    Event: Septic Tank 1

    First Step: Establish proposed working platform -> Earthwork Acti

    Reason: 1 inimi!ing earthwork after com& Ens"re the ease of earthwork e'

    ( Ens"re the stabilit) of one metre

    . Stabili!e the ha!ard !one %rst# Fi

    Second Step: /ewatering

    1 Establish a well or shoring 0prop

    & 3t seepage thro"gh it and the wa

     Third Step : Ens"re 4rotection on ain /rain

    1 Strengthening the soil stabilit) and avoid

    Appl) Steel 4late along the main

    Ascertain the location and nat"r

    rock "sed for riprap will be done

    Forth Step: Temporar) c"t o< pile at level 8m

    1 to ease the placement the piling

    & to ease the e'cavation of septic

  • 8/9/2019 Propose Plan on Septic Tank

    2/8

  • 8/9/2019 Propose Plan on Septic Tank

    3/8

    Zone PRL Road Fdn

    A /rivewa) Ramp 8#1,m > m   350mm+

    /rivewa) Septic Tank m350mm

    /rivewa) Ramp 1#7m350mm

      vities

    letion on septic tank constr"ction# $ess %ll and c"t activities afterward#  cavation on septic tank

    main drain beside fencing - platform level of *one + to be maintained 1#,

    ll the septic tank area to stabili!e the area as e'cavation can be done speed

    sed level min"s &m2 depth which allow water seepage#

    ter being p"mp direct to nearest drain#

    loosen fo"ndatoin on main drain

    drain &m5(#6m on 1#78m below# ethod: 9ibration on steel plate and baka"

    of an) e'isting s"bstr"ct"res and services and shall take ever) necessar)

    b) a la)er thickness of 1m which from 1##8m ;1#7 m

    machine on 1(=.=&81

    tank

  • 8/9/2019 Propose Plan on Septic Tank

    4/8

    s on septic tank 1

    o"ndation base

      septic tank

    started#

  • 8/9/2019 Propose Plan on Septic Tank

    5/8

     Asph Road  Ext Subgrade Lvl Subgrade Proposed Lvl

    100mm 1#7m 1#m

    100mm min"s1#8m 1#,m

    100mm m 1#,m

    #

    as anchoring

      reca"tion against damaging or interfering with them d"ring e'cavations

  • 8/9/2019 Propose Plan on Septic Tank

    6/8

  • 8/9/2019 Propose Plan on Septic Tank

    7/8

    Earthwork 

    "t 8#( m

    "t 1#& m for septic tank fdn

    c"t 8#(m

  • 8/9/2019 Propose Plan on Septic Tank