project master list of controlled documents, contract #de ...bmico science appb~ls itcation llutnal...
TRANSCRIPT
BmICoScience Appb~lS itcation llutnal Corporatian
WBS # 1.2.9.1.4QA: N/A
June 27, 1989
DISTRIBUTION
Project Master List of Controlled Documents, Contract #DE-AC08-87NV10576
Enclosed for your information and use is the Yucca Mountain Project MasterList of Controlled Documents, identifying the versions current as of June 27,1989. This listing of document status should be used to verify that documentsheld for use are current and that out-of-date material is not used for theconduct of Project work.
Copies of revisions to these documents are forwarded to controlled documentholders so the controlled sets can stay current. If deficiencies in thecontrolled copies of these documents are identified, correct copies may beobtained by forwarding deficiency listings to the attention of DocumentControl at the company address listed below:
John H. NelsonTechnical Project Officer
for Yucca Mountain ProjectATIN: Document ControlScience Applications International Corporation101 Convention Center Drive, Suite 407Las Vegas, NV 89109
If you have any questions regarding this matter, pleaseat FTS 544-7047 or (702) 794-7047.
contact Elaine Cotten
o H. Nelson, Project Manager!chnical and Management
,/Support ServiesPMD:MDC:bk:L89-001
Enclosure:Yucca Mountain Project OfficeMaster List of Controlled Documents
8 9 070~39j52j 7bPDR WASTE 9&2WM-11 PDC
10i Convention Center Dr., Ste. 407, Las Vegas, NV 89109 (702) 295-1204Other SAIC Offices Albuquerque. Ann Arbor. Ardngton Atlanta Boston Chicago HtuntsyvllA LA Joa. Los Angeles. McLean Orlando Sant& Barbara. Sunnyvale. and Tucson
FULL TMX ASCII SCAN
Aifloi
/og..
s- w~~K-
Distribution -2-
cc w/encl.:Larry Clem, Weston, Washington, D.C.W. J. Danker, HQ (RW-321) FORSM. L. Payton, HQ (Rw-132) FOES
S. C. Adams, Harza, M/S-517/T-13Harald Ahagan, Project Office, M/S-523C. G. Aiello, Project Office, M/S-523S. B. Ailes, Highland (2765)L. Akridge, EPA/NV, M/S-513D. H. Alexander, DOE/HQ (RW-332)Dr. Clarence Allen, Pas. Cal.C. A. Alm, SAIC, M/S-517/T-38K. L. Anderson, H&N, M/S-943W. B. Andrews, SAIC, M/S-517/T-05Gordon Appel, DOE/HQ (RW-332)M. R. Arenaz, SAIC, M/S-517/T-23R. J. August, DOE/HQ (RW-14)M. Azhikakath, REECO, M/S-625Gerri Babero, DOE/RMBDA. L. Baca, Project Office, M/S-523Dick Baehr, SNLR. J. Bahorich, Westinghouse, M/S-517/T-37R. C. Baker, DOE/RTPL. B. Ballou, LLNLL. H. Barrett, DOE/HQR. V. Barton, Project Office, M/S-523S. J. Bauer, SNLCatherine Bautista, H&NG. K. Beall, SAIC, M/S-517/T-36W. L. Belke, NRC, M/S 4H-3Richard Belyea, SAIC, M/S-517/T-17J. Z. Bem, Bechtel Natl.Inc./SFC. B. Bentley, USGS/LVF. Bentley, EG&GC. L. Biddison, SAIC, M/S-517/T-13F. W. Bingham, SNLT. W. Bjerstedt, Project Office, M/S-523S. Black, EPA/NV, M/S-513M. B. Blanchard, Project Office, M/S-523James Blaylock, Project Office, M/S-523T. E. Blejwas, SNLJ. L. Blue, SAIC, M/S-517/T-20H. W. Booth, FSN/LVM. J. Borich, SAIC, MIS 517/T-23Judith Bradbury, SAIC/Oak RidgeSuzette Bradley, LLNLMarge Brake, H&NEldron Bray, DOE/Grand JunctionRodric Breland, MSHAKathy Brennan, Westinghouse, M/S-517/T-21J. C. Bresee, DOE/HQPatrice Brewington, DOE/ILC. M. Brizeno, SAIC, M/S-517/T-28Steve Brocoum, DOE/HQ (RW-221)J. J. Brogan, SAIC, M/S-517/T-12C. E. Brooks, DOE/HQ
Don Brown, H&N, M/S-519M. L. Brown, SAIC, M/S-517/T-27R. E. Browning, NRCG. T. Bruesch, FSN, M/S-940B. A. Bryan, LLNLP. E. Bryant, SAIC, M/S-517/T-22R. L. Bullock, FSN, M/S-403T. Buono, USGSDiana Burasco, H&N/Mercury, M/S-605A. E. Burer, H&N, M/S-258Ernie Buskirk, H&N, M/S-258L. L. Byars, SNLH. H. Caldwell, SAIC, M/S-517/T-06J. C. Calovini, H&N, M/S-519S. D. Cameron, SAIC/SDLorie Campbell, SAIC, M/S-517/T-09M. K. Campbell, SAIC, M/S-517/T-17Julie Canepa, LANLDr. John Cantlon, E. Lansing, MI.Dr. Melvin Carter, Atlanta, Ga.S. A. Carter, Project Office, M/S-523A. P. Cavazos, SAIC, M/S-517/T-06Barbara Cerny, DOE/HQT. H. Chaney, USGS, M/S-421E. P. Chen, SNLMike Chornack, USGSK. K. Church, SAIC, M/S-517/T-38B. R. Chytrowski, FSN/LVE. M. Cikanek, Harza, M/S-517/T-14U. S. Clanton, Project Office, M/S-523J. E. Clark, SAIC, M/S-517/T-06Joanne Clark, LLNLK. M. Cline, WestonM. 0. Cloninger, Project Office, M/S-523Tom Colandrea, EEIAngela Colarusso, SAIC, M/S-517/T-29Eric Cole, LATAWilliam Colucci, EPA/NRAD, M/S-513Prof. Wm. W. Coons, Wash. D. C.Manny Comar, DOE/HQ (RN-223)Z. J. Conway, SAIC, M/S-517/T-l1D. L. Coppage, FSNC. F. Costa, EPA/NRAD, M/S-513L. S. Costin, SNLElaine Cotten, Westinghouse, M/S-517/T-34I. R. Cottle, SAIC, M/S-517/T-14M. D. Cotter,SAIC,M/S-517/T-02William Cotter, H&N, M/S-223D. E. Cover, SAIC/C. PT.L. K. Cox, FSN, M/S-940N. D. Cox, SAIC, M/S-517/T-06Steve Craft, EEI
PAGE 1 OF 6
K>
Bob Craig, USGS/L.V.R. A. Crawley, Project Office, M/S-523J. A. Cross, FSN, M/S-514Bill Cross, H&N, M/S-607Prof. J. Daemen, Univ. of AZ.Gary Daer, SAIC, M/S-517/T-29M. K. Daley, SAIC, M/S-517/T-25Steve Dalich, SAIC/C. PT.Joseph Daly, DOE/HQ (RW-123)S. R. Dana, SAIC, M/S-517/T-06J. M. Davenport, SAIC, M/S-517/T-27Ed Davis, ANECM. J. Davis, SAIC/ALBQDr. D. U. Deere, Gainesville, Fl.Richard DeKlever, H&N/LV, M/S-519Nello Del Gobbo, DOE/HQ (RW-3)Marie DeMartino, SAIC, M/S-517/T-02S. R. Dengler, SNLA. W. Dennis, SNLW. B. Devlin, SAIC, M/S-517/T-28G. H. Dewey, SAIC, M/S-517/T-09W. R. Dixon, Project Office, M/S-523D. C. Dobson, Project Office, M/S-523Document Control, SAIC, M/S-517/T-34H. Z. Dokuzoguz, SAIC, M/S-517/T-14JoAnn Douglass, FSN, M/S-403G. Doyle, Project OfficeJ. R. Doyle, SAIC, M/S-517/T-06J. J. Dronkers, LLNLW. W. Dudley, USGSM. M. Dussman, SAIC, M/S-517/T-11J. R. Dyer, Project Office, M/S-523G. D. Dymmel, Project Office, M/S-523S. A. Edmund, SNLR. D. Edwards, Project Office, M/S-523S. R. Elliot, DOE/SHD, M/S-505R. K. Ely, H&ND. 0. Emerson, LLNLJ. W. Estella, SAIC, M/S-517/T-08Elaine Ezra, EG&GG. A. Fasano, SAIC, M/S-517/T-11Gary Faust, WestonGreg Fehr, SAIC, M/S-517/T-13J. E. Ferguson, FSN, M/S-403J. A. Fernandez, SNLRay Finley, SNLJ. H. Fiore, SAIC, M/S-517/T-38P. K. Fitzsimmons, DOE/HPED, M/S-505Michale Flanigan, DOE/Argonne, ILM. I. Foley, SAIC, M/S-517/T-29A. V. Ford, SAIC, M/S-517/T-35B. D. Foster, SAIC, M/S-517/T-08
Karen Foster, LATAL. N. Fox, SAIC, M/S-517/T-23M. A. Fox, REECo, M/S-408S. D. Francis, LANLD. L. Fraser, REECo, M/S-555M. W. Frei, DOE/HQ, (RW-22)W. K. Frey, SAIC, M/S-517/T-19C. J. Fridrich, Project Office, M/S-523T. A. Frisk, SAIC, M/S-517/T-09J. E. Frye, DOE/HQ (MA-231.4)D. A. Furbush, SAIC, M/S-517/T-01Robert Gamble, WestonB. R. Gardella, REECo, M/S-408J. T. Gardiner, Project Office, M/S-523B. B. Garms, FSN, M/S-514E. C. Garnett, H&N, M/S-519C. W. Garvin, SAIC, M/S-517/T-23David Gassman, DOE/OCC, M/S-505R. A. Gast, FSN, M/S-514R. E. Gates, MACTEC, M/S-502H. B. Gayle, H&N, M/S-519P. D. Gehner, H&N, M/S-519J. J. George, LATAC. P. Gertz, Project Office, M/S-523K. 0. Gilkerson, SAIC, M/S-517/T-08Dan Gillies, USGS/DenverJ. W. Gilray, NRCW. A. Girdley, Project Office, M/S-523V. M. Glanzman, USGSW. E. Glassley, LLNLErnest Glick, USGSM. A. Glora, SAIC, M/S-517/T-27Vincent Gong, REECo, M/S-408M. M. Gonzales, SNLDr. R. Gotchy, SAIC/McLeanR. B. Graham, SAIC, M/S-517/T-23T. A. Grant, SAIC, M/S-517/T-13J. A. Gray, SAIC, M/S-517/T-19T. D. Greiner, FSNL. M. Gron, SAIC, M/S-517/T-33E. R. Gruer, SNLKimberly Guerino, SAIC, M/S-719/SMFGeorgette Guzzetta, SAIC, M/S-517/T-18P. B. Hale, FSN, M/S-514H. J. Hall, H&N, M/S-519C. E. Hampton, Project Office, M/S-523S. P. Hans, SAIC, M/S-517/T-06L. J. Hansen, LLNLM. E. Happ, H&N, M/S-943E. L. Hardin, SAIC, M/S-517/T-24R. H. Harig, PBQ&DG. T. Harper, MACTEC, M/S-502
PAGE 2 OF 6
David Harris, Bureau of ReclamM. W. Harris, SAIC, M/S-517/T-05D. Y. Rattler, SAIC, M/S-517/T-10L. R. Hayes, USGS, DenverC. R. Head, DOE/HQ, (RW-322)HPE/Radiological Operation &Defense Waste Branch, DOE/HPE
Gerald Heaney, SAIC, M/S-517/T-22J. A. Redden, SAIC, M/S-517/T-28Dale Hedges, CER CorporationG. W. Heitland, SAIC, M/S-517/T-21E. J. Helley, USGSR. G. Helms, SAIC, M/S-517/T-30F. M. Hemmes, Project Office, M/S-523C. C. Herrington, SAIC, M/S-517/T-27R. J. Herbst/LANLB. Y. Hersh, SAIC, M/S-517/T-35E. S. Hertel, SNLT. J. Higgins, SAIC, M/S-517/T-22R. R. Hill, SNLJ. H. Hines, DOE/ALBQT. E. Hinkebein, SNLL. V. Hoffman, SAIC, M/S-517/T-13J. F. Holland, SNLJ. J. Holonich, NRC/High-Level WasteB. C. Hopkins, SAIC, M/S-517/T-19S. H. Horton, SAIC, M/S-517/T-08D. T. Hoxie, USGS, DenverD. G. Hubbard, MACTEC, M/S-402S. L. Hughes, REECo, M/S-614W. T. Hughes, Project Office, M/S-523Jim Hughlett, DOE/TNHoward Hundley, FSNT. 0. Hunter, SNLB. W. Hurley, SAIC, M/S-517/T-38Jerry Hyde, DOE/HQ (RW-223)K. L. Ingenthron, SAIC, M/S-517/T-26Vince Iorii, Project Office, M/S-523T. H. Isaacs, DOE/HQPamela Jackson, H&N, M/S-519R. E. Jackson, WestonE. V. Jankus, Project Office, M/S-523J. A. Jardine, SAIC, M/S-517/T-22L. J. Jardine, LLNLJ. D. Jenkins, SAIC, N/S-517/T-14A. R. Jennetta, SAIC, M/S-517/T-27L. E. Jensen, SAIC, M/S-517/T-23D. R. Jerez, WestonCarl Johnson, State of Nev.G. J. Johnson, SAIC, M/S-517/T-11J. M. Johnson, FSN, M/S-697K. B. Johnson, SAIC, M/S-517/T-08
R. L. Johnson, NRCS. B. Jones, Project Office, M/S-523D. B. Jorgenson, SAIC, M/S-517/T-24Tom Juarez, EG&G/EM, SBO/A-01R. D. Kaiser, Project Office, M/S-523S. H. Kale, DOE/HQH. N. Kalia, LANL/VBC/LV, M/S-527P. C. Kaplan, SNLJ. D. Kaprowicz, DOE/ChicagoN. R. Karas, SAIC, M/S-517/T-02P. J. Karnoski, SAIC, M/S-517/T-22Jefferry Kass, LLNLMike Kearney, WestonCarl Keller, Science & EngineeringD. D. Keller, SAIC, M/S-517/T-02J. Kennedy, NRCJack Kepper, SMF AREA25-M/S-719R. A. Kettell, SAIC, M/S-517/T-08C. J. Kilpatrick, SAIC, M/S-517/T-01J. K. Kimball, DOE/HQ (RW-221)J. L. King, SAIC, M/S-517/T-03G. C. Kingham, SAIC, M/S-517/T-35R. L. Kimble, SAIC, M/S-517/T-05A. R. Kirk, SAIC, M/S-517/T-29Joe Kirk, SAIC, M/S--517/T-13L. J. Klamerus, SNLK. A. Klein, DOE/HQ (RW-30)S. H. Klein, SAIC, M/S-517/T-15R. H. Klemens, SAIC, M/S-517/T-22Robert Klett, SNLD. A. Klimas, SAIC, M/S-517/T-08D. L. Koss, REECo, M/S-408L. E. Krivanek, Project Office, M/S-523M. P. Kunich, DOE/QADRam Lahoti, DOE/HQ (RW-223)Bill Langer, USGS, DenverB. S. Langkopf, SNLDr. Donald Langmuir, Golden, Co.Judith Leahy, DOE/HQ, (RW-23)H. E. Leake, SAIC, M/S-517/T-10Joanne Kane-Ledbetter, H&N, M/S-519Fitz Lee, USGSLynda Lee, Westinghouse, M/S-517/T-33R. C. Lee, SAIC, M/S-517/T-24Shan Chu Lee, EPA/NRAD, M/S-513R. A. Levich, Project Office, M/S-523B. D. Lewis, USGSChris Lewis, SMF-Area 25/NTSTerri Lezcano-Kirch, SAIC, M/S-517/T-19J. J. Linehan, NRC/Wash.F. J. Linder, H&N, VBC-M/S 519
PAGE 3 OF 6
Dr. E. N. Lindner, BattelleL. E. Little, Project Office, M/S-523D. E. Livingston, Project Office, M/S-523R. W. Lizut, SNLJ. J. Lorenz, Project Office, M/S-523Loren Lorig, ICGR. R. Loux, State of NVMike Lugo, WestonC. Lui, EPA/NV, M/S-513B. A. Luke, SNLP. J. Luthiger, SAIC, M/S-517/T-11A. MacIntosh, H&N, M/S-223W. V. Macnabb, SAIC, M/S-517/T-04J. L. Madsen, MACTECB. J. Malcolm, WestonD. G. Malcolm, SAIC, M/S-517/T-13W. B. Mansel, Project Office, M/S-523W. R. Manis, LLNL, M/S L-217G. A. Mansur, SAIC, M/S-517/T-19Vilijia Markunas, SNLD. R. Martin, DOE/SHD, M/S-505S. C. Matthews, SAIC, M/S-517/T-07A. C. Matthusen, SAIC, M/S-517/T-13D. E. McAlister, SAIC, M/S-517/T-07E. W. McCann, SAIC, M/S-517/T-llJ. H. McConville, Harza, M/S-517K. T. McFall, SAIC, M/S-517/T-06Charles McFarland, Env. Eval. GroupJ. B. McKenzie, FSNMark McKeown, USGSJ. E. McNeely, H&NJ. E. Mecca, SAIC, M/S-517/T-15E. E. Melander, SAIC, M/S-517/T-03P. C. Merkley, SAIC, M/S-517/T-07T. J. Merson, LANL, M/S-527Stephen Metta, SAIC, M/S-517/T-12M. B. Mirza, FSN/LV, M/S-514D. L. Mogar, SAIC, M/S-517/T-12Nancy Montgomery, EEIK. W. Moore, SAIC, M/S-517/T-28Carl Mora, SNLN. A. Morley, Project Office, M/S-523Kathleen Moroney, EPA/NRAD, M/S-513R. P. Morrisette, SAIC, M/S-517/T-14G. P. Morrison, SAIC, M/S-517/T-30Evert Mouser, H&NM. J. Mrugala, FSN/LVP. J. Mudra, SAIC, M/S-517/T-15R. B. Murthy, Project Office, M/S-523R. G. Musick, H&N, M/5-519T. N. Narasimhan, LBL
J. R. Narron, SAIC, M/S-517/T-08J. H. Nelson, SAIC, M/S-517/T-04Richard Nelson, DOE/HQ (CP-3)T. A. Nelson, LLNLNV Tech Library, OPAL, M/S-505C. M. Newbury, Project Office, M/S-523M. F. Nicol, ADV. SciencesD. L. Nidy, SAIC, M/S-517/T-20D. A. Nilsen, SAIC, M/S-517/T-28F. B. Nimick, SNLS. P. Nolan, SAIC, M/S-517/T-08T. W. Noland, Westinghouse, M/S-517/T-06A. E. Norris, LANLDr. D. W. North, Los Altos, Ca.H. P. Nunes, LANLJ. W. Nunziato, SNLD. T. Oakley, LANLW. J. O'Connell, LLNLA. C. O'Donnell, H&NTom O'Farrell, EG&G/NV, M/S-570-PO3Office of External Relations and
Policy, DOE/HQ (RW-40)Office of Facilities Siting and
Development, DOE/HQ (RW-20)Office of Program Administration
and Resources Management, DOE/HQ (RW-10)Office of Quality Assurance, DOE/HQ (RW-3)Office of Systems Integration and
Regulations, DOE/HQ (RW-30)P. K. Ortego, FSN, M/S-940Gabriel Ortiz, LANLW. R. Owel, SAIC, M/S-517/T-38L. J. Owens, Project Office, M/S-523T. L. Pane, SAIC, M/S-517/T-02James Panico, SAIC/C. PT.U-Sun Park, SAIC, M/S-517/T-24F. B. Parker, SAIC, M/S-517/T-15D. K. Parrish, RE/Spec.M. W. Parsons, SAIC, M/S-517/T-27W. C. Patrick, CNWRA/TXE. A. Patzer, Battelle/ORJ. H. Peck, SAIC, M/S-517/T-16J. P. Pedalino, H&N, M/S-J521, N-5M. W. Pendleton, SAIC, M/S-517/T-13F. D. Peters, SAIC, M/S-517/T-22A. C. Peterson, SNLRobert Peterson, Bureau of ReclamE. H. Petrie, Project Office, M/S-523C. G. Pflum, SAIC, M/S-517/T-27J. Phillips, SNLS.W. Phillips, SAIC, M/S-517/T-03Robert Philpott, DOE/HQ (RW-421)
PAGE 4 OF 6
I .
L. Pippin, DRIB. J. Plumley, SAIC, M/S-517/T-13L. A. Polivka, Harza, M/S-517/T-15R. B. Pope, SAIC/OakridgeDarrell Porter, SAIC/GoldenAllyn Pratt, LANLHoward Pratt, SAIC/C. PT.P. T. Prestholt, NRCDr. Dennis Price, Blacksburg, VA.R. H. Price, SNLJ. K. Prince, SAIC, M/S-517/T-29R. W. Prindle, SNLR. F. Pritchett, REECo, M/S-408G. H. Prowell, SAIC, M/S-517/T-11K. Pruess, LBL -
C. D. Putz, SAIC, M/S-517/T-01Quality Assurance Division, DOE/QADRadiological Operation &Defense Branch, DOE/HPEFlorencio Ramirez, DOE/SFR. K. Ramsgate, SAIC, M/S-517/T-08L. D. Ramspott, LLNLS. L. Randolph, SAIC, M/S-517/T-38J. L. Rast, SAIC/Oak RidgeDr. Joe Ratigan, RE/Spec.R. B. Raup, USGSChris Rautman, SNLL. C. Raymer, SAIC, M/S-517/T-21M. J. Regenda, FSN, M/S-697E. C. Rehkop, Project Office, M/S-523I. M. Reinhardt, SAIC, M/S-517/T-01J. M. Replogle, H&N, M/S-519M. A. Revelli, LLNLD. E. Rhode, Desert Research InstituteR. R. Richards, SNLResource Center, SAIC, M/S-517/T-19George Riling, DOE/HQ (RW-123)E. P. Ripley, SAIC, M/S-517/T-06G. D. Roberson, SAIC, M/S-517/T-30A. J. Roberts, DOE/RMB, M/S-505J. B. Robertson, SAIC, M/S-517/T-29L. D. Robertson, SAIC, M/S-517/T-26J. K. Robson, Project Office, M/S-523J. M. Roccapriore, DOE/HQ (RW-122)W. J. Rodgers, SAIC, M/S-517/T-11E. T. Rodriguez, Project Office, M/S-523J. A. Roll, Westinghouse, M/S-517/T-21Sammuel Rousso, DOE/HQJ. L. Rue, FSN/LVDr. J. L. Russell, S.W. Research Inst.F. J. Ruth, SAIC, M/S-517/T-06J. F. Ryan, SAIC, M/S-517/T-28
A. T. Sabo, Westinghouse, Pittsburgh, PAR. P. Sabol, H&N, M/S-605Angie Sacco, Project Office, M/S-523J. D. Saltzman, DOE/HQ (RW-20)R. P. Sandoval, SNLA. M. Sastry, MACTEC, M/S-402A. M. Scanmell, Project Office, M/S-523L. G. Scherr, SAIC, M/S-517/T-06F. J. Schelling, SNLJ. A. Schleef, SAIC, M/S-517/T-38D. L. Schleicher, USGSY. M. Schmitt, SAIC, M/S-517/T-14R. L. Schreiner, H&N, M/S-519Ronald Schwartz, LLNLK. E. Schwartztrauber, SAIC, M/S-517/T-22J. D. Scott, FSN, M/S-514C. L. Sellards, SAIC, M/S-517/T-35D. P. Schlick, Project Office, M/S-523J. E. Shaler, SAIC, M/S-517/T-15H. F. Shaw, LLNLG. R. Sheldon, SNLE. W. Shepherd, SNLL. E. Shepherd, SNLD. Short, LLNLD. L. Siefken, WestonJ. E. Siefken, Weston/Wash. D.C.L. W. Simmons, SAIC, M/S-517/T-09S. F. Sims, SAIC, M/S-517/T-30M. T. Simpson, SAIC/GoldenS. H. Sims, SAIC, M/S-517/T-09Scott Sinnock, SNL/LV PlantC. D. Smith, H&NC. M. Smith, DOE/HQ, (RW-421)J. V. Smith, SAIC, M/S-517/T-09S. C. Smith, SAIC, M/S-517/T-14Robert Snelling, EPA/LV, M/S-513N. J. Snyder, Project OfficeK. G. Sommer, DOE/HQ (RW-3)M. E. Spaeth, SAIC/SD, M/S-512E. L. Spangler, SAIC, M/S-517/T-38N. K. Stablein, NRCP. J. St. Marie, H&N, M/S-606J. K. Statler, SAIC, M/S-517/T-02J. N. Stellavato, SAIC, M/S-719A. E. Stephenson, SAIC, M/S-517/T-30A. W. Stevens, SNLJ. D. Stewart, DOE/NTSOJ. E. Stiegler, SNL/6310R. E. Stinebaugh, SNLW. K. Stockdale, LLNL, M/S L-219R. W. Stoffle, University of MichiganEd Straker, SAIC/C. PT.
PAGE 5 OF 6
K-'
S.W.R.J.A.R.
0.R.J.S.D.D.
ChuckDannyJ. G.HowardFalahJ. E.D. W.W. F.
Straub, REECo, M/S-408Sublette, SAIC, M/S-517/T-24Sweeney, SAIC, M/S-517/T-23Szymanski, Project Office, M/S-523Tacelli, SAIC, M/S-517/T-33Tate, H&N, M/S-605Taylor, SAIC, M/S-517/T-12Taylor, Univ. of Nevada, RenoTaylor, SAIC, M/S-517/T-30i Tewes, LLNLThamir, USGSTherien, SAIC, M/S-517/T-08Thomas, FSN/LVThomas, SAIC, M/S-517/T-40
C. M. Thompson, SAIC, M/S-517/T-06M. C. Thompson, REECo, M/S-408M. J. Thompson, SAIC, M/S-517/T-07P. J. Thompson, SAIC, M/S-517/T-15Dawn Thomure, Project Office, M/S-523D. Thome, EPA/NV, M/S-513C. L. Throckmorton, USGSM. S. Tierney, SNLJ. R. Tillerson, SNLP. Tillery, LATAR. L. Tome, SAIC, M/S-517/T-14A. J. Tompkins, SAIC, M/S-517/T-29L. K. Townsend, SAIC, M/S-517/T-19Rob Trautz, USGSJ. S. Treadwell, SAIC, M/S-517/T-17Lorraine Trevino, SAIC, M/S-517/T-28Tom Trevino, SAIC/C. PT.Chao-Hsiung Tung, EPA/NRAD, M/S-513C. W. Tucker, SNLH. R. Tuthill, H&N, M/S-519M. D. Valentine, Project Office, M/S-523Carleen Van House, SAIC, M/S-517/T-16A. R. Veloso, NTSO, M/S-701J. D. Verden, H&N, M/S-519Dr. E. D. Verink, Gainesville, FL.M. D. Voegele, SAIC, K/S-517/T-03L. W. Vogel, SAIC/McLeanS. M. Volek, SAIC, M/S-517/T-18N. A. Voltura, Project Office, M/S-523J. D. Waddell, SAIC, M/S-517/T-21P. Wade Austin, SAIC/McLeanC. A. Wagner, SAIC, M/S-517/T-28P. A. Walden, LLNLD. L. Waltjen, SAIC, M/S-517/T-09Charles Ward, H&N, M/S-519Peggy Warner, SAIC/Golden
D. R. Warriner, REECo, M/S-550R. S. Waters, Project Office, M/S-523Dick Watkins, USGS, DenverT. L. Watson, SAIC, M/S-517/T-14Dave Wayman, SAIC, M/S-517/T-30Robert Webb, EG&G/MS-Y05R. L. Weeks, SAIC, M/S-517/T-16C. D. Weiss, SAIC, M/S-517/T-01S. I. Welch, SAIC, M/S-719/SMFK. A. West, LANLR. G. West, SAIC, M/S-517/T-27Merrick Whitfield, USGS, DenverV. F. Whitherill, DOE/NTS, M/S-701D. G. Wilder, LLNLA. C. Williams, Project Office, M/S-523Clarence Williams, BattelleS. H. Williams, H&N, M/S-519J. R. Willmon, USGS, M/S-421Cathy Wills, EG&G/NV, M/S-570 P03E. L. Wilmot, Project Office, M/S-523M. H. Wilson, FSN, M/S-403W. A. Wilson, Project Office, M/S-523R. L. Wise, SAIC/GoldenDodie Witham, EPA/NRAD, M/S-513K. M. Wolverton, SAIC, M/S-517/T-08G. D. Woodard, H&N, M/S-519S. W. Woolfolk, SAIC, M/S-517/T-29B. R. Woolsey, H&N, M/S-258B. A. Wright, SAIC, M/S-517/T-28C. 0. Wright, H&N, M/S-519Al Yang, USGSD. A. York, LANLJ. L. Younker, SAIC, M/S-517/T-03J. L. Yow, LLNLR. S. Ziegenbein, H&N, M/S 605Susan Zimmerman, State of Nev
PAGE 6 OF 6
I -.
YUCCA EVNTAN PROJECT
MASTER LIST OF CONTROLLED DOCUMENTS
TARTS OF COF[ENTS
PAGE
Office of Civilian Radioactive Waste Management Documents . . . . . . . . 1
Office of Geologic Repositories Documents . . . . . . . . . . . . . . . . 3
Yucca Mountain Project Documents . . . . . . . . . . . . . . . . . . . . 4
Yucca Mountain Project Office Documents .1.5.. . . . . . . . . . . . . . 15
Technical & Management Support Services Documents . . . . . . . . . . . . 17
i
<,-j '1-12 June 26, 1989
OFFICE OF CIVILIAN RADIOACTIVE WASTE MNAGUENT DOCUMENTS
EffectiveDateDocument ID Title Revision
DOE/RW-0042**(notebook)
DOE/RW-0043
DOE/RW-0119
DOE/RW-0051
DOE/RW-0223
N/A**(notebook)
DOE/RW-0091
DOE/RW-0063
DOE/RW-0197**(notebook)
QAAP 2.1QAAP 2.3
QAAP 2.5
Program Management SystemPolicies and Procedures(Manual)
Program Management SystemManual
OCRWM Safety Plan
Systems Engineering ManagementPlan (SEMP)
Program Change Control Procedure
2
0
0
1
12/22/86
12/18/86
10/01/85
02/01/89
Program Baseline Documents
* Program Reference ScheduleBaseline
* Waste Management SystemsRequirements and Descriptions (SRD)
Quality Assurance AdministrativeProcedures
Indoctrination and TrainingEstablishing Quality AssuranceControlsQuality Assurance ProgramDocument ReviewReadiness ReviewManagement AssessmentTechnical Document ReviewDesign ReviewPeer ReviewPreparation of Quality AssuranceAdministrative ProceduresCorrective ActionCertification of Audit PersonnelAudit ProgramSurveillance Program
07/28/87
01/01/86
02/24/89
03/27/8906/19/89
03/27/89
QAAPQAAPQAAPQAAPQAAPQAAP
QAAPQAAPQAAPQAAP
2.62.73.13.23.35.1
16.118.118.218.3
03/27/8906/19/8903/27/8903/27/8903/27/8903/27/89
03/27/8903/27/8903/27/8903/27/89
* Baseline Document**(notebook) This is a notebook binder to hold the documents
it in the list.indented below
1
June 26, 1989
OFFICE OF CIVILIAN RADIOACTIVE WASTE MANAGEMENT DOCUMENTS (CONTINUED)
EffectiveDateDocument ID Title Revision
DOE/RW-0214(QAR)DOE/RW-0215(QAPD)**(notebook)
Quality Assurance Manual
Quality Assurance RequirementsDocument, QAR (DOE/RW-0214)
1
1
N/A
11/03/88
Qaulity Assurance ProgramDescription Document, QAPD
- (DOE/RW-0215)
1 12/20/88
** (notebook) This is a notebook binder to hold the documents indented belowit in the list.
2
June 26, 1989
OFFICE OF GEOLOGIC REPOSITORIES DOCUMENTS
EffectiveDateDocument ID Title Revision
DOE/RW-0068
DOE/RW-0090
N/A**(notebook)
* Program Baseline ProceduresNotebook OGR/B-1
* Generic Requirements for a MinedGeologic Disposal System OGR/B-2
* Office of GeologicRepositoriesBaseline Documents OGR/B-4through OGR/B-13
7.1
4
02/23/88
02/23/89
N/A * OGR Work Breakdown Structure andDictionary-Development andEvaluation Phase (OGR/B-4)
0 11/84
DOE/RW-0142
DOE/RW-0147
N/A
* Annotated Outline for SiteCharacterization Plans (OGR/B-5)
* Annotated Outline for the SCPConceptual Design Report (OGR/B-6)
* Systems Engineering ManagementPlan for the OGR,(OGR/B-7)
2 08/31/87
1 06/05/87
2 03/06/89
DOE/RW-0125
DOE/RW-0136
DOE/RW-0101
N/A
N/A
* Waste Acceptance PreliminarySpecifications for the DefenseWaste Processing Facility HighLevel Waste Form (OGR/B-8)
* Waste Acceptance PreliminarySpecifications for the WestValley Demonstration ProjectHigh-Level Waste Form (OGR/B-9)
* Issues Hierarchy For A MinedGeologic Disposal System (OGR/B-10)
* Project Charter for the NNWSI(OGR/B-12)
* Office of Geologic RepositoriesQuality Assurance Requirements forHigh-Level Waste Form ProductionOGR/B-14)
0 12/05/86
0 4/87
1
0
08/31/87
6/87
0 2/88
* Baseline Documents**(notebook) This is
it ina notebook binder to hold the documents indented belowthe list.
3
' >June 26, 1989
Document ID
YNP/CC-0001
YMP/CC-0002
YMP/CC-0003
YMP/CC-0004
YMP/88-2
NNWSI/88-3
YMP/88-4
YMP/CM-0001
YMP/CM-0002 thruYMP/CM-0005
YUCCA MDUNTAIN PROJECT DOCUMENTS
Title Revision
YMP Work Breakdown N/AStructure Dictionary
YMP Reference 4Information Base
ESF Subsystem Design Requirements 0Document for Title II
YMP QA Level Assignment Records 2
YMP Project Management Plan 0
NNWSI Project Systems Engineering 0Management Plan
Yucca Mountain Project Configuration 1Management Plan
* YMP Project Baseline Document N/A- YMP Project Budget Baseline- YMP Project Cost Plan- YMP Project MSA Milestone
* YMP Quality Lists 0(lists generated by applicationof AP-6.8Q, AP-6.9Q AP-6.10Q,& AP.6.11Q)
EffectiveDate
03/17/88
02/01/89
04/11/89
06/21/89
02/89
07/88
01/89
12/13/8807/07/8807/07/8807/07/88
04/12/89
N/A Change Control Board (CCB)Records - Volume VIII FY-89
NNWSI/88-9 NNWSI Quality Assurance Plan
YMP/88-1 YMP Project Plan
SAIC 84/7600 Meteorological Monitoring PlanDOE/NV/10270-5
SAIC 80/8013 NNWSI Radiological EnvironmentalMonitoring Sampler Location
SAIC-89/8000 YMP Radiological Field ProgramsCalibration Document Manual
SAIC 87/8000 Radiological Monitoring Plan forDOE NV/10576-6 the NNWSI Project Volume 1 & 2NNWSI/88-14
* Baseline Documents
N/A
2
1
1
0
01/10/89
12/09/88
05/89
06/05/89
05/04/88
1 06/09/89
0 05/25/88
4
;June 26, 1989
YUCCA IEUNTMI PROJECT DOCUENs (CONTINUED)
EffectiveDateDocument ID Title Revision
NNWSI/88-15 NNWSI Project Records Management Plan 0 07/14/88
ETP-1 Environmental Technical Procedurefor Identification of TraditionalCultural Values and American IndianConsultation
0 07/15/87
YMP/88-11
YMP/88-13
N/A
YNP Project Regulatory Document-Manual Volumes 1 and 2
SCP Management Plan
NNWSI Project EnvironmentalRadiological Monitoring TechnicalProcedure Manual
15 05/31/89
3 03/89
N/A 06/09/89
BTP-ER-001
TP-ER-002
TP-ER-006
TP-ER-007
TP-ER-010
BTP-ER-011
BTP-ER-015
VOLUME I BRANCH TECHNICAL PROCEDURESPreparation And Control ofEnvironmental RadiologicalMonitoring Procedures
Receipt, Operation, Exchange,Termination, And Shipment ofIntegrating Radon Samplers
Receipt Inspection And AcceptanceTesting of a Continuous Air SamplerAnd Associated Timer Calibration
Operation And AccuracyVerification/Calibration ofContinuous Air Samplers
Preparation of Quality Control
Radiation Safety Control Procedure(Radiation, Contamination, andRadioactive Material)
Environmental MonitoringRadiological DocumentationControl And Distribution,General Maintenance, AndCalibration of Systems
3 05/23/89
0 05/26/89
0
0
0
0
05/26/89
05/26/89
05/26/89
05/31/89
06/10/881
5
K.-' June 26, 1989
YUCCA MUNTAIX PROJECT DOCUMENTS (CONTINUED)
Document ID
TP-ER-016
BTP-ER-017
TP-ER-018
BTP-ER-020
BTP-ER-031
BTP-ER-034
JPA-ER-004
JPA-ER-030
JPA-ER-031
JPA-ER-035
JPA-ER-036
JPA-ER-037
JPA-ER-910
JPA-ER-911
JPA-ER-912
JPA-ER-913
JPA-ER-916
Title Revi.
Electrical Safety Inspectionof 110 Volt AC Powered Equipment
Environmental Monitoring RadiologicalPlan/Reports, Analyses, ComputerProgram Usage and Readiness Review
Receipt Inspection for-Radiological MonitoringProgram Materials And Equipment
General Acceptance Testing Procedurefor Radiological MonitoringEquipment
Siting, Transfer, and Termination of
Response to Projected Unplanned Events
VOLUME II JOB PERFORMANCE AIDS
ESP-1 Swipe Sample Counting
Ludlum Micro-R Meter Operation
Ludlum Alpha Counter - Gas (LAC-G)
ESP-1 Operation
ESP-1 Alarm Level Setting Operation
ESP-1 Scaler Mode Operation
RFPB Calibration Records Database:Data Retrieval Operation
RFPB Calibration Records Database:Data Modification Operations
RFP Training Records Database: DataModification Operations
RFP Training Records Database: DataRetrieval Operations
RFPB Calibration Records Database:Archive Retrieval Operations
5ion
0
0
EffectiveDate
08/13/87
06/10/88
0 08/13/87
0 06/10/88
0
0
05/15/89
05/31/89
0
0
0
0
0
0
0
0
05/23/89
05/23/89
05/23/89
05/23/89
05/23/89
05/23/89
02/10/89
02/10/89
0
0
06/01/89
06/01/89
02/10/890
6
June 26, 1989
YUCCA MOUNTAIN PROJECT DOCUMENTS (CONTIUE:D)
EffectiveDocument ID Title Revision Date
JPA-ER-917 RFP Training Records Database: 0 06/01/89Archive Retrieval Operations
VOLUME III APPENDICES
A-1 Personnel Authorized - Senior Health 8a-8cPhysicist Authorization
A-2.1 Radiological Field Programs Branch B 08/24/88Training Reqirmnts. & Quali. Documts.
A-2.2 Level A: Theoretical Training 0 12/29/86Module 1 General Program Data
A-2.3 Level A: Theoretical Training 0 12/30/86Module 2 Basic Health Physics
A-2.4 Level A: Theoretical Training 0 12/22/86Module 3 Radon Monitoring
A-2.5 Level A: Theoretical Training 0 12/29/86Module 4 Airborne Radionuclides
A-2.6 Level A: Theoretical Training 0 02/26/87Module 5 Worker Safety
7
June 26, 1989
YUCCA H oNTAIN PROJECT DOCUMENTS (CONTINUED)
Document ID
YMP/APM-1
AP 1.1Q
AP 1.3Q
AP 1.4Q
AP 1.5Q
AP 1.6Q
AP 1.7Q
AP 1.9Q
AP l.1OQ
Title Rei
YMP AdministrativeProcedures Manual
Administrative Procedure Preparation
Publications Review and Approval
Distribution of Information Products
Issuance & Maintenance of ControlledDocuments
Release of Unpublished Information
Records Management
Waste Management Project Office(WMPO) Action Item Tracking System
Preparation, Review, and Approvalof SCP Study Plans
Weekly Highlights Reports
Major System Acquisitions Report
Monthly Technical Data TransferReport
Monthly Reporting and Analysis
Change Control Process
Configuration Management
Technical Information Flow to andfrom the Yucca Mountain ProjectTechnical Data Base
Information Flow into the ReferenceInformation Base
vision
29
EffectiveDate
06/14/89
2
1
1
0
06/23/89
04/11/88
07/27/87
04/11/88
0
2
0
06/17/88
05/23/89
11/24/87
AP
AP
AP
2.10
2.3Q
2.8Q
0
1
0
0
12/14/88
06/17/88
01/15/85
09/29/87
AP 3.2Q
AP 3.3Q
AP 3.60
AP 5.2Q
AP 5.3Q
0
1
0
0
0
01/15/85
01/17/89
01/17/89
01/26/89
01/11/89
8
June 26, 1989
YUCCA AIDUNTAIN PROJECT DOCUMENTS (CONTINUD)Effective
Document ID Title Revision Date
AP 5.4Q Assignment of Quality Assurance 0 01/25/89Levels
AP 5.9Q Qualification of Data or Data Analyses 0 04/19/89not Developed Under the Yucca MountainProject Quality Assurance Plan
AP 5.10Q Use of NTS Contractors on The NNWSI 0 08/30/88Project
AP 5.13Q Readiness Review 0 12/29/88
AP 5.14Q Design Review 0 12/29/88
AP 5.17Q Application of Graded QA 0 01/25/89
AP 5.18Q ESF Design Control 0 01/31/89
AP 5.19Q Interface Control 0 06/15/89
AP 5.20Q Hold Control 0 05/23/89
AP 6.2Q Management and Operation of Sample 0 06/21/89Handling Activities at Borehole Sites
AP 6.3Q Interaction of Participants and Out- 0 06/21/89side Interests with YMP Sample Manage-ment
AP 6.6Q Field Collection, Documentation, and 0 06/21/89Specimen Removal of ExploratoryShaft and Drift Rock
AP 6.9Q Identification of Items and Activ- 0 01/04/89ities Subject to the Quality LevelAssignment Process
AP 6.10Q Identification of Items Important 0 01/04/89to Safety
AP 6.11Q Identification of Activities to be 0 01/04/89Placed on the Quality Activities List
AP 9.1Q NNWSI Project Participant and 0 01/15/85Public Interaction
AP ll.lQ Electronic Transfer of Corres- 0 04/11/88pondence Files
9
'N9 xoJune 26, 1989
YUCCA MUNTAIN PROJECT DOCUMETS (CONTINUED)
Document ID
NNWSI/88-16
N/A
1.2.6-0001
1.2.6-0002
1.2.6-0006
1.2.6-0007
1.2.6-0011
1.2.6-0012
6.2.1-0001
6.2.2-0001
6.2.2-0002
6.2.2-0003
6.2.2-0004
6.2.2-0005
6.2.2-0006
6.2.2-0009
6.2.2-0010
Title
NNWSI Project Training ManagementPlan
NNWSI Exploratory Shaft Facility(ESF) Quality Assurance LevelAssignment Sheets (QALAS)
Fluid Control
Rock Excavation
Rock Excavation from ES-1, ES-2and Drifts
Shaft Liners and UndergoundOpenings
Shaft Internals and Conveyances
Shaft Internals and Conveyances
Site and Roads
Utilities and CommunicationsSystems (Surface)
Utilities and CommunicationsSystems (Surface)
Utilities and CommunicationsSystems (Surface)
Utilities and CommunicationsSystems (Surface)
Utilities and CommunicationsSystems (Surface)
Utilities and CommunicationsSystems (Surface)
Utilities and CommunicationsSystems (Surface)
Utilities and CommunicationsSystems (Surface)
Revision
1
6
EffectiveDate
1/89
05/02/88
07/01/87
05/13/87
02/03/88
02/03/88
02/03/88
02/03/88
04/30/87
04/30/87
05/13/87
05/13/87
05/13/87
05/13/87
04/30/87
03/21/88
03/21/88
10
June 26, 1989
YUCCA H2NTAIN PROJECT D MENTS (CONTNUD)
Document ID
6.2.2-0011
6.3.1-0001
6.3.1-0003
6.3.1-0006
6.3.1-0007
6.3.1-0009
6.4.1-0001
6.4.1-0002
6.4.1-0004
6.4.1-0005
6.4.2-0001
6.4.2-0002
6.4.2-0003
6.5.1-0004
6.5.2-0002
6.5.2-0003
6.5.2-0004
6.7.1-0001
6.7.1-0002
6.7.1-0004
6.7.1-0005
6.7.1-0006
Title
Utilities and CommunicationsSystems (Surface)
Surface Facilities - Buildings
Surface Facilities - Buildings
Surface Facilities - Buildings
Surface Facilities - Buildings
Surface Ficilities - Buildings
ES-1 Shaft and Liner
ES-1 Shaft and Liner
ES-1 Shaft and Liner
ES-1 Shaft and Liner
Hoists and Head Frame - ES-1
Hoist(s) and Head Frame - ES-1
Hoist(s) and Head Frame - ES-1
ES-2 Shaft and Liner
Hoist and Head Frame - ES-2
Hoist and Head Frame - ES-2
Hoists and Head Frame - ES-2
Undergound Service Systems
Underground Utility Systems
Underground Utility Systems
Underground Service SystemsUtilities and Communications
Underground Utility Systems
Revision
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
EffectiveDate
09/16/87
05/13/87
05/13/87
04/29/88
03/01/88
04/29/88
05/13/87
05/13/87
03/21/88
03/21/88
09/16/87
04/29/88
04/29/88
03/21/88
06/05/87
04/29/88
04/29/88
04/30/87
04/20/88
07/01/87
06/05/87
07/01/87
11
June 26, 1989
YUCCA leUNTAIN PROJECT DOCUMENTS (CONTINUED)
Document ID
6.7.1-0007
6.7.1-0011
6.7.1-0012
6.7.1-0013
6.7.1-0015
6.7.1-0017
6.7.2-0001
N/A
ESF-FSTL-002
ESF-FSTL-003
ESF-FSTL-004
ESF-FSTL-005
ESF-FSTL-006
ESF-FSTL-007
Title Revision
0
EffectiveDate
06/05/87Underground Service SystemsUtilities and Communications
Underground Utility Systems
Underground Utility Systems
Underground Utility Systems
Underground Utility Systems
Underground Utility Systems
Mine Plant
NNWSI Exploratory Shaft FacilityESF Development Study Report(Study No. 1 of 11)
NNWSI Exploratory Shaft FacilityESF Future 1400 Level Development(Study No. 2 of 11)
NNWSI Exploratory Shaft FacilityExcavation Methods Study Report(Study No. 3 of 11)
NNWSI Exploratory Shaft FacilityESF Controlled Blasting StudyReport (Study No. 4 of 11)
NNWSI Exploratory Shaft FacilityESF Hoisting System Study ReportFor Shafts ES-1 And ES-2(Study No. 5 of 11)
NNWSI Exploratory Shaft FacilityESF Ventilation Study Report(Study No. 6 of 11)
NNWSI Exploratory Shaft FacilityESF Dust Abatement Study Report(Study No. 7 of 11)
0
0
0
0
0
0
1
02/03/88
04/29/88
07/01/87
04/29/88
08/04/87
02/29/88
04/06/87
1 05/12/87
1 05/20/87
1 09/21/87
1 07/17/87
1
1
06/26/87
08/27/87
12
June 26, 1989
YUCCA EtUNTAIN PROJECT DOCUMENTS (CONTINUED)
EffectiveDateDocument ID Title Revision
ESF-FSTL-008
ESF-FSTL-009
ESF-FSTL-010
N/A
N/A
N/A
N/A
NNWSI Exploratory Shaft FacilityESF Water And Waste Water ControlStudy Report (Study No. 8 of 11)
NNWSI Exploratory Shaft FacilityESF Compressed Air System StudyReport (Study No. 9 of 11)
-NNWSI Exploratory Shaft FacilityESF Use Of GOE Equipment StudyReport (Study No. 10 of 11)
NNWSI/ESF Special Study No. 1Surface Site Layout
NNWSI/ESF Special Study No. 2Environmental PermittingRequirements
NNWSI/ESF Special Study No. 3Utilization Of The Off-Site A/EBuilding Area 25
NNWSI/ESF Special Study No. 5Sanitary Waste Treatment
NNWSI/ESF Special Study No. 6ALife Safety Systems
1 09/16/87
1 05/20/87
10/07/87
09/18/87
02/02/88
08/27/87
06/18/87
06/13/88N/A
N/A Technical Assessment Review PlanExploratory Shaft Facility Title-I-Design Acceptability Analysis andComparative Evaluation of AlternativeESF Locations
0 02/03/89
YNP/88-18
YMP/89-3
Yucca Mountain Project TechnicalData Management Plan
Review Record MemorandumExploratory Shaft Facility (ESF)Tilte I Design AcceptabilityAnalysis & Comparative Evaluationof Alternative ESF Locations
0 01/89
0 02/03/89
13
June 26, 1989
'YUCCA MOUNTAIN PROJECT DOCaMENTS (CONTINUED)
EffectiveDateDocument ID Title Revision
STUDY PLANS
8.3.1.4.2.2
8.3.1.15.2.1
8.3.1.2.2.4
8.3.1.15.1.5
8.3.1.2.2.2
8.3.1.17.4.2
8.3.1.5.2.1
8.3.1.3.2.1
Characterization of StructuralFeatures in the Site Area
Characterization of the SiteAmbient Stress Conditions
Characterization of the YuccaMountain Unsaturated ZonePercolation Exploratory ShaftFacility Study
Excavation Investigations
Water Movement Tests
Evaluating the Location and Recencyof Faulting near Prospective SurfaceFacility
Characterization of the YuccaMountain Quaternary Regional Hydrology
Mineralogy, Petrology and Chemistryof Transport Pathways
0 02/89
0 01/89
0 01/89
0 01/89
0 01/89
0 05/89
0 06/89
0 06/89
14
June 26, 1989
YUCCA Y3UNTAIN PROJECT OFFICE DOCUMENTS
Document ID
WMPO/88-1
N/A
Title Re,
YMPO Quality Assurance ProgramPlan & Quality Management Procedures
WMPO Quality Management ProceduresTable of Contents
vision
1
EffectiveDate
04/20/89
N/A 06/23/89
QMP-01-01
QMP-01-02
QMP-02-01
QMP-02-02
WMPO ICN
QMP-02-08
QMP-02-09
QMP-03-01
QMP-04-01
QMP-05-01
QMP-05-02
QMP-05-03
WMPO ICN
QMP-06-02
WWPO ICN
WMPO ICN
Organization
Stop Work
Qualification, Proficiency,Indoctrination, and Training ofWaste Management Project Personnel
Qualification of Quality AssuranceProgram Audit Personnel
WMPO Interim Change Noticeto QMP-02-08 (ICN #1)
Technical Assessment Review
Development and Conduct of Training
Peer Reviews
Procurement Document Control
Preparation and Control ofQuality Management Procedures
Preparation and Control ofBranch Technical Procedures
Preparation and Control of theNNWSI Project QAP and the WMPOQAPP
WMPO Interim Change Noticeto QMP-06-02 (ICN 11)
Document Control
WMPO Interim Change Noticeto QMP-06-03 (ICN #2)
WMPO Interim Change Noticeto QMP-06-03 (ICN #1)
1
0
1
05/27/88
04/11/88
09/02/88
1 02/22/88
1 02/07/89
08/08/88
03/31/89
01/11/89
04/11/88
04/11/88
05/27/88
05/27/88
04/02/89
12/01/88
08/01/88
05/05/88
15
June 26, 1989
Document ID
QMP-06-03
QMP-07-03
QMP-15-01
QMP-16-01
WMPO ICN
QMP-16-02
QMP-16-03
QMP-17-01
QMP-18-01
YMPO ICN
YMPO ICN
YMPO ICN
YMPO ICN
QMP-18-02
N/A
BTP-RMD-00:
YUCCA M)MUHTM PROJECT OFFICE DOCUMENTS (CONTINUED)
Title Revision
Document Review/Acceptance/ 1Approval
Control of Purchased Items 0and Services
Control of Nonconformances 1
Corrective Action 0
-WMPO Interim Change Notice 2QHP-16-02 (ICN #1)
Trend Analysis 2
Standard Deficiency Reporting 1System
Record Source and Record User 0Responsibilities
Audit System for the Waste 3Management Project Office
YMPO Interim Change Notice 1to QMP-18-02 (ICN #4)
YMPO Interim Change Noticeto QMP-18-02 (ICN #3) 1
YMPO Interim Change Notice 1to QMP-18-02 (ICN 12)
YMPO Interim Change Notice 1to QMP-18-02 (ICN #1)
Surveillances 1
BRANCH TECHNICAL PROCEDURES (BTPs)
YMPO BTP for the Local RecordsDivision:
L T&MSS Local Records Center Opera. 0
EffectiveDate
02/22/88
04/11/88
05/27/88
12/10/84
06/23/89
05/27/88
06/05/89
01/11/89
10/03/88
04/20/89
04/20/89
04/02/89
02/06/89
05/27/88
01/16/89
N/A
BTP-RMD-002
YMPO BTP for the Central RecordsDivision:
Central Records Facility Opera. 0 01/16/89
16
June 26, 1989
YUCCA HDUNfTAIN PROJECT OFFICE DOCUMENTS (CORTINuED)
EffectiveDateDocument ID Title Revision
BRANCH TECHNICAL PROCEDURES, CONTINUED
N/A YMPO BTP for the Engineering &Development Division:
BTP-EDD-001 Acceptance of Documents 0 05/26/89
N/A YMPO Meteorological and Air QualityMonitoring Technical ProceduresManual:
0 05/05/89
BTP-AQ-001 Air Quality Monitoring: AmbientParticulate Sampling
0 04/01/89
BTP-AQ-002 Air Quality Monitoring:Acceptance Testing, andAuditing of ParticulateEquipment
Receiving,PerformanceSampling
0 04/01/89
BTP-AQ-003
BTP-AQ-004
BTP-AQ-005
Air Quality Monitoring: FilterPreparation and Control
Air Quality Monitoring: CalibrationChecks of Particulate SamplingEquipment
Air Quality Monitoring: CalculatingParticulate Concentrations
0 04/01/89
0
0
04/01/89
04/01/89
17
. W' 1 WJune 26, 1989
TECBNICAL L I2NGEMENT SUPPORT SERVICES DOCUMENTS
EffectiveDateDocument ID Title Revision
SAIC-86/8000
SAIC-85/8002
N/A
ICG
AP 1.1
AP 1.2
ICG
AP 1.7
AP 1.8
ICG
AP 1.9
ICG
AP 1.10
AP 1.11
AP 1.24
AP 1.25
NNWSI Project MeteorologicalMonitoring Program Instructionsfor Operation and CalibrationChecks of Meteorological MonitoringEquipment
NNWSI Project MeteorologicalMonitoring Program Instructions-for Receipt, Acceptance Testing,and Performance Auditing ofMeteorological Monitoring Equipment
T&MSS Project Guide ManualAdministrative ProceduresHandbook (Volumes 2 of 5)
Table of Contents
Interim Change Guidance toT&MSS AP 1.1
T&MSS Administrative ProcedurePreparation
Unusual Occurrence Reporting
Interim Change Guidance to 1.7
Graphics Control
Forms Control
Interim Change Guidance to 1.9
Word Processing Control
Interim Change Guidance to 1.10
Editing Control
Document Preparation and Production
T&MSS Software Developmentand Maintenance
T&MSS Internal Procedure forDeveloping or Revising NNWSIProject Administrative Procedures
0 04/30/86
1 07/19/85
0
12
2
11/18/87
06/08/89
08/08/88
09/17/87
0
0
1
05/08/89
11/05/87
05/31/85
01/17/89
11/05/87
05/31/85
11/05/87
06/30/85
01/17/89
01/27/87
0
0
0
0
0 09/09/88
18
June 26, 1989
TECHNICAL & NANAGEHENT SUPPORT SERVICES DOCUNTS (CONTINE)
EffectiveDocument ID Title Revision Date
AP 1.26 Transfer of T&MSS Generated 0 03/23/88DOE Correspondence andEnclosures to WMPO
AP 2.1 Action Tracking System 0 03/10/89
AP 2.2 Appraisal of T&MSS Environmental, 0 05/08/89Safety, and Health Protection Programs
AP 2.3 -T&MSS Formal Internal Review 4 01/17/89
AP 2.4 United States Department of Energy 0 06/08/89Order Review and Implementation
AP 3.1 Training and Orientation of 3 11/16/87T&MSS Personnel
AP 3.15 T&MSS Verification of Informa- 1 01/08/88tion Education and Experience
AP 3.16 Familiarization Program Implemen- 0 11/16/87tation
ICG Interim Change Guidance to 4.1 10/21/88
AP 4.1 Radiological Safety Training 0 01/29/87
AP 4.2 Personnel Dosimetry 1 05/08/89
AP 4.3 Possession, Procurement, Shipment, 0 07/28/88and Receipt of Radioactive Material
AP 5.1 Preparation and Control of the 0 05/24/88Contract Work Breakdown Structureand the Responsibility AssignmentMatrix
AP 5.2 Cost Account Planning, Budgeting and 0 03/31/88Authorization
AP 5.3 Schedule Development, Control, and 0 09/09/88Maintenance
AP 5.9 Earned Value Techniques 0 10/21/88
AP 6.2 Access to and Retrieval of T&MSS 1 10/13/87Project Files By Non-T&MSSIndividuals
19
June 26, 1989
TECHNICAL & KWAGEdENT SUPPORT SERVICES DOCUMENTS (CONTINUED)
Document ID
N/A
N/A
QP 3.1
QP 3.2
SAIC 86/8006
N/A
Title Re,
T&MSS Project Guide ManualStyle Guide (Volume 3 of 5)
T&MSS Quality Assurance ProgramPlan and Supporting Documents
Scientific Investigation Controland Design Control
Use and Control of Computer Programs
NNWSI Project Safety Plan forT&MSS Field Activities
SAIC Administrative Handbook
uision
0
EffectiveDate
12/31/87
N/A 03/23/89
2 12/20/86
2
1
12/20/86
01/22/88
0 12/01/88
20