PROJECT OVERVIEW
Northern Walnut Creek Trail Section 3 is one of two 2016 Mobility Bond projects within the Walnut Creek Trail System.
This approximately 8-mile section will be located between IH-35 to Southern Walnut Creek Trail, connecting east and northwest portions of our trails network.
Project Website: AustinTexas.gov/WalnutCreekTrail
Walnut Creek Trail System Map
/ATXPUBLICWORKS@AUSTINTEXASGOV@AUSTINMOBILITY
N
Ferguson Ln
E 51st St
Cam
eron
Rd
Spri
ngda
le R
d
Duval Rd
E Braker Ln
Loyola Ln
N L
amar
Blv
d
Webberville Rd
Yager Ln E
Decke
r Ln
Johnny
Mor
ris
Rd
E Koenig Ln
Govalle Neighborhood Park
Manor Rd
Burn
et R
d
Walnut Creek Metropolitan
Park
Rundberg Ln
Blue Goose Rd
W Parmer Ln
W Howard Ln
Balcones District
Park
Met
ric B
lvd
Cameron R
d
Spri
nkle
Rd
Old Manor Rd
W Anderson Ln
E 12th St
E 7th St
E 1st St
Air
port
Blv
dBe
rkm
an D
r
E Martin Luther King Jr Blvd
Legend
Southern Walnut Creek Trail(Govalle Park to Daffan Lane)
Northern Walnut Creek Trail Section 1(Balcones District Park to Walnut Creek Metropolitan Park)
Northern Walnut Creek Trail Section 2(Walnut Creek Metropolitan Park to IH-35)
Northern Walnut Creek Trail Section 3 (IH-35 to Southern Walnut Creek Trail)
Sprinkle Cutoff Rd
35
183
290
1
PROJECT BACKGROUND
Project Timeline
Project Overview• City staff are developing a Preliminary Engineering Report to identify a recommended route and
project considerations like environmental concerns, wildlife, nearby property ownership and more
• No design or construction funds are currently allocated for this project, but having a plan ready allows the City to move forward quickly, if funding is identified
• Staff are working to identify funding opportunities for continued development of this project
FALL 2017
• Preliminary Engineering Report (PER)process begins
SPRING/ SUMMER 2018
• First draft of PER prepared
• First public meeting held
WINTER/ SPRING 2019
• Environmental Field Inspections performed
• Environmental Assessment & Resource Inventory finalized
SUMMER 2019
• Archaeological report finalized
• Texas Historical Commission approval received
FALL 2019
• Second public meeting held
PROJECT BACKGROUND
Existing Conditions & Considerations
• Environmental concern: rimrock • Environmental concern: rimrock
• IH-35 crossing
• Existing wetlands
• Existing MoKan easements • Existing Austin Energy easements
RECOMMENDATIONS
Trail Segments
• Segment 1: Southern Walnut Creek Trail to US 290
• Segment 2: US 290 to Sprinkle/Cameron Rds
• Segment 3: Sprinkle/Cameron Rds to Dessau Rd
• Segment 4: Dessau Rd to IH-35
Trail Features:
• 8-mile concrete trail
• 12 ft. wide
• ADA accessible
AA
35
183
4
3
2
1
290
Old Manor Rd
John
ny M
orri
s RdSp
ring
dale
Rd
Spri
nkle
Rd
N L
amar
Blv
d
Ferguson Ln
Blue Goose Rd
Cameron R
d
Samsu
ng Blv
d
E Braker Ln
Sprinkle Cut Rd
Parmer Ln
E Yager Ln
Gile
s Rd
Howard Ln
E Braker Ln
E Rundberg Ln
Cam
eron
Rd
Dess
au R
d
Spri
ngda
le R
d
N
Legend
Preferred Route
Connecting Project: NWCT Section 2
Existing Trail: Southern Walnut Creek Trail
Existing Trail: 290 Shared Use Path
Existing Trail: Austin to Manor Trail
SEGMENT 1
Southern Walnut Creek Trail to US 290
N
N
35
183
290
290
183
Old Manor Rd
John
ny M
orri
s Rd
Spri
ngda
le R
d
Legend
Preferred Route
Non-preferred Alternative Route
Existing Trail: Southern Walnut Creek Trail
Existing Trail: 290 Shared Use Path
Existing Trail: Austin to Manor Trail
SEGMENT 2
US 290 to Sprinkle/Cameron Rds
N
35
183
290
LegendPreferred Route
Non-preferred Alternative Route
Spri
ngda
le R
d
Cameron Rd
Sprinkle Rd
N
Ferguson Ln
290
SEGMENT 3
Sprinkle/Cameron Rds to Dessau Rd
N
N
35
183
290
E Braker Ln
Camero
n Rd
Spri
ngda
le R
d
LegendPreferred Route
Non-preferred Alternative Route
35
E Braker Ln
Sprinkle Cut Rd
Sprinkle Rd
Samsung B
lvd
SEGMENT 4
US 290 to Dessau Rd to IH-35
N
N
35
183
290
E Yager Ln
Dessa
u Rd
E Braker Ln
35
E Parmer Ln
Shro
pshi
re
Blvd
LegendPreferred Route
Non-preferred Alternative Route
Connecting Project: NWCT Section 2 (Walnut Creek Metropolitan Park to IH-35)
Connecting Project: Safe Routes to School Shropshire Blvd Trail Connection
E Braker
Ln