ACTIVITY: CLEAR AND GRUB
FIG 01 BUSH CLEARING
FIG 02 TREE FELLING
ACTIVITY: TOPSOIL STRIPPING
PROGRESS PHOTO GRAPHS
FIG 03 TOP SOIL STRIPPING USING A DOZER
FIG 04 TOP SOIL STRIPPED
PREPARATION OF FOUNDATION BASE
FIG 05 EMBANKMENT FOUNDATION BASE PREPARED AND READY FOR FILLING
SOIL EXCAVATION IN RESERVOIR AREA
FIG 06 EXCAVATION OF SOIL FROM THE RESERVOIR AREA TO FILL EMBANKMENT
ACTIVITY : EMBANKMENT FILL
FIG 07 SPREADING OF FILL TO EMBANKMENT
ACTIVITY : WATERING AND COMPACTION OF FILL TO THE EMBANKMENT
FIG 08 : COMPATING OF FILLING TO EMBANKMENT WITH A ROLLER
ACTIVITY : EXCAVATION FOR INLET /OUTLET PIPE TRENCH
FIG 10 : TRENCH EXCAVATION
LAYING OF 630MM DIAMETER PIPES ON IN TRENCH
FIG 12 REINFORCEMENT FOR CONCRETE FOR WRAPPING PIPES
FIG 13 SHUTTERING FOR CONCRETE FOR WRAPPING PIPES