www.construction.murrob.com LONMIN DEEPENING North-West, Marikana PROJECT TYPE: OPENCAST MINING CLIENT: Eastern Platinum VALUE: R1.8 Billion CONSULTANTS: None PROJECT DURATION: 60 Months DATE OF PROJECT: 1 October 2009 PROJECT DESCRIPTION: Opencast Mining of Merensky Reef to a depth of 60m. Approximate volumes mined for the project :- Topsoil 1,500,000bm³ Box cut over burden 3,425,000bm³ Strip min over burden 31,000,000bm³ Merensky Reef 3,170,000tons Rehabilitation 11,800,000m³

Upload: gert-buitendach

Post on 03-Jul-2015

21 views

Category:

Business


0 download

DESCRIPTION

Opencast Contract Mining, Drill, Blast, Load, Haul, Crushing

TRANSCRIPT

Page 1: Project-sheet Lonmin deepening

www.construction.murrob.com

LONMIN DEEPENING North-West, Marikana

PROJECT TYPE: OPENCAST MINING

CLIENT:

Eastern Platinum

VALUE:

R1.8 Billion

CONSULTANTS:

None

PROJECT DURATION:

60 Months

DATE OF PROJECT:

1 October 2009

PROJECT DESCRIPTION:

Opencast Mining of Merensky Reef to a depth of

60m.

Approximate volumes mined for the project :-

• Topsoil 1,500,000bm³

• Box cut over burden 3,425,000bm³

• Strip min over burden 31,000,000bm³

• Merensky Reef 3,170,000tons

• Rehabilitation 11,800,000m³