1 Project Management Institute – Baltimore Chapter PMBOK Version 5 – What are the Changes? Mike Berendt, PMP, PMI-RMP

Upload: aine

Post on 19-Jan-2016

59 views

Category:

Documents


3 download

DESCRIPTION

Project Management Institute – Baltimore Chapter PMBOK Version 5 – What are the Changes? Mike Berendt, PMP, PMI-RMP. Agenda. PMBOK Review Scope Major Changes Changes by Knowledge Area/Chapter Implementation Timelines. Scope of the Review. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

1

Project Management Institute –

Baltimore Chapter

PMBOK Version 5 – What are the Changes?

Mike Berendt, PMP, PMI-RMP

Page 2: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

2

Agenda

PMBOK Review Scope Major Changes Changes by Knowledge Area/Chapter Implementation Timelines

Page 3: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

3

Incorporate comments and feedback on Version 4 from practitioners

Align PMBOK with: PMI Lexicon Other PMI Standards – Scheduling, Risk, Agile, PgMP. etc ISO 21500

Consider project management role delineation study results

Reposition Chapter 3 (The Standard for Project Management) as a standalone, ANSI approved standard (Appendix) within the Fifth Edition

Scope of the Review

Page 4: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

4

Business Rules established for Inputs, Tools & Techniques and Outputs (ITTO)

Project Management plan is input for all processes that produce a subsidiary plan as output, eg. Scope Management Plan

Documents specifically named when created as a primary output, eg. Scope Management Plan; captured as part of “Project Documents Updates” subsequently

Precedence rules established for input and output lists – plans, subsidiary plans, baselines, data/reports, updates, enterprise environmental factors, organizational process assets

Major Changes

Page 5: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

5

For consistency and clarity, four new Planning Processes were added to create subsidiary plans that are part of the overall project management plan

Plan Scope Management Plan Schedule Management Plan Cost Management Plan Stakeholder Management

Major Changes

Page 6: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

6

For consistency and clarity, the monitor and controlling processes were named using the form “Control {XXX}”, since controlling includes monitoring – eg. Monitor and Control Risks changed to Control Risks

Chapter 3 was downsized to introduce the project management processes and Process Groups but not list each individual process; most of this content was moved to an Appendix as the ANSI standard

Major Changes

Page 7: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

7

Chapter 10 was separated into two distinct Knowledge Areas: Project Communications Management and Project Stakeholder Management

New Chapter 13 – Project Stakeholder Management 13.1 Identify Stakeholders 13.2 Plan Stakeholder Management 13.3 Manage Stakeholder Engagement 13.4 Control Stakeholder Engagement

Major Changes

Page 8: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

8

Redefined terms to align with the DIKW (data, information, knowledge, wisdom) model used in the field of Knowledge Management Work Performance Data - The raw observations and

measurements identified during activities being performed to carry out the project work – ex. percent of work completed, actual costs

Work Performance Information - The performance data collected from various controlling processes, analyzed in context and integrated based on relationships across areas – ex. status of deliverables and forecasted estimates to complete.

Work Performance Reports - The physical or electronic representation of work performance information compiled in project documents, intended to generate decisions, actions, or awareness – ex. status reports and updates

Major Changes

Page 9: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

9

Refined Data Model

Page 10: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

10

Project Integration Management

PMBOK Version 4 PMBOK Version 5

4.1 Develop Project Charter 4.1 Develop Project Charter

4.2 Develop Project Management Plan

4.2 Develop Project Management Plan

4.3 Direct and Manage Project Execution

4.3 Direct and Manage Project Work

4.4 Monitor and Control Project Work

4.4 Monitor and Control Project Work

4.5 Perform Integrated Change Control

4.5 Perform Integrated Change Control

4.6 Close Project or Phase 4.6 Close Project or Phase

Page 11: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

11

Project Scope Management

PMBOK Version 4 PMBOK Version 5

5.1 Plan Scope Management

5.1 Collect Requirements 5.2 Collect Requirements

5.2 Define Scope 5.3 Define Scope

5.3 Create WBS 5.4 Create WBS

5.4 Verify Scope 5.5 Validate Scope

5.5 Control Scope 5.6 Control Scope

Page 12: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

12

Project Time Management

PMBOK Version 4 PMBOK Version 5

6.1 Plan Schedule Management

6.1 Define Activities 6.2 Define Activities

6.2 Sequence Activities 6.3 Sequence Activities

6.3 Estimate Activity Resources 6.4 Estimate Activity Resources

6.4 Estimate Activity Durations 6.5 Estimate Activity Durations

6.5 Develop Schedule 6.6 Develop Schedule

6.6 Control Schedule 6.7 Control Schedule

Page 13: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

13

Project Cost Management

PMBOK Version 4 PMBOK Version 5

7.1 Plan Cost Management

7.1 Estimate Costs 7.2 Estimate Costs

7.2 Determine Budget 7.3 Determine Budget

7.3 Control Costs 7.4 Control Costs

Page 14: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

14

Project Quality Management

PMBOK Version 4 PMBOK Version 5

8.1 Plan Quality 8.1 Plan Quality Management

8.2 Perform Quality Assurance 8.2 Perform Quality Assurance

8.3 Perform Quality Control 8.3 Control Quality

Page 15: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

15

Project Human Resource Management

PMBOK Version 4 PMBOK Version 5

9.1 Develop Human Resource Plan 9.1 Plan Human Resource Management

9.2 Acquire Project Team 9.2 Acquire Project Team

9.3 Develop Project Team 9.3 Develop Project Team

9.4 Manage Project Team 9.4 Manage Project Team

Page 16: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

16

Project Communications Management

PMBOK Version 4 PMBOK Version 5

10.1 Identify Stakeholders Moved to 13.1

10.2 Plan Communications 10.1 Plan Communications Management

10.3 Distribute Information 10.2 Manage Communications

10.4 Manage Stakeholder Expectations

Moved to 13.3

10.5 Report Performance 10.3 Control Communications

Page 17: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

17

Project Risk Management

PMBOK Version 4 PMBOK Version 5

11.1 Plan Risk Management 11.1 Plan Risk Management

11.2 Identify Risks 11.2 Identify Risks

11.3 Perform Qualitative Risk Analysis

11.3 Perform Qualitative Risk Analysis

11.4 Perform Quantitative Risk Analysis

11.4 Perform Quantitative Risk Analysis

11.5 Plan Risk Responses 11.5 Plan Risk Responses

11.6 Risk Monitoring and Control 11.6 Control Risks

Page 18: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

18

Project Procurement Management

PMBOK Version 4 PMBOK Version 5

12.1 Plan Procurements 12.1 Plan Procurement Management

12.2 Conduct Procurements 12.2 Conduct Procurements

12.3 Administer Procurements 12.3 Control Procurements

12.4 Close Procurements 12.4 Close Procurements

Page 19: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

19

Project Stakeholder Management

PMBOK Version 4 PMBOK Version 5

10.1 Identify Stakeholders 13.1 Identify Stakeholders

13.2 Plan Stakeholder Management

10.4 Manage Stakeholder Expectations

13.3 Manage Stakeholder Engagement

13.4 Control Stakeholder Engagement

Page 20: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

20

Chapter 13 Process Flow

Identify Stakeholders

Project Charter

Stakeholder Register Plan

Stakeholder Management

Stakeholder Management

Plan

ManageStakeholder

EngagementIssue Log

ControlStakeholder

Engagement

PerformIntegrated

Change Control

Change Requests

Page 21: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

21

1 new Knowledge Area/Chapter – Project Stakeholder Management

5 new processes – Up to 51 processes

12 process name changes

Summary of Changes

Page 22: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

Copyright © 2007 PMI BC – All Rights Reserved

22

15 January 2013 – PMBOK, Version 5 available in print

January-July 2013 – Registered Education Providers (REPs) modified training classes, boot camps, and educational materials to incorporate Version 5 changes

31 July 2013 – Last PMP exam based on PMBOK, Ver. 4

1 August 2013 – Full implementation of PMBOK, Version 5 with PMP exam aligned to new knowledge areas and processes

Implementation Timelines

Page 23: Project Management Institute –  Baltimore Chapter  PMBOK Version 5 – What are the Changes?

23

Questions???

Mike Berendt, PMP, PMI-RMPColumbia Site [email protected]