portfolio remi buscot en
DESCRIPTION
ÂTRANSCRIPT
PORTFOLIORémi Buscot
PORTFOLIO
School
Internship - Workshops
Models
1
19
24
1
2
School
Neo Industrial
Ocean is calling
Public building
Checkmate
The wacken district Urban Infill
3
5
7
11
13
15
They are many aban-donned industrial buil-dings in some neighbou-rhoods in Mulhouse. The aim of my project was to develop a housing concept, that would make the best use of the typolo-gy of this old industrial buil-ding, to turn it in a liveable housing complex. This com-plex should dynamise the neighbourhood again, and through its relation to the street , encourage people to live together as a community. I developped a game between the old and new fassade in order to give life back to this buil-ding and its street.
Neo-IndustrialHousing concept
3
4
Ocean is calling
A bridge to the ocean
5
6
Public building
7
For this project I designed a building-pu-blic space. This one is made out of boxes that contain different programs and are shaping the public spaces. The proxi-mity of these is beneficial for both of them. The spaces are very various, alternately very open and grand or small and cosy.
between public and private space
8
Public building
9
What if public spaces would became a game? By inserting an ur-ban furniture set that could be used as a chess set, this one would highlight the game of relations between the different pieces that, as time goes by, evolve just like the relations between the people that would use them..
Checkmate
11
Urban furniture
12with Carl Latulippe-Hébert
13
The wacken districta new urban landscape
In this exercise we had to find a new identity for the Wacken district. Our will was to create a new urban landscape closer to our conception of what public spaces should be like nowadays. Therefore we tried to create a lot of interactions between the buildings and the public spaces. We also wanted to offer various kind of spaces, always easy to appropriate. For that we studied the work of Rem Koolhaas and Bernard Tschumi to finally create a urban landscape based on the two tram stops.
14with Clément Gay
Here, the exercise was about constructing in a «hollow tooth», a land of plot stuck between two existing buil-dings in a dense and historical context. This context is marked by his history and there are plenty of old half-timbered houses. My proposition is based on two shapes, a house shape as well as a cube, a more modern form. The aim is to enlarge the border between private and public space in order to live in it.
constructing in a dense and historical contextURBAN INFILL
15
16
Technical documents
Plaques de béton ciré
Plaques de béton ciré
Plaques de béton ciré
Plaques de béton ciré
Couvertine en zincDescente d'EP en zinc
±0,000 Rez-de-chaussée
+3,201 1er Etage PRO
+6,402 2eme étage
+9,603 Etage
+12,804 Toiture
+12,805 façade
Plaques de béton ciré
Plaques de béton ciré
Plaques de béton ciré
Plaques de béton ciré
Couvertine en Zinc Descente d'EP en zinc
62/45
Echelle(s) :
N° de plan:
N° de projet :
Dim. plan :
Nom du plan:
Date :
Auteur :
Adresse :
Maître d'ouvrage :
#IDMp
Jacques Orth, Richard Normand et Alexandre Grutter
Construction d'une résidence hôtelière7, rue Erckmann Chatrian67000 Strasbourg
:
Révision :Phase de projet:
#Nom du Sous-ensemble
(7257)Rémi BuscotArchitectes & Associates
LOGO
Architecte
C:\Users\Standard\Desktop\residence façade.pln
09/01/2013
Façade Pro 1/50
17
Echelle(s) :
N° de plan:
N° de projet :
Dim. plan :
Nom du plan:
Date :
Auteur :
Adresse :
Maître d'ouvrage :
EXE-08
Jacques Orth, Richard Normand et Alexandre Grutter
Construction d'une résidence hôtelière7, rue Erckmann Chatrian67000 Strasbourg
:
Révision :Phase de projet:
EXECUTION
(7257)Rémi BuscotArchitectes & Associates
LOGO
Architecte
C:\Users\Utilisateur\Desktop\MMO\residence façade.pln
05/03/2013
AXONOMETRIE PRO 1/50
chape béton + résine aspect béton ciré(épaisseur 5mm type terra clean)
isolant incompressible(polyfoam c350)
dalle(béton armé)
suspente (tige filetée ou autres)
Panneau-bande en suspension directe
rails métalliques
Corian épaisseur 13mm
vide
Complexe isolant (laine de verre + pare-pluie)
équerre de soutien
tableaux de fenêtres en corian
fenêtre double vitrage(sans appui, surépaisseur du dormant)
plaque de BA 13
rebord en BA 13
isolation polyuréthane haute densité
surépaisseur du cadre
joint creux
joint creux
dalle sur plot
corian épaisseur 13mm
rail métallique
vide
complexe isolant (laine de verre+ pare -pluie)
couvertine
5010
0134
120
280
1005
5010
08050
10049
150
15025
512
028
0
1005
5010
08050
10049
150
15045
280
280
2305
5028
0385
5028
04050
280
7605
1020
070
555
70
340
1021
010
20
110
103580
3510
925
90
885
5615
180
149
130 19
115
514
913
0 191
2135
482 557 265 5145 978
102051
19593
10 511945935
10
10 22010
100
1092
19173
18
745 80210
1051065
130100
10100
1301065
105
80210
77510100
1301065
105
80775
35 2010
69 5
19 575
43 5
20 33 41 510
122 5 150
74 5
20 56583180
10505104991835
18
50120
150580
6080
1615
50120
228580 15650120
216 2775190
13035 80 35
10
11020
64 60 558 517
2016 5
59 540 64
20
80
351034
10 5
1035
8035101035
8035
10
8060
8054
080
6485
5010
041
5
150
290
4545
105010
45
451050
1022
53531
5
6060
5995 10
4040
3531
560 60
5995
10
40
37
37
46 546 5
110
80210
5080210
100
110
100
100
100 100
100 10
586 10
010
0 100
100 100
100 100
100 100
100 10
0
80
90100
100100
100100
20 102
100 100100 100
100 10066 5
518 512 5155 5145
90°
130°
140,00°
140,
00°
140,
00°50
°
A14
A14
A15
A15
A16
A16
A17
A17
Sud39
oues
t
GT
logement type C
65m²
logement type A'
25m²logement type A'
25m² logement type A'
25m²
logement type A
25m
logement type A
25m
ASC
limite de propriété
WC Handicapés
WC Handicapés
circulation
GT
A B
1
2
GTGT
JD (4cm)
JD (4cm)
circulation
circulation
GT GT GT
GT
GT
GT
GT
Zone sélectionnée pour l'axonométrie
Lignes cachéesderrière la cloison(traits cachés)
Fauxplafond
12-1
12-1
42-1
12-1
12-1
32-1
coupe A1 coupe A1
logement type A'
25m²logement type A'
25m²
GT
Eau chaude
Eau froide
Eaux vannes(diamètre 100 mm)
12-1
12-1
32-1
32-1
12-1 32-1
42-1
During our study we learned to use different softwares to draw technical documents for the construction planing. Here are a couple drawings I did for a hotel projet.
18
Last summer I did a 3 mon-ths internship in a japanese firm: Mikan Gûmi. During this time I have been working on several projects at different steps, sometimes doing models, some other times creating renders. I also participated on a national competition for a city hall. This experience brought me a lot and I was pleased to discover the japanese culture.
19
INTERNSHIPMikan Gümi
20
This summer, I participated at the EASA (Euro-pean Association of Students in Architecture). Every summer, students from all over europe gather in one city to work on different projects together. This year I participated with 10 other people to the Paper Pavillion Workshop. It was an amazing expe-rience sharing this work with students from so many different countries. The pavillion itself is inspired by the work of Shi-geru Ban, who worked a lot with cardboard too. As you can see the base is made out of wood and OSB. The rest of it are cardboard tubes that are tighten together with rope, using different knot tech-niques.
EASAPaper pavillion
21
So we decided to build a forest out of plastic bottles. When someone walks through the installation, he makes the bottles move. This movement creates various light effects and sounds. Finally we won the first prize!
A couple months ago, I took part to a workshop that was organised by the Architecture School of Strasbourg. The goal was simple: 5 senses, 3 days, 1material. We had to build an installation out of plastic bottles that would play with our senses. Our concept was inspired by the work of Soto and Ishigami. «Mori» means in japanese «the forest».
WORKSHOPMori_the forest
23
The «charettes» are a very special time during the year. This one last one month, the month of september. During this time every stu-dents of every year are working together to help the students who are graduating to make the models and the visual documents. This is how the first two years I did the models for the graduating students. Here are a few examples.
17
MODELS
18
[email protected], rue Cuvier 67000 Strasbourg
www.issuu.com