PROJECT OVERVIEW Northern Walnut Creek Trail Section 3 is one of two 2016 Mobility Bond projects within the Walnut Creek Trail System. This approximately 8-mile section will be located between IH-35 to Southern Walnut Creek Trail, connecting east and northwest portions of our trails network. Project Website: AustinTexas.gov/WalnutCreekTrail Walnut Creek Trail System Map /ATXPUBLICWORKS @ AUSTINTEXASGOV @AUSTINMOBILITY N Ferguson Ln E 51st St Cameron Rd Springdale Rd Duval Rd E Braker Ln Loyola Ln N Lamar Blvd Webberville Rd Yager Ln E Decker Ln Johnny Morris Rd E Koenig Ln Govalle Neighborhood Park Manor Rd Burnet Rd Walnut Creek Metropolitan Park Rundberg Ln Blue Goose Rd W P a r m e r L n W H o w a r d L n Balcones District Park Metric Blvd C a m e r o n R d Sprinkle Rd Old Manor Rd W Anderson Ln E 12th St E 7th St E 1st St Airport Blvd Berkman Dr E Ma r t i n Lut her Ki ng J r B l v d Legend Southern Walnut Creek Trail (Govalle Park to Daffan Lane) Northern Walnut Creek Trail Section 1 (Balcones District Park to Walnut Creek Metropolitan Park) Northern Walnut Creek Trail Section 2 (Walnut Creek Metropolitan Park to IH-35) Northern Walnut Creek Trail Section 3 (IH-35 to Southern Walnut Creek Trail) S p r i n k l e C u t o f f R d 35 183 290 1

Upload: others

Post on 25-Aug-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT OVERVIEW - AustinTexas.govaustintexas.gov/sites/default/files/files/Public...PROJECT BACKGROUND Project Timeline Project Overview • City staff are developing a Preliminary

PROJECT OVERVIEW

Northern Walnut Creek Trail Section 3 is one of two 2016 Mobility Bond projects within the Walnut Creek Trail System.

This approximately 8-mile section will be located between IH-35 to Southern Walnut Creek Trail, connecting east and northwest portions of our trails network.

Project Website: AustinTexas.gov/WalnutCreekTrail

Walnut Creek Trail System Map

/ATXPUBLICWORKS@AUSTINTEXASGOV@AUSTINMOBILITY

N

Ferguson Ln

E 51st St

Cam

eron

Rd

Spri

ngda

le R

d

Duval Rd

E Braker Ln

Loyola Ln

N L

amar

Blv

d

Webberville Rd

Yager Ln E

Decke

r Ln

Johnny

Mor

ris

Rd

E Koenig Ln

Govalle Neighborhood Park

Manor Rd

Burn

et R

d

Walnut Creek Metropolitan

Park

Rundberg Ln

Blue Goose Rd

W Parmer Ln

W Howard Ln

Balcones District

Park

Met

ric B

lvd

Cameron R

d

Spri

nkle

Rd

Old Manor Rd

W Anderson Ln

E 12th St

E 7th St

E 1st St

Air

port

Blv

dBe

rkm

an D

r

E Martin Luther King Jr Blvd

Legend

Southern Walnut Creek Trail(Govalle Park to Daffan Lane)

Northern Walnut Creek Trail Section 1(Balcones District Park to Walnut Creek Metropolitan Park)

Northern Walnut Creek Trail Section 2(Walnut Creek Metropolitan Park to IH-35)

Northern Walnut Creek Trail Section 3 (IH-35 to Southern Walnut Creek Trail)

Sprinkle Cutoff Rd

35

183

290

1

Page 2: PROJECT OVERVIEW - AustinTexas.govaustintexas.gov/sites/default/files/files/Public...PROJECT BACKGROUND Project Timeline Project Overview • City staff are developing a Preliminary

PROJECT BACKGROUND

Project Timeline

Project Overview• City staff are developing a Preliminary Engineering Report to identify a recommended route and

project considerations like environmental concerns, wildlife, nearby property ownership and more

• No design or construction funds are currently allocated for this project, but having a plan ready allows the City to move forward quickly, if funding is identified

• Staff are working to identify funding opportunities for continued development of this project

FALL 2017

• Preliminary Engineering Report (PER)process begins

SPRING/ SUMMER 2018

• First draft of PER prepared

• First public meeting held

WINTER/ SPRING 2019

• Environmental Field Inspections performed

• Environmental Assessment & Resource Inventory finalized

SUMMER 2019

• Archaeological report finalized

• Texas Historical Commission approval received

FALL 2019

• Second public meeting held

Page 3: PROJECT OVERVIEW - AustinTexas.govaustintexas.gov/sites/default/files/files/Public...PROJECT BACKGROUND Project Timeline Project Overview • City staff are developing a Preliminary

PROJECT BACKGROUND

Existing Conditions & Considerations

• Environmental concern: rimrock • Environmental concern: rimrock

• IH-35 crossing

• Existing wetlands

• Existing MoKan easements • Existing Austin Energy easements

Page 4: PROJECT OVERVIEW - AustinTexas.govaustintexas.gov/sites/default/files/files/Public...PROJECT BACKGROUND Project Timeline Project Overview • City staff are developing a Preliminary

RECOMMENDATIONS

Trail Segments

• Segment 1: Southern Walnut Creek Trail to US 290

• Segment 2: US 290 to Sprinkle/Cameron Rds

• Segment 3: Sprinkle/Cameron Rds to Dessau Rd

• Segment 4: Dessau Rd to IH-35

Trail Features:

• 8-mile concrete trail

• 12 ft. wide

• ADA accessible

AA

35

183

4

3

2

1

290

Old Manor Rd

John

ny M

orri

s RdSp

ring

dale

Rd

Spri

nkle

Rd

N L

amar

Blv

d

Ferguson Ln

Blue Goose Rd

Cameron R

d

Samsu

ng Blv

d

E Braker Ln

Sprinkle Cut Rd

Parmer Ln

E Yager Ln

Gile

s Rd

Howard Ln

E Braker Ln

E Rundberg Ln

Cam

eron

Rd

Dess

au R

d

Spri

ngda

le R

d

N

Legend

Preferred Route

Connecting Project: NWCT Section 2

Existing Trail: Southern Walnut Creek Trail

Existing Trail: 290 Shared Use Path

Existing Trail: Austin to Manor Trail

Page 5: PROJECT OVERVIEW - AustinTexas.govaustintexas.gov/sites/default/files/files/Public...PROJECT BACKGROUND Project Timeline Project Overview • City staff are developing a Preliminary

SEGMENT 1

Southern Walnut Creek Trail to US 290

N

N

35

183

290

290

183

Old Manor Rd

John

ny M

orri

s Rd

Spri

ngda

le R

d

Legend

Preferred Route

Non-preferred Alternative Route

Existing Trail: Southern Walnut Creek Trail

Existing Trail: 290 Shared Use Path

Existing Trail: Austin to Manor Trail

Page 6: PROJECT OVERVIEW - AustinTexas.govaustintexas.gov/sites/default/files/files/Public...PROJECT BACKGROUND Project Timeline Project Overview • City staff are developing a Preliminary

SEGMENT 2

US 290 to Sprinkle/Cameron Rds

N

35

183

290

LegendPreferred Route

Non-preferred Alternative Route

Spri

ngda

le R

d

Cameron Rd

Sprinkle Rd

N

Ferguson Ln

290

Page 7: PROJECT OVERVIEW - AustinTexas.govaustintexas.gov/sites/default/files/files/Public...PROJECT BACKGROUND Project Timeline Project Overview • City staff are developing a Preliminary

SEGMENT 3

Sprinkle/Cameron Rds to Dessau Rd

N

N

35

183

290

E Braker Ln

Camero

n Rd

Spri

ngda

le R

d

LegendPreferred Route

Non-preferred Alternative Route

35

E Braker Ln

Sprinkle Cut Rd

Sprinkle Rd

Samsung B

lvd

Page 8: PROJECT OVERVIEW - AustinTexas.govaustintexas.gov/sites/default/files/files/Public...PROJECT BACKGROUND Project Timeline Project Overview • City staff are developing a Preliminary

SEGMENT 4

US 290 to Dessau Rd to IH-35

N

N

35

183

290

E Yager Ln

Dessa

u Rd

E Braker Ln

35

E Parmer Ln

Shro

pshi

re

Blvd

LegendPreferred Route

Non-preferred Alternative Route

Connecting Project: NWCT Section 2 (Walnut Creek Metropolitan Park to IH-35)