UpdateonStreetReconstructionofNPAvenuepUniversityDriveto10th Street
February 20 2015February20,2015PresentedbyJeremyM.Gorden,PE,PTOE
DivisionEngineer Transportation
-
Presentation PurposePresentationPurpose
Review Mission Statement from NP/1st Ave NReviewMissionStatementfromNP/1 AveNCorridorStudy
Review the construction project limits Reviewtheconstructionprojectlimits Reviewtheprojectschedule&construction
h iphasing Discussthebaseroaddesignalternative Discussalternativestobaseroaddesign
-
Study Mission StatementStudyMissionStatement
This Study will recommend a plan thatThisStudywillrecommendaplanthataccommodatesalltravelers:pedestrians,bicyclists transit users and driversbicyclists,transitusers,anddrivers.
The plans design and safety features willTheplan sdesignandsafetyfeatureswillimprovethephysicalhealthofindividuals,theenvironmental quality of the community andenvironmentalqualityofthecommunity,andfurtherincreaseopportunitiesfordevelopmentdevelopment.
-
Project LimitsProjectLimits
-
Construction PhasingConstructionPhasing
-
ApprovedRoadwayDesignAlternativefromStudyin2011
-
UpdatetoRecommendedRoadwayDesignafter1wayConversion
Reduce the road to just 1 lane in eachReducetheroadtojust1laneineachdirectionbetweenUniversityDrivetoBroadwayBroadway
Designroadwaytohavewiderlanes(15)toaccommodate shared lane markings foraccommodatesharedlanemarkingsforbicyclesAdd b i / l i b d bl k Addcurbextensions/plantingbedsatblockcornerstoaddplanting
26tallLEDstreetlightsonbothsidesofstreet
-
CurrentRoadDesignUniv Drivetoh12th Street
-
CurrentRoadDesignh h11th Streetto10th Street
-
ListofUserstoConsiderduringDesign,C i & P j C l iConstruction&ProjectCompletion
Business operations & deliveriesBusinessoperations&deliveries Customersandbusinessaccess Parking On & OffStreetParking On&Off Street FireDept NDSU NDSU Transit Garbage Service GarbageService Pedestrians,BicyclistsandADAS i l E t & P d SpecialEvents&Parades
-
Design Review Committee CommentsDesignReviewCommitteeComments
Direction from committee was to examine possibleDirectionfromcommitteewastoexaminepossibletravellanenarrowingtoallowpotentialbikefacilitiesonsidewalksideofparkinglane,sinceurbanbikewaydesignhaschangedtremendouslysincestudywascompleted.
2alternativesidentified: Option1Raisedcycletrackelevatedhalfwayb d l d d lkbetweenroadwayelevationandsidewalkelevationO ti 2 R i d l t k t id lk l ti Option2Raisedcycletrackatsidewalkelevation
-
NACTO Design GuideNACTODesignGuide
-
Raised Cycle TrackRaisedCycleTrack
-
Option1 RaisedCycleTrack froml dPortland,OR
-
Raised Cycle TrackRaisedCycleTrack
-
Option2CycleTrackatSidewalkHeight
-
Sidewalk Cycle TrackCambridge, MASidewalkCycleTrack Cambridge,MA
-
SidewalkCycleTrackCambridge,MA
-
NP Avenue Raised Cycle TrackNPAvenueRaisedCycleTrack
-
NP Avenue Sidewalk Cycle TrackNPAvenueSidewalkCycleTrack
-
Plan view of NP Avenue Cycle TracksPlanviewofNPAvenueCycleTracks
-
Cycle Track Design GuidanceCycleTrackDesignGuidance
-
Bike Safety by Facility TypeBikeSafetybyFacilityType
-
CostsCosts BaseRoadDesignEstimatedProjectCost$2.6M
I f S l T f d $1 45M InfrastructureSalesTaxfunds$1.45M SpecialAssessmentfunds$745,000(cappedatthisamount) WaterandSewerfunds$410,000
C l T k O ti C t O ti 1 R i d CycleTrackOptionCosts Option1 Raised Estimated10%overBaseRoadDesign requiresa2nd setofcurb&gutters InfrastructureSalesTaxfunds$1.71M
$ SpecialAssessmentfunds$745,000(cappedatthisamount) WaterandSewerfunds$410,000
CycleTrackOptionCosts Option2 Sidewalklevel Estimated5%overBaseRoadDesign InfrastructureSalesTaxfunds$1.58M SpecialAssessmentfunds$745,000(cappedatthisamount) WaterandSewerfunds$410,000
-
Next StepsNextSteps
1. PublicWorksProjectEvaluationCommitteemeetingj gMonday,Feb23
2. CityCommissionMeetingtoapprovefinaldesignlt ti M d M h 2alternative,Monday,March2
3. BidprojectinApril4 Begin Construction in May4. BeginConstructioninMay5. CompleteConstructioninOctober
-
QuestionsorComments?
Jeremy M Gorden PE PTOEJeremyM.Gorden,PE,PTOE
j d @ i ff [email protected]
EngineeringOffice 2411545