press release - uh.edu · press release for immediate release ruth hulett administrative assistant...

2
Division of Administration and Finance University Services Press Release FOR IMMEDIATE RELEASE Ruth Hulett Administrative Assistant 713-743-3788 [email protected] *REVISED* CLASSROOM AND BUSINESS BUILDING ACCESS ROAD CLOSURE Houston, Texas, September 29, 2011 Several Access Road Closures for the New Classroom and Business Building have been scheduled for the installation of the water line and storm sewer. The schedule is as follows: Saturday, Oct 8, 2011 & Sunday, Oct 9, 2011 from 6 AM to 6 PM each day. Saturday, Oct 22, 2011 & Sunday, Oct 23 from 6 AM to 6 PM each day. Please refer to the attached map showing the location of Linbeck’s work to be performed, the dates the work will be performed and the required room for the access road closure. Please note, the work on Sunday will be a makeup day if weather does not permit completion of work on Saturday. The area indicated in red is the portion of access road closure. The areas indicated in blue are the storm sewer and water line. Completion is expected Sunday, October 23, 2011. Please contact Bernie Harless, Project Manager, if you have any questions related to this project at [email protected] or by phone at 713-743-8049. About the University of Houston The University of Houston is a comprehensive national research institution serving the globally competitive Houston and Gulf Coast Region by providing world-class faculty, experiential learning and strategic industry partnerships. UH serves more than 38,500 students in the nation’s fourth- largest city, located in the most ethnically and culturally diverse region of the country.

Upload: others

Post on 20-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Press Release - uh.edu · Press Release FOR IMMEDIATE RELEASE Ruth Hulett Administrative Assistant 713-743-3788 rmhulett@central.uh.edu *REVISED* CLASSROOM AND BUSINESS BUILDING ACCESS

Division of Administration and Finance University Services

Press Release FOR IMMEDIATE RELEASE Ruth Hulett Administrative Assistant 713-743-3788 [email protected]

*REVISED* CLASSROOM AND BUSINESS BUILDING

ACCESS ROAD CLOSURE Houston, Texas, September 29, 2011 – Several Access Road Closures for the New Classroom and Business Building have been scheduled for the installation of the water line and storm sewer. The schedule is as follows: Saturday, Oct 8, 2011 & Sunday, Oct 9, 2011 from 6 AM to 6 PM each day. Saturday, Oct 22, 2011 & Sunday, Oct 23 from 6 AM to 6 PM each day. Please refer to the attached map showing the location of Linbeck’s work to be performed, the dates the work will be performed and the required room for the access road closure. Please note, the work on Sunday will be a makeup day if weather does not permit completion of work on Saturday. The area indicated in red is the portion of access road closure. The areas indicated in blue are the storm sewer and water line. Completion is expected Sunday, October 23, 2011. Please contact Bernie Harless, Project Manager, if you have any questions related to this project at [email protected] or by phone at 713-743-8049.

About the University of Houston The University of Houston is a comprehensive national research institution serving the globally competitive Houston and Gulf Coast Region by providing world-class faculty, experiential learning and strategic industry partnerships. UH serves more than 38,500 students in the nation’s fourth-largest city, located in the most ethnically and culturally diverse region of the country.

Page 2: Press Release - uh.edu · Press Release FOR IMMEDIATE RELEASE Ruth Hulett Administrative Assistant 713-743-3788 rmhulett@central.uh.edu *REVISED* CLASSROOM AND BUSINESS BUILDING ACCESS

CEMO Lecture Hall

Central Plant /Vaughn

Construction Site

Melcher Hall

Access Road Closure for Installation of Water Line and Storm Sewer Saturday, Oct 8 & *Sunday, Oct 9: 6 am-6 pm

Saturday, Oct 22 & *Sunday, Oct 23: 6 am-6 pm*Work on Sunday will be a make up day if weather does not permit completion of work on Saturday

UH CBB / LinbeckConstruction Site

Portion oofo AccessRoad Closed

Access Road

8" Wateere Line