project description: lakeshore gold 144 project ... · project description: lake shore gold 144...

4
Project Description: Lake Shore Gold 144 Project (Permission to Test Mineral Content) Project Summary MNDM received applications from Lakeshore Gold Corporation on March 4 th , 2015 for a Permission to Test Mineral Content (bulk sample). The request is for a proposed bulk sample of up to 50,000 tonnes of ore from the 144 Property located within mining claims 1159640 and 1159637. The project site is located 20 kilometres west of Timmins, Ontario in Thornloe and Bristol townships (Figure 1). Figure 1: Regional Map 1

Upload: others

Post on 19-May-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project Description: Lakeshore Gold 144 Project ... · Project Description: Lake Shore Gold 144 Project (Permission to Test Mineral Content) Project Summary MNDM received applications

Project Description: Lake Shore Gold 144Project (Permission to Test MineralContent)

Project Summary MNDM received applications from Lakeshore Gold Corporation on March 4th, 2015 for a Permission to Test Mineral Content (bulk sample). The request is for a proposed bulk sample of up to 50,000 tonnes of ore from the 144 Property located within mining claims 1159640 and 1159637. The project site is located 20 kilometres west of Timmins, Ontario in Thornloe and Bristol townships (Figure 1).

Figure 1: Regional Map

1

Page 2: Project Description: Lakeshore Gold 144 Project ... · Project Description: Lake Shore Gold 144 Project (Permission to Test Mineral Content) Project Summary MNDM received applications

The applicant is proposing to extract the bulk sample from the existing Thunder Creek underground workings of the Timmins West Complex mine site by driving the Thunder Creek (underground) ramp in a westerly direction for about 1060 metres. Appendix 1 contains a map that identifies the proposed exploration drift and mining claims.

No additional surface infrastructure is required and no surficial impacts to the environment are expected.

Setting The Timmins West Complex is presently zoned as Residential Rural by the City of Timmins and is suitable for agriculture, forestry and mining land uses. The Mine site is situated over a bedrock outcrop and adjoining lands within the lower Thunder Creek watershed.

Thunder Creek itself flows east across the Property and reports to the Tatachikapika River, which is located approximately 1.5 kilometres downstream of the Property boundary. The Tatachikapika River eventually drains into the Mattagami River.

The 144 Property is situated in a low-lying swampy area with no known recreational or other defined land use at present.

Existing Studies A Stage 1 Archaeological and Cultural Resource Study that encompassed the 144 Property was conducted in 2006. The study indicated that there are no cultural heritage resources within the property boundary. A baseline Terrestrial Biological Study and a baseline Aquatic Biological Study were conducted in 2007. The studies indicated that there are no biological environment concerns, including species at risk.

Relevant Mining History The purpose of the operating Timmins West Complex is to further explore and extract ore from the Timmins West and Thunder Creek Gold Deposits, and potentially additional deposits, via underground mine workings that are accessed by a vertical shaft and a decline ramp.

Class Environmental Assessment This project has been screened to a Category B in accordance with the Ministry of Northern Development and Mines’ A Class Environmental Assessment for MNDM’s Activities under the Mining Act (Class EA). As the entire project is being conducted underground the potential negative environmental effects of the proposed project are expected to be minimal.

Pending the completion of the Class EA process, the applicant anticipates that the exploration drift will be completed by September 2015.

2

Page 3: Project Description: Lakeshore Gold 144 Project ... · Project Description: Lake Shore Gold 144 Project (Permission to Test Mineral Content) Project Summary MNDM received applications

Appendix 1: Proposed 144 Exploration Drift

3

Page 4: Project Description: Lakeshore Gold 144 Project ... · Project Description: Lake Shore Gold 144 Project (Permission to Test Mineral Content) Project Summary MNDM received applications

3000 458000 4000 5000 460000 6000

Map Legend 101 P9580 P499935 P9391 P9581

Timmins W est Mine P18749 P18750P499938 P18751 ¯ P499934 River P26393

Lake P26395 Wetland Utility Line P26398 P9389 Primary R oad P4227 Secondary R oad

P4039 Tertiary Road P4040 Timmins M ine Closure Plan Boundary

Timmins W est Property B oundary P9392 P9393 Patented Leased Claims

Staked Claims 101 Mafic I ntrusive

Mafic V olcanics 144 P26396 Chemical Sediments Porphyritic Syenite P26397 Hypabyssal_Rocks

Felsic V olcanics P19098 1176341 P9586

Ultramafic V olcanic

Ultramafic I ntrusive P9587 Metasediments

Intermediate Volcanics P495307

1201162 P18918 Approximate Underground 764945 P19099 1177822 Workings

1181995 1189528 B B R R I I S S T T O O L L P18916 P18917 3004044 101P18913

P495308 P19100

P495309

1189580 Proposed 1441159640 1159641 Exploration Drift

P19678 P19679 P10920

530884 1189592

1159638 1181409 649965 144 1159637

1189886

1193477 583234 P10921

£¤

649964 1159635 1159636 1159639 Proposed 144

1:10,000 Exp loration Drift & Trail

Date: June 16, 20150 250 500 1177821 649963 1159642 1159643 Meters 1189553 923646 923647 930782 File: prop_exploration_dr930783 ift_feb2015.mxd 930784 3000 458000 4000 5000 460000 6000

£¤

£¤

£¤

£¤

!

6000

53

5800

0 70

00

8000

6000

5358

000

7000

8000