project: “dlf new town heights”, residential group …nromoef.gov.in/smpr/25102016/43.pdf ·...

24
Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions 1 of 32 1 PURPOSE OF THE REPORT As per the “Sub Para (ii)” of “Para 10” of EIA Notification 2006, it is stated that “It shall be mandatory for the project management to submit half-yearly compliance reports in respect of the stipulated prior environmental clearance terms and conditions in hard and soft copies to the regulatory authority concerned, on 1st June and 1st December of each calendar year” and as per compliance of condition mentioned in Environment Clearance Letter (i.e. Part B General Condition, point number XVII), Six monthly compliance reports should be submitted to the Regulatory Authority of Central and State Government. It is mandatory to submit a Six Monthly Compliance Report to show the status & compliance of all the Conditions mentioned in Environment clearance Letter, along with monitoring of various Environmental Parameters (as per CPCB Norms). The regulatory authorities in this case are MoEF & CC, Delhi, MoEF & CC, Chandigarh and HSPCB, Panchkula. Various scheduled Site Visits were conducted by a team of Experts to Monitor Pollution related parameters as defined by CPCB / HSPCB. Samples for water and soil were also collected for further analysis. Based on the Specific and General Conditions mentioned in the EC Letter, a Compliance Report was prepared by the Vardan Enviro Net on behalf of Project Proponent; details of which are present in Chapter – “Compliance Report”. This report is supposed to submit after every six month as per the conditions stipulated in Environment Clearance Order. The Environmental assessment has been carried out to verify: 1) That the proposed project has not any adverse effect on the project site as well as its surrounding. 2) That there is compliance with the conditions stipulated in the Environmental Clearance Letter. 3) That the Project proponent is implementing the environmental safeguards in true spirit. 4) The non conformity in the project with respect to the environmental implication of the project. 5) That the project proponent is implementing the environmental pollution mitigative measures as suggested in approved Form-1 and Form – 1A, Environmental Management Plan and Building Plan. 1.1 Methodology for Preparation of Report is as follows: 1) Study of EC Letter & Related Documents, 2) Site Visits by a Team of Experts, 3) Monitoring of Environment Parameters, viz. Ambient Air, Water, Noise, Soil & DG Sets, 4) Analysis of Samples collected during Monitoring, 5) Interpretation of Monitoring Results, 6) Preparation of Semi Annual Environmental Compliance Report. 1

Upload: vudiep

Post on 06-Jul-2018

230 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions 1 of 32

1

PURPOSE OF THE REPORT

As per the “Sub Para (ii)” of “Para 10” of EIA Notification 2006, it is stated that “It shall be mandatory for the project management to submit half-yearly compliance reports in respect of the stipulated prior environmental clearance terms and conditions in hard and soft copies to the regulatory authority concerned, on 1st June and 1st December of each calendar year” and as per compliance of condition mentioned in Environment Clearance Letter (i.e. Part B General Condition, point number XVII), Six monthly compliance reports should be submitted to the Regulatory Authority of Central and State Government. It is mandatory to submit a Six Monthly Compliance Report to show the status & compliance of all the Conditions mentioned in Environment clearance Letter, along with monitoring of various Environmental Parameters (as per CPCB Norms). The regulatory authorities in this case are MoEF & CC, Delhi, MoEF & CC, Chandigarh and HSPCB, Panchkula. Various scheduled Site Visits were conducted by a team of Experts to Monitor Pollution related parameters as defined by CPCB / HSPCB. Samples for water and soil were also collected for further analysis. Based on the Specific and General Conditions mentioned in the EC Letter, a Compliance Report was prepared by the Vardan Enviro Net on behalf of Project Proponent; details of which are present in Chapter – “Compliance Report”. This report is supposed to submit after every six month as per the conditions stipulated in Environment Clearance Order. The Environmental assessment has been carried out to verify:

1) That the proposed project has not any adverse effect on the project site as well as its surrounding.

2) That there is compliance with the conditions stipulated in the Environmental Clearance Letter.

3) That the Project proponent is implementing the environmental safeguards in true spirit.

4) The non conformity in the project with respect to the environmental implication of the project.

5) That the project proponent is implementing the environmental pollution mitigative measures as

suggested in approved Form-1 and Form – 1A, Environmental Management Plan and Building Plan.

1.1 Methodology for Preparation of Report is as follows:

1) Study of EC Letter & Related Documents,

2) Site Visits by a Team of Experts,

3) Monitoring of Environment Parameters, viz. Ambient Air, Water, Noise, Soil & DG Sets,

4) Analysis of Samples collected during Monitoring,

5) Interpretation of Monitoring Results,

6) Preparation of Semi Annual Environmental Compliance Report.

1

Page 2: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 2 of 24

2

1.2 Generic Structure of Report:

1) Purpose of the Report, explaining the need of a Compliance Report and Methodology Adopted for preparation of Report. .

2) Compliance Report, explaining the entire General & specific conditions in the EC Letter and providing details w.r.t. each condition/ guideline.

3) Monitoring Reports & Analysis, showing the level of emission within the project site for various Environment Parameters.

4) Photographs showing status of the project and site.

5) Supporting Documents related mandatory for the project

Page 3: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 3 of 24

3

ADHERENCE TO SPECIFIC AND GENERAL CONDITIONS

2.1 Introduction

Environmental Clearance of “DLF New Town Heights” was obtained from State Environment Impact Assessment Authority (SEIAA),Haryana , with the EC No. SEIAA/HR/2012/261 on 30-08-2012.

PART A – SPECIFIC CONDITIONS I. Operation Phase

S. No Conditions of Environmental Clearance Status of Compliance 1 The STP installed for the treatment of the sewage

generated to the prescribed standards including odour and treated effluent will be recycled to achieve zero discharge. The STP should be installed at the farthest place in the project area.

Three Sewage Treatment Plants of 750 KLD, 320 KLD and 200 KLD have been installed and treated effluent after tertiary treatment is being recycled for horticulture, flushing purpose and DG sets cooling to achieve zero discharge.

2 Separation of gray and black water should be done by the use of dual plumbing line. Treatment of 100% gray water by decentralized treatment should be done ensuring that the recirculated water should have BOD maximum 10 ppm and the recycled water will be used for flushing, gardening and HVAC makeup and DG set cooling.

Black and grey water are separated using a dual plumbing line. Recycled water is being used for flushing, gardening, DG set cooling. BOD level is being maintained maximum up to 10 ppm.

3 For disinfections of the treated waste water ultra violates radiation or ozonization should be used.

Ultra Violet technology used for water disinfection in 750 KLD and 320 KLD STPs whereas Ozonisation is being used for 200 KLD STP.

4 The solid waste generated should be properly collected and segregated. Wet garbage should be composted and dry/inert solid waste should be disposed off to the approved sites for land filling after recovering recyclable material.

Solid waste generated from the project is mainly in form of domestic waste. This waste is properly segregated and disposed off through authorized vendors.

5 Diesel power generating sets proposed as source of backup power for lifts, common area illumination and for office use should be of enclosed type and conform to rules made under the Environment (Protection) Act, 1986. The location of the DG sets should be in the basement as promised by the project proponent with appropriate stack height i.e. above the roof level as per the CPCB norms. The diesel used for DG sets should be of low sulphur contents (maximum 0.25%)

DG sets are installed in acoustically treated room at basement and conforms to the rules made under Environment (Protection) Act, 1986. The stack heights are provided above the roof level as per norms. Low sulphur diesel (LSD) containing less than 0.25% sulphur is being used for DG sets.

6 Ambient Noise level should be controlled to ensure that it does not exceed the prescribed standards both within and at the boundary of the proposed commercial complex.

Ambient noise levels are regularly monitored and are within the prescribed standards. Results are Attached as annexure-1

7 The project proponent should maintain at least 15% as green cover area for tree plantation especially all around the periphery of the project and on the road sides preferably with local species

A peripheral tree plantation has been developed around the project site and is more than 15%. Most of the tree species planted are of indigenous variety. In the open spaces inside the have been landscaped and organised greens, lawns and play for

2

Page 4: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 4 of 24

4

S. No Conditions of Environmental Clearance Status of Compliance so as to provide protection against particulate and noise. The open spaces inside the plot should be preferably landscaped and covered with vegetation/grass.

children have been developed

8 Weep holes in the compound walls shall be provided to ensure natural drainage of rain water in the catchment area during the monsoon period.

Natural drainage of rain water in the catchment area is being ensured during the monsoon period.

9 Rain water harvesting for roof run-off and surface run-off as plan submitted should be implemented. Before recharging the surface runoff, pre-treatment must be done to remove suspended matter, oil and grease. The bore well for rain water recharging should be kept at least 5 mtr. Above the highest ground water table.

18 numbers of rain water harvesting pits with two wells in each have been provided. Oil & Grease trap is provided in the rainwater harvesting system to remove oil & grease from the surface runoff and de-silting chamber is provided to remove the suspended matter. Bore wells kept at 5m above the ground water table.

10 The ground water level and its quality should be monitored regularly in Consultation with Central Ground Water Authority.

Regular monitoring of ground water quality is being done.

11 There should be no traffic congestion near the entry and exit points for the road adjoining the proposed project site must be avoided. Parking should be fully internalized and no public space should be utilized.

There is no traffic congestion near the entry and exit points due to separate entry and exit points, Wide roads have been developed as to avoid congestion in traffic. Parking is fully internalized. The adequate space has been given for parking of vehicles.

12 A report on the energy conservation measures conforming to energy conservation norms finalize by Bureau of Energy Efficiency should be prepared incorporating details about building materials and technology, R & U Factors etc. and submit to the IA Division of Environment Department, Haryana in three months time.

The energy conservation measures have already been submitted to SEIAA along with Form I, IA.

13 Energy conservation measures like installation of CFLs/ TELs for lighting the areas outside the building should be integral part of the project design and should be in place before project commissioning. Used CFLs and TFLs should be properly collected and disposed off/ sent for recycling as per the prevailing guidelines/ rules of the regulatory authority to avoid mercury contamination. Use of solar panels may be done to extent possible.

The CFLs/ TFLs are being used for lightening purposes at common areas. The used CFLs are properly collected and handed over to the authorized e-waste recyclers.

14 The solid waste generated should be properly collected and segregated as per the requirement of the MSW Rules 2000. The project proponent will subject the solid waste generated from the complex to the following process with in the complex site. A. Segregation into biodegradable and non biodegradable solid waste. B. In situ composting of the biodegradable waste at the compost pits. C. Transportation of non-biodegradable waste to an authorized dumping site/solid waste management plan.

Solid wastes generated at the project site is segregated into biodegradable and non-biodegradable components and collected in separate bins. Both biodegradable and non-biodegradable wastes are disposed off through authorized vendors for recycling of non-biodegradable wastes and disposal of biodegradable waste as per the Municipal Solid Wastes (Management and Handling) Rules, 2000.

15 The provision of the solar water heating system shall be as per the norms specified by HAREDA and

Solar panels for water heating have been provided by the project proponent as per the norms specified by HAREDA.

Page 5: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 5 of 24

5

S. No Conditions of Environmental Clearance Status of Compliance shall be made operational in each building block

16 The project will be operationalized only after the permission obtained from CGWA for the abstraction of ground water or after the commissioning of infrastructure for supply of water by HUDA.

Fresh water is being procured through water connection provided by HUDA. Ground water shall only be used after obtaining permission of CGWA.

PART B – GENERAL CONDITIONS

S. No.

Conditions of Environmental Clearance Status of Compliance

1 The environmental safeguards contained in the EIA/EMP should be implemented in letter and spirit.

The environmental safeguards contained in the Form 1 & 1A/ EMP are being implemented during operation phase of the project.

2 Six-monthly monitoring reports should be submitted to the HSPCB and Regional Office, MOEF, GOI, Northern Region, Chandigarh and a copy to the Regulatory Authority of Haryana.

Six monthly monitoring reports are being submitted timely in every six months to the Regional Office of MoEF, GOI and HSPCB office.

3 The project proponent will send one copy of EMP Report to Additional Director, Regional Office, MOEF, GOl, Sec 31, Chandigarh and to the Chairman Haryana State Pollution Control Board, Panchkula for their reference.

Complied with.

4 The SEIAA, Haryana reserves the right to add additional safeguards measures subsequently, if found necessary, Environmental clearance granted will be revoked if it is found that false information has been given for getting approval of this project.

Any additional environmental safeguard measures if added by SEIAA, Haryana that will be implemented by us in true sprit.

5 All other statutory clearances such as the approvals for storage of diesel from Chief Controller of Explosives, Fire Department, Civil Aviation Depart, Forest Conservation Act, 1980 and Wildlife (Protection) Act 1972 etc. shall be obtained, as applicable by project proponents from the respective authorities.

All statutory clearances as applicable have been obtained/shall be obtained.

6 These stipulations would be enforced among others ,under the provisions of Water (Prevention and Control of Pollution) act, 1981, the Environment (Protection) Act, 1986, the Public Liability( Insurance) Act,1991, Forest Conservation Act, 1980 and EIA notification 2006.

The project is functioning under all the guidelines under the Water (Prevention and Control of Pollution) Act, 1974, the Air (Prevention and Control of Pollution) Act, 1981, the Environment (Protection) Act, 1986 and the Public Liability (Insurance) Act, 1991.

7 The project proponent will not violate any judicial orders/ pronouncement issued by the Hon’ble Supreme Court/High Courts.

The project proponent is not violating any judicial orders/ pronouncement issued by the Hon’ble Supreme/High Courts.

Page 6: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 6 of 24

6

DETAILS OF ENVIRONMENTAL MONITORING

Study Period: This report is prepared for the period of October 2015 to March 2016 as per EC conditions. Post Environmental Clearance Monitoring was carried out during February 2016. The samples were analyzed at NABL approved Environmental laboratory named Vardan Enviro Lab, Gurgaon. Following environmental components has been monitored and analyzed.

1. Ambient Air Quality 2. DG Stack Emission 3. Noise Quality 4. DG Noise Monitoring 5. Water Quality 6. Waste Water 7. Soil Quality

3.1 AMBIENT AIR QUALITY MONITORING 3.1.1 Ambient Air Quality Monitoring Stations

Ambient air quality monitoring has been carried out at three locations to assess the ambient air quality of the project site. This will enable to have a comparative analytical understanding about air quality and the changes in the air environment in the study area with respect to the condition prevailing. The locations of the ambient air quality monitoring stations are given in Table 2.1.

Table 3.1 Details of Ambient Air Quality Monitoring Stations

S. No. Location Code Location Name/ Description Environmental Setting

1. AAQ-1 Near Main Gate Residential

2. AAQ-2 Centre of the Project Residential

3. AAQ-3 Backside of the Project Residential

AAQ-1: Near Main Gate The sampler was placed near main gate. Vicinity represents residential environmental setting.

AAQ-2: Centre of the Project The sampler was placed within boundary of the project. Vicinity represents residential environmental setting. AAQ-3: Backside of the Project The sampler was placed within boundary of the project. Vicinity represents residential environmental setting

3

Page 7: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 7 of 24

7

3.1.2 Ambient Air Quality Monitoring Methodology

Monitoring was conducted in respect of the following parameters: Particulate Matter 2.5 (PM 2.5) Particulate Matter 10 (PM 10) Sulphur Dioxide (SO2) Oxides of Nitrogen (NOx) Carbon Monixide (CO) The duration of sampling of PM 2.5, PM10, SO2 and NOx were 24 hourly continuous monitoring this is to allow a comparison with the National Ambient Air Quality Standards. This is to allow a comparison with the National Ambient Air Quality Standards. The air samples were analyzed as per standard methods specified by Central Pollution Control Board (CPCB) and IS: 5182. The techniques used for ambient air quality monitoring and minimum detectable levels are given in Table 3.2. Fine Particulate Sampler APM 250 instruments have been used for monitoring Particulate Matter 2.5 (PM2.5 i.e. <2.5 microns), and Respirable Dust Sampler APM 860 was used for sampling Respirable fraction (<10 microns), gaseous pollutants like SO2, and NOx. Bladder and Aspirator bags were used for collection Carbon monoxide samples. Gas Chromatography techniques have been used for the estimation of CO.

Table 3.2 Techniques used for Ambient Air Quality Monitoring

S. No. Parameter Technique Technical Protocol 1 Particulate Matter 2.5 Fine Particulate Sampler, Gravimetric Method CPCB/MOEF Guidelines

2 Particulate Matter 10 Respirable Dust Sampler, with cyclone separator, Gravimetric Method IS-5182 (Part-23)

3 Sulphur dioxide Modified West and Gaeke IS-5182 (Part- II) 4 Oxides of Nitrogen Jacob & Hochheiser IS-5182 (Part-VI) 5. Carbon Monoxide Gas Chromatography IS-5182 (Part-X)

3.1.3 Ambient Air Quality Monitoring Results

The detailed on-site monitoring results of PM 2.5, PM 10, SO2, NOx and CO are presented in Table 3.3.

Table 3.3 Ambient Air Quality Monitoring Results

S. No. Parameter Test Result Protocol NAAQS*

Limit AAQ1 AAQ2 AAQ3

1. Particulate Matter (PM2.5), g/m3 40.61 42.10 46.61 PM2.5 sampler

(Gravimetric) 60

2. Particulate Matter (PM10), g/m3 85.94 88.95 89.51 IS: 5182 (P-23),

2006 100

3. Nitrogen Dioxide (NO2), g/m3 35.75 33.88 33.41 IS: 5182 (P-6), 1975

Reffirmed-1998 80

4. Sulphur Dioxide (SO2), g/m3 16.45 16.74 17.10 IS: 5182 (P-2), 2001 80

5. Carbon Monoxide (CO) mg/m3 0.88 0.79 0.81 IS: 5182 (P-10),

1999 4

Page 8: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 8 of 24

8

Figure 2.1 Location-wise Variation of Ambient Air Quality (PM2.5, PM10, SOX, NOX)

Figure 2.2 Location-wise Variation of CO in Ambient Air Quality 3.1.4 Discussion on Ambient Air Quality in the Study Area

PM10 and PM2.5 levels at the project site are within the permissible limit of 100 μg/m3 and 60 μg/m3 respectively (for residential, rural and other areas as stipulated in the National Ambient Air Quality Standards). SO2, NOx and CO was observed within the corresponding stipulated limits (Limit for SO2 and NOx: 80 g/m3 and limit for CO: 4.0g/m3) at all monitoring locations. Station wise variation of ambient air quality parameters has been pictorially shown in Figure 3.1 & 3.2

AAQ1 AAQ2 AAQ3 limits

Pm2.5 40.61 42.1 46.61 60pm10 85.94 88.95 89.51 100no2 35.75 33.88 33.41 80so2 16.45 16.74 17.1 80

0

20

40

60

80

100

120

AAQ1 AAQ2 AAQ3 limits

co 0.88 0.79 0.81 4

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

Page 9: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 9 of 24

9

3.2 Stack Emission Monitoring

Table 3.4 Details of Stack Emission Monitoring Stations

S. No. Location Code Description 1. DG1 1010 KVA 2. DG2 1010KVA 3. DG3 1010 KVA 4. DG4 380 KVA 6. DG6 1010 KVA

Table 3.5 Stack Emission Monitoring Results

Location- DG-1

S. No. Parameters Protocol Units Results Limits (As Per CPCB)

1. Particulate Matter (PM) at 15 % O2 Gravimetric Method mg/Nm3 46.20 75

2. Oxides of Nitrogen (as NO2) at 15 % O2 PDA Method ppmv 88.10 710

3. NMHC (as C) at 15% O2 By Gas Chromatography mg/Nm3 5.40 100

4. Carbon Monoxide at 15% O2 By Gas Chromatography mg/Nm3 9.41 150

Table 3.6 Stack Emission Monitoring Results

Location- DG-2

S. No. Parameters Protocol Units Results Limits (As Per CPCB)

1. Particulate Matter (PM) at 15 % O2 Gravimetric Method mg/Nm3 40.60 75

2. Oxides of Nitrogen (as NO2) at 15 % O2 PDA Method ppmv 93.10 710

3. NMHC (as C) at 15% O2 By Gas Chromatography mg/Nm3 4.64 100

4. Carbon Monoxide at 15% O2 By Gas Chromatography mg/Nm3 7.91 150

Table 3.7 Stack Emission Monitoring Results

Location- DG-3

S. No. Parameters Protocol Units Results

Limits (As Per CPCB)

1. Particulate Matter (PM) at 15 % O2 Gravimetric Method mg/Nm3 43.10 75

2. Oxides of Nitrogen (as NO2) at 15 % O2 PDA Method ppmv 89.60 710

3. NMHC (as C) at 15% O2 By Gas Chromatography mg/Nm3 3.50 100

4. Carbon Monoxide at 15% O2 By Gas Chromatography mg/Nm3 8.12 150

Page 10: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 10 of 24

10

Table 3.8 Stack Emission Monitoring Results

Location- DG-4 S.

No. Parameters Protocol Units Results Limits (As Per CPCB)

1. Particulate Matter (PM) Gravimetric Method g/kW - hr 0.08 ≤ 0.2

2. Oxides of Nitrogen (as NOX) PDA Method g/kW - hr 1.01 ≤ 4.0

3. Hydrocarbons (HC) By Gas Chromatography g/kW - hr 0.26

4. Carbon Monoxide By Gas Chromatography g/kW - hr 1.48 ≤ 3.5

Table 3.9 Stack Emission Monitoring Results Location- DG-5

S. No. Parameters Protocol Units Results Limits (As Per CPCB)

1. Particulate Matter (PM) at 15 % O2 Gravimetric Method mg/Nm3 49.28 75

2. Oxides of Nitrogen (as NO2) at 15 % O2 PDA Method ppmv 90.60 710

3. NMHC (as C) at 15% O2 By Gas Chromatography mg/Nm3 3.95 100

4. Carbon Monoxide at 15% O2 By Gas Chromatography mg/Nm3 7.60 150

Table 3.10 Stack Emission Monitoring Results Location- DG-6

S. No. Parameters Protocol Units Results Limits

(As Per CPCB)

1. Particulate Matter (PM) Gravimetric Method g/kW - hr 0.03 ≤ 0.2

2. Oxides of Nitrogen (as NOX) PDA Method g/kW - hr 1.61 ≤ 4.0

3. Hydrocarbons (HC) By Gas Chromatography g/kW - hr 0.36

4. Carbon Monoxide By Gas Chromatography g/kW - hr 1.40 ≤ 3.5

Page 11: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 11 of 24

11

3.3 AMBIENT NOISE MONITORING

3.3.1 Ambient Noise Monitoring Locations The main objective of noise monitoring in the study area is to assess the present ambient noise levels in project site & project boundary due to various construction allied activities and increased vehicular movement. A preliminary reconnaissance survey has been undertaken to identify the major noise generating sources in the area. Ambient noise monitoring was conducted at three locations at the boundary of the project site as given in Table 3.12.

Table 3.12 Details of Ambient Noise Monitoring Stations

S. No. Location Code Location Name/ Description Present Land use 1. N1 Near Project Site Residential 2. N2 Centre of the Project Residential 3. N3 Backside of the Project Residential

3.3.2 Methodology of Noise Monitoring

Noise levels were measured using integrated sound level meter manufactured by Quest Technologies. The integrating sound level meter is an integrating/ logging type with Octave filter attachment with frequency range of 31.5 to 16000 Hz. This instrument is capable of measuring the Sound Pressure Level (SPL), Leq and octave band frequency analysis. Noise level monitoring was carried out continuously for 24-hours with one hour interval starting at 06:00 hrs to 06:00 hrs next day. The noise levels were monitored on working days only. During each hour Leq were directly computed by the instrument based on the sound pressure levels. Monitoring was carried out at ‘A’ response and fast mode.

3.3.3 Ambient Noise Monitoring Results The location wise ambient noise monitoring results is summarized in Table 3.13. The location-wise variation of noise levels are graphically presented in Figure 3.3.

Table 3.13 Ambient Noise Monitoring Results

Parameter

Location Code

N1 N2 N3

Day Time Night Time Day Time Night Time Day Time Night Time

Lmax 61.20 52.40 61.50 52.50 59.80 52.50

Lmin 47.30 40.50 46.40 38.30 45.50 41.10

Leq 53.20 44.50 52.40 42.70 54.60 43.60

CPCB Limits in dB(A) Leq

(Residential Area) 55.00 45.00 55.00 45.00 55.00 45.00

Page 12: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 12 of 24

12

Figure 3.3 Location-wise Variation of Ambient Noise Levels

3.3.4 Discussion on Ambient Noise Levels in the Study Area

Day Time Noise Levels (Lday): The day time noise level at all the locations were found to within limits prescribed for residential area i.e. 55 dB (A). Night Time Noise Levels (Lnight): The night time noise level at all the locations were found to within limit prescribed for residential area i.e. 45 dB (A).

Day Time Night Time Day Time Night Time Day Time Night Time

Lmax 61.2 52.4 61.5 52.5 59.8 52.5

Lmin 47.3 40.5 46.4 38.3 45.5 41.1Leq 53.2 44.5 52.4 42.7 54.6 43.6Limits 55 45 55 45 55 45

0

10

20

30

40

50

60

70

Page 13: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 13 of 24

13

3.4 DG Noise Monitoring

Table 3.14 Details of DG Noise Monitoring Stations

S. No. Location Code Location Name

1. PSN1 Near D.G Set (1010 KVA) (H- Tower)

2 PSN2 Near D.G Set (1010 KVA) (H- Tower)

3 PSN3 Near D.G Set (1010 KVA) (H- Tower)

4 PSN4 Near D.G Set (380 KVA) (H- Tower)

5 PSN5 Near D.G Set (380 KVA) (Q- Tower)

Table 3.15 DG Noise Monitoring Results (Near DG Set (H-Tower)

S. No. Parameters Protocol

Results dB (A)

1. Leq Indian Standard:9989 71.30

2. Lmin Indian Standard:9989 65.60

3. Lmax Indian Standard:9989 78.30

4. CPCB Limits in dB(A) - 75.00

S. No. Parameters Protocol

Results dB (A)

1. Leq Indian Standard:9989 74.60

2. Lmin Indian Standard:9989 62.60

3. Lmax Indian Standard:9989 77.20

4. CPCB Limits in dB(A) - 75.00

Page 14: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 14 of 24

14

Table 3.15 DG Noise Monitoring Results (Near DG Set (H-Tower)

S. No. Parameters Protocol

Results dB (A)

1. Leq Indian Standard:9989 74.10

2. Lmin Indian Standard:9989 64.20

3. Lmax Indian Standard:9989 78.60

4. CPCB Limits in dB(A) - 75.00

Table 3.15 DG Noise Monitoring Results (Near DG Set (H-Tower)

S. No. Parameters Protocol

Results dB (A)

1. Leq Indian Standard:9989 72.40

2. Lmin Indian Standard:9989 66.20

3. Lmax Indian Standard:9989 79.20

4. CPCB Limits in dB(A) - 75.00

Table 3.15 DG Noise Monitoring Results (Near DG Set (H-Tower)

S. No. Parameters Protocol

Results dB (A)

1. Leq Indian Standard:9989 70.40

2. Lmin Indian Standard:9989 66.10

3. Lmax Indian Standard:9989 77.60

4. CPCB Limits in dB(A) - 75.00

Table 3.16 DG Noise Monitoring Results (Near DG Set (H-Tower)

Page 15: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 15 of 24

15

3.5 WATER QUALITY MONITORING

3.5.1 Water Quality Monitoring Locations Keeping in view the importance of water as an important source to the local population, sample of water was collected near the project site for the assessment of impacts of the project on the water quality. Water sample was collected from the project site. The sample was analyzed for various parameters to compare with the standards for drinking water as per IS: 10500 for water sources. The details of water sampling locations are given in Table 3.17.

Table 3.17 Details of Water Quality Monitoring Station

S. No. Location Code Location Name/ Description

1. DW 1 Project Site

3.5.2 Methodology of water Quality Monitoring

Sampling of water was carried out on February 2016. Samples were collected as grab sample and sampling forms are filled in as per the sampling plan. The preservative sample were properly added to preserve as per standard operating procedures (SOP) and stored immediately in ice boxes, which were ensured for appropriate temperatures. Sample for chemical analysis was collected in polyethylene carboys. Sample collected for metal content were acidified to <2 pH with 1 ml HNO3. A sample for bacteriological analysis was collected in sterilized glass bottles. Soon after the completion of sampling, chain of custody sheets for the samples are filled in and then they were transported by road to Vardan EnviroLab, Gurgaon for further analysis. Proper care was taken during packing and transportation of samples. All the samples reached the central laboratory within the holding times for different parameters. After ensuring the same the samples were forwarded immediately for analysis.

The samples were analyzed as per the standard procedures specified in 'Standard Methods for the Examination of Water and Wastewater' published by American Public Health Association (APHA) and CPCB. The analytical techniques and the test methods adopted for testing of water are given in Table 3.18.

Page 16: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 16 of 24

16

3.5.3 Water Quality Monitoring Results The detailed water quality monitoring results are presented in Table 3.18.

Table 3.18 Water Quality Monitoring Results

S. No. Parameter Test-Method Result Unit Limits of IS:10500 -2012

Desirable Permissible limit

1. pH (at 25 0C) APHA 22nd Edition, 4500-H+ B 7.51 -- 6.5 to 8.5 No Relaxation

2. Colour APHA 22nd Edition, 2120 B BDL (DL 5Hazen) Hazen 5 15

3. Turbidity APHA 22nd Edition, 2130 B BDL (DL 1 NTU) NTU 1 5

4. Odour APHA 22nd Edition, 2150 B Agreeable -- Agreeable Agreeable

5. Taste APHA 22nd Edition, 2160 B Agreeable -- Agreeable Agreeable

6. Total Hardness as CaCO3 APHA 22nd Edition, 2340 C 31.52 mg/l 200 600

7. Calcium as Ca APHA 22nd Edition, 3500 Ca B 9.45 mg/l 75 200

8. Alkalinity as CaCO3 APHA 22nd Edition, 2320 B 36.18 mg/l 200 600

9. Chloride as Cl APHA 22nd Edition, 4500-Cl- B 17.30 mg/l 250 1000

10. Cyanide as CN APHA 22nd Edition, 4500 CN- D BDL(DL 0.02 mg/l) mg/l 0.05 No Relaxation

11. Magnesium as Mg APHA 22nd Edition, 2340 B 1.92 mg/l 30 100

12. Total Dissolved Solids APHA 22nd Edition, 2540 C 59.0 mg/l 500 2000

13. Sulphate as SO4 APHA 22nd Edition, 4500 E 1.10 mg/l 200 400

14. Fluoride as F APHA 22nd Edition, 4500-F- D 0.09 mg/l 1.0 1.5

15. Nitrate as NO3 IS 3025 (P-34) 1988 0.26 mg/l 45 No Relaxation

16. Iron as Fe APHA 22nd Edition, 3500-Fe B 0.61 mg/l 0.3 No relaxation

17. Aluminium as Al APHA 22nd Edition, 3111 B BDL(DL 0.03 mg/l) mg/l 0.03 0.2

18. Boron APHA 22nd Edition, 4500B C BDL(DL 0.01 mg/l) mg/l 0.5 1

19. Chromium as Cr APHA 22nd Edition, 3111 B BDL(DL 0.01 mg/l) mg/l 0.05 No Relaxation

20. Phenolic Compounds APHA 22nd Edition, 5530 C BDL(DL 0.001 mg/l) mg/l 0.001 0.002

21. Mineral Oil Clause 6 of IS:3025(Part 39) BDL(DL 0.01mg/l) mg/l 0.5 No Relaxation

22. Anionic Detergents as APHA 22nd Edition, 5540 C BDL(DL 0.02 mg/l) mg/l 0.2 1.0

23. Zinc as Zn APHA 22nd Edition, 3111 B BDL(DL 0.02 mg/l) mg/l 5 15

24. Copper as Cu APHA 22nd Edition, 3111 B BDL(DL 0.02 mg/l) mg/l 0.05 1.5

25. Manganese as Mn APHA 22nd Edition, 3111 B BDL(DL 0.10 mg/l) mg/l 0.1 0.3

26. Cadmium as Cd APHA 22nd Edition, 3111 B BDL(DL 0.001 mg/l) mg/l 0.003 No Relaxation

27. Lead as Pb APHA 22nd Edition, 3111 B BDL(DL 0.01mg/l) mg/l 0.01 No Relaxation

28. Selenium as Se APHA 22nd Edition, 3111 B BDL(DL 0.01 mg/l) mg/l 0.01 No Relaxation

29. Arsenic as As APHA 22nd Edition, 3111 B BDL(DL 0.01 mg/l) mg/l 0.01 No Relaxation

30. Mercury as Hg APHA 22nd Edition, 3111 B BDL (DL 0.001 mg/l) mg/l 0.001 No Relaxation

31. Total Coliform IS 1622,1981(Reaffirmed 2003) Absent MPN/100ml - 10.00

32. E. Coli IS 1622,1981(Reaffirmed 2003) Absent MPN/100ml Absent Absent

Page 17: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 17 of 24

17

2.5.4 Discussion on Groundwater Quality in the Study Area

The water quality in the project area is observed to be alkaline in nature with total alkalinity reaching up to 36.18 mg/L in drinking water taken from project site against desirable limit of 200 mg/L, however, alkalinity is lower than the permissible limit of 600 mg/L. Total dissolved solids in the in drinking water is 59.00 mg/L which is lower than the prescribed limit of 500 mg/L. However, remaining parameters are within the CPCB prescribed limits. Heavy Metals which are considered to be the very risky contaminants were found below detection limit. The microbiological contaminants (E. Coli and Total Coliform) are absent in water sample taken from the project site.

Page 18: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 18 of 24

18

3.6 Waste Water 3.6.1 Waste Water Quality Monitoring Locations

Sampling of STP water was carried out on February2016. Samples were collected as grab sample and sampling forms are filled in as per the sampling plan. The preservative sample were properly added to preserve as per standard operating procedures (SOP) and stored immediately in ice boxes, which were ensured for appropriate temperatures. Soon after the completion of sampling, chain of custody sheets for the samples are filled in and then they were transported by road to Vardan Enviro Lab, Gurgaon for further analysis. Proper care was taken during packing and transportation of samples. All the samples reached the central laboratory within the holding times for different parameters. After ensuring the same the samples were forwarded immediately for analysis.

The samples were analyzed as per the standard procedures specified in 'Standard Methods for the Examination of Water and Wastewater' published by American Public Health Association (APHA) and CPCB. The analytical techniques, the test methods adopted for testing of STP water & results are given below Table 3.21 and 3.22

Table 3.20 Details of Waste Water Quality Monitoring

S. No. Location Code Location Name/ Description

1. WW 1 From the STP Inlet

2. WW2 From the STP Outlet 3.6.2 Waste water result

Table: 3.21 STP Inlet Result

Table: 3.22 STP Outlet Result

S. No. Parameter Protocol Result Units

1. pH (at 25 0C) APHA 22nd Edition, 4500-H+ B 8.10 --

2. COD APHA 22nd Edition, 5220 B 410.50 mg/l

3. BOD (3 Days at 27 0C) IS 3025,P-44,1999 (Reaffirmed 2003) 135.00 mg/l

4. Total Suspended Solids APHA 22nd Edition, 2540 D 450.00 mg/l

5. Oil and Grease APHA 22nd Edition, 5220 E 17.50 mg/l

S. No. Parameter Protocol Result Units Limit as Per

CPCB

1. pH (at 25 0C) APHA 22nd Edition, 4500-H+ B 7.63 -- 6.5-8.5

2. COD APHA 22nd Edition, 5220 B 77.10 mg/l 250

3. BOD (3 Days at 27 0C) IS 3025,P-44,1999 (Reaffirmed 2003) 24.61 mg/l 30

4. Total Suspended Solids APHA 22nd Edition, 2540 D 56.30 mg/l 100

5. Oil and Grease APHA 22nd Edition, 5220 E 1.26 mg/l 10

Page 19: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 19 of 24

19

3.7 SOIL MONITORING

3.7.1 Soil Monitoring Locations

The objective of the soil monitoring is to identify the impacts of ongoing project activities on soil quality and also predict impacts, which have arisen due to execution of various constructions allied activities. Accordingly, a study of assessment of the soil quality has been carried out. To assess impacts of ongoing project activities on the soil in the area, the Physico-chemical characteristics of soils were examined by obtaining soil samples from selected points and analysis of the same. Single sample of soil was collected from the project site for studying soil characteristics, the location of which is listed in Table 3.23.

Table 3.23 Details of Soil Quality Monitoring Location

S. No. Location Code Location Name/ Description

1. S1 Near Project Site

3.7.2 Methodology of Soil Monitoring The sampling has been done in line with IS: 2720 & Methods of Soil Analysis, Part-1, 2nd edition, 1986 of American Society for Agronomy and Soil Science Society of America. The homogenized samples were analyzed for physical and chemical characteristics (physical, chemical and heavy metal concentrations). The soil samples were collected in the month of February 2016. The samples have been analyzed as per the established scientific methods for Physico-chemical parameters. The heavy metals have been analyzed by using Atomic Absorption Spectro-photometer

3.7.3 Soil Monitoring Results

Single sample of soil is collected from the site to check the quality of soil of the study area .The Physico-chemical characteristics of the soil, as obtained from the analysis of the soil sample, are presented in Table 2.24.

Page 20: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 20 of 24

20

Table 2.24 Physico-Chemical Characteristics of Soil in the Study Area

3.7.4 Discussion on Soil Characteristics in the Study Area The soil in study area is characterized by moderate organic content. The soil quality in the project area has not been affected by the project activities.

S. No. Parameter Protocol Result Unit

1. pH (at 25 0C) IS : 2720 (P-26,1987) 8.14 --

2. Conductivity IS:14767-2000 Reaffirmed 2006 0.385 mS/cm

3. Soil Texture USDA Method, 1968 Silty --

4. Color USDA Method, 1968 Yellowish Brown --

5. Water holding capacity USDA Method, 1968 35.20 %

6. Bulk density USDA Method, 1968 1.39 gm/cc

7. Chloride as Cl USDA Method, 1968 38.41 mg/100gm

8. Calcium as Ca USDA Method, 1968 20.36 mg/100gm

9. Sodium as Na USDA Method, 1968 13.51 mg/100gm

10. Potassium as K USDA Method, 1968 85.41 kg/hec.

11. Organic Matter IS:2720 (P-22, 1972) 0.36 %

12. Magnesium as Mg USDA Method, 1968 7.98 mg/100gm

13. Available Nitrogen as N IS:14684, 1999 162.25 kg./hec.

14. Available Phosphorus USDA, APHA-4500PC 42.12 kg./hec.

15. Zinc as Zn APHA-3030D, APHA-3111B 1.85 mg/100gm

16. Manganese as Mn APHA-3030D, APHA-3111B 0.61 mg/100gm

17. Chromium as Cr APHA-3030D, APHA-3111B 0.79 mg/100gm

18. Lead as Pb APHA-3030D, APHA-3111B 1.56 mg/100gm

19. Cadmium as Cd APHA-3030D, APHA-3111B 2.34 mg/100gm

20. Copper as Cu APHA-3030D, APHA-3111B 3.15 mg/100gm

Page 21: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 21 of 24

21

2.8 Site Photographs

Plate 1: Project Site (New Town Heights, Sector-90, Gurgaon (HR)

Page 22: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 22 of 24

22

Plate 2: Ambient Air Quality Monitoring

Page 23: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 23 of 24

23

Plate 3; Ambient Noise Level Monitoring

Plate4: Waste Water Sampling

Page 24: Project: “DLF New Town Heights”, Residential Group …nromoef.gov.in/SMPR/25102016/43.pdf · project proponent as per the norms specified by HAREDA. Project: “DLF New Town Heights”,

Project: “DLF New Town Heights”, Residential Group Housing Project, Sector-90, Gurgaon Half-yearly Compliance Report of EC Conditions Page 24 of 24

24

Plate 6: Soil Sampling