
©¥
©¥
©¥
©¥
©¥
©¥
©¥
©¥
©¥
©¥
©¥
©¥
©¥
©¥ ©¥
Rocky Area RockyArea
RockyArea
Rocky Area
RockyArea
RockyArea
Rocky
Area
Rocky AreaRockyArea
RockyArea
Rocky Area
Rocky Area
RockyArea
RockyArea
RockyArea
Rocky Area
Rocky Area
375.1
402.7 355.9
405.7322.5362.3
369.7
320.6
358.6
398.1
407.2
321.2
405.2
326.2
399.4
438.1
315.5
408.7
406.4
444.7320.3
409.2456.0
454.4
361.1450.9
306.5
317.5
355.6
465.4 307.3
463.2464.1
280.1
290.0
459.1326.8
292.9 279.6300.4
289.7 286.0
297.6
299.5
270.7
438.3
340.8
272.8435.0
453.4
414.2
299.3
345.5 338.7
391.1
316.1
394.5
434.5 319.2 321.1
348.9
397.4
362.0
344.3
385.1
323.7
374.5
334.0370.9
340.9
259.8
386.9
373.1
402.7392.4
336.4
270.9273.9376.0
381.2
274.0
399.5
387.0 355.9
296.6375.3353.4
381.3 304.8
353.7363.4 355.7
371.8
371.0345.8
352.9354.0
291.6
267.6
344.0
263.1
267.6
356.2261.7
262.4
377.6
274.3
299.8
385.2
391.0 302.9
297.0
392.8393.1
271.9
260.9277.1
391.2
390.4
391.7
FP
12
10
4
4
20
40
52
4
60
20
4
40 10
4
14
60
20
82
80
82
40
ESS
ÀG¹
ÀG¹
ÀG¹
ÀG¹
CUL
CUL
Tunn
el Portal
CUL
Tunn
el Portal
Tunn
el Portal
CUL
Tunnel
Portal
CUL
G
G
G
G
G
G
G
G
GG
´äÅK¡
]¾÷
MTR (Airp
ort
Expr
ess)
¸H
¸H
¥
H
¥
¥
¥¥
¥
©¥
¥
¥
©¥
©¥
©¥
HWM
Rubble
Rubble
HWM
Flat Rock
Rubble
Flat Rock
Flat Rock
Flat Rock HWM
Flat Rock
FlatRock
HWM HWM
Rocky Area
FlatRock
HWM
HW
M
Rocky Area
HW
M
Rocky Area
Rocky Area
11.4 8.46.0
6.1
5.8
7.58.56.1
6.0
6.06.0
5.88.47.4
6.0 8.612.4
5.8
5.7
5.912.9
5.9
5.96.2
12.8
6.9
5.6 12.9
7.9
6.0
6.25.7 6.7
12.3
6.2
6.0
6.013.0 5.6
5.8
6.012.8
12.2
6.3 7.5
6.9
13.2
6.56.0
12.2
6.0
5.9
6.4
13.06.3
5.8
6.2
5.8
6.7
6.05.7
5.8
6.35.9
5.7
6.2
7.1
5.76.5 5.76.1
6.2
12.55.6
6.4
2.7
5.6
3.619.2
3.63.1
21.1
2.8
3.1
2.8
3.4
47.1
3.0
52.9
3.0
3.5
3.8
2.83.1
5.0
5.0
4.8
3.5
5.3
9.2
5.6
8.24.2 3.1
3.7
5.3
3.53.8
82.46.215.2
4.0
5.7 3.94.6
84.0
6.0 71.06.1
12.44.6
4.85.3
5.36.6
80.46.4
6.4
82.5
6.2 5.7
6.26.9
7.4 5.620.1
7.4 7.4
L
L
H
L
L
L
L
L
H
L
L
L
H
L
L
L
L
LL
L
L
E
E
E
¥_¤jÀ¬
µ¾ª
NORTH LANTAU
HIGHWAY
CHEUNG TUNG
ROAD
¹D
Road
FP
¤»¦
X
112 120116
100
100
80
80
60
60
40
56
40
4
20
40
20
60
10
80
100
120
4 20
40
140
60
80
100
120
¤jÄTAI HO WAN
G
G
G
G
G
G
G
¥
HW
M
HW
M
108.6
101.5
95.3
87.0
79.2
9.0 10.0
3.5
23.5
21.5
2.7
4.0
19.6
12.8
11.3
3.4
13.3
4.39.0
4.8
10.0
12.3
7.5
4.2
6.0
4.7
3.9
7.0 9.55.5
3.5
8.0
12.93.7
9.4
7.9
11.2
6.5
10.89.3
4.4
125.1
18.0
19.0
17.0
18.5
70.5
E
ET
ET
ET
EE
ET
ET
E
E
E
ET
E
E E
ET
E
E
E
E
E
FP
FP
FP
FP
220
240
260
280
300
220
200
180
160
140
120
100
80
60
320
260
24
0
340
280
360
300
340
320
380
360
80
400
100
120
140
360
180
340
160
320
280
200
300
24
0
260
220
©¥
©¥©¥
©¥
©¥
©¥
©¥
©¥
©¥
Rocky Area
Rocky Area
Rocky Area
Rocky Area
Rocky Area
Rocky Area
Rocky Area
Rocky Area
Rocky Area
235.6
240.6293.1
204.9
164.4
282.9
298.6
67.0
348.7
200.3319.8
334.5317.5
360.0
324.8
335.9
375.6173.5
270.4
101.0
98.7
367.6
285.2
94.6
366.2 364.1363.9
327.9
86.8
386.8
379.6404.1
380.5
403.0
396.4
312.1
107.2
294.5
331.3
348.6
136.5
134.0118.2
120.7
156.5
168.9
305.0
FP
FP
FP
380
300
400
320
420
340
440
360
380
400
420
440
440
440
440
420
420
380
400
400
460
¦ÑªLO FU TAU
G
©¥
©¥
©¥
©¥
©¥
©¥
©¥
©¥
©¥
©¥
©¥
Rocky Area
RockyArea
Rocky Area
RockyArea
RockyArea
Rocky Area
RockyArea
Rocky Area
RockyArea
RockyArea
Rocky Area
387.2405.0
402.8407.4
392.1
391.8
362.2
396.2
402.0
426.3
338.0
443.1
343.3
448.6
457.0
449.1
451.2452.4
450.5
449.1
447.6
452.8
447.3
455.8
445.0
429.3
442.9
439.2
441.7443.0
457.5
443.1
442.5 444.9
441.0
421.4
445.4439.0
427.6451.5
444.6
448.9
445.5
441.5
454.8
443.3
410.1 436.5
438.4
450.2
437.0 449.8446.9 448.4
413.7
404.3
444.9
421.4
413.3
413.4
414.5
449.3
412.7
455.3
449.1413.5
450.7
413.4
445.5
441.0
416.2
451.4
407.7
408.4
447.2
397.1
410.4
390.5
465.0
393.7
388.8
442.7
394.8
459.9 391.4
389.0
440.2
FP
FP
FP
FP
FP
FP
FP
FP
Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan DepotSCALE:
DATE:
FIGURE No.
N
METRES
250500 100 150 200
JUL 2016
1:10000 (A3)
1.1
TREATMENT WORKS
SIU HO WAN SEWAGE
NORTH LA
NTAU HI
GHWAY
TREATMENT WORKS
SIU HO WAN WATER
TRANSFER STATION
NORTH LANTAU REFUSE
LOCATION OF PROJECT
(UNDER CONSTRUCTION)
TM-CLK LINK
TAI HO WAN
LEGEND
SITE BOUNDARY
COUNTRY PARK
WATER TREATMENT WORKS
CONSULTATION ZONE OF SIU HO WAN
LANTAU NORTH (EXTENSION) COUNTRY PARK
STATION
AND PIGGING
TAI HO OFFTAKE
MAINTENANCE DEPOT
GOVERNMENT
SIU HO WAN
BROTHERS ISLANDS
MARINE PARK IN THE
BUILDING
ADMINISTRATION
DISCOVERY BAY TUNNEL
(UNDER STUDY)
COLUMBARIUM SITES
POTENTIAL
AND WEIGH STATION
VEHICLE EXAMINATION CENTRE
SIU HO WAN VEHICLE POUND
(UNDER CONSTRUCTION)
ORGANIC WASTE TREATMENT FACILITIES
SIU HO WAN DEPOT
NEW LANTAO BUS COMPANY
(UNDER PLANNING)
TOWN EXTENSION
TUNG CHUNG NEW
(UNDER PLANNING)
TAI HO INTERCHANGE
EXISTING SIU HO WAN DEPOT
LANTAU AIRPORT RAILWAY
2) THE PROPOSED MTR SIU HO WAN STATION IS INDICATIVE, SUBJECT TO FURTHER STUDIES.
1) THERE ARE OFF-SITE UTILITIES OUTSIDE THE PROJECT BOUNDARY.
NOTE:
(INDICATIVE FOR ILLUSTRATION PURPOSE)
PROPOSED MTR SIU HO WAN STATION
(UNDER PLANNING)
(TUNG CHUNG - TAI HO SECTION)
ROAD P1