Update on Street Reconstruction of NP AvenueUniversity Drive to 10 th Street February 20 2015 February 20, 2015 Presented by Jeremy M. Gorden, PE, PTOE Division Engineer Transportation

Upload: inforumdocs

Post on 21-Nov-2015

100 views

Category:

Documents


0 download

DESCRIPTION

Powerpoint presentation made to the Downtown Community Partnership Friday

TRANSCRIPT

  • UpdateonStreetReconstructionofNPAvenuepUniversityDriveto10th Street

    February 20 2015February20,2015PresentedbyJeremyM.Gorden,PE,PTOE

    DivisionEngineer Transportation

  • Presentation PurposePresentationPurpose

    Review Mission Statement from NP/1st Ave NReviewMissionStatementfromNP/1 AveNCorridorStudy

    Review the construction project limits Reviewtheconstructionprojectlimits Reviewtheprojectschedule&construction

    h iphasing Discussthebaseroaddesignalternative Discussalternativestobaseroaddesign

  • Study Mission StatementStudyMissionStatement

    This Study will recommend a plan thatThisStudywillrecommendaplanthataccommodatesalltravelers:pedestrians,bicyclists transit users and driversbicyclists,transitusers,anddrivers.

    The plans design and safety features willTheplan sdesignandsafetyfeatureswillimprovethephysicalhealthofindividuals,theenvironmental quality of the community andenvironmentalqualityofthecommunity,andfurtherincreaseopportunitiesfordevelopmentdevelopment.

  • Project LimitsProjectLimits

  • Construction PhasingConstructionPhasing

  • ApprovedRoadwayDesignAlternativefromStudyin2011

  • UpdatetoRecommendedRoadwayDesignafter1wayConversion

    Reduce the road to just 1 lane in eachReducetheroadtojust1laneineachdirectionbetweenUniversityDrivetoBroadwayBroadway

    Designroadwaytohavewiderlanes(15)toaccommodate shared lane markings foraccommodatesharedlanemarkingsforbicyclesAdd b i / l i b d bl k Addcurbextensions/plantingbedsatblockcornerstoaddplanting

    26tallLEDstreetlightsonbothsidesofstreet

  • CurrentRoadDesignUniv Drivetoh12th Street

  • CurrentRoadDesignh h11th Streetto10th Street

  • ListofUserstoConsiderduringDesign,C i & P j C l iConstruction&ProjectCompletion

    Business operations & deliveriesBusinessoperations&deliveries Customersandbusinessaccess Parking On & OffStreetParking On&Off Street FireDept NDSU NDSU Transit Garbage Service GarbageService Pedestrians,BicyclistsandADAS i l E t & P d SpecialEvents&Parades

  • Design Review Committee CommentsDesignReviewCommitteeComments

    Direction from committee was to examine possibleDirectionfromcommitteewastoexaminepossibletravellanenarrowingtoallowpotentialbikefacilitiesonsidewalksideofparkinglane,sinceurbanbikewaydesignhaschangedtremendouslysincestudywascompleted.

    2alternativesidentified: Option1Raisedcycletrackelevatedhalfwayb d l d d lkbetweenroadwayelevationandsidewalkelevationO ti 2 R i d l t k t id lk l ti Option2Raisedcycletrackatsidewalkelevation

  • NACTO Design GuideNACTODesignGuide

  • Raised Cycle TrackRaisedCycleTrack

  • Option1 RaisedCycleTrack froml dPortland,OR

  • Raised Cycle TrackRaisedCycleTrack

  • Option2CycleTrackatSidewalkHeight

  • Sidewalk Cycle TrackCambridge, MASidewalkCycleTrack Cambridge,MA

  • SidewalkCycleTrackCambridge,MA

  • NP Avenue Raised Cycle TrackNPAvenueRaisedCycleTrack

  • NP Avenue Sidewalk Cycle TrackNPAvenueSidewalkCycleTrack

  • Plan view of NP Avenue Cycle TracksPlanviewofNPAvenueCycleTracks

  • Cycle Track Design GuidanceCycleTrackDesignGuidance

  • Bike Safety by Facility TypeBikeSafetybyFacilityType

  • CostsCosts BaseRoadDesignEstimatedProjectCost$2.6M

    I f S l T f d $1 45M InfrastructureSalesTaxfunds$1.45M SpecialAssessmentfunds$745,000(cappedatthisamount) WaterandSewerfunds$410,000

    C l T k O ti C t O ti 1 R i d CycleTrackOptionCosts Option1 Raised Estimated10%overBaseRoadDesign requiresa2nd setofcurb&gutters InfrastructureSalesTaxfunds$1.71M

    $ SpecialAssessmentfunds$745,000(cappedatthisamount) WaterandSewerfunds$410,000

    CycleTrackOptionCosts Option2 Sidewalklevel Estimated5%overBaseRoadDesign InfrastructureSalesTaxfunds$1.58M SpecialAssessmentfunds$745,000(cappedatthisamount) WaterandSewerfunds$410,000

  • Next StepsNextSteps

    1. PublicWorksProjectEvaluationCommitteemeetingj gMonday,Feb23

    2. CityCommissionMeetingtoapprovefinaldesignlt ti M d M h 2alternative,Monday,March2

    3. BidprojectinApril4 Begin Construction in May4. BeginConstructioninMay5. CompleteConstructioninOctober

  • QuestionsorComments?

    Jeremy M Gorden PE PTOEJeremyM.Gorden,PE,PTOE

    j d @ i ff [email protected]

    EngineeringOffice 2411545