Ponds 6, 7 & 8. Napa Sonoma Marsh Restoration Group Meeting USGS San Pablo Field Station Office, Building 505, Mare Island September 26, 2006. Presentation. Project Overview Upper Ponds (8 & 7/7A) Goals and Solutions Ponds 6/6A Goals and Solutions Geotechnical Investigation and Survey - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Ponds 6, 7 & 8

Ponds 6, 7 & 8Ponds 6, 7 & 8Napa Sonoma Marsh Napa Sonoma Marsh

Restoration Group MeetingRestoration Group Meeting

USGS San Pablo Field Station Office, Building 505, Mare IslandUSGS San Pablo Field Station Office, Building 505, Mare Island

September 26, 2006September 26, 2006

Page 2: Ponds 6, 7 & 8

Presentation Presentation• Project Overview• Upper Ponds (8 & 7/7A) Goals and Solutions• Ponds 6/6A Goals and Solutions• Geotechnical Investigation and Survey• Schedule

Page 3: Ponds 6, 7 & 8

Location MapLocation Map

Page 4: Ponds 6, 7 & 8

Existing ConditionsExisting Conditions

• Situated on former Napa River floodplain

• Current Flow from Pond 8 to Ponds 7/7A to Ponds 6/6A

• Pond 7 Bittern

Page 5: Ponds 6, 7 & 8

Goals:• Perimeter Levee Improvement• Internal Levee Improvement (wave run-up)• Reduce Pond 7 Salinity to Acceptable Level

– Mix Pond 7 Bittern with Tidal Flows in Mixing Chamber– Increase Tidal Flows to Mixing Chamber

• New Outfall for Mixing Chamber Discharge into Napa Slough

Upper Ponds (8 & 7/7A) SystemUpper Ponds (8 & 7/7A) System

Page 6: Ponds 6, 7 & 8

Solution Options:Option 1:

• Increase Flow to Pond 8 From Mud Slough

• Improve System to Allow Increased Flows to Mixing Chamber

Option 2:

• Find Alternate Source for Mixing Chamber Source Water– Mud Slough Finger Into Pond 7A

Upper Ponds (8 & 7/7A) SystemUpper Ponds (8 & 7/7A) System

Page 7: Ponds 6, 7 & 8

Design Components:• Perimeter Levee Improvement• Internal Levee Improvement• Mixing Chamber Design• New Discharge Pipe/Control Structure at Napa Slough• New System to Increase Tidal Flows to Mixing Chamber

Upper Ponds (8 & 7/7A) SystemUpper Ponds (8 & 7/7A) System

Page 8: Ponds 6, 7 & 8

Goals:• Perimeter Levee Improvement• Internal Levee Improvement• Demolish Siphon from Ponds 7/7A• Decrease Residence Time (one week)

Ponds 6/6APonds 6/6A

Page 9: Ponds 6, 7 & 8

Options:• New Intake from Napa Slough• New Intake/Outfall at China Slough (south side)• New Control Structure through Internal Levee• Outfall to Devil’s Slough• Outfall to Little Island Farms

Ponds 6/6APonds 6/6A

Page 10: Ponds 6, 7 & 8

Design Components:• Perimeter Levee Improvement• Raise Internal Levee & Fix Breach• Demolish Siphon from Ponds 7/7A• New Systems to Improve Residence Time

Ponds 6/6APonds 6/6A

Page 11: Ponds 6, 7 & 8

Geotechnical:• Levee Walk to Assess Conditions

• Geotechnical Scope for Upcoming Investigation

Survey:• Field Survey to obtain Bathymetry and Topography for

Design

Geotechnical and Survey ScopeGeotechnical and Survey Scope

Page 12: Ponds 6, 7 & 8

Geotechnical Investigation Pond 8

Geotechnical Investigation Pond 8

Page 13: Ponds 6, 7 & 8

Geotechnical Investigation Pond 7/7A

Geotechnical Investigation Pond 7/7A

Page 14: Ponds 6, 7 & 8

Geotechnical Investigation Pond 6/6A

Geotechnical Investigation Pond 6/6A

Page 15: Ponds 6, 7 & 8

• Finalize Geotechnical and Survey Scope• Alternatives Analyses• Complete Geotechnical Investigation• Complete Survey• Plans to 50% - February 2007

Ongoing TasksOngoing Tasks