PROJECT ORGANISING

Page 2: Project organising

Forms of Project Organisation

Depending on the authority that is given to the person responsible for

the project, the project organisation may take one of the following three

forms:

• Line and Staff organisation

• Divisional organisation

• Matrix organisation

Page 3: Project organising

Line and Staff Organisation

In this form of project organisation, a person is appointed with the primary responsibility of coordinating the work of the people in the functional departments. Such a person, referred to commonly as the project coordinator, acts essentially in a staff position to facilitate the coordination of line management in functional departments. The project coordinator does not have authority and direct responsibility of the line management. He serves as a focal point for receiving project- related information, and seeks to promote the cause of the project by rendering advice, sharing information and providing assistance.

Clearly, this is a weak form of organisation which may be employed mostly for small projects – it is certainly not suitable for large projects.

Page 4: Project organising

Divisional Organisation

Under this form of project organisation, a separate division is set up to implement the project. Headed by the project manager, this division has its complement of personnel over whom the project manger has full line authority. In effect, this form of organisation implies the creation of separate goal-oriented division of the company, with its own functional departments.

Promotes effective attainment of project objectives but results in an inefficient use of the resources of the firm.

Page 5: Project organising

Matrix Organisation

In a matrix organisation, the people working on the project have a responsibility to their functional superior as well as to the project manager

The matrix form of organisation seeks to achieve the twin objectives of efficient use of resources and effective realisation of project objectives – at the cost of greater organisational complexity of course

Page 6: Project organising

Project Planning

Projects involving few activities, resources, constraints, and inter-

relationships can be visualised easily by the human mind and planned

informally. However,when a project crosses a certain threshold level of size

and complexity, informal planning has to be substituted by formal planning.

The need for formal planning is indeed much greater for project work than

for normal operations. Without effective planning , there may be chaos.

Comprehensive project planning covers the following:

• Planning the project work

• Planning the manpower and organisation

• Planning the money

• Planning the information system

Page 7: Project organising

Work Breakdown Structure

The work breakdown structure, as its name suggests, represents a

systematic and logical breakdown of the project into its component parts.

It is constructed by dividing the project into its major parts, with each of

these being further divided into sub-parts. This is continued till a

breakdown is done in terms of manageable units of work for which

responsibility can be defined.

Page 8: Project organising

Life Cycle of a Project

The important stages in the life cycle of a project are:

• Project development and preliminary engineering

• Bidding and contract negotiation

• Engineering design

• Purchase and procurement

• Construction

• Commissioning

Page 9: Project organising

Tools of Planning: Bar ChartThis is a pictorial device in which the activities are represented by horizontal bars on the time axis. The left-hand end of the bar shows the beginning time, the right-hand end the ending time. The duration of the activity is indicated by length of the bar. The manpower required for the activity is shown by a number on the bar.

10 20 30 40 50

7

12

164

Design

Purchase of parts

Fabrication

Assembly

An Illustrative Bar Chart

Time in weeks from project start

Page 10: Project organising

Tools of Planning: Network Technique

These are more sophisticated than the traditional bar chart. In these techniques, the activities, events, and their inter-relationships are represented by a network diagram, also called an arrow diagram.

An Illustratative Network Diagram

Page 11: Project organising

Hierarchy of PlansA large project may consist of thousands (or even tens of thousands) of activities. A project plan consisting of such a large number of activities cannot be comprehended and visualised by the human mind. Hence, the global plan of so many activities may be held in a computer memory and structured on a hierarchical and modular basis in terms of plans of much smaller size , consisting of, say, 30 to 150 activities.

I Level Plan : A highly summarised plan, the I level plan shows the broad activities of the project, such as engineering design, contract negotiation, procurement, construction, and commissioning with very elementary breakdown.

II Level Plan : The activities in the summary plan (at the I level) are shown in greater detail in the II level plan. This permits a more detailed examination of various stages of the project, so that inter-relationships can be properly established.

III Level Plan : This is the plan constructed in terms of cost accounts. It is useful for lower levels of management. It helps them in week to week, or even day to day, planning and control.

Page 12: Project organising

Project Control

Project control involves a regular comparison of performance against targets, a

search for the causes of deviation, and a commitment to check adverse

variances. It serves two major functions: (i) it ensures regular monitoring of

performance, and (ii) it motivates project personnel to strive for achieving

project objectives.

Reasons for Ineffective control:

• Characteristics of the project

• People problems

• Poor control and information system.

Page 13: Project organising

Human Aspects of Project Management

A satisfactory human relations system is essential for the successful execution of a project. Without such a system, the other systems of project management, however sound they may be by themselves, are not likely to work well.

To achieve satisfactory human relations in the project setting, the project manager must successfully handle problems and challenges relating to:

Authority

Orientation

Motivation

Group functioning

Page 14: Project organising

Authority

Since the project manager works largely with professionals and supervisory personnel, the basis of the authority would be different from that found in simple superior-subordinate relationships. For exercising leadership and influence over professional people, he has to explain the logic and rationale for the project activities; show receptivity to the suggestions made by others; avoid unilateral imposition of decisions: eschew dogmatic postures; and search for areas of agreement which can be the basis of acceptable solutions.

His effective authority would stem from his ability to develop a rapport with the project personnel, his skill in resolving conflicts among various people working on the project, his professional reputation and stature, his skills in communication and persuasion, and his ability to act as a buffer between the technical, engineering, financial, and commercial people involved in the project.

Page 15: Project organising

Orientation

Most of the managers working for a project are usually engineers (or technologists) . Typically, an engineer:

Works with physical laws, characterised by mathematical precision, as his tools.

Adopts a structured, mechanical approach to his problem

Seeks an enduring solution to his problem

Attaches a high value on technical perfection

When an engineer assumes managerial responsibilities, he faces a very different world in which he is supposed to :

Perform the tasks of planning, organising, directing, and controlling the resources of the firm in a world of uncertainty.

Adopt a more creative approach to solve non-programmed and unstructured problems

Attach greater importance to efficient utilisation of resources and resolution of human relation problems.

Page 16: Project organising

Motivation

The project manager should bear in mind the following:

Human beings are motivated by a variety of needs: physiological needs, social needs, recognition needs, and self-actualisation various need satisfactions.

Behavioral research shows that while some pressure is beneficial, an excess of it is undesirable. Beyond a certain point, pressure is dysfunctional

Motivation tends to be strong when the goal set is challenging, yet attainable

Expectation of reward, rather than fear of punishment, has a greater bearing on individual behaviour

In a project setting where hygiene factors are reasonably taken care of, the principal motivators would be a sense of accomplishment and professional growth.

Page 17: Project organising

Group Functioning

The groups formed in a project setting may be of three types: vertical

groups, horizontal groups and mixed groups. A vertical group consists

of people drawn from different levels in the same department, or

function, or company. A horizontal group consists of people drawn

from different functions, departments, and companies, but occupying

similar hierarchical positions. A mixed group consists of people drawn

from different levels from various functions, departments, and

companies.

Page 18: Project organising

Building Effective Groups

An effective group consists of members who are satisfied and committed and who strive for the attainment of project objectives, without dissipating their energies in inter-personal and inter-group conflicts. The manifest signs of an effective group are: esprit de corps, pride in the project, supportive behaviour, coordinated endeavour, mutual respect, and resilience during trying periods.

How can effective groups be established? Studies in group dynamics suggest several stages, which are partially overlapping, in the formation of an effective group:

Development of mutual trust

Diminution of defensive behaviour

Openness and candour in communication

Cooperation and supportive behaviour

Resolution of differences by mutual negotiation

Page 19: Project organising

Pre-requisites for successful Project Implementation

What can be done to minimise time and cost over – runs and thereby improve the prospects of the successful completion of projects? While a lot of things can be done to achieve this goal, the more important ones appear to be as follows:

• Adequate formulation

• Sound project organisation

• Proper implementation planning

• Advance action

• Timely availability of funds

• Judicious equipment tendering and procurement

• Better contract management

• Effective monitoring

Page 20: Project organising

Essence of Project Management

The Project Management Institute (PMI) has developed a body of knowledge termed the Project Management Book of Knowledge (PMBOK). The PMBOK describes project management under nine areas as follows:

• Project integration

• Project scope management

• Project time management

• Project cost management

• Project quality management

• Project human resource management

• Project communications management

• Project risk management

• Project procurement planning

Page 21: Project organising

SUMMARY

The traditional form of organisation is not very suitable for project work because it has no means of integrating different departments at levels below the top management and it does not facilitate effective communication, coordination, and control.

Project organisation may take one of the following three forms: line and staff organisation, divisional organsiation, and matrix organisation.

In the line and staff form of project organisation, a person is appointed with the primary responsibility of coordinating the wok of the people in the functional departments. Under the divisional form of project organisation, a separate division headed by the project manager is set up to implement the project. In a matrix organisation, the personnel working on the project have a responsibility to their functional superior as well as to the project manager.

The line and functional form of organisation is conducive to an efficient use of resources but is not suitable for an effective realisation of project objectives. The divisional form of organisation, on the other hand, is suitable for an effective realisation of project objectives but not conducive to an efficient use of resources. The matrix form of organisation seeks to achieve the twin objectives of efficient use of resources and effective realisation of project objectives, at the cost of greater organisational complexity, of course.

Page 22: Project organising

Comprehensive project planning covers the following areas: project work, manpowr and organisation, money, and information system.

The important stages in the life cycle of a project are: project development and preliminary engineering, bidding and contract negotiations, engineering design, purchase and procurement, construction, and commissioning.

The two important tools of planning are the bar chart and the network techniques. The bar chart is a pictorial device in which the activities are represented by horizontal bars on the time axis. In network techniques, the activities, events, and their inter-relationships are represented by a network diagram

For large projects, a hierarchy of plans showing various levels of detail may be prepared.

The traditional approach to project control, involving a comparison of the actual cost with the budgeted cost, is referred to as variance analysis. This approach is inadequate for project control for the following reasons: (i) it is backward-looking rather than forward-looking, and (ii) it does not use the data effectively to provide integrated control.

The modern approach to project control, referred to as performance analysis, involves monitoring the project along the following lines: Cost variance : Budgeted cost of work performed- Actual cost of work performed

Page 23: Project organising

The modern approach to project control, referred to as performance analysis, involves monitoring the project along the following lines: Cost variance : Budgeted cost of work performed- Actual cost of work performed Schedule variance in cost terms : Budgeted cost of work performed – Budgeted cost of work scheduled.Cost performance index : Budgeted cost of work performed /Actual cost of work scheduledSchedule performance index : Budgeted cost of work performed /Budgeted cost of work scheduled Estimated cost performance index : Budgeted cost for total work/(Actual cost of work performed + Additional cost for completion)

To achieve satisfactory human relations in the project setting, the project manager must successfully handle problems and challenges relating to (i) authority, (ii) orientation, (iii) motivation, and (iv) group functioning.

Often, the project manager has to coordinate the efforts of various functional groups (within the organisation) and outside agencies without the leverage of hierarchical authority. His effective authority depends largely on his professional stature and inter-personal skills.

Page 24: Project organising

The project manager has to strengthen the managerial orientation of project personnel, particularly technical and engineering personnel.

In order to succeed in motivating personnel, the project manager must be a perceptive observer of human beings, must have the ability to appreciate the variable needs of human beings, must have skills in several styles of management suitable to different situations, and must be sensitive to the reactions of people so that he can act supportively rather than threateningly.

There are several stages, partially overlapping, in the formation of an effective group: development of mutual trust, diminution of defensive behaviour, openness and candour in communication, cooperation and supportive behaviour, and resolution of differences by mutual negotiation.

Time and cost over-runs of projects are very common in India, particularly in the public sector. Hence, projects tend to become uneconomical and economic development is adversely affected.

The important pre-requisites for successful completion of projects are : (i) adequate formulation, (ii) sound project organisation, (iii) proper implementation planning, (iv) advance action, (v) timely availability of funds, (vi) judicious equipment tendering and procurement, (vii) better contract management, and (viii) effective monitoring.