LO140 Processes in Logistics Execution LO140 R/3 System Release 46C 27.03.2001 0

Upload: deepak-sangramsingh

Post on 07-Apr-2016

76 views

Category:

Documents


9 download

DESCRIPTION

SAP LE

TRANSCRIPT

Page 1: Processes in Logistics Execution Edited

LO140 Processes in Logistics ExecutionLO140

R/3 System Release 46C 27.03.2001

0

Page 2: Processes in Logistics Execution Edited

LO140 Processes in Logistics Execution ............................................................................................................................. 0-1

Copyright............................................................................................................................................................................... 0-2

Logistics Execution......................................................................................................................................................... 0-3

Course Prerequisites........................................................................................................................................................ 0-4

Target Group .................................................................................................................................................................... 0-5

Course Overview.................................................................................................................................................................. 1-1

Course Goals .................................................................................................................................................................... 1-2

Course Objectives............................................................................................................................................................ 1-3

Course Content................................................................................................................................................................. 1-4

Main Business Scenario ................................................................................................................................................. 1-5

Navigation ............................................................................................................................................................................. 2-1

Navigation: Unit Objectives .......................................................................................................................................... 2-2

Navigation: Business Scenario...................................................................................................................................... 2-3

Logging On to the System ............................................................................................................................................. 2-4

SAP Easy Access - Standard ......................................................................................................................................... 2-5

Role -Based User Menu................................................................................................................................................... 2-6

Screen Elements............................................................................................................................................................... 2-7

Selecting Functions......................................................................................................................................................... 2-8

Field Help: F1 and F4..................................................................................................................................................... 2-9

Menus: System and Help.............................................................................................................................................. 2-10

SAP Library .................................................................................................................................................................... 2-11

User-Specific Personalization ..................................................................................................................................... 2-12

Personalizing the Frontend with GuiXT.................................................................................................................... 2-13

Elements of the Workplace.......................................................................................................................................... 2-14

Active Applications (In Use)....................................................................................................................................... 2-15

Workplace Favorites ..................................................................................................................................................... 2-16

Personalizing MiniApps............................................................................................................................................... 2-17

Workplace: Advantages ............................................................................................................................................... 2-18

Navigation: Unit Summary .......................................................................................................................................... 2-19

Navigation - Exercises.................................................................................................................................................. 2-20

Navigation - Solutions.................................................................................................................................................. 2-25

Overview of Logistics Execution ...................................................................................................................................... 3-1

Overview of Logistics Execution: Unit Objectives ................................................................................................... 3-2

Overview: Business Scenario ........................................................................................................................................ 3-3

Logistics Execution......................................................................................................................................................... 3-4

SAP LES: Integrated Part of the Supply Chain .......................................................................................................... 3-5

Process Integration.......................................................................................................................................................... 3-6

Overview: Logistics ........................................................................................................................................................ 3-7

Goods Receipt: Procurement......................................................................................................................................... 3-8

Purchase Orders ............................................................................................................................................................... 3-9

GR for Purchase Order: Document Overview......................................................................................................... 3-10

Page 3: Processes in Logistics Execution Edited

Goods Issue: Sales Order Processing......................................................................................................................... 3-11

GI for Sales Order: Document Overview.................................................................................................................. 3-12

The Shipping Process.................................................................................................................................................... 3-13

Warehouse Management.............................................................................................................................................. 3-14

Overview: Unit Summary ............................................................................................................................................ 3-15

Data Used in Exercises................................................................................................................................................. 3-16

Exercises ......................................................................................................................................................................... 3-18

Solutions.......................................................................................................................................................................... 3-28

Organizational Units and Master Data ............................................................................................................................. 4-1

Unit Objectives ................................................................................................................................................................ 4-2

Business Scenario ............................................................................................................................................................ 4-3

Organizational Units: Topic Objectives ...................................................................................................................... 4-4

The Organizational Unit ................................................................................................................................................. 4-5

The Organizational Unit ................................................................................................................................................. 4-6

The Organizational Unit ................................................................................................................................................. 4-7

The Organizational Unit ................................................................................................................................................. 4-8

Organizational Units in a Warehouse Number........................................................................................................... 4-9

The Organizational Unit ............................................................................................................................................... 4-10

The Organizational Unit ............................................................................................................................................... 4-11

Organizational Structures: Logistics and LES .......................................................................................................... 4-12

Storage Bins and Quants .............................................................................................................................................. 4-13

Storage Bins and Quants .............................................................................................................................................. 4-14

Information Contained in a Quant.............................................................................................................................. 4-15

Material Master.............................................................................................................................................................. 4-16

Views in a Material Master Record ............................................................................................................................ 4-17

Material Type................................................................................................................................................................. 4-18

Maintaining a Material Master Record: Screen Sequence ..................................................................................... 4-19

Customer Master............................................................................................................................................................ 4-20

Vendor Master................................................................................................................................................................ 4-21

Unit Summary ................................................................................................................................................................ 4-22

Exercises ......................................................................................................................................................................... 4-23

Solutions.......................................................................................................................................................................... 4-28

Goods Receipts..................................................................................................................................................................... 5-1

Goods Receipts: Unit Objectives .................................................................................................................................. 5-2

Goods Receipts: Business Scenario ............................................................................................................................. 5-3

Goods Receipts and Transfer Requirements: Topic Objectives .............................................................................. 5-4

The Inbound Process....................................................................................................................................................... 5-5

GR for Purchase Order: Document Overview........................................................................................................... 5-6

Information in Transfer Requirement .......................................................................................................................... 5-7

Planning a Movement..................................................................................................................................................... 5-8

Putaway Steps.................................................................................................................................................................. 5-9

Transfer Order for Putaway: Topic Objectives ........................................................................................................ 5-10

Page 4: Processes in Logistics Execution Edited

Goods Receipt: Process Flow...................................................................................................................................... 5-11

Transfer Order for Transfer Requirement ................................................................................................................. 5-12

Procedure for Creating TOs in the SAP System ...................................................................................................... 5-13

Palletization Instructions.............................................................................................................................................. 5-14

Printing a Transfer Order ............................................................................................................................................. 5-15

Transfer Order Confirmation....................................................................................................................................... 5-16

Handling Differences.................................................................................................................................................... 5-17

Putting Away Goods Received: Topic Objectives................................................................................................... 5-18

Goods Receipt with Inbound Deliveries: Process Flow.......................................................................................... 5-19

Inbound Delivery ........................................................................................................................................................... 5-20

Ways of Creating an Outbound Delivery .................................................................................................................. 5-21

Information in Inbound Delivery ................................................................................................................................ 5-22

Goods Receipts: Unit Summary .................................................................................................................................. 5-23

Exercises ......................................................................................................................................................................... 5-24

Solutions.......................................................................................................................................................................... 5-30

Goods Issues ......................................................................................................................................................................... 6-1

Goods Issues: Unit Objectives ...................................................................................................................................... 6-2

Goods Issues: Business Scenario .................................................................................................................................. 6-3

Outbound Deliveries: Topic Objectives ...................................................................................................................... 6-4

The Shipping Process...................................................................................................................................................... 6-5

Structure of an Outbound Delivery .............................................................................................................................. 6-6

Updating Orders............................................................................................................................................................... 6-7

Document Flow................................................................................................................................................................ 6-8

Ways of Creating an Outbound Delivery .................................................................................................................... 6-9

Outbound Delivery Monitor........................................................................................................................................ 6-10

Scheduling ...................................................................................................................................................................... 6-11

Backward Scheduling ................................................................................................................................................... 6-12

Forward Scheduling ...................................................................................................................................................... 6-13

Determining the Shipping Point.................................................................................................................................. 6-14

Transfer Order for Outbound Delivery: Topic Objectives ..................................................................................... 6-15

Steps in the Outbound Process.................................................................................................................................... 6-16

Transfer Order for Outbound Delivery ...................................................................................................................... 6-17

Lean WM - Using a TO as a Pick Order ................................................................................................................... 6-18

Connection Between Shipping and WM................................................................................................................... 6-19

Ways of Creating TOs for Deliveries......................................................................................................................... 6-20

Creating Groups in the Outbound Delivery Monitor .............................................................................................. 6-21

Ways of Creating TOs: WMTA .................................................................................................................................. 6-22

Picking: Topic Objectives............................................................................................................................................ 6-23

Rough Workload Estimate: Objectives...................................................................................................................... 6-24

Rough Workload Estimate: Key Figures................................................................................................................... 6-25

Picking Waves................................................................................................................................................................ 6-26

Two-Step Picking .......................................................................................................................................................... 6-27

Page 5: Processes in Logistics Execution Edited

Radio Frequency (RF) Connection: Topic Objectives............................................................................................ 6-28

Advantages of RF Connections................................................................................................................................... 6-29

Radio Frequency Activities ......................................................................................................................................... 6-30

Picking Using RF: Scanning Bins .............................................................................................................................. 6-31

RF Queue Management................................................................................................................................................ 6-32

Radio Frequency Monitor............................................................................................................................................ 6-33

Packing: Topic Objectives ........................................................................................................................................... 6-34

Packaging Materials ...................................................................................................................................................... 6-35

Handling Units as Shipping Elements ....................................................................................................................... 6-36

Packing: Functions........................................................................................................................................................ 6-37

Handling Units in the Supply Chain .......................................................................................................................... 6-38

Business Processes Inbound ........................................................................................................................................ 6-39

Business Processes Outbound ..................................................................................................................................... 6-40

Posting a Goods Issue: Topic Objectives .................................................................................................................. 6-41

Posting a Goods Issue: Overview............................................................................................................................... 6-42

Effects of a Goods Issue Posting................................................................................................................................ 6-43

Goods Issues: Unit Summary ...................................................................................................................................... 6-44

Exercises ......................................................................................................................................................................... 6-45

Solutions.......................................................................................................................................................................... 6-57

Transportation....................................................................................................................................................................... 7-1

Transportation: Unit Objectives.................................................................................................................................... 7-2

Transportation: Business Scenario ............................................................................................................................... 7-3

Inbound and Outbound Shipments: Topic Objectives .............................................................................................. 7-4

Transportation Activities in the SAP System............................................................................................................. 7-5

Inbound Shipments.......................................................................................................................................................... 7-6

Outbound Shipments....................................................................................................................................................... 7-7

Individual Shipments ...................................................................................................................................................... 7-8

Collective Shipments ...................................................................................................................................................... 7-9

Transportation Chain .................................................................................................................................................... 7-10

Shipment Documents: Topic Objectives ................................................................................................................... 7-11

Transportation Planning and Processing................................................................................................................... 7-12

Shipment Documents and Their Functions............................................................................................................... 7-13

Structure of Shipment Documents.............................................................................................................................. 7-14

Creating Shipments ....................................................................................................................................................... 7-15

Shipment Stages............................................................................................................................................................. 7-16

Shipment Cost Documents: Topic Objectives.......................................................................................................... 7-17

How Shipment Costs Fit into the Overall Process................................................................................................... 7-18

Calculating Shipment Costs: Prerequisites ............................................................................................................... 7-19

Creating a Shipment Cost Document......................................................................................................................... 7-20

Items in a Shipment Cost Document.......................................................................................................................... 7-21

Transportation: Unit Summary ................................................................................................................................... 7-22

Exercises ......................................................................................................................................................................... 7-23

Page 6: Processes in Logistics Execution Edited

Solutions.......................................................................................................................................................................... 7-27

Reporting ............................................................................................................................................................................... 8-1

Reporting: Unit Objectives ............................................................................................................................................ 8-2

Reporting: Business Scenario........................................................................................................................................ 8-3

Warehouse Activity Monitor......................................................................................................................................... 8-4

Warehouse Activity Monitor Objects .......................................................................................................................... 8-5

Shipment Details .............................................................................................................................................................. 8-6

Itinerary and Transportation Network.......................................................................................................................... 8-7

Warehouse Controlling................................................................................................................................................... 8-8

Transportation Information System (TIS) ................................................................................................................... 8-9

ABAP List Viewer ........................................................................................................................................................ 8-10

Reporting: Unit Summary ............................................................................................................................................ 8-11

Exercises ......................................................................................................................................................................... 8-12

Solutions.......................................................................................................................................................................... 8-15

ASAP...................................................................................................................................................................................... 9-1

ASAP: Business Scenario .............................................................................................................................................. 9-2

ASAP: Objectives............................................................................................................................................................ 9-3

TeamSAP Components .................................................................................................................................................. 9-4

AcceleratedSAP: Implementation Planning................................................................................................................ 9-5

AcceleratedSAP Implementation Roadmap................................................................................................................ 9-6

Global ASAP.................................................................................................................................................................... 9-7

IMG: Tasks ....................................................................................................................................................................... 9-8

Customer-Specific Configuration................................................................................................................................. 9-9

Accelerated Industry Solutions: Steps....................................................................................................................... 9-10

Implementation Planning and Tools: Summary ....................................................................................................... 9-11

Conclusion........................................................................................................................................................................... 10-1

Course Objectives.......................................................................................................................................................... 10-2

Recommended Follow-up Courses............................................................................................................................. 10-3

Recommended Follow-up Activities.......................................................................................................................... 10-4

Page 7: Processes in Logistics Execution Edited

SAP AG 1999

LO140 Processes in Logistics Execution

LO140LO140

Processes in Logistics ExecutionProcesses in Logistics Execution

SAP AG

n R/3 System n Release 4.6C n October 2000 n Material number 50042474

Page 8: Processes in Logistics Execution Edited

(C) SAP AG LO140 1-4

SAP AG

Unit 6 Goods Issues

Unit 7 Transportation

Unit 8 Reporting, Planning and Monitoring

Unit 9 ASAP and IMG

Unit 10 Conclusion

Unit 1 Course Overview

Unit 2 Navigation

Unit 3 Overview of Logistics Execution

Unit 4 Organizational Units and Master Data

Unit 5 Goods Receipts

Preface

Course Content

Page 9: Processes in Logistics Execution Edited

(C) SAP AG LO140 1-5

SAP AG 1999

l Our model company, IDES, orders a range of materials from vendors, and offers and sells these to its customers.

l This model company is implementing an R/3 System.

l You are a member of the project team. You are responsible for the logistics aspects of the system.

l In this course, you will check and test the functionality of the R/3 System to see if and how it can be used to handle the business processes for which you are responsible.

Main Business Scenario

Page 10: Processes in Logistics Execution Edited

(C) SAP AG LO140 3-1

SAP AG 1999

l Inbound process in the SAP System - without Warehouse Management

l Outbound process with lean WM

l Internal warehouse processes

l Where Logistics Execution fits into the supply chain

Contents:

Overview of Logistics Execution

Page 11: Processes in Logistics Execution Edited

(C) SAP AG LO140 3-4

SAP AG 1999

Logistics Execution

Production warehouse

Distribution center

Production site

Customer

Border

Vendor

Warehouse

n The Logistics Execution component (LE) maps a company's logistics processes. The component covers the entire process chain - from the vendor, internal warehouse, production site, and distribution center right through to the customer.

n LE processes include: � Inbound process - the goods are collected from the vendor and placed in storage in a company

warehouse. � Outbound process - the goods are removed from storage, and delivered to the customer. � Internal warehouse processes such as posting changes, stock transfers, inventory, and so on. � Transportation process - inbound and outbound shipments, as well as the calculation and

settlement of shipment costs

Page 12: Processes in Logistics Execution Edited

(C) SAP AG LO140 3-5

SAP AG 1999

SAP LES: Integrated Part of the Supply Chain

Business Processes

Planning and Optimization

Supply Network PlanningForecast

l Planning & simulation

lConsolidation

ProductionPurchasing

Warehouse Management

Transport-ation

SAP LES

Sales

n The Logistics Execution System is an integral part of the supply chain. It forms the basis for logistics processing, and provides a link between planning, optimizing, and actually working through business processes.

n The LES, with its warehouse and transportation management functions, supports all the necessary business process flows. It is the "executing" level of the supply chain. This results in a streamlined flow of information and material flow, and makes the function chain more transparent. This, in turn, means that the different levels - planning, optimization, and execution - can communicate efficiently with each other.

n SAP LES is an "open" system, and can be integrated into an SAP R/3 System. It can also be used in conjunction with supply chain planning and optimization tools such as SAP APO, Data Warehouses like the SAP BW, and other mySAP.com components.

Page 13: Processes in Logistics Execution Edited

(C) SAP AG LO140 3-6

SAP AG 1999

Process Integration

Sales Order Processing (SD)

InventoryInventoryManagementManagement

Ordering (MM)

Determination ofDetermination ofrequirementsrequirements

Go

od

sre

ceip

t

Req

uir

emen

ts

Stock

Go

od

sis

sue

Req

uir

emen

ts

G/L

ac

coun

t Customer

Vendor

Payment

Payment

Presalesactivities

Orderprocessing

Delivery/Transportation Billing

Source determination

Processing ofpurchase orders

InvoiceVerification

Lo

gis

tics

Exe

cutio

n (

LE

)

n The logistics process can be subdivided into the following main processes: � Sales order processing for goods issues � Ordering (purchase order processing) for goods receipts � Physically moving goods in the supply chain

n Sales order processing is handled mainly by the SD component (Sales and Distribution), whereas ordering is processed in the MM component (Materials Management). SAP Logistics Execution (LE) represents the link between the two processes.

Page 14: Processes in Logistics Execution Edited

(C) SAP AG LO140 3-7

SAP AG 1999

Overview: Logistics

Goodsissue

Internal and externalInternal and externalaccountingaccounting

MRP

InvoiceVerification

Goods receipt

Postingchange

Invoicereceipt

Inventory Management

Internal procurementProduction

External procurementPurchasing

PresalesactivitiesSales order

Shipping Billing

n The various steps in the logistics process chain are processed in different components of the SAP System. The different areas are closely connected, and linked together by means of a document flow.

n The logistics process can be subdivided into a material flow and a value flow. Material requirements planning is processed in the Materials Management component (MM). Information on requirements is passed on to this component from sales orders, for example. The requirements are passed on to internal or external procurement, and processed by Purchasing of Production (PP).

n The Inventory Management component (IM) maps transactions that result in changes involving stock: goods receipts, goods issues, reservations, posting changes, and stock transfers. The Warehouse Management component (WM) is integrated into the material flow, and maps complex warehouse structures and stock movements. The logistical process flows in Logistics Execution (LE) are then processed further in the Shipping component. The process is completed in the Billing component. The Billing component is integrated with internal and external accounting components (FI and CO).

n In Invoice Verification, the value flow is updated, and the various details passed on from the goods receipt, purchase order and goods issue are summarized.

Page 15: Processes in Logistics Execution Edited

(C) SAP AG LO140 3-8

SAP AG 1999

Goods Receipt: Procurement

Selection of vendorDetermination ofsource of supply

Purchase order

Ordering

Purchase order

Invoice verification

Invoice

??

Purchase ordermonitoring

Goods receipt

Handling of payments

Purchasereq.

Determination of requirements

n Determination of requirements: The department in question can report that materials are required by submitting a purchase requisition to Purchasing. If you have defined an appropriate MRP procedure in the material master record of a material, the R/3 System can generate the purchase requisition automatically.

n Determination of source of supply: The R/3 System helps the purchaser (buyer) to determine possible sources of supply. One way of determining sources of supply is to create requests for quotation, and then to enter the corresponding quotations. It is also possible to draw on purchase orders and conditions that already exist in the system.

n Selection of vendor: A comparison of the prices contained in the various quotations makes it much easier to select vendors. Letters of rejection can be generated and sent automatically.

n Ordering: The system boasts a range of features that make it easier to create purchase orders. n Purchase order monitoring: The purchaser can monitor the progress of the purchase order in the

system. For example, he or she can find out if a goods receipt or invoice receipt has been posted for an order item. The system also supports various dunning (urging) procedures.

n Goods receipt: The system checks the goods receipt quantity against the purchase order quantity. n Invoice verification: The vendor invoices are checked to make sure that they are correct. n Handling of payments: Normally, payments to vendors are processed in Financial Accounting.

Page 16: Processes in Logistics Execution Edited

(C) SAP AG LO140 3-9

SAP AG 1999

Purchase Orders

Purchaserequisition

Requestfor quotation(inquiry)

Purchaseorder

Purchasing

External vendor

Other plantMasterdata

Masterdata

n A purchase order is a formal request made of a vendor to supply goods or services under specific terms and conditions.

n You can create a purchase order without a reference, or with a reference to a purchase requisition, request for quotation, or another purchase order.

n When you are entering purchase order data, the system proposes default values to help you. For example, the ordering address, as well as conditions of payment and shipping (Incoterms) are proposed by reading the corresponding information from the vendor master record. If you have created a material master record for a specific material in the SAP System, this is read by the system so that it can propose the material short text, for example, or the material group. If you have already defined a purchasing information record in the system, you can default a price proposal for the purchase order.

n Either you send the purchase order to a vendor, or you trigger a stock transfer order from another plant in your company. In the latter case, you can take account of the shipping costs in the purchase order.

n Note: To find out more about stock transfer orders, please refer to the Materials Management documentation on Inventory Management. ("Special Stocks and Special Forms of Procurement in Materials Management.")

Page 17: Processes in Logistics Execution Edited

(C) SAP AG LO140 3-10

SAP AG 1999

GR for Purchase Order: Document Overview

Purchaseorder

Materialdocument

Accountingdocument(s)

Goods receiptposting

External vendor or

other plant

Delivery of materialsordered

Purchasing/Inventory ManagementPurchasing/Inventory Management

The process for posting a goods receipt with reference to a purchase order might be as follows: n The goods receiving point can check to see if the delivery matches up with the purchase order data

(in other words, if what was ordered was delivered). n The system can propose default values from the purchase order (for example, item and quantity) -

this makes entering goods receipt data easier. It also means that overdelivery and underdelivery can be detected more easily when the goods are received.

n The ordering data is updated automatically - this is triggered in part by the deliveries. If delivery deadlines are not met, the purchasing department can send a reminder.

n When a goods movement is posted in Inventory Management, a material document is generated. This document acts as proof that one or more movements took place, and can be used as a source of information by all downstream applications. When the goods receipt is posted, a material document is generated. This document contains information on the material delivered, and on the quantity delivered. It also contains details of the storage location where the material was received and stored.

n In the case of transactions that affect material valuation, at least one accounting document is generated. This contains information on the affects the material movement has on accounting.

Page 18: Processes in Logistics Execution Edited

(C) SAP AG LO140 3-11

SAP AG 1999

Goods Issue: Sales Order Processing

Presales activities Order processing Procurement

Shipping /transportation /

goods issue

Billing

Rechnung

Payment

Invoice

n In R/3, sales and distribution processing is subdivided into the following areas: sales support, sales, shipping, transportation, and billing.

n Every sales activity made in one of these areas is documented by means of a sales document. n Various business transactions in sales, shipping, transportation, and billing can be mapped by means

of specially tailored document types. n Each document is identified by means of a unique document number. Special search features (called

"matchcodes") are available to help you find a document easily. n Each document is assigned an overall status that shows the processing stage that the document has

reached. The overall status is determined from the various statuses in the document. These show what stage the individual steps that make up the sales activity have reached.

n You can analyze and evaluate sales and distribution transactions in the Sales Information System. n Sales and distribution processing interfaces with several other areas (for example, Materials

Management, Financial Accounting, and Controlling). n Shipping is a follow-on activity to sales. In the Shipping component, you can perform a range of

shipping activities (picking, packing, printing out shipping documents, and so on). All of these activities are based on a delivery document (outbound delivery).

Page 19: Processes in Logistics Execution Edited

(C) SAP AG LO140 3-12

SAP AG 1999

Sales orderSales order

Materialdocument

Accountingdocument(s)

SD

Sold-to party

Ship-toparty

Outbound delivery Transfer

order(pick order)

Bill-toparty

Payer

Goods issue

Billing document

GI for Sales Order: Document Overview

Shipment

n A range of documents are used in the SAP System to map the individual steps in the goods issue process (inbound process). These documents contain relevant information on the business transactions. In other words, the various documents each represent business transactions. � Sales documents are documents that are created during presales and order processing. Requests for

quotation, quotations, contracts, scheduling agreements, and standard orders are all examples of sales document types. � Outbound deliveries, transfer orders (transfer requirements), and shipments are documents that are

used in the goods issue process. A goods receipt document contains changes involving stock, and forms the basis for the corresponding accounting documents. � A billing document is a document in the Billing component, and forms the basis for the

corresponding accounting documents.

n Business partners can be legal persons or natural persons who are involved directly in conducting a business transaction with you. Possible business partner roles (functions) include: sold-to party, ship-to party, bill-to party, and payer.

Page 20: Processes in Logistics Execution Edited

(C) SAP AG LO140 3-13

SAP AG 1999

The Shipping Process

Warehouse

• Packing

..........................

..........................

..........................

. . . . . . . . . . . . . .

..........................

..........................

..........................

. . . . . . . . . . . . . .

..........................

..........................

..........................

. . . . . . . . . . . . . .

• Shipping documents • Picking• Goods issue

Functions affecting shipping:• Determination of shipping

point• Determination of route• Scheduling

• Monitoring of shippingdue dates

• Create delivery

Shipping point

1 2 3 4 5 6 7

8 9 10 11 12 13 14

15 16 17 18 19 20 21

22 23 24 25 26 27 28

29 30 31

SalesSalesorderorder

n SAP LE functions available for shipping processing include: � Monitoring of shipping due dates in reference documents (e.g. sales orders and purchase orders) � Creating and editing outbound deliveries � Monitoring availability � Picking (with a connection to Warehouse Management) � Packing the outbound delivery � Printing out and passing on shipping documents � Processing the goods issue

n The outbound deliveries posted in the 'Goods Issue' shipping department can be used to create a worklist for billing (billing due list).

Page 21: Processes in Logistics Execution Edited

(C) SAP AG LO140 3-14

SAP AG 1999

Warehouse Management

Planning and monitoring

Stock movements Warehouse control

Storage bin management

Radio frequency(RF) connection

n In the Warehouse Management system (WMS), you manage complex warehouse structures with various types of storage areas (high rack random storage, block storage, fixed bin storage, and so on) within one or more plants - right down to the storage bin level.

n The processing of all stock movements (such as goods receipts, goods issues, stock transfers using stock placement and stock removal strategies) is controlled in WM, and takes the characteristics of the individual materials into account.

n Stock movements and other warehouse activities such as physical inventories are supported by a direct radio frequency connection.

n Non-SAP warehouse control systems can be linked up to the Warehouse Management System via the WM-LSR interface.

Page 22: Processes in Logistics Execution Edited

(C) SAP AG LO140 3-15

SAP AG 1999

l Work through a simple inbound process (order, goods receipt, invoice verification)

l Work through a simple outbound process (sales order, outbound delivery, goods issue, billing)

l Explain the idea behind the Warehouse Management System (physical stock movements in a complex warehouse structure)

l Explain how Logistics Execution fits into the supply chain as the link between goods receipt, goods issue, internal warehouse processes, and transportation

You are now able to:

Overview: Unit Summary

Page 23: Processes in Logistics Execution Edited

(C) SAP AG LO140 3-28

Solutions

Unit: Overview of Logistics Execution

1-1 How do the processes fit into the supply chain?

1-1-1 The individual steps in the ordering process are: determination of requirements, determination of source of supply, selection of vendor, ordering, purchase order monitoring, goods receipt, invoice verification, and handling of payments.

1-1-2 The individual steps in the sales order processing process are: presales activities, order processing, procurement, shipping, goods issue, billing, and payment.

1-1-3 The Logistics Execution System covers the following processes: shipping, goods issue, placing in storage, inbound and outbound transportation.

2-1 Creating a purchase order

Logistics → Materials Management → Purchasing → Purchase Order → Create → Vendor/Supplying Plant Known

Field Name/Type of Data Values

Order type Standard purchase order

Vendor 1000

Purchasing organization IDES Germany(1000)

Purchasing group Chef, H. (000)

Company code IDES AG (1000)

Material LES01-##

PO quantity 48

Order unit PC

Delivery date Today’s date

Plant 1200

Storage location 0001

Save your purchase order.

2-2 Logistics → Materials Management → Purchasing → Purchase Order → Display

3-1 Posting a goods receipt

Page 24: Processes in Logistics Execution Edited

(C) SAP AG LO140 3-29

Logistics → Logistics Execution → Inbound Process → Goods receipt for Purchase Order, Order, Other Transactions → Enter Goods Receipt for Purchase Order

Field Name/Type of Data Values

Document number Number of your purchase order

Item OK Select this option

Quantity in UnE 48

Storage location Materials store

Post the goods receipt.

3-2 Logistics → Logistics Execution → Inbound Process → Goods receipt for Purchase Order, Order, Other Transactions → Display Material Document

Enter the number of your material document, and choose Enter.

3-3 Logistics → Materials Management → Purchasing → Purchase Order → Display

Click Item details, and then choose the Purchase order history tab page.

4-1 Entering a vendor invoice

Logistics → Materials Management → Invoice Verification → Logistics Invoice Verification→ Document Entry → Enter Invoice

Field Name/Type of Data Values

Document date Today’s date

Purchase order Number of your purchase order

Amount 21120 (net)

Tax amount 1920

Save your invoice.

Page 25: Processes in Logistics Execution Edited

(C) SAP AG LO140 3-30

5-1 Creating a sales order

5-1-1 Logistics → Sales and Distribution → Sales → Order → Create

Enter the order type Standard order (OR), and press Enter.

Field Name/Type of Data Values

Sold-to party T-S11B##

Purchase order number LO140-##1

PO date Today’s date

Material LES01-##

Order quantity 12

Unit PC

Save the order.

5-1-2 Logistics → Sales and Distribution → Sales → Order → Display

The line item is to be delivered from plant 1200. Select item 10, and then click the Display item details icon. You can view the delivering plant on the Shipping tab page.

5-1-3 Logistics → Sales and Distribution → Sales → Order → Display

To display the document flow, choose Environment → Display document flow. As you can see, the status is Open.

Page 26: Processes in Logistics Execution Edited

(C) SAP AG LO140 3-31

6-1 Creating an outbound delivery

6-1-1 Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Outbound Delivery → Create → Single Document → With Reference to Sales Order

Field Name/Type of Data Values

Shipping point 1200

Selection date 1 week from today

Order The number of your standard order

6-1-2 Delivery quantity: 12 pcs

Pick. quantity: 0 pcs

6-1-3

6-1-4 Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Outbound Delivery → Display → Environment → Document flow

Standard order: Completed

Outbound delivery: Open

7-1 Picking the outbound delivery

7-1-1 Logistics → Logistics Execution → Internal Warehouse Processes → Bins and Stock → Display → Total Stock per Material (Inventory Management)

Field Name/Type of Data Values

Material LES01-##

Plant 1200

Storage location 0001

48 pieces of material LES01-## are in unrestricted-use stock.

7-1-2 Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Picking → Create Transfer Order → Single Document

Page 27: Processes in Logistics Execution Edited

(C) SAP AG LO140 3-32

Field Name/Type of Data Values

Warehouse number 012

Delivery The number of your outbound delivery

Foreground/background Background

7-1-3 Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Outbound Delivery → Display

Choose the Picking tab page.

Delivery quantity: 12 pieces

Pick quantity: 12 pieces

7-1-4 Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Outbound Delivery → Change → Single Document

Click the Post goods issue icon.

7-1-5 Logistics → Logistics Execution → Internal Warehouse Processes → Bins and Stock → Display → Total Stock per Material (Inventory Management)

Field Name/Type of Data Values

Material LES01-##

Plant 1200

Storage location 0001

36 pieces of this material are in unrestricted-use stock.

Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Outbound Delivery → Display

The status of the outbound delivery is Being processed.

Page 28: Processes in Logistics Execution Edited

(C) SAP AG LO140 3-33

8-1 Billing

8-1-1 Logistics → Sales and Distribution → Billing → Billing Document → Create

Field Name/Type of Data Values

Document The number of your outbound delivery

Billing type Invoice

Save your invoice.

8-1-2 Logistics → Sales and Distribution → Billing → Billing Document → Display → Environment → Display document flow

The status of the billing document is Completed.

9-1 Stock overviews in Warehouse Management

9-1-1 Logistics → Logistics Execution → Internal Warehouse Processes → Bins and Stock → Display → Bin Status Report

Enter your warehouse number (###), and use the F4 Help function to select storage type 004 (bulk storage). Storage type 004 has 10 storage bins.

9-1-2 Logistics → Logistics Execution → Internal Warehouse Processes → Bins and Stock → Display → Total Stock per Material (Warehouse Management)

Enter your warehouse number (###) and material LES02-##. The stock overview shows you in which storage types the material is found. 240 pieces of this material are in shelf storage.

9-1-3 Logistics → Logistics Execution → Internal Warehouse Processes → Bins and Stock → Display → Bin Stock per Material

Enter material LES03-##, and your warehouse number (###). An overview of the bins in which the material is stored appears.

9-1-4 Logistics → Logistics Execution → Internal Warehouse Processes → Bins and Stock → Display → Single Displays → Storage Bin

Enter your warehouse number (###), storage type 005 and storage bin FIX-03. Material LES05-## is stored in this storage bin.

Page 29: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-1

SAP AG 1999

l Organizational Units in Logistics Execution

l Master Data in Logistics Execution

Contents:

Organizational Units and Master Data

Page 30: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-5

SAP AG 1999

l Legally independent unit with a self-contained set of accounts

l The following are created at the company code level:

è Financial statements

è Profit and loss statements

Company Code

The Organizational Unit "Company Code"

Page 31: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-6

SAP AG 1999

The Organizational Unit "Plant"

l A plant is an organizational unit in Logistics, and allows you to look at a company from the point of view of production, procurement, plant maintenance, and materials planning.

l A plant is a branch or division within a company.

n A plant can be used to map various functions in a company, for example: � Central delivery plant � Regional sales office � Production site � Company headquarters � Plant maintenance site

n When you create a new plant, you can use the Copy Plant function. If you use this function, the entry in the plant table and all dependent Customizing tables and system tables where the plant appears as a key are processed.

Page 32: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-7

SAP AG 1999

The Organizational Unit "Storage Location"

l An organizational unit that enables you to distinguish between the various material stocks in a plant.

l Quantity-based inventory management data pertaining to the plant is summarized at the storage location level.

Page 33: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-8

SAP AG 1999

The Organizational Unit "Warehouse Number"

l An organizational unit that maps the company from a warehouse management perspective. A warehouse number corresponds to a warehouse complex containing different storage types that are organized differently.

l The physical conditions of the warehouse are mapped in the warehouse number.

n The warehouse number is the highest organization unit in Warehouse Management. It is used to represent an entire warehouse complex, and is defined uniquely in the client. A warehouse number maps the physical conditions in a warehouse complex.

n You define individual storage types within a warehouse number. These storage types represent the different kinds of storage available in the warehouse number. Examples of storage types include bulk storage, shelf storage, and fixed bin storage.

Page 34: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-9

SAP AG 1999

Warehouse Number 140

Organizational Units in a Warehouse Number

Door 2

Door 1

Door 3

Door 4

Pallet storage

Storage type007

Bulk storage

Storage type004

Fixed bin storage

Storage type005

Picking area 1

Picking area 2

Door 5

Shipping area

Stagingarea 1

Stagingarea 2

Storage type916

Goodsreceivingzone

Storage type902

Storage section 001

Storage section 002

n A warehouse number comprises various storage types. A storage type is a collection of storage bins with a similar process structure. A process structure is regarded as similar, for example, if the same putaway strategy is used (bulk storage, pallet storage, ...), or even if the bins have a geographical link.

n There are two kinds of storage types: physical storage types (i.e. storage types that actually exist), and logical storage types. Goods receipt areas and goods issue areas are also considered to be storage types. However, since stocks are only stored here for short amounts of time, they are referred to as interim storage types.

n Storage bins are grouped together into storage areas to facilitate putaway (for example, section 001 for fast-moving items, section 002 for slow-moving items). It is also possible to create picking areas for the purposes of picking, but this is optional.

n Further structuring options include doors and staging areas.

Page 35: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-10

SAP AG 1999

The Organizational Unit "Transportation Planning Point"

Transportationplanning points

1010Hamburg Internat.

Ocean Freight

1011Hamburg RailTransportation

1200Dresden TruckTransportation

Planning, handling,and settlementof shipments

n A transportation planning point is the central point in a company where shipments are organized and monitored. A transportation planning point can be a physical location or a group of people responsible for processing shipments.

n Every shipment is created and processed by a transportation planning point. n You can define transportation shipping points to meet your company's requirements - by location, for

example, or by mode of transport.

Page 36: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-11

SAP AG 1999

The Organizational Unit "Shipping Point"

l A shipping point is an organizational unit that allows you to look at a company from the point of view of shipping, the shipping materials required, and the means of transportation required. On the goods receipt side of things, the goods receiving point corresponds to the shipping point.

Shipping point for trucks

1 2 3 4 5 6 7

8 9 10 11 12 1 3 1 4

1 5 1 6 1 7 18 19 20 21

22 23 2 4 25 2 6 2 7 28

2 9 30 31

Shippingpoint for rail

1 2 3 4 5 6 7

8 9 10 11 12 13 1 4

1 5 1 6 1 7 18 19 20 21

2 2 23 2 4 25 2 6 2 7 28

2 9 30 31

Plant 1012Plant 1000

n Shipping points are important organizational units used for shipping. They represent the physical location or group of persons responsible for processing sales activities. Every delivery is processed by one shipping point. Shipping points are assigned to one or more plants. They can be broken down further into loading points.

Page 37: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-12

SAP AG 1999

Organizational Structures: Logistics and LES

Warehouse number

Shipping points

1 2 3 4 5 6 7

8 9 1 0 1 1 12 13 14

1 5 16 1 7 1 8 1 9 20 21

2 2 2 3 2 4 2 5 26 2 7 2 8

2 9 3 0 3 1

Company code

Plant

Storage location

Plant

Storage location

ABBC

B

ABBC

B

Transportationplanning pointsTransportation

planning points

Shipping points

1 2 3 4 5 6 7

8 9 1 0 1 1 1 2 1 3 1 4

1 5 1 6 17 1 8 1 9 2 0 2 1

2 2 23 2 4 25 2 6 2 7 28

29 3 0 3 1

n The organizational units in LES are linked to the organizational structure of Logistics in the SAP System. You can set up these assignments in Customizing - this is where you configure the SAP System.

n Transportation planning points are assigned to a company code. Several transportation planning points can be assigned to the same company code, but a transportation planning point cannot be assigned to more than one company code.

n Shipping points are assigned to one or more plants. Several shipping points can be assigned to a plant, and the same shipping point can be assigned to several plants.

n Warehouse numbers are assigned to a plant via a storage location. You can assign several plants and several storage locations of a plant to the same warehouse number. However, you can only assign a storage location to one warehouse.

Page 38: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-13

SAP AG 1999

Storage Bins and Quants

Storage Bins

Bin Type Small

Bin Type Large

n In Warehouse Management, the individual storage bins are defined within each storage type. A storage bin is the smallest geographical or organizational unit that can be addressed by the system. They can be mapped as coordinates. Example: 02-04-09 (aisle 02, stack 04, level 09)

n Storage bins can be identified by means of a bin type. Example: Bin type P1 for upper bins, bin type P2 for lower bins

n The existence of a material (with specific characteristic values) in a bin is referred to as a quant.

Page 39: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-14

SAP AG 1999

Storage Bins and Quants

Quants are defined by:§ Material§ (Batch)§ Stock category

§ Special stock§ Plant / storage location§ (Storage unit number)

Two quants:mixed storage

One quant

One quant

n In the case of non-mixed bins (bins designated for storing only one material), only one quant may be stored in a storage bin. If a new quant is put away in this storage bin, and it is compatible with the quant already in the bin, this is referred to as an addition to existing stock. The two quants become one.

n In bins designated for mixed storage, different quants may be stored in the same storage bin. These quants might be different materials, batches, special stocks, or stock categories.

Page 40: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-15

SAP AG 1999

Information Contained in a Quant

MaterialPlant/storage locationBatch

Stock categorySpecial stockStorage unit

Available stockPutaway/pick?Weight

GR dateGR numberLast movement

Blocking indicator

n Information used to identify the quant is stored in the quant itself. Information on the available stock and any open putaways and picks are also stored in the quant.

n At the quant level, "available stock" means that the stock in question is available for a physical movement in Warehouse Management (in other words, that this quant can be put away, picked, or transferred).

n Goods receipt data is stored at the quant level.

Page 41: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-16

SAP AG 1999

Material Master

General Data

Plant-Specific Data

Warehouse Management Data

Accounting Data

Sales and Distribution Data

Purchasing Data

...

n The material master contains full information on all the materials that a company designs, purchases, produces, stores, and sells.

n The material master is subdivided by area: basic data, sales and distribution data, purchasing data, additional data for engineering/construction, accounting, costing, warehouse management, and so on.

n Basic data is relevant to all areas. It applies to all of the organizational units within a client. n Sales and distribution data is relevant to SD, and applies to the sales organization and distribution

channel. n Sales plant data is also relevant to SD, and applies to the delivery plant. n Data is also defined for a range of other areas, and applies to the various organizational units used in

these areas. n In a company, the material master is the central source where material-specific data can be accessed.

The material master is used by all of the components in SAP Logistics.

Page 42: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-17

SAP AG 1999

Views in a Material Master Record

SDMRP

PC

t

Purchasing

WorkScheduling

Storage

QualityManagement

Stock in plant/storage loc.

AB

WarehouseManagement Classification

Forecast

Accounting

Basic Data

Material Master

n Since all material data is incorporated into a single database object, the problem of redundant data does not arise. The data can be used by all areas (purchasing, inventory management, shipping, warehouse management, MRP, invoice verification, and so on).

n Since different company departments process materials, and enter different types of material data, the data in a material master record is organized according to user department. This means that each user department has its own view of a material master record, and is responsible for maintaining the data contained in this view.

n You define which views of the material master record are possible for each material type. n You can also define which views of the material master records can be displayed/maintained by a

specific user. Each user can specify which views should appear when he or she maintains material master records.

n The data in the individual views is assigned to specific organizational levels: plant, storage location, sales organization, warehouse number or storage type. The material master views are created for these specific organizational levels.

Page 43: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-18

SAP AG 1999

ControlControl

Material Type

Number assignment

Procurement type

User departments

Field selection

. . . FinishedFinishedproductsproducts

SemiSemi--finishedfinishedproductsproducts

TradingTradinggoodsgoods

RawRawmaterialsmaterials

n Materials with similar characteristics can be assigned to the same material type. Examples of material types include raw materials, semi-finished products, and finished products.

n The material type determines the following: � Type of number assignment used (internal, external) � Which number range intervals are allowed � Which screens appear, and the sequence in which they appear � Which department-specific data (views) appear for entering data � Which procurement type is allowed for a material (in other words, if the material is produced in

house or externally, or if both these options are possible) n In conjunction with the plant, the material type determines whether inventory management is

compulsory for a material (in other words, whether quantity changes are updated in the material master record and value changes are updated in the balance sheet accounts in Financial Accounting).

n The material type also determines the accounts to which information is posted if a material enters the warehouse or leaves the warehouse.

n A whole range of material types have already been defined in the standard SAP system. If you need to define additional material types for your company, you can do so in Customizing.

Page 44: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-19

SAP AG 1999

Maintaining a Material Master Record:Screen Sequence

Material

(Industry sector)(Material type)(Reference)

Views- Basic data- Purchasing- Warehouse mgt- Accounting- ...

Organizationallevels- Plant- Warehouse no.- ...

Data screen(s)

n When you edit material master data, you work through a range of screens. You start out on the initial screen, and then process two dialog boxes, one after the other. In the first of the these dialog boxes, you specify which views you want to edit. In the second, you specify the appropriate organizational levels. Finally, the data screens themselves appear.

n The industry sector can be defaulted on a user-individual basis. Alternatively, you can specify that the industry sector should not be displayed on the initial screen.

n You can also define user-specific defaults for the views and organizational levels. The Select Views and Organizational levels dialog boxes can be removed from the standard screen sequence by making the appropriate default settings in the material master.

Page 45: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-20

SAP AG 1999

Customer Master

Sales Area DataRelevant to SD

Company Code Data Relevant to Accounting

Valid for:Company code

General Data Relevant to SD andAccounting

Valid for allorganizationalunits

Valid for:Sales organization /Distribution channel /Division

n In Accounting, a customer is considered to be a company partner with a customer account. For this reason, customer master records are maintained both by Accounting and by Sales and Distribution.

n The customer master is subdivided into general data, sales area data, and company code data. � General data is relevant to SD and to Accounting. It is stored centrally (client-specific) to prevent

data redundancy. It applies to all of the organizational units within a client. � Sales area data is relevant to SD, and applies to the sales area (combination of sales organization,

distribution channel, and division). � Company code data is relevant to Accounting, and applies to the company code in question.

n The customer master contains all the data required for processing orders, outbound deliveries, invoices, and payments.

Page 46: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-21

SAP AG 1999

Vendor Master

Purchasing Organization Data

Relevant to Purchasing

Valid for:Purchasing organization

Company Code Data Relevant to Accounting Valid for:Company code

General Data Relevant to Purchasing

and Accounting

Valid for allorganizationalunits

n The vendor master contains all of the vendor information required. Vendor master records are maintained both by Accounting and by Purchasing.

n The vendor master is subdivided into general data, sales area data, and company code data. � General data is relevant to Purchasing and to Accounting. It is stored centrally (client-specific) to

prevent data redundancy. It applies to all of the organizational units within a client. � Purchasing organization data is relevant to Purchasing, and applies to the purchasing organization

in question. � Company code data is relevant to Accounting, and applies to the company code in question.

Page 47: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-22

SAP AG 1999

l Name the organizational units and master data used in Logistics Execution

l Explain the relationships between the following organizational units: plant, storage location, warehouse number, shipping point, and transportation planning point

l Create, change, and display the following master data: storage bin, material, customer, vendor

You are now able to:

Unit Summary

Page 48: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-28

Solutions

Unit: Organizational Units and Master Data

Topic: Organizational Units

1-1 Organizational Units

1-1-1 A plant is a unit that allows you to look at a company from the point of view of production, procurement, plant maintenance, and materials planning. A plant can be a central delivery plant, a regional sales office, a production site, the company’s headquarters, or even a central warehouse.

1-1-2 Stocks are summarized, and managed at the storage location level. It is not possible to determine the stock stored in a specific storage bin at the storage location level.

1-1-3 The warehouse number belongs to Warehouse Management.

1-1-4 Shipments are planned and controlled at the transportation planning point, whereas deliveries are planned and controlled at the shipping point.

1-2 Relationships Between Organizational Units

1-2-1 Shipping points are assigned at the plant level.

1-2-2 Transportation planning points are assigned to a company code.

1-2-3 In LES, a physical warehouse structure is mapped using a warehouse number, and individual storage types, storage sections, and storage bins.

1-2-4 If you want to use WM, the warehouse number must be assigned to a plant (via a storage location).

Unit: Organizational Units and Master Data

Topic: Master Data

Page 49: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-29

2-1 Creating a Storage Bin

Logistics → Logistics Execution → Master Data → Warehouse → Storage Bin → Create → Manually

2-1-1 Enter your warehouse number (###), storage type 005, and Box-## as the name of your new storage bin.

Field Name/Type of Data Values

Storage section 001

Maximum weight 2000

Putaway block X

Block reason 3 (New storage bin)

2-1-3 Logistics → Logistics Execution → Master Data → Warehouse → Storage Bin → Display

2-1-4 Logistics → Logistics Execution → Internal Warehouse Processes → Bins and Stock → Display → Empty Storage Bins

Enter your warehouse number (###), and storage type 002 (Shelf Storage).

2-1-5 Logistics → Logistics Execution → Internal Warehouse Processes → Bins and Stock → Display → Bin Status Report

Enter your warehouse number (###), and storage type 004. Place your cursor on the column entitled Duration (TiL), and press F1. This column tells you how many days the quant has already been in this storage bin.

2-1-6 Logistics → Logistics Execution → Internal Warehouse Processes → Bins and Stock → Display → Capacity Load Utilization

Enter your warehouse number (###).

2-1-7 Logistics → Logistics Execution → Internal Warehouse Processes → Bins and Stock → Block → Storage Bin Selection

Enter your warehouse number (###), and storage type 005. Select storage bin BOX-##, and click the Unblock icon. Select the Putaway block option, and press Enter. Finally, click the Save icon in the standard toolbar.

Page 50: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-30

3-1 Material Data

3-1-1 Logistics → Logistics Execution → Master Data → Material → Material → Create → Immediately

Enter material number LES04-##, and press Enter. In the Select View(s) dialog box, select the views Warehouse Management 1 and Warehouse Management 2, and then press Enter. In the Organizational Levels dialog box, enter plant 1200, and warehouse number ###, and then press Enter.

On the Create Material screen, go to the Warehouse Management 1 tab page, and enter REG in the Stock removal and Stock placement fields. On the Warehouse Management 2 tab page, enter an LE quantity of 24 PC (storage unit type E1).

3-1-2 Logistics → Logistics Execution → Master Data → Material → Material → Create → Immediately

Enter material number LES02-##, and press Enter. In the Select View(s) dialog box, select the views Warehouse Management 1 and Warehouse Management 2, and then press Enter. In the Organizational Levels dialog box, enter plant 1200, warehouse number ###, storage type 005, and then press Enter.

On the Create Material screen, go to the Warehouse Management 1 tab page, and enter FIX in the Stock removal and Stock placement fields. On the Warehouse Management 2 tab page, enter BOX-## in the Storage bin field.

Save your changes.

3-1-3 Logistics → Logistics Execution → Master Data → Material → Material → Change → Immediately → Defaults → Organizational levels

Field Name/Type of Data Values

Plant 1200

Warehouse number ###

Press Enter.

3-2 Customer Master Data

3-2-1 Logistics → Logistics Execution → Master Data → Partner → Customer → Change → Sales and Distribution

Page 51: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-31

Field Name/Type of Data Values

Customer T-S11B##

Sales organization 1000

Distribution channel 12

Division 00

Click the Sales areas data pushbutton, and then go to the Shipping tab page. Enter the following data:

Field Name/Type of Data Values

Shipping condition 50+## – ## Standard

Delivering plant 1200

Save your input.

3-2-2 Logistics → Logistics Execution → Master Data → Partner → Customer → Display → Sales and Distribution

Field Name/Type of Data Values

Customer T-S11B##

Sales organization 1000

Distribution channel 12

Division 00

Click the Sales areas data pushbutton, and then go to the Partner functions tab page. The customer has the following partner functions:

SP – Sold-to party T-S11B##

BP – Bill-to party T-S11B##

PY - Payer T-S11B##

SE – Sales employee 1205

SH – Ship-to party T-S11B##

4-1 Logistics → Logistics Execution → Master Data → Partner → Vendor → Display

Field Name/Type of Data Values

Vendor 1000

Company code 1000

Page 52: Processes in Logistics Execution Edited

(C) SAP AG LO140 4-32

Purch. organization 1000

Address Select this option

The address of customer C.E.B. Berlin is as follows:

Kolpingstr. 15

12001 Berlin, DE

Page 53: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-1

SAP AG 1999

l Inbound process in Warehouse Management (using transfer orders)

l Transfer order for putaway

l Inbound process involving inbound deliveries

Contents:

Goods Receipts

Page 54: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-2

SAP AG 1999

l Name the various options available for working through the inbound process in Logistics Execution

l Explain how transfer orders for putaway are structured, and how they are used

l Work through the inbound process (goods receipt, putaway) in a warehouse managed in WM

At the conclusion of this unit, you will be able to:

Goods Receipts: Unit Objectives

Page 55: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-3

SAP AG 1999

l In the IDES model company, when goods are received, they are put away in a warehouse managed in WM. As a member of the project team, you familiarize yourself with the various options that can be used for goods receipts in the Logistics Execution System. In the model company, when materials are received from vendors, this is recorded in the form of goods receipts that reference the corresponding purchase orders.

Goods Receipts: Business Scenario

Page 56: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-4

SAP AG 1999

l Post goods receipt against a purchase order

l Name and work with the documents used in the inbound process

At the conclusion of this topic, you will be able to:

Goods Receipts and Transfer Requirements:Topic Objectives

Page 57: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-5

SAP AG 1999

The Inbound Process

Quant inbin

Inventory Management

Quant in Quant in GR GR areaarea

Transferorder

Destination binPalletizationStrategies

Transferreqmt

Source binQuantityMaterial

Confirmtransfer

order

Difference?

Cleardifference

Purchase order

Goods receipt

Warehouse Management

n The inbound process for posting a goods receipt with reference to a purchase order and for putting away the goods in WM begins in Inventory Management (IM).

n The goods receipt is entered in Inventory Management: � A material document is created in IM � An accounting document is created in IM � A quant is created in the GR area in WM � A transfer requirement is created in WM

Page 58: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-6

SAP AG 1999

GR for Purchase Order: Document Overview

Purchaseorder

Materialdocument

Accountingdocument(s)

GR posting

External vendor orother plant

Delivery ofmaterials ordered

Transferrequirement

WM System

Purchasing/Inventory Management

n When the goods receipt is posted with reference to a purchase order, a material document in generated in Inventory Management, and an accounting document is generated in External Accounting.

n A transfer requirement is created in Warehouse Management. n Goods Receipts: Real-Life Physical Process

When goods are received, they are usually transferred first to the goods receipt (GR) area. The goods are not put away in the warehouse until a suitable storage bin has been determined for them.

Page 59: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-7

SAP AG 1999

Information in Transfer Requirement

Tranfer requirement

?GR Area GI Area

Storage type

WhatHow muchPalletizationWhenWhere fromTriggered by

n A transfer requirement (TR) contains the following information: � What is to be moved (material number, batch, stock category)? � How much is to be moved (quantity)? � How is it palletized (material document)? � What was the trigger/cause (movement type / reference)? � How much has already been moved (if partial quantity)?

Page 60: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-8

SAP AG 1999

Planning a Movement

GR Area

High-ShelfStorage

Transfer requirement

Transfer order

n A transfer requirement (TR) is created in order to plan a stock movement. n The TR is a request that a specific quantity (quant) of a material should be brought into the

warehouse (putaway) or removed from the warehouse (stock removal, or picking). n The TR provides information about anticipated stock movements. n The TR is later converted into one or more transfer orders (TO).

Page 61: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-9

SAP AG 1999

Putaway Steps

Stock available

Goods receiptposting (TO

generated from TR)

Confirmtransfer

order

Pallet slip

Transfer order

n When goods are delivered, the goods receipt is entered in Inventory Management. On the basis of the goods receipt posting, a transfer requirement and a quant in the GR area are created.

n In order to put away the goods, a transfer order is created with a reference to the transfer requirement. When the transfer order is created, the system determines the destination storage bin.

n The transfer order documents are used to physically put away the goods. The transfer quantity remains unavailable in the warehouse until the putaway is confirmed in the system.

n As soon as the physical putaway has taken place, you confirm the transfer order and also enter any differences that might arise.

n Depending on the system set-up, transfer orders can also be created automatically in the background.

Page 62: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-10

SAP AG 1999

l Explain how transfer orders for putaway are structured, and how they are used

l Describe the information contained in a transfer order

l Create transfer orders for putaway, and list the various options available for doing this

l Confirm transfer orders, thus completing the physical putaway

At the conclusion of this topic, you will be able to:

Transfer Order for Putaway: Topic Objectives

Page 63: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-11

SAP AG 1999

Goods Receipt: Process Flow

Warehouse Management

Quant in GR area

TO

Destination binPalletizationStrategies

TR

Source binQuantityMaterial

Confirm TO

Quant inbin

Difference?

Cleardifference

Purchase order

Goods receipt

Inventory Management

n A transfer order with a reference to the transfer requirement is created in WM. This document forms the basis for carrying out the actual physical transfer in the warehouse.

n When you confirm the transfer order, this informs WM that the movement has been completed. Once the transfer order has been confirmed, the goods are regarded as available. Any differences noted during putaway are also entered at this time.

n These differences are posted to an interim record fore differences. Information on differences has to be passed on to IM, where the differences are cleared.

n There are a range of options for automating this process at various points.

Page 64: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-12

SAP AG 1999

Transfer Order for Transfer Requirement

Transferrequirement

Item 1

Item 2

Header

Transfer order

Item 1

Item 2SourceDest.

SourceDest.

Item 3

GR area

n Before the goods can be actually put away, the transfer requirement has to be converted into a transfer order. If the quantity of a transfer requirement item is distributed among several storage bins (for example, one storage bin per pallet), several transfer order items will be created for this transfer requirement item. A transfer order is an instruction to move materials from a source storage bin to a destination storage bin within a warehouse number.

n Transfer orders contain the following information: � Material (quant ID), quantity to be moved, source storage bin, destination storage bin and return

storage bin n The information that the transfer order needs comes from several sources: � The material master record, WM movement type, strategies for determining the source or

destination storage bin, user input, and source documents such as transfer requirements and deliveries

Page 65: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-13

SAP AG 1999

Procedure for Creating TOs in the SAP System

Transfer requirements list

Overview of TR items

Preparation screen

Details of TO item

TR items

TR

n The transfer requirements list contains all transfer requirements that match the selection criteria specified. In this list, you can select a transfer requirement, process it and create the transfer order in the background.

n The overview of transfer requirement items contains all the items in the selected transfer requirement. It is possible to select one or several items in the list and process them either in the foreground or in the background.

n On the preparation screen, the quantity of a specific transfer requirement item is distributed to different storage bins (where appropriate, palletization instructions are proposed by the system).

n The detail screen of a transfer order item contains a source item, a destination item, and sometimes also a return item.

Page 66: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-14

SAP AG 1999

Palletization Instructions

TransferRequirement

Item 1 200 pc

PreparationScreen

Transfer Order

Item 1 50 pc

Item 2 50 pc

Item 3 50 pc

Item 4 50 pc

Mat.master50 pc onE1 pallet

n The preparation screen is used to distribute the transfer requirement quantity among the various pallets (storage bins).

n Any palletization data contained in the transfer requirement is proposed on the preparation screen. n If any default palletization data has been defined in the material master record, the system proposes

that the quantity should be distributed in accordance with these storage unit types (SUT). n You can change the proposed palletization data, or specify manually how the goods should be

palletized.

Page 67: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-15

SAP AG 1999

Printing a Transfer Order

Item 1

Item 2

Item 3

Pick List

Mat 1 from – to

Mat 2 from – to

.

.

.

Single slip Collective slip

Transfer OrderItem 1

Item 2

Item 3...

n Generally speaking, transfer order are printed out as soon as the are created, or they are passed on via radio frequency to mobile data entry devices (MDE).

n You can print out transfer orders in different ways: � As a single slip (one item per page) � As a collective slip (several items per page) � As a pick list (several transfer orders with different sort options per page)

n You can also print out bar codes (optional). n You can also print out labels for each transfer order.

Page 68: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-16

SAP AG 1999

Transfer Order Confirmation

GR area

4 4

4 Warehouse no.

TO 1895

Item Material Dest.st.type Dest.bin Difference quantity

Confirm Transfer Order

Active work...

10 T - BW 001 11 - 05 - 0520 T - BW 001 13 - 04 - 0630 T - MS 005 01 - 17

Conf.Inactive..

6/25 14:36 h

n When you confirm a transfer order or a transfer order item, you are in effect verifying that the required quantity of material has actually been transferred from one location to another and that the processing of the transfer order or item has been completed.

n The TO Confirmation function provides three different confirmation options: � Standard

1st screen - confirm that actual quantities are equal to target quantities 2nd screen - enter any differences that have arisen (1 screen per item) � Input list

A screen for confirming quantities and entering any differences � TO confirmation can be carried out directly in the warehouse using a PDC (portable data capture)

device. n You can make settings in Customizing to specify whether or not transfer orders should be confirmed

automatically.

Page 69: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-17

SAP AG 1999

Handling Differences

40 pc

GR Area

Confirmation TargetActualDifference

50 pc40 pc10 pc

GR posting

TO ItemFROM GR Target 50 pcTO Shelf

Difference postingInventory Management

50 pc

Difference10 pc

n If a difference is detected during a stock transfer, you can enter this into the system when you confirm the transfer order.

n The quantity that makes up the difference is automatically posted to an interim record for differences.

n In a second step, the differences are cleared in Inventory Management either manually or using batch input.

n When differences are processed in the system, the quantity of stock in the Inventory Management and Warehouse Management systems remains the same.

Page 70: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-18

SAP AG 1999

l Describe the options available for putting away incoming materials before the goods receipt is posted

l Explain how inbound deliveries are used for putaway

l Discuss the pros and cons of the various methods available for processing goods receipts

At the conclusion of this topic, you will be able to:

Putting Away Goods Received: Topic Objectives

Page 71: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-19

SAP AG 1999

Goods Receipt with Inbound Deliveries: Process Flow

Negative Negative quant in quant in GR GR areaarea

TO

Dest. binPalletizationStrategies

ConfirmTO

QuantQuant ininbinbin

Difference?

Goods receipt

Purchaseorder Inbound

delivery

Inventory Management Warehouse Management

Cleardifference

Adjustment?

n If you wish, you can put away goods in Warehouse Management before you actually post the goods receipt. To do this, you create an inbound delivery for a purchase order. The WM system uses this inbound delivery as a kind of 'to-do' list for putaway.

n A transfer order is created for the inbound delivery. This transfer order controls the actual physical putaway. The quantity to be put away is stored as a negative quant in the goods receipt area. In effect, this quantity is not yet regarded as available stock.

n Once the putaway has been confirmed, the goods receipt is posted. Any differences that occur can be entered in the system at this point. The quantity is now regarded as available stock.

Page 72: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-20

SAP AG 1999

Inbound Delivery

Outboundshipment

Inboundshipment Warehouse

Inbound delivery

Inbound delivery

Outbound delivery

Outbound delivery

Outbound delivery

Inbound delivery

Inbound delivery

Outbound delivery

Outbound delivery

Outbound delivery

n In the system, an inbound delivery represents the materials that are delivered and received at a goods receiving point. An inbound delivery is a document that is structured in the same way as an outbound delivery for a goods issue.

n An inbound delivery is a request that goods should be put away in a warehouse. A transfer order for putaway can be generated from an inbound delivery.

Page 73: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-21

SAP AG 1999

Collectiveprocessing

Ways of Creating an Outbound Delivery

EDI

Manually

Inbound delivery

Purchase order

Easy Web Transaction

n In the LE System, there are different ways in which you can create an inbound delivery: � Using EDI communication - where a shipping notification is transmitted from the vendor. In this

case, the system generates an inbound delivery automatically. � The inbound delivery is created manually with reference to a purchase order. � The inbound deliveries are created with the help of a worklist (if they are not created via EDI or

manually). � The inbound delivery is created by the vendor in the SAP system (via the Internet)

n If you wish to generate inbound deliveries with a worklist, the purchase order confirmation must be set up in Purchasing in such a way that inbound deliveries can be created automatically.

n Inbound deliveries should be created as early as possible in order to generate a worklist. Like transfer requirements, they do not block either storage bins or materials.

Page 74: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-22

SAP AG 1999

Information in Inbound Delivery

Inbound delivery

WhatHow muchWhenWhere fromVendorStatus

?

Inbound delivery #180005614

Vendor

Transport Status overviewItems

20 Material2 Plant Storage location ...

10 Material1 Plant Storage location ...

Putaway

n The inbound delivery contains information derived from the purchase order. This information is the same as the information contained in the trasnfer requirement: � What is to be moved (quant information)? � How much is to be moved (quantity)? � What was the trigger/cause (movement type / reference)? � How much has already been moved (if partial quantity)?

n The following statuses are kept up to date in an inbound delivery: � Putaway status � Storage status � Goods movement status

Page 75: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-23

SAP AG 1999

l Name the various options available for working through the inbound process in Logistics Execution

l Explain how transfer orders for putaway are structured, and how they are used

l Work through the inbound process (goods receipt, putaway) in a warehouse managed in WM

You are now able to:

Goods Receipts: Unit Summary

Page 76: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-30

Solutions

Unit: Goods Receipts

Topic: Goods Receipts and Transfer Requirements

1-1 Displaying stock information in WM and Inventory Management

Logistics → Logistics Execution → Internal Warehouse Processes → Bins and Stock → Display

1-1-1 To display the Inventory Management stock overview, choose Total Stock per Material (Inventory Management). To display the WM stock overview, choose Total Stock per Material (Warehouse Management).

Stock in Inventory Management overview: 0 pieces

Stock in Warehouse Management overview: 0 pieces

The stocks of the material do not yet exist in the goods receipt area.

1-2 Posting of goods receipt

Logistics → Logistics Execution → Inbound Process → Goods Receipt for Purchase Order, Order, Other Transactions → Enter Goods Receipt for Purchase Order

1-2-1 Press F4 for help, and select matchcode M: Purchasing documents for material. Enter plant 1200 and material LES04-## as search criteria. Press Enter.

Purchase order number: varies

1-2-2 Select the line containing the purchase order item for material LES04-##. The system display details of the line item in question. On the Quantity tab page, you will see the quantity that was ordered – you can change the quantity to 72 pieces.

1-2-3 Choose the Where tab page. The goods receipt is posted for storage location 0###.

1-2-4 You will also find the movement type that was used to post the goods receipt on the Where tab page. This is movement type 101.

1-2-5 Select OK for the purchase order item, and choose Post.

Material document number: varies (number assigned internally)

Page 77: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-31

1-3 Displaying stock information in WM and Inventory Management

Logistics → Logistics Execution → Internal Warehouse Processes → Bins and Stock → Display

1-3-1 To display the Inventory Management stock overview, choose Total Stock per Material (Inventory Management).

Inventory Management: _____________________________________________

1-3-2 Stock in Warehouse Management overview: Choose Total Stock per Material (Warehouse Management).

Storage type: 902

To display the storage bin, place your cursor on the line containing Plant 1200, and choose Bin stock.

Storage bin: Number of your purchase order

To view the goods receipt date, click on the available quantity – this displays the quant.

Goods receipt date: today

1-4 Displaying a transfer requirement

Logistics → Logistics Execution → Inbound Process → Goods Receipt for Purchase Order, Order, Other Transactions → Putaway → Create Transfer Order → By Material

1-4-1 Enter material number LES04-##, and press Enter. On the screen entitled List of Transfer Requirements for Material, you can see all open transfer requirements for material LES04-##. To display a transfer requirement, click the transfer requirement number in question.

Transfer requirement number: varies

Requirement type: B – Purchase order

Requirement tracking number: Number of your purchase order

Source storage type: 902 – GR Area External Receipts

Source storage bin: Number of your purchase order

Movement type: 101 – Goods Receipt for Purchase Order

Open quantity: 72 pieces

1-4-2 To display the transfer order quantity, choose Processing status.

Transfer order quantity: 0 pieces

Page 78: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-32

Unit: Goods Receipts

Topic: Transfer Order for Putaway

2-1 Putaway

Logistics → Logistics Execution → Inbound Process → Goods Receipt for Purchase Order, Order, Other Transactions → Putaway → Create Transfer Order → By Material

2-1-1 In the list of transfer requirements, choose TO in foreground to create a transfer order.

2-1-2 The system proposes palletization (3 pallets, each with 24 pieces). This information is derived from the material master record in the Warehouse Management 2 view.

2-1-3 To put away the items individually, choose Putaway foreground, and then choose Post.

2-1-4 Logistics → Logistics Execution → Inbound Process → Goods Receipt for Purchase Order, Order, Other Transactions → Putaway →Display Transfer Order → Single Document

Enter the number of your transfer order, and press Enter. You have not yet confirmed the putaway.

2-1-5 Logistics → Logistics Execution → Internal Warehouse Processes → Bins and Stock → Display → Total Stock per Material (Warehouse Management)

72 pieces are to be put away into shelf storage. Click Bin stock. The stock is not yet available.

Page 79: Processes in Logistics Execution Edited

(C) SAP AG LO140 5-33

2-2 Confirmation/differences

Logistics → Logistics Execution → Inbound Process → Goods Receipt for Purchase Order, Order, Other Transactions → Putaway → Confirm Transfer Order

2-2-1 Single Document → In One Step

Enter the number of your transfer order, and press Enter. Decrease the quantity of the third item to 22 pieces. Save the confirmation, and confirm the difference in the dialog box.

2-2-2 Logistics → Logistics Execution → Internal Warehouse Processes → Bins and Stock → Display → Total Stock per Material (Warehouse Management)

Enter material number LES04-##, and press Enter.

Storage type Quantity

002 – Shelf Storage 70 pieces

999 - Differences 2 pieces

To display the stock in Inventory Management, click MM stock.

Stock in Inventory Management: 72 pieces

2-2-3 Logistics Execution → Internal Warehouse Processes → Physical Inventory→ In Warehouse Management → Clear Differences → Inventory Management

Enter your warehouse number (###), and storage type 999. Choose Execute. On the screen entitled Clear Difference in Inventory Management, choose Clear.

2-2-4 Logistics → Logistics Execution → Internal Warehouse Processes → Bins and Stock → Display → Total Stock per Material (Warehouse Management)

Enter material number LES04-##, and press Enter.

Storage type Quantity

002 – Shelf Storage 70 pieces

To display the stock in Inventory Management, click MM stock.

Stock in Inventory Management: 70 pieces

Page 80: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-1

SAP AG 1999

l Outbound Deliveries

l Transfer Order for Outbound Delivery

l Picking

l Radio Frequency Connection

l Packing

l Goods Issues

Contents:

Goods Issues

Page 81: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-2

SAP AG 1999

l Describe and work through the outbound process for outbound deliveries

l Use the various options available for optimizing the outbound delivery process (rough workload estimate, picking waves, two-step picking, direct connection to radio frequency terminals)

At the conclusion of this unit, you will be able to:

Goods Issues: Unit Objectives

Page 82: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-3

SAP AG 1999

l In the IDES model company, goods are issued to customers using outbound deliveries. The goods are picked in a warehouse managed in WM. When you plan and perform picking, you explore the various options available for optimizing the outbound process. As a member of the project team, you want to find out how the process flows can be mapped in Logistics Execution.

Goods Issues: Business Scenario

Page 83: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-4

SAP AG 1999

l Describe how outbound delivery documents are structured and how they are used

l Create a Sales Order and work through the various options available for creating deliveries

l Describe the information contained in outbound deliveries, and specify where this information comes from

l Use the delivery monitor for creating deliveries as part of the outbound process

At the conclusion of this topic, you will be able to:

Outbound Deliveries: Topic Objectives

Page 84: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-5

SAP AG 1999

The Shipping Process

Warehouse

• Packing

..........................

..........................

..........................

. . . . . . . . . . . . . .

..........................

..........................

..........................

. . . . . . . . . . . . . .

..........................

..........................

..........................

. . . . . . . . . . . . . .

• Shipping docs • Picking• Goods issue

Functions relevant to shipping:• Determine shipping point• Determine route• Scheduling

Sales order

• Monitor shipping due dates

• Create delivery

Shipping point

1 2 3 4 5 6 7

8 9 10 11 12 13 14

15 16 17 18 19 20 21

22 23 24 25 26 27 28

29 30 31

n SAP LE functions available for shipping processing include: � Monitoring of shipping due dates in reference documents (e.g. sales orders and purchase orders) � Creating and editing outbound deliveries � Monitoring availability � Monitoring capacity in the warehouse � Picking (with a connection to Warehouse Management) � Packing the outbound delivery � Printing out and passing on shipping documents � Processing the goods issue � Controlling using overviews of

­ The outbound deliveries currently being processed ­ The activities still to be carried out ­ Potential bottlenecks

n The outbound deliveries for which goods issues are posted in the shipping department can be used to create a worklist for billing (billing due list).

Page 85: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-6

SAP AG 1999

Structure of an Outbound Delivery

Change Outbound Delivery 80004893:Change Outbound Delivery 80004893: OverviewOverview

Outbnd delivery:Ship-to party:

I tem overview

800048932145

Picking Loading Transportat ionStatus overview

All i tems

Header details:Header details:

10 1400-100 Headlights 5 PC TAN

Item details:Item details:

Header:Header:e.g. ship-to party,shipping point, route

Items:Items:e.g. material, quantity

n A delivery document comprises a header and any number of items. n The header contains data that applies to the entire document. This means, for example, that the ship-

to party, shipping point, and route are unique for each outbound delivery. n The individual items contain above all information on the material to be delivered. n The information in the delivery document is displayed on a range of different screens:

The overview screen contains header and item information, grouped thematically on several tab pages. This means that important data can be viewed on a single screen.

n A further screen is available for displaying further header and item details. This data is also grouped together thematically onto tab pages. � Header details include data sorted into the following groups: processing, picking, loading,

transportation, foreign trade/customs, texts, partners, output, package tracking, conditions, etc. � The item detail screen also contains similar tab pages with item-specific information.

Page 86: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-7

SAP AG 1999

Updating Orders

K110 M1 100PC20 M2 50PC

K110 M1 100PC20 M2 50PC

Outbound delivery

K110 M1 100PC20 M2 30PC

K110 Fully delivered20 Partially delivered

Delivery status

OrderOrder

n When the outbound delivery is created, the order in question is given a delivery status (at the header and item level). This status denotes the progress of the outbound delivery in the shipping process.

n The progress made in the shipping activity is displayed in the outbound delivery by means of statuses.

Page 87: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-8

SAP AG 1999

Document Flow

Document

. Order 5373

Delivery 80003752

. WM transfer order 2651

. WL Outbound delivery 49007029

Document flow

Date

06/05

06/09

06/09

06/10

Overall processing status

Completed

Being processed

Completed

Completed

Outbounddelivery

OrderOrder TransferTransferorderorder

...

n Since documents are interlinked in SD sales and distribution processing, it is possible to find the order that gave rise to a particular outbound delivery (or to find subsequent documents such as the WM transfer order, goods issue document, and billing document).

n It is possible to display these documents from the document flow. n The document flow and the statuses displayed here allow you to monitor the progress made in

processing an activity. n You can display the document flow at the header level, for one or for all items in the document in

question. n Note: The overall processing status of the outbound delivery is "Being processed" until the billing

document has been generated. This applies even if picking has been completed, and the goods issue has already been posted.

Page 88: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-9

SAP AG 1999

Ways of Creating an Outbound Delivery

OrderOrder Delivery

l Collective processing of orders and order items due forshipping using different selection options

l Create outbound delivery manually

n Delivery scenarios are a way of mapping the various business processes involved in a delivery. Every user can configure a delivery scenario that is tailored to his/her personal requirements. Additional criteria are available for selecting documents for delivery. These include the material, partner, document type, shipping condition, and so on.

n You can also create the outbound delivery manually.

Page 89: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-10

SAP AG 1999

Outbound Delivery Monitor

Transportation planning

Loading

Picking Goods issue

Perform and monitoroutbound delivery activities

Confirmation

Outbound delivery list

n The Delivery Monitor allows you to display and edit open and completed deliveries. You can use it to process both inbound and outbound deliveries. Since many functions work in the same way for both types of delivery, the generic term delivery is mostly used when describing these functions.

Page 90: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-11

SAP AG 1999

Process transportation

Goods issue

Process shipment document

Scheduling

Time

Sales Sales orderorder

Requested delivery date

SAP System

Actions Pick delivery

Create delivery

Plan transportation

LoadPack

Process transfer order

Process delivery

n When the goods issue activities are scheduled, the various activities required for shipping processing are taken into account. These activities include picking in Warehouse Management (i.e. making the material available for the goods issue), packing and loading the delivery, as well as planning and processing the shipment/transportation of the delivery.

n In LES, these activities are distributed among Warehouse Management (picking), Shipping (creating and editing the delivery), and Transportation (editing the shipment document). These internal processes are completed by posting the goods issue - before the goods are delivered by the requested delivery date.

Page 91: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-12

SAP AG 1999

Backward Scheduling

Time

SAP SystemRequested delivery date

Transit time

Loading time

Pick/pack time

Lead time

Order dateMaterial

availabilitydate

The earlier date is the creation date used for the delivery.

Goods issuedate

Transportationplanning

dateLoading date

Sales Sales orderorder

n The material availability date is determined by delivery scheduling. Enough of the material must be available on this date if the customer is to receive the delivery on time.

n The material availability date is determined by the system (by taking the delivery date requested by the customer and scheduling backward).

n The system also takes into account the amount of time required to pick, pack, load, and ship the goods.

Page 92: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-13

SAP AG 1999

Forward Scheduling

Time

SAP System Requested delivery date

Transit time

Loading time

Pick/pack time

Lead time

Order dateNew materialavailability

date

Goods issuedate

Transportationplanning

dateLoading date

Sales Sales orderorder

Confirmeddelivery date

The confirmed delivery date is determined using forward scheduling based on the new material availability date.

The confirmed delivery date is determined using forward scheduling based on the new material availability date.

n If the material is not available on the material availability date, the system tries to find a date on which the material is available. This date is the new material availability date.

n The system uses this new material availability date as the basis for re-scheduling (in order to determine a new delivery date).

Page 93: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-14

SAP AG 1999

Determining the Shipping Point

1000

1400

Shippingconditions Loading group

l

Other possibleshipping points

Shipping point(default value)Plant

Express

Standard

Truck shipping

point

1 2 3 4 5 6 7

8 9 10 11 12 13 14

15 16 17 18 19 20 21

22 23 24 25 26 27 28

29 30 31

Rail shipping

point

1 2 3 4 5 6 7

8 9 10 11 12 13 14

15 16 17 18 19 20 21

22 23 24 25 26 27 28

29 30 31

Express shipping

point

1 2 3 4 5 6 7

8 9 10 11 12 13 14

15 16 17 18 19 20 21

22 23 24 25 26 27 28

29 30 31

Sold-toparty

Orderitem

Material

n The shipping point responsible for the goods issue is determined on the basis of the following combination: shipping condition, loading group, and plant. This information can be derived from the following sources: � The shipping conditions are stored in the shipping view of the customer master record. � The loading group is stored in the "Sales/Plant Data" view of the material master record. � The plant is stored in the sales order.

Page 94: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-15

SAP AG 1999

l Describe the structure and content of a transfer order for an outbound delivery

l Describe the various options available for creating transfer orders for outbound deliveries

l Create transfer orders for outbound deliveries, and use these documents for picking

At the conclusion of this topic, you will be able to:

Transfer Order for Outbound Delivery: Topic Objectives

Page 95: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-16

SAP AG 1999

Steps in the Outbound Process

Postgoods issue

Create TO foroutbounddelivery

Transfer order

Confirmtransfer

order

n In order to pick a material, an outbound delivery is created. n To pick the goods, a transfer order is created with a reference to this outbound delivery. When the

transfer order is created, the system determines the source storage bin. n The goods are physically removed from the warehouse with the help of the transfer order documents. n As soon as the physical stock removal is completed, the user confirms the transfer order. Here it is

possible to enter differences straight away. n Once the transfer order has been confirmed, the goods issue is posted. You can work through this

step when you are confirming the TO. n Depending on your system setup, you can specify that the system should create transfer orders

automatically in the background.

Page 96: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-17

SAP AG 1999

Transfer Order for Outbound Delivery

Transfer order

Src - Dest

Src - Dest

Src - Dest

Src - Dest

Src - Dest

Src - Dest

Delivery

Item 1

Item 2

Item 3

GI area

n A transfer order is created for the outbound delivery so that the corresponding materials can be picked. It is possible that several TO items might result from a single outbound delivery item. The appropriate source storage bins are determined in the transfer order. The destination storage bins are located in the goods issue area (GI area).

n You can enter default values for the selection of storage bins, leave it to the system to search in accordance with the strategies defined in Customizing, or change these proposals manually.

Page 97: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-18

SAP AG 1999

Lean WM - Using a TO as a Pick Order

DeliveryTransferorder

Fixed bin 01

Warehouse number 010 (Lean WM)

Fixed bin 02

Fixed bin 03

Fixed bin 04

Output options

Individual TOs:

• Individual printout

• Multiple printout

Groups:

• Individual printout

• Multiple printout

• Pick list

Send IDocs to subsystems

n Lean WM functionality makes it possible to create transfer orders for deliveries even if storage bins are not managed in the WM component.

n Transfer orders that are created for deliveries in Lean WM are used to pick stock from available fixed bins in the warehouse that are managed entirely at the storage location level.

n The characteristics of a transfer order created for Lean WM are basically the same as for any transfer order: � You can specify whether or not the transfer orders created for Lean WM are subject to

confirmation. � You can confirm overdeliveries, shortages and batches. � You can print out the transfer orders using WM functionality. � You can transmit Lean WM transfer order data to external systems. � You can enter performance data (such as assignment to a picker, confirmation of actual times, or

determination of target times) for this type of transfer order.

Page 98: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-19

SAP AG 1999

Connection Between Shipping and WM

YesYes

NoNo

No

Createoutbounddelivery

Pick from fixed bin

PostGI

Pickingstorage loc.?

Differences

?

TO printout

IDoc

Create TO

Lean WMLean WM WMWM

Confirm TO

YesYes Copy TO datato delivery?

Pick

Create TO TO printoutTO printout

IDoc

n WM and Shipping are linked to each other via the picking location. n If the picking location is managed in WM, the outbound deliveries are also picked in WM. When the

transfer order is processed, the storage bins from which the materials are to be picked are determined. Picking is carried out on the basis of the information in the TO. The picking process ends with confirmation (and the option of entering differences).

n If the picking location is managed using Lean WM, the source bin is determined on the basis of the fixed bin of the material (and not on the basis of a strategy).

n The process is completed by posting the goods issue.

Page 99: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-20

SAP AG 1999

Ways of Creating TOs for Deliveries

l Create transfer order manually

l Create transfer order from Delivery Monitor

l Create transfer order automatically/directly

l Collective processing for a group of deliveries

l Create transfer order as a subsequent function for the delivery

Transfer orderDelivery

n There are different ways of creating TOs for an outbound delivery: � Manually using the "Transfer Order for Outbound Delivery" transaction. � In the Outbound Delivery Monitor, by selecting all outbound deliveries due for picking, and

creating TOs for these. � Create TO directly/automatically upon creation of the outbound delivery. � Multiple processing for several deliveries. � TO as a subsequent function of the outbound delivery.

Page 100: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-21

SAP AG 1999

Creating Groups in the Outbound Delivery Monitor

Print withoutgroup

Collective processing:Create transfer ordersfor group

Release/print with group

LSR interfaceIDocRelease Group #23

Pick listGroup #23

Select and assignto group

DL 4711

DL 4720DL 4725

DL 4813

Group #23

Transferorder

for DL 4711

Transferorder

for DL 4725

Transferorder

for DL 4720Transferorder

for DL 4813

Outbound Delivery Monitor:Create transfer orders individually

n You can group together outbound deliveries. This group of outbound deliveries can then be processed further as a single entity. You can use a range of criteria to select the deliveries in the Outbound Delivery Monitor, and then group these deliveries together into a single group.

n The TOs in a group can be printed out individually, or printed out together as a group in a pick list. If you use the group printout option, various options are available for sorting the individual items.

n When you release a group, this triggers printout or transmission of IDocs to subsystems.

Page 101: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-22

SAP AG 1999

Ways of Creating TOs: WMTA

Output

WMTA

RLAUTA20Batch

program

Transaction:Output from

deliveries

Process directlyupon creation

of delivery

Create TOautomatically

Create TOdirectly

Job

Transaction

Immediately

Delivery

Shipping pt. 1200Shipping condition Immediately

Delivery typeLFShippingconditionImmediately

n At the interface from SD Shipping to WM, you can specify whether transfer orders should be created directly or automatically for deliveries. Processing is controlled by the output control function of the shipping module. Using the condition technique, you can trigger output type WMTA when the delivery is created. In this case, at least one item of the delivery must be relevant to WM. The "Shipping point / Delivery type" combination is responsible for determining the output type.

n Depending on how output type "WMTA" is set up, there are a range of different types of processing: � The output is processed either using a batch program, or manually using the "Output for Delivery"

transaction. Since this processing type is executed separately from the delivery creation process, we refer to this as Automatic Transfer Order Creation. � If TOs are created directly, output processing is triggered immediately after the delivery has been

created. Therefore, this is referred to as Direct (Immediate) Transfer Order Creation.

Page 102: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-23

SAP AG 1999

l Name the options available for optimizing the picking process

l Use the rough workload estimate to forecast the workload in the warehouse

l Use picking waves to group together tasks in the warehouse

l Use two-step picking to optimize the picking process

At the conclusion of this topic, you will be able to:

Picking: Topic Objectives

Page 103: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-24

SAP AG 1999

Rough Workload Estimate: Objectives

Resources Processes

l Goods receipt

l Picking and goods issue

l Returns to vendor

l Returns from customer

l Human resources

l Pallets

l Forklifts

l ...

n The rough workload estimate is a tool that enables you to forecast the expected workload in a warehouse. The future workload involved in warehouse processes such as goods receipts for purchase orders, goods issues for deliveries, and returns from customers or to vendors, is estimated. You can use the information in the rough workload estimate to plan the resources you will require.

n Business processes are regarded as requirements for the rough workload. You can define operations and assign them to the business processes to refine your analyses.

Page 104: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-25

SAP AG 1999

Rough Workload Estimate: Key Figures

l Weight

l Volume

l Quantity (quantity unit group)

l Number of document items

l Time for workload

l Shipping materials

n Key figures are summarized and displayed for the individual days on which the workload is due, warehouse numbers, etc.

n The standard key figures for analysis in the RWE include weight, volume, quantity, and number of document items. These key figures are available immediately, without additional customizing.

n With additional customizing, it is possible to include time as a factor in your analyses. You can assign standard times to business process and operations - this means that the analysis is calculated in a unit of time.

Page 105: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-26

SAP AG 1999

Picking Waves

TO 4

TO 5

TO 6

TO 1

TO 2

TO 3

TO 7

TO 8

TO 9

Warehouse Number 001

TO 10

TO 11

TO 12

TO 13

TO 14

TO 15

TO 16

TO 17

TO 18

Wave 200002301

May 25 0900 hCompany

Invoice

Company

InvoiceDel 1 MMMCompany

Invoice

Company

InvoiceDel 2 MMMCompany

Invoice

Company

InvoiceDel 3 MMMCompany

Invoice

Company

InvoiceDel 4 MMMCompany

Invoice

Company

InvoiceDel 5 MMMCompany

Invoice

Company

InvoiceDel 6 MMM

Wave 200002302

May 25 1600 h

n Picking waves are groups of deliveries that have been grouped together using time-based criteria. These time-based criteria refer to activities in the warehouse. A picking wave corresponds to one group, and is processed accordingly in the warehouse.

n You can create picking waves for transfers. n You can create transfer orders, print out pick documents/connect up external systems, confirm

transfer orders, print out deliveries, print out loading lists, trigger transfer activities, post goods issues, and trigger billing - all with reference to a picking wave.

Page 106: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-27

SAP AG 1999

Two-Step Picking

Pick TO for one group

Step 1: Picking

Item 1 Mat.01 10 pc

From 001To 200

From 001 To 200

Item 2 Mat.02 10 pc

Step 2: Allocation

FROM: 200TO: 916

TO #252

Mat.01 3 pcMat.02 1 pc

FROM: 200TO: 916

TO #251

Mat.01 4 pcMat.02 5 pc

FROM: 200TO: 916

TO #250

Mat.01 3 pcMat.02 4 pc

DEL 4813Mat.01 3 pcMat.02 4 pc

DEL 4814Mat.01 4 pcMat.02 5 pc

DEL 4815Mat.01 3 pcMat.02 1 pc

Group

Material-basedpicking

Delivery-basedallocation

n In 2-step picking, the removal of the material is optimized with regard to quantity. The quantities required are grouped together, totaled up, and picked as an "overall quantity" (pick step). The group can consist of deliveries or transfer requirements. The destination storage type is an interim storage type.

n In a second step, the quantities are allocated to the individual requirements (allocation). This step is a multiple processing step, and can also include materials picked using 1-step picking (direct picking).

n In the standard system, the material in question determines whether 2-step picking is used.

Page 107: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-28

SAP AG 1999

l Explain how radio-frequency terminals in a warehouse are linked up directly to an SAP System for paper-free communication

l Explain how queues are used for processing transfer orders, and describe processor assignment

l Use the RF Monitor to monitor the RF activities in a warehouse

At the conclusion of this topic, you will be able to:

Radio Frequency (RF) Connection: Topic Objectives

Page 108: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-29

SAP AG 1999

Advantages of RF Connections

l Fast, reliable, accurate processing of individual goods movements

l Simple, easy-to-understand control mechanism for warehouse staff

l Paper-free communications usingportable data capture devices

l Low costs

l Improved quality resulting from fewer errors

n The radio frequency (RF) solution is new in the Enjoy release. The IDoc interface will continue to be supported. Both solutions set out to achieve different goals. The pros and cons of each are detailed in the table below: MOB / LSR Direct Radio Frequency Connection ------------------------------------------------------------------------------------------------------------ Can also be used offline Online solution Individual program interface Standard solution with growing functionality Requires third-party software New ABAP transactions easy to create For complex automated warehouses Cheaper Very secure, asynchronous data transfer Plug-and-play solution

Page 109: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-30

SAP AG 1999

Radio Frequency Activities

2. Stock removals

6. Queue

5. Loading control

3. Inventory

4. Query

1. Putaways

F8 - Exit F2 - Reset F3 - Back F4 - Cont

SAP R/3

2. For delivery

3. Managed

1. Select by TO

F8 - Exit F2 - Reset F3 - Back F4 - Cont

SAP R/3

Select an RF activity by clickingpushbutton/pressing function key

Following RF activity appearson the next screen

n Putaway process A warehouse employee scans in the storage unit or transfer order; a destination storage bin is assigned on the basis of this information. If the materials are to be put away in this bin, the storage bin can be verified. This completes the putaway process.

n Picking process (stock removal process) A warehouse employee receives the next transfer order on his/her RF terminal; this contains the information on where the next material is to be picked. The material number of EAN can be verified (by scanning it in) at the storage bin in question. The material is then transferred to the GI area.

n Loading control It is possible to control packing and unpacking using RF terminals. This can be done using various selection criteria (such as loading for a shipment or outbound delivery on the basis of identifiable shipping elements).

n Inventory The inventory can be performed for storage bins or for storage units. Users can select a specific bin to be inventoried, or they are assigned to an inventory document. Users can then work in the system.

n Stock information It is possible to display information on bin stocks. Information can be selected on the basis of storage bin, goods receipt date or shelf life exp iration date.

n Queue When TOs are created, they are assigned to different queues, and represent a specific workload for the queue in question. It is possible to change the assignment of users to queues - this allows you to react quickly and flexible to changes.

Page 110: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-31

SAP AG 1999

Picking Using RF: Scanning Bins

F8 - Exit F2 - Reset F3 - Back F4 - Cont

SAP R/3

Source information

Source bin 008 01- 05 - 18

Material information

T-BW01-00 50 pc

n Users have to verify specific pieces of information when they confirm transfer orders. They might, for example, have to verify the destination storage bin, or the actual quantity transferred. The ID of the bin that is scanned in is compared with the information contained in the transfer order.

n This verification can be defined individually for source screen and destination screens. The fields that can be verified are as follows: � Storage bins

The bin verification data scanned in is compared with the verification field in the storage bin data. This verification field can contain the name of the storage bin in question, or some other ID. You can use a special transaction to enter data in this field. � Storage unit number � Material number

The material number can be the SAP material number, the old material number from the material master, or the EAN. � Quantity

Page 111: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-32

SAP AG 1999

Goods receipt

Goods issue

High rack storageFixed bin storage

RF Queue Management

TO #45

TO #46

TO #47

Goods receipt queue:

TO #45

TO #46

Goods issue queue:

TO #47

n Queues grouping together similar activities are defined to make it easier to coordinate the activities in a warehouse. For example, you might define a queue that groups together all of the activities involved in a goods receipt. The transfer orders are then processed within this queue. The transfer orders and users are assigned to queues.

n Queues are required for coordinating the RF activities in a warehouse. Users can only display the TOs in their own specific queue.

n You can define queues for various activities, doors or areas in a warehouse number. This allows you flexibility in defining the various queues that coordinate the processing of the TOs.

Page 112: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-33

SAP AG 1999

User Mick Jones

Goods issue queue

Radio Frequency Monitor

TA#46TA#48

User Joe Strummer

TO #46TO #46

TO #45TO #46TO #48

TO #47

Goods receipt queue

TO #45

TO #46

TO #51

n The RF Monitor is a tool that enables you to coordinate the activities and users that are assigned to the various queues. The monitor assigns the new TOs to the various queues. It does this on the basis of the type of transfer involved (putaway or pick), and on the basis of the source and destination data contained in the transfer orders. You can also manage the workload and the capacities of the queues.

n You can display the number of TOs assigned, as well as monitoring the behavior of the users assigned and displaying the actual workload in the queue. You can process additional detailed information for individual TOs - sorted by creation date and time.

n You can move transfer orders and users manually from one queue to another by dragging and dropping them. This gives you more flexibility, and allows you to react quickly to unforeseen circumstances.

n A transfer order can be passed on to another queue. If no users are available for processing the TO, the TO can be passed on automatically.

n You can change the transfer priority of a TO (and thus influence the sequence in which TOs are processed).

Page 113: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-34

SAP AG 1999

l Pack the materials for an outbound delivery

l Explain the relevant packing terms

l Describe the inventory management options available for packaging materials

At the conclusion of this topic, you will be able to:

Packing: Topic Objectives

Page 114: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-35

SAP AG 1999

Packaging Materials

Carton

TruckPallet

Wire basket Crate

Container

n Packaging materials are materials that can be used to pack or transport goods. n If you wish to store packing information for outbound deliveries, you must specify packaging

materials. n You must have created a material master record for each packaging material. In the standard system,

you can use material type VERP for these materials. You enter special information such as the permissible packaging weight and volume in the material master. You can, however, also make these fields ready for input for other material types.

Page 115: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-36

SAP AG 1999

Handling Units as Shipping Elements

M1 10 pcM3 20 kg

Unpacked DeliveriesUnpacked Deliveries

Handling unit

Delivery: 80000327

Material Quantity

M1 10 pcM3 20 kg

Pack

Delivery: 80000327

Material Quantity

M1 10 pcM3 20 kg

n Selected items in an outbound delivery can be packed into an individual packaging material, referred to as a handling unit (package).

n The handling unit is either assigned a unique sequential number from a predefined number range, or it can be given a unique name based on SSCC18 (serialized shipping container code).

n The handling unit header contains information on the packaging material into which the items were packed. The content overview of the shipping element shows which delivery items or other shipping elements are contained, and also details the quantities of these.

n You can change the data defaulted from the material master record of the packaging material. You can also enter an external ID (the pallet number, for example).

Page 116: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-37

SAP AG 1999

Packing: Functions

Pallet 3011

Container 7821

Crate1

Pallet 5211

Packing list

Shippinglabel

Delivery

Crate2

Crate3

Crate4

n Packing is in effect the assignment of delivery items to shipping materials. The resulting handling units can then be packed into further handling units. This, in turn, results in new handling units. There is no limit to the number of levels of handling units you create (multi-level packing).

n You can unpack from handling units, and you can also empty and delete handling units. n For items involving a batch split, you can specify in the delivery item category whether packing

should be carried out for the main item (using the total quantity derived from the batch split items), or for the individual batch split items. If you pack the batch split items individually, you will be able to identify the handling unit in which a specific batch is to be found.

Page 117: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-38

SAP AG 1999

Handling Units in the Supply Chain

l Handling Units

n Describe what is packed how

n Have an identification number (licence plate eg. EAN128 or UCC128)

n Have a history

n Simplify the operation in the Supply Chain

n Are known by all logistic applications

l Enabling

n Goods movements without typing material numbers

n Customer specific packing

n Inventory control per HU

n HU‘s simplify the processes in logistics. Any goods movement can be done for the handling unit. n A HU only has to be created once. The content and the history information is kept in t he handling

unit and from here available to the different logistics components.

Page 118: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-39

SAP AG 1999

Business Processes Inbound

Inbound business processes covered with Handling Unit Management

l Goods Receipt Process

n Handling Units in the inbound delivery / ASN

n Quality Management with HU‘s

n Putaway in the warehouse

l Production Replenishment

n Order dependent (Pick Parts)

n Order independent

l Special processes in Production

n Material Reconciliation

n Goods receipt and putaway are two basic processes in the warehouse, and they take place when goods are delivered from a vendor or from production. The putaway process includes putting away goods in storage bins in the warehouse. You can use the putaway strategies in WM to find a suitable bin easily.

n When a vendor notifies the goods recipient of the delivery of goods by using a shipping notification, this can also contain packaging information. The shipping notification generates an inbound delivery that includes the packing data from the shipping notification. Also, an inspection lot in QM can be created for the HU`s and the stock then is posted into quality inspection stock upon goods receipt.

n For production supply, you can carry out material staging of production order components with HU´s in conjunction with WM.

n You can also use material reconciliation with HU`s. Material reconciliation is used to analyze and verify ingredients at the end of the production process in process manufacturing. It allows to compare the material quantity that actually flowed in with the planned quantity or the quantity of the material produced.

Page 119: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-40

SAP AG 1999

Business Processes Outbound

l Finished Goods processes in production

n Packing in production

n Goods Receipt from production

l Picking and packing

n Pick HU‘s

n Handling Units in the Delivery

n Handling Units and RF

n Delivery Split with HU‘s

l Handling Units in the shipment

l Plant to plant movements

Outbound business processes covered by Handling Unit Management:

n Packing finished goods in production means, you can group material produced from a production order in HU‘s. You pack the material and post goods receipt with reference to to the HU or to the order. This means that material can be divided beteen several handling units.

n Since all inventory is principally managed with HU‘s, it is necessary, even for pick TO‘s, that the stock is repacked into HU‘s.

n Using the mobile data processing function, you can perform quick and error-free data transfer since the data entered through scanning the bar codes is posted synchronously in the SAP R/3 system.

n HU‘s are known in transportation as well since a container could be packed into a truck.

Page 120: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-41

SAP AG 1999

l Describe the various options available for posting a goods issue in the Logistics Execution System

l Complete the outbound process by posting a goods issue

At the conclusion of this topic, you will be able to:

Posting a Goods Issue: Topic Objectives

Page 121: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-42

SAP AG 1999

All shipping activities

completed?

Posting a Goods Issue: Overview

Delivery 80003714

Goods issue ü

1 2 3 4 5 6 7

8 9 10 11 12 1 3 1 4

15 16 1 7 1 8 19 20 21

22 2 3 24 25 2 6 27 2 8

29 3 0 31

• Manually (change outbound delivery)

• Multiple processing

• During TO confirmation

• Using Outbound Delivery Monitor

Shipping point

n Shipping activities are completed when a goods issue is posted for the outbound delivery. n All compulsory shipping activities must be completed before you can post the goods issue. These

might be compulsory confirmation, or compulsory picking status. n You can post the goods issue by changing an individual outbound delivery. Alternatively, you can

use the multiple processing function to first of all select all outbound deliveries for which a goods issue is to be posted, and then to actually post goods issues for these. You can use the Outbound Delivery Monitor for this.

n You can also post the goods issue when you confirm the transfer order. n When you change an individual outbound delivery, you can specify the actual goods issue date

(without changing the planned date) before posting the goods issue. n The goods issue applies to the entire outbound delivery. If any errors occur, these are logged (if, for

example, batch or serial number information is missing for unpicked or partially picked items). If errors occur, the goods issue is not posted.

Page 122: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-43

SAP AG 1999

Effects of a Goods Issue Posting

Order

Goods issue

Account 1 Stock

X X

Materialstock

DeliveryBillingdue list

Material 1 100PC

Outbound delivery

Interimstoragearea

n Once you have posted the goods issue for the outbound delivery, certain restrictions are imposed as to the data you can change in the delivery - for example, you cannot change any quantities. This is because the outbound delivery must be a precise reflection of the real-life situation.

n The goods issue � Reduces the stock in Inventory Management, and clears the interim storage bins. � Posts the value change to the balance sheet accounts of inventory accounting. � Clears the delivery requirements. � Writes status information in the outbound delivery. � Is recorded in the document flow. � Creates the billing due list.

Page 123: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-44

SAP AG 1999

l Describe and work through the outbound process for outbound deliveries

l Use the various options available for optimizing the outbound delivery process (rough workload estimate, picking waves, two-step picking, direct connection to radio frequency terminals)

You are now able to:

Goods Issues: Unit Summary

Page 124: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-57

Solutions

Unit: Goods Issues

Topic: Outbound Deliveries

1-1 Creating a sales order

1-1-1 Logistics → Sales and Distribution → Sales → Order → Create

Field Name/Type of Data Values

Order type OR

Sold-to party T-S11B##

Purchase order number ##-01

Material LES02-##

Quantity 5

Material LES04-##

Quantity 5

Choose Save. The order number is assigned internally (i.e. automatically by the SAP R/3 System).

1-1-2 Logistics → Sales and Distribution → Sales → Order → Display

Enter the number of your order, and choose the Shipping tab page. You will see the following information for both items:

Item 10: Plant 1200 (Dresden)

Item 20: Plant 1200 (Dresden)

1-1-3 Item 10: Shipping point X0## (Dresden)

Item 20: Shipping point X0## (Dresden)

1-1-4 A shipping point is the physical location or group of persons responsible for processing shipping activities. Every delivery is processed by one shipping point.

Page 125: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-58

1-2 Information in the order on the plant

1-2-1 The delivery plant can be derived from the customer material information (on the sold-to party), from the master data of the ship-to party (sales area data), or from the material master (in the sales view “Sales org. data 1”).

1-2-2 If a delivering plant has not been specified, no delivering plant is defaulted in the order. Exception: You have specified a default value manually in the Delivering plant field in the header of the sales document.

1-3 Information in the order on the shipping point

1-3-1 The delivering plant, shipping condition of the sold-to party, and loading group of the material are used to derive the shipping point.

1-3-2 Delivering plant 1200, shipping condition 50+## (e.g. 70 for course group 20) and loading group “Forklift” were used to determine the shipping point.

1-4 Scheduling

Logistics → Sales and Distribution → Sales → Order → Display

1-4-1 Enter your order number. Select item 10, choose Schedule line for item, and then click the Shipping icon. Make a note of the dates displayed.

1-4-2 The shipping activities must be started on the material availability date.

1-4-3 Picking, packing, and transportation planning must be completed.

2-1 Creating an outbound delivery

Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Outbound Delivery → Create → Single Document → With Reference to Sales Order

2-1-1 No. The scheduling data in the order shows that you do not have to start processing shipping today (you can start in a few days’ time).

2-1-2 Yes. Processing of shipping must have commenced on the material availability date so that the goods are delivered to the customer on the confirmed delivery date.

3-1 Displaying an outbound delivery

Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Outbound Delivery → Display

3-1-1 To view the overall status, choose Header details, and then choose the Processing tab page.

To display detailed information on item 10, choose Item overview, select item 10, and then choose Item details.

Page 126: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-59

Overall status of picking: A – Not yet picked

Overall status of WM activities: A – WM-TO required

Warehouse no.: ###

Storage type: 916

Bin (WM): The number of your outbound delivery

Goods issue status of item 10: A – Not yet started

3-1-2 The warehouse number is determined by the picking storage location on the basis of the combination of plant, shipping point and storage condition defined for the material.

3-1-3 The delivery quantity is 5 pieces, and the picked quantity is 0 pieces.

3-1-4 Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Outbound Delivery → Change → Single Document

The goods issue cannot be posted for the outbound delivery because the outbound delivery has not yet been fully picked.

Page 127: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-60

Unit: Goods Issues

Topic: Transfer Order for Outbound Delivery

4-1 Stocks and statuses

4-1-1 Logistics → Logistics Execution → Internal Warehouse Processes → Bins and Stock → Display → Total Stock per Material (Warehouse Management)

Enter material LES02-##.

Storage type Storage bin Quantity

___________ ___________ _________

___________ ___________ _________

___________ ___________ _________

Stock in Inventory Management

____________________________________________________________

4-1-2 Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Outbound Delivery → Display

Enter your outbound delivery. To display detailed information on item 10, choose Item overview, select item 10, and then choose Item details.

Picking: A – Not yet picked

WM activities: A – WM-TO required

Goods issue: A – Not yet started

4-2 Creating a transfer order

4-2-1 You can create transfer orders for outbound deliveries in the following ways: Manually using the “Transfer Order for Outbound Delivery” transaction; by selecting the outbound deliveries due for picking from the outbound delivery monitor and creating the transfer orders; by creating transfer orders directly or automatically once you have created an outbound delivery; using the collective processing function for several deliveries; or by specifying the creating a transfer order is a subsequent function of the outbound delivery.

Page 128: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-61

4-2-2 Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Picking → Create Transfer Order → Single Document

Enter the number of your outbound delivery, and your warehouse number (###). On the screen of the items to be processed, select the first item, and choose Storage type search sequence.

4-2-3 Movement type 601 – GR delivery note

4-2-4 Storage type = 916; storage bin = Number of your outbound delivery.

4-2-5 Choose Stock removal foreground, and confirm the warning that tells you to check the storage bin. You can change the storage bin from which the goods are to be picked.

4-2-6 To go to the next material, choose Generate and next material.

4-2-7 To view the stock of the material in specific bins, choose Stock. Select the pallet that only has 22 pieces (this is the one from the goods receipt exercise), and take 5 pieces from it.

4-2-8 Save your transfer order, and make a note of the transfer order number.

4-3 Stocks and statuses

4-3-1 Logistics → Logistics Execution → Internal Warehouse Processes → Bins and Stock → Display → Total Stock per Material (Warehouse Management)

Enter material LES02-##.

Storage type Storage bin Quantity

___________ ___________ _________

___________ ___________ _________

___________ ___________ _________

Stock in Inventory Management

____________________________________________________________

Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Outbound Delivery → Display

Page 129: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-62

4-3-2 Enter your outbound delivery. To display detailed information on item 10, choose Item overview, select item 10, and then choose Item details.

Picking: C – Fully picked

WM activities: B – Ex. open TO items

Goods issue: A – Not yet started

Picked quantity: 5 pieces

4-4 Confirming the transfer order

4-4-1 Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Picking → Confirm Transfer Order → Pick Step

Enter the number of your transfer order, and choose Input list. Confirm the transfer order by saving it.

Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Picking → Display Transfer Order

The confirmation status of the source data is Withdrawal confirmed.

4-4-2 Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Picking → Confirm Transfer Order → Transfer Step

Enter the number of your transfer order, and choose Entry list. Confirm the transfer order by saving it.

Logistics → Logistics Execution → Internal Warehouse Processes → Bins and Stock → Display → Total Stock per Material (Warehouse Management)

Enter material LES02-##.

Storage type Storage bin Quantity

___________ ___________ _________

___________ ___________ _________

___________ ___________ _________

Stock in Inventory Management ____________________________________________________________

Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Outbound Delivery → Display

4-4-3 Enter your outbound delivery. To display detailed information on item 10, choose Item overview, select item 10, and then choose Item details.

Picking: C – Fully picked

WM activities: C – WM TO confirmed

Goods issue: A – Not yet started

Page 130: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-63

Picked quantity: 5 pieces

Page 131: Processes in Logistics Execution Edited

(C) SAP AG LO140 6-64

Unit: Goods Issues

Topic: Goods Issue for Outbound Delivery

5-1 Posting the goods receipt

Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Outbound Delivery → Lists and Logs → Outbound Delivery Monitor

5-1-1 Choose For goods issue, and enter your shipping point (X0##). Select your outbound delivery, and choose Goods issue. Display the outbound delivery by double-clicking it. To find out the number of the material document, choose Environment → Document flow.

5-1-2 Logistics → Logistics Execution → Internal Warehouse Processes → Bins and Stock → Display → Total Stock per Material (Warehouse Management)

Enter material LES02-##.

Storage type Storage bin Quantity

___________ ___________ _________

___________ ___________ _________

___________ ___________ _________

Stock in Inventory Management

__________________________________________________________

Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Outbound Delivery → Display

5-1-3 Enter your outbound delivery. To display detailed information on item 10, choose Item overview, select item 10, and then choose Item details.

Picking: C – Fully picked

WM activities: C – WM TO confirmed

Goods issue: C – Completed

Picked quantity: 5 pieces

Page 132: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-1

SAP AG 1999

l Inbound and outbound shipments

l Shipment documents

l Shipment cost documents

Contents:

Transportation

Page 133: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-2

SAP AG 1999

l Describe where and how transportation fits into the supply chain

l Create, plan, and process shipments

l Calculate shipment costs

At the conclusion of this unit, you will be able to:

Transportation: Unit Objectives

Page 134: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-3

SAP AG 1999

l In the IDES model company, deliveries are grouped together and planned as shipments. This optimizes the supply chain. The shipment costs incurred also have to be calculated. Since you are the project team member responsible for this, you have to familiarize yourself with the transportation activities in Logistics Execution.

Transportation: Business Scenario

Page 135: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-4

SAP AG 1999

l Describe where and how transportation fits into the supply chain

l Name the different types of shipment possible (inbound shipment, outbound shipment, individual shipment, collective shipment, transportation chain), and explain how they differ from each other

At the conclusion of this topic, you will be able to:

Inbound and Outbound Shipments: Topic Objectives

Page 136: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-5

SAP AG 1999

Transportation Activities in the SAP System

From plant to customer á Outbound shipments

Transportation activities deal with the shipping of goods ...

From vendor to plant á Inbound shipments

From plant to plant á Stock transfer

n A shipment is a collection of outbound or inbound deliveries with the same conditions for transportation.

n If deliveries are to be shipped on time and arrive at the customer site accordingly to plan, the transportation process must be handled efficiently.

n The Transportation part of Logistics Execution provides you with the most important functions you need for handling inbound and outbound shipments.

n Different type of shipment are used to manage the transportation process.

Page 137: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-6

SAP AG 1999

Inbound Shipments

PurchaseOrder

Inbound Delivery

GoodsReceipt

InboundInvoice

Inbound Shipment

Vendor

Plant

n The shipment type contains all the information required for controlling a shipment (e.g. the number range, and whether the shipment is an inbound or outbound shipment).

n Inbound shipments are part of the inbound process, and are made on the basis of inbound deliveries. n An inbound shipment is the transportation of the delivery from the vendor to your own plant. n The goods receipt for this is then posted. Invoice verification is the final activity in the purchasing

process.

Page 138: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-7

SAP AG 1999

Outbound Shipments

Order OutboundDelivery

GoodsIssue

OutboundInvoice

OutboundShipment

Plant

Customer

n An outbound shipment is another type of shipment. Outbound shipments are part of the outbound process, and are made on the basis of outbound deliveries.

n An outbound shipment is the transportation of goods from your own plant/shipping point to the customer.

n The goods issue is then posted, and the invoice for the goods created.

Page 139: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-8

SAP AG 1999

Shipment

Individual Shipments

DELIVERY 2

From: Hamburg

To: Frankfurt

Load: B

DELIVERY 1

From: Hamburg

To: Frankfurt

Load: A

Hamburg

Frankfurt

Delivery 1,2

AABB

n Individual shipments are yet another separate type of shipment. An individual shipment is characterized as follows: � One or more inbound/outbound deliveries are involved in the shipment � There is one point of departure and one point of destination � Normally, only one mode of transport is involved � One shipment document is created

Page 140: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-9

SAP AG 1999

Collective Shipments

DELIVERY 2

From: Hamburg

To: Frankfurt

Load: B

DELIVERY 1

From: Hamburg

To: Stuttgart

Load: A

ShipmentHamburg

Frankfurt

AABB Delivery 1,2

Stuttgart

Delivery 1AA

n A collective shipment is another type of shipment. A collective shipment is characterized as follows: � One or more inbound/outbound deliveries are involved in the shipment � There can be one or more points of departure and one or more points of destination � Normally, only one mode of transport is involved � One shipment document is created

Page 141: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-10

SAP AG 1999

Transportation Chain

Shipment 2

Delivery 3-6

Shipment 1

Delivery 1,2

Hamburg Harbor New York Harbor

Time

Shipment 3

Delivery 1-6

Locations

Dresden Boston Philadelphia

Preliminarylegs

Main legSubsequent legs

Shipment 5

Delivery 3

Shipment 6

Delivery 4-6

Shipment 4

Delivery 1,2

n A transportation chain enables you to manage shipments where inbound/outbound deliveries are made using several modes of transport. In other words, the deliveries are involved in different shipments.

n A transportation chain is characterized as follows: � One or more inbound/outbound deliveries are involved in several shipments � There can be one or more points of departure and one or more points of destination � Several modes of transport can be involved � Several shipment documents are created: preliminary legs, main legs and subsequent legs. In each

case, separate shipment types are available.

Page 142: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-11

SAP AG 1999

l Describe how shipment documents are structured, and what they are used for

l Name the different methods that can be used to create a shipment

l Describe the information contained in shipment documents

l Create, plan, and process an outbound collective shipment

At the conclusion of this topic, you will be able to:

Shipment Documents: Topic Objectives

Page 143: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-12

SAP AG 1999

Transportation Planning and Processing

Transportation Planning:

Transportation planning covers all planning and organizational activities that have to be performed before an actual shipment is made

Transportation Processing:

Transportation processing (akashipment completion) covers all the steps required for making an actual shipment

n Transportation planning involves a whole range of further tasks. n All the information pertaining to these tasks can be stored in a shipment document. n Some of this information is determined by the shipment type (the means of transport, for example),

or is copied from the deliveries (shipping elements, service agents, routes and route stages, for example). You can change this defaulted data as required.

n You enter other pieces of information manually in the shipment document (deadlines, comments, texts, etc.).

n A range of activities can be performed before the shipment leaves the shipping point. These activities follow on from the planning activities, and are linked inextricably with actually carrying out the shipment. These activities are normally not started until the means of transport is present.

n You can store information and data on these activities in the shipment document.

Page 144: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-13

SAP AG 1999

Shipment Documents and Their Functions

Record planned and actual dates / status

information

Record details ofshipment

Determine shipment stages

Group together inbound or outbound deliveries into a

shipment

Create output(EDI / papers)

June 4June 12

Functions of Shipment

Documents

Create shipping units

Service providerService provider

Mode of transportMode of transport

Plan. Act.C

B

A

n A shipment document is a central document that is used to map shipments in Logistics Execution. It contains all the information required for organizing and carrying out shipments.

n A shipment assumes the following functions: � Grouping together of inbound deliveries into inbound shipments � Grouping together of outbound deliveries into outbound shipments � Assignment of service agents, modes of transport, shipment type, and so on � Scheduling and deadline monitoring � Information on shipment stages � Packing and formation of shipping elements � Creating output (messages) and shipping papers � Recording texts relevant to shipping � Recording information on partners

Page 145: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-14

SAP AG 1999

Structure of Shipment Documents

Header

Items

Shipment TrPPt Service agent Weight/KG Route

Delivery ShipPt Recipient address Weight/KG Deliv.date

1095 1000 12345 27 R00025

80000123 1200 61234 Frankfurt 14 04/23/XX

80000345 1200 70418 Stuttgart 13 04/23/XX

n A shipment document comprises the following: � Shipment header - contains data that applies to the entire shipment. This is data on the shipment

type, transportation planning point, deadlines, statuses, and so on. � Shipment items - in inbound shipments, the items correspond to individual inbound deliveries; in

outbound shipments, they correspond to individual outbound deliveries.

Page 146: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-15

SAP AG 1999

Creating Shipments

Individually, using the

Create Shipment function

Automatically in a collective run

using the Worklist function

Online Batch

Using a non-SAP transportation

planning system

LES

TPS

n There are different ways of creating shipments in Logistics Execution: n You can use the Create Transportation function to create individual shipments. In this case, you use

a range of selection criteria to select deliveries due for transportation, and create shipment documents for these.

n You can also create several shipments at the same time. You use a multiple processing run for this. This can be done online or in the background. On the basis of various processing rules, the system creates one or more shipment documents automatically.

n If the shipment documents are created in an external transportation planning system, and have to be optimized, an interface is available for linking up the external system with the Logistics Execution System.

Page 147: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-16

SAP AG 1999

Shipment Stages

Possiblestages of shipment

Shipment leg

Hamburg - FrankfurtPartner: Forwarding

agent

Border crossing point

HamburgPartner: Customs

broker

Load transfer point

FrankfurtPartner: Loading

supervisor

Customs

n Stages contain geographical information for a shipment. n The following stages are available in the standard system: � Leg - this is the link between a starting point and a finishing point; the starting and finishing points

might be transportation connection points, shipping points, unloading points, and the like. � Load transfer point - this is the location/point where a shipment is loaded or unloaded, or is

transferred from one means of transport to another. � Border crossing point - this is the location/point where a shipment crosses over a border.

n Information on service agents, partners, deadlines, distances, shipment costs relevance, and so on, can be stored for each of these stages.

n You can also assign the deliveries to the individual stages.

Page 148: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-17

SAP AG 1999

l Describe how shipment cost documents are structured, and list the information they contain

l Create a simple shipment cost document

At the conclusion of this topic, you will be able to:

Shipment Cost Documents: Topic Objectives

Page 149: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-18

SAP AG 1999

How Shipment Costs Fit into the Overall Process

Outbound

Sales order

Outbound delivery

Shipment

Goods issue

Calculation ofshipment costs

Purchase order

Inbound delivery

Shipment

Goods receipt

Inbound

Settlement Settlement

Calculation ofshipment costs

n Shipment costs can be calculated and settled for both inbound and outbound shipments. n The shipment costs are stored in a separate document in Logistics Execution - the shipment cost

document. A range of functions are available in a shipment cost document: � Calculation of shipment costs � Settlement with service agent � Pass on costs to external accounting (FI) and internal accounting (CO)

Page 150: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-19

SAP AG 1999

Calculating Shipment Costs: Prerequisites

The shipment document must have the correct overall status (but at least the status "Planned")

The shipment document must be relevant to shipment costs

Shipment Document

Shipment costs rel. 4

Status

Planned 44 Completed

n If you wish to create a shipment costs document for a shipment, the shipment must be flagged as "relevant to shipment costs." The shipment document must also have the required overall status specified in the shipment cost element definition (but at least the status "Planned").

Page 151: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-20

SAP AG 1999

Creating a Shipment Cost Document

1 : 1

Shipment cost doc.

1

2

3

Shipment doc.

1

2

3

n You can create shipment cost documents individually in the foreground, or in a multiple processing run.

n If you create a shipment cost document individually, you will refer directly to a shipment document. You create one shipment cost document for each shipment document.

n Depending on your system setup, the shipment costs can be calculated automatically, assigned to the correct accounts, and passed on to accounting.

Page 152: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-21

SAP AG 1999

Items in a Shipment Cost Document

Shipment doc. Shipment cost doc.

HeaderInsurerABC Insurance

Stage 1Hamburg - FrankfurtForwarding agentNordspeed

Stage 2Frankfurt - StuttgartForwarding agentSchmalenbach

Item 1

Item 2

Item 3

n Shipment cost items refer either to the shipment header or a shipment stage. n For example, an item that refers to the header can contain insurance costs for supplementary

transportation insurance. An item that refers to a shipment stage might contain transportation costs, load transfer costs, and so on.

n The way in which items function is determined by the item category.

Page 153: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-22

SAP AG 1999

l Describe where and how transportation fits into the supply chain, and how it is linked to Shipping

l Create, plan, and process shipments

l Calculate shipment costs

You are now able to:

Transportation: Unit Summary

Page 154: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-27

Solutions

Unit: Transportation

1-1 Where transportation fits in in LE

1-1-1 Transportation is the external logistics within the LES supply chain. On the inbound side of things, transportation fits in as follows Purchase order – Inbound delivery – Transportation – Goods receipt; on the outbound side of things Sales order – Outbound delivery – Transportation – Goods issue.

1-1-2 Inbound and outbound deliveries. The delivery type determines whether the delivery affects transportation.

1-1-3 The transportation planning point plans, process and monitors shipments.

2-1 Creating outbound deliveries

2-1-1 Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Outbound Delivery → Create → Single Document → With Reference to Sales Order

Use the matchcode function (F4) to search for the sales order numbers on the basis of purchase order numbers. Create an outbound delivery for each sales order.

2-1-2 Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Outbound Delivery → Display

The status is A – Transportation not yet planned.

2-1-3

Page 155: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-28

2-2 Creating a shipment

2-2-1 You can use Collective shipment and Collective shipment by road.

2-2-2 Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Transportation → Create → Single Documents

Enter the following data:

Field Name/Type of Data Values

Transportation planning point 1200

Shipment type Collective Shipment

Click the Select deliveries icon, and enter the following:

Field Name/Type of Data Values

Shipping point/receiving point X0##

Transportation planning date Your date

Save your shipment document.

2-2-3 Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Transportation → Display

Overall status of shipment: Planned

Transportation planning status of outbound delivery: C – Planning completed.

2-3 Processing the shipment document

2-3-1 Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Transportation → Change → Single Documents

Enter the number of your shipment, and enter forwarding agent 1058 in the Forwarding agent field. Then click the Planning pushbutton to change the status of the shipment.

2-3-2 Now go to the Stages tab page. The first stage is from Dresden (shipping point) to Frankfurt (Compumax), and the second from Frankfurt (Compumax) to Stuttgart (PC – World).

2-3-3 The stage from Dresden to Frankfurt is a main leg with Leg indicator 2. Save the shipment document.

Page 156: Processes in Logistics Execution Edited

(C) SAP AG LO140 7-29

2-4 Combined picking

2-4-1 Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Picking → Wave Picks → Create → According to Shipment

Create a wave pick for the shipment. Enter the shipment, and save the group.

2-4-2 Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Picking → Create Transfer Order → By Wave Pick

Enter the number of the wave pick, and select the Background processing option. Once the TOs have been created, click Release and then click Totals info to display the numbers of the TOs created.

2-4-3 Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Picking → Confirm Transfer Order → By Wave Pick

Enter your wave pick, select the Background processing option, and select the Pick and transfer option. Choose Execute.

2-5 Shipment completion

2-5-1 Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Transportation → Change → Single Documents

Click the Shipment completion pushbutton, and save your shipment.

2-5-2 Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Transportation → Display

Overall status of shipment: Shipment completion

Transportation planning status of outbound delivery: C – Planning completed.

Page 157: Processes in Logistics Execution Edited

(C) SAP AG LO140 8-1

SAP AG 1999

l Warehouse Activity Monitor

l Shipment details

l Standard analyses

l ABAP List Viewer

Contents:

Reporting

Page 158: Processes in Logistics Execution Edited

(C) SAP AG LO140 8-2

SAP AG 1999

l Use the Warehouse Activity Monitor to monitor critical processes in a warehouse

l Call up different kinds of summarized information from Logistics Execution

l Configure ABAP List Viewer lists

At the conclusion of this unit, you will be able to:

Reporting: Unit Objectives

Page 159: Processes in Logistics Execution Edited

(C) SAP AG LO140 8-3

SAP AG 1999

l Now that you have become familiar with the functionality of Logistics Execution, you want to explore the options available for reporting, planning and monitoring. You want to determine critical warehouse activities at regular intervals. You also want to be able to display shipment details clearly. The movement data you analyze should be summarized.

Reporting: Business Scenario

Page 160: Processes in Logistics Execution Edited

(C) SAP AG LO140 8-4

SAP AG 1999

Warehouse Activity Monitor

Storage typeStorage typeProductionProduction

DeliveriesDeliveries

Goods receiptsGoods receipts

n The Warehouse Activity Monitor is a tool that enables you to monitor the activities in your warehouse so that you can detect and correct errors and critical situations. The Warehouse Activity Monitor automatically detects irregularities as soon as possible after they arise. It displays these and provides assistance in analyzing and correcting these irregularities.

n You can automate the selection of the critical objects displayed in the Warehouse Activity Monitor.

Page 161: Processes in Logistics Execution Edited

(C) SAP AG LO140 8-5

SAP AG 1999

Warehouse Activity Monitor Objects

l Transfer orders

l Transfer requirements

l Negative stock situations

l Deliveries

l Posting changes

l Interim storage stock without movement

l Critical stock for production supply

n Transfer orders: unconfirmed transfer orders that have existed for longer than a specific period defined in Customizing.

n Transfer requirements: unprocessed (open) transfer requirements that have existed for longer than the critical time period defined in Customizing. Time can be measured from the creation date/time or planned date/time.

n Negative stock situations: this monitoring function shows you all negative stock situations that have existed for longer than a specific critical period.

n Critical deliveries: unprocessed delivery notes with WM relevant items where there is less time available for processing than the critical time period defined in Customizing.

n Posting changes: unprocessed posting change notices that have existed for longer than a specific period defined in Customizing.

n Interim storage stock without movement: the Warehouse Activity Monitor displays all bin stocks that are stored in interim storage types and whose last movement was so long ago that a predefined critical period is exceeded.

n Critical stocks for production supply: shows where you have inconsistencies between the reservation amount and the transfer requirement.

Page 162: Processes in Logistics Execution Edited

(C) SAP AG LO140 8-6

SAP AG 1999

Shipment Details

Graphic displayof shipment

Planned/actual dates

Detailedquery

Order

Delivery

Shipment

London

Edinburgh

Dresden Hamburg

DeliveriesShipmentsWeightsDates....

n You can use an information system in the SAP System to get a clearer overview of your shipments. You can display information in list form or graphical form here.

n You can call up this information system from a sales order, delivery, or shipment. n You can also make further detailed queries in the graphic display.

Page 163: Processes in Logistics Execution Edited

(C) SAP AG LO140 8-7

SAP AG 1999

Itinerary and Transportation Network

PlantHamburg

WarehouseHamburg

North

PlantDresden

Hamburgstation

Rotter-dam

NewYork

CustomerBoston

CustomerPhiladel.

CustomerDetroit

Germany Netherlands USA

D1

D2

D3

D1,D2

D1, D2, D3

D1

D2

D3

Itinerary of delivery D2

S1

S4

S2S5

S3

S7

S8

S6

Transportation network for delivery D2

n Shipment details include the itinerary and the transportation network. n The itinerary shows only shipment stages in which the deliveries/shipments in question are involved. n The transportation network, on the other hand, shows all of the shipment stages connected with a

delivery/shipment. In other words, it shows all of the shipments pertaining to an activity (including preliminary legs and subsequent legs, etc.).

Page 164: Processes in Logistics Execution Edited

(C) SAP AG LO140 8-8

SAP AG 1999

Warehouse Controlling

Quantity flowQuantity flow

Material flowMaterial flow

Movement typesMovement types

Stock removalsStock removals

PutawaysPutaways

“Q” to

“Rel”

Standard Standard analysesanalyses

n The Warehouse Management system is integrated with the SAP Logistics Information System (LIS) to support the analysis of the physical flow of quantities in the warehouse. The evaluations for Warehouse Controlling are incorporated as standard analyses in the Inventory Controlling menu.

n The following five standard WM analyses are available in Inventory Controlling: � Putaway and stock removal (picking) � Quantity flow � Material putaway/picking � Material flow � Movement types

Page 165: Processes in Logistics Execution Edited

(C) SAP AG LO140 8-9

SAP AG 1999

Transportation Information System (TIS)

TISTIS

Route and stage details

Service agents

Materials, weights,volumes, etc.

Transportation planning point/ shipping point

Shipping elements/materials

n The Transportation Information System (TIS) is an information system within the Logistics Information System (LIS). You can use the TIS to generate a range of analyses and statistics for shipments.

n The following standard analyses are available: � Transportation: provides general information on a shipment (such as the service agent, start and

end of the shipment, type of shipment) � Shipment Routes: provides analyses of routes (e.g. how often are specific routes used?) � Means of Transportation: provides an analysis of the main shipping material (e.g. to what extent

are the means of transportation being used?) � Transportation Shipping: analysis based on shipping information (e.g. how many deliveries of type

LF were shipped from the Hamburg shipping point?) � Stages of Shipment: analysis of individual stages (e.g. how many trucks drive from Hamburg to

Frankfurt?) � Transportation Material: analysis of individual materials (e.g. material xyz makes up what

proportion of the entire shipment volume?)

Page 166: Processes in Logistics Execution Edited

(C) SAP AG LO140 8-10

SAP AG 1999

ABAP List Viewer

StockStorage bin Material Plant

1000T-BW-01 51000T-MS-00 151000T-MS-00 15

<< Empty >>

<< Empty >>

<< Empty >>

<< Empty >>

1200T-BW25 80

1000T-BW30 78

<< Empty >>

218

Stock cat.

Bin Status Report: Overview

100 - 450 25

01-01-01

01-01-02

01-01-03

01-01-04

01-01-05

01-01-06

01-01-07

01-01-08

01-01-09

01-01-10

01-02-01

Total

Duration

25130

130

368

51

0

n In LE, many lists are displayed as ALV lists.

n The ABAP List Viewer enables you to standardize and simplify lists in the SAP System. A standardized user interface and standardized presentation options are available for all lists. This means that there are no redundant functions.

n You can use generally applicable and user-specific display variants to configure the appearance of lists. You can, for example, show or hide individual fields, generate totals, or move columns. This gives you the flexibility you need when working with lists.

Page 167: Processes in Logistics Execution Edited

(C) SAP AG LO140 8-11

SAP AG 1999

l Use the Warehouse Activity Monitor to monitor critical processes in a warehouse

l Call up different kinds of summarized information from Logistics Execution

l Configure ABAP List Viewer lists

You are now able to:

Reporting: Unit Summary

Page 168: Processes in Logistics Execution Edited

(C) SAP AG LO140 8-15

Solutions

Unit: Reporting

1-1 Warehouse Activity Monitor

Logistics → Logistics Execution → Information System → Warehouse → Warehouse Activity Monitor

1-1-1 Enter your warehouse number (###) and variant LES001. The critical processes are Unconfirmed transfer orders, Open transfer requirements, Critical deliveries and Interim storage stock, without movement.

1-1-2 The data you see was updated at the last full hour. To update data manually, place your cursor on the line in question, and choose Edit → Determine data again.

1-1-3 Double-click the objects, and edit them. Once you have corrected the critical situation, the traffic-lights icon turns green.

1-1-4* To create a new variant, call up the Warehouse Activity Monitor for your warehouse number, and do not specify a variant. In the screen that appears, you can restrict your selection to specific objects. Select only the objects Unconfirmed transfer orders and Critical deliveries. Also specify the source and destination storage types. Save your variant, and give it a name.

1-2 Shipment details

Logistics → Logistics Execution → Outbound Process → Goods Issue for Outbound Delivery → Transportation → Display

1-2-1 By choosing Environment → Transportation info → Itinerary: Graphic/Transportation network: Graphic, you can display the shipments in graphic form.

1-2-2 From shipment documents, deliveries, and sales orders.

Page 169: Processes in Logistics Execution Edited

(C) SAP AG LO140 8-16

2-1 Logistics Information System

Logistics → Logistics Execution → Information System → Warehouse → Standard Analyses

2-1-1 If you use the Material Flow analysis, you can display further information on the materials and movement data.

2-1-2 Place your cursor on the column entitled Moved quantity, and click the Time series icon.

2-1-3 Logistics → Logistics Execution → Information System → Transportation Planning → Standard Analyses

Select the standard analysis called Transportation Material, and enter the material from the previous exercise.

2-2 Rough Workload Estimate

2-2-1 Logistics → Logistics Execution → Information System → Warehouse → Rough Workload Estimate → General Overview

Enter your warehouse number (###), and an analysis period.

2-2-2 You can update the following key figures here: Processing time/hours, weight, volume, quantities in load categories, number of schedule lines, and shipping materials.

2-2-3 In the Rough Workload Estimate, information in a warehouse number is broken by warehouse process. Warehouse processes are goods receipt/putaway, and picking/goods issue.

3-1 ABAP List Viewer (ALV) Lists

Logistics → Logistics Execution → Internal Warehouse Processes → Bins and Stock → Display → Bin Status Report

3-1-1 Enter your warehouse number (###), and click Execute. To change the current display variant, click the Current display variant icon. Find the field Available stock in the list of hidden fields (on the right-hand side of the dialog box). Select the line containing this field and transfer it to the list of selected fields on the left.

3-1-2 Now select the Batch field on the left-hand side of the dialog box, and hide it (by transferring it to the list of hidden fields). To use your display variant, click the Copy icon.

3-1-3 Now click the Save display variant icon, and enter a name and description for your display variant. Save your display variant. If you want to use it as the default display variant, choose Settings → Display variant → Administration. Click IV (Initial Variant) for your variant.

3-1-4 Now call up the bin status report again.

Page 170: Processes in Logistics Execution Edited

(C) SAP AG LO140 9-1

SAP AG 1999

l Components of TeamSAP

l ASAP Roadmaps

l Major implementation tools

Contents:

ASAP

Page 171: Processes in Logistics Execution Edited

(C) SAP AG LO140 9-2

SAP AG 1999

l The implementation team analyses the tools and services provided by SAP to facilitate the implementation of SAP software.

ASAP: Business ScenarioASAP: Business Scenario

Page 172: Processes in Logistics Execution Edited

(C) SAP AG LO140 9-3

SAP AG 1999

l Describe the components of TeamSAP

l List and briefly describe the five phases of the ASAP Implementation Roadmap

l Discuss the main tools available for implementing SAP software

At the conclusion of this unit, you will be able to:

ASAP: ObjectivesASAP: Objectives

Page 173: Processes in Logistics Execution Edited

(C) SAP AG LO140 9-4

SAP AG 1999

Peop

le

Processes

Products

People:People:Solutions expertiseQualityn SAPn Consulting partnersn Complementary

software partners n Technology &

hardware partners

Processes :Processes :AcceleratedSAPConsistencyn AcceleratedSAP Roadmaps

or powered-by methodologiesn SAP Review Programn Support, services

& training

Products : Products : The Business Framework Strengthsn SAP product familyn Complementary software productsn Products from technology partnersn Industry solutions

TeamSAP ComponentsTeamSAP Components

n TeamSAP involves coordinated interaction between the groups involved in the implementation environment of the products concerned.

Page 174: Processes in Logistics Execution Edited

(C) SAP AG LO140 9-5

SAP AG 1999

AcceleratedSAP: Implementation PlanningAcceleratedSAP: Implementation Planning

Consulting, licensing, training material,support, project reviews

Consulting, licensing, training material,support, project reviews

Methodology

Services

l ProjectManagement

l Change Management

l Risk analysis

l Review

Project-related

knowledgeTools

BusinessBlueprint

Realization

FinalPreparation Go Live &

Support

Continuous

Improvement

ASAP Roadmap

l Implementation Assistant

l Q&Adb

l Implementation Guide

l Profile Generator

l Transport System

ProjectPreparation

n SAP recommends that you use ASAP as a standard methodology for implementation planning and for implementing SAP software. The ASAP Roadmap provides a step-by-step guide to implementation.

n During the five phases of an ASAP project, the results of each phase are recorded in specific documents. This is particularly important in Phase 2.

Page 175: Processes in Logistics Execution Edited

(C) SAP AG LO140 9-6

SAP AG 1999

AcceleratedSAP Implementation Roadmap

ProjectPreparation

BusinessBlueprint

Realization

FinalPreparation

Go Live &Support

Continuous

Improvement

ASAP Roadmap

n Phase 1: Project Preparation - The primary focus of Phase 1 is getting the project started, identifying team members and developing a high-level plan.

n Phase 2: Business Blueprint - The primary focus of Phase 2 is to understand the business goals of the enterprise and to determine the business requirements needed to support these goals.

n Phase 3: Realization - The purpose of this phase is to implement all the business and process requirements identified in the Business Blueprint. You configure the system step-by-step in the work packages Baseline and Final Configuration.

n Phase 4: Final Preparation - The purpose of this phase is to complete testing, end-user training, system management and cutover activities. Critical open issues are resolved. When you have successfully completed this phase, you will be ready to run your business in your production system.

n Phase 5: Go Live and Support - Transition from a project-oriented, pre-production environment to a successful and live production environment.

n The new ASAP Roadmap (available as of Release 4.6A), helps integrate all existing ASAP Roadmaps into one "configurable" one. It is based on the products R/3, BW (Business Information Warehouse), APO (Advanced Planner & Optimizer), CRM (Customer Relationship Management encompassing Mobile Sales/Mobile Services), and B2B (Business to Business Procurement) and provides a single implementation solution within ASAP for all SAP software.

Page 176: Processes in Logistics Execution Edited

(C) SAP AG LO140 9-7

SAP AG 1999

l Implementation strategy

l Global definition of business processes

l Global system topology

l Standardization of business processes

Realization

l Change management

l Manage global activities

l Legal requirements

ProgramSet-Up

BusinessBlueprint

Rollout ASAP Roadmap

Maintenance &Support

Global ASAP

ProjectPreparation

BusinessBlueprint

RealizationFinal

PreparationGo Live &Support

Continuous

Improvement

n SAP has developed Global ASAP as the standard implementation methodology for the global implementation of SAP software. The basic concept of Global ASAP is to map all activities that do not take place at local level onto a special structure called the Global Roadmap. This Roadmap is structured according to the AcceleratedSAP principle and includes How-to's, accelerators, modeling methods and tools. The Global Roadmap is linked to each Roadmap for projects at local level.

n A global implementation strategy involves defining a pre-configured corporate system or global template. The global template is the sum of all enterprise-specific configuration and Customizing settings, and models that are included in one SAP System and provide a reference for live systems at the global and local levels (individual companies and plants). This implementation approach is also referred to as the global template rollout of the SAP System.

n The Global ASAP Roadmap consists of four phases: � Global Program Set-Up � Global Business Blueprint � Global Realization � Global Maintenance & Support

Page 177: Processes in Logistics Execution Edited

(C) SAP AG LO140 9-8

SAP AG 1999

Global settings

Countries

Currencies

Calendars

l Conceptl Recommendationsl Requirementsl ActivitylWinHelp

l Status/activity datal Schedulingl Resourcesl Microsoft Project

interface

ProjectManagement

l Open Customizingtransactions

Activities

l Efficiently organizedusing notes

l Use Microsoft Word

ProjectDocumentationSAP Documentation

•The IMG contains documentationfor each activity.

•The activities can be carried out directly.•Functions for project managementand project documentation are available.

IMG

IMG: Tasks

n The IMG contains all Customizing activities you need to implement application components. n You can create Customizing projects in an SAP System, to help structure and manage an

implementation project. You can also record cross-project documentation. n You can create an IMG for each project. n From a Project IMG you can work on Customizing transactions, project documentation, cross-

project documentation, and information on project management.

Page 178: Processes in Logistics Execution Edited

(C) SAP AG LO140 9-9

SAP AG 1999

CustomerCustomer--Specific ConfigurationSpecific Configuration

ProjectIMGsGenerateGenerate

CustomizingCustomizingProjectsProjects

Manually ASAP-IMGlink

SAPReference

IMG

Projectdocumentation

Projectmanagement

Customizingtransactions

GenerateGenerate

Project IMGProject IMGViewsViews

Project IMG

views

n The IMG acts as a checklist of the Customizing activities that your enterprise should complete to implement an SAP System. The IMG is hierarchically structured.

n The structure of the IMG and the IMG tools (for example, allocating resources such as project members and the MS Project interface) help your project team to work through the Customizing activities in a rational sequence.

n For the realization, you can divide the scope of the Reference IMG into different projects, which, in turn, are assigned to Project IMGs. Use a Project IMG to work on Customizing transactions, project and cross-project documentation, as well as information on project management.

n You can create views to improve the structure of a Project IMG. You can use these views to edit Customizing transactions, project and cross-project documentation, and information on project management, in line with the Project IMG.

n As of Release 4.6, you can use the ASAP-IMG link in the Q&Adb to create project views. This transfers the project scope set in the Question & Answer database (Q&Adb) to the R/3 System. The views generated by the ASAP-IMG link contain Customizing activities for the processes set in scope in the Q&Adb.

n To use the ASAP-IMG link, a Customizing project must already exist in the R/3 System.

Page 179: Processes in Logistics Execution Edited

(C) SAP AG LO140 9-10

SAP AG 1999

Industry-specific Customizing in IMG and CATTsPreconfigured Industry System

Industry-specific details in ASAP and documentation

Model-based presentation of the industry solution

Industry-specific Business Blueprint

Industry-specific business components

Business framework component

A c c e l e r a t e d S o l u t i o n

Accelerated Industry Solutions: StepsAccelerated Industry Solutions: Steps

n System documentation and the ASAP Question & Answer database contain industry-specific information and are the ideal places to start looking for information.

n Model-based presentations of industry-specific business processes help you analyze the business processes you have selected. Event-driven process chains (EPCs) are available for several industries (for example, the automotive and pharmaceutical industries) and are integrated in the SAP Reference Structure. A structure is available for each industry in the ASAP Question & Answer database, and helps you to produce an industry-specific Business Blueprint (Phase 2 of the ASAP Roadmap).

n Industry-specific Customizing involves integrating default Customizing parameters for a specific industry in the IMG. SAP has documented this process in the IMG. You can use the Computer Aided Test Tool (CATT) which is also integrated in the system to transfer industry-specific master data structures to the system. Test programs (CATTs), named after the above tool, are provided for the industry-specific business cases defined by SAP. This collection of tools is known as Preconfigured Industry Systems.

n Industry-specific business solutions are integrated as business components in the business framework. Implementation in the system can also be a ready-to-work solution. The main feature of such a solution is the delivery of a combination of software and hardware required to install an SAP System.

Page 180: Processes in Logistics Execution Edited

(C) SAP AG LO140 9-11

SAP AG 1999

You are now able to:

l Describe the elements of TeamSAP

l List and briefly describe the five phases of the ASAP Implementation Roadmap

l Discuss the major tools that support an SAP implementation

Implementation Planning and Tools: SummaryImplementation Planning and Tools: Summary

Page 181: Processes in Logistics Execution Edited

(C) SAP AG LO140 10-1

SAP AG 1999

Conclusion

Course Overview

Navigation

Overview of Logistics Execution

Organizational Units and Master Data

Goods Receipts

Goods Issues

Transportation

Reporting, Planning and Monitoring

ASAP and IMGConclusion

Page 182: Processes in Logistics Execution Edited

(C) SAP AG LO140 10-2

SAP AG 1999

Course Objectives

You are now able to:

l Maintain the master data required in Logistics Execution, and name the corporate structures required

l Work through the process flows in warehouse management, shipping, and transportation

l Describe and appraise the various procedures available for goods receipts and goods issues in Logistics Execution

Page 183: Processes in Logistics Execution Edited

(C) SAP AG LO140 10-3

SAP AG 1999

Recommended Follow-up Courses

l LO530 - Basic Processes in Warehouse Management

l LO531 - Additional Topics in Warehouse Management

l LO610 - Shipping

l LO611 - Transportation

Page 184: Processes in Logistics Execution Edited

(C) SAP AG LO140 10-4

SAP AG 1999

Recommended Follow-up Activities

l Go through the exercises again using the IDES dataor your own data

l Read the online documentation

l Read the IMG documentation

l Read the release notes