practical iec 61850 for substation automation for engineers & technicians

4
Register NOW: Email the registration form to us at [email protected] For more information contact 1300 138 522 or visit www.idc-online.com SYDNEY 24 & 25 March 2015 PERTH 26 & 27 March 2015 Been to an IDC workshop before? - Attend this workshop and you’ll receive 5% OFF the registration price! Technology Training that Works Andrew West BE Electrical, BSc (Computer Science, Psychology), BA (Music, Information Systems) A 2-day practical workshop presented by: AUSTRALIA CANADA INDIA • IRELAND MALAYSIA NEW ZEALAND • SINGAPORE SOUTH AFRICA UNITED KINGDOM UNITED STATES VIETNAM EARLY BIRD BOOKING OFFER TOTAL VALUE TO YOU - $835 Book by 24 February 2015 and you will receive 20% OFF the full registration price + 4 eBooks each with hundreds of pages of engineering knowledge 4-FOR-3 BOOKING OFFER PLUS OUR ONLY $ 1995 per person including GST PRACTICAL IEC 61850 FOR SUBSTATION AUTOMATION FOR ENGINEERS AND TECHNICIANS YOU WILL LEARN HOW TO: • Explain the basic scope and outline of IEC 61850 (including the latest revisions) • Describe the IEC 61850 hardware architecture for substation automation • Use the IEC 61850 data model to specify a substation automation system • Use the IEC 61850 model as data integration platform • Specify the most appropriate networking components for substation automation • Perform device independent system specification and engineering • Create SSD, ICD, IID and SCD files • Create, capture and analyse GOOSE messages WHO SHOULD ATTEND: • Consulting • Control and instrumentation • Control systems • Design • Maintenance supervisors • Electrical installations • Process control • Process development • Project management • SCADA and telemetry systems This workshop is designed for personnel with a need to understand the techniques required to use and apply IEC 61850 to substation automation, hydro power plants, wind turbines and distributed energy resources as productively and economically as possible. This includes engineers and technicians involved with: • Practical Troubleshooting and Problem Solving of Industrial Data Communications • Practical Wireless, Ethernet and TCP/IP Networking • Practical SCADA Systems for Industry • Practical Troubleshooting and Problem Solving of Ethernet Networks

Upload: idc-technologies

Post on 02-Jul-2015

528 views

Category:

Engineering


8 download

DESCRIPTION

COPY THIS LINK INTO YOUR BROWSER FOR MORE INFORMATION: bit.ly/11AM1oL Older (‘legacy’) substation automation protocols and hardware/software architectures provided basic functionality for power system automation, and were designed to accommodate the technical limitations of the technologies available at the time. However, in recent years there have been vast improvements in technology, especially on the networking side. This has opened the door for dramatic improvements in the approach to power system automation in substations. The latest developments in networking such as high-speed, deterministic, redundant Ethernet, as well as other technologies including TCP/IP, high-speed Wide Area Networks and high-performance embedded processors, are providing capabilities that could hardly be imagined when most legacy substation automation protocols were designed. IEC61850 is a part of the International Electro-technical Commission (IEC) Technical Committee 57 (TC57) architecture for electric power systems. It is an important new international standard for substation automation, and it will have a significant impact on how electric power systems are designed and built in future. The model-driven approach of IEC61850 is an innovative approach and requires a new way of thinking about substation automation. This will result in significant improvements in the costs and performance of electric power systems. This workshop provides comprehensive coverage of IEC 61850 and will provide you with the tools and knowledge to tackle your next substation automation project with confidence. WHO SHOULD ATTEND? This workshop is designed for personnel with a need to understand the techniques required to use and apply IEC 61850 to substation automation, hydro power plants, wind turbines and distributed energy resources as productively and economically as possible. This includes engineers and technicians involved with: Consulting Control and instrumentation Control systems Design Maintenance supervisors Electrical installations Process control Process development Project management SCADA and telemetry systems COPY THIS LINK INTO YOUR BROWSER FOR MORE INFORMATION: bit.ly/11AM1oL

TRANSCRIPT

Page 1: Practical IEC 61850 for Substation Automation for Engineers & Technicians

register Now: Email the registration form to us at [email protected] For more information contact 1300 138 522 or visit www.idc-online.com

sYDNeY24 & 25 March 2015

PeRth26 & 27 March 2015

Been to an iDC workshop before? - Attend this workshop and you’ll receive 5% off the registration price!

Technology Training that Works

Andrew WestBE Electrical, BSc (Computer Science,

Psychology), BA (Music, Information Systems)

A 2-day practical workshop presented by:

AUSTRALIA • CANADA • INDIA • IRELAND MAlAySIA • NEW ZEALAND • SINGAPORE • SOUTH AFRICA

UNITED KINGDOM • UNITED STATES • VIETNAM

eaRlY BiRD BooKiNg offeR

total value to you - $835

Book by 24 February 2015 and you will receive 20% off the full

registration price + 4 ebooks each with hundreds of pages of

engineering knowledge

4-foR-3 BooKiNg offeR

Plusour

ONly $1995 per person including gST

PRaCtICal

IEC 61850 FOr SuBSTATION AuTOMATION FOR EnGInEERS anD tEChnICIanS

you Will learn hoW to:• Explain the basic scope and outline of IEC 61850 (including the latest

revisions)• Describe the IEC 61850 hardware architecture for substation automation• Use the IEC 61850 data model to specify a substation automation system• Use the IEC 61850 model as data integration platform• Specify the most appropriate networking components for substation

automation• Perform device independent system specification and engineering• Create SSD, ICD, IID and SCD files• Create, capture and analyse GOOSE messages

Who shoulD attenD:

• Consulting• Control and instrumentation• Control systems• Design• Maintenance supervisors

• Electrical installations• Process control• Process development• Project management• SCADA and telemetry systems

This workshop is designed for personnel with a need to understand the techniques required to use and apply IEC 61850 to substation automation, hydro power plants, wind turbines and distributed energy resources as productively and economically as possible. This includes engineers and technicians involved with:

• PracticalTroubleshootingandProblem Solving of Industrial Data Communications

• PracticalWireless,EthernetandtCP/IP networking

• PracticalSCADASystemsforIndustry

• PracticalTroubleshootingandProblem Solving of Ethernet networks

Page 2: Practical IEC 61850 for Substation Automation for Engineers & Technicians

andrew is a graduate of the University of Queensland with degrees in Electrical Engineering and Computer Science. Previously he worked for the Queensland Electricity Commission in the Control Systems Division. andrew is Chair of the DnP Users Group technical Committee and Spokesperson for the IECTC57WG03, thecommittee responsible fortheIEC60870-5seriesofstandards.HehasbeenactivelyinvolvedwithSCADAsystemsforover 20 years and has participated in SCADA communication protocol standardisationprocesses since 1996.

PrACTICAl IEC 61850 FOr SuBSTATION AuTOMATION FOr ENgINEErS AND TEChNICIANS

An intensive, practical 2-day workshop presented by Andrew West

BE Electrical, BSc (Computer Science, Psychology), BA (Music, Information Systems)

free reference Manual as a hard-copy and ebook (VAluED AT $223.90)

Our delegates don’t just receive photocopied notes!

You will receive the comprehensive fully illustrated reference manual, asahard-copyandeBookversion,filledwithhundredsofpagesoftables, charts, figures and handy hints.

DisCoUNt offeRsave $1995

* discounted and free registration to be used for the same workshop

in the same venue

BOOK FOur DElEgATES PaY foR thRee!

register three people on a public two-day workshop and

receive your fourth registration fRee

about iDc technologies

Visit our WEB SITE www.idc-online.com to download

fRee software and technical information

With a portfolio of over 300 workshopsspecialising in the fields of industrial data communications, electrical and mechanical engineering, automation and control, we have trainedover500,000engineers, techniciansandtechnologistsoverthelast20years.

Wehaveanenthusiasticteamofprofessionalsin offices conveniently located around the world, who are committed to providing the highest quality of engineering and technical training.

on-site training

all IDC technologies training workshops are available on an on-site basis, presentedatthe venue of your choice, saving delegates travel time and expenses, thus providing your company with even greater savings.

save moRe thaN 50% off the per person cost!

2-day courses start from $6,000 foR UP to 6 PeoPle and can be

CUstomiseD to your needs.

have the training delivered wheN aND wheRe you need it!

For more information or a free detailed proposal contact:Kevin Baker on 1300 138 522 or email: [email protected]

PlUs 5 eBooKs of YoUR ChoiCe!Every delegate will also receive

5 ebooks of their choice from IDC’s technical library

– valued at $420!

the WorkshoP

Older (‘legacy’) substation automation protocols and hardware/software architectures provided basic functionality for power system automation, and were designed to accommodate the technical limitations of the technologies available at the time. however, in recent years there have been vast improvements in technology, especially on the networking side. this has opened the door for dramatic improvements in the approach to power system automation in substations.Thelatestdevelopmentsinnetworkingsuchashigh-speed,deterministic,redundantEthernet,aswellasothertechnologiesincludingTCP/IP,high-speedWideAreaNetworksandhigh-performanceembedded processors, are providing capabilities that could hardly be imagined when most legacy substation automation protocols were designed.IEC61850isapartoftheInternationalElectro-technicalCommission(IEC)TechnicalCommittee57(tC57) architecture for electric power systems. It is an important international standard for substation automation, and it is having a significant impact on how electric power systems are designed and built for the future. The model-driven approach of IEC61850 is an innovativeapproach and requires a new way of thinking about substation automation. this will result in significant improvements in the costs and performance of electric power systems.ThisworkshopprovidescomprehensivecoverageofIEC61850andwillprovideyouwiththetoolsand knowledge to tackle your next substation automation project with confidence.

Pre-requisites a basic working knowledge of data communications in general, or some exposure to Ethernet and tCP/IP, would be useful but is not essential.

Practical sessions

Thisisapractical,hands-onworkshopenablingyoutoworkthroughexerciseswhichreinforcethe concepts discussed. Sessions include:• SetupandconfigureEthernetinfrastructure• CreateSSD,ICD,IIDandSCDfiles• BrowseIEDmodelofadevice(usingself-description,validationofmodeland

SCLfile)andcreateoutgoingGOOSEmessages• CaptureandanalyseGOOSEmessageswithaprotocolanalyser• TestexecutionofGOOSEmessagesusingIEC61850compatibletestdeviceto gain full value from this workshop, please bring your laptop/notebook computer.

Page 3: Practical IEC 61850 for Substation Automation for Engineers & Technicians

PrACTICAl IEC 61850 FOr SuBSTATION AuTOMATION FOr ENgINEErS AND TEChNICIANS

the PrograM

The fee for each workshop covers all materials including workshop manual, lunches

and refreshments

DaY oNe

introDuction•7-layercommunicationmodel•8thlayerasdata•Networktopologies•UtilityCommunicationArchitecture(UCA)•Client/serverconcept•Publish/subscribeconcept•KeyfeaturesofIEC61850•IEC61850vs.DNP3andIEC60870scoPe anD outline of iec 61850•Generalfunctionalrequirements(Parts3,

4 and 5)•Definitionofabstractservices(Part7.2)•Abstractionofdataobjects(Part7.4)•CommonDataClasses(CDC)(Part7.3)•MappingofabstractdataobjectsandservicesontotheManufacturingMessagingSpecification(MMS)(Part8.1)

•MappingofSampleMeasuredValuesontoserial links (Part 9.1)

•MappingofSampleMeasuredValuesontoISO/IEC8802-3(IEEE802.3/Ethernet)

iec 61850 substation architecture•MergingUnits(MUs)•StationBus•ProcessBusethernet coMMunication Within substations•PhysicalInterfaces(10/100/1000Mbps)•Media(copper,multi-modefibre,single

mode fibre)•Mediaaccess(fullduplexvs.CSMA/CD)•MAC(L2)addressing:broadcasting,

multicasting, unicasting•Frame(packet)structure•DifferencesbetweenISO/IEC8802.3,ISO/IEC8802.3Ethertype,andISO/IEC8802.2LLC

•Bridges/switches•VLANs:Port-basedvs.taggedVLANs,IEEE802.1pportprioritisation,IEEE802.1QVLAN

•Timesynchronisation:IEEE1588, SAEAS6802

•Networkredundancy:Redundantstar,Redundant ring, Spanning tree protocols, Parallel Redundancy Protocol (IEC62439-3)

tcP/iP anD relateD concePts•IP(L3)addressing:IPv4vs.IPv6•Subnetmasksanddefaultgateways•Basicroutingconcepts•Routers•Ports/sockets•TCPconnections•TCPvs.UDP

DaY two

Wan coMMunications issues•Reliability,determinismandspeedissues•Multi-ProtocolLayerSwitching(MPLS)•IPoverDenseWavelengthDivisionMultiplexing(IPoDWDM)

•MPLSTrafficEngineering–FastRerouteoverIPoverDenseWavelengthDivisionMultiplexing(MPLSTE-FRRoverIPoDWDM)

•IEEE802.1Qav–ForwardingandQueuingEnhancementsforTime-SensitiveStreams

Data MoDelling aPProach•Theinformationmodel(IEC61850-7-xandIEC61400-25)

•Theinformationexchangeservicesandmappings(IEC61850-7-2and8-1)

•Physicaldevices•Logicaldevices•Dataelements•CommonDataClass(IEC61850-7-3)coMMunication Profiles•SampledValues(SV)multicast•GenericObjectOrientedSubstationEvent

(GOOSE)•GOOSEmessagesoverL2•GOOSEmessagesoverL3(IEC61850-90-5)•GenericSubstationStatusEvent(GSSE)•TimeSync(SNTP/GPS/IRIG-B)•ManufacturingMessageSpecification(MMS)•Applicationofandcomparisonbetween

profiles MaPPing of iec 61850 to coMMunication Profiles•AbstractCommunicationServiceInterface

(aCSI)•MappingofIEC61850toMMS•Objectmapping•Servicemappingconfiguration•ConfigurationofIEDs•IEC61850-6SubstationConfiguration

language (SCl)•SoftwaretoolsconforMance anD testing•Documentationandprocess•Assessmentprocess•Tools•Testingmethods•Interpretationofcompliancecertificatesrecent DeveloPMents•IEC61850Edition2•Objectmodelsforhydropowerplants,

wind turbines and Distributed Energy Resources (DER)

•MappingofIEC61850onDNP3andIEC60870-5-101/-104

•TheuseofIEC61499(DistributedFunctionBlocks)inconjunctionwithIEC61850

•ExchangingsynchrophasordatabetweenPMUs,PDCs,WAMPACandcontrolcentreapplications:IEC/TR618-90-5:2012(E)

•CommunicationwiththecontrolcentrebasedonIEC61850andHarmonisationwithCIM

suMMary, oPen foruM anD closing

Page 4: Practical IEC 61850 for Substation Automation for Engineers & Technicians

ABN 78 003 263 189

Web Site:www.idc-online.com

Email: [email protected]

Mail: IDC Technologies PO Box 1093West Perth WA 6872

Fax: 1300 138 533

RegisteR Now:

ENquIrIES: Phone: 1300 138 522

PrACTICAl IEC 61850 FOr SuBSTATION AuTOMATION FOr ENgINEErS AND TEChNICIANS

BooKiNg CoDe: SM

woRKshoP Details• Workshopsstartat8:30amandfinishat5:00pmdaily.• Registrationisfrom8:00amonthefirstday.• Theworkshopfeesareperdelegateandincludeareference

manual,handouts,lunchesandallrefreshments.• Fullpaymentisrequiredpriortothecommencementofthe

workshop.eaRlY BiRD BooKiNg offeRPleasenotethattheEarlyBirdBookingOfferisonlyavailabletothoseregistrationsreceivedby24February2015andpaidpriortothecommencementoftheworkshop.

CoNfiRmatioNConfirmationofreceivingyourregistrationwillbesentwithin48hours.Officialconfirmationanddetailsoftheworkshopwillbesenttoyoupriortotheworkshopdate.Pleasewaitforofficialconfirmationbeforemakingaccommodationand/ortravelarrangements.

CaNCellatioNA fee of 20% will apply for written cancellations received7-14 days prior to the commencement of the workshop.Cancellationsreceivedlessthan7dayspriortotheworkshoparenotrefundablehoweversubstitutesarewelcome.Please NoteVenuestobeconfirmeduponregistration.Venuesaresubjecttochange.Instructorsmaychangewithoutnotice.IDC Technologies has no affiliation with suppliers ormanufacturersandthereforepresentsacompletelyunbiasedfactualviewoftheindustry.100% moNeY BaCK gUaRaNteeIDCTechnologies’engineershaveputconsiderabletimeandexperienceintoensuringthatyouderivethemaximumvaluefromeachworkshop.Ifyoufeelbylunchtimeofthefirstdaythattheworkshopisnotappropriate,pleaseletusknowsothatwecanarrangea100%refundofyourfee.

PRivaCY iNfoRmatioNIf youraddressdetailsare incorrect,or youwish to removeyournamefromourmailinglist,pleasecontactusbyphone,faxoremail.Attimeswemakeuseofliststhatcannotbecross-checkedagainstourowndatabaseandyoumayreceiveaduplicate.Ifso,pleasepassthisontoaninterestedcolleague.

CoNtiNUiNg PRofessioNal DeveloPmeNt (CPD) This program is designed to meet your continuingprofessional development requirements. A certificatedocumenting your attendance will be awarded at theend of the workshop. This serves as important evidenceof your continuing professional commitment to yourcareer. This workshop may count towards fulfillingyour Engineers Australia CPD obligations – EngineersAustralia’s CPD Policy can be found at their website:http://www.engineersaustralia.org.au/

Contact: Company Name:

Company Address:

Suburb: State: Post Code:

Phone: Fax: Email:

Mr/Ms: Job Title: Email:

Mr/Ms: Job Title: Email:

Mr/Ms: Job Title: Email:

Mr/Ms: Job Title: Email:

Should you have more people interested in attending this workshop, please contact us via email: [email protected]

Delegate Details

ATTE

ND

EES:

sYDNeY - 24 & 25 March 2015 rydges Camperdown, Sydney

PeRth - 26 & 27 March 2015IDC Technologies, West Perth

Please register by 3 March to avoid disappointment

WorkshoP Details

register three people on a public two-day workshop and receive your fourth registration FrEE* discounted and free registration to be used for the same

workshop in the same venue.

Discount offer - save $1995 - BooK 4 Delegates, PaY foR 3!

Received a brochure in the mail

Received an email from IDC

Searched online (Google, Yahoo etc)

Recommended by a friend/colleague

Other (please specify) ________________________

______________________________________________

how DiD YoU heaR aBoUt this woRKshoP? (Please tiCK)

1

3

BOOKINg FOr oNe DElEgATE: $1995 x ______ delegates = $ _____________

BOOKINg FOr foUR DElEgATES: $1995 x ______ delegates = $ _____________ The fourth participant is FrEE

EArly BIrD BOOKINg OFFEr: (if booking on or before 24 February 2015)yES, I qualify and would like to receive my 4 FrEE eBooks PluS 20% OFF the registration price lESS 20% = $ _____________

TOTAl = $ _____________

On the reverse of your card, above the signature, is a security number. In order to authorise your card transaction, we require the last 3 digits:

If the Cardholder's address is not the same as shown above please tick this box:

Please note: full payment is required prior to the commencement of the workshop.

PayMent Details Note: Prices are INCluSIVE of gST

I wish to pay by Cheque, made payable to IDC Technologies

Company Order Number: __________________________________

Please charge my Mastercard Visa Expiry Date: ____/_____

______________________________________________________________

Cardholder’s Name:

Cardholder’s Signature

My billing information is the same as above in 'DElEgATE DETAIlS'

Please send invoice to: Company Name:

Company Address:

Suburb: State: Post Code:

billing inforMation (Please iNvoiCe to)

1

3