  • 7/27/2019 Prestressing Niraj Sir

    1/294

    Sl. NO. Block No. StageTendon

    No.

    Tendon

    Free

    Length

    Load in

    KNPressure Elongation

    1 4 1st A1 21.714 410.2 40 82

    820.4 80 100

    1230.6 120 121

    1640.8 160 140

    1987.5 193.8 155

    2 4 1st A2 21.714 410.2 40 75

    820.4 80 90

    1230.6 120 115

    1640.8 160 131

    1987.5 193.8 144

    3 4 1st A3 21.714 410.2 40 110

    820.4 80 128

    1230.6 120 145

    1640.8 160 163

    1987.5 193.8 182

    4 4 1st B1 23.379 410.2 40 90

    820.4 80 100

    1230.6 120 110

    1640.8 160 112

    1987.5 193.8 117

    5 4 1st B2 23.379 410.2 40 95

    820.4 80 105

    1230.6 120 115

    1640.8 160 130

    1987.5 193.8 144

    6 4 1st B3 23.379 410.2 40 84

    820.4 80 92

    1230.6 120 97

    1640.8 160 97

    1987.5 193.8 99

    7 4 1st C1 22.066 410.2 40 30

    820.4 80 48

    1230.6 120 62

    1640.8 160 73

    1987.5 193.8 88

    8 4 1st C2 22.066 410.2 40 32

    820.4 80 46

    1230.6 120 59

    1640.8 160 75

  • 7/27/2019 Prestressing Niraj Sir

    2/294

    1987.5 193.8 94

    9 4 1st C3 22.066 410.2 40 20

    820.4 80 27

    1230.6 120 29

    1640.8 160 32

    1987.5 193.8 39

    10 4 D 410.2 40

    820.4 80

    1230.6 120

    1640.8 160

    1987.5 193.8

    11 4 1st E1 22.561 410.2 40 100

    820.4 80 118

    1230.6 120 133

    1640.8 160 147

    1987.5 193.8 157

    12 4 1st E2 22.561 410.2 40 37

    820.4 80 55

    1230.6 120 70

    1640.8 160 80

    1987.5 193.8 95

    13 4 1st E3 22.561 410.2 40 64

    820.4 80 68

    1230.6 120 70

    1640.8 160 73

    1987.5 193.8 79

    14 4 1st F1 24.412 410.2 40 120

    820.4 80 130

    1230.6 120 147

    1640.8 160 160

    1987.5 193.8 175

    15 4 1st F2 24.412 410.2 40 42

    820.4 80 57

    1230.6 120 73

    1640.8 160 88

    1987.5 193.8 108

    16 4 1st F3 24.412 410.2 40 72

    820.4 80 82

    1230.6 120 90

    1640.8 160 92

    1987.5 193.8 97

  • 7/27/2019 Prestressing Niraj Sir

    3/294

    17 4 1st G1 23.209 410.2 40 51

    820.4 80 65

    1230.6 120 82

    1640.8 160 95

    1987.5 193.8 110

    18 4 1st G2 23.209 410.2 40 51

    820.4 80 70

    1230.6 120 82

    1640.8 160 95

    1987.5 193.8 116

    19 4 1st G3 23.209 410.2 40 65

    820.4 80 73

    1230.6 120 82

    1640.8 160 90

    1987.5 193.8 95

    20 4 2nd A1 21.714 1987.5 193.88 105

    2461.2 240 120

    2871.4 280 135

    3281.6 320 155

    3691.8 360 165

    3975 387.9 175

    21 4 2nd A2 21.714 1987.5 193.88 90

    2461.2 240 118

    2871.4 280 130

    3281.6 320 150

    3691.8 360 163

    3975 387.9 172

    22 4 2nd A3 21.714 1987.5 193.88 105

    2461.2 240 132

    2871.4 280 150

    3281.6 320 170

    3691.8 360 180

    3975 387.9 197

    23 4 2nd B1 23.379 1987.5 193.88 85

    2461.2 240 95

    2871.4 280 113

    3281.6 320 117

    3691.8 360 120

    3975 387.9 125

    24 4 2nd B2 23.379 1987.5 193.88 105

    2461.2 240 120

    2871.4 280 129

    3281.6 320 138

  • 7/27/2019 Prestressing Niraj Sir

    4/294

    3691.8 360 144

    3975 387.9 152

    25 4 2nd B3 23.379 1987.5 193.88 80

    2461.2 240 89

    2871.4 280 93

    3281.6 320 95

    3691.8 360 98

    3975 387.9 99

    26 4 2nd C1 22.066 1987.5 193.88 101

    2461.2 240 115

    2871.4 280 130

    3281.6 320 158

    3691.8 360 169

    3975 387.9 177

    27 4 2nd C2 22.066 1987.5 193.88 59

    2461.2 240 73

    2871.4 280 88

    3281.6 320 103

    3691.8 360 119

    3975 387.9 129

    28 4 2nd C3 22.066 1987.5 193.88 37

    2461.2 240 42

    2871.4 280 46

    3281.6 320 51

    3691.8 360 57

    3975 387.9 62

    29 4 2nd E1 22.561 1987.5 193.88 100

    2461.2 240 115

    2871.4 280 130

    3281.6 320 150

    3691.8 360 165

    3975 387.9 175

    30 4 2nd E2 22.561 1987.5 193.88 108

    2461.2 240 123

    2871.4 280 136

    3281.6 320 157

    3691.8 360 176

    3975 387.9 191

    31 4 2nd E3 22.561 1987.5 193.88 82

    2461.2 240 88

    2871.4 280 90

    3281.6 320 95

    3691.8 360 99

  • 7/27/2019 Prestressing Niraj Sir

    5/294

    3975 387.9 106

    32 4 2nd F1 24.412 1987.5 193.88 100

    2461.2 240 115

    2871.4 280 130

    3281.6 320 150

    3691.8 360 165

    3975 387.9 175

    33 4 2nd F2 24.412 1987.5 193.88 120

    2461.2 240 136

    2871.4 280 154

    3281.6 320 169

    3691.8 360 189

    3975 387.9 208

    34 4 2nd F3 24.412 1987.5 193.88 61

    2461.2 240 76

    2871.4 280 96

    3281.6 320 111

    3691.8 360 126

    3975 387.9 144

    35 4 2nd G1 23.209 1987.5 193.88 67

    2461.2 240 83

    2871.4 280 98

    3281.6 320 114

    3691.8 360 131

    3975 387.9 151

    36 4 2nd G2 23.209 1987.5 193.88 126

    2461.2 240 141

    2871.4 280 156

    3281.6 320 170

    3691.8 360 189

    3975 387.9 205

    37 4 2nd G3 23.209 1987.5 193.88 95

    2461.2 240 105

    2871.4 280 114

    3281.6 320 117

    3691.8 360 125

    3975 387.9 130

  • 7/27/2019 Prestressing Niraj Sir

    6/294

    Displacement

    Corrected

    Displacement Net Elongation Th. Elongation

    19.33

    18

    21

    19

    15

    18.67

    15

    25

    16

    13

    17.67 372.7609

    18

    17

    18

    19

    7.33

    10

    10

    2

    5

    11.67

    10

    10

    15

    14

    4.33

    8

    5

    0

    2

    14.33

    18

    14

    11

    15

    14.33

    14

    13

    16

    66.33 76.50

    70.33 76.50

    13.33 81.05

    28.33 81.05

    54.67 81.05

    83.67 75.27

    86.33 75.27

    81.67 75.27

  • 7/27/2019 Prestressing Niraj Sir

    7/294

    19

    4.00

    7

    2

    3

    7

    15.67

    18

    15

    14

    10

    14.33

    18

    15

    10

    15

    3.00

    4

    2

    3

    6

    13.33

    10

    17

    13

    15

    15.33

    15

    16

    15

    20

    6.67

    10

    8

    2

    5

    25.67 84.63

    62.33 84.63

    75.33 84.63

    All cables blocked in

    concrete

    12.00 78.21

    66.67 78.21

    66.33 78.21

    17.00 76.50

  • 7/27/2019 Prestressing Niraj Sir

    8/294

    14.67

    14

    17

    13

    15

    14.67

    19

    12

    13

    21

    8.33

    8

    9

    8

    5

    15

    15

    20

    10

    10

    28

    12

    20

    13

    9

    27

    18

    20

    10

    17

    10

    18

    4

    3

    5

    15

    9

    9

    34.00 81.05

    41.00 81.05

    86.00 75.28

    64.00 75.28

    76.00 75.28

    32.33 80.46

    67.67 80.46

    73.67 80.46

  • 7/27/2019 Prestressing Niraj Sir

    9/294

    6

    8

    9

    4

    2

    3

    1

    14

    15

    28

    11

    8

    14

    15

    15

    16

    10

    5

    4

    5

    6

    5

    15

    15

    20

    15

    10

    15

    13

    21

    19

    15

    6

    2

    5

    4

    18.00 78.21

    69.00 78.21

    77.00 78.21

    19.00 76.50

    70.00 76.50

    64.00 76.50

    13.00 81.05

  • 7/27/2019 Prestressing Niraj Sir

    10/294

    7

    15

    15

    20

    15

    10

    16

    18

    15

    20

    19

    15

    20

    15

    15

    18

    16

    15

    16

    17

    20

    15

    15

    14

    19

    16

    10

    9

    3

    8

    5

    29.00 80.46

    78.00 80.46

    73.00 80.46

    77.00 84.63

    69.00 84.63

    82.00 84.63

  • 7/27/2019 Prestressing Niraj Sir

    11/294

    Sl. NO. Block No. StageSub-Tendon

    No.

    Tendon Free

    LengthLoad in KN Pressure Elongation

    1 4 1st H1 7.03 267.5 40 92

    535 80 100

    802.5 120 105

    1203.75 160 111

    1255 187.67 117

    2 4 1st H2 7.03 267.5 40 95

    535 80 101

    802.5 120 107

    1203.75 160 111

    1255 187.67 113

    3 4 1st H3 7.03 267.5 40 65

    535 80 72

    802.5 120 77

    1203.75 160 81

    1255 187.67 85

    4 4 1st H4 7.03 267.5 40 60

    535 80 66

    802.5 120 73

    1203.75 160 80

    1255 187.67 86

    5 4 1st H5 7.03 267.5 40 80

    535 80 95

    802.5 120 100

    1203.75 160 104

    1255 187.67 107

    6 4 1st H6 7.03 267.5 40 55

    535 80 61

    802.5 120 68

    1203.75 160 75

    1255 187.67 79

    7 4 1st H7 7.03 267.5 40 85

    535 80 90

    802.5 120 94

    1203.75 160 103

    1255 187.67 108

    8 4 1st H8 7.03 267.5 40 63

    535 80 69

    802.5 120 73

  • 7/27/2019 Prestressing Niraj Sir

    12/294

    1203.75 160 80

    1255 187.67 85

    9 4 1st H9 7.03 267.5 40 79

    535 80 83

    802.5 120 89

    1203.75 160 92

    1255 187.67 95

    10 4 1st H10 7.03 267.5 40 54

    535 80 60

    802.5 120 67

    1203.75 160 71

    1255 187.67 75

    11 4 1st H11 7.03 267.5 40 68

    535 80 85

    802.5 120 90

    1203.75 160 93

    1255 187.67 96

    12 4 1st H12 7.03 267.5 40 84

    535 80 91

    802.5 120 100

    1203.75 160 106

    1255 187.67 110

    13 4 1st H13 7.03 267.5 40 118

    535 80 127

    802.5 120 134

    1203.75 160 139

    1255 187.67 145

    14 4 1st H14 7.03 267.5 40 95

    535 80 102

    802.5 120 109

    1203.75 160 112

    1255 187.67 117

    15 4 1st H15 7.03 267.5 40 85

    535 80 92

    802.5 120 97

    1203.75 160 104

    1255 187.67 107

    16 4 1st H16 7.03 267.5 40 103

    535 80 115

  • 7/27/2019 Prestressing Niraj Sir

    13/294

    802.5 120 120

    1203.75 160 127

    1255 187.67 130

    17 4 1st H17 7.03 267.5 40 75

    535 80 81

    802.5 120 88

    1203.75 160 94

    1255 187.67 98

    18 4 1st H18 7.03 267.5 40 67

    535 80 75

    802.5 120 82

    1203.75 160 89

    1255 187.67 97

    19 4 2nd H1 7.03 1255 187.67 70

    1471.25 220 78

    1738.75 260 84

    2006.25 300 90

    2273.75 340 97

    2510 375.33 105

    20 4 2nd H2 7.03 1255 187.67 95

    1471.25 220 101

    1738.75 260 108

    2006.25 300 114

    2273.75 340 119

    2510 375.33 125

    21 4 2nd H3 7.03 1255 187.67 78

    1471.25 220 87

    1738.75 260 95

    2006.25 300 101

    2273.75 340 109

    2510 375.33 114

    22 4 2nd H4 7.03 1255 187.67 75

    1471.25 220 84

    1738.75 260 91

    2006.25 300 96

    2273.75 340 101

    2510 375.33 106

    23 4 2nd H5 7.03 1255 187.67 80

    1471.25 220 87

    1738.75 260 92

  • 7/27/2019 Prestressing Niraj Sir

    14/294

    2006.25 300 99

    2273.75 340 104

    2510 375.33 110

    24 4 2nd H6 7.03 1255 187.67 62

    1471.25 220 69

    1738.75 260 75

    2006.25 300 80

    2273.75 340 87

    2510 375.33 93

    25 4 2nd H7 7.03 1255 187.67 70

    1471.25 220 78

    1738.75 260 84

    2006.25 300 90

    2273.75 340 97

    2510 375.33 105

    26 4 2nd H8 7.03 1255 187.67 75

    1471.25 220 81

    1738.75 260 89

    2006.25 300 93

    2273.75 340 99

    2510 375.33 107

    27 4 2nd H9 7.08 1255 187.67 75

    1471.25 220 81

    1738.75 260 89

    2006.25 300 94

    2273.75 340 100

    2510 375.33 106

    28 4 2nd H10 7.03 1255 187.67 40

    1471.25 220 47

    1738.75 260 53

    2006.25 300 61

    2273.75 340 65

    2510 375.33 70

    29 4 2nd H11 7.03 1255 187.67 80

    1471.25 220 86

    1738.75 260 90

    2006.25 300 93

    2273.75 340 95

    2510 375.33 97

    30 4 2nd H12 7.03 1255 187.67 75

  • 7/27/2019 Prestressing Niraj Sir

    15/294

    1471.25 220 80

    1738.75 260 85

    2006.25 300 90

    2273.75 340 96

    2510 375.33 102

    31 4 2nd H13 7.03 1255 187.67 110

    1471.25 220 112

    1738.75 260 118

    2006.25 300 123

    2273.75 340 128

    2510 375.33 134

    32 4 2nd H14 7.03 1255 187.67 85

    1471.25 220 92

    1738.75 260 98

    2006.25 300 105

    2273.75 340 112

    2510 375.33 118

    33 4 2nd H15 7.03 1255 187.67 80

    1471.25 220 87

    1738.75 260 92

    2006.25 300 96

    2273.75 340 106

    2510 375.33 111

    34 4 2nd H16 7.03 1255 187.67 95

    1471.25 220 105

    1738.75 260 114

    2006.25 300 120

    2273.75 340 127

    2510 375.33 133

    35 4 2nd H17 7.03 1255 187.67 70

    1471.25 220 77

    1738.75 260 83

    2006.25 300 88

    2273.75 340 94

    2510 375.33 100

    36 4 2nd H18 7.03 1255 187.67 65

    1471.25 220 72

    1738.75 260 78

    2006.25 300 84

    2273.75 340 91

    2510 375.33 98

  • 7/27/2019 Prestressing Niraj Sir

    16/294

    DisplacementCorrected

    Displacement

    Net

    Elongation

    Th.

    ElongationRemarks

    6.33

    8

    5

    6

    6

    5.33

    6

    6

    4

    2

    5.33

    7

    5

    4

    4

    6.67

    6

    7 Cable Free

    7

    6

    8.00

    15

    5 Cable Free

    4

    3

    6.67

    6

    7 Cable Free

    7

    4

    6.00

    5

    4

    9

    5

    5.67

    6

    4

    19.33 23.08

    26.67 23.08

    25.33 23.08

    17.33 23.08

    23.00 23.08

    21.67 23.08

    29.00 23.08

    24.67 23.08

  • 7/27/2019 Prestressing Niraj Sir

    17/294

    7

    5

    4.33

    4

    6

    3

    3

    5.67

    6

    7

    4

    4

    8.33

    17

    5

    3

    3

    7.33

    7

    9

    6

    4

    7.00

    9

    7 Cable Free

    5

    6

    5.67

    7

    7

    3

    5

    6.33

    7

    5

    7

    3

    8.00

    12

    30.33 23.08

    27.33 23.08

    14.33 23.08

    20.67 23.08

    22.33 23.08

    28.00 23.08

    21.67 23.08

  • 7/27/2019 Prestressing Niraj Sir

    18/294

    5 Cable Free

    7

    3

    6.33

    6

    7Cable Free

    6

    4

    7.33

    8

    7

    7

    8

    8

    6

    6

    7

    8

    6

    7

    6

    5

    6

    9

    8

    6

    8

    5

    9

    7 Cable Free

    5

    5

    5

    7

    5

    29.00 23.08

    29.00 23.08

    24.00 23.08

    23.33 23.08

    31.33 23.08

    30.00 23.08

    25.00 23.08

  • 7/27/2019 Prestressing Niraj Sir

    19/294

    7 Cable Free

    5

    6

    7

    6Cable Free

    5

    7

    6

    8

    6

    6

    7

    8

    6

    8

    4

    6

    8

    6

    8

    5

    6

    6

    7

    6

    8

    4

    5

    6

    4

    3

    2

    2

    . .

    25.00 23.08

    25.00 23.08

    24.00 23.08

    29.00 23.08

    26.00 23.08

    11.00 23.08

  • 7/27/2019 Prestressing Niraj Sir

    20/294

    5

    5

    5

    6

    6

    2

    6 Cable Free

    5

    5

    6

    7

    6

    7

    7

    6

    7

    5

    4

    10

    5

    10

    9 Cable Free

    6

    7

    6

    7

    6 Cable Free

    5

    6

    6

    7

    6

    6

    7

    7

    18.00 23.08

    27.00 23.08

    21.00 23.08

    24.00 23.08

    27.00 23.08

    25.00 23.08

    32.00 23.08

  • 7/27/2019 Prestressing Niraj Sir

    21/294

    Sl. NO. Block No. Stage Tendon No.Tendon Free

    LengthLoad in KN

    1 5 1st A1 21.714 410.2

    820.4

    1230.6

    1640.8

    1987.5

    2 5 1st A2 21.714 410.2

    820.4

    1230.6

    1640.8

    1987.5

    3 5 1st A3 21.714 410.2

    820.4

    1230.6

    1640.8

    1987.5

    4 5 1st A4 21.714 410.2

    820.4

    1230.6

    1640.8

    1987.5

    5 5 1st B1 23.379 410.2

    820.4

    1230.6

    1640.8

    1987.5

    6 5 1st B2 23.379 410.2

    820.4

    1230.6

    1640.8

    1987.5

    7 5 1st B3 23.379 410.2

    820.4

    1230.6

    1640.8

    1987.5

    8 5 1st B4 23.379 410.2

    820.4

  • 7/27/2019 Prestressing Niraj Sir

    22/294

    1230.6

    1640.8

    1987.5

    9 5 1st C1 22.066 410.2

    820.4

    1230.6

    1640.8

    1987.5

    10 5 1st C2 22.066 410.2

    820.4

    1230.6

    1640.8

    1987.5

    11 5 1st C3 22.066 410.2

    820.4

    1230.6

    1640.8

    1987.5

    12 5 1st C4 22.066 410.2

    820.4

    1230.6

    1640.8

    1987.5

    13 5 1st D1 23.817 410.2

    820.4

    1230.6

    1640.8

    1987.5

    14 5 1st D2 23.817 410.2

    820.4

    1230.6

    1640.8

    1987.5

    15 5 1st D3 23.817 410.2

    820.4

    1230.6

    1640.8

    1987.5

    16 5 1st D4 23.817 410.2

  • 7/27/2019 Prestressing Niraj Sir

    23/294

    820.4

    1230.6

    1640.8

    1987.5

    17 5 1st E1 22.561 410.2

    820.4

    1230.6

    1640.8

    1987.5

    18 5 1st E2 22.561 410.2

    820.4

    1230.6

    1640.8

    1987.5

    19 5 1st E3 22.561 410.2

    820.4

    1230.6

    1640.8

    1987.5

    20 5 1st E4 22.561 410.2

    820.4

    1230.6

    1640.8

    1987.5

    21 5 1st F1 24.412 410.2

    820.4

    1230.6

    1640.8

    1987.5

    22 5 1st F2 24.412 410.2

    820.4

    1230.6

    1640.8

    1987.5

    23 5 1st F3 24.412 410.2

    820.4

    1230.6

    1640.8

    1987.5

  • 7/27/2019 Prestressing Niraj Sir

    24/294

    24 5 1st F4 24.412 410.2

    820.4

    1230.6

    1640.8

    1987.5

    25 5 1st G1 23.209 410.2

    820.4

    1230.6

    1640.8

    1987.5

    26 5 1st G2 23.209 410.2

    820.4

    1230.6

    1640.8

    1987.5

    27 5 1st G3 23.209 410.2

    820.4

    1230.6

    1640.8

    1987.5

    28 5 1st G4 23.209 410.2

    820.4

    1230.6

    1640.8

    1987.5

    29 5 2nd A1 21.714 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    30 5 2nd A2 21.714 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    31 5 2nd A3 21.714 1987.5

    2461.2

    2871.4

  • 7/27/2019 Prestressing Niraj Sir

    25/294

    3281.6

    3691.8

    3975

    32 5 2nd A4 21.714 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    33 5 2nd B1 23.379 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    34 5 2nd B2 23.379 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    35 5 2nd B3 23.379 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    36 5 2nd B4 23.379 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    37 5 2nd C1 22.066 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    38 5 2nd C2 22.066 1987.5

  • 7/27/2019 Prestressing Niraj Sir

    26/294

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    39 5 2nd C3 22.066 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    40 5 2nd C4 22.066 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    41 5 2nd D1 23.817 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    42 5 2nd D2 23.817 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    43 5 2nd D3 23.817 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    44 5 2nd D4 23.817 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

  • 7/27/2019 Prestressing Niraj Sir

    27/294

    45 5 2nd E1 22.561 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    46 5 2nd E2 22.561 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    47 5 2nd E3 22.561 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    48 5 2nd E4 22.561 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    49 5 2nd F1 24.412 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    50 5 2nd F2 24.412 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    51 5 2nd F3 24.412 1987.5

    2461.2

    2871.4

    3281.6

  • 7/27/2019 Prestressing Niraj Sir

    28/294

    3691.8

    3975

    52 5 2nd F4 24.412 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    53 5 2nd G1 23.209 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    54 5 2nd G2 23.209 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    55 5 2nd G3 23.209 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    56 5 2nd G4 23.209 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

  • 7/27/2019 Prestressing Niraj Sir

    29/294

  • 7/27/2019 Prestressing Niraj Sir

    30/294

    Pressure Elongation DisplacementCorrected

    DisplacementNet Elongation Th. Elongation

    40 55 18.67

    80 73 18

    120 92 19

    160 111 19

    193.8 130 19

    40 42 15.67

    80 56 14

    120 70 14

    160 89 19

    193.8 104 15

    40 60 16.00

    80 76 16

    120 93 17

    160 108 15

    193.8 120 12

    40 72 19.00

    80 91 19

    120 111 20

    160 129 18

    193.8 147 18

    40 45 18.67

    80 66 21

    120 84 18

    160 101 17

    193.8 115 14

    40 82 17.33

    80 98 16

    120 118 20

    160 134 16

    193.8 153 19

    40 83 19.33

    80 101 18

    120 120 19

    160 141 21

    193.8 153 12

    40 33 12.67

    80 46 13

    81.05

    81.05

    81.05

    75.27

    75.27

    87.67

    71.67

    82.67

    82.33

    83.33

    70.00 75.27

    88.00 75.27

  • 7/27/2019 Prestressing Niraj Sir

    31/294

    120 67 21

    160 71 4

    193.8 89 18

    40 73 18.00

    80 92 19

    120 109 17

    160 127 18

    193.8 147 20

    40 33 12.67

    80 46 13

    120 67 21

    160 71 4

    193.8 89 18

    40 33 12.67

    80 46 13

    120 67 21

    160 71 4

    193.8 89 18

    40 33 12.67

    80 46 13

    120 67 21

    160 71 4

    193.8 89 18

    40 71 17.67

    80 88 17

    120 106 18

    160 124 18

    193.8 146 22

    40 69 17.67

    80 88 19

    120 105 17

    160 122 17

    193.8 143 21

    40 78 18.33

    80 96 18

    120 113 17

    160 133 20

    193.8 152 19

    40 77 18.00

    86.67 82.57

    85.67 82.57

    62.67

    86.33 82.57

    62.67 76.50

    81.05

    76.50

    86.00 76.50

    62.67 76.50

    62.67

  • 7/27/2019 Prestressing Niraj Sir

    32/294

    80 95 18

    120 112 17

    160 131 19

    193.8 150 19

    40 42 17.33

    80 58 16

    120 82 24

    160 94 12

    193.8 105 11

    40 43 21.00

    80 63 20

    120 90 27

    160 106 16

    193.8 122 16

    40 51 19.00

    80 71 20

    120 96 25

    160 108 12

    193.8 124 16

    40 22 15.67

    80 39 17

    120 53 14

    160 69 16

    193.8 77 8

    40 75 17.67

    80 92 17

    120 110 18

    160 128 18

    193.8 151 23

    40 78 21.00

    80 99 21

    120 119 20

    160 141 22

    193.8 152 11

    40 82 19.00

    80 99 17

    120 118 19

    160 139 21

    193.8 156 17

    87.67 84.63

    89.00 84.63

    86.00 78.21

    64.67 78.21

    87.00 84.63

    78.21

    74.33 78.21

    94.00

    85.00 82.57

  • 7/27/2019 Prestressing Niraj Sir

    33/294

    40 50 18.33

    80 69 19

    120 87 18

    160 105 18

    193.8 122 17

    40 36 15.33

    80 53 17

    120 66 13

    160 82 16

    193.8 99 17

    40 54 18.67

    80 72 18

    120 92 20

    160 110 18

    193.8 125 15

    40 0 0.00

    80 0 0

    120 0 0

    160 0 0

    193.8 0 0

    40 35 11.33

    80 49 14

    120 58 9

    160 69 11

    193.8 79 10

    193.88 47

    240 70 23

    280 90 20

    320 106 16

    360 121 15

    387.9 133 12

    193.88 79

    240 98 19

    280 113 15

    320 129 16

    360 142 13

    387.9 155 13

    193.88 79

    240 95 16

    280 113 18

    70.00 75.28

    80.00 75.28

    -6.00 80.46

    49.33 80.46

    72.33 80.46

    83.67 80.46

    84.33 84.63

  • 7/27/2019 Prestressing Niraj Sir

    34/294

    320 125 12

    360 141 16

    387.9 156 15

    193.88 44

    240 62 18

    280 81 19

    320 101 20

    360 120 19

    387.9 135 15

    193.88 44

    240 65 21

    280 83 18

    320 101 18

    360 116 15

    387.9 131 15

    193.88 89

    240 99 10

    280 109 10

    320 118 9

    360 129 11

    387.9 139 10

    193.88 82

    240 104 22

    280 123 19

    320 139 16

    360 155 16

    387.9 175 20

    193.88 57

    240 76 19

    280 98 22

    320 117 19

    360 131 14

    387.9 143 12

    193.88 40

    240 57 17

    280 76 19

    320 95 19

    360 112 17

    387.9 125 13

    193.88 54

    79.00 76.50

    87.00 81.05

    80.00 81.05

    75.28

    81.00 81.05

    44.00 81.05

    85.00

    . .

  • 7/27/2019 Prestressing Niraj Sir

    35/294

    240 72 18

    280 92 20

    320 107 15

    360 124 17

    387.9 139 15

    193.88 52

    240 71 19

    280 91 20

    320 106 15

    360 121 15

    387.9 138 17

    193.88 56

    240 73 17

    280 90 17

    320 108 18

    360 125 17

    387.9 141 16

    193.88 33

    240 54 21

    280 72 18

    320 87 15

    360 102 15

    387.9 117 15

    193.88 63

    240 79 16

    280 94 15

    320 104 10

    360 127 23

    387.9 146 19

    193.88 61

    240 76 15

    280 92 16

    320 108 16

    360 125 17

    387.9 145 20

    193.88 43

    240 64 21

    280 85 21

    320 103 18

    360 118 15

    387.9 132 14

    78.00 82.57

    83.00 82.57

    78.00 82.57

    77.00 82.57

    80.00 76.50

    79.00 76.50

    79.00 76.50

  • 7/27/2019 Prestressing Niraj Sir

    36/294

    193.88 53

    240 76 23

    280 94 18

    320 111 17

    360 125 14

    387.9 139 14

    193.88 38

    240 59 21

    280 79 20

    320 96 17

    360 112 16

    387.9 126 14

    193.88 47

    240 67 20

    280 85 18

    320 104 19

    360 123 19

    387.9 136 13

    193.88 49

    240 64 15

    280 87 23

    320 111 24

    360 126 15

    387.9 140 14

    193.88 75

    240 94 19

    280 112 18

    320 130 18

    360 150 20

    387.9 167 17

    193.88 67

    240 105 38

    280 150 45

    320 0 -150

    360 0 0

    387.9 0 0

    193.88 61

    240 76 15

    280 96 20

    320 111 1577.00 84.63

    86.00 84.63

    -73.00 84.63

    83.00 78.21

    85.00 78.21

    80.00 78.21

    82.00 78.21

  • 7/27/2019 Prestressing Niraj Sir

    37/294

    360 126 15

    387.9 144 18

    193.88 75

    240 96 21

    280 113 17

    320 131 18

    360 148 17

    387.9 166 18

    193.88 35

    240 55 20

    280 78 23

    320 98 20

    360 114 16

    387.9 128 14

    193.88 41

    240 58 17

    280 79 21

    320 98 19

    360 115 17

    387.9 129 14

    193.88 0

    240 0 0

    280 0 0

    320 0 0

    360 0 0

    387.9 0 0

    193.88 34

    240 48 14

    280 62 14

    320 77 15

    360 91 14

    387.9 103 12

    -6.00 80.46

    63.00 80.46

    87.00 80.46

    82.00 80.46

    85.00 84.63

  • 7/27/2019 Prestressing Niraj Sir

    38/294

  • 7/27/2019 Prestressing Niraj Sir

    39/294

  • 7/27/2019 Prestressing Niraj Sir

    40/294

    397500

    1024.492

    387.9971732

    193.9985866

    38.79971732

    77.59943465

    116.399152

    155.1988693

    193.9985866

    232.7983039

    271.5980213

    310.3977386

    349.1974559

    387.9971732

    19.39985866

    407.3970319

  • 7/27/2019 Prestressing Niraj Sir

    41/294

  • 7/27/2019 Prestressing Niraj Sir

    42/294

    NO STRAND

  • 7/27/2019 Prestressing Niraj Sir

    43/294

    Sl. NO. Block No. Stage Sub-Tendon No.Tendon Free

    LengthLoad in KN

    1 5 1st H1 8.2 267.5

    535

    802.5

    1203.75

    1255

    2 5 1st H2 8.2 267.5

    535

    802.5

    1203.75

    1255

    3 5 1st H3 8.2 267.5

    535

    802.5

    1203.75

    1255

    4 5 1st H4 8.2 267.5

    535

    802.5

    1203.75

    1255

    5 5 1st H5 8.2 267.5

    535

    802.5

    1203.75

    1255

    6 5 1st H6 8.2 267.5

    535

    802.5

    1203.75

    1255

    7 5 1st H7 8.2 267.5

    535

    802.5

    1203.75

    1255

    8 5 1st H8 8.2 267.5

    535

  • 7/27/2019 Prestressing Niraj Sir

    44/294

    802.5

    1203.75

    1255

    9 5 1st H9 8.2 267.5

    535

    802.5

    1203.75

    1255

    10 5 1st H10 8.2 267.5

    535

    802.5

    1203.75

    1255

    11 5 1st H11 8.2 267.5

    535

    802.5

    1203.75

    1255

    12 5 1st H12 8.2 267.5

    535

    802.5

    1203.75

    1255

    13 5 1st H13 8.2 267.5

    535

    802.5

    1203.75

    1255

    14 5 1st H14 8.2 267.5

    535

    802.5

    1203.75

    1255

    15 5 1st H15 8.2 267.5

    535

    802.5

    1203.75

    1255

    16 5 1st H16 8.2 267.5

  • 7/27/2019 Prestressing Niraj Sir

    45/294

    535

    802.5

    1203.75

    1255

    17 5 1st H17 8.2 267.5

    535

    802.5

    1203.75

    1255

    18 5 1st H18 8.2 267.5

    535

    802.5

    1203.75

    1255

    19 5 2nd H1 8.2 1255

    1471.25

    1738.75

    2006.25

    2273.75

    2510

    20 5 2nd H2 8.2 1255

    1471.25

    1738.75

    2006.25

    2273.75

    2510

    21 5 2nd H3 8.2 1255

    1471.25

    1738.75

    2006.25

    2273.75

    2510

    22 5 2nd H4 8.2 1255

    1471.25

    1738.75

    2006.25

    2273.75

    2510

    23 5 2nd H5 8.2 1255

    1471.25

  • 7/27/2019 Prestressing Niraj Sir

    46/294

    1738.75

    2006.25

    2273.75

    2510

    24 5 2nd H6 8.2 1255

    1471.25

    1738.75

    2006.25

    2273.75

    2510

    25 5 2nd H7 8.2 1255

    1471.25

    1738.75

    2006.25

    2273.75

    2510

    26 5 2nd H8 8.2 1255

    1471.25

    1738.75

    2006.25

    2273.75

    2510

    27 5 2nd H9 8.2 1255

    1471.25

    1738.75

    2006.25

    2273.75

    2510

    28 5 2nd H10 8.2 1255

    1471.25

    1738.75

    2006.25

    2273.75

    2510

    29 5 2nd H11 8.2 1255

    1471.25

    1738.75

    2006.25

    2273.75

    2510

  • 7/27/2019 Prestressing Niraj Sir

    47/294

    30 5 2nd H12 8.2 1255

    1471.25

    1738.75

    2006.25

    2273.75

    2510

    31 5 2nd H13 8.2 1255

    1471.25

    1738.75

    2006.25

    2273.75

    2510

    32 5 2nd H14 8.2 1255

    1471.25

    1738.75

    2006.25

    2273.75

    2510

    33 5 2nd H15 8.2 1255

    1471.25

    1738.75

    2006.25

    2273.75

    2510

    34 5 2nd H16 8.2 1255

    1471.25

    1738.75

    2006.25

    2273.75

    2510

    35 5 2nd H17 8.2 1255

    1471.25

    1738.75

    2006.25

    2273.75

    2510

    36 5 2nd H18 8.2 1255

    1471.25

    1738.75

    2006.25

    2273.75

  • 7/27/2019 Prestressing Niraj Sir

    48/294

    2510

  • 7/27/2019 Prestressing Niraj Sir

    49/294

  • 7/27/2019 Prestressing Niraj Sir

    50/294

  • 7/27/2019 Prestressing Niraj Sir

    51/294

  • 7/27/2019 Prestressing Niraj Sir

    52/294

    Pressure Elongation DisplacementCorrected

    DisplacementNet Elongation Th. Elongation

    40 18 6.00

    80 24 6

    120 28 4

    160 36 8

    187.67 43 7

    40 24 6.33

    80 33 9

    120 37 4

    160 43 6

    187.67 48 5

    40 68 8.33

    80 77 9

    120 85 8

    160 93 8

    187.67 101 8

    40 30 6.33

    80 36 6

    120 41 5

    160 49 8

    187.67 56 7

    40 75 6.00

    80 81 6

    120 87 6

    160 93 6

    187.67 96 3

    40 16 5.67

    80 20 4

    120 25 5

    160 33 8

    187.67 38 5

    40 14 7.33

    80 22 8

    120 28 6

    160 36 8

    187.67 42 6

    40 71 6.00

    80 78 7

    29.33 26.93

    21.67 26.93

    35.33 26.93

    26.33 26.93

    25.00 26.93

    24.33 26.93

    21.00 26.93

  • 7/27/2019 Prestressing Niraj Sir

    53/294

    120 83 5

    160 89 6

    187.67 93 4

    40 58 0.67

    80 60 2

    120 60 0

    160 60 0

    187.67 60 0

    40 35 7.00

    80 38 3

    120 47 9

    160 56 9

    187.67 62 6

    40 26 7.33

    80 33 7

    120 40 7

    160 48 8

    187.67 52 4

    40 33 6.33

    80 42 9

    120 47 5

    160 52 5

    187.67 56 4

    40 25 4.33

    80 31 6

    120 34 3

    160 38 4

    187.67 41 3

    40 15 8.33

    80 25 10

    120 33 8

    160 40 7

    187.67 44 4

    40 24 6.67

    80 31 7

    120 39 8

    160 44 5

    187.67 49 5

    40 28 6.67

    25.67 26.93

    14.33 26.93

    31.33 26.93

    27.33 26.93

    23.33 26.93

    -3.33 26.93

    28.00 26.93

    22.00 26.93

  • 7/27/2019 Prestressing Niraj Sir

    54/294

    80 42 14

    120 46 4

    160 48 2

    187.67 51 3

    40 62 5.67

    80 67 5

    120 73 6

    160 79 6

    187.67 83 4

    40 67 7.00

    80 74 7

    120 82 8

    160 88 6

    187.67 93 5

    187.67 37

    220 44 7

    260 51 7

    300 57 6

    340 65 8

    375.33 70 5

    187.67 36

    220 45 9

    260 53 8

    300 60 7

    340 66 6

    375.33 73 7

    187.67 49

    220 57 8

    260 63 6

    300 68 5

    340 72 4

    375.33 76 4

    187.67 43

    220 47 4

    260 53 6

    300 60 7

    340 67 7

    375.33 73 6

    187.67 63

    220 70 7

    24.00 26.93

    21.00 26.93

    27.00 26.93

    31.00 26.93

    20.67 26.93

    27.00 26.93

    23.67 26.93

  • 7/27/2019 Prestressing Niraj Sir

    55/294

    260 76 6

    300 82 6

    340 89 7

    375.33 96 7

    187.67 78

    220 81 3

    260 86 5

    300 92 6

    340 99 7

    375.33 108 9

    187.67 87

    220 95 8

    260 100 5

    300 105 5

    340 113 8

    375.33 119 6

    187.67 42

    220 50 8

    260 57 7

    300 64 7

    340 72 8

    375.33 78 6

    187.67 42

    220 42 0

    260 45 3

    300 47 2

    340 48 1

    375.33 48 0

    187.67 42

    220 47 5

    260 53 6

    300 59 6

    340 66 7

    375.33 73 7

    187.67 43

    220 48 5

    260 56 8

    300 63 7

    340 70 7

    375.33 77 7

    28.00 26.93

    0.00 26.93

    25.00 26.93

    26.00 26.93

    30.00 26.93

    27.00 26.93

    24.00 26.93

  • 7/27/2019 Prestressing Niraj Sir

    56/294

    187.67 70

    220 74 4

    260 78 4

    300 83 5

    340 88 5

    375.33 92 4

    187.67 28

    220 33 5

    260 46 13

    300 53 7

    340 61 8

    375.33 67 6

    187.67 36

    220 43 7

    260 50 7

    300 57 7

    340 62 5

    375.33 69 7

    187.67 62

    220 67 5

    260 72 5

    300 80 8

    340 87 7

    375.33 94 7

    187.67 45

    220 52 7

    260 60 8

    300 67 7

    340 74 7

    375.33 80 6

    187.67 56

    220 63 7

    260 70 7

    300 76 6

    340 83 7

    375.33 87 4

    187.67 70

    220 77 7

    260 82 5

    300 88 6

    340 92 4

    25.00 26.93

    23.00 26.93

    26.00 26.93

    29.00 26.93

    33.00 26.93

    27.00 26.93

    16.00 26.93

  • 7/27/2019 Prestressing Niraj Sir

    57/294

    375.33 99 7

  • 7/27/2019 Prestressing Niraj Sir

    58/294

  • 7/27/2019 Prestressing Niraj Sir

    59/294

  • 7/27/2019 Prestressing Niraj Sir

    60/294

  • 7/27/2019 Prestressing Niraj Sir

    61/294

    Sl. NO. Block No. Stage Tendon No.Tendon Free

    LengthLoad in KN

    1 6 1st A1 21.714 410.2

    820.4

    1230.6

    1640.8

    1987.5

    2 6 1st A2 21.714 410.2

    820.4

    1230.6

    1640.8

    1987.5

    3 6 1st A3 21.714 410.2

    820.4

    1230.6

    1640.8

    1987.5

    4 6 1st A4 21.714 410.2

    820.4

    1230.6

    1640.8

    1987.5

    5 6 1st B1 23.379 410.2

    820.4

    1230.6

    1640.8

    1987.5

    6 6 1st B2 23.379 410.2

    820.4

    1230.6

    1640.8

    1987.5

    7 6 1st B3 23.379 410.2

    820.4

    1230.6

    1640.8

    1987.5

    8 6 1st B4 23.379 410.2

    820.4

  • 7/27/2019 Prestressing Niraj Sir

    62/294

    1230.6

    1640.8

    1987.5

    9 6 1st C1 22.066 410.2

    820.4

    1230.6

    1640.8

    1987.5

    10 6 1st C2 22.066 410.2

    820.4

    1230.6

    1640.8

    1987.5

    11 6 1st C3 22.066 410.2

    820.4

    1230.6

    1640.8

    1987.5

    12 6 1st C4 22.066 410.2

    820.4

    1230.6

    1640.8

    1987.5

    13 6 1st D1 23.817 410.2

    820.4

    1230.6

    1640.8

    1987.5

    14 6 1st D2 23.817 410.2

    820.4

    1230.6

    1640.8

    1987.5

    15 6 1st D3 23.817 410.2

    820.4

    1230.6

    1640.8

    1987.5

    16 6 1st D4 23.817 410.2

  • 7/27/2019 Prestressing Niraj Sir

    63/294

    820.4

    1230.6

    1640.8

    1987.5

    17 6 1st E1 22.561 410.2

    820.4

    1230.6

    1640.8

    1987.5

    18 6 1st E2 22.561 410.2

    820.4

    1230.6

    1640.8

    1987.5

    19 6 1st E3 22.561 410.2

    820.4

    1230.6

    1640.8

    1987.5

    20 6 1st E4 22.561 410.2

    820.4

    1230.6

    1640.8

    1987.5

    21 6 1st F1 24.412 410.2

    820.4

    1230.6

    1640.8

    1987.5

    22 6 1st F2 24.412 410.2

    820.4

    1230.6

    1640.8

    1987.5

    23 6 1st F3 24.412 410.2

    820.4

    1230.6

    1640.8

    1987.5

  • 7/27/2019 Prestressing Niraj Sir

    64/294

    24 6 1st F4 24.412 410.2

    820.4

    1230.6

    1640.8

    1987.5

    25 6 1st G1 23.209 410.2

    820.4

    1230.6

    1640.8

    1987.5

    26 6 1st G2 23.209 410.2

    820.4

    1230.6

    1640.8

    1987.5

    27 6 1st G3 23.209 410.2

    820.4

    1230.6

    1640.8

    1987.5

    28 6 1st G4 23.209 410.2

    820.4

    1230.6

    1640.8

    1987.5

    29 6 2nd A1 21.714 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    30 6 2nd A2 21.714 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    31 6 2nd A3 21.714 1987.5

    2461.2

    2871.4

  • 7/27/2019 Prestressing Niraj Sir

    65/294

    3281.6

    3691.8

    3975

    32 6 2nd A4 21.714 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    33 6 2nd B1 23.379 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    34 6 2nd B2 23.379 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    35 6 2nd B3 23.379 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    36 6 2nd B4 23.379 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    37 6 2nd C1 22.066 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    38 6 2nd C2 22.066 1987.5

  • 7/27/2019 Prestressing Niraj Sir

    66/294

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    39 6 2nd C3 22.066 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    40 6 2nd C4 22.066 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    41 6 2nd D1 23.817 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    42 6 2nd D2 23.817 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    43 6 2nd D3 23.817 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    44 6 2nd D4 23.817 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

  • 7/27/2019 Prestressing Niraj Sir

    67/294

    45 6 2nd E1 22.561 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    46 6 2nd E2 22.561 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    47 6 2nd E3 22.561 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    48 6 2nd E4 22.561 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    49 6 2nd F1 24.412 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    50 6 2nd F2 24.412 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    51 6 2nd F3 24.412 1987.5

    2461.2

    2871.4

    3281.6

  • 7/27/2019 Prestressing Niraj Sir

    68/294

    3691.8

    3975

    52 6 2nd F4 24.412 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    53 6 2nd G1 23.209 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    54 6 2nd G2 23.209 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    55 6 2nd G3 23.209 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

    56 6 2nd G4 23.209 1987.5

    2461.2

    2871.4

    3281.6

    3691.8

    3975

  • 7/27/2019 Prestressing Niraj Sir

    69/294

  • 7/27/2019 Prestressing Niraj Sir

    70/294

    Pressure Elongation DisplacementCorrected

    Displacement

    Net

    ElongationTh. Elongation

    40 30 17.67

    80 53 23

    120 73 20

    160 83 10

    193.8 102 19

    40 43 17.33

    80 60 17

    120 80 20

    160 95 15

    193.8 110 15

    40 85 17.33

    80 101 16

    120 120 19

    160 137 17

    193.8 152 15

    40 105 17.67

    80 125 20

    120 141 16

    160 158 17

    193.8 175 17

    40 55 19.00

    80 75 20

    120 95 20

    160 112 17

    193.8 127 15

    40 68 18.67

    80 86 18

    120 104 18

    160 124 20

    193.8 142 18

    40 50 16.00

    80 68 18

    120 84 16

    160 98 14

    193.8 121 23

    40 65 18.00

    80 85 20

    81.00 81.05

    85.00 81.05

    86.67 81.05

    78.33 75.27

    81.67 75.27

    83.67 75.27

    78.33 75.27

  • 7/27/2019 Prestressing Niraj Sir

    71/294

    120 100 15

    160 119 19

    193.8 135 16

    40 37 17.67

    80 56 19

    120 72 16

    160 90 18

    193.8 105 15

    40 43 17.67

    80 60 17

    120 78 18

    160 96 18

    193.8 111 15

    40 39 17.00

    80 54 15

    120 69 15

    160 90 21

    193.8 106 16

    40 48 17.00

    80 69 21

    120 85 16

    160 99 14

    193.8 112 13

    40 47 19.00

    80 68 21

    120 87 19

    160 104 17

    193.8 122 18

    40 56 18.67

    80 74 18

    120 94 20

    160 112 18

    193.8 129 17

    40 48 18.00

    80 67 19

    120 85 18

    160 102 17

    193.8 117 15

    40 55 19.00

    81.00 82.57

    88.00 82.57

    85.67 82.57

    78.00 76.50

    75.00 76.50

    79.67 76.50

    79.67 76.50

    82.00 81.05

  • 7/27/2019 Prestressing Niraj Sir

    72/294

    80 76 21

    120 94 18

    160 112 18

    193.8 126 14

    40 36 4.00

    80 39 3

    120 44 5

    160 48 4

    193.8 58 10

    40 23 15.67

    80 37 14

    120 53 16

    160 70 17

    193.8 89 19

    40 54 15.33

    80 61 7

    120 83 22

    160 100 17

    193.8 118 18

    40 31 15.33

    80 51 20

    120 64 13

    160 77 13

    193.8 94 17

    40 65 19.00

    80 84 19

    120 102 18

    160 122 20

    193.8 138 16

    40 32 17.67

    80 51 19

    120 68 17

    160 85 17

    193.8 101 16

    40 45 18.00

    80 65 20

    120 82 17

    160 99 17

    193.8 117 18

    84.00 84.63

    86.00 84.63

    80.67 84.63

    73.33 78.21

    72.33 78.21

    20.00 78.21

    75.67 78.21

    84.00 82.57

  • 7/27/2019 Prestressing Niraj Sir

    73/294

    40 60 18.00

    80 78 18

    120 96 18

    160 114 18

    193.8 127 13

    40 47 15.67

    80 67 20

    120 77 10

    160 94 17

    193.8 109 15

    40 55 16.00

    80 70 15

    120 85 15

    160 103 18

    193.8 121 18

    40 66 18.67

    80 90 24

    120 107 17

    160 122 15

    193.8 140 18

    40 39 19.33

    80 60 21

    120 79 19

    160 97 18

    193.8 111 14

    193.88 90

    240 110 20

    280 130 20

    320 145 15

    360 155 10

    387.9 174 19

    193.88 39

    240 59 20

    280 74 15

    320 89 15

    360 106 17

    387.9 131 25

    193.88 78

    240 96 18

    280 113 17

    78.00 75.28

    86.00 75.28

    86.67 80.46

    85.33 80.46

    71.67 80.46

    76.00 80.46

    79.00 84.63

  • 7/27/2019 Prestressing Niraj Sir

    74/294

    320 127 14

    360 142 15

    387.9 160 18

    193.88 76

    240 94 18

    280 111 17

    320 129 18

    360 138 9

    387.9 156 18

    193.88 51

    240 70 19

    280 88 18

    320 109 21

    360 127 18

    387.9 142 15

    193.88 53

    240 70 17

    280 89 19

    320 107 18

    360 126 19

    387.9 143 17

    193.88 34

    240 53 19

    280 74 21

    320 93 19

    360 110 17

    387.9 124 14

    193.88 52

    240 71 19

    280 88 17

    320 107 19

    360 124 17

    387.9 139 15

    193.88 58

    240 75 17

    280 93 18

    320 110 17

    360 122 12

    387.9 139 17

    193.88 85

    75.00 76.50

    84.00 81.05

    81.00 81.05

    85.00 81.05

    84.00 81.05

    . .

    74.00 75.28

  • 7/27/2019 Prestressing Niraj Sir

    75/294

    240 102 17

    280 117 15

    320 137 20

    360 146 9

    387.9 163 17

    193.88 75

    240 90 15

    280 107 17

    320 125 18

    360 135 10

    387.9 155 20

    193.88 65

    240 84 19

    280 100 16

    320 115 15

    360 129 14

    387.9 144 15

    193.88 85

    240 95 10

    280 115 20

    320 123 8

    360 133 10

    387.9 148 15

    193.88 68

    240 86 18

    280 105 19

    320 126 21

    360 144 18

    387.9 162 18

    193.88 72

    240 91 19

    280 109 18

    320 127 18

    360 147 20

    387.9 163 16

    193.88 40

    240 53 13

    280 74 21

    320 82 8

    360 102 20

    387.9 121 19

    85.00 82.57

    75.00 82.57

    57.00 82.57

    88.00 82.57

    74.00 76.50

    73.00 76.50

    72.00 76.50

  • 7/27/2019 Prestressing Niraj Sir

    76/294

    193.88 62

    240 82 20

    280 101 19

    320 120 19

    360 135 15

    387.9 149 14

    193.88 46

    240 61 15

    280 79 18

    320 98 19

    360 115 17

    387.9 134 19

    193.88 43

    240 65 22

    280 82 17

    320 99 17

    360 115 16

    387.9 133 18

    193.88 66

    240 83 17

    280 104 21

    320 123 19

    360 139 16

    387.9 153 14

    193.88 45

    240 65 20

    280 87 22

    320 106 19

    360 122 16

    387.9 130 8

    193.88 38

    240 55 17

    280 76 21

    320 96 20

    360 115 19

    387.9 131 16

    193.88 45

    240 63 18

    280 85 22

    320 104 1986.00 84.63

    79.00 84.63

    87.00 84.63

    84.00 78.21

    81.00 78.21

    81.00 78.21

    82.00 78.21

  • 7/27/2019 Prestressing Niraj Sir

    77/294

    360 121 17

    387.9 137 16

    193.88 36

    240 55 19

    280 77 22

    320 97 20

    360 116 19

    387.9 130 14

    193.88 49

    240 68 19

    280 88 20

    320 105 17

    360 121 16

    387.9 137 16

    193.88 52

    240 70 18

    280 89 19

    320 104 15

    360 114 10

    387.9 134 20

    193.88 60

    240 80 20

    280 98 18

    320 114 16

    360 129 15

    387.9 145 16

    193.88 43

    240 61 18

    280 80 19

    320 98 18

    360 117 19

    387.9 133 16

    79.00 80.46

    84.00 80.46

    82.00 80.46

    76.00 80.46

    88.00 84.63

  • 7/27/2019 Prestressing Niraj Sir

    78/294

  • 7/27/2019 Prestressing Niraj Sir

    79/294

    Sl. NO. Block No. Stage

    Sub-

    Tendon

    No.

    Tendon

    Free

    Length

    Load in

    KNPressure Elongation

    Displacem

    ent

    1 6 1st H1 8.2 267.5 40 24

    535 80 31 7

    802.5 120 39 8

    1203.75 160 46 7

    1255 187.67 51 5

    2 6 1st H2 8.2 267.5 40 76

    535 80 82 6

    802.5 120 89 7

    1203.75 160 96 7

    1255 187.67 103 7

    3 6 1st H3 8.2 267.5 40 23

    535 80 30 7

    802.5 120 36 6

    1203.75 160 41 5

    1255 187.67 46 5

    4 6 1st H4 8.2 267.5 40 75

    535 80 79 4

    802.5 120 83 4

    1203.75 160 85 2

    1255 187.67 89 4

    5 6 1st H5 8.2 267.5 40 8

    535 80 14 6

    802.5 120 21 7

    1203.75 160 26 5

    1255 187.67 31 5

    6 6 1st H6 8.2 267.5 40 28

    535 80 36 8

    802.5 120 43 7

    1203.75 160 49 6

    1255 187.67 55 6

    7 6 1st H7 8.2 267.5 40 69

    535 80 75 6

    802.5 120 82 7

    1203.75 160 90 8

    1255 187.67 96 6

    8 6 1st H8 8.2 267.5 40 77

  • 7/27/2019 Prestressing Niraj Sir

    80/294

    535 80 84 7

    802.5 120 90 6

    1203.75 160 97 7

    1255 187.67 103 6

    9 6 1st H9 8.2 267.5 40 33

    535 80 45 12

    802.5 120 54 9

    1203.75 160 60 6

    1255 187.67 63 3

    10 6 1st H10 8.2 267.5 40 35

    535 80 42 7

    802.5 120 46 4

    1203.75 160 50 4

    1255 187.67 53 3

    11 6 1st H11 8.2 267.5 40 70

    535 80 77 7

    802.5 120 83 6

    1203.75 160 88 5

    1255 187.67 93 5

    12 6 1st H12 8.2 267.5 40 34

    535 80 42 8

    802.5 120 54 12

    1203.75 160 61 7

    1255 187.67 65 4

    13 6 1st H13 8.2 267.5 40 56

    535 80 62 6

    802.5 120 68 6

    1203.75 160 77 9

    1255 187.67 83 6

    14 6 1st H14 8.2 267.5 40 38

    535 80 45 7

    802.5 120 52 7

    1203.75 160 58 6

    1255 187.67 64 6

    15 6 1st H15 8.2 267.5 40 65

    535 80 72 7

    802.5 120 79 7

    1203.75 160 85 6

    1255 187.67 91 6

  • 7/27/2019 Prestressing Niraj Sir

    81/294

    16 6 1st H16 8.2 267.5 40 65

    535 80 72 7

    802.5 120 79 7

    1203.75 160 85 6

    1255 187.67 92 7

    17 6 1st H17 8.2 267.5 40 25

    535 80 32 7

    802.5 120 38 6

    1203.75 160 44 6

    1255 187.67 49 5

    18 6 1st H18 8.2 267.5 40 30

    535 80 37 7

    802.5 120 44 7

    1203.75 160 51 7

    1255 187.67 56 5

    19 6 2nd H1 8.2 1255 187.67 78

    1471.25 220 80 2

    1738.75 260 81 1

    2006.25 300 88 7

    2273.75 340 89 1

    2510 375.33 92 3

    20 6 2nd H2 8.2 1255 187.67 34

    1471.25 220 42 8

    1738.75 260 50 8

    2006.25 300 56 6

    2273.75 340 62 6

    2510 375.33 68 6

    21 6 2nd H3 8.2 1255 187.67 74

    1471.25 220 75 1

    1738.75 260 76 1

    2006.25 300 78 2

    2273.75 340 79 1

    2510 375.33 82 3

    22 6 2nd H4 8.2 1255 187.67 51

    1471.25 220 55 4

    1738.75 260 59 4

    2006.25 300 64 5

    2273.75 340 68 4

    2510 375.33 76 8

    23 6 2nd H5 8.2 1255 187.67 32

  • 7/27/2019 Prestressing Niraj Sir

    82/294

    1471.25 220 40 8

    1738.75 260 46 6

    2006.25 300 53 7

    2273.75 340 59 6

    2510 375.33 66 7

    24 6 2nd H6 8.2 1255 187.67 72

    1471.25 220 77 5

    1738.75 260 83 6

    2006.25 300 88 5

    2273.75 340 94 6

    2510 375.33 103 9

    25 6 2nd H7 8.2 1255 187.67 87

    1471.25 220 89 2

    1738.75 260 90 1

    2006.25 300 93 3

    2273.75 340 94 1

    2510 375.33 96 2

    26 6 2nd H8 8.2 1255 187.67 39

    1471.25 220 46 7

    1738.75 260 53 7

    2006.25 300 59 6

    2273.75 340 65 6

    2510 375.33 71 6

    27 6 2nd H9 8.2 1255 187.67 54

    1471.25 220 62 8

    1738.75 260 69 7

    2006.25 300 76 7

    2273.75 340 82 6

    2510 375.33 87 5

    28 6 2nd H10 8.2 1255 187.67 41

    1471.25 220 48 7

    1738.75 260 55 7

    2006.25 300 64 9

    2273.75 340 70 6

    2510 375.33 75 5

    29 6 2nd H11 8.2 1255 187.67 39

    1471.25 220 47 8

    1738.75 260 55 8

    2006.25 300 62 7

    2273.75 340 68 6

    2510 375.33 74 6

  • 7/27/2019 Prestressing Niraj Sir

    83/294

    30 6 2nd H12 8.2 1255 187.67 66

    1471.25 220 71 5

    1738.75 260 78 7

    2006.25 300 84 6

    2273.75 340 91 7

    2510 375.33 98 7

    31 6 2nd H13 8.2 1255 187.67 76

    1471.25 220 79 3

    1738.75 260 83 4

    2006.25 300 90 7

    2273.75 340 95 5

    2510 375.33 103 8

    32 6 2nd H14 8.2 1255 187.67 75

    1471.25 220 80 5

    1738.75 260 85 5

    2006.25 300 91 6

    2273.75 340 96 5

    2510 375.33 105 9

    33 6 2nd H15 8.2 1255 187.67 71

    1471.25 220 76 5

    1738.75 260 82 6

    2006.25 300 87 5

    2273.75 340 94 7

    2510 375.33 101 7

    34 6 2nd H16 8.2 1255 187.67 48

    1471.25 220 55 7

    1738.75 260 61 6

    2006.25 300 67 6

    2273.75 340 75 8

    2510 375.33 81 6

    35 6 2nd H17 8.2 1255 187.67 41

    1471.25 220 50 9

    1738.75 260 57 7

    2006.25 300 64 7

    2273.75 340 70 6

    2510 375.33 75 5

    36 6 2nd H18 8.2 1255 187.67 46

    1471.25 220 53 7

    1738.75 260 61 8

    2006.25 300 67 6

  • 7/27/2019 Prestressing Niraj Sir

    84/294

    2273.75 340 74 7

    2510 375.33 78 4

  • 7/27/2019 Prestressing Niraj Sir

    85/294

    Corrected

    Displacem

    ent

    Net

    Elongatio

    n

    Th.

    Elongatio

    n

    7.33

    6.67

    6.00

    3.33

    6.00

    7.00

    7.00

    6.67

    28.00 26.93

    23.00 26.93

    28.00 26.93

    23.00 26.93

    11.33 26.93

    28.33 26.93

    27.67 26.93

  • 7/27/2019 Prestressing Niraj Sir

    86/294

    9.00

    5.00

    6.00

    9.00

    7.00

    6.67

    6.67

    26.67 26.93

    28.00 26.93

    26.67 26.93

    23.00 26.93

    34.00 26.93

    33.00 26.93

    17.00 26.93

    26.67 26.93

  • 7/27/2019 Prestressing Niraj Sir

    87/294

    6.67

    6.33

    7.00

    2.00 26.93

    19.00 26.93

    8.00 26.93

    28.00 26.93

    24.33 26.93

    27.00 26.93

    27.67 26.93

  • 7/27/2019 Prestressing Niraj Sir

    88/294

    29.00 26.93

    27.00 26.93

    28.00 26.93

    3.00 26.93

    26.00 26.93

    28.00 26.93

    25.00 26.93

  • 7/27/2019 Prestressing Niraj Sir

    89/294

    28.00 26.93

    26.00 26.93

    24.00 26.93

    27.00 26.93

    21.00 26.93

    24.00 26.93

    26.00 26.93

  • 7/27/2019 Prestressing Niraj Sir

    90/294

  • 7/27/2019 Prestressing Niraj Sir

    91/294

    Sl. NO. Block No. StageTendon

    No.

    Tendon

    Free

    Length

    Load in

    KNPressure Elongation

    Displacem

    ent

    1 7 1st A1 21.714 410.2 40 57

    820.4 80 75 18

    1230.6 120 95 20

    1640.8 160 112 17

    1987.5 193.8 125 13

    2 7 1st A2 21.714 410.2 40 43

    820.4 80 60 17

    1230.6 120 76 16

    1640.8 160 93 17

    1987.5 193.8 110 17

    3 7 1st A3 21.714 410.2 40 36

    820.4 80 54 18

    1230.6 120 73 19

    1640.8 160 91 18

    1987.5 193.8 105 14

    4 7 1st A4 21.714 410.2 40 71

    820.4 80 88 17

    1230.6 120 107 19

    1640.8 160 121 14

    1987.5 193.8 139 18

    5 7 1st B1 23.379 410.2 40 65

    820.4 80 80 15

    1230.6 120 95 15

    1640.8 160 110 15

    1987.5 193.8 133 23

    6 7 1st B2 23.379 410.2 40 58

    820.4 80 77 19

    1230.6 120 95 18

    1640.8 160 115 20

    1987.5 193.8 130 15

    7 7 1st B3 23.379 410.2 40 53

    820.4 80 73 20

    1230.6 120 94 21

    1640.8 160 109 15

    1987.5 193.8 127 18

    8 7 1st B4 23.379 410.2 40 70

  • 7/27/2019 Prestressing Niraj Sir

    92/294

    820.4 80 85 15

    1230.6 120 110 25

    1640.8 160 115 5

    1987.5 193.8 138 23

    9 7 1st C1 22.066 410.2 40 32

    820.4 80 51 19

    1230.6 120 70 19

    1640.8 160 87 17

    1987.5 193.8 102 15

    10 7 1st C2 22.066 410.2 40 57

    820.4 80 73 16

    1230.6 120 91 18

    1640.8 160 108 17

    1987.5 193.8 123 15

    11 7 1st C3 22.066 410.2 40 63

    820.4 80 78 15

    1230.6 120 98 20

    1640.8 160 115 17

    1987.5 193.8 131 16

    12 7 1st C4 22.066 410.2 40 42

    820.4 80 58 16

    1230.6 120 76 18

    1640.8 160 93 17

    1987.5 193.8 108 15

    13 7 1st D1 23.817 410.2 40 61

    820.4 80 78 17

    1230.6 120 98 20

    1640.8 160 117 19

    1987.5 193.8 132 15

    14 7 1st D2 23.817 410.2 40 64

    820.4 80 85 21

    1230.6 120 103 18

    1640.8 160 120 17

    1987.5 193.8 136 16

    15 7 1st D3 23.817 410.2 40 53

    820.4 80 70 17

    1230.6 120 92 22

    1640.8 160 110 18

    1987.5 193.8 127 17

  • 7/27/2019 Prestressing Niraj Sir

    93/294

    16 7 1st D4 23.817 410.2 40 53

    820.4 80 73 20

    1230.6 120 92 19

    1640.8 160 111 19

    1987.5 193.8 127 16

    17 7 1st E1 22.561 410.2 40 39

    820.4 80 59 20

    1230.6 120 75 16

    1640.8 160 92 17

    1987.5 193.8 109 17

    18 7 1st E2 22.561 410.2 40 65

    820.4 80 90 25

    1230.6 120 102 12

    1640.8 160 120 18

    1987.5 193.8 137 17

    19 7 1st E3 22.561 410.2 40 60

    820.4 80 85 25

    1230.6 120 96 11

    1640.8 160 115 19

    1987.5 193.8 131 16

    20 7 1st E4 22.561 410.2 40 49

    820.4 80 70 21

    1230.6 120 87 17

    1640.8 160 106 19

    1987.5 193.8 121 15

    21 7 1st F1 24.412 410.2 40 75

    820.4 80 92 17

    1230.6 120 112 20

    1640.8 160 131 19

    1987.5 193.8 150 19

    22 7 1st F2 24.412 410.2 40 32

    820.4 80 52 20

    1230.6 120 73 21

    1640.8 160 92 19

    1987.5 193.8 109 17

    23 7 1st F3 24.412 410.2 40 31

    820.4 80 50 19

    1230.6 120 73 23

    1640.8 160 92 19

    1987.5 193.8 107 15

  • 7/27/2019 Prestressing Niraj Sir

    94/294

    24 7 1st F4 24.412 410.2 40 80

    820.4 80 97 17

    1230.6 120 118 21

    1640.8 160 137 19

    1987.5 193.8 153 16

    25 7 1st G1 23.209 410.2 40 66

    820.4 80 84 18

    1230.6 120 104 20

    1640.8 160 123 19

    1987.5 193.8 139 16

    26 7 1st G2 23.209 410.2 40 44

    820.4 80 62 18

    1230.6 120 82 20

    1640.8 160 101 19

    1987.5 193.8 117 16

    27 7 1st G3 23.209 410.2 40 43

    820.4 80 60 17

    1230.6 120 79 19

    1640.8 160 98 19

    1987.5 193.8 114 16

    28 7 1st G4 23.209 410.2 40 73

    820.4 80 92 19

    1230.6 120 113 21

    1640.8 160 131 18

    1987.5 193.8 145 14

    29 7 2nd A1 21.714 1987.5 193.88 37

    2461.2 240 52 15

    2871.4 280 69 17

    3281.6 320 87 18

    3691.8 360 105 18

    3975 387.9 120 15

    30 7 2nd A2 21.714 1987.5 193.88 47

    2461.2 240 64 17

    2871.4 280 83 19

    3281.6 320 100 17

    3691.8 360 117 17

    3975 387.9 131 14

    31 7 2nd A3 21.714 1987.5 193.88 53

    2461.2 240 71 18

  • 7/27/2019 Prestressing Niraj Sir

    95/294

    2871.4 280 87 16

    3281.6 320 105 18

    3691.8 360 122 17

    3975 387.9 137 15

    32 7 2nd A4 21.714 1987.5 193.88 37

    2461.2 240 52 15

    2871.4 280 69 17

    3281.6 320 87 18

    3691.8 360 105 18

    3975 387.9 120 15

    33 7 2nd B1 23.379 1987.5 193.88 78

    2461.2 240 97 19

    2871.4 280 115 18

    3281.6 320 135 20

    3691.8 360 154 19

    3975 387.9 169 15

    34 7 2nd B2 23.379 1987.5 193.88 50

    2461.2 240 68 18

    2871.4 280 83 15

    3281.6 320 101 18

    3691.8 360 118 17

    3975 387.9 135 17

    35 7 2nd B3 23.379 1987.5 193.88 60

    2461.2 240 78 18

    2871.4 280 95 17

    3281.6 320 113 18

    3691.8 360 129 16

    3975 387.9 146 17

    36 7 2nd B4 23.379 1987.5 193.88 74

    2461.2 240 96 22

    2871.4 280 111 15

    3281.6 320 125 14

    3691.8 360 144 19

    3975 387.9 163 19

    37 7 2nd C1 22.066 1987.5 193.88 47

    2461.2 240 67 20

    2871.4 280 85 18

    3281.6 320 103 18

    3691.8 360 120 17

    3975 387.9 134 14

  • 7/27/2019 Prestressing Niraj Sir

    96/294

    38 7 2nd C2 22.066 1987.5 193.88 62

    2461.2 240 80 18

    2871.4 280 97 17

    3281.6 320 108 11

    3691.8 360 125 17

    3975 387.9 143 18

    39 7 2nd C3 22.066 1987.5 193.88 50

    2461.2 240 62 12

    2871.4 280 85 23

    3281.6 320 100 15

    3691.8 360 116 16

    3975 387.9 133 17

    40 7 2nd C4 22.066 1987.5 193.88 47

    2461.2 240 65 18

    2871.4 280 82 17

    3281.6 320 88 6

    3691.8 360 106 18

    3975 387.9 123 17

    41 7 2nd D1 23.817 1987.5 193.88 39

    2461.2 240 60 21

    2871.4 280 80 20

    3281.6 320 98 18

    3691.8 360 116 18

    3975 387.9 131 15

    42 7 2nd D2 23.817 1987.5 193.88 45

    2461.2 240 65 20

    2871.4 280 80 15

    3281.6 320 98 18

    3691.8 360 115 17

    3975 387.9 134 19

    43 7 2nd D3 23.817 1987.5 193.88 50

    2461.2 240 64 14

    2871.4 280 80 16

    3281.6 320 100 20

    3691.8 360 117 17

    3975 387.9 134 17

    44 7 2nd D4 23.817 1987.5 193.88 51

    2461.2 240 70 19

    2871.4 280 89 19

    3281.6 320 106 17

    3691.8 360 124 18

  • 7/27/2019 Prestressing Niraj Sir

    97/294

    3975 387.9 140 16

    45 7 2nd E1 22.561 1987.5 193.88 70

    2461.2 240 87 17

    2871.4 280 101 14

    3281.6 320 116 15

    3691.8 360 137 21

    3975 387.9 154 17

    46 7 2nd E2 22.561 1987.5 193.88 48

    2461.2 240 63 15

    2871.4 280 80 17

    3281.6 320 101 21

    3691.8 360 112 11

    3975 387.9 129 17

    47 7 2nd E3 22.561 1987.5 193.88 37

    2461.2 240 52 15

    2871.4 280 65 13

    3281.6 320 79 14

    3691.8 360 100 21

    3975 387.9 117 17

    48 7 2nd E4 22.561 1987.5 193.88 60

    2461.2 240 76 16

    2871.4 280 94 18

    3281.6 320 110 16

    3691.8 360 129 19

    3975 387.9 144 15

    49 7 2nd F1 24.412 1987.5 193.88 68

    2461.2 240 89 21

    2871.4 280 107 18

    3281.6 320 126 19

    3691.8 360 142 16

    3975 387.9 157 15

    50 7 2nd F2 24.412 1987.5 193.88 55

    2461.2 240 73 18

    2871.4 280 91 18

    3281.6 320 104 13

    3691.8 360 122 18

    3975 387.9 141 19

    51 7 2nd F3 24.412 1987.5 193.88 50

    2461.2 240 72 22

    2871.4 280 89 17

  • 7/27/2019 Prestressing Niraj Sir

    98/294

    3281.6 320 103 14

    3691.8 360 121 18

    3975 387.9 138 17

    52 7 2nd F4 24.412 1987.5 193.88 62

    2461.2 240 81 19

    2871.4 280 99 18

    3281.6 320 117 18

    3691.8 360 134 17

    3975 387.9 149 15

    53 7 2nd G1 23.209 1987.5 193.88 47

    2461.2 240 64 17

    2871.4 280 83 19

    3281.6 320 102 19

    3691.8 360 120 18

    3975 387.9 135 15

    54 7 2nd G2 23.209 1987.5 193.88 41

    2461.2 240 60 19

    2871.4 280 81 21

    3281.6 320 101 20

    3691.8 360 119 18

    3975 387.9 135 16

    55 7 2nd G3 23.209 1987.5 193.88 37

    2461.2 240 57 20

    2871.4 280 75 18

    3281.6 320 93 18

    3691.8 360 110 17

    3975 387.9 126 16

    56 7 2nd G4 23.209 1987.5 193.88 52

    2461.2 240 71 19

    2871.4 280 88 17

    3281.6 320 106 18

    3691.8 360 124 18

    3975 387.9 139 15

  • 7/27/2019 Prestressing Niraj Sir

    99/294

  • 7/27/2019 Prestressing Niraj Sir

    100/294

    Corrected

    Displacement

    Net

    Elongation

    Th.

    Elongation

    18.33

    16.67

    18.33

    16.67

    15.00

    19.00

    18.67

    15.00

    86.67 81.05

    77.00 81.05

    85.00 81.05

    81.33 75.27

    78.67 75.27

    80.33 75.27

    77.67 75.27

  • 7/27/2019 Prestressing Niraj Sir

    101/294

    18.33

    17.00

    17.33

    17.00

    18.67

    18.67

    19.00

    87.00 82.57

    83.67 82.57

    84.67 82.57

    79.33 76.50

    77.00 76.50

    82.33 76.50

    77.00 76.50

    77.00 81.05

  • 7/27/2019 Prestressing Niraj Sir

    102/294

    19.33

    17.67

    18.33

    18.33

    19.00

    18.67

    20.00

    20.33

    90.33 84.63

    87.67 84.63

    91.00 84.63

    83.33 78.21

    85.00 78.21

    81.67 78.21

    84.33 78.21

    87.33 82.57

  • 7/27/2019 Prestressing Niraj Sir

    103/294

    19.00

    19.00

    19.00

    18.33

    19.33

    77.00 75.28

    78.00 75.28

    83.33 80.46

    85.33 80.46

    86.00 80.46

    86.00 80.46

    86.00 84.63

  • 7/27/2019 Prestressing Niraj Sir

    104/294

    81.00 76.50

    80.00 81.05

    83.00 81.05

    85.00 81.05

    79.00 81.05

    78.00 75.28

    77.00 75.28

  • 7/27/2019 Prestressing Niraj Sir

    105/294

    78.00 82.57

    83.00 82.57

    86.00 82.57

    83.00 82.57

    77.00 76.50

    70.00 76.50

    75.00 76.50

  • 7/27/2019 Prestressing Niraj Sir

    106/294

    83.00 84.63

    80.00 84.63

    74.00 78.21

    78.00 78.21

    78.00 78.21

    75.00 78.21

  • 7/27/2019 Prestressing Niraj Sir

    107/294

    83.00 80.46

    81.00 80.46

    82.00 80.46

    88.00 80.46

    . .

    81.00 84.63

  • 7/27/2019 Prestressing Niraj Sir

    108/294

  • 7/27/2019 Prestressing Niraj Sir

    109/294

    Sl. NO. Block No. Stage

    Sub-

    Tendon

    No.

    Tendon

    Free

    Length

    Load in

    KNPressure Elongation Displacement

    1 7 1st H1 8.2 267.5 40 25

    535 80 40 15

    802.5 120 47 7

    1203.75 160 53 6

    1255 187.67 57 4

    2 7 1st H2 8.2 267.5 40 24

    535 80 27 3

    802.5 120 30 3

    1203.75 160 33 3

    1255 187.67 36 3

    3 7 1st H3 8.2 267.5 40 62

    535 80 70 8

    802.5 120 78 8

    1203.75 160 85 7

    1255 187.67 90 5

    4 7 1st H4 8.2 267.5 40 38

    535 80 44 6

    802.5 120 51 7

    1203.75 160 58 7

    1255 187.67 65 7

    5 7 1st H5 8.2 267.5 40 65

    535 80 72 7

    802.5 120 79 7

    1203.75 160 85 6

    1255 187.67 91 6

    6 7 1st H6 8.2 267.5 40 43

    535 80 50 7

    802.5 120 56 6

    1203.75 160 63 7

    1255 187.67 70 7

    7 7 1st H7 8.2 267.5 40 34

    535 80 39 5

    802.5 120 46 7

    1203.75 160 53 7

    1255 187.67 61 8

    8 7 1st H8 8.2 267.5 40 25

    535 80 31 6

  • 7/27/2019 Prestressing Niraj Sir

    110/294

    802.5 120 37 6

    1203.75 160 44 7

    1255 187.67 51 7

    9 7 1st H9 8.2 267.5 40 70

    535 80 78 8

    802.5 120 85 7

    1203.75 160 92 7

    1255 187.67 97 5

    10 7 1st H10 8.2 267.5 40 35

    535 80 42 7

    802.5 120 47 5

    1203.75 160 53 6

    1255 187.67 58 5

    11 7 1st H11 8.2 267.5 40 23

    535 80 29 6

    802.5 120 34 5

    1203.75 160 38 4

    1255 187.67 43 5

    12 7 1st H12 8.2 267.5 40 37

    535 80 44 7

    802.5 120 50 6

    1203.75 160 56 6

    1255 187.67 63 7

    13 7 1st H13 8.2 267.5 40 35

    535 80 40 5

    802.5 120 43 3

    1203.75 160 45 2

    1255 187.67 47 2

    14 7 1st H14 8.2 267.5 40 31

    535 80 38 7

    802.5 120 43 5

    1203.75 160 47 4

    1255 187.67 52 5

    15 7 1st H15 8.2 267.5 40 73

    535 80 80 7

    802.5 120 87 7

    1203.75 160 95 8

    1255 187.67 100 5

    16 7 1st H16 8.2 267.5 40 30

  • 7/27/2019 Prestressing Niraj Sir

    111/294

    535 80 36 6

    802.5 120 43 7

    1203.75 160 51 8

    1255 187.67 57 6

    17 7 1st H17 8.2 267.5 40 77

    535 80 84 7

    802.5 120 90 6

    1203.75 160 97 7

    1255 187.67 103 6

    18 7 1st H18 8.2 267.5 40 29

    535 80 36 7

    802.5 120 43 7

    1203.75 160 50 7

    1255 187.67 56 6

    19 7 2nd H1 8.2 1255 187.67 63

    1471.25 220 67 4

    1738.75 260 73 6

    2006.25 300 80 7

    2273.75 340 84 4

    2510 375.33 91 7

    20 7 2nd H2 8.2 1255 187.67 51

    1471.25 220 58 7

    1738.75 260 64 6

    2006.25 300 73 9

    2273.75 340 79 6

    2510 375.33 88 9

    21 7 2nd H3 8.2 1255 187.67 60

    1471.25 220 68 8

    1738.75 260 76 8

    2006.25 300 83 7

    2273.75 340 90 7

    2510 375.33 95 5

    22 7 2nd H4 8.2 1255 187.67 32

    1471.25 220 40 8

    1738.75 260 47 7

    2006.25 300 55 8

    2273.75 340 63 8

    2510 375.33 70 7

    23 7 2nd H5 8.2 1255 187.67 50

    1471.25 220 57 7

  • 7/27/2019 Prestressing Niraj Sir

    112/294

    1738.75 260 63 6

    2006.25 300 70 7

    2273.75 340 76 6

    2510 375.33 83 7

    24 7 2nd H6 8.2 1255 187.67 53

    1471.25 220 60 7

    1738.75 260 68 8

    2006.25 300 74 6

    2273.75 340 80 6

    2510 375.33 86 6

    25 7 2nd H7 8.2 1255 187.67 52

    1471.25 220 59 7

    1738.75 260 65 6

    2006.25 300 72 7

    2273.75 340 80 8

    2510 375.33 86 6

    26 7 2nd H8 8.2 1255 187.67 75

    1471.25 220 82 7

    1738.75 260 88 6

    2006.25 300 95 7

    2273.75 340 102 7

    2510 375.33 108 6

    27 7 2nd H9 8.2 1255 187.67 55

    1471.25 220 63 8

    1738.75 260 71 8

    2006.25 300 78 7

    2273.75 340 86 8

    2510 375.33 91 5

    28 7 2nd H10 8.2 1255 187.67 27

    1471.25 220 35 8

    1738.75 260 42 7

    2006.25 300 49 7

    2273.75 340 55 6

    2510 375.33 63 8

    29 7 2nd H11 8.2 1255 187.67 52

    1471.25 220 59 7

    1738.75 260 65 6

    2006.25 300 71 6

    2273.75 340 78 7

    2510 375.33 84 6

  • 7/27/2019 Prestressing Niraj Sir

    113/294

    30 7 2nd H12 8.2 1255 187.67 55

    1471.25 220 61 6

    1738.75 260 69 8

    2006.25 300 76 7

    2273.75 340 83 7

    2510 375.33 89 6

    31 7 2nd H13 8.2 1255 187.67 55

    1471.25 220 66 11

    1738.75 260 74 8

    2006.25 300 81 7

    2273.75 340 89 8

    2510 375.33 97 8

    32 7 2nd H14 8.2 1255 187.67 63

    1471.25 220 72 9

    1738.75 260 81 9

    2006.25 300 90 9

    2273.75 340 96 6

    2510 375.33 103 7

    33 7 2nd H15 8.2 1255 187.67 55

    1471.25 220 59 4

    1738.75 260 66 7

    2006.25 300 73 7

    2273.75 340 79 6

    2510 375.33 87 8

    34 7 2nd H16 8.2 1255 187.67 55

    1471.25 220 63 8

    1738.75 260 72 9

    2006.25 300 77 5

    2273.75 340 84 7

    2510 375.33 92 8

    35 7 2nd H17 8.2 1255 187.67 51

    1471.25 220 58 7

    1738.75 260 65 7

    2006.25 300 72 7

    2273.75 340 79 7

    2510 375.33 85 6

    36 7 2nd H18 8.2 1255 187.67 45

    1471.25 220 53 8

    1738.75 260 60 7

    2006.25 300 67 7

    2273.75 340 73 6

  • 7/27/2019 Prestressing Niraj Sir

    114/294

    2510 375.33 79 6

  • 7/27/2019 Prestressing Niraj Sir

    115/294

    Corrected

    Displacement

    Net Elongation Th. Elongation

    9.33

    3.00

    7.67

    6.67

    6.67

    6.67

    6.33

    6.33

    27.33 26.93

    26.67 26.93

    27.67 26.93

    29.67 26.93

    27.67 26.93

    35.33 26.93

    9.00 26.93

  • 7/27/2019 Prestressing Niraj Sir

    116/294

    7.33

    6.00

    5.00

    6.33

    3.33

    5.33

    7.33

    7.00

    28.33 26.93

    9.33 26.93

    20.33 26.93

    19.00 26.93

    26.33 26.93

    28.33 26.93

    23.00 26.93

    26.33 26.93

  • 7/27/2019 Prestressing Niraj Sir

    117/294

    6.67

    7.00

    29.00 26.93

    32.00 26.93

    22.00 26.93

    31.00 26.93

    26.67 26.93

    28.00 26.93

    28.00 26.93

  • 7/27/2019 Prestressing Niraj Sir

    118/294

    26.00 26.93

    30.00 26.93

    30.00 26.93

    28.00 26.93

    27.00 26.93

    27.00 26.93

    27.00 26.93

  • 7/27/2019 Prestressing Niraj Sir

    119/294

    28.00 26.93

    28.00 26.93

    26.00 26.93

    31.00 26.93

    36.00 26.93

    34.00 26.93

    28.00 26.93

  • 7/27/2019 Prestressing Niraj Sir

    120/294

  • 7/27/2019 Prestressing Niraj Sir

    121/294

    Sl. NO. Block No. StageTendon

    No.

    Tendon

    Free

    Length

    Load in

    KNPressure Elongation Displacement

    1 8 1st A1 21.714 410.2 40 36

    820.4 80 54 18

    1230.6 120 71 17

    1640.8 160 87 16

    1987.5 193.8 102 15

    2 8 1st A2 21.714 410.2 40 37

    820.4 80 55 18

    1230.6 120 71 16

    1640.8 160 89 18

    1987.5 193.8 104 15

    3 8 1st A3 21.714 410.2 40 51

    820.4 80 71 20

    1230.6 120 87 16

    1640.8 160 103 16

    1987.5 193.8 117 14

    4 8 1st A4 21.714 410.2 40 51

    820.4 80 69 18

    1230.6 120 87 18

    1640.8 160 103 16

    1987.5 193.8 117 14

    5 8 1st B1 23.379 410.2 40 42

    820.4 80 60 18

    1230.6 120 80 20

    1640.8 160 98 18

    1987.5 193.8 113 15

    6 8 1st B2 23.379 410.2 40 90

    820.4 80 105 15

    1230.6 120 122 17

    1640.8 160 141 19

    1987.5 193.8 159 18

    7 8 1st B3 23.379 410.2 40 62

    820.4 80 80 18

    1230.6 120 97 17

    1640.8 160 117 20

    1987.5 193.8 134 17

    8 8 1st B4 23.379 410.2 40 44

  • 7/27/2019 Prestressing Niraj Sir

    122/294

    820.4 80 63 19

    1230.6 120 80 17

    1640.8 160 98 18

    1987.5 193.8 114 16

    9 8 1st C1 22.066 410.2 40 71

    820.4 80 90 19

    1230.6 120 106 16

    1640.8 160 122 16

    1987.5 193.8 136 14

    10 8 1st C2 22.066 410.2 40 58

    820.4 80 76 18

    1230.6 120 92 16

    1640.8 160 108 16

    1987.5 193.8 125 17

    11 8 1st C3 22.066 410.2 40 72

    820.4 80 89 17

    1230.6 120 104 15

    1640.8 160 120 16

    1987.5 193.8 136 16

    12 8 1st C4 22.066 410.2 40 63

    820.4 80 80 17

    1230.6 120 96 16

    1640.8 160 115 19

    1987.5 193.8 130 15

    13 8 1st D1 23.817 410.2 40 94

    820.4 80 115 21

    1230.6 120 132 17

    1640.8 160 148 16

    1987.5 193.8 168 20

    14 8 1st D2 23.817 410.2 40 76

    820.4 80 93 17

    1230.6 120 111 18

    1640.8 160 129 18

    1987.5 193.8 146 17

    15 8 1st D3 23.817 410.2 40 69

    820.4 80 88 19

    1230.6 120 105 17

    1640.8 160 122 17

    1987.5 193.8 141 19

  • 7/27/2019 Prestressing Niraj Sir

    123/294

    16 8 1st D4 23.817 410.2 40 88

    820.4 80 108 20

    1230.6 120 124 16

    1640.8 160 141 17

    1987.5 193.8 158 17

    17 8 1st E1 22.561 410.2 40 80

    820.4 80 96 16

    1230.6 120 114 18

    1640.8 160 131 17

    1987.5 193.8 147 16

    18 8 1st E2 22.561 410.2 40 83

    820.4 80 101 18

    1230.6 120 118 17

    1640.8 160 135 17

    1987.5 193.8 152 17

    19 8 1st E3 22.561 410.2 40 81

    820.4 80 100 19

    1230.6 120 116 16

    1640.8 160 132 16

    1987.5 193.8 150 18

    20 8 1st E4 22.561 410.2 40 72

    820.4 80 90 18

    1230.6 120 107 17

    1640.8 160 125 18

    1987.5 193.8 141 16

    21 8 1st F1 24.412 410.2 40 37

    820.4 80 56 19

    1230.6 120 77 21

    1640.8 160 96 19

    1987.5 193.8 111 15

    22 8 1st F2 24.412 410.2 40 36

    820.4 80 55 19

    1230.6 120 76 21

    1640.8 160 96 20

    1987.5 193.8 114 18

    23 8 1st F3 24.412 410.2 40 44

    820.4 80 62 18

    1230.6 120 81 19

    1640.8 160 99 18

    1987.5 193.8 116 17

  • 7/27/2019 Prestressing Niraj Sir

    124/294

    24 8 1st F4 24.412 410.2 40 34

    820.4 80 50 16

    1230.6 120 69 19

    1640.8 160 88 19

    1987.5 193.8 104 16

    25 8 1st G1 23.209 410.2 40 42

    820.4 80 61 19

    1230.6 120 79 18

    1640.8 160 98 19

    1987.5 193.8 115 17

    26 8 1st G2 23.209 410.2 40 43

    820.4 80 60 17

    1230.6 120 78 18

    1640.8 160 98 20

    1987.5 193.8 115 17

    27 8 1st G3 23.209 410.2 40 41

    820.4 80 59 18

    1230.6 120 77 18

    1640.8 160 95 18

    1987.5 193.8 111 16

    28 8 1st G4 23.209 410.2 40 43

    820.4 80 59 16

    1230.6 120 77 18

    1640.8 160 96 19

    1987.5 193.8 113 17

    29 8 2nd A1 21.714 1987.5 193.88 38

    2461.2 240 57 19

    2871.4 280 74 17

    3281.6 320 91 17

    3691.8 360 109 18

    3975 387.9 123 14

    30 8 2nd A2 21.714 1987.5 193.88 57

    2461.2 240 76 19

    2871.4 280 93 17

    3281.6 320 110 17

    3691.8 360 126 16

    3975 387.9 139 13

    31 8 2nd A3 21.714 1987.5 193.88 46

    2461.2 240 65 19

  • 7/27/2019 Prestressing Niraj Sir

    125/294

    2871.4 280 82 17

    3281.6 320 100 18

    3691.8 360 118 18

    3975 387.9 132 14

    32 8 2nd A4 21.714 1987.5 193.88 61

    2461.2 240 80 19

    2871.4 280 97 17

    3281.6 320 114 17

    3691.8 360 131 17

    3975 387.9 146 15

    33 8 2nd B1 23.379 1987.5 193.88 49

    2461.2 240 70 21

    2871.4 280 88 18

    3281.6 320 106 18

    3691.8 360 123 17

    3975 387.9 138 15

    34 8 2nd B2 23.379 1987.5 193.88 63

    2461.2 240 82 19

    2871.4 280 103 21

    3281.6 320 122 19

    3691.8 360 140 18

    3975 387.9 156 16

    35 8 2nd B3 23.379 1987.5 193.88 53

    2461.2 240 71 18

    2871.4 280 91 20

    3281.6 320 109 18

    3691.8 360 126 17

    3975 387.9 141 15

    36 8 2nd B4 23.379 1987.5 193.88 37

    2461.2 240 57 20

    2871.4 280 76 19

    3281.6 320 94 18

    3691.8 360 111 17

    3975 387.9 126 15

    37 8 2nd C1 22.066 1987.5 193.88 49

    2461.2 240 68 19

    2871.4 280 85 17

    3281.6 320 102 17

    3691.8 360 119 17

    3975 387.9 133 14

  • 7/27/2019 Prestressing Niraj Sir

    126/294

    38 8 2nd C2 22.066 1987.5 193.88 34

    2461.2 240 51 17

    2871.4 280 69 18

    3281.6 320 87 18

    3691.8 360 104 17

    3975 387.9 118 14

    39 8 2nd C3 22.066 1987.5 193.88 37

    2461.2 240 55 18

    2871.4 280 71 16

    3281.6 320 88 17

    3691.8 360 104 16

    3975 387.9 118 14

    40 8 2nd C4 22.066 1987.5 193.88 51

    2461.2 240 70 19

    2871.4 280 87 17

    3281.6 320 105 18

    3691.8 360 122 17

    3975 387.9 136 14

    41 8 2nd D1 23.817 1987.5 193.88 46

    2461.2 240 66 20

    2871.4 280 84 18

    3281.6 320 102 18

    3691.8 360 121 19

    3975 387.9 137 16

    42 8 2nd D2 23.817 1987.5 193.88 38

    2461.2 240 58 20

    2871.4 280 76 18

    3281.6 320 95 19

    3691.8 360 115 20

    3975 387.9 132 17

    43 8 2nd D3 23.817 1987.5 193.88 43

    2461.2 240 64 21

    2871.4 280 83 19

    3281.6 320 101 18

    3691.8 360 120 19

    3975 387.9 134 14

    44 8 2nd D4 23.817 1987.5 193.88 53

    2461.2 240 70 17

    2871.4 280 89 19

    3281.6 320 108 19

    3691.8 360 126 18

  • 7/27/2019 Prestressing Niraj Sir

    127/294

    3975 387.9 141 15

    45 8 2nd E1 22.561 1987.5 193.88 56

    2461.2 240 76 20

    2871.4 280 94 18

    3281.6 320 113 19

    3691.8 360 130 17

    3975 387.9 144 14

    46 8 2nd E2 22.561 1987.5 193.88 61

    2461.2 240 81 20

    2871.4 280 99 18

    3281.6 320 116 17

    3691.8 360 132 16

    3975 387.9 146 14

    47 8 2nd E3 22.561 1987.5 193.88 47

    2461.2 240 67 20

    2871.4 280 86 19

    3281.6 320 105 19

    3691.8 360 123 18

    3975 387.9 138 15

    48 8 2nd E4 22.561 1987.5 193.88 59

    2461.2 240 78 19

    2871.4 280 95 17

    3281.6 320 113 18

    3691.8 360 130 17

    3975 387.9 145 15

    49 8 2nd F1 24.412 1987.5 193.88 41

    2461.2 240 63 22

    2871.4 280 83 20

    3281.6 320 101 18

    3691.8 360 118 17

    3975 387.9 133 15

    50 8 2nd F2 24.412 1987.5 193.88 39

    2461.2 240 61 22

    2871.4 280 80 19

    3281.6 320 98 18

    3691.8 360 116 18

    3975 387.9 130 14

    51 8 2nd F3 24.412 1987.5 193.88 61

    2461.2 240 80 19

    2871.4 280 101 21

  • 7/27/2019 Prestressing Niraj Sir

    128/294

    3281.6 320 120 19

    3691.8 360 138 18

    3975 387.9 153 15

    52 8 2nd F4 24.412 1987.5 193.88 39

    2461.2 240 60 21

    2871.4 280 80 20

    3281.6 320 98 18

    3691.8 360 116 18

    3975 387.9 130 14

    53 8 2nd G1 23.209 1987.5 193.88 45

    2461.2 240 65 20

    2871.4 280 83 18

    3281.6 320 101 18

    3691.8 360 119 18

    3975 387.9 133 14

    54 8 2nd G2 23.209 1987.5 193.88 39

    2461.2 240 60 21

    2871.4 280 78 18

    3281.6 320 96 18

    3691.8 360 114 18

    3975 387.9 129 15

    55 8 2nd G3 23.209 1987.5 193.88 53

    2461.2 240 73 20

    2871.4 280 90 17

    3281.6 320 108 18

    3691.8 360 126 18

    3975 387.9 141 15

    56 8 2nd G4 23.209 1987.5 193.88 36

    2461.2 240 56 20

    2871.4 280 75 19

    3281.6 320 92 17

    3691.8 360 110 18

    3975 387.9 125 15

  • 7/27/2019 Prestressing Niraj Sir

    129/294

  • 7/27/2019 Prestressing