Project No. WW-000009-007June 9, 2016Noman M. Cole Jr. Pollution Control PlantPohick Creek Restoration Project Phase IMount Vernon District

A Fairfax County, VA, publicationDepartment of Public Works and Environmental ServicesWorking for You!

Pohick Creek Restoration Project Phase I

Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction Branch

Pohick Creek Restoration Project Phase I

Project Overview:Construction of a stacked, imbricated rock wall along the toe of the slope and a bench along the top of the wall Installation of live stakesPlanting that includes native riparian vegetationInstallation of soil lifts for upper bank stabilization

DPWES Project Team:Utilities Design and Construction Division Adil Lhous, Mohamed Madih, Chris Triolo and Howard ChampWastewater Treatment Division Nikta Attar, Eddie TateStormwater Planning Division Sajan PokharelMaintenance and Stormwater Management Division Chad Crawford

Description:The Pohick Creek Restoration Project Phase I, provided earthworks and bank stabilization along Area 1, located on the left bank of Pohick Creek adjacent to the Noman M. Cole, Jr. Pollution Control Plant. This project provided a stream diversion with the use of temporary sandbags adjacent to the creek. Additional requirements included the removal, stockpile, and replacement of the existing Class III rip rap. This project was substantially completed on June 13, 2016.Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction Branch

Project Details

Pohick Creek Restoration Project Phase I9399 Richmond Highway, Lorton, VA 22079 Mount Vernon District, Tax Map No. 108-3

Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction Branch

Pohick Creek Restoration Project Phase I

New Rock Wall Installation Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction Branch

Pohick Creek Restoration Project Phase I

Soil Lifts

Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction Branch

Pohick Creek Restoration Project Phase IFinal Look of the Pohick Creek Restoration Project

Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction Branch

Pohick Creek Restoration Project Phase I

Soil Lifts

Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction Branch

BeforeAfter

Rehabilitation of the Primary Sludge Degritting Facilities and Replacement of MCC-2Irene Haske, Public Information Officer703-324-5821 TTY 711SWPDmail@fairfaxcounty.govCapital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction Branch