project 1 (cprb 413 / cgnb 413) briefing
DESCRIPTION
Project 1 (CPRB 413 / CGNB 413) Briefing. By: COIT Undergraduate Project Committee. Why do you need to do project?. Apply knowledge that has been learned in class. Gain experience in developing a system. Learn something new. To create a sample of your work. Requirement to get a degree. - PowerPoint PPT PresentationTRANSCRIPT
Project 1 (CPRB 413 / CGNB 413) Briefing
By:COIT Undergraduate Project
Committee
Why do you need to do project?
Apply knowledge that has been learned in class.
Gain experience in developing a system.
Learn something new. To create a sample of your work. Requirement to get a degree.
Project 1 Activities Find and register for a project
Pick our project Propose your own project
Submit an initial report Keep a logbook Set a meeting with supervisor every week Discuss with examiner at least once Write the draft report Perform presentation Write the final report
Where to get the project titles?
Go to the following URL: http://sephiroth/spmsv2
After you have chosen the projects that you are interested in, go and see the lecturer who proposed the project for further discussion.
The lecturer will register you for the project.
Project Guidelines
There are two guidelines that you need to obtain. COIT Project Guidelines Report Writing Guidelines
Both documents can be obtained from http://sephiroth/spmsv2
Project Categories
There are four project categories: Systems and Networking Software Engineering Graphics and Multimedia Information Systems
Students may only take projects that belong to their specialization.
How do you propose your own project?
Write a brief proposal containing the following information: Project title A brief description on what you are going
to implement Objectives and scopes Outcome of the project
The proposed topic must be related to your specialization.
Find a lecturer who is willing to supervise your project. Preferably a lecturer who belongs to your
department
Minimum Standard
All projects must at least achieve the minimum standard as outlined in Appendix A in the guideline.
Each project category has its own minimum standard.
Will be explained further in the breakout session after this.
Initial Report A small write up (around 2 to 3 page)
that contain the plan for the whole project.
Should be agreed upon by both student and supervisor.
Contents: Project title Brief description Objectives and scopes Expected outcome Gantt Chart
Logbook Each student is required to keep a
logbook (can be obtained from http://sephiroth/spmsv2/).
All your progress must be written in the logbook.
Bring the logbook during your meeting with supervisor. Supervisor need to read and sign your
logbook. At the end of the semester, if there are
less than SIX signatures, your supervisor has the right to give you an E.
Project 1 vs. Project 2 The actual scope for project 1 and project 2
depends on the methodology used. Example 1: Waterfall Model
Project 1: Literature review, user requirements, system design.
Project 2: Implementation, testing. Example 2: Prototyping Model
Project 1: Literature review, system design (maybe partially), prototype 1, prototype testing.
Project 2: More design, prototype 2 (or more), final product, testing.
Discuss expected deliverables (for both Project 1 and 2) with your supervisor.
Project 1 Evaluation
Marks will be given by your project supervisor and your examiner.
Marks allocation:
60%Report
30%Presentation
10%Logbook and meeting attendance
PercentageAssessment Criteria
Project Examiner Each project will be assigned an
examiner. A lecturer who will evaluate your project
together with your supervisor. Examiners will choose the projects that
he/she wants to examine. You have no control over who your examiner
will be. It is COMPULSORY for you to discuss your
project with your examiner at least once during the semester.
Presentation
Will be done in supervisor’s room and evaluated by supervisor and examiner.
Duration around 30 minutes Recommendation and suggestions
should be taken seriously Modify report if necessary
Final Report Read the COIT’s final year project
guidelines to learn about the format. Should roughly follow our suggested
report contents. Make sure grammar is correct. Write with intention that somebody else
who read this will be able to understand and implement your system.
Make sure all contents cited from other sources are referenced properly.
Facilities Money allocation
Each of you are allocated RM 400.00 for buying equipments.
Procedures: Get form from lab technician. Fill in the required information. Get your supervisor to verify. Bring back the form to lab technician. The technician will buy the items for you.
Facilities You CANNOT buy:
Pirated software Books Software that is already available in the
lab. Remember that whatever you buy,
they belong to the college. Make sure you return them to the lab by
the end of your project. Failure to do so may cause your grade to
be suspended.
Facilities Final year project lab
There is a computer lab dedicated for final year project students.
BW-4-R06. You can use the lab for:
Research (browsing the Web, etc). Development.
If you need to install any specific software, please contact the lab technicians.
Project Workshops
Several workshop sessions will be conducted throughout the semester.
Aimed to help students in doing the project properly.
Cover key activities in final year project: How to do research Report writing
Deadlines
16 October 2009 (1 week before end of semester)
Submission of final report
Between 28 September to 9 October 2009 (Around 2 or 3 weeks before end of semester)
Presentation
25 September 2009 (4 weeks before end of semester)
Submission of draft report
24 July 2009 (One week after confirming your topic)
Submit an initial report to supervisor
17 July 2009 (One week from today)
Confirm a project topic
DeadlinesTasks
FAQs What happen if I cannot get a project?
Consult the project coordinator to see whether he can help you.
After a certain deadline, you need to drop the project. Otherwise, you will be given an E.
I cannot finish my project 1 in this semester. Can I extend? Extension is only allowed until the first week
of the next semester. Otherwise, you will be given an E.
FAQs
What if I want to submit my report a little bit later than the deadline? Yes, you can do so, but you need to
seek permission from both your supervisor and examiner.
If you do not ask for permission, your supervisor and examiner has the right to give a 0.
FAQs
Can I change my project in the middle of project 1? Yes, with the permission of the
supervisor. Can I change my supervisor in the
middle of project 1? No. But if you are really desperate
please see your project coordinator.
FAQs What if I don’t like my examiner?
Live with it… What if my supervisor becomes
unavailable? If it can be planned (i.e. maternity
leave), please make arrangement beforehand.
If it cannot be planned (i.e. death, hospitalization, lecturer got fired), please see the project coordinator.
Common Problems Fail to get a project before
deadline. Poor attendance to meeting with
supervisor. Do not meet examiner at the
beginning of the project. Late report submission. Forget to submit report to examiner. Plagiarism / cheating.
Q & A
Breakout Sessions
Systems and Networking: BW-G-R04
Software Engineering: BW-G-R05 Information Systems: BW-G-R06 Graphics and Multimedia: BW-G-
R14