presentation - six sigma for managers

Upload: simon-koh

Post on 02-Apr-2018

229 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/27/2019 Presentation - Six Sigma for Managers

    1/55

    Six Sigma for Managers

  • 7/27/2019 Presentation - Six Sigma for Managers

    2/55

    2www.exploreHR.org

    Contents : Six Sigma : An Overview

    What is Six Sigma?

    Why Six Sigma?

    Six Sigma Phases : Define, Measure, Analyze,

    Improve and Control

    Tools and Key Roles for Six Sigma

    If you find this presentation useful, please consider telling others

    about our site (www.exploreHR.org)

  • 7/27/2019 Presentation - Six Sigma for Managers

    3/55

    3www.exploreHR.org

    Why Six Sigma?

  • 7/27/2019 Presentation - Six Sigma for Managers

    4/55

    4www.exploreHR.org

    What is Sigma ?

    Sigma

    A term used in statistics to represent

    standard deviation, an indicator of thedegree of variation in a set of a process

  • 7/27/2019 Presentation - Six Sigma for Managers

    5/55

    5www.exploreHR.org

    What is Six Sigma?

    SixSigma

    A statistical concept that measures a

    process in terms of defects at the sixsigma level, there 3.4 defects per

    million opportunities

    A philosophy and a goal : as perfect aspractically possible

    A methodology and a symbol of quality

  • 7/27/2019 Presentation - Six Sigma for Managers

    6/55

    6www.exploreHR.org

    Sigma LevelSigma Level

    (Process

    Capability)

    Defects per MillionOpportunities

    2 308,537

    3 66,807

    4 6,210

    5 2336 3.4

  • 7/27/2019 Presentation - Six Sigma for Managers

    7/557www.exploreHR.org

    Sigma Level

    Six Sigma =99,9997%

  • 7/27/2019 Presentation - Six Sigma for Managers

    8/558www.exploreHR.org

    Sigma Level Every hour the postal service

    would lose 20,000 pieces of mail

    Every day our drinking water

    would be unsafe for almost 15

    minutes

    Every week there would be 5,000

    surgical operations that go wrong

    in some way

    Every month we would be without

    electricity for almost seven hours

    Why not Four

    Sigma or99.379% ?

  • 7/27/2019 Presentation - Six Sigma for Managers

    9/559www.exploreHR.org

    Why Six Sigma?

    Money

    CustomerSatisfaction

    Growth

    Quality

    CompetitiveAdvantage

    Employee Pride

  • 7/27/2019 Presentation - Six Sigma for Managers

    10/5510www.exploreHR.org

    At GE, Six Sigma added more than $ 2 billion to the

    bottom line in 1999 alone

    Motorola saved more than $ 15 billion in the first 10

    years of its Six Sigma effort

    AlliedSignal reports saving $ 1,5 billion through SixSigma.

    Why Six Sigma?

  • 7/27/2019 Presentation - Six Sigma for Managers

    11/5511www.exploreHR.org

    Why Six Sigma?

    Six Sigma is about practices that help you

    eliminate defects and always deliver

    products and services that meet customer

    specifications

  • 7/27/2019 Presentation - Six Sigma for Managers

    12/5512www.exploreHR.org

    Cost of Poor QualityWhat is cost of scrap?

    What is cost of rework?

    What is cost of excessive cycle times anddelays?

  • 7/27/2019 Presentation - Six Sigma for Managers

    13/5513www.exploreHR.org

    Cost of Poor QualityWhat is cost of business lost because

    customers are dissatisfied with your

    products or services?

    What is cost of opportunities lost because

    you didnt have time or the resources to takeadvantage of them?

  • 7/27/2019 Presentation - Six Sigma for Managers

    14/5514www.exploreHR.org

    Critical-to-Quality (CTQ)Elements of a process that significantly affect

    the output of that process. Identifying these

    elements is figuring out how to make

    improvements that can dramatically reduce

    costs and enhance quality.

  • 7/27/2019 Presentation - Six Sigma for Managers

    15/5515www.exploreHR.org

    Six Sigma Phases

  • 7/27/2019 Presentation - Six Sigma for Managers

    16/55

    16www.exploreHR.org

    Define Measure Analyze

    Improve

    Control

    Six Sigma Phases

    D M A I C

  • 7/27/2019 Presentation - Six Sigma for Managers

    17/55

    17www.exploreHR.org

    Define

    Measure

    Analyze

    Six Sigma Phases

    Define the project goals and customer

    (internal and external) deliverables

    Measure the process to determine current

    performance

    Analyze and determine the root cause(s)

    of the defects

  • 7/27/2019 Presentation - Six Sigma for Managers

    18/55

    18www.exploreHR.org

    Improve

    Control

    Six Sigma Phases

    Control future process performance

    Improve the process by eliminating defects

  • 7/27/2019 Presentation - Six Sigma for Managers

    19/55

    19www.exploreHR.org

    Six Sigma Phases

    Define

    Define Customers and Requirements (CTQs)

    Develop Problem Statement, Goals and

    Benefits

    Identify Champion, Process Owner and Team

    Define Resources

    Evaluate Key Organizational Support

    Develop Project Plan and Milestones

    Develop High Level Process Map

  • 7/27/2019 Presentation - Six Sigma for Managers

    20/55

    20www.exploreHR.org

    Six Sigma Phases

    Measure

    Define Defect, Opportunity, Unit and Metrics

    Detailed Process Map of Appropriate Areas

    Develop Data Collection Plan

    Validate the Measurement System

    Collect the Data

    Begin Developing Y=f(x) Relationship Determine Process Capability and Sigma

    Baseline

  • 7/27/2019 Presentation - Six Sigma for Managers

    21/55

    21www.exploreHR.org

    Six Sigma Phases

    Analyze

    Define Performance Objectives

    Identify Value/Non-Value Added Process

    Steps

    Identify Sources of Variation

    Determine Root Cause(s)

    Determine Vital Few x's, Y=f(x)

    Relationship

  • 7/27/2019 Presentation - Six Sigma for Managers

    22/55

    22www.exploreHR.org

    Six Sigma Phases

    Improve

    Perform Design of Experiments

    Develop Potential Solutions

    Define Operating Tolerances of Potential

    System

    Assess Failure Modes of Potential

    Solutions

    Validate Potential Improvement by Pilot

    Studies

    Correct/Re-Evaluate Potential Solution

  • 7/27/2019 Presentation - Six Sigma for Managers

    23/55

    23www.exploreHR.org

    Six Sigma Phases

    Control

    Define and Validate Monitoring and Control

    System

    Develop Standards and Procedures Implement Statistical Process Control

    Determine Process Capability

    Develop Transfer Plan, Handoff to Process Owner

    Verify Benefits, Cost Savings/Avoidance, ProfitGrowth

    Close Project, Finalize Documentation

    Communicate to Business, Celebrate

  • 7/27/2019 Presentation - Six Sigma for Managers

    24/55

    24www.exploreHR.org

    Define Measure Analyze Improve Control

    Deliverables :

    Fully trained team is formed, supported, and

    committed to work on improvement project.

    Team charter developed, customers identified and

    high impact characteristics (CTQs) defined, business

    process mapped.

  • 7/27/2019 Presentation - Six Sigma for Managers

    25/55

    25www.exploreHR.org

    Checkpoints for Readiness

    Team Readiness :

    Team is sponsored by a champion or business leader.

    Team formed and team leaders assigned.

    Improvement team members fully trained on Six Sigma and DMAIC.

    Define Measure Analyze Improve Control

    Team Charter :

    Completed project management charter, including business case,

    problem and goal statements, project scope, milestones, roles and

    responsibilities, communication plan.

  • 7/27/2019 Presentation - Six Sigma for Managers

    26/55

    26www.exploreHR.org

    Define Measure Analyze Improve Control

    Checkpoints for Readiness

    Customers

    Customer(s) identified and segmented according to their different

    needs and requirements.

    Data collected and displayed to better understand customer(s) critical

    needs and requirements.

    Business Process Mapping Completed, verified, and validated high-level 'as is' (not 'should be' or

    'could be') business process map.

    Completed SIPOC representation, describing the Suppliers, Inputs,

    Process, Outputs, and Customers.

  • 7/27/2019 Presentation - Six Sigma for Managers

    27/55

    27www.exploreHR.org

    Define Measure Analyze Improve Control

    Deliverables :

    Key measures identified, data collection planned and

    executed, process variation displayed and communicated,

    performance baselined, sigma level calculated.

  • 7/27/2019 Presentation - Six Sigma for Managers

    28/55

    28www.exploreHR.org

    Define Measure Analyze Improve Control

    Checkpoints for Readiness

    Key Measures Identified

    Key measures identified and agreed upon.

    High impact defects defined and identified in the business process.

    Data Collection Planned and Executed

    Solid data collection plan established that includes measurement

    systems analysis.

    Data collected on key measures that were identified.

  • 7/27/2019 Presentation - Six Sigma for Managers

    29/55

    29www.exploreHR.org

    Define Measure Analyze Improve Control

    Checkpoints for Readiness

    Process Variation Displayed/Communicated

    Process variation components displayed/communicated using

    suitable charts, graphs, plots.

    Long term and short term variability accounted for.

    Performance Baseline/Sigma Calculation

    Measure baseline process performance (capability, yield,

    sigma level).

  • 7/27/2019 Presentation - Six Sigma for Managers

    30/55

    30www.exploreHR.org

    Define Measure Analyze Improve Control

    Deliverables :

    Data and process analysis, root cause analysis,

    quantifying the gap/opportunity.

  • 7/27/2019 Presentation - Six Sigma for Managers

    31/55

    31www.exploreHR.org

    Define Measure Analyze Improve Control

    Checkpoints for Readiness

    Data and Process Analysis

    Identify gaps between current performance and the goalperformance.

    Root Cause Analysis

    Generate list of possible causes (sources of variation).

    Segment and stratify possible causes (sources of variation).

    Prioritize list of 'vital few' causes (key sources of variation).

    Verify and quantify the root causes of variation.

  • 7/27/2019 Presentation - Six Sigma for Managers

    32/55

    32www.exploreHR.org

    Define Measure Analyze Improve Control

    Checkpoints for Readiness

    Quantifying the Gap/Opportunity

    Determine the performance gap.

    Display and communicate the gap/opportunity in financial terms.

  • 7/27/2019 Presentation - Six Sigma for Managers

    33/55

    33www.exploreHR.org

    Define Measure Analyze Improve Control

    Deliverables :

    Generate (and test) possible solutions, select the best

    solutions, design implementation plan.

  • 7/27/2019 Presentation - Six Sigma for Managers

    34/55

    34www.exploreHR.org

    Define Measure Analyze Improve Control

    Checkpoints for Readiness

    Generating (and Testing) Possible Solutions

    Possible solutions generated and tested.

  • 7/27/2019 Presentation - Six Sigma for Managers

    35/55

    35www.exploreHR.org

    Define Measure Analyze Improve Control

    Checkpoints for Readiness

    Selecting The Best Solution(s)

    Optimal solution selected based on testing and analysis.

    New and improved process ('should be') maps developed.

    Cost/benefit analysis of optimal solution(s).

    Small-scale pilot for proposed improvement(s).

    Pilot data collected and analyzed.

    Improved process ('should be') maps modified based on pilot data

    and analysis.

    Project impact on utilizing the best solution(s).

  • 7/27/2019 Presentation - Six Sigma for Managers

    36/55

    36www.exploreHR.org

    Define Measure Analyze Improve Control

    Checkpoints for Readiness

    Designing Implementation Plan

    Solution implementation plan established, including schedule/work

    breakdown structure, resources, risk management plan,

    cost/budget, and control plan.

    Contingency plan established.

  • 7/27/2019 Presentation - Six Sigma for Managers

    37/55

    37www.exploreHR.org

    Define Measure Analyze Improve Control

    Deliverables :

    Documented and implemented monitoring plan,

    standardized process, documented procedures, responseplan established and deployed, transfer of ownership

    (project closure).

  • 7/27/2019 Presentation - Six Sigma for Managers

    38/55

  • 7/27/2019 Presentation - Six Sigma for Managers

    39/55

    39www.exploreHR.org

    Define Measure Analyze Improve Control

    Checkpoints for Readiness

    Response Plan

    Response plans established, understood, and deployed.

    Transfer of Ownership (Project Closure)

    Transfer ownership and knowledge to process owner and process

    team tasked with the responsibilities.

  • 7/27/2019 Presentation - Six Sigma for Managers

    40/55

    40www.exploreHR.org

    Tools and Roles forSix Sigma

  • 7/27/2019 Presentation - Six Sigma for Managers

    41/55

  • 7/27/2019 Presentation - Six Sigma for Managers

    42/55

    42www.exploreHR.org

    DOE is a structured, organized method for

    determining the relationship between

    factors (Xs) affecting a process and theoutput of that process (Y).

    Tools for Six Sigma

    Design of

    Experiments

    or DOE

  • 7/27/2019 Presentation - Six Sigma for Managers

    43/55

    43www.exploreHR.org

    A group of rows and columns, with one set

    of increments marked along the X

    (horizontal) axis and another set ofincrements marked along the Y (vertical)

    axis.

    The purpose of using XY matrix is to study

    and understand the relationship betweenwhat you are putting into a process and

    what your customer is getting out of it.

    The XY matrix allows the team to identify

    gaps, areas for improvement.

    Tools for Six Sigma

    XY Matrix

  • 7/27/2019 Presentation - Six Sigma for Managers

    44/55

    44www.exploreHR.org

    The goal of this tool is to ensure that your

    measurement system is statically

    confidentthat its both accurate andprecise each and every time it is used.

    Undertaken during Measure phase, your

    MSA determines whether or not you can

    take a certain measurement and repeat orreproduce it among different people who

    take the same measurement.

    Tools for Six Sigma

    Measurement

    System

    Analysis

  • 7/27/2019 Presentation - Six Sigma for Managers

    45/55

    45www.exploreHR.org

    Process capability tool is the measure of a

    process being able to meet specification

    requirements and fulfill customer CTQneeds on a long term basis.

    Tools for Six Sigma

    Process

    Capability

    Tool

  • 7/27/2019 Presentation - Six Sigma for Managers

    46/55

    46www.exploreHR.org

    Investigating a theory about the suspected

    cause (s) of a particular effect in a process

    to determine if it is correct. Its a compass that points you directly to

    the vital few factors that are most affecting

    your process.

    Tools for Six Sigma

    Hypothesis

    Testing

  • 7/27/2019 Presentation - Six Sigma for Managers

    47/55

    47www.exploreHR.org

    The manner in which a part or process can

    fail to meet a specification, creating a

    defect or non-conformance, and the impacton the customer if that failure mode is not

    prevented or corrected.

    Tools for Six Sigma

    Failure

    Mode Effect

    Analysis

  • 7/27/2019 Presentation - Six Sigma for Managers

    48/55

    48www.exploreHR.org

    A detailed assessment and guide for

    maintaining all the positive changes you,

    your black belt, and the project team havemade.

    It ensures that all your analysis and efforts

    stay in effect and that you have information

    at your disposal to prevent backsliding or areturn to less than optimal performance

    standard.

    Tools for Six Sigma

    Control

    Plan

  • 7/27/2019 Presentation - Six Sigma for Managers

    49/55

    49www.exploreHR.org

    Champions Are responsible for the Six Sigma

    implementation across the organization in anintegrated manner. Champions also act as

    mentor to Black Belts.

    Includes CEO and other key top management

    team members. They are responsible for setting

    up a vision for Six Sigma implementation.

    Key Roles for Six Sigma

    Executive

    Leadership

  • 7/27/2019 Presentation - Six Sigma for Managers

    50/55

    50www.exploreHR.org

    Black Belts Operate under Master Black Belts to apply Six

    Sigma methodology to specific projects. Theyprimarily focus on Six Sigma project execution.

    Identified by champions, act as in-house expert

    coach for the organization on Six Sigma. They

    devote 100% of their time to Six Sigma.

    Key Roles for Six Sigma

    Master

    Black Belts

  • 7/27/2019 Presentation - Six Sigma for Managers

    51/55

    51www.exploreHR.org

    Are the employees who take up Six Sigma

    implementation along with their other job

    responsibilities. They operate under the guidance

    of Black Belts and support them in achieving the

    overall results.

    Key Roles for Six Sigma

    Green Belts

  • 7/27/2019 Presentation - Six Sigma for Managers

    52/55

    52www.exploreHR.org

    Six Sigma Dos

    Do communicate the commitment company-

    wide

    Do demonstrate the commitment of company

    leaders

    Do empower your key human resources

    Do provide on-site mentoring for black belts

  • 7/27/2019 Presentation - Six Sigma for Managers

    53/55

    53www.exploreHR.org

    Six Sigma Dos

    Do be patient at the inception of you six Sigma

    initiative

    Do claim and advertise early wins

    Do benchmark

    Do establish project baseline and goals

  • 7/27/2019 Presentation - Six Sigma for Managers

    54/55

    54www.exploreHR.org

    Recommended Further Readings:

    1. Greg Brue, Six Sigma for Managers, McGraw Hill

    2. George Eckes, Six Sigma for Everyone, John Wiley and Sons

  • 7/27/2019 Presentation - Six Sigma for Managers

    55/55

    End of Material