ILC Americas Cavity and Cryomodule R&D Shekhar Mishra ILC Program Fermilab Talk presented at DOE Annual Program Review Breakout Sessions Wednesday, May 17

Upload: trantuyen

Post on 03-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas

Cavity and Cryomodule R&D

Shekhar MishraILC Program

Fermilab

Talk presented at DOE Annual Program Review 

Breakout Sessions   –   Wednesday, May 17

Page 2: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas ILC Cavity and Cryomodule R&D Goals

• ILC R&D at Fermilab is focused to address the high priority ILC design and technical issues as recommended by ILC-TRC and recently by ILC-GDE R&D Board.

• The main thrust of the ILC Cavity and Cryomodule R&D is to establish technical capabilities in the Superconducting Radio Frequency (SRF) Cavity and Cryomodule technology. The main goals are

– Cavity technology development in the US to routinely achieve > 35 MV/m and Q ~0.5-1e10,

– ILC Cryomodule design, fabrication (cost reduction)

– Fully tested basic building blocks of the Main Linac (Evaluate the integration, reliabilities issues and value engineering).

– LLRF, Instrumentation and Controls development for Main Linac

• Development of U.S. laboratories and industrial infrastructure for the fabrication, processing and testing of high performance SRF cavities, Coupler, Tuner, HOM and Cryomodule.

Page 3: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas Plans for 35 MV/m• Cavity Fabrication, Preparation, Surface Processing, Clean Surface and Clean

environment is the key to achieving a high gradient in the ILC cavities.

• Fermilab is leading the US effort with collaborating laboratories.

– Niobium is being scanned at Fermilab. (Need larger inventory. There are variation from batch to batch, vendor to vendor etc.)

– Cavity is being fabricated at industry under the supervision of Fermilab and Cornell. Jlab will join this soon.

– Cavity is being processed (BCP and EP) and vertical tested at Cornell, Jlab and will be processed at ANL/FNAL

• The processing infrastructure needs more focused effort. Experiences from DESY and KEK suggest that we build this facility at where cavity is dressed, horizontally tested and put in a string.

• We are in process of having this facility at Fermilab by 07.

• Fermilab is fabricating 8 (FY05), 16(FY06), 24-36 (FY07) ILC cavities. More could be needed to

• These cavities will be systematically processed and testing. We would systematically collect data during the fabrication, processing and testing.

• These data would be analyzed for co-relations to understand the process.

Page 4: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas ILC Cavity: R&D

• Material R&D: Fine, Large, Single Crystal• Fabrication

– A number of minor modifications and improvements could be implemented without impact to the basic cavity design.

• Cavity Preparation • Buffer Chemical Processing• Cavity Processing R&D

– Electro-polishing (EP) System– High Pressure Rinsing (HPR)– Clean Assembly Procedure

Page 5: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas Cavity Fabrication

• Industrial production of the cavity by Fermilab (ACCEL, AES)

• 8 TESLA Design Cavities ordered• 10 ILC Baseline Design Cavities in FY06

• Cavity fabrication at Jlab• 2 ILC Baseline design and Type-IV• 2 Low Loss Cavity• Several single cell for Process and Material R&D • Material R&D (Fine Grain, Large Grain, Single Crystal)

• Cavity fabrication at Cornell• Re-Entrant Cavities (70 mm)• Re-Entrant Cavities (60 mm)• Several single cell for Process R&D

• Cavity fabrication at KEK (US-Japan)• Cavities of TESLA, Low Loss and ICHIRO design

Page 6: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas

Cavity Fabrication, Processing and Testing Road Map

Cavity FabricationBy Industry

Cavity Dressing &Horizontal Testing

@ Fermilab

BCP and EPProcessing @ Cornell

BCP and EPProcessing

@ Jlab

BCP and EPProcessing @ ANL/FNAL

Vertical Testing @ Cornell

Vertical Testing @ Jlab

Vertical Testing @ FNAL

Exists

Developing

Page 7: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas Cavity Measurements

• RF measurement of the ACCEL Cavities at Fermilab.

Accelerating field amplitude in cavity axes.

0

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

0 200 400 600 800 1000 1200Z, mm

Am

plitu

de

ACCEL6 ACCEL7 ACCEL9

Page 8: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas ILC Cavity Material Grain size R&D at Jlab

• Study of Single Cell large grain niobium from CBMM, Heraeus and Ningxia

• 5 single cell cavities each from these vendors will be fabricated for statistics.

• Two 9-cell cavities are being fabricated for Fermilab using CBMM ingot.

Large Grain TESLA Cavity Shape SC, Chinese Nb

1.00E+09

1.00E+10

1.00E+11

0 5 10 15 20 25 30 35

Eacc [MV/m]

Q0

Test#1/2/3/4

Q - drop

Quench 29 MV/m

Quench @ 33.3 MV/m

Ningxia

Large Grain TESLA Cavity Shape SC, WC_Heraeus Nb

1.00E+09

1.00E+10

1.00E+11

0 5 10 15 20 25 30 35

Eacc [MV/m]

Q0

Test#2/4

Quench at 34.4 MV/m

HeraeusLarge Grain TESLA Cavity Shape SC#2, Ingot"D"

1.00E+09

1.00E+10

1.00E+11

0 5 10 15 20 25 30 35

Eacc [MV/m]

Q0

T=1.99K Series2

Test #1/2Test #1

Quench at 31.2 MV/m

Page 9: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas

50 MV/m in Single Cells !Lower Surface Magnetic Field & Lower Losses

Re-entrant

CornellKEK

Low Loss

Jlab

KEK

Tesla Shape

Need Multi-cells Next

New Shapes Breakthrough

Page 10: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas

Fabricated at Cornell

Proof of Principle Results: Eacc = 47 - 52 MV/m

/Ichiro

Page 11: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas

60 mm aperture similar to LL shape -> 16% lower Hpk/Eacc

New Reentrant Cavity Shape

Work done in Collaboration with KEK

Page 12: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas ILC Cavity Processing• We are using infrastructures at the collaborating laboratories to develop the

processing capabilities and parameters in USA to achieve 25 MV/m with BCP and 35 MV/m with EP.

• These facilities are also being used to train people.

• Cornell:– BCP and HPR – Vertical EP

• Jlab– EP

• Fermilab and ANL (New Facility)– BCP – EP

• We are also sending Fermilab staff to DESY for participation and training in surface processing, vertical and Horizontal testing.

Page 13: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas Check Reproducibility of HPR

Cornell Re-entrant Cavity

3.9.9

3.9.10

Work done in Collaboration with KEK

Page 14: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas

BCP Complete

First ACCEL ILC Cavity at Cornell

HPR Complete

3.9.3.1

Page 15: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas Vertical Test of ACCEL Cavity

Fermilab is sending engineering staff and technician to participate in the BCP and vertical testing at Cornell.

ACCEL8_21apr06

1.000E+09

1.000E+10

1.000E+11

0 5 10 15 20Eacc (MV/M)

Q

QuenchNo Radiation

60 um BCP (nominal) + 50 um at ACCEL

Low Field: Q >1010, Eacc = 17 MV/m, (Quench)

Q

Eacc (Mv/m)

Page 16: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas Goals for EP Development at JlabEstablish EP processing for ILC 9-cell cavities at Jlab

• Commissioning EP cabinet with Spare DESY 9-cell cavity

• Perform HPR, assembly and testing with S35 cavity to analyze procedure effectiveness and reproducibility

• Investigate standard process procedures to gain a better understanding of current issues (Sulfur precipitation, HF loss during use)– Identify and develop relevant process metrics and QA steps

• Establish and document procedures– Aim is uniform reproducible etching with clean surfaces after rinsing

• Process, test, qualify and prep cavities for FNAL string assembly

Page 17: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas

HPR and Assembly Alignment Cage

Electropolish Development for ILC

Jlab EP Cabinet

3.9.3.2

Page 18: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas

EP System Alignment Frame and Cathode with ILC Cavity 3.9.3.2

Page 19: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas

ILC Surface Processing Facility Development at ANL/FNAL

• The Joint ANL/FNAL Superconducting Surface Processing Facility (SCSPF), located at Argonne National Laboratory, is a major chemical processing facility capable of electro-polishing and buffered chemical polishing a large quantity and variety of superconducting structures.

• This BCP part of the facility is ready and going through the safety approval. It is expected to be operational end of 06.

• An initial plans has been developed for an EP facility to be build (FY06-07) at ANL/Fermilab Surface Processing Facility at ANL.

• This facility should include the knowledge of EP from the ILC Collaboration.

Page 20: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas Cryomodule Design and Fabrication

• In FY05 Fermilab started on converting the DESY/INFN design of the ILC cryomodule (Type-III+).

• We have formed an ILC Cryomodule working group that is working towards a design of an ILC cryomodule. This design will evolve.

• The Goal is to design an improved ILC cryomodule (Type-IV) and build one at Fermilab by FY08.

High Power testing of the cavities and the fabrication of 1st ILC cryomodule with new design 2008.

Page 21: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas

Cryomodule Fabrication Plans for an RF Unit test at ILCTA

Cryomodule 1 Cryomodule 2 Cryomodule 3

DressedCavity Provided

By DESY

Cold MassBy DESY/INFN

CryomoduleAssembled at

Fermilab

March 07

Standard LengthCavity Purchased

By Fermilab

BCP & VTAt Cornell

EP & VTAt Jlab

Cold MassFrom ZanonBy Fermilab

Dressed and HTAt Fermilab

Dec 07 Mid 08

ILC LengthCavity Purchased

By Fermilab (AES/Jlab)

BCP & VTIn USA

EP & VTIn USA

Dressed New Design and HT

At Fermilab

Cold Mass Type-IVFrom US Company

By Fermilab

Page 22: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas

1st US Assembled Cryomodule: Fermilab, DESY and INFN

• DESY will send Fermilab eight 9-Cell 1.3 GHz dressed and horizontally tested cavities. – The present schedule for the delivery of these 8 cavities is around end of

2006. DESY will attempt to advance this schedule.

• DESY and INFN have ordered two cold masses for Type-III cryomodules from Zanon. – DESY will send one of these cold masses to Fermilab for the 1st

cryomodule assembly at Fermilab. – It is expected that this cold mass will be available about Sept.-Oct. 2006.

• Some parts for the 1.3 GHz cryomodule are not provided by Zanon but rather by INFN. – It was agreed that INFN will send these associated parts to Fermilab and

provide parts needed for a 3rd cold mass.  – INFN-DESY will also send the assembly documentation to Fermilab.

• Fermilab will work to achieve the earliest possible delivery date for the DESY four cavity 3.9 GHz cryomodule. This is currently expected to be early in  2007.

Page 23: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas ILC Cryomodule Design Considerations• Move quad package to middle of cryomodule to achieve better

support and alignment.

• Shorten cavity-to-cavity interconnect and simplify for ease of fabrication and cost reduction. Possible superconducting joint.

• Overall improved packing factor.

• Minimize direct heat load to cavity through MC.

• Simplify the assembly procedure.

• MLI redesign to reduce hands-on labor costs.

• More robust design to survive shipping.

• Reliability of tuner motors in cold operation.

• Etc. (we’ve heard many suggestions)

Page 24: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas ILC Cryomodule: Conceptual Model

Page 25: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas

Increasediameter beyond X-FEL

Increasediameter beyond X-FEL

Review 2-phase pipe size and effect of slope

Change in Cryogenic Distribution

Page 26: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas

ILC Cavity Spacing, Dimensions with Blade Tuner

Blade Tuner

35068mm1036.2 mm

Active length = 1036.2 mm x 24 cavities = 24868.6 mm

Packing Factor = 24868.6 / 35068 = 0.71

Page 27: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas 1st Cryomodule Assembly Plans

• Cavity String Assembly Procedures & Fixtures Learning at DESY (February 20 –March 3)

– A draft traveler was written during this visit. It is currently being reviewed by Axel Matheisen for comments.

– Tooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab.

– Assembly sketches, movies and took a lot of pictures and notes.

• Cryomodule #6 Assembly Procedures Learning at DESY (May-June 06)

• CAF Infrastructure ready & operational: May-June 06– MP9 Clean Room installation finished– Cold Mass and Vacuum Vessel Assembly Fixtures received at Fermilab.– Cavity String Assembly Fixtures are being fabricated to be installed

• Assemble 1st Cryomodule (4 months): Start date depends when we receive the kit from DESY

Page 28: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas

Cavity and Cryomodule Assembly Fixtures

Page 29: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas FY07 Plans: Cavities & Cryomodule• The FY07 plan of the ART will be the continuation of the plan we are undertaking in

FY07.

• Cavity Fabrication– ILC Design– New Shape (LL and RE)– Fine, Large and Single Crystal– R&D on material, fabrication etc– 3.9 GHz deflecting cavity design and fabrication

• Cavity Processing and Vertical Testing– BCP, EP and Vertical Testing at Cornell– BCP, EP and Vertical Testing at Jlab– BCP, EP and Vertical Testing at FNAL/ANL (New Facility)– R&D on surface treatment

• Cryomodule Design and Fabrication– Type III+ Fabrication– Type IV Design

• US Industrial involvement in Cavity and Cryomodule Design and Fabrication

• Enhanced University participation in ILC R&D

Page 30: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas Summary

• US-ILC Main Linac: Cavity and Cryomodule R&D program is established to address the key technology issues.– Cavity Gradient– ILC Cryomodule design and fabrication

• R&D is focused on the Baseline design of the cavity and cryomodule.

• We are also working on alternate design for Cavity and material.

• We are upgrading existing infrastructure at US laboratories to cost effectively advance the R&D program on a ambitious schedule.

• We are developing infrastructure at Fermilab for cavity processing and testing and fabrication of cryomodule.

• We are leading the ILC effort in the ILC Cryomodule design.

• We are working with US industry in fabrication.

• We are also working with US industry in ILC Cost Study.

Page 31: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas

Could lab really spend the Money Faster on ILC than its currently funded?

• Yes, Yes and Yes• Fermilab has qualified scientists and engineers who wants to

work on ILC.• We continue to defer investment that would be needed for more

focused R&D.– Cavity R&D: (This is the highest R&D priority for ILC-GDE)

• Niobium • More cavities fabrication at industry. We should fabricate enough to saturate

the pipeline at existing and upcoming processing facilities. • Electron Beam Welding• Surface Processing: We need a pre-production BCP, EP and HPR system at

Fermilab• Vendor development

– Cavity Tuning Device ( A copy of DESY Design)– Vertical testing temperature study– Cryomodule Testing– 10 MWatt Klystron– Cryogenic plant– Industrial fabrication

• US industries could fabricate an RF unit using laboratory infrastructure.

Page 32: [PPT]Cavity and Cryomodule R&D - Fermilab · Web viewTooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. Assembly sketches,

ILCAmericas FTE in ILC R&D at Fermilab: FY06 and FY07