project manager or construction manager or superintendent or gen

2
Debra Mahony-Higgins 512 N Addison Rd Villa Park, Illinois 60181 630-279-6227 Cell 630-936-3070 [email protected] Objective Seeking a position where I can fully utilize my 30 years of experience in the c onstruction industry. I can improve s ubcontractor relations, owner/client relat ions, and to help deliver quality projects with maximum owner satisfaction...On time and on-budget. My years of experience with all building systems - both new and old - provide de pendable knowledge in which employer/clients can rely upon. I have experience in Manufacturing, Industrial, Warehousing (super flat floors), Commercial office a nd retail (New and TI), Restaurant, Healthcare (dental and medical) Work Experience Project Manager 5/2004 - 11/2010 Triad Construction Services, West Chicago, IL * Full accountability for Design/Build projects. Bid, negotiate, draft contracts , prepare project schedules - monitor and maintain progress, monitor on-site pro gress, insure MEP coordination, complete responsibility from break ground to tur nkey. Construction Manager 7/2002 - 5/2004 Wight Construction Services, Downers Grove, IL * Construction field representative for Design/Build on new Bolingbrook High Sch ool. Drawing coordination, site scheduling and trade management. Additionally pr oduced bi-weekly publication addressing quality control. Lessons learned and com pany policy for distribution to all construction managers. Project Manager 3/1997 - 7/2002 Triad Construction Services, West Chicago, IL * Project manager on projects ranging in size from 100k to 7 million. Commercial , Industrial and T.I. Assist on implementing design changes to make projects "bu ild able", create all work scopes for bid packages, bid and negotiate bid packag es. Total project responsibility from design to turnkey. Senior Superintendent 7/1994 - 3/1997 Century Contractors, Bedford Park, IL * Senior Superintendent on projects from 50k to 3 million. Commercial, industria l, public works and residential. Take over complete project control after bid pa ckages awarded, including change order controls. Superintendent 10/1993 - 6/1994 Versatile Enterprises, Villa Park, IL * Projects ranged from 25k to 4 million. Commercial and T.I., Day to day site op erations and scheduling. Superintendent 2/1992 - 10/1993 Ganna construction, Addison, IL * Oversaw construction of a two mile I.D.O.T. infrastructure improvement, includ ing mass earthwork, water, storm, lighting, paving etc...Assisted other superint endents by implementing a simple submittal, material control and scheduling syst em. Facility Engineer/ Material Controller 6/1988 - 2/1992 Abbott Laboratories (thru Strom Engineering), Abbott Park, IL * Team member on a 300,000 S.F. Reagent manufacturing facility. First phase cons

Upload: api-121364924

Post on 06-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project manager or construction manager or superintendent or gen

8/3/2019 Project manager or construction manager or superintendent or gen

http://slidepdf.com/reader/full/project-manager-or-construction-manager-or-superintendent-or-gen 1/2

Debra Mahony-Higgins512 N Addison RdVilla Park, Illinois 60181630-279-6227Cell [email protected]

ObjectiveSeeking a position where I can fully utilize my 30 years of experience in the construction industry. I can improve subcontractor relations, owner/client relations, and to help deliver quality projects with maximum owner satisfaction...Ontime and on-budget.My years of experience with all building systems - both new and old - provide dependable knowledge in which employer/clients can rely upon. I have experience inManufacturing, Industrial, Warehousing (super flat floors), Commercial office and retail (New and TI), Restaurant, Healthcare (dental and medical)

Work ExperienceProject Manager5/2004 - 11/2010 Triad Construction Services, West Chicago, IL* Full accountability for Design/Build projects. Bid, negotiate, draft contracts, prepare project schedules - monitor and maintain progress, monitor on-site progress, insure MEP coordination, complete responsibility from break ground to turnkey.

Construction Manager7/2002 - 5/2004 Wight Construction Services, Downers Grove, IL* Construction field representative for Design/Build on new Bolingbrook High School. Drawing coordination, site scheduling and trade management. Additionally produced bi-weekly publication addressing quality control. Lessons learned and company policy for distribution to all construction managers.

Project Manager3/1997 - 7/2002 Triad Construction Services, West Chicago, IL* Project manager on projects ranging in size from 100k to 7 million. Commercial, Industrial and T.I. Assist on implementing design changes to make projects "build able", create all work scopes for bid packages, bid and negotiate bid packag

es. Total project responsibility from design to turnkey.

Senior Superintendent7/1994 - 3/1997 Century Contractors, Bedford Park, IL* Senior Superintendent on projects from 50k to 3 million. Commercial, industrial, public works and residential. Take over complete project control after bid packages awarded, including change order controls.

Superintendent10/1993 - 6/1994 Versatile Enterprises, Villa Park, IL* Projects ranged from 25k to 4 million. Commercial and T.I., Day to day site operations and scheduling.

Superintendent2/1992 - 10/1993 Ganna construction, Addison, IL* Oversaw construction of a two mile I.D.O.T. infrastructure improvement, including mass earthwork, water, storm, lighting, paving etc...Assisted other superintendents by implementing a simple submittal, material control and scheduling system.

Facility Engineer/ Material Controller6/1988 - 2/1992 Abbott Laboratories (thru Strom Engineering), Abbott Park, IL* Team member on a 300,000 S.F. Reagent manufacturing facility. First phase cons

Page 2: Project manager or construction manager or superintendent or gen

8/3/2019 Project manager or construction manager or superintendent or gen

http://slidepdf.com/reader/full/project-manager-or-construction-manager-or-superintendent-or-gen 2/2

isted of material control and scheduling for the building. Second phase consisted of supervising and coordinating construction of lab and offices in previouslyunfinished areas.

Labor Forman1/1984 - 1/1988 Weiss Cal, San Jose, CA* Labor foreman in charge of 6-man crew. Installed sewer, water and traffic controls for the San Jose Transit Mall. Liaison to city of San Jose for Safety and Traffic Control.

Laborer10/1980 - 6/1982 Granite Construction, Skokie, IL* Top Lander/Laborer on the Deep Tunnel Project.EducationTriton College, River Grove, IL* Associate Degree - Construction Management, AAS* 3.94 gpa, presidential honor roll* I read, and keep up with, numerous trade journals for construction, facilities maintenance and engineering and Architecture.* Osha 30 hour card* NUCCA competent person cardSkillsMicrosoft products, Expedition, Sure Track / P3 Scheduling