USPresentation

2

WHATProduct

4

WHODistributors

PRESENTATION

Sertec S.R.L. manufactures and commercializes THE PDCE (Deionizer Lightning Rod of Electrostatic Load by the acronism in Spanish) technology, capable of preventing the lightning formation and minimizing in a very significant way the indirect effects of the electromagnetic pulses.

The climate change makes necessary to revise the prevention and protection systems against atmospheric effects such as solar storms, lightning and its consequences.Surprisingly, since Franklin’s time up to the arrival of the PDCE there has not been any effective innovation in this field.

1

3

HOWInstallations

Page 3: Presentation EDD

BAJO LICENCIA

PRODUCT

2.1. What is the PDCE?

The PDCE prevents the formation of lightning and minimizes significantly the indirect effects (between 60 and 99%), from the induced over tensions by the electromagnetic pulses and the ground derived currents, by lightning strikes in areas out of its coverage range, which are the cause of the majority of the failures in machinery, electrical installations or accidents that can even cause the death. The most effective way to protect against lightning is avoiding its appearance. In case of strike it will harm individuals and installations in proportion to the intensity transported by the lightning potential.In fact, all labor risk prevention laws, in its principles of the preventive activity, indicate that the “RISKS MUST BE AVOIDED” if possible and “NOT ATTRACT THEM”, like other conventional systems do.Without communications we would be in chaos, with the PDCE we guarantee the continuity and well functioning of our activities, with a total protection for living beings and for installations.

The PDCE technology, was homologated by NATO the 9th October 2013, in the concept of “Lightning Protection System and Electromagnetic Protector”, being the NATO code of the PDCE: NCAGE: SUM83, guaranteeing that, further than preventing the lightning formation, minimizes in a very significant way the electromagnetic and electrostatic effects form external induced over tensions, responsible for the majority of breakdowns and electrical failures in the installations and electric machinery.Moreover, as id does not produce sparks, in its functioning mode, it is a LPS (Lightning Protection System) unique and highly effective and efficient in ATEX areas (Explosive Atmospheres), eliminating in a very significant way the explosion risks caused by lightning in the installations with chemical processes, storage tanks and deposits of flammable products.For the first time we can protect of the direct lightning strike in petrol stations, ammunition depots, gas pipelines and in general, in any ATEX installation-type, preventing accidents of unpredictable consequences.With the PDCE it is not necessary to interrupt our daily activity due to a storm; with the PDCE we can sail and do sport with security, among other things.Furthermore, it cleans the environment of the electrostatic loads and, consequently, improves the communications, minimizes the noise and extends the installations life and improves the quality of the workplace.

2

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 4: Presentation EDD

BAJO LICENCIA

PRODUCT

3

PDCE-SERTEC

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 5: Presentation EDD

BAJO LICENCIA

As it can be appreciated in the following maps of lightning density, the influential areas where there are protected installations with the PDCE, have experimented a considerable variation in the density of lightning strikes (white areas), showing a meaningful diminution of them in the 2003-2007 period respect the 1997-2002 (were no PDCE installations existed)

4

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 6: Presentation EDD

BAJO LICENCIA

PRODUCT

2.2. How it works?

The PDCE is an Atmospheric Downloads Protection System and Electromagnetic Protector, THAT PREVENTS THE LIGHTNING FORMATION, defined as a SENSOR system of electrostatic loads ON TIME, of PDCE (Electrostatic charge deionizer lightning rod) technology, that derives them to earth, avoiding the electric field saturation in its environment and preventing the lightning formation in the structure it protects. It also MINIMZES, in a significant way (60-90%), the indirect effects from lightning strikes in its environment, outside of its coverage range, because in this case, it behaves like a thermal fuse, absorbing part of the lightning energy into heat by fusion of its internal components, reducing to the minimum the electromagnetic effects.

The functioning principle PDCE technology, is based in deionizing the electrostatic load present in any environment around it, to control the electric field below the boundaries of dielectric breakage of the air (GAS)

5

Lightning is an electric reaction in the atmosphere, created by the electrostatic saturation between two points of opposite polarity and within a ionized dielectric environment of low resistance. The electric phenomenon develops normally during the storm clouds formation. The typical thunder cloud is the Cumulonimbus that it electrically transforms into a natural condenser (Q1), forcing the apparition of a second condenser because of the difference of potential between the cloud base and the earth surface (Q2). The loads concentrate in the most predominant points of the ground, and the load capacity of the elements on the ground is proportionally related with the load capacity of Q1, its travel speed, the medium permeability and the distance variation between plaques (base of the cloud and elements on the ground or the Earth itself).

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 7: Presentation EDD

BAJO LICENCIA

6

The presence of leakage currents are the result of the induce loads transformation between the two electrodes of the PDCE lightning rod, specifically of the great difference of potential created between the base of Q1 and Q2.This process of leakage current is called “load deionization” and it is basic to cancel all the processes that take part in the saturation of the electric field of high-tension in the structures, responsible factor of the lightning formation principle that starts with excitation of the descendent tracers (electric path in the atmosphere), leader (ionization effect or tip that creates the ascendant tracer) and the excitation and the lightning call (tracers union and energy download). If these processes are controlled, the lightning apparition will be voided.The dissipation of loads capacity of the PDCE is influenced by the travel speed of the condenser Q1 (cloud speed), the load time of Q1 (thermodynamic process of the cloud), the behavior of the Q2 dielectric (air resistance below the cloud) and the ohms resistance of the ground of the LPS (load transfer time). The intensity and polarity of the PDCE are variable values depending on the polarity and distance between the plaques Q1 and Q2. These parameters are referred and calculated at extreme working limits that can occur in the nature (around 500Kv/m) to model the PDCE (Q3), reason why the ground resistance value is essential for the LPS with the PDCE to function in normal working regime.

As it has already been stated, the functioning principle of the PDCE technology, is based on the DEIONIZATION; it is achieved facilitating to the present loads in the environment find its equilibrium without saturation or difference of potential between them. The LPS transforms the loads that are present in the structure into wek currents to earth, due to its mechanical and electric design that its characterized for constantly controlling the difference of potential, inverting the polarity of the current field that appears inside its two electrodes (Q3). Its characteristic shape, facilitates the internal sorting of loads, producing the apparition of an internal controlled flow of electrons, that leak through the downspout of the LPS, in the form of a weak current of milliamps (between 50 and 350 mA in good weather and between 700 and 1,600 mA in thunder periods) to the ground of the LPS. The apparition of these weak currents of milliamps that leak through the downspout of the LPS, prevent the saturation of the surrounding electric field and thus lightning does not appear in the area and/or protected structure.

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 8: Presentation EDD

BAJO LICENCIA

7

The load control of the Q2 condenser, with a Q3 condenser, limits the time and the load tension of the dielectric in the base of the Q2 condenser. Taking into account that when the average field of the guide (descendant tracer) and the salient points of the Earth (ascending tracer), that can be many in any normal environment, it reaches around 500 KV/m, the crown currents of such points increase and transform into ionized channels that propagate upwards in an analogue way to the propagation of the step guide, propelled by the electric field itself and taking into consideration that the PDCE is proved (laboratory tests) that there is no lightning appearance for much higher tensions than the cited 500 KV/m. It will be important that the resistance of the grounding of the LPS does not have a higher value than 10 ohms, in order to not increase the load transfer time of the PDCE, increasing the probability that the exterior electric field is saturated and lightning appears.

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 9: Presentation EDD

BAJO LICENCIA

6

The minimum working height of the PDCE determines the air isolation power and the working time factor of the PDCE technology. Given that the PDCE is the most predominant element in the installation, it raises the ground potential to its lower hemisphere, being the lower resistance point in ohms of its environment regarding the earth level and the natural environment, if a ground and masses equipotential exists. The set of its characteristics convert it into one of the best loads SENSOR SYSTEMS, for its location, capacity and polarity.

The ELECTROMAGNEETIC PROTECION, is another complementary technological advantage that is offered by the PDCE lightning rod, that the tip conventional systems cannot reach. The PDCE is designed to offer protection of the so dangerous electromagnetic pulses generated by lightning (EMP) and from the radiated magnetic fields (EM). The PDCE technology dissipates the radiated energy in the air, effectively mitigating the radiated or induced magnetic fields, electric fields and electromagnetic pulses in any frequency, power or tension (E1, E2, E3).

It is an equipment that can be used either as lightning rod or as electromagnetic screen, being transparent to the domestic or industrial frequencies.

Four levels of electromagnetic protection exist. We use the PDCE Senior Modl BASIC LEVEL. Objective: Minimize the indirect effects up to 60%. Installation requirements: R < 10 . Maximum distance between PDCE’s of 180 m. Equipotential system and over tension protectors of 40 KA power at least.MEDIUM LEVEL. Objective: Minimize the indirect effects up to 75%. Installation requirements: R < 10 . Maximum distance between PDCE’s of 160 m. Equipotential system and over tension protectors of 80 KA power at least.HIGH LEVEL. Objective: Minimize the indirect effects up to 90%. Installation requirements: R < 5 . Maximum distance between PDCE’s of 160 m. Equipotential system and over tension protectors of 100 KA power at least.MAXIMUM LEVEL. Objective: Minimize the indirect effects up to 99%. Installation requirements: R < 5 . Maximum distance between PDCE’s of 160 m. Equipotential system and over tension protectors of 100 KA power at least. There must be placed as many lateral PDCE’s, as sides has the protected structure.

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 10: Presentation EDD

BAJO LICENCIA

PRODUCT

TECHNOLOGICAL DIFFERENCES BETWEEN THE PDCE AND THE CONVENTIONAL LIGHTNING RODS

Does not excite and neither captures the lightning strike with a 99% efficiency guaranteed by the laboratory tests and field tests (where efficiency 100% has been achieved

8

PDCE LIGHTNING ROD CONVENTIONAL OR PRIMING LIGHTNING RODS

During the process of maximum activity of the storm, transfer medium values (leakage currents) can be registered of between 700 mA and 1.2 A for each cable of the lightning rod installation, with leakage peaks of 1.6 A when lightning strikes occur 300 meters close approximately.

Excites and captures the lightning strike

During the process of activity of the storm, transfer medium values (leakage currents) can be registered, in the case of lightning strike in the lightning rod, through the installation cable of 120 A to 350,000A, being the average values between 30,000 A to 70,000 A

2.3. Why is it the best?

The electrostatic load of the installation is compensated progressively to ground when the difference of potential between the cloud and the Earth increases, neutralizing the tip effect in a 99% of the cases (Tracer or Leader) and minimizing the electric indirect effects (electromagnetic pulses and derived current by land) between 60 and 99%.

It increases considerably the probability of lightning strike in the lightning rod itself (70-80%), for being a tip ionizing metallic element, with severe effects to its surroundings, that will depend on the intensity transported by the lightning, something impossible to predict.

In the case of direct lightning strike (that it is what they are designed for), generates electromagnetic pulses, over tensions, over intensities and electric risks, in the structure itself that it is supposed to protect and its surroundings, which can be very important and severe.

Protects all types of structures, specially effective for environments with fire or explosion risk and predominant metallic structures, like telecommunications towers.

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 11: Presentation EDD

BAJO LICENCIA

TECHNOLOGICAL DIFFERENCES BETWEEN THE PDCE AND THE CONVENTIONAL LIGHTNING RODS

9

PDCE LIGHTNING ROD CONVENTIONAL OR PRIMING LIGHTNING RODS

In the event of lightning strikes in close areas to the PDCE (indirect effects) or impact in the PDCE (1%), the PDCE is built with melting materials (650ºC) to be sacrificed like a fuse, transforming the lightning energy in the moment of impact into thermal energy due to the type of materials it is made of, melting part of it very quickly. The transformation effect of Electric energy/Thermal energy, cancels the appearance of possible dangerous leakage currents through all the LPS installation, negating the possibility of creation of radiated electromagnetic pulses and dangerous step tensions (they are minimized between 60 to 99%).

In the event of lightning strikes in close areas to the conventional or priming lightning rod, or direct impact to the lightning rod itself (70-80%), it absorbs the current melting the material progressively (dependent on the intensity that arrives to the LPS), generating over intensities and over tensions in all the installation where it is placed. We have to keep in mind that a copper cable of 50 mm section can hold 150 A of permanent intensity. When there is a lightning impact of 40,000 A, for example, even though it happens in microseconds (this transfer time will depend on the resistance of the grounding), the cable remains completely rigid and burned.

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 12: Presentation EDD

BAJO LICENCIA

TECHNOLOGICAL DIFFERENCES BETWEEN THE PDCE AND THE CONVENTIONAL LIGHTNING RODS

It is compliant with the international laws of Labor Risks Prevention in its basic principles of preventive action and the electric risks like:

• Avoiding the risks, as it does not attract lightning• Evaluate and battle the risks that cannot be avoided, acting as a thermal fuse in the case that indirect effects appear from lightning impacts in nearby areas.• Take into consideration the technique, because it is always better a system that does not attract lightning than one that does.• Substitute dangerous elements for others that carry little or no danger, as the PDCE replaces an element that attempts to attract a very important risk, like it is a FRANKLIN tip.• Adopt measures that set before collective to individual protection, as the PDCE is a lightning collective protection system and avoids, in the area where it is placed, having individual protections to workers, in the majority of the cases ineffective, to the resulting electric risks of a lightning strike.

10

PDCE LIGHTNING ROD CONVENTIONAL OR PRIMING LIGHTNING RODS

It is not compliant with the international laws of Labor Risks Prevention based on its basic principles of preventive action and the electric risks:• Dose NOT avoid risks, because it attracts the electrical risk from lightning strikes. Moreover, we can never know which intensity will be transporting the lightning that strikes, because it is random, and the derived effects of the lightning strikes depend completely of the intensity it transports.• Evaluate and battle the risks that cannot be avoided. The conventional tips will try transferring the energy transported by lightning, through a copper cable of 50 mm, reaching an earth, but in the point of impact of a lightning strike, a thermal effect is produced in all the LPS (dependent on the intensity carried by the lightning it will be lower or higher; and also on the earth resistance, the more earth resistance, the more thermal effect there will be), an explosion effect (point of impact) and an electromagnetic pulse (air conducted current that travels in all directions, that transports a very high energy peak, that will depend on the intensity carried by the lightning). Therefore, managing all these risks, WITHOUT IMPORTANT CONSEQUENCES to the protected structure and the individuals around it, is completely impossible, like they admit in their own regulations.• They DO NOT take into account the technique evolution, because its functioning principle remains being attracting lightning and thus, the risks that entails.• Substitute dangerous element for others that carry little or no danger, as attracting lightning, always carries a danger of unknown consequences, but very dangerous.

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 13: Presentation EDD

BAJO LICENCIA

TECHNOLOGICAL DIFFERENCES BETWEEN THE PDCE AND THE CONVENTIONAL LIGHTNING RODS

Are not compliant with the laws of labor risks preventions, in danger signaling, because through the PDCE LPS installation go low tension currents and thus it is not necessary to signal electric danger.

11

PDCE LIGHTNING ROD CONVENTIONAL OR PRIMING LIGHTNING RODS

They are not compliant with the laws of labor risk prevention, in terms of danger signaling, as the installation of a conventional system is a high voltage installation, because in a storm phase, they are designed to attract lightning and if it strikes, through the LPS, go HIGH VOLTAGE currents, and thus needs to be consequently signaled.

Does not generate Electromagnetic Compatibility effects.It is the biggest generator of electromagnetic pulses and moreover, of a very high energy and therefore, very dangerous.

The earth connection is compatible with low tension earths and thus, it can by connected to the installation grounding, as long as it is lower than 10 ohms.

The ground connection is incompatible with the low voltage grounds, because it is a high voltage installation and thus, cannot be connected to the earth of the installation. It needs to be independent from it.

Minimizes the installation shutdowns caused by direct lightning effects. Reduces the journey and material costs due to lightning breakages. Optimizes the electrical supply and the reliability in the information and the critical data.

Increases the technical shutdowns due to the indirect effects of lightning. Increases the costs of journeys and materials due to breakages caused by lightning. Reduces the effectiveness of the electrical supply and of the information and the critical data.

It does not generate crystallization of the ground and neither electrolytic currents.

Generates severe crystallization of the ground and electrolytic currents.

It does not contain electronic or radioactive components.Generates severe crystalization of the ground and the priming ones have electronic components. Currently they do not have radioactive components.

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 14: Presentation EDD

BAJO LICENCIA

PRODUCT

2.4. Regulations and specifications

• CE LABELING:

Directives 2001/95/EC (Product Security).Directives 92/31/EEC (Electromagnetic Compatibility).Directives 73/23/EEC (Low Voltage Equipment).

• NREGULATIONS under which the PDCE IS CERTIFIED BY BUREAU VERITAS WITH CERTIFICATE NUMBER:NO. ES036861

. UNE-EN (IEC) 62305: 2012 lightning protection: parts 1 (general principles), 2 (risk evaluation) and 3 (physical damage to structures and human risk).. CTE (TECHNICAL BUILDING CODE) SU8, security against the risk caused by the action of lightning)

. NFPA 780:2008

. NBR 5419:2005

. NTC 4552:2004

· APPLICABLE LABOR RISKS PREVENTION AND SECURITY LAWS: The PDCE technology lightning rods are LPS that satisfy the minimum requirements for the health and safety protection of workers against the electric risk caused by lightning, according to Royal Decree 614/2001 of June 8th.

• NATO CERTIFICATEThe PDCE, in the concept of “Lightning Protection System and Electromagnetic Protector” has been homologated officially by NATO.The PDCE is part of the NATO Cataloguing System (NCS), by which it is guaranteed that one article in known within the logistics of the user nations of the system (currently 28 countries belong to NATO), for a same and unique denomination and a same and unique NATO Catalogue Number (NCN), being the NATO code of the PDCE: NCAGE: SUM83

• QUALITY AND ENVIRONMENTAL REGULATIONS: Quality Management System according to international standards ISO 9001:2008, certified by BUREAU VERITAS, approved by ENAC and UKAS applied to: design, commercialization, management, set up and assembling of the deionizer lightning rod of electrostatic load and intelligent ground.

12

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 15: Presentation EDD

BAJO LICENCIA

13

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 16: Presentation EDD

BAJO LICENCIA

14

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 17: Presentation EDD

BAJO LICENCIA

PRODUCT

2.5. PDCE Technical Specifications

COVERAGE RADIUS AGAINST LIGHTNING STRIKES It is guaranteed the protection against lightning strike in the structure where the PDCE is installed. Its location determines the radius and protected area where lightning will not appear in a 99% of the time, with a 100% efficiency. These conditions will be certified an guaranteed, as long as the manual requisites are respected and in its protection radius there are other potentially ionizing structures, of equal or higher height to the protected one. In this last scenario, the protection radius will be up to where this potential structure of equal or higher height, which will need to be protected to guarantee the coverage radius. The range of the protection of each PDCE model, has been determined by the application of the THEORETICAL MODEL OF THE ROLLING SPHERE, page 40, point A4 of the standard UNE-EN-IEC 62305 (PART I).

MAXIMUM WORKING TENSION OF THE PDCE OF PDCE TECHNOLOGY WITHOUT LIGHTNING 640,000 volts at one meter, according to the high voltage laboratory tests in the LABORATOIRE DE GÉNIE ELECTRIQUE of the PAU University (France), Scientific Research University.

CERTIFICATION OF BEHAVIOR VERIFICATION OF THE PDCE TECHNOLOGY IN SHORT CIRCUIT OF 100KA – 10/350 s according to the requisites of the standard UNE-EN-IEC 62305 In order to verify the extreme behavior of the PDCE in the event of internal short circuit (1%), the equipment is tested under simulation conditions of internal short circuit with a step current of 100,000 A, according to the regulation of the electro technical official central laboratory (L.C.O.E.) of the Spanish Ministry of Industry, Tourism and Commerce. With this test we demonstrate also, the behavior of the material the PDCE is made with, and the mechanical security in extreme cases (indirect effects by external induced over tensions in case of lightning strike (1%)). The PDCE goes through a series of short circuit tests , with 4 very quick consecutive downloads, of 100,000 A each. We verify that there is no mechanical damage after the first 2 tests, and in the last 2 only suffers breakage of the isolation part (PVC), keeping its mechanical and functional integrity.

APPLICATIONS

The PDCE technology is composed by 3 different models. Each PDCE MODEL, is designed with the same objective of effectiveness, prevention and protection against lightning. Its difference is in its size and weight, that modify its working capacity and protection radius. Being possible to adjust and enlarge the coverage areas to adapt to the protection needs of the structures and the area. We can protect any type of structure except wind turbines. For further information check point 16 in the PDCE Instruction Manual.

15

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 18: Presentation EDD

BAJO LICENCIA

6. COMPOSITION MATERIALS AND PARTS:

16

PARTS MATERIAL ELECTRICAL CHARACTERISTICS

DESCRIPTION

1

Aluminum

Upper electrode Upper hemisphere

2 PVC Electrical insulator Nipple

3 AluminumLower electrode with electric and mechanical connection

Lower hemisphere with main axis and mast adapter

7. WEIGHT AND EXTERNAL MEASURES OF THE PDCE MODELS

MEASURES PDCE-SERTEC

Height mm 377,6

φ Width mm 241,7

Weight kg 7,222

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 19: Presentation EDD

BAJO LICENCIA

PRODUCT

2.6. PDCE INSTALLATION GUIDE

1. INSTALLATION OF THE CONDUCTOR DOWNSPOUT.

When possible, the downspout of the conductor cable that connects the PDCE with the ground will be as direct as possible. The connection cables of the equipotential masses will be connected to it along its path. The cable will have a minimum section of 50 mm² and its path will be secured by adequate flanges or staples. In all the cases, it will be avoided to create curves with inferior radius to 20 cms. When possible, it will be guaranteed that the cable path is always descendent from the PDCE to the ground in one single path, without making ascensions, keeping as much as possible vertical course. In the event that the cable is exposed to possible breakage due to vandalism or passing vehicles it will need to be protected with a metal pipe for its mechanical protection. In other circumstances where the structures to be protected are perfect electric conductors with a superior section than the conductor cable, the structure itself can be used as electric conductor, signaling it as a LPS cable. In this case, a cable will be connected directly from the PDCE to the structure in its highest part, at the height of the mast, and another cable in the low part from the structure to the sacrifice electrodes.

ELECTRIC VALIDATION OF THE CONDUCTOR DOWNSPOUT:Once the electric installation is done, in any of the configuration scenarios, we will check the electric continuity to validate that the PDCE and the ground are electrically connected, and that the electric measure of the cable that connects them it is not higher to zero ohms of resistance between them.

2. CONSTRUCTION OF THE EARTH SYSTEM.

Given that the resistance in ohms of the different land types, can vary considerably during the year because of meteorological changes, we will always search the best location and as close as possible to the lightning rod vertical, and if possible in a humid area. In all the cases, at least, it will be used a total surface of electrodes in contact with the land, equal or superior to 1 m². The electrodes to build the ground can have the form of a javelin or metal plaques, made of copper, aluminum or zinc.IMPORTANT: In no case stainless steel electrodes will be used, and neither will be serially connected to the ground filters or inductances that can slow the flow of currents in the ground cable or polarize it.

17

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 20: Presentation EDD

BAJO LICENCIA

ELECTRIC VALIDATION OF THE GROUND

Once the ground has been built, we will measure its resistance in ohms, referenced to the land, to achieve a value equal or lower to 10 ohms in the set of the ground connected to the electric installation and the equipotential. If we do not achieve this value, we will place more electrodes and we will incorporate a humidity record in the land all year, by means of an irrigation drip. Complementarily we can enrich the set of the land/ground with mineral salts.

3. PERIMETER AND EQUIPOTENTIAL CABLE

In order to avoid that the dangerous step currents affect directly to individuals, outside of the protected structure during a storm, it is recommended to make a ring of grounds in the perimeter of the area where exists the possibility of movement of individuals. The objective is assuring the electric security of individuals in the event of lightning strike outside the protection perimeter, minimizing the effects of possible currents that can appear through the land near our protected structure. This is achieved by combining the ground perimeter ring that makes a screen effect, with the equipotential connection of the metal elements that are near the ring and inside of it, in order to reference them all to a ground plane, like could be: fences, garage gates, lampposts, swings, water fountains, aerials, etc.

18

For doing so, a ditch in the ground will be made, where the bare copper cable will be buried, of at least 35 mm section, and at a minimum depth of 25 cm and maximum of 50 cms. This bare copper cable will be referenced to ground by the connection of the cable to pickaxes of 1.5 m long that will be stuck in the ground within the ditch, and separated between them every 10 meters. To this perimeter cable, all the metallic masses will be connected electrically by unions of bare copper cable unions of section not inferior to 2.5mm and not superior to 50mm. With the same objective of achieving a harmonized equipotential with the masses and the electrical equipment, all the existing electrical grounds, new or old, will be connected to the PDCE ground, guaranteeing then the same value in ohms in any point of the installation. All the mechanical and electrical connections will be made in a PVC or cement box, with the objective of revising its corrosion during maintenance. In the case of lands where pickaxes cannot be stuck, the javelins will be cut in 50 cms chunks, reducing then the separation distance between pickaxes in equidistant measures within the 10 meters. In case of impossibility of placing pickaxes, the perimeters will be doubled with copper cable as many times as needed to lower the resistance of the land. As a complementary technical guide to this installation manual, related with the electrical grounding, the more strict REBT references by each country can be taken.

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 21: Presentation EDD

BAJO LICENCIA

PERIMETER AND EQUIPOTENTIAL ELECTRICAL VALIDATION:

Once the installation of the perimeter and equipotential cables is finished, the installation will be validated verifying the electrical continuity in ohms between the metal elements and the grounding, being in each step the resistance value 0 ohms. Ultimately, the electrical continuity will be verified between the further mass point and the tip of the lightning rod.

4. MOUNTING OF THE PDCE TECHNOLOGY PDCE LIGHTNING ROD

Once the copper cable of the LPS has been placed in its entire outline and the mast supports are in their correct position, we have to mechanize the mast previously with the mounting hole before placing the PDCE.

MECHANICAL CONNECTION TO THE MAST a) Once the adequate height has been decided and the mast with interior section of 42 mm (49 mm exterior), to place the PDCE, we will need to make a trough hole in the mast to guarantee the support and the mechanical union between the PDCE and the mast. b) Drill the mast with a through hole of 8 mm and 35 mm from the mast border.

19

c) Once the hole has been made, we will proceed with the preparation of the copper cable for the electrical connection of the PDCE to the mast.

1-Place the terminal in the copper cable and tighten it with a mechanical jaw. 2-Pass the copper cable inside the mast from the lower part to excel 1 meter from the upper part of the mast 3-Loosen the two Allen screws. 4-Insert the cable through the connection terminal of the PDCE until it hits the bottom. 5-Tighten the Allen screws and verify that they are correctly tightened and that the cable is not released. 6-Place a retractable cover (not supplied), covering the Allen screws and heat it until it is properly sealed to avoid humidity going in. Finish sealing with silicone or Vaseline fat to avoid chemical reaction with the air. 7-Insert the PDCE in the mast, place the through screw and tighten.

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 22: Presentation EDD

BAJO LICENCIA

19

ELECTRICAL CONNECTION FOR THE GROUND CABLE a) In the bottom part of the PDCE the axis itself

ends in the form of terminal for the connection of the grounding cable of 35 or 50 mm . It is compulsory to place a connection terminal at the ground cable to assure the mechanical and electrical connection inside the PDCE terminal.

b) In order to guarantee the electrical continuity of the lightning rod to the ground, two Allen screws are provided to mechanically assure the electrical connection between the ground cable and the PDCE lightning rod. To guarantee that no oxidations occurs, it is advisable to flood the connection with Vaseline, once the electrical connection has been made

ELECTRICAL CONTINUITY VALIDATION OF THE SET LIGHTNING ROD/GROUNDING

To validate the electrical continuity of the LPS with PDCE of PDCE technology, once the mast has been placed, its electrical continuity will be verified from the ground to the lower part of the PDCE head. For this test, a meter of electrical continuity will be used and it will be verified that the resistance between the two points, ground/lightning rod, is zero ohms, (0 ). If the measurement is correct, the mast can be placed in its definitive position. VALIDATION OF THE HEIGHT OF THE PDCE LIGHTNING ROD

To validate the height of the lightning rod, it will be verified that the total height of the head of the lightning rod surpasses 2 meters over any other element of the structure. Once revised, a picture of the set mast/PDCE/structure will be taken where the finished work and the environment can be appreciated. This procedure is essential to sending it with the commissioning record.

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 23: Presentation EDD

BAJO LICENCIA

20

IMPORTANT DOCUMENTATION

INTERNAL PROTECTION ACCORDING TO UNE-EN (IEC) 62305:2012, PART 4 STANDARDS.

As a complementary LPS protection, it is recommended to make an internal protection composed by different fine, medium and powerful electronic protection technologies. The internal protection is installed in order to void possible sparks as well as the destruction of electrical equipment inside of the protected area, caused by the effects of indirect over tensions, generated by inductions and coupling when lightning strikes near the installation protected with the PDCE LIGHTNING ROD WITH PDCE TECHNOLOGY.For its effect of prevention and protection, there will be placed an electronic barrier of over tension protectors, generally not higher than 50kA, in the general electrical panel, and the discharger will be connected by a ground cable, with a cover, to an independent ground to the other ground systems or equipotentials. This ground, will only be used to discharge the residual over tensions of the lightning coming from the network. Its resistance value in ohms will need to be lower than 10 Ω in the worst climate conditions. When possible, the technology to be used as a discharger will have to be a GAS, and not made of semiconductor electronic components.

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 24: Presentation EDD

BAJO LICENCIA

COMPLEMENTARY NOTES ON THE PROTECTION AGAINST LATERAL LIGHTNING STRIKES IN STRUCTURESS OVER 100 M HIGH.

To protect against lightning, in the structures higher tan 100 meters, complementary levels of protection will be created every 100 meters. In this type of structures, the set of external LPS will be formed by equipment placed in the upper part of the structure and equipment placed every 100 meters of height placed on the perimeter of the structure. The lateral equipment will be arranged in every corner as a basic distribution, and there will be as many equipment in lineal form to the perimeter, according to the distances of connection of the radius of lineal protection, in a way that the lateral equipment, can be seen between them and their protection radius are overlapped 10 meters each one, i.e. for the PDCE-100 model, the maximum distance between them will be 180 meters.

The equipment will be placed in brackets adapted to the structure and separated of it by 50 cm with a vertical inclination degree of 5%, in a way that it is inclined outwards of the structure.Electrically all the PDCE lightning rods will be connected by a perimeter cable at every level of lateral protection and, every set of perimeter rings will be connected to the upper PDCE and to the earth system by at least 2 copper cables of 50 mm of section. This configuration of the LPS is made to guarantee the equipotential union of all the equipment referenced to earth. The earth value for these type of high altitude protections needs to have a maximum value of 5 ohms. For the design of protection of structures of altitude higher than 500 meters and of irregular and singular architectural forms, contact the manufacturer.

22

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 25: Presentation EDD

BAJO LICENCIA

INSTALLATIONS

3.1. AIRPORTS: Approach Radar Systems

23

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 26: Presentation EDD

BAJO LICENCIA

3.2. Telecommunication Tower

24

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 27: Presentation EDD

BAJO LICENCIA

3.2. Telecommunication Tower

25

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 28: Presentation EDD

BAJO LICENCIA

3.2. Telecommunication Tower

26

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 29: Presentation EDD

BAJO LICENCIA

3.3. Buddha in Japan

27

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 30: Presentation EDD

BAJO LICENCIA

3.4. Copper Mines in Chile

28

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 31: Presentation EDD

BAJO LICENCIA

3.5. Panama Channel

29

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 32: Presentation EDD

BAJO LICENCIA

3.5. Panama Channel

30

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 33: Presentation EDD

BAJO LICENCIA

3.6. Petrol Station

31

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 34: Presentation EDD

BAJO LICENCIA

3.6. Petrol Station

32

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 35: Presentation EDD

BAJO LICENCIA

3.7. Petrochemical

33

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 36: Presentation EDD

BAJO LICENCIA

3.7. Petrochemical

34

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 37: Presentation EDD

BAJO LICENCIA

3.7. Petrochemical

35

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 38: Presentation EDD

BAJO LICENCIA

3.7. Petrochemical

36

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 39: Presentation EDD

BAJO LICENCIA

DISTRIBUTORS

37

1

USPresentation

2

WHATProduct

4

WHODistributors

3

HOWInstallations

Page 40: Presentation EDD

BAJO LICENCIA

Av. Gral. Santos 2555 c/18 de julioAsunción – ParaguayTel.: (595) 21 302023

www.sertec.com.py

technical dept.: [email protected] commercial dept.: [email protected]

SERTEC S.R.L.