www.e2b-ei.eu Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc Industrial Advisory Group [email protected] All rights, including translation, reserved. No part of this document may be disclosed to any third party, for purposes other than the original, without written consent of E2BA.

Upload: others

Post on 03-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

Presentation of the draft Roadmap

for 2014-2020

Stefano Carosio

D’Appolonia SpA (Rina Group)

Co-chairman EeB Ad-Hoc Industrial Advisory Group

[email protected]

All rights, including translation, reserved. No part of this document may be disclosed to any third party,

for purposes other than the original, without written consent of E2BA.

Page 2: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

Project

Concepts/

opportunities Project

Project

Project

From a project to

a programme logic

Development and

Demonstration

>>>> E2B STRATEGY AND LONG TERM ROADMAP >>>>>>>> E2B STRATEGY AND LONG TERM ROADMAP >>>>

Co

nce

pts

Scre

en

ing

/Inte

gra

tio

n

Replication and

Deployment throughout

EU and beyond

Front End

Risk of failure

Cost of adaptationsCost of project changes/

redirectionsNon technological

barriers and cross-

cutting issues

Page 3: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

Building pillars (1/2)

Systemic approach -> high potential for multidisciplinary

developments

The district dimension

Page 4: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

Building pillars (2/2)

GEOCLUSTERS

“GOLD” approach

Page 5: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

EeB PPP as first wave of a Long Term Strategy

Years 01 02 03 04 05 06 07 08 09 10

Wave 1 O

Wave 2 O

Wave 3 O

Continuous Research

D & B

D & B

D & B

Years 01 02 03 04 05 06 07 08 09 10

Wave 1 O

Wave 2 O

Wave 3 O

Continuous Research

D & B

D & B

D & B

Years 01 02 03 04 05 06 07 08 09 10

Wave 1 O

Wave 2 O

Wave 3 O

Continuous Research

D & B

D & B

D & B

i.e. Retrofitting and

reduction of energy use

i.e. Energy neutral

buildings/districts

i.e. Energy positive

buildings/districts

EeB PPP

2010-13

A long term programme

Page 6: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

The key relevance of existing buildings

Page 7: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

Towards Horizon 2020

Page 8: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

From an end-use driven approach…

Page 9: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

…to a value chain approach

Page 10: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

Inputs

• Vision 2030

• Review of E2B first multi-annual roadmap coverage

• EU and local targets (e.g. for CO2 emissions)

• Review of national, EU and international roadmaps (i.e.

SET Plan, ETPs, other PPPs,…), existing ‘future

scenarios’, recent position and consultation papers

• Lessons learnt from the portfolio of running EeB projects

and other energy related projects (e.g. ICT4E2B Forum

and Building up)

• Links with other EU initiatives: KETs (e.g. Advanced

Materials), KICs (e.g. InnoEnergy), Lead Market,

Intelligent Energy, Eco-innovation …

Page 11: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

• The ambition is to drive the creation of an innovative

high-tech energy efficiency industry extending the scope

of the running EeB PPP beyond 2013.

• Connecting construction industry to other built environment

system suppliers will be the decisive step for Europe to

reach its economic, social and environmental goals,

contributing to the objectives of the Innovation Union.

• By creating and fostering this paradigm shift, EU

companies will become competitive on a global level in

the design, construction and operation of the built

environment while sustaining local economies across EU-

27 through job creation and skills enhancement, driven by

the vast majority of SMEs active in the value chain.

Vision 2030 (1/2)

Page 12: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

By 2030, research and innovation has allowed the European

building sector to mutate into a mature, innovative and energy

efficient enabling industry:

• delivering new or refurbished, user centric and affordable

buildings/districts in line with national commitments towards

2050

• working according to quality standards that encompass the

whole life cycle of any building, thus guaranteeing durable

building performances

• valuing not only energy performances but also aesthetics,

acoustics, accessibility or comfort as purchase criteria for end

users

• committing to long term performance guaranteed contracts on

the energy bills

Vision 2030 (2/2)

Page 13: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

A multi-disciplinary and cross-sectorial (ETPs) approach

The roadmap structure

Design Structure EnvelopeEnergy

equipment

Construction

process

Perf.

monitoring

End

of life

OVERALL VISION 2030

SPECIFIC

CHALLENGES

&BARRIERS

SPECIFIC

TARGETS

& INNOVATION

DRIVERS

Cross-

cutting

CROSS-CUTTING

CHALLENGES

&BARRIERS

CROSS-CUTTING

TARGETS

& INNOVATION

DRIVERS

SPECIFIC

CHALLENGES

&BARRIERS

SPECIFIC

TARGETS

& INNOVATION

DRIVERS

Timeline

2020

2030

2012

Page 14: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

Preliminary resource allocation

Page 15: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

Covering the whole

innovation cycle

Large Scale

Demo Projects

(up to City level)

Standards,

Regulations,

Procurement,…

R&D

Buildings or

districts demo

scale

Available

technologies or their

innovative

combinations

Novel solutions

Page 16: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu 24/04/12 16

Effectiveness

Operational

prototypes

working under

real life

conditions

Efficacy

Appropriation

of innovations

by the

construction

value chain

Efficiency

Potential

benefits on

performance

and costs

Development and

demonstration Industrialisation

National

deployment

European

replication

Technology

suppliers

and

contractors

The extended

construction

value chain

Contractors

Pla

yers

Innovation

maturity

European

Added

Value

Building owner

and users

Research

Universities

Research

centers

Mock ups

The innovation model

JOB CREATION

TECH. TRANSFER,

NEW SKILLS

Page 17: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

• Buildings use 40 % of total EU energy consumption

• Buildings provide the second largest untapped cost-

effective potential for energy savings after the energy sector

• Investments in improved energy efficiency in buildings

could generate an additional 2-3.5 million jobs in Europe

and the United States alone

Strategic impact

Page 18: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

Direct expected impact

Segment of the value chain

Key Performance Indicators Expected outcomes for the building players

DESIGN The gap between building performance by design and built performance at commissioning is narrowed down to a value consistent with energy performance contracts

More reliable design tools

Higher quality in the construction process

Good the first time: commissioning is made faster and cheaper

STRUCTURE The embodied CO2 content per m² of useful floor area due to construction materials in building structures reduced by at least a factor of 2

New standards for suitable construction materials that put European manufacturers as world leaders

ENVELOPE New envelope solutions that maintain architectural flexibility respond to integration constraints (seismic, acoustic, air quality, …) while improving annual energy performance of buildings by at least 50% when compared against building of same type and function (measured in kWh/m² floor area/year )

Prefabricated solutions to reduce investments at constant quality

Durable high performance solutions for new buildings that minimizes cost of ownership

Active envelope available at affordable costs

Refurbishment processes involving standard envelope configurations built on purpose

Page 19: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

Monitoring progress

and redirecting efforts

PPPvision

Targets

Projects

How to measure that 2050 goals

can be met ?

KPIs level 2

KPIs for each programme target

Effectiveness of the

implementation of the PPP

KPIs level 3

Project specific

indicators, in line

with expected

benefits

KPIs level 1

Completion of the overall PPP

goals (Vision 2030), in

connection with the EC energy

policy

Page 20: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu 24/04/12 20

An international challenge…

Opportunity to become world-wide leaders

in delivering innovative solutions

Page 21: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu 24/04/12 21

… with a local

impact

Page 22: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

Reaching consensus

www.ectp.org/enewsportal/

Page 23: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

A paradigm shift …

aiming HIGH!

Page 24: Presentation of the draft Roadmap for 2014-2020 · 2015-08-11 · Presentation of the draft Roadmap for 2014-2020 Stefano Carosio D’Appolonia SpA (Rina Group) Co-chairman EeB Ad-Hoc

www.e2b-ei.eu

Thank you for your attention!!

[email protected]

[email protected]