ponds 6, 7 & 8
DESCRIPTION
Ponds 6, 7 & 8. Napa Sonoma Marsh Restoration Group Meeting USGS San Pablo Field Station Office, Building 505, Mare Island September 26, 2006. Presentation. Project Overview Upper Ponds (8 & 7/7A) Goals and Solutions Ponds 6/6A Goals and Solutions Geotechnical Investigation and Survey - PowerPoint PPT PresentationTRANSCRIPT
Ponds 6, 7 & 8Ponds 6, 7 & 8Napa Sonoma Marsh Napa Sonoma Marsh
Restoration Group MeetingRestoration Group Meeting
USGS San Pablo Field Station Office, Building 505, Mare IslandUSGS San Pablo Field Station Office, Building 505, Mare Island
September 26, 2006September 26, 2006
Presentation Presentation• Project Overview• Upper Ponds (8 & 7/7A) Goals and Solutions• Ponds 6/6A Goals and Solutions• Geotechnical Investigation and Survey• Schedule
Location MapLocation Map
Existing ConditionsExisting Conditions
• Situated on former Napa River floodplain
• Current Flow from Pond 8 to Ponds 7/7A to Ponds 6/6A
• Pond 7 Bittern
Goals:• Perimeter Levee Improvement• Internal Levee Improvement (wave run-up)• Reduce Pond 7 Salinity to Acceptable Level
– Mix Pond 7 Bittern with Tidal Flows in Mixing Chamber– Increase Tidal Flows to Mixing Chamber
• New Outfall for Mixing Chamber Discharge into Napa Slough
Upper Ponds (8 & 7/7A) SystemUpper Ponds (8 & 7/7A) System
Solution Options:Option 1:
• Increase Flow to Pond 8 From Mud Slough
• Improve System to Allow Increased Flows to Mixing Chamber
Option 2:
• Find Alternate Source for Mixing Chamber Source Water– Mud Slough Finger Into Pond 7A
Upper Ponds (8 & 7/7A) SystemUpper Ponds (8 & 7/7A) System
Design Components:• Perimeter Levee Improvement• Internal Levee Improvement• Mixing Chamber Design• New Discharge Pipe/Control Structure at Napa Slough• New System to Increase Tidal Flows to Mixing Chamber
Upper Ponds (8 & 7/7A) SystemUpper Ponds (8 & 7/7A) System
Goals:• Perimeter Levee Improvement• Internal Levee Improvement• Demolish Siphon from Ponds 7/7A• Decrease Residence Time (one week)
Ponds 6/6APonds 6/6A
Options:• New Intake from Napa Slough• New Intake/Outfall at China Slough (south side)• New Control Structure through Internal Levee• Outfall to Devil’s Slough• Outfall to Little Island Farms
Ponds 6/6APonds 6/6A
Design Components:• Perimeter Levee Improvement• Raise Internal Levee & Fix Breach• Demolish Siphon from Ponds 7/7A• New Systems to Improve Residence Time
Ponds 6/6APonds 6/6A
Geotechnical:• Levee Walk to Assess Conditions
• Geotechnical Scope for Upcoming Investigation
Survey:• Field Survey to obtain Bathymetry and Topography for
Design
Geotechnical and Survey ScopeGeotechnical and Survey Scope
Geotechnical Investigation Pond 8
Geotechnical Investigation Pond 8
Geotechnical Investigation Pond 7/7A
Geotechnical Investigation Pond 7/7A
Geotechnical Investigation Pond 6/6A
Geotechnical Investigation Pond 6/6A
• Finalize Geotechnical and Survey Scope• Alternatives Analyses• Complete Geotechnical Investigation• Complete Survey• Plans to 50% - February 2007
Ongoing TasksOngoing Tasks
QuestionsQuestions