Page 1: Presentation - July 4, 2011

www.newpacificmetals.com

Page 2: Presentation - July 4, 2011

2

Expansion of the camp from 25 to 50 persons has been completed with the installation of services, including power, water, and communications.   Refurbishment of the 6,000 square feet geological office and core logging facility is also complete

Page 3: Presentation - July 4, 2011

3

Front and inside of the camp 

Page 4: Presentation - July 4, 2011

4

Celebration of Solstice Day with Carcross/Tagish Lake First Nation 

Page 5: Presentation - July 4, 2011

5

1. Raca

2. Goddell

3. Skukum Creek 

4. Chieftain Hill

5.Chieftain Hill NorthCamp 

2011 Exploration and priority drilling targets

Page 6: Presentation - July 4, 2011

6

Road Building from Raca to Chieftain Hill (Photo Taken from Skukum Creek 1300 m Level Tunnel) has been completed

Page 7: Presentation - July 4, 2011

7

Surface mapping and sampling at the Roca and Cheiftain Hill Area

Page 8: Presentation - July 4, 2011

8

Re‐interpretation of Geology at the Roca and Chieftain Hill

Page 9: Presentation - July 4, 2011

9

Surface Drilling at the Raca to test the extension of the historical discovery and four new parallel mineralized structures mapped by New Pacific

Skukum Creek 

Raca

Page 10: Presentation - July 4, 2011

10

Drill Cross Section showing historical drill holes and proposed drill hole for Section E1950 at the Raca(dashed blue lines are planned drill holes) 

3.61 m @ 2.66 g/t Au561 g/t Ag

Page 11: Presentation - July 4, 2011

11

Surface Drilling from at the Raca has commenced on June 28, 2011

Page 12: Presentation - July 4, 2011

12

Access Road to the Chieftain Hill is completed and drilling is scheduled at mid‐August to test the soil gold anomalies that extend over 2 km long northeast of Raca

Raca

Chieftain Hill 

Skukum Creek 

Page 13: Presentation - July 4, 2011

13

Surface Mapping and sampling at the Chieftain Hill

Page 14: Presentation - July 4, 2011

14

Geological model and drill cross section showing planned drill hole to test the soil gold‐lead‐zinc anomalies (discovered in 1986 and confirmed by NUX in June 2011) for the first time at the Chieftain Hill area

Page 15: Presentation - July 4, 2011

15

Surface and Underground drilling for Skukum Creek ProjectSurface Facility at the Skukum Creek 1300m Level Adit Entrance:  Access for underground drilling and bulk sampling program and future mining

new Generator

Scoop

settling pond

First Aid trailer 

Page 16: Presentation - July 4, 2011

16

Inside Skukum Creek 1300m Level: De‐icing  is completed and the Adit is at very stable conditions and is currently being prepared for underground in‐fill and step‐out drilling

Page 17: Presentation - July 4, 2011

17

Jumbo underground drill rig is on site the Skukum Creek 1300 Adit. Underground drilling is scheduled to commence on July 15, 2011 

Page 18: Presentation - July 4, 2011

18

Drilling will be carried out at the Skukum Creek both from underground and surface (blue lines are planned drill hole projections) 

Skukum Creek 

Page 19: Presentation - July 4, 2011

19

Surface and underground  Drilling Section plan at Cross Section 1400 for the SkukumCreek project.   

Drilling will test the depth extension of known high grade gold‐silver mineralization and test those sections of the veins along strike that have not been drilled before 

Page 20: Presentation - July 4, 2011

20

Surface and Underground Drilling for GoddellUnderground drilling from the existing Goddell Decline will substantially reduce the amount of drilling than from surface, and can been carried out year round. Accordingly, emphasis has been placed on de‐watering the decline to take advantage of the underground drilling strategy

new generator and underground mining equipment

water settling ponds

First Air Trailer

Goddell Decline

Page 21: Presentation - July 4, 2011

21

However, de‐watering Goddell decline has experienced delay and difficulty as gouge filled faults with widths of 2 to 3 metres have caused difficult ground conditions that have required extensive support steel frame work to be installed.

Page 22: Presentation - July 4, 2011

22

As a contingency plan, the old GoddellGully road has been repaired and advanced.  A surface drill rig will carry out some of the drilling that was initially planned for the decline

Goddell Decline

Goddell Gully road

IP Anomalies

Page 23: Presentation - July 4, 2011

23

A second Surface drill rig will arrive at the Goddell site July 6, 2011 and will carry out some of the drilling that was initially planned for the decline from the old GoddellGully road.

Once de‐watering is successfully completed at the Goddell decline by the mid‐August, a second underground  rig will be brought to the site for drilling.

Page 24: Presentation - July 4, 2011

24

Surface drilling from the west of the Goddell Decline will be carried out later in the program to test the west extension of the Goddell zone, where IP geophysical anomalies have been identified by the previous owner