CALIFORNIA HIGH-SPEED TRAIN PROJECT EIR/EIS LOS ANGELES-TO-SAN DIEGO SECTION DRAFT SCOPING REPORT
U.S. Department of Transportation Federal Railroad Administration
PowerPoint Presentation and Scoping Boards Appendix P
-
Welcome
Welcome to the California High-Speed Rail Authority
and Federal Railroad Administrationsand Federal Railroad Administration sScoping Meetingp g g
Fall 2009
Los Angeles to San Diegovia the Inland Empirea t e a d p e
High-Speed Train Project
-
Scoping ProcessScoping Meeting Fall 2009
Scoping ObjectivesScoping Objectives
- Identify Affected Public / Agency Concerns
- Outline the Key Steps in the Environmental Processy p
- Identify Environmental Issues to be Addressed in the Environmental Document
Comment Period ends Friday, November 20, 2009
- Receive Written CommentsReceive Written Comments
- Web-Based Commenting (Send to: [email protected])
- Develop Scoping Reporte e op Scop g epo t
-
Public Participation How to Comment
Scoping Meeting Fall 2009Scoping Meeting Fall 2009
Thank you for attending todays scoping meeting. To provide your input, please (1) fill out a comment sheet and hand it to a staff person, or (2) fill out a comment sheet and leave it in the comment box provided, or (3) provide your comment verbally to the court reporter to be documented.
If you want to comment outside the meeting here is how to provide input:If you want to comment outside the meeting, here is how to provide input:
E-mailed Comments:California High-Speed Rail Authority comments@hsr ca gov
Written Comments: California High-Speed Rail AuthorityMr Dan Leavitt Deputy Director [email protected]
Include in the subject line:LA - SD HST Section via the Inland Empire
Mr. Dan Leavitt, Deputy DirectorAttn: LA - SD HST Project EIR/EIS925 L Street, Suite 1425Sacramento, CA 95814 p,Fax: (916) 322-0827
Comments must be received no later than Friday, November 20, 2009.For more project information visit the authoritys website:
www.cahighspeedrail.ca.gov or phone (909) 627-2974 or (916) 324-1541
-
Purpose and NeedScoping Meeting Fall 2009
Purpose of the High-Speed Train Project Provide reliable HST service that links Southern California Provide reliable HST service that links Southern California
cities, the Central Valley, Sacramento, and Bay area
Provide rapid and reliable travel between Los Angeles, the p g ,Inland Empire, and San Diego areas
Deliver predictable and consistent travel times using electric d t l h l t ipowered steel wheel trains
Provide greater access and choice of transportation modes to increase mobility throughout Californiato increase mobility throughout California
Provide station locations to support Smart Growth and multimodal transit connections
-
Purpose and NeedScoping Meeting Fall 2009
Need for the High-Speed Train System: Accommodate expected growth in population
Meet travel demand between the Los Angeles, Inland Empire and San Diego County regionsEmpire, and San Diego County regions
Reduce travel delays arising from the growing congestion on Southern Californias highways and at airportso Sout e Ca o a s g ays a d at a po ts
Promote economic growth, and improve quality of life and air quality in and around Southern Californias metropolitan areas
Reduce or minimize congestion and increase mobility
-
What are High-Speed Trains?Scoping Meeting Fall 2009p g g
Intercity passenger trains capable of maximumcapable of maximum operating speeds of 220 miles per hourmiles per hour
Tracks separated from d d hi h
CHSRA Train Conceptroads and highways
Proven technology
Other High-Speed Trains around the World
Proven technology Safe and Reliable
Successfully operating Intercity Express,
GermanyTGV, Francey p gthroughout Europe and Asia
Shinkansen, Japan
-
High-Speed Train Travel TimesScoping Meeting Fall 2009
Service up to 220 mph linking: Southern CaliforniaSouthern California Central Valley San Francisco Bay Area
San Francisco (Transbay) :30 1:53 1:20 2:38 2:57 3:10 3:56
San Jose :30 1:24 :51 2:09 2:28 2:41 3:27
Sacramento 1:53 1:24 :59 2:17 2:36 2:49 3:35
Fresno 1:20 :51 :59 1:24 1:43 1:56 2:42
Los Angeles Union Station 2:38 2:09 2:17 1:24 :20 :33 1:18
Anaheim 2:57 2:28 2:36 1:43 :20Anaheim 2:57 2:28 2:36 1:43 :20
Riverside 3:10 2:41 2:49 1:56 :33 :48
San Diego 3:56 3:27 3:35 2:42 1:18 :48
-
Grade SeparationsScoping Meeting Fall 2009
Grade separations are underpasses and
p g g
are underpasses and overpasses where roadways cross railroad tracksrailroad tracks
Grade separations reduce congestion
Before
Typical Overpass
Before
Typical Underpassreduce congestion and noise and improve safety
Typical Overpass
After
Typical Underpass
After
California High-Speed Train tracks will be grade-separated from roadway crossings
-
Typical Sections Along AlignmentScoping Meeting Fall 2009
ROW ROW
Intrusion Detection
10-8 16-6 10-8
HSR
Emergency Walkway
10-8 16-6 10-8
HSR
Emergency Walkway
HSR
ROW ROW
Aerial Structure
At-Grade Section Trench
Portions of the alignment will need special structures to fit into built environment
Structures could include:ROW ROW
Aerial Structure
Aerial Structures (bridges)
Tunnels Trenches
ROW ROW65.5
Emergency Walkway
Fire Safe Door
11.5
Hillside Cuts
Source: CA High Speed Train Program EIR/EIS, 2005
Hillside CutTwin Single Track Tunnels
-
High-Speed Train StationsScoping Meeting Fall 2009
Smart Growth and Transit Oriented Development
Scoping Meeting Fall 2009
Intermodal connectivity (transit, bikes and pedestrians)
Increase rail to air connection opportunities Increase rail to air connection opportunities Support sustainable economic growth
-
Statewide High-Speed Train SystemScoping Meeting Fall 2009
Connecting:g San Diego Inland Empire Los Angeles Orange County Central Valley San Francisco Bay Area Sacramento
-
Southern California Inland Corridor Group (SOCAL ICG)
Scoping Meeting Fall 2009p g g
The Southern California High-Speed Rail Inland Corridor Group (SOCAL ICG) was formed by a Memorandum of Understanding(SOCAL ICG), was formed by a Memorandum of Understanding (MOU) between the CHSRA and Southern California Association of Governments, San Diego Association of Governments, San Bernardino Associated Governments, the Riverside County Transportation Commission, the San Diego County Regional Airport Authority and Metro.Authority and Metro.
SOCAL ICG input includes: Forming Technical Working Groups (TWGs) in Los Angeles,
Riverside, San Bernardino, and San Diego Counties to assist the CHSRA i fi i th ti LA SD li t d t d iCHSRA in refining the programmatic LA-SD alignment adopted in 2005
Identifying additional alternative project alignments and optional station locations to be studied in the LA-SD project EIR/EIS
-
Los Angeles to San Diegovia the Inland Empire Section
California High-Speed Rail AuthorityLos Angeles to San Diego via the Inland Empire Section
High-Speed Train ProjectScoping Meeting Fall 2009
Section Overview
RIVERSIDE COUNTY
ORANGE COUNTY
SAN DIEGO COUNTY
I-15 I-215
To Palmdale
To Anaheim
SANBAG2/MetrolinkMetro/Metrolink
Holt Avenue
I-10
SR-60
EscondidoEscondido Option
(Transit Center)
University City Option
San Diego
LOS ANGELES COUNTY SAN BERNARDINO COUNTY
Murrieta OptionMurrieta
Corona OptionRiverside
Riverside Option
Riverside Option(March Air
Reserve Base)
San BernardinoOption
Ontario Airport
SGV Option(Pomona)
SGV1 Option (West Covina)SGV Option (El Monte)
SGV Option (Cal Poly)
SGV (Industry)
Los Angeles
San Diego Option(Lindbergh Field)
I-605Union Pacific Railroad
Union Pacific Railroad Adjacent
University CityHST AlignmentsProgram AlignmentAlternative TWG3 Alignment HST StationsProgram Level Preferred Station LocationsOptional Station Locations
Legend
1SGV = San Gabriel Valley2SANBAG = San Bernardino Associated Governments3TWG = Technical Working Group
0 147
Miles
-
SGV (Industry)
Los Angeles
LOS ANGELES COUNTY
SAN BERNARDINO COUNTY
ORANGE COUNTY
I-10
Union Pacific RailroadUnion Pacific Railroad
I-605SR-60
Union Pacific Railroad Adjacent
To Palmdale
To Anaheim
Holt Avenue
Metro/Metrolink
SGV Option (West Covina)
SGV1 Option (El Monte)
SGV Option (Pomona)SGV Option (Cal Poly)
Legend
0 42
Miles
1SGV = San Gabriel Valley2TWG = Technical Working Group
HST AlignmentsProgram AlignmentAlternative TWG2 Alignment HST StationsProgram Level Preferred Station LocationsOptional Station LocationsOne Station Along Alignment in this General Area
California High-Speed Rail AuthorityLos Angeles to San Diego via the Inland Empire Section
High-Speed Train ProjectScoping Meeting Fall 2009
Los Angeles to San Diegovia the Inland Empire Section Los Angeles County
-
SGV1 Option (Pomona) Ontario Airport
San Bernardino Option
Riverside Option Riverside
Riverside Option(March Air Reserve Base)
SAN BERNARDINO COUNTY
I-215
I-15
Union Pacific Railroad
Milliken Ave
Holt Avenue
Metro/MetrolinkSANBAG/Metrolink
RIVERSIDE COUNTY
LOS ANGELES COUNTY
March AirReserve Base
HST AlignmentsProgram AlignmentAlternative TWG2 Alignment HST StationsProgram Level Preferred Station LocationsOptional Station Locations
Legend
1SGV = San Gabriel Valley2TWG = Technical Working Group
0 42
Miles
One Station Along Alignment in this General Area
Los Angeles to San Diegovia the Inland Empire Section
California High-Speed Rail AuthorityLos Angeles to San Diego via the Inland Empire Section
High-Speed Train ProjectScoping Meeting Fall 2009
San Bernardino County
-
Riverside
Murrieta
RIVERSIDE COUNTY
SAN BERNARDINO COUNTY
ORANGE COUNTY
SAN DIEGO COUNTY
I-15
I-15
I-215
March Air Reserve BaseCorona
Los Angeles to San Diegovia the Inland Empire Section
California High-Speed Rail AuthorityLos Angeles to San Diego via the Inland Empire Section
High-Speed Train ProjectScoping Meeting Fall 2009
Riverside County
HST AlignmentsProgram AlignmentAlternative TWG1 Alignment HST StationsOne Station Along Alignment in this General Area
Legend
1TWG = Technical Working Group0 52.5
Miles
MaReCorona
-
Escondido
Carroll Canyon
Miramar Road
University CityUniversity City Option
San Diego Option (Lindbergh Field)
San Diego
Escondido Option (Transit Center)
RIVERSIDE COUNTY
SAN DIEGO COUNTY
I-15
Los Angeles to San Diegovia the Inland Empire Section
California High-Speed Rail AuthorityLos Angeles to San Diego via the Inland Empire Section
High-Speed Train ProjectScoping Meeting Fall 2009
HST AlignmentsProgram AlignmentAlternative TWG1 Alignment HST StationsProgram Level Preferred Station LocationsOptional Station Locations
Legend
1TWG = Technical Working Group0 84
Miles
One Station Along Alignment in this General Area
San Diego County
-
LA-SD via the Inland Empire Section Project OverviewScoping Meeting Fall 2009Scoping Meeting Fall 2009
Description 2009 2010 2011 2012 2013Description 2009 2010 2011 2012 2013
Notice of Intent/Notice of Preparation (NOI/NOP)
Scoping ProcessScoping Meetings *We are here
Alternatives Analysis
Draft Project Description
15% Engineering
E i t l T h i l R tEnvironmental Technical Reports
Draft Environmental Impact Report/Environmental Impact Statement (EIR/EIS)Selection of Preferred Alignment Alternatives and Station Locations
30% Engineering30% Engineering
Final EIR/EIS
Record of Decision/Notice of Determination (ROD/NOD)
-
HST Project Environmental Process
Scoping Meeting 2009Scoping Meeting 2009
Los Angeles to San Diego via the Inland Empire HST ProjectEnvironmental Impact Report/
Environmental Impact Statement (EIR/EIS)
2009 2013Environmental Impact Statement (EIR/EIS)
Project D fi iti
Public Scoping
Meetings
DefinitionPreliminary Engineering Design
Environmental
FinalEIR/EIS
(NOD/ROD)
AlternativesAnalysisProcess
DraftEIR/EIS
PUBLICCOMMENT
Studies
*We are here
Ongoing Community & Agency Meetings, Outreach, Communicationsg g y g y g , ,
-
Alternatives AnalysisScoping Meeting Fall 2009
Initial Development
of
Revise Initial
Developmentof
Alternatives
PMT/Authority/FRA/AG
Prepare Alternatives
Analysis
Conduct Outreach
to Agencies
EarlyOutreach
to Agencies
Prepare Alternatives
Analysis of Alternatives
AlternativesAA Report
Section
/ G
ReviewReport Agencies
and Public
g
and Public(AA) Final
Report
Make Presentation to CAHSRA
Board
Prepare Draft
Project
Description
Conduct Project
Alternatives Staff Workshop
Ongoing Agency Coordination: Southern California Association of Governments, San Bernardino Associated Governments, Riverside County Transportation Commission, San Diego Association of Governments San Diego County Regional Airport Authority and Metro (SOCAL ICG)
p
Governments, San Diego County Regional Airport Authority, and Metro (SOCAL ICG)
-
Alternatives Analysis2009 2010
Scoping Meeting Fall 2009Scoping Meeting Fall 2009
Alternatives Analysis Evaluation Measures
Travel Time Operations Community Disruption / Impacts Community Disruption / Impacts Capital and Operating Costs Constructability Intermodal Connections Intermodal Connections Development Potential Property Impacts Right-of-Way ConstraintsRight of Way Constraints Environmental Constraints / Impacts
-
Areas of Environmental Analysis
Scoping Meeting Fall 2009Scoping Meeting Fall 2009
Transportation Air Quality
Socioeconomics, Communities & Environmental Justice Air Quality
Noise & Vibration Electromagnetic Interference/
Environmental Justice Local Growth, Station Planning,
Land Use, & Propertyg /Electromagnetic Frequency
Public Utilities & EnergyBi l i l R &
Agricultural Land Impacts Parks, Recreation and Open Space Aesthetics & Visual Quality Biological Resources &
Wetlands Hydrology & Water Resources
Aesthetics & Visual Quality Cultural Resources Construction Methods and Impacts
Geology, Soils, Seismicity Hazardous Materials/Wastes
S f t & S it
p Cumulative and Secondary Impacts Section 4(f) & 6(f) Evaluation
Safety & Security
-
Key Environmental IssuesScoping Meeting Fall 2009p g g
What key issues will be addressed in the EIR/EIS?
Historical and Cultural Resources, including Native American Consultation
Community Character visual land use and noise compatibility Community Character visual, land use, and noise compatibility Environmental Justice Hydrology/Water Resources
Bi l i l R i l di W tl d Biological Resources including Wetlands Wildlife Habitat and Movement Corridors Connectivity with Other Modes of Travel Power Supply/Energy Requirements Right-of-Way Constraints Safety and Security
-
Governors CommentsScoping Meeting Fall 2009
Comments from Governor Schwarzenegger at the October 7 High-Speed Train Rally at Los Angeles Union StationHigh Speed Train Rally at Los Angeles Union Station
Video inserted here. Video available on the project website.p j
-
High-Speed TrainsAround the World
Scoping Meeting Fall 2009Scoping Meeting Fall 2009
Video "Around the World" inserted here. Video available on the project website.
-
HST MilestonesScoping Meeting Fall 2009
1996 CA High-Speed Rail Authority created
2000 Investment-grade forecasts of ridership, revenue, cost & g p, ,benefits, Business Plan
2001-2005 Program-level EIR/EIS process
2005 CHSRA B d d FRA i R d f D i i S id2005 CHSRA Board and FRA issue Record of Decision on Statewide Program-Level EIR/EIS
2007 LA-SD via the Inland Empire Section begins alternatives development with planning and transportation agency input
2008 CHSRA Board approves revised Business Plan
2008 California voters approve Prop 1A $9 95B bond2008 California voters approve Prop. 1A - $9.95B bond
2009 Federal ARRA grant program begins: potential $8B in funding
2009 LA-SD via the Inland Empire Section begins Project EIR/EIS2009 LA SD via the Inland Empire Section begins Project EIR/EIS process
-
LA-SD via the Inland Empire Section Project OverviewScoping Meeting Fall 2009Scoping Meeting Fall 2009
Description 2009 2010 2011 2012 2013Description 2009 2010 2011 2012 2013
Notice of Intent/Notice of Preparation (NOI/NOP)
Scoping ProcessScoping Meetings *We are here
Alternatives Analysis
Draft Project Description
15% Engineering
E i t l T h i l R tEnvironmental Technical Reports
Draft Environmental Impact Report/Environmental Impact Statement (EIR/EIS)Selection of Preferred Alignment Alternatives and Station Locations
30% Engineering30% Engineering
Final EIR/EIS
Record of Decision/Notice of Determination (ROD/NOD)
-
California High-Speed Train Visual Tour
Scoping Meeting Fall 2009Scoping Meeting Fall 2009
Video "Visual Tour" inserted here. Video available on the project website.
-
HST Project Environmental Process
Scoping Meeting 2009Scoping Meeting 2009
Los Angeles to San Diego via the Inland Empire HST ProjectEnvironmental Impact Report/
Environmental Impact Statement (EIR/EIS)
2009 2013Environmental Impact Statement (EIR/EIS)
Project D fi iti
Public Scoping
Meetings
DefinitionPreliminary Engineering Design
Environmental
FinalEIR/EIS
(NOD/ROD)
AlternativesAnalysisProcess
DraftEIR/EIS
PUBLICCOMMENT
Studies
*We are here
Ongoing Community & Agency Meetings, Outreach, Communicationsg g y g y g , ,
-
Alternatives AnalysisScoping Meeting Fall 2009
Initial Development
of
Revise Initial
Developmentof
Alternatives
PMT/Authority/FRA/AG
Prepare Alternatives
Analysis
Conduct Outreach
to Agencies
EarlyOutreach
to Agencies
Prepare Alternatives
Analysis of Alternatives
AlternativesAA Report
Section
/ G
ReviewReport Agencies
and Public
g
and Public(AA) Final
Report
Make Presentation to CAHSRA
Board
Prepare Draft
Project
Description
Conduct Project
Alternatives Staff Workshop
Ongoing Agency Coordination: Southern California Association of Governments, San Bernardino Associated Governments, Riverside County Transportation Commission, San Diego Association of Governments San Diego County Regional Airport Authority and Metro (SOCAL ICG)
p
Governments, San Diego County Regional Airport Authority, and Metro (SOCAL ICG)
-
High-Speed TrainOntario Airport
Scoping Meeting Fall 2009Scoping Meeting Fall 2009
-
Public Participation How to Comment
Scoping Meeting Fall 2009Scoping Meeting Fall 2009
Thank you for attending todays scoping meeting. To provide your input, please (1) fill out a comment sheet and hand it to a staff person, or (2) fill out a comment sheet and leave it in the comment box provided, or (3) provide your comment verbally to the court reporter to be documented.
If you want to comment outside the meeting here is how to provide input:If you want to comment outside the meeting, here is how to provide input:
E-mailed Comments:California High-Speed Rail Authority comments@hsr ca gov
Written Comments: California High-Speed Rail AuthorityMr Dan Leavitt Deputy Director [email protected]
Include in the subject line:LA - SD HST Section via the Inland Empire
Mr. Dan Leavitt, Deputy DirectorAttn: LA - SD HST Project EIR/EIS925 L Street, Suite 1425Sacramento, CA 95814 p,Fax: (916) 322-0827
Comments must be received no later than Friday, November 20, 2009.For more project information visit the authoritys website:
www.cahighspeedrail.ca.gov or phone (909) 627-2974 or (916) 324-1541
-
High-Speed TrainSan Diego
Scoping Meeting Fall 2009Scoping Meeting Fall 2009
-
Bienvenidos
Bienvenidos a la Reunin de Deteccin de Necesidades de la Autoridad del Tren de
Alta Velocidad de California y laAlta Velocidad de California y la Administracin Federal de Ferrocarriles
Otoo de 2009Otoo de 2009
Los Angeles hasta San DiegoLos Angeles hasta San DiegoVa Inland Empire
P t d l T d Alt V l id dProyecto del Tren de Alta Velocidad
-
Proceso de Deteccin de Necesidades
Reunin de Deteccin de Necesidades otoo 2009Reunin de Deteccin de Necesidades, otoo 2009
Objetivos de la reunin de deteccin de necesidadesObjetivos de la reunin de deteccin de necesidades
- Identificar al pblico afectado / inquietudes de la Agencia
- Resumen de los pasos claves en el el proceso ambientalp p
- Identificar las preocupaciones ambientales que sern abordadas en el Documento Ambiental
Periodo de Comentarios termina el 20 de noviembre de 2009
- Recibir comentarios por escritoRecibir comentarios por escrito
- Comentarios va electrnica (Enviar a: [email protected])
- Elaborar un Reporte de las Necesidades Detectadasabo a u epo te de as eces dades etectadas
-
Participacion del PublicoComo dar su comentario
Reunin de Deteccin de Necesidades otoo 2009Reunin de Deteccin de Necesidades, otoo 2009
Gracias por atender la Reunin de Deteccin de Necesidades. Para dar su comentario, por favor (1) llene una tarjeta de comentarios y entrege la a uno de los representantes, o (2) deje su tarjeta en la caja de comentarios o (3) provee su comentario directamente a el reportero de la corte para ser documentado.
Si desea hacer un comentario en otra ocasin aqui es cmo hacer aportaciones:Si desea hacer un comentario en otra ocasin, aqui es cmo hacer aportaciones:
Comentarios por correo electrnico:California High Speed Rail Authority
Comentarios por escrito: California High-Speed Rail AuthorityMr Dan Leavitt Deputy Director California High-Speed Rail Authority
[email protected] en la lnea de asunto:LA - SD HST Section via the Inland
Mr. Dan Leavitt, Deputy DirectorAttn: LA - SD HST Project EIR/EIS925 L Street, Suite 1425Sacramento, CA 95814
Empire,
Fax: (916) 322-0827
Comentarios debern recibirse a ms tardar el 20 de noviembre de 2009.Para ms informacin visite el sitio de web del proyecto:
www.cahighspeedrail.ca.gov o telfono (909) 627-2974 or (916) 324-1541
-
Propsito y NecesidadReunin de Deteccin de Necesidades, otoo 2009
Propsito del Proyecto del Tren de Alta Velocidad Proveer servicio confiable de HST que conecte a las ciudades del Proveer servicio confiable de HST que conecte a las ciudades del
Sur de California, el Valle Central, Sacramento y el rea de la Baha de San Francisco
Proveer viajes rpidos y confiables entre las reas de Los Angeles, Inland Empire y San Diego
Proporcionar tiempos de viaje predecibles y consistentes usando Proporcionar tiempos de viaje predecibles y consistentes usando trenes elctricos con ruedas de acero
Proporcionar mayor acceso y eleccin de modos de transportacin para incrementar la movilidad por toda California
Establecer ubicaciones de estaciones que apoyen el crecimiento inteligente y las conexiones de trnsito multimodalesinteligente y las conexiones de trnsito multimodales
-
Propsito y NecesidadReunin de Deteccin de Necesidades, otoo 2009
Necesidad del Sistema del Tren de Alta Velocidad:
Dar cabida para el crecimiento esperado de la poblacin Satisfacer la demanda entre las regiones de los Condados Satisfacer la demanda entre las regiones de los Condados
de Los Angeles, Inland Empire y San Diego Reducir las crecientes demoras en viajes, consecuencia de
la creciente congestin en las carreteras y aeropuertos del Sur de California
Promover el crecimiento econmico y mejorar la calidad de Promover el crecimiento econmico y mejorar la calidad de vida y la calidad del aire en y alrededor de las reas metropolitanas del Sur de California
Reducir o minimizar la congestin e incrementar la movilidad
-
Qu son los Trenes de Alta Velocidad?
Reunin de Deteccin de Necesidades otoo 2009Reunin de Deteccin de Necesidades, otoo 2009
Trenes de pasajeros entre ciudades con capacidad deciudades con capacidad de alcanzar velocidades mximas de 220 millas por hhora
Vas separadas de las calles Prototipo CHSRApy carreteras
Tecnologa comprobada
Otros HST alrededor del mundo
Tecnologa comprobadaSegura y confiable
Operando exitosamente en Intercity Express,
AlemaniaTGV, Francia
toda Europa y AsiaShinkansen, Japn
-
Tiempos de Viaje del Tren de Alta Velocidad
Reunin de Deteccin de Necesidades otoo 2009
Servicio hasta a 220 mph, conectando: Sur de California
Reunin de Deteccin de Necesidades, otoo 2009
Sur de California Valle Central rea de la Baha de San Francisco
San Francisco (Transbay) :30 1:53 1:20 2:38 2:57 3:10 3:56
San Jose :30 1:24 :51 2:09 2:28 2:41 3:27
Sacramento 1:53 1:24 :59 2:17 2:36 2:49 3:35
Fresno 1:20 :51 :59 1:24 1:43 1:56 2:42
Los Angeles Union Station 2:38 2:09 2:17 1:24 :20 :33 1:18
Anaheim 2:57 2:28 2:36 1:43 :20Anaheim 2:57 2:28 2:36 1:43 :20
Riverside 3:10 2:41 2:49 1:56 :33 :48
San Diego 3:56 3:27 3:35 2:42 1:18 :48
-
Separaciones a DesnivelReunin de Deteccin de Necesidades, otoo 2009
Las separaciones a desnivel son pasos bajo
,
o sobre tierra donde se cruzan vas frreas con carreteras
Las separaciones a desnivel reducen la
Antes
Paso elevado tpico
Antes
Paso inferior tpicocongestin y el ruido, y mejoran la seguridad
Paso elevado tpico
Despus
Paso inferior tpico
Despus
Las vas de Tren de Alta Velocidad de California estarn a desnivel deestarn a desnivel de los cruces con carreteras
-
Secciones Tpicas a lo Largo de la Alineacin
Reunin de Deteccin de Necesidades otoo 2009Reunin de Deteccin de Necesidades, otoo 2009ROW ROW
Intrusion Detection
10-8 16-6 10-8
HSR
Emergency Walkway
10-8 16-6 10-8
HSR
Emergency Walkway
HSR
ROW ROW
Estructura Area
Seccin a Nivel Va Bajo Nivel
Algunas porciones de la alineacin necesitarn estructuras especiales para ajustarse al lugar donde se construyanL d i l iROW ROW
Estructura Area
Las estructuras podran incluir: Estructuras areas (puentes) Tneles Bajo Nivel
ROW ROW65.5
Emergency Walkway
Fire Safe Door
11.5
j Corte de Ladera
Fuente: EIR/EIS del Programa del Tren de Alta Velocidad de CA, 2005
Corte de LaderaTneles de Vas SencillosTipo Twin
-
Estaciones del Tren de Alta Velocidad
Re nin de Deteccin de Necesidades otoo 2009
Crecimiento Inteligente y Desarrollo Orientado al Trnsito
Reunin de Deteccin de Necesidades, otoo 2009
Trnsito Conectividad Intermodal (trnsito, bicicletas y
peatones) Aumentar las oportunidades de conexin tren a avin Apoyar un crecimiento econmico sostenible
-
Sistema Estatal del Tren de Alta Velocidad
Reunin de Deteccin de Necesidades otoo 2009Reunin de Deteccin de Necesidades, otoo 2009
Conexin entre: San Diego Inland Empire Los Angeles Orange County Central Valley rea de la Baha de San
Francisco Sacramento
-
Grupo del Corredor Inland del Sur de California (SOCAL ICG)
Reunin de Deteccin de Necesidades, otoo 2009,
El Grupo del Corredor Inland del Tren de Alta Velocidad de California (SOCAL ICG), fue formado por un Memorando de Entendimiento (MOU) entre la CHSRA y la Asociacin de Gobiernos del Sur de California, la Asociacin de Gobiernos de San Diego, la Asociacin
de Gobiernos de San Bernardino, la Comisin de Transportacin del Condado de Riverside, la Autoridad del Aeropuerto Regional del Condado de San Diego y Metro.
Los comentarios del SOCAL ICG incluyen: Conformar Grupos de Trabajo Tcnico (TWGs) en los
condados de Los Angeles, Riverside, San Bernardino ycondados de Los Angeles, Riverside, San Bernardino y San Diego para prestar asistencia a la CHSRA en el refinamiento del programa de alineacin LA-SD adoptado en 2005
Identificacin de alternativas de alineacin del Identificacin de alternativas de alineacin del proyecto adicionales y opciones de ubicacin de las estaciones para ser estudiadas en el EIR/EIS del proyecto LA-SD
-
Los Angeles to San Diegovia the Inland Empire Section
California High-Speed Rail AuthorityLos Angeles to San Diego via the Inland Empire Section
High-Speed Train ProjectScoping Meeting Fall 2009
Section Overview
RIVERSIDE COUNTY
ORANGE COUNTY
SAN DIEGO COUNTY
I-15 I-215
To Palmdale
To Anaheim
SANBAG2/MetrolinkMetro/Metrolink
Holt Avenue
I-10
SR-60
EscondidoEscondido Option
(Transit Center)
University City Option
San Diego
LOS ANGELES COUNTY SAN BERNARDINO COUNTY
Murrieta OptionMurrieta
Corona OptionRiverside
Riverside Option
Riverside Option(March Air
Reserve Base)
San BernardinoOption
Ontario Airport
SGV Option(Pomona)
SGV1 Option (West Covina)SGV Option (El Monte)
SGV Option (Cal Poly)
SGV (Industry)
Los Angeles
San Diego Option(Lindbergh Field)
I-605Union Pacific Railroad
Union Pacific Railroad Adjacent
University CityHST AlignmentsProgram AlignmentAlternative TWG3 Alignment HST StationsProgram Level Preferred Station LocationsOptional Station Locations
Legend
1SGV = San Gabriel Valley2SANBAG = San Bernardino Associated Governments3TWG = Technical Working Group
0 147
Miles
-
SGV (Industry)
Los Angeles
LOS ANGELES COUNTY
SAN BERNARDINO COUNTY
ORANGE COUNTY
I-10
Union Pacific RailroadUnion Pacific Railroad
I-605SR-60
Union Pacific Railroad Adjacent
To Palmdale
To Anaheim
Holt Avenue
Metro/Metrolink
SGV Option (West Covina)
SGV1 Option (El Monte)
SGV Option (Pomona)SGV Option (Cal Poly)
Legend
0 42
Miles
1SGV = San Gabriel Valley2TWG = Technical Working Group
HST AlignmentsProgram AlignmentAlternative TWG2 Alignment HST StationsProgram Level Preferred Station LocationsOptional Station LocationsOne Station Along Alignment in this General Area
California High-Speed Rail AuthorityLos Angeles to San Diego via the Inland Empire Section
High-Speed Train ProjectScoping Meeting Fall 2009
Los Angeles to San Diegovia the Inland Empire Section Los Angeles County
-
SGV1 Option (Pomona) Ontario Airport
San Bernardino Option
Riverside Option Riverside
Riverside Option(March Air Reserve Base)
SAN BERNARDINO COUNTY
I-215
I-15
Union Pacific Railroad
Milliken Ave
Holt Avenue
Metro/MetrolinkSANBAG/Metrolink
RIVERSIDE COUNTY
LOS ANGELES COUNTY
March AirReserve Base
HST AlignmentsProgram AlignmentAlternative TWG2 Alignment HST StationsProgram Level Preferred Station LocationsOptional Station Locations
Legend
1SGV = San Gabriel Valley2TWG = Technical Working Group
0 42
Miles
One Station Along Alignment in this General Area
Los Angeles to San Diegovia the Inland Empire Section
California High-Speed Rail AuthorityLos Angeles to San Diego via the Inland Empire Section
High-Speed Train ProjectScoping Meeting Fall 2009
San Bernardino County
-
Riverside
Murrieta
RIVERSIDE COUNTY
SAN BERNARDINO COUNTY
ORANGE COUNTY
SAN DIEGO COUNTY
I-15
I-15
I-215
March Air Reserve BaseCorona
Los Angeles to San Diegovia the Inland Empire Section
California High-Speed Rail AuthorityLos Angeles to San Diego via the Inland Empire Section
High-Speed Train ProjectScoping Meeting Fall 2009
Riverside County
HST AlignmentsProgram AlignmentAlternative TWG1 Alignment HST StationsOne Station Along Alignment in this General Area
Legend
1TWG = Technical Working Group0 52.5
Miles
MaReCorona
-
Escondido
Carroll Canyon
Miramar Road
University CityUniversity City Option
San Diego Option (Lindbergh Field)
San Diego
Escondido Option (Transit Center)
RIVERSIDE COUNTY
SAN DIEGO COUNTY
I-15
Los Angeles to San Diegovia the Inland Empire Section
California High-Speed Rail AuthorityLos Angeles to San Diego via the Inland Empire Section
High-Speed Train ProjectScoping Meeting Fall 2009
HST AlignmentsProgram AlignmentAlternative TWG1 Alignment HST StationsProgram Level Preferred Station LocationsOptional Station Locations
Legend
1TWG = Technical Working Group0 84
Miles
One Station Along Alignment in this General Area
San Diego County
-
Visin General del Proyecto de la Seccin LA-SD va Inland Empire
Reunin de Deteccin de Necesidades otoo 2009Reunin de Deteccin de Necesidades, otoo 2009
Descripcin 2009 2010 2011 2012 2013Descripcin 2009 2010 2011 2012 2013
Notificacin de Intencin/Notificacin de Preparacin (NOI/NOP)
Proceso de Deteccin de NecesidadesReuniones de Deteccin de Necesidades *Aqu estamosq
Anlisis de Alternativas
Borrador de la Descripcin del Proyecto
15% Ingeniera
Reportes Tcnicos Ambientales
Borrador del Reporte de Impacto Ambiental/Declaracin de Impacto Ambiental (EIR/EIS)Seleccin de las Alternativas Preferidas de Alineacin del Proyecto y Ubicacin de las Estaciones
30% Ingeniera
EIR/EIS Final
Registro de Decisin/Notificacin de Determinacin (ROD/NOD)
-
Proceso Ambiental del Proyecto del HST
Reunin de Deteccin de Necesidades otoo 2009Reunin de Deteccin de Necesidades, otoo 2009
Reporte de Impacto Ambiental del Proyecto del HST desde Los Angeles hasta San Diego va Inland Empire/Declaracin
de Impacto Ambiental (EIR/EIS)
2009 2013de Impacto Ambiental (EIR/EIS)
R iDefinicin del P tReuniones
Pblicas de Deteccin
de Necesidades
ProyectoDiseo Preliminar de Ingeniera
Estudios
EIR/EIS(NOD/ROD)
Final
Proceso de Anlisis de
Alternativas
Borradores del
EIR/EIS
Comentario Pblico
NecesidadesAmbientales
*Estamos aqu
Reuniones Comunitarias y de la Agencia en Curso, Acercamiento a la Comunidad ComunicacionesComunidad, Comunicaciones
-
Anlisis de AlternativasReunin de Deteccin de Necesidades, otoo 2009
DesarrolloInicial del i
Revisin delDesarrollo
Inicial de laSeccin del
RevisinPMT/
Autoridad/
Preparar Reporte de Anlisis de
Realizar Acerca-
miento a
AcercamientoInicial a lasAgencias y
Preparar el Reporte Final de
Anlisis deAlternativas Reporte deAnlisis de
Alternativas
Autoridad/FRA/AG Alternativas Agencias
y al Pblico
g y
al PblicoAnlisis de
Alternativas
(AA)
Presentacin para la Junta
de CAHSRA
Preparar Borrador de la
Descripcin
del Proyecto
Realizar Taller de Trabajo sobre las
Alternativas del Proyecto
Coordinacin en Curso de las Agencia: Asociacin de Gobiernos del Sur de California, Gobiernos Asociados de San Bernardino, Comisin de Transportacin del Condado de Riverside, Asociacin de Gobiernos de San Diego Autoridad del Aeropuerto Regional de San Diego y Metro (SOCAL ICG)
ydel Proyecto
Gobiernos de San Diego, Autoridad del Aeropuerto Regional de San Diego, y Metro (SOCAL ICG)
-
Anlisis de Alternativas2009 2010
Reunin de Deteccin de Necesidades otoo 2009Reunin de Deteccin de Necesidades, otoo 2009
Medidas de Evaluacin del Anlisis de Alternativas
Tiempo de viaje Operaciones Trastorno/impactos en la comunidad Trastorno/impactos en la comunidad Costos de capital y operativos Viabilidad de la construccin Conexiones intermodales Conexiones intermodales Potencial de la construccin Impactos en las propiedades Limitaciones al derecho de vaLimitaciones al derecho de va Trastorno/impactos ambientales
-
Areas of Environmental Analysis
Reunin de Deteccin de Necesidades otoo 2009Reunin de Deteccin de Necesidades, otoo 2009
Transportacin Calidad del Aire
Socioeconmico, comunidades y justicia ambiental
Ruido y vibracin Interferencia
electromagntica/frecuencia
justicia ambiental Crecimiento local, planeacin de
estaciones, uso de tierras y propiedadI t l ti i ltelectromagntica/frecuencia
electromagntica Servicios pblicos y energa
bi l i
Impacto en las tierras para agricultura Parques, recreacin y espacios
abiertos Recursos biolgicos y
humedales Hidrologa y recursos acuferos
Calidad esttica y visual Recursos culturales Mtodos de construccin e impactos
Geologa, suelos, sismicidad Materiales/desperdicios
peligrosos
Mtodos de construccin e impactos Impactos acumulativos y secundarios Evaluacin de las Secciones 4(f) y
(f)peligrosos Seguridad
6(f)
-
Asuntos ambientales ClaveReunin de Deteccin de Necesidades, otoo 2009,
Qu asuntos clave sern abordados en el EIR/EIS?
Recursos histricos y culturales, incluyendo Consultas con los Nativos Americanos
Carcter comunitario compatibilidad visual de uso de tierras y Carcter comunitario compatibilidad visual, de uso de tierras y ruido
Justicia ambiental Hidrologa y recursos acuferos Hidrologa y recursos acuferos Recursos biolgicos, incluyendo humedales Hbitat de vida salvaje y corredores de movimiento
C ti id d t d d i j Conectividad con otros modos de viajar Requerimientos de suministro energtico/energa Limitaciones al derecho de va Seguridad
-
Comentarios del GobernadorReunin de Deteccin de Necesidades, otoo 2009
Comentarios del Gobernador Schwarzenegger en la concentracin del Tren de Alta Velocidad del 7 de octubre en laconcentracin del Tren de Alta Velocidad del 7 de octubre, en la
estacin Union Station de Los Angeles
Vdeo disponible por separado en el sitio web del proyectop p p p y
-
Trenes de Alta Velocidad Alrededor del Mundo Reunin de
D t i d N id d t 2009Deteccin de Necesidades, otoo 2009
Vdeo "Alrededir del Mundo" insertado aqu. Vdeo disponible por separado en el sitio web del proyectop p p p y
-
Etapas Clave del HSTReunin de Deteccin de Necesidades, otoo 2009
1996 Creacin de la Autoridad Tren de Alta Velocidad de CA
2000 Plan de Negocio detallado que incluye volumen de pasajeros, b fingresos, costo y beneficios
2001-2005 Proceso del EIR/EIS integral del programa
2005 Junta de CHSRA y la FRA emiten Registro de Decisin sobre2005 Junta de CHSRA y la FRA emiten Registro de Decisin sobre el EIR/EIS integral del programa estatal
2007 La Seccin LA-SD va Inland Empire comienza el desarrollo de alternativas con aportes de la agencia de planeacin y p g p ytransportacin
2008 Junta de HSRA aprueba el Plan de Negocio revisado
2008 Los votantes de California aprueban la Prop 1A bono2008 Los votantes de California aprueban la Prop. 1A - bono estatal de $9.95B
2009 Comienza programa de subsidio Federal ARRA: potencialmente $8B de financiacinpotencialmente $8B de financiacin
2009 Comienza el proceso de EIR/EIS de proyecto de la Seccin LA-SD va Inland Empire
-
Vistazo al Proyecto de la Seccin LA-SD va Inland Empire
Reunin de Deteccin de Necesidades otoo 2009Reunin de Deteccin de Necesidades, otoo 2009
Descripcin 2009 2010 2011 2012 2013Descripcin 2009 2010 2011 2012 2013
Notificacin de Intencin/Notificacin de Preparacin (NOI/NOP)
Proceso de Deteccin de NecesidadesReuniones de Deteccin de Necesidades *Aqu estamosq
Anlisis de Alternativas
Borrador de la Descripcin del Proyecto
15% Ingeniera
Reportes Tcnicos Ambientales
Borrador del Reporte de Impacto Ambiental/Declaracin de Impacto Ambiental (EIR/EIS)Seleccin de las Alternativas Preferidas de Alineacin del Proyecto y Ubicacin de las Estaciones30% Seleccin de las Alternativas Preferidas de Alineacin30% Seleccin de las Alternativas Preferidas de Alineacin del Proyecto y Ubicacin de las Estaciones
EIR/EIS Final
Registro de Decisin/Notificacin de Determinacin (ROD/NOD)
-
Tour Visual del Tren de Alta Velocidad de California Reunin de
Deteccin de Necesidades otoo 2009Deteccin de Necesidades, otoo 2009
Vdeo "Tour Visual" insertado aqu. Vdeo disponible por separado en el sitio web del proyectop p y
-
Proceso Ambiental del Proyecto del HST
Reunin de Deteccin de Necesidades otoo 2009Reunin de Deteccin de Necesidades, otoo 2009
Reporte de Impacto Ambiental del Proyecto del HST desde Los Angeles hasta San Diego va Inland Empire/Declaracin de Impacto Ambiental (EIR/EIS)
2009 2013de Impacto Ambiental (EIR/EIS)
R iDefinicin del P tReuniones
Pblicas de Deteccin
de Necesidades
ProyectoDiseo Preliminar de Ingeniera
Estudios
EIR/EIS(NOD/ROD)
Final
Proceso de Anlisis de
Alternativas
Borradores del
EIR/EIS
Comentario Pblico
NecesidadesAmbientales
*Estamos aqu
Reuniones Comunitarias y de la Agencia en Curso, Acercamiento a la Comunidad ComunicacionesComunidad, Comunicaciones
-
Anlisis de AlternativasReunin de Deteccin de Necesidades, otoo 2009,
DesarrolloInicial del i
Revisin delDesarrollo
Inicial de laSeccin del
RevisinPMT/
Autoridad/
Preparar Reporte de Anlisis de
Realizar Acercamie
nto a
AcercamientoInicial a lasAgencias y
Preparar el Reporte Final de
Anlisis deAlternativas Reporte deAnlisis de
Alternativas
Autoridad/FRA/AG Alternativas Agencias
y al Pblico
g y
al PblicoAnlisis de
Alternativas
(AA)
Presentacin para la Junta
de CAHSRA
Preparar Borrador de la
Descripcin
del Proyecto
Realizar Taller de Trabajo sobre las
Alternativas del Proyecto
Coordinacin en Curso de las Agencia: Asociacin de Gobiernos del Sur de California, Gobiernos Asociados de San Bernardino, Comisin de Transportacin del Condado de Riverside, Asociacin de Gobiernos de San Diego Autoridad del Aeropuerto Regional de San Diego y Metro (SOCAL ICG)
ydel Proyecto
Gobiernos de San Diego, Autoridad del Aeropuerto Regional de San Diego, y Metro (SOCAL ICG)
-
Tren de Alta VelocidadAeropuerto de Ontario Reunin de
Deteccin de Necesidades otoo 2009Deteccin de Necesidades, otoo 2009
-
Participacion del PublicoComo dar su comentario
Reunin de Deteccin de Necesidades otoo 2009Reunin de Deteccin de Necesidades, otoo 2009
Gracias por atender la Reunin de Deteccin de Necesidades. Para dar su comentario, por favor (1) llene una tarjeta de comentarios y entrege la a uno de los representantes, o (2) deje su tarjeta en la caja de comentarios o (3) provee su comentario directamente a el reportero de la corte para ser documentado.
Si desea hacer un comentario en otra ocasin aqui es cmo hacer aportaciones:Si desea hacer un comentario en otra ocasin, aqui es cmo hacer aportaciones:
Comentarios por correo electrnico:California High Speed Rail Authority
Comentarios por escrito: California High-Speed Rail AuthorityMr Dan Leavitt Deputy Director California High-Speed Rail Authority
[email protected] en la lnea de asunto:LA - SD HST Section via the Inland
Mr. Dan Leavitt, Deputy DirectorAttn: LA - SD HST Project EIR/EIS925 L Street, Suite 1425Sacramento, CA 95814
Empire,
Fax: (916) 322-0827
Comentarios debern recibirse a ms tardar el 20 de noviembre de 2009.Para ms informacin visite el sitio de web del proyecto:
www.cahighspeedrail.ca.gov o telfono (909) 627-2974 or (916) 324-1541
-
Tren de Alta VelocidadSan Diego Reunin de Deteccin de
Necesidades otoo 2009Necesidades, otoo 2009
20091020143324_ScopingMeetingBoards_English20091016122234_ScopingMeetingBoards_English_part1HSR_SDLAoverall_BOARD_v2HSR_LosAngeles_BOARD_altversionHSR_SanBernardino_BOARD_altversionHSR_Riverside_BOARD_altversionHSR_SanDiego_BOARD_altversion20091016122234_ScopingMeetingBoards_English_part2
20091020144239_ScopingMeetingBoards_Spanish20091016122432_ScopingMeetingBoards_Spanish_part1HSR_SDLAoverall_BOARD_v2HSR_LosAngeles_BOARD_altversionHSR_SanBernardino_BOARD_altversionHSR_Riverside_BOARD_altversionHSR_SanDiego_BOARD_altversion20091016122432_ScopingMeetingBoards_Spanish_part2